Xcel Energy is involved in various litigation matters in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for losses probable of being incurred and subject to reasonable estimation. 
Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories.
In such cases, there is considerable uncertainty regarding the timing or ultimate resolution, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, would have a material effect on Xcel Energy’s consolidated financial statements. Legal fees are generally expensed as incurred.
Gas Trading Litigation e prime is a wholly owned subsidiary of Xcel Energy. e prime was in the business of natural gas trading and marketing but has not engaged in natural gas trading or marketing activities since 2003. Multiple lawsuits involving multiple plaintiffs seeking monetary damages were commenced against e prime and its affiliates, including Xcel Energy, between 2003 and 2009 alleging fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices. Cases were all consolidated in the U.S. District Court in Nevada.
One case remains open, which is the multi-district litigation matter consisting of a Wisconsin purported class (Arandell Corp.). In October 2025, a settlement in principle was reached, resulting in an immaterial loss consistent with previously accrued amounts. This settlement is subject to court approval.
Marshall Wildfire Litigation In December 2021, a wildfire ignited in Boulder County, Colorado (Marshall Fire), which burned over 6,000 acres and destroyed or damaged over 1,000 structures. According to an October 2022 statement from the Colorado Insurance Commissioner, the Marshall Fire is estimated to have caused more than $2 billion in property losses.
On June 8, 2023, the Boulder County Sheriff’s Office released its Marshall Fire Investigative Summary and Review and its supporting documents (Sheriff’s Report). According to the Sheriff’s Report, on Dec. 30, 2021, a fire ignited on a residential property in Boulder, Colorado, located in PSCo’s service territory, for reasons unrelated to PSCo’s power lines. According to the Sheriff’s Report, approximately one hour and 20 minutes after the first ignition, a second fire ignited just south of the Marshall Mesa Trailhead in unincorporated Boulder County, Colorado, also located in PSCo’s service territory. According to the Sheriff’s Report, the second ignition started approximately 80 to 110 feet away from PSCo’s power lines in the area.
PSCo is aware of 307 complaints, most of which have also named Xcel Energy Inc. and Xcel Energy Services Inc. as additional defendants, relating to the Marshall Fire. The complaints are on behalf of at least 4,087 plaintiffs. The complaints generally allege that PSCo’s equipment ignited the Marshall Fire and assert various causes of action under Colorado law, including negligence, premises liability, trespass, nuisance, wrongful death, willful and wanton conduct, negligent infliction of emotional distress, loss of consortium and inverse condemnation. Certain of the complaints also seek exemplary damages. In addition to asserting claims against PSCo, Xcel Energy Inc. and Xcel Energy Services, various Plaintiffs, including insurance company plaintiffs, asserted claims against certain telecommunications companies (the Telecom Companies). In April 2025, most of the remaining plaintiffs amended their complaints to also assert claims against the Telecom Companies. In June 2025, the Boulder County District Court dismissed Xcel Energy Inc. from the complaints that named that entity as a defendant, due to lack of jurisdiction.
An initial trial on liability issues was scheduled to start in September 2025. Prior to trial, in September 2025, Xcel Energy, Qwest Corporation and Teleport Communications America, LLC reached settlement agreements in principle that resolve all claims asserted by the subrogation insurers, the public entity plaintiffs and individual plaintiffs. PSCo did not admit any fault, wrongdoing or negligence in connection with these settlement agreements.
PSCo expects to pay approximately $640 million related to these settlements, with approximately $353 million expected to be reimbursed to PSCo by remaining insurance coverage (after consideration of legal costs incurred to date). PSCo recognized a $287 million charge to earnings as a result of these settlement agreements in the quarterly period ended Sept. 30, 2025.
A remaining estimated liability of $640 million is presented in other current liabilities as of Sept. 30, 2025; no estimated liability was recognized as of Dec. 31, 2024. PSCo records insurance recoveries when it is deemed probable that recovery will occur, and PSCo can reasonably estimate the amount or range. Insurance receivables of $353 million related to the settlement are presented in prepayments and other current assets as of Sept. 30, 2025; no such insurance receivables were recognized as of Dec. 31, 2024.
The agreements in principle remain subject to final documentation and individual plaintiffs opting in to the agreements negotiated and recommended by their counsel. The trial that was scheduled to begin in September 2025 has been vacated to allow the parties time to execute definitive settlement agreements. To the extent any individual plaintiffs choose to opt out of the agreements negotiated and recommended by their counsel and such cases are not otherwise resolved, they will be subject to further litigation.
2024 Smokehouse Creek Fire Complex — On February 26, 2024, multiple wildfires began in the Texas Panhandle, including the Smokehouse Creek Fire and the 687 Reamer Fire, which burned into the perimeter of the Smokehouse Creek Fire (together, referred to herein as the “Smokehouse Creek Fire Complex”). The Texas A&M Forest Service issued incident reports that determined that the Smokehouse Creek Fire and the 687 Reamer Fire were caused by power lines owned by SPS after wooden poles near each fire origin failed. According to the Texas A&M Forest Service’s Incident Viewer and news reports, the Smokehouse Creek Fire Complex burned approximately 1,055,000 acres. In August 2025, the Texas Attorney General’s office announced that it was opening a civil investigation into utilities, including Xcel Energy and SPS, connected to the Smokehouse Creek and Windy Deuce fires. The company is cooperating with that investigation.
SPS is aware of approximately 34 complaints, most of which have also named Xcel Energy Services Inc. as an additional defendant, relating to the Smokehouse Creek Fire Complex. The complaints, which assert claims on behalf of one or more plaintiffs, generally allege that SPS’ equipment ignited the Smokehouse Creek Fire Complex and seek compensation for losses resulting from the fire, asserting various causes of action under Texas law. In addition to seeking compensatory damages, certain of the complaints also seek exemplary damages. Of the 34 complaints, 12 have been resolved and dismissed to date, with nine others settled or settled in principle, and pending dismissal.
SPS has received 254 claims through its claims process and has reached final settlements on 212 of those claims as of the date of this filing. In addition to filed complaints and claims made through SPS’ claims process, SPS has also received information from attorneys for approximately 83 claims which have not been submitted through the claims process and have also not been filed as lawsuits, and has reached settlement of 71 of those claims through mediation.
SPS has settled claims related to both of the fatalities believed to be associated with the Smokehouse Creek Fire Complex. Settlements have also been reached with the subrogated insurer plaintiffs as well as the three largest claims that have been asserted from the fire, as measured by fire-impacted acreage. Settlements reached as of the date of this filing total $361 million of expected loss payments, of which $219 million and $35 million were paid through Sept. 30, 2025 and Dec. 31, 2024, respectively.
Based on the current state of the law and the facts and circumstances available as of the date of this filing, Xcel Energy has recorded $410 million of total estimated losses for the matter (before available insurance). This represents a $120 million increase from the estimated losses as of June 30, 2025, largely driven by actual settlement activity for large claims and previously inestimable categories, such as damage to trees. A remaining estimated liability of $191 million and $180 million is presented in other current liabilities as of Sept. 30, 2025 and Dec. 31, 2024, respectively.
The cumulative estimated probable losses of $410 million for complaints and claims in connection with the Smokehouse Creek Fire Complex (before available insurance) represents the total of actual settlements reached to date plus the low end of the range for remaining reasonably estimable losses, and is subject to change as additional information becomes available. This $410 million estimate does not include amounts for (i) potential penalties or fines that may be imposed by governmental entities on Xcel Energy, (ii) exemplary or punitive damages, (iii) compensation claims by federal, state, county and local government entities or agencies, (iv) unsettled compensation claims for damage to trees and oil and gas equipment, or (v) other amounts that are not reasonably estimable.
Xcel Energy remains unable to reasonably estimate any additional loss or the upper end of the range because there are a number of unknown facts and legal considerations that may impact the amount of any potential liability, including whether additional complaints and demands may be made. In the event that SPS or Xcel Energy Services Inc. was found liable related to the litigation related to the Smokehouse Creek Fire Complex and was required to pay damages, such amounts could exceed our insurance coverage of approximately $500 million for the annual policy period and could have a material adverse effect on our financial condition, results of operations or cash flows.
The process for estimating losses associated with potential claims related to the Smokehouse Creek Fire Complex requires management to exercise significant judgment based on a number of assumptions and subjective factors, including the factors identified above and estimates based on currently available information and prior experience with wildfires. As more information becomes available, management estimates and assumptions regarding the potential financial impact of the Smokehouse Creek Fire Complex may change.
Texas law does not apply strict liability in determining an electric utility company’s liability for fire-related damages. For negligence claims under Texas law, a public utility has a duty to exercise ordinary and reasonable care.
Potential liabilities related to the Smokehouse Creek Fire Complex depend on various factors, including the cause of the equipment failure and the extent and magnitude of potential damages, including damages to residential and commercial structures, personal property, vegetation, livestock and livestock feed (including replacement feed), personal injuries and any other damages, penalties, fines or restitution that may be imposed by courts or other governmental entities if SPS is found to have been negligent.
SPS records insurance recoveries when it is deemed probable that recovery will occur, and SPS can reasonably estimate the amount or range. Insurance receivables of $341 million and $210 million, net of recoveries received, are presented in prepayments and other current assets as of Sept. 30, 2025 and Dec. 31, 2024, respectively. While SPS plans to seek recovery of all insured losses, it is unable to predict the ultimate amount and timing of such insurance recoveries.
Rate Matters and Other
Xcel Energy’s operating subsidiaries are involved in various regulatory proceedings arising in the ordinary course of business. Until resolution, typically in the form of a rate order, uncertainties may exist regarding the ultimate rate treatment for certain activities and transactions. Amounts have been recognized for probable and reasonably estimable losses that may result. Unless otherwise disclosed, any reasonably possible range of loss in excess of any recognized amount is not expected to have a material effect on the consolidated financial statements.
Prairie Island Outage Prudency Review — In March 2024, NSP-Minnesota filed its annual fuel clause adjustment true-up petition to the MPUC. In a response to that petition, intervenors recommended refunds for replacement power costs related to an outage at the Prairie Island generating station (October 2023 through February 2024).
In a September 2024 decision, the MPUC ruled NSP-Minnesota was imprudent in the operation of the Prairie Island nuclear plant based on an incident that resulted in the extended outage. The MPUC did not quantify the refund and referred the determination of the refund amount to the Office of Administrative Hearings. NSP-Minnesota recorded an estimated liability for a customer refund in 2024.
In May 2025, in the resulting case currently before an ALJ to determine the refund amount, NSP-Minnesota submitted direct testimony asserting that no more than $6 million of customer refunds are warranted for the outage.
In July 2025, intervenor direct testimony was filed by the DOC, OAG, and XLI. These parties, together with the CUB, also filed a joint motion requesting the ALJ rule that customer refunds cannot be adjusted as proposed by NSP-Minnesota, including certain reductions for avoided future outages. If NSP-Minnesota’s proposed adjustments were rejected, and other DOC and OAG direct testimony recommendations were applied to both 2023 and 2024, NSP-Minnesota estimates that the customer refunds would be approximately $34 million. The joint motion was denied in August 2025, and the application of the adjustments will be addressed in the case before the ALJ.
Rebuttal and surrebuttal testimony were filed in August and September 2025. An ALJ report is expected in March 2026, with a MPUC decision expected in the second quarter of 2026.
Cabin Creek Prudency ReviewIn 2015, the CPUC granted a CPCN for an $88 million upgrade project to increase the generating and storage capacity of the Cabin Creek hydroelectric storage facility, which anticipated project completion in 2020. Due to significant and unforeseen challenges, the project was not completed until 2023 and cost approximately $110 million.
In April 2025, PSCo and CPUC Staff filed a settlement agreement that would resolve the matter, with terms including reduced return on the upgrade project totaling $8 million, recognized over five years. In August 2025, the CPUC approved the settlement agreement.
Environmental
New and changing federal and state environmental mandates can create financial liabilities for Xcel Energy, which are normally recovered through the regulated rate process.
Site Remediation
Various federal and state environmental laws impose liability where hazardous substances or other regulated materials have been released to the environment. Xcel Energy Inc.’s subsidiaries may sometimes pay all or a portion of the cost to remediate sites where past activities of their predecessors or other parties have caused environmental contamination.
Environmental contingencies could arise from various situations, including sites of former MGPs; and third-party sites, such as landfills, for which one or more of Xcel Energy Inc.’s subsidiaries are alleged to have sent wastes to that site.
MGP, Landfill and Disposal Sites
Xcel Energy is investigating, remediating or performing post-closure actions at 14 historical MGP, landfill or other disposal sites across its service territories, excluding sites that are being addressed under current coal ash regulations (see below).
Xcel Energy has approximately $15 million of remaining liabilities for resolution of these issues, however, the final outcome and timing are unknown. In addition, there may be regulatory recovery, insurance recovery and/or recovery from other potentially responsible parties, offsetting a portion of costs incurred.
Water and Waste
Coal Ash Regulation — Xcel Energy is subject to the CCR Rule, which imposes requirements for handling, storage, treatment and disposal of coal ash and other solid waste.
In May 2024, final amendments to the CCR Rule were published, widening its scope to include legacy CCR surface impoundments at inactive facilities and previously exempt areas where CCR was placed directly on land at CCR-regulated facilities, including areas of beneficial use.
As a requirement of the CCR Rule, utilities must complete facility evaluations and groundwater sampling around their subject landfills, surface impoundments and certain other areas where coal ash was placed on land.
If certain impacts to groundwater are detected, utilities are required to perform additional groundwater investigations and/or perform corrective actions, beginning with an Assessment of Corrective Measures.
Investigation and/or corrective action related to groundwater impacts are currently underway at certain active and closed coal-generating facilities at a current estimated cost of at least $45 million. In addition, Xcel Energy expects to incur $15 million for investigations through 2028 to perform required reporting and assess whether corrective actions are necessary. AROs have been recorded for each of these activities, and amounts are expected to be recoverable through regulatory mechanisms.
Xcel Energy has also identified coal ash that is expected to be required to be removed from certain closed coal-generating facilities at estimated costs totaling approximately $105 million. AROs have been recorded, with the costs expected to be recoverable through regulatory mechanisms.
Xcel Energy continues to perform site investigation activities related to the CCR Rule, which may result in updates to estimated costs as well as identification of additional required corrective actions.
In July 2025, the EPA issued a proposed rule amending the CCR Legacy rule. The proposal seeks to extend deadlines for various regulatory actions and clarify previous information regarding implementation of the rule. Xcel Energy will monitor the proposed rule and evaluate the impacts of any final rule.
Clean Water Act Section 316(b) — The Federal Clean Water Act requires the EPA to regulate cooling water intake structures to assure they reflect the best technology available for minimizing impingement and entrainment of aquatic species.
Estimated capital expenditures of approximately $50 million may be required to comply with the requirements. Xcel Energy anticipates these costs will be recoverable through regulatory mechanisms.
Air
Clean Air Act NOx Allowance Allocations — In June 2023, the EPA published final regulations for ozone under the “Good Neighbor” provisions of the Clean Air Act that established NOx allowance budgets for fossil fuel-fired electric generating facilities in subject states. The final rule applies to generation facilities in Minnesota, Texas and Wisconsin, as well as other states outside of our service territory. In February 2024, the EPA proposed to include New Mexico in the rule. In March 2025, the 5th Circuit Court of Appeals denied petitions challenging EPA’s disapproval of Texas’s state implementation plan, affirming inclusion of Texas facilities in the EPA’s plan.
However, the plan is subject to both judicial and administrative stays and the EPA has announced that it intends to reconsider the rule.
Compliance with the published plan would require subject facilities to secure additional allowances, install NOx controls and/or develop a strategy of operations that utilizes the existing allowance allocations. While the financial impacts of the final rule are uncertain and dependent on market forces and anticipated generation, if the rule is implemented, Xcel Energy anticipates the annual costs could be significant but would be recoverable through regulatory mechanisms.
Leases
Xcel Energy evaluates contracts that may contain leases, including PPAs and arrangements for the use of office space and other facilities, as well as certain contracts for the use of land, vehicles and other equipment. A contract contains a lease if it conveys the exclusive right to control the use of a specific asset.
In the third quarter of 2025, certain PPAs for natural gas fueled generating facilities were amended, extending NSP-Minnesota’s use of these plants to 2039 and 2048. The amended agreements qualify for classification as finance leases. As of Sept. 30, 2025, other current liabilities and non-current finance lease liabilities include $37 million and $1.2 billion of finance lease obligations for these amended PPAs, respectively. Prior to these amendments, the agreements were classified as operating leases.
PPA finance lease payments are allocated between interest charges and depreciation and amortization on the consolidated statements of income. PPA operating lease payments are included in electric fuel and purchased power, and expense for other operating leases is included in O&M expense and electric fuel and purchased power.
Components of lease expense:
Three Months Ended Sept. 30
(Millions of Dollars)20252024
Operating leases
PPA capacity payments$47 $57 
Other operating leases (a)
11 
Total operating lease expense$56 $68 
Finance leases
Amortization of ROU assets$$
Interest expense on lease liability14 
Total finance lease expense$18 $
(a)Includes immaterial short-term lease expense.

Nine Months Ended Sept. 30
(Millions of Dollars)20252024
Operating leases
PPA capacity payments$158 $172 
Other operating leases (a)
32 33 
Total operating lease expense$190 $205 
Finance leases
Amortization of ROU assets$$
Interest expense on lease liability22 11 
Total finance lease expense$28 $14 
(a)Includes immaterial short-term lease expense.
Commitments under operating and finance leases as of Sept. 30, 2025:
(Millions of Dollars)PPA Operating
Leases
Other Operating
Leases
Total Operating
Leases
Finance
 Leases (a)
Total minimum obligation$667 $516 $1,183 $2,211 
Interest component of obligation(98)(200)(298)(900)
Present value of minimum obligation$569 $316 885 1,311 
Less current portion(114)(39)
Noncurrent operating and finance lease liabilities$771 $1,272 
(a)Excludes certain amounts related to PSCo’s lease obligations given Xcel Energy’s 50% ownership interest in WYCO.
Variable Interest Entities
Under certain PPAs, NSP-Minnesota, PSCo and SPS purchase power from IPPs for which the utility subsidiaries are required to reimburse fuel costs, or to participate in tolling arrangements under which the utility subsidiaries procure the natural gas required to produce the energy that they purchase. Xcel Energy has determined that certain IPPs are VIEs, however Xcel Energy is not subject to risk of loss from the operations of these entities, and no significant financial support is required other than contractual payments for energy and capacity.
In addition, certain solar PPAs provide an option to purchase emission allowances or sharing provisions related to production credits generated by the solar facility under contract. These specific PPAs create a variable interest in the IPP.
Xcel Energy evaluated each of these VIEs for possible consolidation, including review of qualitative factors such as the length and terms of the contract, control over O&M, control over dispatch of electricity, historical and estimated future fuel and electricity prices and financing activities. Xcel Energy concluded that these entities are not required to be consolidated in its consolidated financial statements because Xcel Energy does not have the power to direct the activities that most significantly impact the entities’ economic performance.
The utility subsidiaries had 3,661 MW and 3,751 MW of capacity under long-term PPAs at Sept. 30, 2025 and Dec. 31, 2024, respectively, with entities that have been determined to be variable interest entities. The PPAs have expiration dates through 2048.
Other
Guarantees and Bond Indemnifications — Xcel Energy Inc. and its subsidiaries provide guarantees and bond indemnities, which guarantee payment or performance. Xcel Energy Inc.’s exposure is based upon the net liability under the specified agreements or transactions. Most of the guarantees and bond indemnities issued by Xcel Energy Inc. and its subsidiaries have a stated maximum amount.
As of Sept. 30, 2025 and Dec. 31, 2024, Xcel Energy had no assets held as collateral related to their guarantees, bond indemnities and indemnification agreements. Guarantees and bond indemnities issued and outstanding for Xcel Energy were approximately $111 million and $93 million at Sept. 30, 2025 and Dec. 31, 2024, respectively.
Other Indemnification Agreements — Xcel Energy Inc. and its subsidiaries provide indemnifications through various contracts. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, breaches of representations and warranties, including corporate existence, transaction authorization and income tax matters with respect to assets sold, as well as disallowances or reductions to the contractual amounts of tax credit transfers.