XML 230 R62.htm IDEA: XBRL DOCUMENT v3.25.0.1
Accounting Policies (Tables)
12 Months Ended
Dec. 31, 2024
Summary of significant accounting policies [Abstract]  
New standards amendments and interpretations [Table Text Block]
Standards and amendments
Mandatory application:
annual periods beginning on or after
Amendment to IAS 21Amendment to IAS 21 – The effects of changes in foreign exchange rates: Lack of exchangeability.1 January 2025
Amendment to IFRS 9Contracts Referencing Nature-dependent Electricity Amendments to IFRS 9
and IFRS 7. Amendments to the Classification and Measurement of Financial Instruments.
1 January 2026
Amendment to IFRS 7
IFRS 18: Presentation and Disclosure in Financial StatementsIt replaces IAS 1 and introduces significant new requirements, particularly for the statement of profit or loss.
1 January 2027
Construction projects [Table Text Block]
PROJECTACTIVITYCOUNTRY% SHARE2024 REVENUE
(EUR M)
HS2 Main worksWorks on 80 km of the HS2 between Chilterns and Warwickshire, including 15 viaducts, 5 km of green tunnels, 22 km of road diversions, 67UK15 %332
Sydney Metro WestMetro design and construction on an 11-kilometre stretch of twin railway tunnels between Sydney Olympic Park and The Bays, Australia.Australia50 %233
Ontario Transit Group Constructor GPDesign, build and finance Ontario Line Subway: Construction of a 6.7 km, seven-station rapid transit system.Canada50 %216
RiverlinxDesign, build, financing, operation and maintenance of the Silvertown Tunnel in East London.UK40 %127
Coffs Harbour BypassDesign and Building contract. It involves 14 km of road, three tunnels and a service road. Australia50 %113
Thames Tideway Tunnel Central Section J.VConstruction of new infrastructure for the London sewerage systemUK50 %60
Metro Paris Ligne 3A JVMetro Paris with 6,7 KM tunnel. The work includes building three stations and eight ancillary infrastructures.France50 %54
Linha Circular, A.C.E. Ferrovial will build a new circular metro line in Oporto, the Pink Line, which will be 3.1 kilometers long. The work on the Pink Line includes the construction of four new stations, three ventilation shafts and the installation of the track and catenary.Portugal65 %54
TOTAL1,187
Disclosure of the useful life considered to depreciate property plant and equipment [Table Text Block]
YEARS OF USEFUL LIFE
Buildings and other structures10-50
Machinery, installations and tooling2-25
Furniture and fittings2-15
Vehicles3-20
Other fixed assets2-20
Information about concession [Table Text Block]
CONCESSION OPERATORCOUNTRYSTATUSSTART YEAR (*)END YEARCONSOL. METHOD
407 International Inc.CanadaOperation19992098Equity consolidation
NTE Mobility Partners, LLCUSAOperation20142061Full consolidation
NTE Mobility Partners Seg 3 LLCUSAOperation20182061Full consolidation
LBJ Infr. Group LLCUSAOperation20142061Full consolidation
I-66 Mobility Partners LLCUSAOperation20162066Full consolidation
I-77 Mobility Partners LLCUSAOperation20192069Full consolidation
IRB Infrastructure Developers Limited (**)IndiaOperation/Construction--Equity consolidation
IRB Infrastructure Trust Limited (***)IndiaOperation/Construction--Equity consolidation
Sociedad Concesionaria Anillo Vial S.A.C (****)PeruConstruction20242054Equity consolidation
Autopista Terrassa Manresa, S.A.SpainOperation19892036Full consolidation
Autovía de Aragón, S.A.SpainOperation20072026Full consolidation
Dalaman International AirportTurkeyOperation20222042Full consolidation
JFK NTO LLCUSAConstruction20222060Equity consolidation
(*) First year of the concession (if in service) or year construction began (if it is in the construction phase).
(**) IRB Infrastructure Developers Limited includes several Intangible and Financial asset model projects whose concession end date goes from 2030 to 2053.
(***) IRB Infrastructure Trust Limited includes several Intangible asset model projects whose concession end date goes from 2036 to 2053.
(****) Bifurcated model, therefore a financial asset and an intangible asset are recognized.
CONCESSION OPERATORCOUNTRYSTATUSSTART YEAR(*)
END YEAR
CONSO. METHOD
Concesionaria de Prisiones LledonersSpainOperation20082038Full consolidation
Depusa Aragón, S.A.SpainOperation20172037Full consolidation
Wroclaw Budimex Car Park
Poland
Operation20122042Full consolidation
UK Waste Treatment (Thalia - Waterbeach plant)UKOperation20082036Full consolidation
(*) First year of operation (if the project is in operational status) or First year of concession/construction period (if the project is in the construction phase).
CONCESSION OPERATORCOUNTRYSTATUSSTART YEAR (*)END YEARCONSOL. METHOD
Nexus Infr. Unit Trust (Toowoomba)AustraliaOperation20192043Equity consolidation
IRB Infrastructure Developers Limited (**)IndiaOperation--Equity consolidation
Sociedad Concesionaria Anillo Vial S.A.C (***)PeruConstruction20242054Equity consolidation
Ruta del Cacao S.A.SColombiaConstruction20152040Equity consolidation
Zero Bypass Ltd.SlovakiaOperation20162050Equity consolidation
Netflow OSARs WesternAustraliaOperation20172040Equity consolidation
Riverlinx, Ltd.UKConstruction20192050Equity consolidation
(*) First year of the concession (if in service) or year construction began (if it is in the construction phase).
(**) IRB Infrastructure Developers Limited includes several Intangible and Financial asset model projects whose concession end date goes from 2036 to 2053.
(***) Bifurcated model, therefore a financial asset and an intangible asset are recognized.