XML 48 R30.htm IDEA: XBRL DOCUMENT v3.6.0.2
Asset Retirement Obligations
12 Months Ended
Dec. 31, 2016
Asset Retirement Obligation [Abstract]  
ASSET RETIREMENT OBLIGATIONS
ASSET RETIREMENT OBLIGATIONS

FirstEnergy has recognized applicable legal obligations for AROs and their associated cost primarily for nuclear power plant decommissioning, reclamation of sludge disposal ponds, closure of coal ash disposal sites, underground and above-ground storage tanks, wastewater treatment lagoons and transformers containing PCBs. In addition, FirstEnergy has recognized conditional retirement obligations, primarily for asbestos remediation.

The ARO liabilities for FES primarily relate to the decommissioning of the Beaver Valley, Davis-Besse and Perry nuclear generating facilities, which total $713 million, as of December 31, 2016. FES uses an expected cash flow approach to measure the fair value of their nuclear decommissioning AROs.
FirstEnergy and FES maintain NDTs that are legally restricted for purposes of settling the nuclear decommissioning ARO. The fair values of the decommissioning trust assets as of December 31, 2016 and 2015 were as follows:
 
 
2016
 
2015
 
 
(In millions)
FirstEnergy
 
$
2,514

 
$
2,282

FES
 
$
1,552

 
$
1,327



The following table summarizes the changes to the ARO balances during 2016 and 2015:
ARO Reconciliation
 
FirstEnergy
 
FES
 
 
(In millions)
Balance, January 1, 2015
 
$
1,387

 
$
841

Liabilities settled
 
(13
)
 
(8
)
Accretion
 
92

 
55

Revisions in estimated cash flows
 
(56
)
 
(57
)
Balance, December 31, 2015
 
$
1,410

 
$
831

Liabilities settled
 
(27
)
 
(18
)
Accretion
 
95

 
56

Liabilities Incurred
 
4

 
32

Balance, December 31, 2016
 
$
1,482

 
$
901



During 2016, in connection with NG purchasing the lessor equity interests of the remaining non-affiliated leasehold interests from an owner participant in Perry Unit 1, OE transferred the ARO (included within the FES liabilities incurred above) and related NDT assets associated with the leasehold interest to NG with the difference of $28 million credited to the common stock of FES. As of June 30, 2016, NG owns 100% of Perry Unit 1.

During 2015, FE and FES reduced its ARO by $57 million based on the results of decommissioning cost studies for the Davis-Besse and Perry nuclear generating stations.

Federal and state hazardous waste regulations have been promulgated as a result of the RCRA, as amended, and the Toxic Substances Control Act. Certain coal combustion residuals, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA's evaluation of the need for future regulation.

In December 2014, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards regarding landfill design, structural integrity design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to assure the safe disposal of CCRs from electric generating plants. Based on an assessment of the finalized regulations, the future cost of compliance and expected timing of spend had no significant impact on FirstEnergy's or FES' existing AROs associated with CCRs. Although not currently expected, any changes in timing and closure plan requirements in the future, including changes resulting from the strategic review at CES, could materially and adversely impact FirstEnergy's and FES' AROs.