EX-99.1 2 eh1700822_ex9901.htm EXHIBIT 99.1
EXHIBIT 99.1
 
For Immediate Release
17-32-TR
 
Date:
July 27, 2017
 
TECK REPORTS UNAUDITED SECOND QUARTER RESULTS FOR 2017

Vancouver, B.C. – Teck Resources Limited (TSX: TECK.A and TECK.B, NYSE: TECK) (“Teck”) reported profit attributable to shareholders of $577 million ($1.00 per share) in the second quarter compared with $15 million ($0.03 per share) a year ago.

“I’m pleased with our results,” said Don Lindsay, President and CEO. “We generated adjusted EBITDA of $1.3 billion in the second quarter and $5.4 billion over the last twelve months. After a challenging first quarter we set second quarter steelmaking coal sales and production records of 6.9 and 6.8 million tonnes, respectively, and we reduced our outstanding notes to US$4.8 billion, achieving our target of less than US$5 billion.”

Highlights and Significant Items

Profit attributable to shareholders was $577 million and EBITDA was $1.3 billion in the second quarter.
 
Gross profit was $1.1 billion in the second quarter compared with $212 million a year ago. Gross profit before depreciation and amortization was $1.4 billion in the second quarter compared with $536 million in the second quarter of 2016.

Cash flow from operations was $1.4 billion in the second quarter of 2017 compared with $339 million a year ago.

We set new second quarter records for both steelmaking coal sales and production of 6.9 and 6.8 million tonnes, respectively. In addition, Antamina achieved record zinc production of 102,300 tonnes in the second quarter.

Steel mills, and the majority of steelmaking coal producers, agreed upon an index-linked pricing mechanism, effective April 1, 2017, based on the average of key premium steelmaking coal spot price assessments to replace the negotiated quarterly benchmark.

In April we announced a new dividend policy and the doubling of our annualized base dividend to $0.20 per share, which is expected to be declared at $0.05 per quarter. We intend to consider declaring a supplemental dividend in the fourth quarter of each year, which will take into consideration our outlook, business considerations and capital requirements.
 
 


All dollar amounts expressed in this news release are in Canadian dollars unless otherwise noted.

Reference:
Fraser Phillips, Senior Vice President, Investor Relations and Strategic Analysis
604.699.4621
     
 
Marcia Smith, Senior Vice President, Sustainability and External Affairs
604.699.4616

Additional corporate information is available at www.teck.com

 


In May, we announced the sale of our two-thirds interest in the Waneta Dam and related transmission assets to Fortis Inc. (Fortis) for $1.2 billion cash. BC Hydro has a right of first offer in respect of the transaction. We expect to realize a pre-tax gain of approximately $800 million on the transaction, which we do not expect to close before the fourth quarter of this year.

In May and June we repurchased US$260 million principal amount of our outstanding notes by way of make-whole redemptions and open market repurchases, reducing the balance of our outstanding notes to US$4.8 billion. We recorded a CAD$38 million pre-tax charge on the transaction.

In late June, we acquired the 21% minority interest in the San Nicolás project located in Zacatecas, Mexico for US$50 million. On completion of the transaction, expected before the end of the year, we will own 100% of the project.

In early July, the employees at Cardinal River ratified a new five-year collective agreement. With this agreement in place, all of the unionized employees within the steelmaking coal business unit are under contract until at least May 31, 2019. Negotiations are ongoing at Highland Valley Copper and a mediated settlement for a new five-year collective agreement is currently in the voting process for unionized employees at Trail Operations.

Construction progress on the Fort Hills oil sands project has surpassed 92%. Mobilization for operation has begun and the project remains on track to produce first oil in late 2017.

We expect our steelmaking coal sales to reach at least 7.0 million tonnes in the third quarter.

We were named to the Best 50 Corporate Citizens in Canada for the fifth consecutive year by media and investment research company Corporate Knights.

Our liquidity remains strong at over $4.5 billion, including US$3.0 billion of undrawn, committed credit facilities and $930 million of cash at July 26, 2017, net of US$145 million of refunds to customers related to provisional steelmaking coal pricing payments.

 
2    Teck Resources Limited 2017 Second Quarter News Release


This management’s discussion and analysis is dated as at July 26, 2017 and should be read in conjunction with the unaudited consolidated financial statements of Teck Resources Limited (“Teck”) and the notes thereto for the three and six months ended June 30, 2017 and with the audited consolidated financial statements of Teck and the notes thereto for the year ended December 31, 2016. In this news release, unless the context otherwise dictates, a reference to “the company” or “us,” “we” or “our” refers to Teck and its subsidiaries. Additional information, including our Annual Information Form and Management’s Discussion and Analysis for the year ended December 31, 2016, is available on SEDAR at www.sedar.com.

This document contains forward-looking statements. Please refer to the cautionary language under the heading “CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION.”

Overview

In the second quarter our operational performance improved. Production for most of our principal products increased. Steelmaking coal production rose to a second quarter record of 6.8 million tonnes, up from 6.1 million tonnes in the first quarter of 2017, and also exceeded the 6.7 million tonnes produced in the second quarter of 2016. However, steelmaking coal unit costs rose as a result of high input costs and our decision to advance annual plant maintenance shutdowns, originally planned for later in the year. As anticipated in the mine plans, copper production in the second quarter rose 9% from the first quarter to 70,000 tonnes as grades at Highland Valley Copper improved. Our zinc in concentrate production rose by 8% from the first quarter as a result of record zinc production from Antamina.

In commodity markets, prices moved higher year-over-year with copper, zinc and lead prices rising 20%, 35%, and 26% in U.S. dollars, respectively, from the same period a year ago. Our realized steelmaking coal price in the second quarter doubled from a year ago and averaged US$169 per tonne. Steelmaking coal spot prices retreated from above US$300 per tonne in mid-April after Cyclone Debbie disrupted key Australian supplies and are now trading above US$170 per tonne. The higher commodity prices combined with increased sales volumes for most of our principal products, including record second quarter sales of 6.9 million tonnes of steelmaking coal, contributed to our improved financial results compared with a year ago.

We announced the sale of our two-thirds interest in the Waneta Dam and related transmission assets to Fortis for $1.2 billion cash. Under the agreement, we will be granted a 20-year lease with an option to extend for an additional ten years to use Fortis’ two-thirds interest in the power generated by Waneta for our Trail Operations. BC Hydro has a right of first offer with respect to the sale of our two-thirds interest in Waneta. Closing of the transaction is subject to receipt of certain consents and other customary conditions and is not expected before the fourth quarter of 2017. Closing of the transaction will further strengthen our balance sheet and provide significant new capital that can be reinvested to enhance our overall business, including our Trail Operations.

Construction progress on the Fort Hills oil sands project has surpassed 92%. Four of the six major project areas have now been turned over to operations. The project remains on track to produce first oil in late 2017.

We established a new dividend policy that reflects our commitment to return cash to shareholders balanced against the needs and opportunities to invest in, and the inherent cyclicality of, our underlying businesses. The policy will be anchored by an annual base dividend of $0.20 per share, which we intend to declare and pay quarterly, commencing in the
3    Teck Resources Limited 2017 Second Quarter News Release

third quarter of this year. Each year the Board will review the free cash flow generated by the business, the outlook for business conditions and priorities regarding capital allocation and determine whether a supplemental dividend should be paid. If declared, supplemental dividends may be highly variable from year to year, given the volatility of commodity prices and the potential need to conserve cash for certain project capital expenditures or other corporate priorities. The $0.10 base dividend declared and paid in the second quarter of 2017 reflects the quarterly dividends for both the first and second quarters of 2017.
 
 
 
 
 
 
 
4    Teck Resources Limited 2017 Second Quarter News Release


Profit and Adjusted Profit(1)

Profit attributable to shareholders was $577 million, or $1.00 per share, in the second quarter compared with $15 million, or $0.03 per share in the same period a year ago.

Adjusted profit attributable to shareholders in the second quarter, after adjusting for the items identified in the table below was $577 million, or $1.00 per share, compared with $3 million, or $0.01 per share, in the same period last year.

The substantial increase in our profit in the second quarter of 2017 was primarily the result of significantly higher contribution from our steelmaking coal business unit due to higher prices and sales volumes, partly offset by higher unit operating costs. In addition, our profit was also positively affected by higher base metal prices as well as the weaker U.S./Canadian dollar average exchange rate compared with a year ago.

Profit and Adjusted Profit
    
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Profit attributable to shareholders
 
$
577
   
$
15
   
$
1,149
   
$
109
 
Add (deduct):
                               
Debt repurchase losses
   
27
     
23
     
159
     
23
 
Debt prepayment option gain
   
(17
)
   
     
(33
)
   
 
Asset sales and provisions
   
(1
)
   
(46
)
   
(9
)
   
(58
)
Foreign exchange (gains) losses
   
(9
)
   
4
     
(19
)
   
(80
)
Collective agreement charges
   
     
     
1
     
10
 
Tax and other items
   
     
7
     
     
17
 
Adjusted profit
 
$
577
   
$
3
   
$
1,248
   
$
21
 
Adjusted earnings per share
 
$
1.00
   
$
0.01
   
$
2.16
   
$
0.04
 

In addition to the items described above, our results include gains and losses due to changes in market prices and interest rates in respect of pricing adjustments, commodity derivatives, share based compensation and changes in the discounted value of decommissioning and restoration costs of closed mines. Taken together, these items resulted in a $5 million charge to our after-tax profits ($7 million before tax) in the second quarter, or $0.01 per share. We do not adjust our reported profit for these items as they occur on a regular basis.
 




Note:
1)
Non-GAAP financial measure. See “Use of Non-GAAP Financial Measures” section for further information.
5    Teck Resources Limited 2017 Second Quarter News Release


FINANCIAL OVERVIEW
 
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions, except per share data)
 
2017
   
2016
   
2017
   
2016
 
Revenues and profit
                       
   Revenues
 
$
2,818
   
$
1,740
   
$
5,712
   
$
3,438
 
   Gross profit before depreciation and amortization (1)
 
$
1,424
   
$
536
   
$
2,952
   
$
1,000
 
   Gross profit
 
$
1,066
   
$
212
   
$
2,253
   
$
367
 
   EBITDA (1)
 
$
1,323
   
$
468
   
$
2,657
   
$
985
 
   Profit attributable to shareholders
 
$
577
   
$
15
   
$
1,149
   
$
109
 
                                 
Cash flow
                               
   Cash flow from operations
 
$
1,408
   
$
339
   
$
2,701
   
$
712
 
   Property, plant and equipment expenditures
 
$
329
   
$
325
   
$
685
   
$
623
 
   Capitalized stripping costs
 
$
173
   
$
122
   
$
325
   
$
281
 
   Investments
 
$
32
   
$
25
   
$
71
   
$
47
 
                                 
Balance Sheet
                               
   Cash balances
                 
$
846
   
$
1,271
 
   Total assets
                 
$
34,898
   
$
33,911
 
   Debt, including current portion
                 
$
6,385
   
$
9,004
 
                                 
Per share amounts
                               
   Profit attributable to shareholders
 
$
1.00
   
$
0.03
   
$
1.99
   
$
0.19
 
   Dividends declared
 
$
0.10
   
$
0.05
   
$
0.10
   
$
0.05
 
                                 
PRODUCTION, SALES AND PRICES
                               
                                 
Production (000’s tonnes, except steelmaking coal)
                               
   Steelmaking coal (millions tonnes)
   
6.8
     
6.7
     
12.9
     
13.3
 
   Copper (2)
   
70
     
91
     
134
     
173
 
   Zinc in concentrate
   
158
     
166
     
304
     
341
 
   Zinc - refined
   
74
     
69
     
152
     
148
 
                                 
Sales (000’s tonnes, except steelmaking coal)
                               
   Steelmaking coal (millions tonnes)
   
6.9
     
6.3
     
12.8
     
12.8
 
   Copper (2)
   
69
     
92
     
133
     
173
 
   Zinc in concentrate
   
113
     
95
     
246
     
224
 
   Zinc - refined
   
74
     
72
     
150
     
150
 
                                 
Average prices and exchange rates
                               
   Steelmaking coal (realized US$/tonne)
 
$
169
   
$
83
   
$
189
   
$
79
 
   Steelmaking coal (realized CAD$/tonne)
 
$
229
   
$
107
   
$
253
   
$
104
 
   Copper (LME cash - US$/pound)
 
$
2.57
   
$
2.14
   
$
2.61
   
$
2.13
 
   Zinc (LME cash - US$/ pound)
 
$
1.18
   
$
0.87
   
$
1.22
   
$
0.82
 
   Average exchange rate (C$ per US$1.00)
 
$
1.35
   
$
1.29
   
$
1.33
   
$
1.33
 
                                 
Gross profit margins before depreciation (1)
                               
   Steelmaking coal
   
61
%
   
29
%
   
64
%
   
27
%
   Copper
   
45
%
   
40
%
   
42
%
   
39
%
   Zinc
   
30
%
   
24
%
   
29
%
   
23
%

Notes:
1)
Non-GAAP financial measure. See “Use of Non-GAAP Financial Measures” section for further information.
2)
We include 100% of production and sales from our Quebrada Blanca and Carmen de Andacollo mines in our production and sales volumes, even though we own 76.5% and 90%, respectively, of these operations, because we fully consolidate their results in our financial statements. We include 22.5% of production and sales from Antamina, representing our proportionate equity interest in Antamina.
6    Teck Resources Limited 2017 Second Quarter News Release


BUSINESS UNIT RESULTS

Our revenues, gross profit before depreciation and amortization, and gross profit by business unit are summarized in the table below.

    
Three months
ended June 30,
   
Six months
ended June 30,
 
  (CAD$ in millions) 
 
2017
   
2016
   
2017
   
2016
 
Revenues
                       
Steelmaking coal
 
$
1,596
   
$
678
   
$
3,262
   
$
1,343
 
Copper
   
562
     
517
     
1,075
     
996
 
 Zinc
   
660
     
544
     
1,375
     
1,098
 
  Energy
   
     
1
     
     
1
 
Total
 
$
2,818
   
$
1,740
   
$
5,712
   
$
3,438
 
                                 
Gross profit, before depreciation and amortization (1)
                               
Steelmaking coal
 
$
975
   
$
198
   
$
2,103
   
$
357
 
Copper
   
253
     
206
     
448
     
386
 
 Zinc
   
196
     
131
     
401
     
256
 
  Energy
   
     
1
     
     
1
 
Total
 
$
1,424
   
$
536
   
$
2,952
   
$
1,000
 
                                 
Gross profit
                               
Steelmaking coal
 
$
785
   
$
52
   
$
1,765
   
$
59
 
Copper
   
128
     
62
     
171
     
121
 
 Zinc
   
153
     
99
     
317
     
189
 
  Energy
   
     
(1
)
   
     
(2
)
Total
 
$
1,066
   
$
212
   
$
2,253
   
$
367
 

Note:
1)
Non-GAAP financial measure. See “Use of Non-GAAP Financial Measures” section for further information.

7    Teck Resources Limited 2017 Second Quarter News Release


STEELMAKING COAL BUSINESS UNIT
   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions) 
 
2017
   
2016
   
2017
   
2016
 
Steelmaking coal price (realized US$/tonne)
 
$
169
   
$
83
   
$
189
   
$
79
 
Steelmaking coal price (realized CAD$/tonne)
 
$
229
   
$
107
   
$
253
   
$
104
 
Production (million tonnes)
   
6.8
     
6.7
     
12.9
     
13.3
 
Sales (million tonnes)
   
6.9
     
6.3
     
12.8
     
12.8
 
Gross profit, before depreciation and amortization
 
$
975
   
$
198
   
$
2,103
   
$
357
 
Gross profit
 
$
785
   
$
52
   
$
1,765
   
$
59
 
Property, plant and equipment expenditures
 
$
10
   
$
8
   
$
61
   
$
19
 

Performance

Gross profit in the second quarter from our steelmaking coal business unit was $785 million compared with $52 million a year ago. Gross profit before depreciation and amortization increased by $777 million from a year ago (see table below) as the benefits of significantly higher realized steelmaking coal prices and record second quarter sales of 6.9 million tonnes more than offset the effect of higher unit production costs. The average realized steelmaking coal price of US$169 per tonne was US$86 per tonne higher than the second quarter of 2016, reflecting improved steelmaking coal market conditions and supply constraints in the quarter due to a cyclone in Queensland.

Second quarter production of 6.8 million tonnes was slightly higher than the same period a year ago, setting a new record for this quarter of the year. However, production was slightly lower than our expected run rate of approximately 7.0 million tonnes. This was the result of our decision to advance annual processing plant maintenance shutdowns, originally planned for later in the year, into the second quarter. This decision reduced onsite inventories, restoring operational flexibility going forward. With the majority of our processing plant shutdowns behind us, we expect production to be stronger in the second half of 2017.

The advancing of plant maintenance activities into the quarter resulted in increased use of contractors and repair parts. Costs also increased relative to the year ago period due to increased strip ratios and cost pressures from labour, diesel, power and natural gas.
8    Teck Resources Limited 2017 Second Quarter News Release


The table below summarizes the year-over-year gross profit changes, before depreciation and amortization, in our steelmaking coal business unit for the quarter:

(CAD$ in millions)
 
Three months
ended June 30,
 
As reported in second quarter of 2016
 
$
198
 
Increase (decrease):
       
   Steelmaking coal price realized
   
784
 
   Sales volume
   
20
 
   Unit operating costs
   
(94
)
   Foreign exchange
   
67
 
Net increase
   
777
 
As reported in current quarter
 
$
975
 

Property, plant and equipment expenditures totaled $10 million in the second quarter. Capitalized stripping costs were $132 million in the second quarter compared with $76 million a year ago.

Markets

Record second quarter sales volumes of 6.9 million tonnes were 10% higher than a year ago, reflecting improved steelmaking coal market conditions. This record was achieved despite irregular purchasing during a period of rapidly changing prices in the aftermath of Cyclone Debbie in Queensland, Australia. Very few transactions were observed in the five-week period from mid-April to mid-May when spot prices exceeded US$300 per tonne for the fourth time since 2008. Customers covered short-term requirements and then retreated from the market until spot prices returned nearer to pre cyclone levels. As a result, we also experienced weak sales during that five-week period, slightly reducing total volumes shipped in the quarter.

Cyclone Debbie also delayed the quarterly benchmark price negotiations and triggered changes to that pricing system. Steel mills, and the majority of steelmaking coal producers, have now agreed to an index-linked pricing mechanism based on the average of key premium steelmaking coal spot price assessments to replace the negotiated quarterly benchmark, effective April 1, 2017. Lower grade semi-soft coals and PCI coal pricing will continue to be negotiated on a quarterly benchmark basis and we will continue to make spot sales reflecting market conditions as sales are concluded.

While the index-linked mechanism varies between customers, we expect our realized price relative to the premium steelmaking coal assessments to be similar to our historical relationship to the negotiated quarterly benchmark. This change in the pricing mechanism affects approximately 40% of our sales and further changes may occur. Our product mix and timing of sales will continue to affect our realized pricing, as was previously the case.

Operations

Significantly improved logistics performance combined with earlier than planned processing plant maintenance shutdowns have substantially reduced onsite steelmaking coal stockpiles and returned operational flexibility to each of our operations. Unfortunately, challenging winter weather conditions in southern British Columbia and northwestern Alberta, above average
9    Teck Resources Limited 2017 Second Quarter News Release

employee turnover and geotechnical issues in two pits affected our ability to move planned waste volumes in both of the first two quarters of 2017 and has negatively affected production. We fully anticipate recovering that shortfall in waste volumes through the second half of the year and will be back on plan by year end.

Cost of Sales

Unit cost of sales in the second quarter were $53 per tonne compared with $42 per tonne a year ago, exceeding the top of our guidance range for the quarter of $51 per tonne. The decision to advance scheduled maintenance increased repair and maintenance costs while reducing production. Strip ratios increased, as we are mining in recently permitted areas at a number of our operations, contributing to the cost increases, along with higher labour and energy costs. Higher costs were also attributed to the increased use of contractors to address employee turnover and to accelerate waste removal. In addition, higher equipment utilization resulted in cost increases. The decision to advance scheduled maintenance and reduce production in the quarter allowed us to draw down inventories at the mine sites and provide more flexibility for production and shipping in the second half of the year.

The tables below report the components of our unit costs in Canadian and equivalent U.S. dollars.

   
Three months
ended June 30,
   
Six months
ended June 30,
 
(amounts reported in CAD$ per tonne)
 
2017
   
2016
   
2017
   
2016
 
Site cost of sales
 
$
53
   
$
42
   
$
54
   
$
43
 
Transportation costs
   
36
     
34
     
36
     
34
 
Unit costs (1) (2)
 
$
89
   
$
76
   
$
90
   
$
77
 

   
Three months
ended June 30,
   
Six months
ended June 30,
 
(amounts reported in US$ per tonne)
 
2017
   
2016
   
2017
   
2016
 
Site cost of sales
 
$
39
   
$
32
   
$
41
   
$
32
 
Transportation costs
   
27
     
27
     
27
     
26
 
Unit costs (1) (2)
 
$
66
   
$
59
   
$
68
   
$
58
 

Notes:
1)
Non-GAAP financial measure. See “Use of Non-GAAP Financial Measures” section for further information.
2)
Does not include deferred stripping or capital expenditures.

Our total cost of sales for the quarter also included a $12 per tonne charge for the amortization of capitalized stripping costs and $16 per tonne for other depreciation.

Outlook

The markets have stabilized over the past month and we are seeing good demand for our products. Spot prices for top quality products have moved up by more than US$30 per tonne and are currently trading above US$170 per tonne, well up from the lows near US$140 per tonne in mid-June.
10    Teck Resources Limited 2017 Second Quarter News Release

 
We expect coal sales in the third quarter of 2017 of at least 7.0 million tonnes. Vessel nominations for contract shipments are determined by customers and final sales and average prices for the quarter will depend on product mix, market direction for spot priced sales, timely arrival of vessels, as well as the performance of the rail transportation network and port-loading facilities.

We expect total production for the year in the range of 27 to 27.5 million tonnes. Our previous guidance was 27 to 28 million tonnes. We expect unit cost of sales in the range of $49 to $53 per tonne, up from our previous guidance of $46 to $50 per tonne. Our original guidance for transportation costs remains unchanged at $35 to $37 per tonne.
 
 
 

11    Teck Resources Limited 2017 Second Quarter News Release


COPPER BUSINESS UNIT
   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Copper price (realized – US$/pound)
 
$
2.58
   
$
2.15
   
$
2.63
   
$
2.13
 
Production (000’s tonnes)
   
70
     
91
     
134
     
173
 
Sales (000’s tonnes)
   
69
     
92
     
133
     
173
 
Gross profit, before depreciation and amortization
 
$
253
   
$
206
   
$
448
   
$
386
 
Gross profit
 
$
128
   
$
62
   
$
171
   
$
121
 
Property, plant and equipment expenditures
 
$
58
   
$
40
   
$
102
   
$
72
 

Performance

Gross profit from our copper business unit for the quarter was $128 million compared with $62 million a year ago. Gross profit before depreciation and amortization increased by $47 million in the second quarter compared with a year ago (see table below). This was primarily due to higher realized prices and substantially higher zinc sales from Antamina as a result of record zinc production. These items were partially offset by lower copper sales volumes and associated higher unit costs.

Copper production declined by 23% from a year ago primarily due to lower ore grades at Highland Valley Copper as anticipated in the mine plan. Production was expected to be lower in the first half of 2017 and is anticipated to gradually improve as the year progresses. Due to the lower copper production and despite continued good site cost performance, our cash unit costs before by-products increased 17% to US$1.69 per pound compared to US$1.44 per pound during the same period a year ago. Significantly higher production of zinc and molybdenum resulted in cash unit costs after by-products decreasing 6% to US$1.26 per pound compared to US$1.34 per pound during the same period last year.

The table below summarizes the changes in gross profit, before depreciation and amortization, in our copper business unit for the quarter:

(CAD$ in millions)
 
Three months
ended June 30,
 
As reported in the second quarter of 2016
 
$
206
 
Increase (decrease):
       
   Copper price realized
   
81
 
   Sales volume
   
(50
)
   Co-product and by-product contribution
   
60
 
   Unit operating costs
   
(51
)
   Inventory write-downs
   
(6
)
   Foreign exchange
   
13
 
Net increase
   
47
 
As reported in current quarter
 
$
253
 

12    Teck Resources Limited 2017 Second Quarter News Release


Property, plant and equipment expenditures totaled $58 million, including $19 million for sustaining capital and $29 million for new mine development related to the Quebrada Blanca Phase 2 project. Capitalized stripping costs were $35 million in the second quarter, the same as a year ago.

Markets

London Metal Exchange (LME) copper prices in the second quarter of 2017 averaged US$2.57 per pound, down 3% from the prior quarter but up 20% from the same quarter a year ago. Year to date prices have averaged US$2.61 per pound, a 22% increase over the same period last year. Copper prices peaked in the first quarter at US$2.80 per pound due to production disruptions at two of the world’s largest copper mines, but then drifted lower in the second quarter to US$2.45 per pound as production resumed at these mines. An improved outlook for demand in Europe and Asia combined with reported exchange stocks falling during the second quarter by 145,000 tonnes, allowed prices to recover back above US$2.60 per pound by the end of the quarter.

Total reported exchange stocks fell 145,850 tonnes during the second quarter to 572,500 tonnes. Total reported global copper exchange stocks are now estimated to be 9.2 days of global consumption, below the estimated 25 year average of 11.9 days of global consumption. Stocks on the LME declined by 42,000 tonnes and stocks at SHFE warehouses also declined 130,000 tonnes and currently stand at 177,000 tonnes, their lowest level since the end of January. The reduction in year to date refined imports into China, lower Chinese domestic production due to smelter maintenance as well as improved domestic consumption, combined to draw down inventories through the second quarter.

Mine production disruptions continued from the first quarter into the second quarter with labour disruptions curtailing the majority of production. With several ongoing issues remaining unresolved, the potential for additional unplanned interruptions remains. We expect the lack of investment made over the past six years due to the downtrend in copper prices to constrain new mine production growth to the end of this decade.

Operations

Highland Valley Copper

Copper production was significantly reduced in the second quarter at 21,100 tonnes, or 45% lower than a year ago. This was primarily due to planned lower grades and recoveries as a higher grade phase of the Valley pit was exhausted in 2016 and significantly more lower-grade ore from the Lornex pit was processed than in the same period last year. As previously disclosed, ore grades and recoveries are expected to remain lower than in prior years, but are anticipated to gradually improve as the year progresses. Molybdenum production of 2.2 million pounds was more than twice the production of a year ago due to higher grades.

Operating costs, before a $2 million inventory writedown, were $108 million in the second quarter, 5% lower than a year ago. Unit costs rose substantially as a result of lower production.

Our labour agreement at Highland Valley Copper expired at the end of the third quarter of 2016 and negotiations are ongoing. A strike vote was approved by union members on July 16, 2017, but no strike notice has yet been delivered to the company.
13    Teck Resources Limited 2017 Second Quarter News Release

Antamina

Antamina processed significantly less copper-only ore while the processing of copper-zinc ore almost tripled from the same period a year ago, which was anticipated in the mine plan. The mix of mill feed in the quarter was 58% copper-only ore and 42% copper-zinc ore, compared with 87% and 13% respectively a year ago. As a result, copper production in the second quarter of 118,500 tonnes was similar to a year ago, while second quarter zinc production increased by 79,500 tonnes to a record 102,300 tonnes, primarily due to increased processing of copper-zinc ores combined with higher grades and recoveries.

Operating costs in the second quarter, as reported in U.S. dollars, were 6% higher than a year ago, primarily due to processing more copper-zinc ores and higher maintenance costs.

Carmen de Andacollo

Copper production in the second quarter of 17,000 tonnes was similar to a year ago as improved grades were offset by lower mill throughput.

Operating costs rose by US$5 million in the second quarter compared with a year ago due to higher milling costs related to processing harder ore and the timing of maintenance activities.

Quebrada Blanca

As previously announced, all supergene ore mined is now being sent directly to the dump leach circuit. This results in lower recovery and a longer leaching cycle at reduced operating costs. As a result of these changes, copper production in the second quarter decreased by 37% to 5,300 tonnes compared with a year ago.

Operating costs in the second quarter were US$13 million lower than a year ago, primarily as a result of suspending the crushing, agglomeration and stacking circuits associated with the previous heap leaching operation.

Depreciation and amortization charges decreased by $18 million compared to a year ago as a result of lower production levels.

Cost of Sales

Unit cash costs of product sold in the second quarter of 2017 as reported in U.S. dollars, before cash margins for by-products, were US$1.69 per pound compared to US$1.44 per pound in the same period a year ago. The higher unit costs were primarily due to the significant decline in production at Highland Valley Copper as a result of lower grades.

Cash margin for by-products increased significantly to US$0.43 per pound compared with US$0.10 per pound in the same period a year ago. This was primarily due to higher zinc prices as well as significantly higher sales volumes of zinc from Antamina and molybdenum from Highland Valley Copper. The higher by-product credits more than offset the significantly lower copper production in the quarter resulting in unit cash costs for copper, after by-products, of US$1.26 per pound compared to US$1.34 in the same period a year ago.
14    Teck Resources Limited 2017 Second Quarter News Release


   
Three months
ended June 30,
   
Six months
ended June 30,
 
(amounts reported in US$ per pound)
 
2017
   
2016
   
2017
   
2016
 
Adjusted cash cost of sales (1)
 
$
1.46
   
$
1.22
   
$
1.54
   
$
1.18
 
Smelter processing charges
   
0.23
     
0.22
     
0.23
     
0.23
 
Total cash unit costs before by-product margins (1)
 
$
1.69
   
$
1.44
   
$
1.77
   
$
1.41
 
Cash margin for by-products (1) (2)
   
(0.43
)
   
(0.10
)
   
(0.37
)
   
(0.10
)
Total cash unit costs after by-product margins (1)
 
$
1.26
   
$
1.34
   
$
1.40
   
$
1.31
 

Notes:
1)
Non-GAAP financial measure. See “Use of Non-GAAP Financial Measures” section for further information.
2)
By-products includes both by-products and co-products.

Copper Development Projects

Quebrada Blanca Phase 2

Project activities during the quarter focused primarily on execution readiness activities including advancing detailed engineering and design, as well as continuing progress on the Social and Environmental Impact Assessment (SEIA) regulatory approval process.

Quebrada Blanca Phase 2 is expected to have an annual production capacity of 300,000 tonnes of copper equivalent production per year for the first five years of mine life, equating to a capital intensity of approximately US$16,000 per annual tonne. A decision to proceed with development would be contingent upon regulatory approvals and market conditions, among other considerations. Given the timeline of the regulatory process, such a decision is not expected before mid-2018.

NuevaUnión

Activities continued to advance the pre-feasibility study in the quarter, including environmental baseline studies and ongoing community engagement with indigenous and non-indigenous communities. We expect to complete the pre-feasibility study by the end of the fourth quarter of 2017.

Other Copper Projects

In March 2017, we launched our Project Satellite initiative, the focus of which is to surface value from five substantial base metals assets — Zafranal, San Nicolás, Galore Creek, Schaft Creek, and Mesaba — all of which are located in stable mining-friendly jurisdictions in the Americas. Our approach is to work with existing and potentially new partners on appropriate and prudently-funded work to advance engineering and design as well as social and environmental activities. Value capture could be achieved through various commercial or development options, including full divestment, further investment by Teck, partnering, vend-in or public offering.

15    Teck Resources Limited 2017 Second Quarter News Release


Zafranal

In January 2017, we increased our ownership of Compañia Minera Zafranal S.A.C., which owns the Zafranal copper-gold project located in Southern Peru, to 80% through an acquisition of all of the outstanding shares of AQM Copper Inc. not already owned by us. Additional drilling and engineering studies began in the second quarter along with additional community engagement activities, environmental and archaeological studies, and permitting work necessary to potentially prepare an Environmental Impact Assessment and initiate a Feasibility Study of the project.

San Nicolás

On June 29, 2017, we entered into an agreement with Goldcorp Inc. to acquire their 21% interest in the San Nicolás copper-zinc asset for cash consideration of US$50 million. As a result of the transaction, we will hold a 100% interest in the San Nicolás copper-zinc asset. The transaction is expected to close before the end of 2017. Planning for the environmental and social baseline studies and hydrologic and hydrogeological studies began in the second quarter, along with early community engagement work and drill program planning in support of preparation and submission of an Environmental Impact Assessment.

Outlook

We continue to expect 2017 copper production to be in the range of 275,000 to 290,000 tonnes and full year copper unit costs to be in the range of US$1.75 to US$1.85 per pound before margins from by-products and US$1.40 to US$1.50 per pound after by-products.

Full year molybdenum production at Highland Valley Copper is also unchanged at 6.0 to 6.5 million pounds contained in concentrate.


16    Teck Resources Limited 2017 Second Quarter News Release


ZINC BUSINESS UNIT
   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Zinc price (realized – US$/lb)
 
$
1.18
   
$
0.85
   
$
1.23
   
$
0.80
 
Production (000’s tonnes)
                               
   Refined zinc
   
74
     
69
     
152
     
148
 
   Zinc in concentrate (1)
   
135
     
161
     
265
     
326
 
Sales (000’s tonnes)
                               
   Refined zinc
   
74
     
72
     
150
     
150
 
   Zinc in concentrate (1)
   
90
     
92
     
205
     
212
 
Gross profit before depreciation and amortization
 
$
196
   
$
131
   
$
401
   
$
256
 
Gross profit
 
$
153
   
$
99
   
$
317
   
$
189
 
Property, plant and equipment expenditures
 
$
47
   
$
39
   
$
89
   
$
75
 

Note:
1) Represents production and sales from Red Dog and Pend Oreille. Excludes co-product zinc production from our copper business unit.

Performance

Gross profit from our zinc business unit was $153 million in the second quarter compared with $99 million a year ago. Gross profit before depreciation and amortization increased by $65 million due primarily to higher zinc prices.

Refined zinc production at our Trail Operations was 6% higher than the same period a year ago primarily due to higher feed rates. At Red Dog, zinc production was 16% lower than the same period a year ago due to lower zinc grade and recoveries, which were partially offset by higher mill throughput.

The table below summarizes the gross profit change, before depreciation and amortization, in our zinc business unit for the quarter in comparison to the same period in 2016.

(CAD$ in millions)
 
Three months
ended June 30,
 
As reported in the second quarter of 2016
 
$
131
 
Increase (decrease):
       
   Zinc price realized
   
87
 
   Co-product and by-product contribution
   
(4
)
   Unit operating costs
   
(15
)
   Royalties
   
(13
)
   Inventory write-down
   
(9
)
   Foreign exchange
   
19
 
Net increase
   
65
 
As reported in current quarter
 
$
196
 

Property, plant and equipment expenditures include $42 million for sustaining capital, which included $29 million at Trail Operations and $11 million at Red Dog.
17    Teck Resources Limited 2017 Second Quarter News Release

Markets

LME zinc prices averaged US$1.18 per pound in the second quarter of 2017, a decrease of 7% from the first quarter, but 35% higher than the second quarter of 2016. Year to date LME zinc prices have averaged US$1.22 per pound, up US$0.40 per pound or 50% over the same period last year.

Total reported zinc exchange stocks fell 198,800 tonnes during the second quarter to 356,180 tonnes. Total exchange stocks are down almost 300,000 tonnes from the same point last year and are now estimated at 9.5 days of global consumption, well below the 25 year average of 23.4 days.

Global demand for refined zinc remained strong in the second quarter of 2017 with galvanized steel production up 4.6% year to date over the same period last year according to CRU. In China, CRU estimates that galvanized steel production rose 8.1% in the first half of 2017 compared with the same period last year. Galvanized steel prices have fallen slightly in the quarter in most regions. Slightly lower, but still-steady, demand contributed to this as well as higher imports in the U.S.

Wood Mackenzie is forecasting an increase in global refined zinc demand in 2017 of 3.0% to 14.7 million tonnes, and that refined zinc production will be limited to a 2.0% increase, to 13.8 million tonnes, leaving the market in deficit again this year. Even with mine production increases, production is not keeping pace with prior smelter capacity growth, leaving refined zinc production constrained by lack of concentrates. A series of smelter maintenance shutdowns at the end of the first quarter and into the second provided temporary relief to the smelters with spot treatment charges rising slightly in China. However, as smelter production comes back on line, concentrate availability will again be limited by near-term supply. We remain of the view that zinc prices are likely to remain strong in the short and medium-term.

Operations

Red Dog

Zinc production of 127,800 tonnes in the second quarter was 16% lower than the same period a year ago primarily due to lower grades and recoveries which were partially offset by higher mill throughput. Lead production increased 17% compared to last year, primarily due to higher grades.

During the quarter, we lowered the amount of higher-grade Qanaiyaq ore processed as this ore is metallurgically complex, particularly in the early stages of pit development where ores are highly oxidized. Qanaiyaq ore is expected to become less oxidized as the pit is deepened, and we expect to include more of this higher grade material in the feed as we gain more processing experience with this ore.

Zinc sales of 83,300 tonnes in the second quarter were slightly ahead of our guidance for the quarter as smelters continued to accelerate the treatment of inventory due to the general tightness in the global concentrate market. This tightness is reflected in spot treatment charges, which continue to be significantly below annual contract terms. Offsite zinc inventory available for sale as of July 1, 2017 was approximately 28,000 tonnes of contained metal.
18    Teck Resources Limited 2017 Second Quarter News Release

Operating costs in the second quarter of US$20 million were the same as a year ago. Capitalized stripping costs were US$5 million in the second quarter compared with US$9 million a year ago due to reduced waste movement.

Trail Operations

Refined zinc production of 73,400 tonnes in the second quarter was 6% higher than the same period a year ago as higher feed rates were partially offset by increases in in-process inventories.

Refined lead production was 17% lower in the second quarter compared with a year ago. This was partly due to an increase in maintenance downtime and changes to the feed mix due to operating disruptions at some mines that supply lead concentrates, which required alternative concentrates to be processed. Silver production was also affected, resulting in production being 8% lower than a year ago.

Operating costs in the second quarter of $111 million were $14 million higher than a year ago, primarily as a result of increased energy prices and repair expenses.

Sustaining capital expenditures in the quarter included $16 million for advancing the Number 2 Acid Plant and $13 million for various small projects.

A mediated settlement for a new five-year collective agreement is currently in the voting process for unionized employees at Trail Operations.

Pend Oreille

Zinc production during the second quarter of 7,200 tonnes was 9% lower than a year ago due to lower mill throughput, partially offset by higher grades.

The current mine plan sustains the operation through to early 2018, although there is still significant potential to extend the mine life. In 2016, we identified highly prospective areas in the currently producing East Mine area and we are continuing a major exploration and drilling program with good success so far.

Outlook

We continue to expect zinc in concentrate production in 2017, including co-product zinc production from our copper business unit, to be in the range of 590,000 to 615,000 tonnes.

The Red Dog concentrate shipping season commenced on July 1, with the first sailing on July 4. We expect sales of 145,000 tonnes of contained zinc in the third quarter and 165,000 tonnes in the fourth quarter, reflecting the normal seasonal pattern of Red Dog sales.

In accordance with the operating agreement governing the Red Dog mine between Teck and NANA Regional Corporation Inc. (NANA), we currently pay a 30% royalty on net proceeds of production to NANA. This royalty increases by 5% every fifth year to a maximum of 50%, with the next adjustment to 35% occurring in the fourth quarter of 2017.
19    Teck Resources Limited 2017 Second Quarter News Release


ENERGY BUSINESS UNIT

Fort Hills Project

Overall construction of the Fort Hills oil sands project has surpassed 92% completion. Four of the six major project areas (mining, ore preparation plant, primary extraction and infrastructure) have been turned over to operations. The construction of utilities is greater than 95% complete and the focus is on mechanical completion and commissioning. First oil facilities in secondary extraction are 81% complete. At the end of the second quarter, over 90% of this year’s budgeted operations personnel had been hired. In September, Suncor plans to initiate froth production in order to accelerate plant commissioning.

In the second quarter, our share of capital expenditures was $201 million. Our share of Fort Hills cash expenditures in 2017 is estimated at $780 million. A disagreement has recently arisen among the Fort Hills partners regarding future funding for the project and discussions are ongoing regarding the partners’ relative funding obligations. Suncor advises that the disagreement is not expected to affect the plan to achieve first oil by the end of 2017.

Oil production from the first of three secondary extraction units is expected near the end of 2017. The other two secondary extraction units are scheduled to be completed and commissioned in the first half of 2018 and production is expected to reach 90% of nameplate capacity by the end of 2018. Suncor, as the operator of the Fort Hills project, is also exploring the opportunity to reduce the ramp-up period.

The Fort Hills partners have executed long-term blend service and pipeline transportation agreements for the delivery of diluent from Edmonton to Fort Hills and blended bitumen to Hardisty from Fort Hills. Construction activities for the regional bitumen, diluent and blend pipelines and the East Tank Farm blending facility are complete and will be in service prior to mine start-up.

Each Fort Hills partner will be responsible for meeting its diluent blend requirements, transporting and selling its share of diluted bitumen to the market. The development of our comprehensive diluent acquisition and blended bitumen sales strategies is ongoing and we continue to review options to sell diluted bitumen into the North American and overseas markets.

Fort Hills blended bitumen is anticipated to have similar quality characteristics to production recently introduced into the marketplace from other large-scale oil sands mining projects. Our share of Fort Hills production will be marketed through a combination of long and short-term contracts. To this end, we are currently reviewing draft contract provisions with prospective customers. In support of our diverse market access strategy, we have contracted for 425,000 blended bitumen barrels of terminal storage at Hardisty.

Frontier Energy Project

The regulatory review for Frontier is continuing with a federal-provincial panel reviewing information filed to date. The process is expected to continue through 2017, making 2018 the earliest a federal decision statement is expected, for Frontier. Our expenditures are limited to supporting this process. We are evaluating the future project schedule and development options as part of our ongoing capital review and prioritization process.
20    Teck Resources Limited 2017 Second Quarter News Release

OTHER OPERATING INCOME AND EXPENSES

Other operating expense, net of other income, was $45 million in the second quarter compared with $28 million a year ago. The most significant of these items was $21 million of commodity derivative losses related to derivatives embedded in our gold and silver streaming agreements and to our zinc and lead positions related to Red Dog, which matches our economic exposure to the average zinc and lead prices over our shipping season. Pricing adjustments in the current quarter and prior year were minimal, as copper and zinc prices were relatively unchanged during those quarters.

The table below outlines our outstanding receivable positions, provisionally valued at June 30, 2017 and March 31, 2017.

   
Outstanding at
   
Outstanding at
 
   
March 31, 2017
   
June 30, 2017
 
(payable pounds in millions)
 
Pounds
   
US$/lb
   
Pounds
   
US$/lb
 
Copper
   
131
     
2.66
     
122
     
2.69
 
Zinc
   
123
     
1.27
     
100
     
1.25
 

Our finance expense of $59 million in the second quarter decreased by $25 million from a year ago. Our finance expense includes the interest expense on our debt, finance fees and amortization, interest components of our pension obligations and accretion on our decommissioning and restoration provisions, less any interest that we capitalize against our development projects. The primary reasons for the decrease in our finance expense was due to a higher amount of interest capitalized against our development projects, including $40 million for Fort Hills and $38 million for Quebrada Blanca Phase 2, reflecting our increased carrying values of both of these projects compared with a year ago and lower debt interest as a result of lower outstanding debt balances. Interest capitalization will cease when each project reaches completion. These were partly offset by higher letter of credit fees and accretion on our decommissioning and restoration provisions.

Non-operating expense in the second quarter of 2017 was $4 million, which included a $38 million loss on the repurchase of our debt, partly offset by foreign exchange gains of $10 million and a $23 million gain on the revaluation of our call options on certain long-term debt notes.

Income and resource taxes for the second quarter were $330 million, or 36% of pre-tax profits. This rate is higher than the Canadian statutory rate of 26% as a result of resource taxes and higher rates in foreign jurisdictions. Due to available tax pools, we are currently shielded from cash income taxes, but not resource taxes, in Canada. We remain subject to cash taxes in foreign jurisdictions.

21    Teck Resources Limited 2017 Second Quarter News Release


FINANCIAL POSITION AND LIQUIDITY

Our financial position and liquidity remains strong. Our debt position, net debt, and credit ratios are summarized in the table below:

   
June 30,
   
December 31,
 
   
2017
   
2016
 
Term notes
 
$
4,847
   
$
6,141
 
Unamortized fees and discounts
   
(40
)
   
(50
)
Other
   
113
     
122
 
Total debt (US$ in millions)
 
$
4,920
   
$
6,213
 
                 
Canadian $ equivalent (1)
   
6,385
     
8,343
 
Less cash balances
   
(846
)
   
(1,407
)
Net debt
 
$
5,539
   
$
6,936
 
                 
Debt to debt-plus-equity ratio (2) (3)
   
26
%
   
32
%
Net-debt to net-debt-plus-equity ratio (2)
   
23
%
   
28
%
Average interest rate
   
5.7
%
   
5.7
%

Notes:
1)
Translated at period end exchange rates.
2)
Non-GAAP financial measure. See “Use of Non-GAAP Financial Measures” section for further information.
3)
Our revolving credit facility requires us to maintain a debt to debt-plus-equity ratio not greater than 50%.

In the first half of 2017, we retired US$1.3 billion of our term notes pursuant to cash tender offers, make-whole redemptions and open market repurchases, of which US$260 million was completed in the second quarter. As a result, the principal balance of our public notes is now US$4.8 billion. At June 30, 2017 our debt to debt-plus-equity ratio was 26%.

Our committed credit facilities comprised of a US$3.0 billion revolving credit facility maturing July 2020 and a US$1.2 billion revolving credit facility maturing June 2019.

As at June 30, 2017, there were no amounts outstanding under the US$3.0 billion facility and US$804 million of letters of credit were outstanding under the US$1.2 billion facility. Of those letters of credit, an aggregate of US$672 million were issued in respect of long-term power purchase agreements for the Quebrada Blanca Phase 2 project and $167 million in respect of long-term transport service agreements for our share of the Fort Hills oil sands project.

We also have various other credit facilities and arrangements that secure our reclamation obligations in the amount of approximately $1.9 billion.

We may be required to post additional security in respect of reclamation at our sites in future periods as regulatory requirements change and closure plans are updated.

22    Teck Resources Limited 2017 Second Quarter News Release


Operating Cash Flow

Cash flow from operations was $1.4 billion in the second quarter compared with $339 million a year ago with the increase primarily due to substantially higher steelmaking coal prices and sales volumes.

Changes in working capital items provided a source of funds of $382 million in the second quarter compared with a use of cash of $109 million a year ago. The source of cash in the quarter was primarily due to a reduction in accounts receivables in our steelmaking coal business unit. With the settlement of the second quarter’s steelmaking coal prices, provisional payments of US$144 million made by our customers on second quarter coal sales will be repaid in the third quarter of the year.

Investing Activities

Expenditures on property, plant and equipment were $329 million in the second quarter, including $201 million of new mine development for the Fort Hills oil sands project, $71 million on sustaining capital and $11 million on major enhancement projects. The largest components of sustaining expenditures were $29 million at our Trail Operations and $11 million each at Antamina and Red Dog.

Capitalized production stripping costs were $173 million in the second quarter compared with $122 million a year ago. The majority of this item represents the advancement of pits for future production at our steelmaking coal mines.

The table below summarizes our year-to-date capital spending for 2017:

($ in millions)
 
Sustaining
   
Major
Enhancement
   
New Mine Development
   
Sub-total
   
Capitalized Stripping
   
Total
 
Steelmaking coal
 
$
43
   
$
18
   
$
   
$
61
   
$
238
   
$
299
 
Copper
   
38
     
1
     
63
     
102
     
72
     
174
 
Zinc
   
65
     
3
     
21
     
89
     
15
     
104
 
Energy
   
16
     
     
414
     
430
     
     
430
 
Corporate
   
3
     
     
     
3
     
     
3
 
   
$
165
   
$
22
   
$
498
   
$
685
   
$
325
   
$
1,010
 

Financing Activities

In the second quarter we repurchased US$260 million principal amount of our outstanding notes by way of make-whole redemptions and open market repurchases, reducing the balance of our outstanding notes to US$4.8 billion.

Debt interest and finance charges paid were $87 million in the second quarter compared with $74 million a year ago.
23    Teck Resources Limited 2017 Second Quarter News Release


OUTLOOK

Foreign Exchange and Debt Revaluation

The sales of our products are denominated in U.S. dollars, while a significant portion of our expenses are incurred in local currencies, particularly the Canadian dollar and the Chilean peso. Foreign exchange fluctuations can have a significant effect on our operating margins, unless such fluctuations are offset by related changes to commodity prices.

Our U.S. dollar denominated debt is subject to revaluation based on changes in the Canadian/U.S. dollar exchange rate. As at June 30, 2017, $4.2 billion of our U.S. dollar denominated debt is designated as a hedge against our foreign operations that have a U.S. dollar functional currency. As a result, any foreign exchange gains or losses arising on that amount of our U.S. dollar debt are recorded in other comprehensive income, with the remainder being charged to profit.


FINANCIAL INSTRUMENTS AND DERIVATIVES

We hold a number of financial instruments and derivatives which are recorded on our balance sheet at fair value with gains and losses in each period included in other comprehensive income and profit for the period as appropriate. The most significant of these instruments are marketable securities, metal-related forward contracts including those embedded in our silver and gold streaming agreements, and settlements receivable and payable, and prepayment rights on certain long-term debt notes. Some of our gains and losses on metal-related financial instruments are affected by smelter price participation and are taken into account in determining royalties and other expenses. All are subject to varying rates of taxation depending on their nature and jurisdiction.


QUARTERLY PROFIT AND CASH FLOW

(in millions, except for share data)
 
2017
   
2016
   
2015
 
     
Q2
     
Q1
     
Q4
     
Q3
     
Q2
     
Q1
     
Q4
     
Q3
     
Q2
 
                                                                         
Revenue
 
$
2,818
   
$
2,894
   
$
3,557
   
$
2,305
   
$
1,740
   
$
1,698
   
$
2,135
   
$
2,101
   
$
1,999
 
                                                                         
Gross profit
   
1,066
     
1,187
     
1,577
     
452
     
212
     
155
     
281
     
339
     
311
 
                                                                         
EBITDA (1)
   
1,323
     
1,334
     
1,561
     
804
     
468
     
517
     
(269
)
   
(2,506
)
   
596
 
                                                                         
Profit (loss) attributable to
   shareholders
   
577
     
572
     
697
     
234
     
15
     
94
     
(459
)
   
(2,146
)
   
63
 
                                                                         
Basic earnings (loss) per share
 
$
1.00
   
$
0.99
   
$
1.21
   
$
0.41
   
$
0.03
   
$
0.16
   
$
(0.80
)
 
$
(3.73
)
 
$
0.11
 
                                                                         
Diluted earnings (loss) per share
 
$
0.98
   
$
0.97
   
$
1.19
   
$
0.40
   
$
0.03
   
$
0.16
   
$
(0.80
)
 
$
(3.73
)
 
$
0.11
 
                                                                         
Cash flow from operations
 
$
1,408
   
$
1,293
   
$
1,490
   
$
854
   
$
339
   
$
373
   
$
693
   
$
560
   
$
335
 

Note:
1)
Non-GAAP financial measure. See “Use of Non-GAAP Financial Measures” section for further information.
24    Teck Resources Limited 2017 Second Quarter News Release


ADOPTION OF NEW ACCOUNTING STANDARDS AND ACCOUNTING DEVELOPMENTS

New IFRS pronouncements that have been issued but are not yet effective are listed below. We plan to apply the new standards or interpretations in the annual period for which they are first required.

Revenue from Contracts with Customers

In May 2014, the IASB issued IFRS 15, Revenue from Contracts with Customers (IFRS 15) as a result of a joint revenue project with the Financial Accounting Standards Board (FASB).

The new revenue standard introduces a single principles-based five-step model for the recognition of revenue when control of goods is transferred to, or a service is performed, for the customer. The five steps are to: identify the contract(s) with the customer, identify the performance obligations in the contract, determine the transaction price, allocate the transaction price, and recognize revenue when the performance obligation is satisfied. IFRS 15 also requires enhanced disclosures about revenue to help investors better understand the nature, amount, timing and uncertainty of revenue and cash flows from contracts with customers.

The standard initially has an effective date of January 1, 2018. We are required to adopt the provisions of IFRS 15 on either a full or modified retrospective basis. We are currently assessing our transition approach and expect to make a determination by the third quarter of 2017.

As at June 30, 2017 we have gathered relevant facts and identified our significant revenue contracts. Through the evaluation of the facts and contracts, we have established possible areas where changes to revenue recognition or presentation may be required. This issue identification has provided a framework for our contract review. We will continue to perform our contract review process and evaluate possible areas of change as identified in the third quarter of 2017.

The most significant item that we are continuing to review is in relation to the treatment of insurance and freight costs. In many of our sales contracts, we are responsible for arranging shipping and insurance services which occur after the date at which control of the product passes to the customer. Under IFRS 15, these services likely represent a separate performance obligation which would require separate accounting and disclosure. We are also evaluating whether we are a principal or an agent to these transactions and consequently whether the revenue should be reported on a gross or net basis, which is a presentation issue only on our statement of income. We are also evaluating whether there is any effect of IFRS 15 on our gold and silver streaming arrangements.

In addition to potential changes in recognition and measurement, IFRS 15 will require additional financial statement disclosures about revenue from contracts with customers than is currently required under existing IFRS. Once we complete our accounting analysis, we will focus on updating systems and processes to facilitate this additional reporting as well as any changes relating to revenue recognition that may be required.

25    Teck Resources Limited 2017 Second Quarter News Release


Financial Instruments

IFRS 9, Financial Instruments (IFRS 9), addresses the classification, measurement and recognition of financial assets and financial liabilities. The July 2014 publication of IFRS 9 is the completed version of the standard, replacing earlier versions of IFRS 9 and superseding the guidance relating to the classification and measurement of financial instruments in IAS 39, Financial Instruments: Recognition and Measurement (IAS 39).

IFRS 9 requires financial assets to be classified into three measurement categories on initial recognition: those measured at fair value through profit and loss, those measured at fair value through other comprehensive income and those measured at amortized cost. Investments in equity instruments are required to be measured by default at fair value through profit or loss. However, there is an irrevocable option for each equity instrument to present fair value changes in other comprehensive income. Measurement and classification of financial assets is dependent on the entity’s business model for managing the financial assets and the contractual cash flow characteristics of the financial asset. For financial liabilities, the standard retains most of the IAS 39 requirements. The main change is that, in cases where the fair value option is taken for financial liabilities, the part of a fair value change relating to an entity’s own credit risk is recorded in other comprehensive income rather than the income statement, unless this creates an accounting mismatch.

IFRS 9 introduces a new three-stage expected credit loss model for calculating impairment for financial assets. IFRS 9 no longer requires a triggering event to have occurred before credit losses are recognized. An entity is required to recognize expected credit losses when financial instruments are initially recognized and to update the amount of expected credit losses recognized at each reporting date to reflect changes in the credit risk of the financial instruments. In addition, IFRS 9 requires additional disclosure requirements about expected credit losses and credit risk.

The new hedge accounting model in IFRS 9 aligns hedge accounting with risk management activities undertaken by an entity. Components of both financial and non-financial items will now be eligible for hedge accounting, as long as the risk component can be identified and measured. The hedge accounting model includes eligibility criteria that must be met, but these criteria are based on an economic assessment of the strength of the hedging relationship. New disclosure requirements relating to hedge accounting will be required and are meant to simplify existing disclosures. The IASB currently has a separate project on macro hedging activities and until the project is completed, the IASB has provided a policy choice for entities to either apply the hedge accounting model in IFRS 9 or IAS 39 in full. Additionally, there is a hybrid option to use IAS 39 to account for macro hedges only and to use IFRS 9 for all other hedges.

The completed version of IFRS 9 is effective for us on January 1, 2018. We are currently assessing the effect of this standard and its related amendments on our financial statements. As at June 30, 2017, we have completed our initial review of the new standard and have identified a limited number of potential differences relevant to Teck. In particular, we are reviewing our portfolio of investments to consider the application of the irrevocable classification choice related to fair value changes and we are reviewing our processes for managing and estimating provisions for credit loss on our trade receivables. At this stage, we do not expect this standard to have a material effect on our financial statements.

26    Teck Resources Limited 2017 Second Quarter News Release


Leases

In January 2016, the IASB issued IFRS 16, Leases (IFRS 16), which eliminates the classification of leases as either operating or finance leases for a lessee. Under IFRS 16, all leases are considered finance leases and will be recorded on the balance sheet. The only exemptions to this classification will be for leases that are 12 months or less in duration or for leases of low-value assets. The requirement to record all leases as finance leases under IFRS 16 will increase lease assets and lease liabilities on an entity’s financial statements. IFRS 16 will also change the nature of expenses relating to leases as the straight-line lease expense previously recognized for operating leases will be replaced with depreciation expense for lease assets and finance expense for lease liabilities. IFRS 16 includes an overall disclosure objective and requires a company to disclose (a) information about lease assets and expenses and cash flows related to leases; (b) a maturity analysis of lease liabilities; and (c) any additional company-specific information that is relevant to satisfying the disclosure objective. IFRS 16 is effective from January 1, 2019 and can be applied before that date but only if IFRS 15 is also applied. We are currently assessing the effect of this standard on our financial statements. As at June 30, 2017, we have developed an understanding of the requirements of IFRS 16 but have not commenced analysis of existing arrangements or possible changes that may result from adoption of IFRS 16.


OUTSTANDING SHARE DATA

As at July 26, 2017 there were 570.0 million Class B subordinate voting shares and 7.8 million Class A common shares outstanding. In addition, there were approximately 24 million stock options outstanding with exercise prices ranging between $4.15 and $58.80 per share. More information on these instruments and the terms of their conversion is set out in Note 21 of our 2016 audited financial statements.


INTERNAL CONTROL OVER FINANCIAL REPORTING

Our management is responsible for establishing and maintaining adequate internal control over financial reporting. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. There have been no significant changes in our internal controls during the quarter ended June 30, 2017 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting.


SIGNIFICANT ACCOUNTING ESTIMATES

In preparing consolidated financial statements, management makes estimates that affect the reported amounts of assets, liabilities, revenue and expenses across all reportable segments. Management makes estimates that are believed to be reasonable under the circumstances. Our estimates are based on historical experience and other factors we consider to be reasonable, including expectations of future events. Critical accounting estimates are those that could affect the consolidated financial statements materially, are highly uncertain and where changes are reasonably likely to occur from period to period. Our critical accounting estimates that have a
27    Teck Resources Limited 2017 Second Quarter News Release

risk of resulting in a material adjustment to the carrying amounts of assets and liabilities within the next year include the recoverable amounts of long-lived assets, fair value of embedded derivatives associated with streaming transactions, estimated recoverable reserves and resources and the valuation of other assets and liabilities such as decommissioning and restoration provisions and the accounting for income taxes. These critical accounting estimates are consistent with those outlined in more detail in our 2016 annual consolidated financial statements and Management’s Discussion and Analysis.
 
 
 


28    Teck Resources Limited 2017 Second Quarter News Release


REVENUES AND GROSS PROFIT

Our revenue and gross profit by business unit are summarized in the tables below:

 
 
Three months
ended June 30,
   
Six months
ended June 30,
 
(Teck’s share in CAD$ millions)  
 
2017
   
2016
   
2017
   
2016
 
REVENUES
                       
   Steelmaking coal
 
$
1,596
   
$
678
   
$
3,262
   
$
1,343
 
 
                               
   Copper
                               
Highland Valley Copper
   
158
     
217
     
297
     
419
 
Antamina
   
243
     
160
     
435
     
285
 
Quebrada Blanca
   
40
     
53
     
94
     
111
 
Carmen de Andacollo
   
121
     
87
     
249
     
181
 
 
   
562
     
517
     
1,075
     
996
 
 
                               
   Zinc
                               
Trail Operations
   
562
     
480
     
1,138
     
947
 
Red Dog
   
193
     
131
     
439
     
282
 
Pend Oreille
   
24
     
15
     
49
     
30
 
Other
   
2
     
1
     
4
     
3
 
Inter-segment sales
   
(121
)
   
(83
)
   
(255
)
   
(164
)
 
   
660
     
544
     
1,375
     
1,098
 
 
                               
   Energy
   
     
1
     
     
1
 
TOTAL REVENUES
 
$
2,818
   
$
1,740
   
$
5,712
   
$
3,438
 
 
                               
GROSS PROFIT (LOSS)
                               
   Steelmaking coal
 
$
785
   
$
52
   
$
1,765
   
$
59
 
 
                               
   Copper
                               
Highland Valley Copper
   
(2
)
   
47
     
(42
)
   
85
 
Antamina
   
149
     
77
     
255
     
129
 
Quebrada Blanca
   
(39
)
   
(60
)
   
(93
)
   
(82
)
Carmen de Andacollo
   
20
     
(2
)
   
53
     
(10
)
Other
   
     
     
(2
)
   
(1
)
 
   
128
     
62
     
171
     
121
 
 
                               
   Zinc
                               
Trail Operations
   
44
     
36
     
91
     
70
 
Red Dog
   
114
     
71
     
235
     
135
 
Pend Oreille
   
(4
)
   
(5
)
   
(8
)
   
(12
)
Other
   
(1
)
   
(3
)
   
(1
)
   
(4
)
 
   
153
     
99
     
317
     
189
 
   Energy
   
     
(1
)
   
     
(2
)
TOTAL GROSS PROFIT
 
$
1,066
   
$
212
   
$
2,253
   
$
367
 
29    Teck Resources Limited 2017 Second Quarter News Release

COST OF SALES SUMMARY

Our cost of sales information by business unit is summarized in the tables below:

 
 
Three months
ended June 30,
   
Six months
ended June 30,
 
(Teck’s share in CAD$ millions)
 
2017
   
2016
   
2017
   
2016
 
OPERATING COSTS
                       
   Steelmaking coal
 
$
364
   
$
262
   
$
686
   
$
546
 
 
                               
   Copper
                               
Highland Valley Copper
   
110
     
114
     
234
     
227
 
Antamina
   
53
     
48
     
104
     
90
 
Quebrada Blanca
   
42
     
57
     
90
     
104
 
Carmen de Andacollo
   
76
     
66
     
145
     
144
 
Other
   
     
     
2
     
1
 
 
   
281
     
285
     
575
     
566
 
 
                               
   Zinc
                               
Trail Operations
   
111
     
97
     
211
     
189
 
Red Dog
   
27
     
26
     
68
     
65
 
Pend Oreille
   
19
     
17
     
40
     
36
 
Other
   
3
     
4
     
5
     
7
 
 
   
160
     
144
     
324
     
297
 
 
                               
   Energy
   
     
     
     
 
Total operating costs
 
$
805
   
$
691
   
$
1,585
   
$
1,409
 
                                 
TRANSPORTATION COSTS
                               
   Steelmaking coal
 
$
254
   
$
216
   
$
465
   
$
436
 
 
                               
   Copper
                               
Highland Valley Copper
   
8
     
8
     
14
     
16
 
Antamina
   
7
     
4
     
12
     
8
 
Quebrada Blanca
   
     
1
     
1
     
2
 
Carmen de Andacollo
   
5
     
6
     
12
     
11
 
 
   
20
     
19
     
39
     
37
 
 
                               
   Zinc
                               
Trail Operations
   
34
     
35
     
71
     
70
 
Red Dog
   
16
     
16
     
38
     
38
 
Pend Oreille
   
1
     
1
     
1
     
1
 
 
   
51
     
52
     
110
     
109
 
Total transportation costs
 
$
325
   
$
287
   
$
614
   
$
582
 
                                 
CONCENTRATE PURCHASES
                               
 
                               
Trail Operations
 
$
353
   
$
293
   
$
725
   
$
580
 
Inter-segment purchases
   
(121
)
   
(83
)
   
(255
)
   
(164
)
Total concentrate purchases
 
$
232
   
$
210
   
$
470
   
$
416
 
30    Teck Resources Limited 2017 Second Quarter News Release

COST OF SALES SUMMARY, continued

 
 
Three months
ended June 30,
   
Six months
ended June 30,
 
(Teck’s share in CAD$ millions)
 
2017
   
2016
   
2017
   
2016
 
ROYALTY COSTS
                       
   Steelmaking coal
 
$
3
   
$
2
   
$
8
   
$
4
 
 
                               
   Copper
                               
Antamina
   
8
     
7
     
13
     
7
 
 
                               
   Zinc
                               
Red Dog
   
21
     
7
     
70
     
20
 
Total royalty costs
 
$
32
   
$
16
   
$
91
   
$
31
 
 
                               
DEPRECIATION AND AMORTIZATION
                               
   Steelmaking coal
 
$
190
   
$
146
   
$
338
   
$
298
 
 
                               
   Copper
                               
Highland Valley Copper
   
42
     
48
     
91
     
91
 
Antamina
   
26
     
24
     
51
     
51
 
Quebrada Blanca
   
37
     
55
     
96
     
87
 
Carmen de Andacollo
   
20
     
17
     
39
     
36
 
 
   
125
     
144
     
277
     
265
 
 
                               
   Zinc
                               
Trail Operations
   
20
     
19
     
40
     
38
 
Red Dog
   
15
     
11
     
28
     
24
 
Pend Oreille
   
8
     
2
     
16
     
5
 
 
   
43
     
32
     
84
     
67
 
 
                               
   Energy
   
     
2
     
     
3
 
Total depreciation and amortization
 
$
358
   
$
324
   
$
699
   
$
633
 
TOTAL COST OF SALES
 
$
1,752
   
$
1,528
   
$
3,459
   
$
3,071
 

31    Teck Resources Limited 2017 Second Quarter News Release


CAPITALIZED STRIPPING COSTS

 
 
Three months
ended June 30,
   
Six months
ended June 30,
 
(Teck’s share in CAD$ millions)
 
2017
   
2016
   
2017
   
2016
 
Steelmaking coal
 
$
132
   
$
76
   
$
238
   
$
171
 
 
                               
Copper
                               
Highland Valley Copper
   
14
     
18
     
31
     
39
 
Antamina
   
20
     
16
     
40
     
43
 
Carmen de Andacollo
   
1
     
1
     
1
     
2
 
 
   
35
     
35
     
72
     
84
 
 
                               
Zinc
                               
Red Dog
   
6
     
11
     
15
     
26
 
Total
 
$
173
   
$
122
   
$
325
   
$
281
 
 
 
32    Teck Resources Limited 2017 Second Quarter News Release


PRODUCTION AND SALES STATISTICS

Production statistics for each of our operations are presented in the tables below. Operating results are on a 100% basis.
   
Three months
ended June 30,
   
Six months
ended June 30,
 
Steelmaking coal
 
2017
   
2016
   
2017
   
2016
 
Waste production (million BCM’s)
   
68.3
     
64.6
     
128.7
     
133.7
 
Clean coal production (million tonnes)
   
6.8
     
6.7
     
12.9
     
13.3
 
                                 
Clean coal strip ratio (waste BCM’s/coal tonnes)
 
10.1:1
   
9.8:1
   
10.0:1
   
9.9:1
 
Sales (million tonnes)
   
6.9
     
6.3
     
12.8
     
12.8
 

Highland Valley Copper
Tonnes mined (000's)
   
28,643
     
28,878
     
56,824
     
56,153
 
Tonnes milled (000's)
   
12,375
     
12,456
     
24,883
     
23,908
 
                                 
Copper
                               
Grade (%)
   
0.23
     
0.36
     
0.21
     
0.34
 
Recovery (%)
   
74.7
     
87.7
     
72.3
     
86.7
 
Production (000's tonnes)
   
21.1
     
38.7
     
37.5
     
69.5
 
Sales (000's tonnes)
   
19.8
     
37.8
     
37.5
     
71.7
 
Molybdenum
                               
Production (million pounds)
   
2.2
     
0.9
     
3.8
     
1.8
 
Sales (million pounds)
   
2.0
     
0.9
     
3.6
     
1.8
 

Antamina
Tonnes mined (000's)
   
62,254
     
62,794
     
118,025
     
117,977
 
Tonnes milled (000's)
                               
Copper-only ore
   
7,704
     
12,785
     
15,685
     
21,865
 
Copper-zinc ore
   
5,525
     
1,926
     
9,499
     
5,260
 
     
13,229
     
14,711
     
25,184
     
27,125
 
Copper (1)
                               
Grade (%)
   
1.00
     
0.90
     
0.94
     
0.96
 
Recovery (%)
   
89.4
     
90.6
     
88.6
     
89.7
 
Production (000's tonnes)
   
118.5
     
118.8
     
208.2
     
227.7
 
Sales (000's tonnes)
   
113.5
     
130.5
     
206.2
     
220.6
 
                                 
Zinc (1)
                               
Grade (%)
   
2.00
     
1.47
     
2.04
     
1.52
 
Recovery (%)
   
88.6
     
81.9
     
88.5
     
82.7
 
Production (000's tonnes)
   
102.3
     
22.8
     
174.9
     
64.6
 
Sales (000's tonnes)
   
98.2
     
10.7
     
181.4
     
53.1
 
                                 
Molybdenum
                               
Production (million pounds)
   
2.1
     
3.7
     
2.3
     
5.2
 
Sales (million pounds)
   
     
2.1
     
     
3.3
 

Note:
(1)
Copper ore grades and recoveries apply to all of the processed ores. Zinc ore grades and recoveries apply to copper-zinc ores only.

33    Teck Resources Limited 2017 Second Quarter News Release

PRODUCTION AND SALES STATISTICS, continued

   
Three months
ended June 30,
   
Six months
ended June 30,
 
Quebrada Blanca
 
2017
   
2016
   
2017
   
2016
 
Tonnes mined (000's)
   
3,056
     
2,325
     
6,183
     
5,779
 
Tonnes placed (000's)
                               
Heap leach ore
   
     
1,162
     
622
     
2,443
 
Dump leach ore
   
1,840
     
298
     
3,372
     
607
 
     
1,840
     
1,460
     
3,994
     
3,050
 
Grade (SCu%) (1)
                               
Heap leach ore
   
     
0.54
     
0.42
     
0.53
 
Dump leach ore
   
0.24
     
0.23
     
0.27
     
0.20
 
                                 
Production (000's tonnes)
                               
Heap leach ore
   
2.5
     
5.1
     
6.9
     
10.6
 
Dump leach ore
   
2.8
     
3.3
     
5.3
     
6.6
 
     
5.3
     
8.4
     
12.2
     
17.2
 
                                 
Sales (000's tonnes)
   
5.2
     
8.5
     
12.2
     
17.5
 

Note:
(1)
For heap leach and dump leach operations, copper grade is reported as % soluble copper (SCu%) rather than % total copper.

Carmen de Andacollo
Tonnes mined (000’s)
   
6,598
     
7,416
     
13,329
     
14,880
 
Tonnes milled (000’s)
   
3,932
     
4,208
     
8,344
     
8,512
 
Copper
                               
Grade (%)
   
0.46
     
0.42
     
0.48
     
0.43
 
Recovery (%)
   
89.3
     
89.0
     
89.2
     
89.4
 
Production (000’s tonnes)
   
16.2
     
15.9
     
35.8
     
32.8
 
Sales (000’s tonnes)
   
16.9
     
15.8
     
34.8
     
32.8
 
                                 
Gold (1)
                               
Production (000’s ounces)
   
12.2
     
11.7
     
26.8
     
25.3
 
Sales (000’s ounces)
   
11.1
     
11.6
     
21.8
     
23.8
 
                                 
Copper cathode
                               
Production (000’s tonnes)
   
0.8
     
1.0
     
1.6
     
1.9
 
Sales (000’s tonnes)
   
1.1
     
1.1
     
1.8
     
1.8
 

Note:
(1)
Carmen de Andacollo processes 100% of gold mined, 100% of the gold produced is for the account of Royal Gold, Inc. until 900,000 ounces have been delivered, and 50% thereafter.

34    Teck Resources Limited 2017 Second Quarter News Release


PRODUCTION AND SALES STATISTICS, continued

   
Three months
ended June 30,
   
Six months
ended June 30,
 
Trail Operations
 
2017
   
2016
   
2017
   
2016
 
Concentrate treated (000’s tonnes)
                       
 Zinc
   
133
     
127
     
282
     
265
 
 Lead
   
39
     
42
     
81
     
89
 
Metal production
                               
Zinc (000's tonnes)
   
73.4
     
69.1
     
151.6
     
147.7
 
Lead (000's tonnes)
   
22.2
     
26.8
     
46.0
     
53.3
 
Silver (million ounces)
   
5.9
     
6.4
     
11.6
     
12.4
 
Gold (000's ounces)
   
10.4
     
14.5
     
19.4
     
27.9
 
                                 
Metal sales
                               
Zinc (000's tonnes)
   
73.9
     
72.1
     
149.6
     
149.6
 
Lead (000's tonnes)
   
21.4
     
27.0
     
45.0
     
50.6
 
Silver (million ounces)
   
6.0
     
6.4
     
11.7
     
12.3
 
Gold (000's ounces)
   
10.2
     
12.3
     
18.8
     
27.5
 

Red Dog
Tonnes mined (000's)
   
2,947
     
3,529
     
5,776
     
7,154
 
Tonnes milled (000's)
   
1,117
     
1,057
     
2,136
     
2,139
 
Zinc
                               
Grade (%)
   
14.2
     
17.4
     
14.4
     
17.4
 
Recovery (%)
   
80.6
     
83.3
     
80.4
     
83.3
 
Production (000's tonnes)
   
127.8
     
152.9
     
248.3
     
310.0
 
Sales (000's tonnes)
   
83.3
     
84.8
     
188.8
     
196.0
 
Lead
                               
Grade (%)
   
5.2
     
4.6
     
5.3
     
4.9
 
Recovery (%)
   
54.7
     
55.3
     
53.2
     
56.6
 
Production (000's tonnes)
   
31.6
     
27.1
     
60.5
     
59.4
 
Sales (000's tonnes)
   
     
     
     
 

Pend Oreille
Tonnes mined (000's)
   
158
     
202
     
349
     
393
 
Tonnes milled (000's)
   
122
     
159
     
264
     
336
 
Zinc
                               
Grade (%)
   
6.9
     
5.8
     
7.1
     
5.6
 
Recovery (%)
   
84.9
     
85.2
     
86.7
     
85.7
 
Production (000's tonnes)
   
7.2
     
7.9
     
16.3
     
16.2
 
Sales (000's tonnes)
   
7.3
     
7.7
     
16.4
     
16.2
 
Lead
                               
Grade (%)
   
1.1
     
1.2
     
1.5
     
1.1
 
Recovery (%)
   
62.0
     
68.5
     
69.6
     
65.1
 
Production (000's tonnes)
   
0.9
     
1.3
     
2.8
     
2.5
 
Sales (000's tonnes)
   
1.0
     
1.2
     
2.8
     
2.5
 

35    Teck Resources Limited 2017 Second Quarter News Release

USE OF NON-GAAP FINANCIAL MEASURES

Our financial results are prepared in accordance with International Financial Reporting Standards (IFRS). This document refers to adjusted profit, adjusted earnings per share, EBITDA, adjusted EBITDA, gross profit before depreciation and amortization, gross profit margins before depreciation, cash unit costs, adjusted cash costs of sales, cash margins for by-products, adjusted revenue, net debt, debt to debt-plus-equity ratio, and the net debt to net debt-plus-equity ratio, which are not measures recognized under IFRS in Canada and do not have a standardized meaning prescribed by IFRS or Generally Accepted Accounting Principles (GAAP) in the United States.

For adjusted profit, we adjust profit attributable to shareholders as reported to remove the effect (after taxes) of certain types of transactions that in our judgment are not indicative of our normal operating activities or do not necessarily occur on a regular basis. EBITDA is profit attributable to shareholders before net finance expense, income and resource taxes, and depreciation and amortization. Adjusted EBITDA is EBITDA before the pre-tax effect of the adjustments that we make to profit attributable to shareholders described above. These adjustments to profit attributable to shareholders and EBITDA highlight items and allow us and readers to analyze the rest of our results more clearly. We believe that disclosing these measures assist readers in understanding the ongoing cash generating potential of our business in order to provide liquidity to fund working capital needs, service outstanding debt, fund future capital expenditures and investment opportunities, and pay dividends.

Gross profit before depreciation and amortization is gross profit with the depreciation and amortization expense added back. Gross profit margins before depreciation are gross profit before depreciation and amortization, divided by revenue for each respective business unit.

Unit costs are calculated by dividing the cost of sales for the principal product by sales volumes. We include this information as it is frequently requested by investors and investment analysts who use it to assess our cost structure and margins and compare it to similar information provided by many companies in our industry.

We sell both copper concentrates and refined copper cathodes. The price for concentrates sold to smelters is based on average London Metal Exchange prices over a defined quotational period, from which processing and refining deductions are made. In addition, we are paid for an agreed percentage of the copper contained in concentrates, which constitutes payable pounds. Adjusted revenue excludes the revenue from co-products and by-products, but adds back the processing and refining allowances to arrive at the value of the underlying payable pounds of copper. Readers may compare this on a per unit basis with the price of copper on the LME.

Adjusted cash cost of sales for our steelmaking coal operations is defined as the cost of the product as it leaves the mine excluding depreciation and amortization charges. Adjusted cash cost of sales for our copper operations is defined as the cost of the product delivered to the port of shipment, excluding depreciation and amortization charges. It is common practice in the industry to exclude depreciation and amortization as these costs are ‘non-cash’ and discounted cash flow valuation models used in the industry substitute expectations of future capital spending for these amounts. In order to arrive at adjusted cash costs of sales for copper we also deduct the costs of by-products and co-products. Total cash unit costs include the smelter and refining allowances added back in determining adjusted revenue. This presentation allows a comparison of unit costs, including smelter allowances, to the underlying price of copper in
36    Teck Resources Limited 2017 Second Quarter News Release

order to assess the margin. Unit costs, after deducting co-product and by-product margins, are also a common industry measure. By deducting the co- and by-product margin per unit of the principal product, the margin for the mine on a per unit basis may be presented in a single metric for comparison to other operations. Readers should be aware that this metric, by excluding certain items and reclassifying cost and revenue items, distorts our actual production costs as determined under GAAP.

Net debt is total debt less cash and cash equivalents. The debt to debt-plus-equity ratio takes total debt as reported and divides that by the sum of total debt plus total equity. The net debt to net debt-plus-equity ratio is net debt divided by the sum of net debt plus total equity, expressed as a percentage. These measures are disclosed as we believe they provide readers with information that allows them to assess our credit capacity and the ability to meet our short and long-term financial obligations.

The measures described above do not have standardized meanings under IFRS, may differ from those used by other issuers, and may not be comparable to such measures as reported by others. These measures have been derived from our financial statements and applied on a consistent basis as appropriate. We disclose these measures because we believe they assist readers in understanding the results of our operations and financial position and are meant to provide further information about our financial results to investors. These measures should not be considered in isolation or used in substitute for other measures of performance prepared in accordance with IFRS.

Reconciliation of Earnings per share to Adjusted Earnings per share

    
Three months
ended June 30,
   
Six months
ended June 30,
 
(Per share amounts)
 
2017
   
2016
   
2017
   
2016
 
Earnings per share
 
$
1.00
   
$
0.03
   
$
1.99
   
$
0.19
 
Add (deduct):
                               
Debt repurchase losses
   
0.05
     
0.04
     
0.28
     
0.04
 
Debt prepayment option gain
   
(0.03
)
   
     
(0.06
)
   
 
Asset sales and provisions
   
     
(0.08
)
   
(0.01
)
   
(0.10
)
Foreign exchange (gains) losses
   
(0.02
)
   
0.01
     
(0.04
)
   
(0.14
)
Collective agreement charges
   
     
     
     
0.02
 
Tax and other items
   
     
0.01
     
     
0.03
 
Adjusted earnings per share
 
$
1.00
   
$
0.01
   
$
2.16
   
$
0.04
 


37    Teck Resources Limited 2017 Second Quarter News Release


Reconciliation of EBITDA and Adjusted EBITDA

   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Profit attributable to shareholders
 
$
577
   
$
15
   
$
1,149
   
$
109
 
Finance expense net of finance income
   
58
     
82
     
134
     
170
 
Provision for income taxes
   
330
     
47
     
675
     
73
 
Depreciation and amortization
   
358
     
324
     
699
     
633
 
EBITDA
   
1,323
     
468
     
2,657
     
985
 
                                 
Add (deduct):
                               
   Debt repurchase losses
   
38
     
27
     
216
     
27
 
   Debt prepayment option gain
   
(23
)
   
     
(44
)
   
 
   Asset sales and provisions
   
(1
)
   
(62
)
   
(12
)
   
(78
)
   Foreign exchange (gains) losses
   
(10
)
   
6
     
(22
)
   
(82
)
   Collective agreement charges
   
     
     
2
     
15
 
   Tax and other items
   
     
7
     
     
22
 
Adjusted EBITDA
 
$
1,327
   
$
446
   
$
2,797
   
$
889
 

Reconciliation of Gross Profit Before Depreciation and Amortization

   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Gross profit
 
$
1,066
   
$
212
   
$
2,253
   
$
367
 
Depreciation and amortization
   
358
     
324
     
699
     
633
 
Gross profit before depreciation and amortization
 
$
1,424
   
$
536
   
$
2,952
   
$
1,000
 
                                 
Reported as:
                               
Steelmaking coal
 
$
975
   
$
198
   
$
2,103
   
$
357
 
                                 
Copper
                               
Highland Valley Copper
   
40
     
95
     
49
     
176
 
Antamina
   
175
     
101
     
306
     
180
 
Quebrada Blanca
   
(2
)
   
(5
)
   
3
     
5
 
Carmen de Andacollo
   
40
     
15
     
92
     
26
 
Other
   
     
     
(2
)
   
(1
)
     
253
     
206
     
448
     
386
 
                                 
Zinc
                               
Trail Operations
   
64
     
55
     
131
     
108
 
Red Dog
   
129
     
82
     
263
     
159
 
Pend Oreille
   
4
     
(3
)
   
8
     
(7
)
Other
   
(1
)
   
(3
)
   
(1
)
   
(4
)
     
196
     
131
     
401
     
256
 
                                 
Energy
   
     
1
     
     
1
 
Gross profit before depreciation and amortization
 
$
1,424
   
$
536
   
$
2,952
   
$
1,000
 
38    Teck Resources Limited 2017 Second Quarter News Release


Steelmaking Coal Unit Cost Reconciliation

   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions, except where noted)
 
2017
   
2016
   
2017
   
2016
 
Cost of sales as reported
 
$
811
   
$
626
   
$
1,497
   
$
1,284
 
Less:
                               
   Transportation
   
(254
)
   
(216
)
   
(465
)
   
(436
)
   Depreciation and amortization
   
(190
)
   
(146
)
   
(338
)
   
(298
)
   Inventory write-down
   
     
     
     
(5
)
Adjusted cash cost of sales
 
$
367
   
$
264
   
$
694
   
$
545
 
Tonnes sold (millions)
   
6.9
     
6.3
     
12.8
     
12.8
 
                                 
Per unit costs - CAD$/tonne
                               
   Adjusted cash cost of sales
 
$
53
   
$
42
   
$
54
   
$
43
 
   Transportation
   
36
     
34
     
36
     
34
 
   Inventory write-down
   
     
     
     
 
Cash unit costs - CAD$/tonne
 
$
89
   
$
76
   
$
90
   
$
77
 
US$ AMOUNTS
                               
Average exchange rate (CAD$ per US$1.00)
 
$
1.35
   
$
1.29
   
$
1.33
   
$
1.33
 
Per unit costs - US$/tonne (1)
                               
   Adjusted cash cost of sales
 
$
39
   
$
32
   
$
41
   
$
32
 
   Transportation
   
27
     
27
     
27
     
26
 
   Inventory write-down
   
     
     
     
 
Cash unit costs - US$/tonne
 
$
66
   
$
59
   
$
68
   
$
58
 

Note:
(1) Average period exchange rates are used to convert to US$/tonne equivalent.

39    Teck Resources Limited 2017 Second Quarter News Release


Copper Unit Cost Reconciliation

   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions, except where noted)
 
2017
   
2016
   
2017
   
2016
 
Revenue as reported
 
$
562
   
$
517
   
$
1,075
   
$
996
 
By-product revenue (A) (1)
   
(99
)
   
(25
)
   
(169
)
   
(57
)
Smelter processing charges
   
45
     
57
     
86
     
112
 
Adjusted revenue
 
$
508
   
$
549
   
$
992
   
$
1,051
 
                                 
Cost of sales as reported
 
$
434
   
$
455
   
$
904
   
$
875
 
Less:
                               
   Depreciation and amortization
   
(125
)
   
(144
)
   
(277
)
   
(265
)
   Inventory write-down
   
(6
)
   
     
(13
)
   
 
   Labour settlement charges
   
     
     
(2
)
   
(15
)
   By-product cost of sales (B) (1)
   
(16
)
   
     
(29
)
   
(10
)
Adjusted cash cost of sales
 
$
287
   
$
311
   
$
583
   
$
585
 
Payable pounds sold (millions) (C)
   
146.3
     
197.7
     
283.3
     
370.7
 
                                 
Adjusted per unit cash costs - CAD$/pound
                               
   Adjusted cash cost of sales
 
$
1.96
   
$
1.57
   
$
2.06
   
$
1.58
 
   Smelter processing charges
   
0.31
     
0.29
     
0.30
     
0.30
 
Total cash unit costs - CAD$/pound (D)
 
$
2.27
   
$
1.86
   
$
2.36
   
$
1.88
 
                                 
Cash margin for by-products – CAD$/pound
   ((A - B)/C) (1)
   
(0.57
)
   
(0.13
)
   
(0.49
)
   
(0.13
)
Net cash unit cost CAD$/pound (2)
 
$
1.70
   
$
1.73
   
$
1.87
   
$
1.75
 
                                 
US$ AMOUNTS
                               
Average exchange rate (CAD$ per US$1.00) (E)
 
$
1.35
   
$
1.29
   
$
1.33
   
$
1.33
 
                                 
Adjusted per unit costs – US$/pound (3)
                               
   Adjusted cash cost of sales
 
$
1.46
   
$
1.22
   
$
1.54
   
$
1.18
 
   Smelter processing charges
   
0.23
     
0.22
     
0.23
     
0.23
 
Total cash unit costs - US$/pound (1)
 
$
1.69
   
$
1.44
   
$
1.77
   
$
1.41
 
                                 
Cash margin for by-products – US$/pound
   
(0.43
)
   
(0.10
)
   
(0.37
)
   
(0.10
)
Net cash unit costs – US$/pound
 
$
1.26
   
$
1.34
   
$
1.40
   
$
1.31
 

Notes:
(1)
By-products includes both by-products and co-products. By-product costs of sales also includes cost recoveries associated with our streaming transactions.
(2)
Net cash unit cost of principal product after deducting co-product and by-product margins per unit of principal product and excluding depreciation and amortization.
(3)
Average period exchange rates are used to convert to US$/lb equivalent.
40    Teck Resources Limited 2017 Second Quarter News Release

CAUTIONARY STATEMENT ON FORWARD-LOOKING STATEMENTS

This news release contains certain forward-looking information and forward-looking statements as defined in applicable securities laws (collectively referred to in this news release as “forward-looking statements”). All statements other than statements of historical fact are forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Teck to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. These forward-looking statements, including under the headings “Outlook,” that appear in various places in this release, include estimates, forecasts, and statements as to management’s expectations with respect to, among other things, anticipated cost and production forecasts at our business units and individual operations and expectation that we will meet our production guidance, sales volume and selling prices for our products (including settlement of steelmaking coal contracts with customers), our expectations regarding future dividends, the timing of the closing of the Waneta Dam sale, expectation that coal production will improve in the second half of the year, the expectation that our realized price for premium steelmaking coal under the evolving index-linked pricing system will be similar to our historical relationship to the quarterly benchmark, anticipation of recovery in shortfall in coal waste volumes, expectation that copper production will increase in the second half of the year, plans and expectations for our development projects, expectation that grades at Highland Valley Copper will improve, expected production capacity of Quebrada Blanca Phase 2, goal of surfacing value through our Project Satellite initiative, the impact of currency exchange rates, the expected timing and amount of production at the Fort Hills oil sands project, total Fort Hills project capital costs, the expected amount and timing of Teck’s share of costs, the expectation that the Fort Hills plan to achieve first oil by the end of 2017 will not be affected by the disagreement among the Fort Hills partners regarding future funding, the timing of completion and commissioning of the secondary extraction units, the expected timing of achieving 90% of the expected production rate and demand and market outlook for commodities. These forward-looking statements involve numerous assumptions, risks and uncertainties and actual results may vary materially.

These statements are based on a number of assumptions, including, but not limited to, assumptions regarding general business and economic conditions, the supply and demand for, deliveries of, and the level and volatility of prices of, zinc, copper and steelmaking coal and other primary metals and minerals as well as oil, and related products, the timing of the receipt of regulatory and governmental approvals for our development projects and other operations, our costs of production and production and productivity levels, as well as those of our competitors, power prices, continuing availability of water and power resources for our operations, market competition, the accuracy of our reserve estimates (including with respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based, conditions in financial markets, the future financial performance of the company, our ability to attract and retain skilled staff, our ability to procure equipment and operating supplies, positive results from the studies on our expansion projects, our steelmaking coal and other product inventories, our ability to secure adequate transportation for our products, our ability to obtain permits for our operations and expansions, our ongoing relations with our employees and business partners and joint venturers, and an assumption that no strike will take place at our Highland Valley Copper or Trail Operations. Assumptions regarding Quebrada Blanca Phase 2 are based on current project assumptions and the final feasibility study. Assumptions regarding Fort Hills are based on the approved project development plan and the assumption that the project will be developed and operated in accordance with that
41    Teck Resources Limited 2017 Second Quarter News Release

plan, assumptions regarding the performance of the plant and other facilities at Fort Hills and the operation of the project, as well as the assumption that the future funding discussions will not impact the plan to achieve first oil by the end of 2017. Assumptions regarding the impact of foreign exchange are based on current commodity prices. The foregoing list of assumptions is not exhaustive. Events or circumstances could cause actual results to vary materially.

Factors that may cause actual results to vary materially include, but are not limited to, changes in commodity and power prices, changes in market demand for our products, changes in interest and currency exchange rates, acts of foreign governments and the outcome of legal proceedings, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, adverse weather conditions and unanticipated events related to health, safety and environmental matters), union labour disputes, political risk, social unrest, failure of customers or counterparties (including logistics suppliers) to perform their contractual obligations, changes in our credit ratings, unanticipated increases in costs to construct our development projects, difficulty in obtaining permits, inability to address concerns regarding permits of environmental impact assessments, and changes or further deterioration in general economic conditions. A strike or lockout at our Highland Valley Copper or Trail Operations may cause our copper or zinc production to vary from our projections. Our Fort Hills project is not controlled by us and construction and production schedules and costs may be adjusted by our partners, and timing of spending and construction is not in our control.

Statements concerning future production costs or volumes are based on numerous assumptions of management regarding operating matters and on assumptions that demand for products develops as anticipated, that customers and other counterparties perform their contractual obligations, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labour disturbances, interruption in transportation or utilities, adverse weather conditions, and that there are no material unanticipated variations in the cost of energy or supplies. Statements regarding anticipated steelmaking coal sales volumes and average steelmaking coal prices for the second quarter depend on timely arrival of vessels and performance of our steelmaking coal-loading facilities, as well as the level of spot pricing sales.

We assume no obligation to update forward-looking statements except as required under securities laws. Further information concerning risks and uncertainties associated with these forward-looking statements and our business can be found in our Annual Information Form for the year ended December 31, 2016, filed under our profile on SEDAR (www.sedar.com) and on EDGAR (www.sec.gov) under cover of Form 40-F.

WEBCAST

Teck will host an Investor Conference Call to discuss its Q2/2017 financial results at 11:00 AM Eastern time, 8:00 AM Pacific time, on Thursday, July 27, 2017. A live audio webcast of the conference call, together with supporting presentation slides, will be available at our website at www.teck.com. The webcast will be archived at www.teck.com

42    Teck Resources Limited 2017 Second Quarter News Release

 


 


Teck Resources Limited

Condensed Interim Consolidated Financial Statements

For the Three and Six Months Ended June 30, 2017
(Unaudited)
 

Teck


 


Teck Resources Limited
Consolidated Statements of Income
(Unaudited)

  
 
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions, except for share data)
 
2017
   
2016
   
2017
   
2016
 
Revenues
 
$
2,818
   
$
1,740
   
$
5,712
   
$
3,438
 
                                 
Cost of sales
   
(1,752
)
   
(1,528
)
   
(3,459
)
   
(3,071
)
Gross profit
   
1,066
     
212
     
2,253
     
367
 
                                 
Other operating expenses
                               
General and administration
   
(24
)
   
(21
)
   
(56
)
   
(46
)
Exploration
   
(12
)
   
(11
)
   
(22
)
   
(22
)
Research and development
   
(13
)
   
(6
)
   
(25
)
   
(17
)
 Other operating income (expense) (Note 2)
   
(45
)
   
(28
)
   
(33
)
   
(18
)
Profit from operations
   
972
     
146
     
2,117
     
264
 
                                 
Finance income
   
1
     
2
     
4
     
10
 
Finance expense (Note 3)
   
(59
)
   
(84
)
   
(138
)
   
(180
)
Non-operating income (expense) (Note 4)
   
(4
)
   
(7
)
   
(149
)
   
83
 
Share of income (losses) of associates and joint ventures
   
3
     
2
     
4
     
3
 
Profit before taxes
   
913
     
59
     
1,838
     
180
 
                                 
Provision for income taxes
   
(330
)
   
(47
)
   
(675
)
   
(73
)
Profit for the period
 
$
583
   
$
12
   
$
1,163
   
$
107
 
                                 
Profit attributable to:
                               
Shareholders of the company
 
$
577
   
$
15
   
$
1,149
   
$
109
 
  Non-controlling interests
   
6
     
(3
)
   
14
     
(2
)
Profit for the period
 
$
583
   
$
12
   
$
1,163
   
$
107
 
                                 
Earnings per share
                               
Basic
 
$
1.00
   
$
0.03
   
$
1.99
   
$
0.19
 
Diluted
 
$
0.98
   
$
0.03
   
$
1.96
   
$
0.19
 
                                 
Weighted average shares outstanding (millions)
   
577.7
     
576.3
     
577.4
     
576.3
 
                                 
Shares outstanding at end of period (millions)
   
577.8
     
576.3
     
577.8
     
576.3
 
44    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Consolidated Statements of Comprehensive Income (Loss)
(Unaudited)

    
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Profit for the period
 
$
583
   
$
12
   
$
1,163
   
$
107
 
                                 
Other comprehensive income (loss) in the period
                               
Items that may be reclassified to profit
                               
   Currency translation differences
      (net of taxes of $(16), $(5), $(25) and $(62))
   
(74
)
   
     
(90
)
   
(61
)
   Change in fair value of available-for-sale financial instruments
       (net of taxes of $1, $nil, $nil and $(2))
   
(4
)
   
2
     
3
     
16
 
   Share of other comprehensive
          loss of associates and joint ventures
   
(1
)
   
     
(5
)
   
 
     
(79
)
   
2
     
(92
)
   
(45
)
Items that will not be reclassified to profit
                               
   Remeasurements of retirement benefit plans
          (net of taxes of $5, $18, $(3) and $44)
   
(12
)
   
(40
)
   
14
     
(95
)
Total other comprehensive income (loss)
   for the period
   
(91
)
   
(38
)
   
(78
)
   
(140
)
Total comprehensive income (loss) for the period
 
$
492
   
$
(26
)
 
$
1,085
   
$
(33
)
                                 
Total other comprehensive income (loss)
   attributable to:
                               
   Shareholders of the company
 
$
(88
)
 
$
(38
)
 
$
(74
)
 
$
(137
)
   Non-controlling interests
   
(3
)
   
     
(4
)
   
(3
)
   
$
(91
)
 
$
(38
)
 
$
(78
)
 
$
(140
)
                                 
 Total comprehensive income (loss) attributable to:
                               
   Shareholders of the company
 
$
489
   
$
(23
)
 
$
1,075
   
$
(28
)
   Non-controlling interests
   
3
     
(3
)
   
10
     
(5
)
   
$
492
   
$
(26
)
 
$
1,085
   
$
(33
)
45    Teck Resources Limited 2017 Second Quarter News Release


Teck Resources Limited
Consolidated Statements of Cash Flows
(Unaudited)

  
 
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Operating activities
                       
Profit for the period
 
$
583
   
$
12
   
$
1,163
   
$
107
 
Depreciation and amortization
   
358
     
324
     
699
     
633
 
Provision for income taxes
   
330
     
47
     
675
     
73
 
Gain on sale of investments and assets
   
(1
)
   
(63
)
   
(12
)
   
(79
)
Foreign exchange gains
   
(10
)
   
6
     
(22
)
   
(82
)
Loss on debt repurchase
   
38
     
27
     
216
     
27
 
Gain on debt prepayment options
   
(23
)
   
     
(44
)
   
 
Finance expense
   
59
     
84
     
138
     
180
 
Income taxes paid
   
(298
)
   
(43
)
   
(422
)
   
(87
)
Other
   
(10
)
   
54
     
25
     
78
 
Net change in non-cash working capital items
   
382
     
(109
)
   
285
     
(138
)
     
1,408
     
339
     
2,701
     
712
 
Investing activities
                               
Property, plant and equipment
   
(329
)
   
(325
)
   
(685
)
   
(623
)
Capitalized production stripping costs
   
(173
)
   
(122
)
   
(325
)
   
(281
)
Expenditures on financial investments and other assets
   
(32
)
   
(25
)
   
(71
)
   
(47
)
Proceeds from the sale of investments and other assets
   
13
     
89
     
90
     
106
 
     
(521
)
   
(383
)
   
(991
)
   
(845
)
Financing activities
                               
Issuance of debt
   
     
1,567
     
     
1,567
 
Repayment of debt
   
(382
)
   
(1,624
)
   
(1,893
)
   
(1,630
)
Debt interest and finance charges paid
   
(87
)
   
(74
)
   
(263
)
   
(283
)
Issuance of Class B subordinate voting shares
   
1
     
     
8
     
 
Dividends paid
   
(58
)
   
(29
)
   
(58
)
   
(29
)
Distributions to non-controlling interests
   
(25
)
   
(1
)
   
(38
)
   
(2
)
     
(551
)
   
(161
)
   
(2,244
)
   
(377
)
                                 
Effect of exchange rate changes on cash and cash equivalents
   
(26
)
   
(9
)
   
(27
)
   
(106
)
Increase (decrease) in cash and cash equivalents
   
310
     
(214
)
   
(561
)
   
(616
)
Cash and cash equivalents at beginning of period
   
536
     
1,485
     
1,407
     
1,887
 
Cash and cash equivalents at end of period
 
$
846
   
$
1,271
   
$
846
   
$
1,271
 
46    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Consolidated Balance Sheets
(Unaudited)

 
 
June 30,
   
December 31,
 
(CAD$ in millions)
 
2017
   
2016
 
ASSETS
           
 
           
Current assets
           
Cash and cash equivalents
 
$
846
   
$
1,407
 
Current income taxes receivable
   
62
     
97
 
Trade accounts receivable
   
1,167
     
1,585
 
Inventories
   
1,670
     
1,673
 
Assets held for sale (Note 5)
   
350
     
 
 
   
4,095
     
4,762
 
 
               
Financial and other assets
   
1,068
     
1,034
 
Investments in associates and joint ventures
   
950
     
1,012
 
Property, plant and equipment
   
27,573
     
27,595
 
Deferred income tax assets
   
112
     
112
 
Goodwill
   
1,100
     
1,114
 
 
 
$
34,898
   
$
35,629
 
 
               
LIABILITIES AND EQUITY
               
 
               
Current liabilities
               
Trade accounts payable and other liabilities
 
$
1,787
   
$
1,902
 
Current income taxes payable
   
178
     
199
 
Debt (Note 6)
   
82
     
99
 
 
   
2,047
     
2,200
 
 
               
Debt (Note 6)
   
6,303
     
8,244
 
Deferred income tax liabilities
   
5,114
     
4,896
 
Deferred consideration
   
687
     
723
 
Retirement benefit liabilities
   
685
     
643
 
Other liabilities and provisions
   
1,438
     
1,322
 
 
   
16,274
     
18,028
 
Equity
               
Attributable to shareholders of the company
   
18,476
     
17,442
 
Attributable to non-controlling interests
   
148
     
159
 
 
   
18,624
     
17,601
 
 
 
$
34,898
   
$
35,629
 

47    Teck Resources Limited 2017 Second Quarter News Release


Teck Resources Limited
Consolidated Statements of Changes in Equity
(Unaudited)

   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
 
Class A common shares
           
   Beginning of period
 
$
7
   
$
7
 
   Class A shares conversion
   
(1
)
   
 
End of period
   
6
     
7
 
                 
Class B subordinate voting shares
               
   Beginning of period
   
6,637
     
6,627
 
   Issued on exercise of options
   
11
     
1
 
   Class A shares conversion
   
1
     
 
End of period
   
6,649
     
6,628
 
                 
Retained earnings
               
Beginning of period
   
10,183
     
9,174
 
Profit for the period attributable to shareholders of the company
   
1,149
     
109
 
Dividends declared
   
(58
)
   
(29
)
  Remeasurements of retirement benefit plans
   
14
     
(95
)
End of period
   
11,288
     
9,159
 
                 
Contributed surplus
               
Beginning of period
   
193
     
173
 
Share option compensation expense
   
8
     
11
 
  Transfer to Class B subordinate voting shares on exercise options
   
(2
)
   
 
End of period
   
199
     
184
 
                 
Accumulated other comprehensive income (loss) (Note 7(b))
               
Beginning of period
   
422
     
426
 
Other comprehensive income (loss)
   
(74
)
   
(137
)
  Less remeasurements of retirement benefit plans recorded in retained earnings
   
(14
)
   
95
 
End of period
   
334
     
384
 
                 
Non-controlling interests
               
Beginning of period
   
159
     
230
 
Profit for the period attributable to non-controlling interests
   
14
     
(2
)
Other comprehensive income (loss) attributable to non-controlling interests
   
(4
)
   
(3
)
Acquisition of AQM Copper Inc.
   
18
     
 
Other
   
(1
)
   
(7
)
  Dividends or net distributions
   
(38
)
   
(2
)
End of period
   
148
     
216
 
Total equity
 
$
18,624
   
$
16,578
 

 
48    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)
 
1.
BASIS OF PREPARATION

We prepare our annual consolidated financial statements in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board (IASB). These condensed interim consolidated financial statements have been prepared in accordance with IAS 34, Interim Financial Reporting (IAS 34).
These condensed interim consolidated financial statements follow the same accounting policies and methods of application as our most recent annual financial statements. Accordingly, they should be read in conjunction with our most recent annual financial statements. On July 26, 2017, the Audit Committee of the Board of Directors authorized these financial statements for issuance.


2. OTHER OPERATING INCOME (EXPENSE)

   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Settlement pricing adjustments
 
$
(3
)
 
$
(1
)
 
$
35
   
$
26
 
Share-based compensation (Note 7(a))
   
15
     
(42
)
   
(9
)
   
(69
)
Environmental and care and maintenance costs
   
(3
)
   
(23
)
   
(22
)
   
(40
)
Social responsibility and donations
   
(1
)
   
(4
)
   
(2
)
   
(20
)
Gain on sale of assets
   
1
     
36
     
12
     
50
 
Commodity derivatives
   
(21
)
   
29
     
25
     
64
 
Take or pay contract costs
   
(19
)
   
(4
)
   
(40
)
   
(8
)
Other
   
(14
)
   
(19
)
   
(32
)
   
(21
)
   
$
(45
)
 
$
(28
)
 
$
(33
)
 
$
(18
)


3. FINANCE EXPENSE
 
   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Debt interest
 
$
98
   
$
112
   
$
210
   
$
227
 
Letters of credit and standby fees
   
20
     
9
     
37
     
23
 
Net interest expense on retirement benefit plans
   
3
     
3
     
6
     
6
 
Accretion on decommissioning and
   restoration provisions
   
20
     
13
     
39
     
25
 
Other
   
     
7
     
2
     
12
 
     
141
     
144
     
294
     
293
 
Less capitalized borrowing costs
   
(82
)
   
(60
)
   
(156
)
   
(113
)
   
$
59
   
$
84
   
$
138
   
$
180
 


49    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

4. NON-OPERATING INCOME (EXPENSE)

   
Three months
ended June 30,
   
Six months
ended June 30,
 
(CAD$ in millions)
 
2017
   
2016
   
2017
   
2016
 
Foreign exchange gains (losses)
 
$
10
   
$
(6
)
 
$
22
   
$
82
 
Gain on debt prepayment options
   
23
     
     
44
     
 
Gain on sale of investments
   
1
     
27
     
1
     
29
 
Loss on debt repurchases (Note 6(a))
   
(38
)
   
(27
)
   
(216
)
   
(27
)
Provision for marketable securities
   
     
(1
)
   
     
(1
)
   
$
(4
)
 
$
(7
)
 
$
(149
)
 
$
83
 

5. ASSETS HELD FOR SALE

During the second quarter of 2017, we announced an agreement to sell our two-thirds interest in the Waneta Dam and related transmission assets for $1.2 billion cash to Fortis Inc. (Fortis). Under the agreement, we will be granted a 20-year lease with an option to extend for an additional ten years to use Fortis’ two-thirds interest in Waneta which entitles us to power for our Trail Operations. The closing of the transaction is subject to receipt of certain consents and other customary conditions and is not expected before the fourth quarter of 2017. BC Hydro has a right of first refusal in respect of the transaction. We have reclassified the carrying value of the Waneta Dam and related transmission assets to “assets held for sale” in accordance with the requirements of IFRS 5, Non-current Assets Held for Sale and Discontinued Operations. There were no adjustments required to the carrying amount of the Waneta Dam on reclassification to assets held for sale as the fair value less costs of disposal exceed the carrying amount.

The Waneta Dam is a hydro-electric dam that is located near the Trail smelter. We hold a two-thirds interest in the Waneta Dam and report this asset in our zinc operating segment.
50    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

6. DEBT

($ in millions)
 
June 30, 2017
   
December 31, 2016
 
                                     
   
Face
   
Carrying
   
Fair
   
Face
   
Carrying
   
Fair
 
   
Value
   
Value
   
Value
   
Value
   
Value
   
Value
 
   
(US$)
   
(CAD$)
   
(CAD$)
   
(US$)
   
(CAD$)
   
(CAD$)
 
3.15% notes due January 2017
 
$
   
$
   
$
   
$
34
   
$
45
   
$
45
 
3.85% notes due August 2017
   
16
     
20
     
21
     
16
     
21
     
21
 
2.5% notes due February 2018
   
22
     
29
     
29
     
22
     
30
     
30
 
3.0% notes due March 2019 (a)
   
     
     
     
278
     
372
     
375
 
4.5% notes due January 2021 (a)
   
220
     
284
     
298
     
500
     
668
     
685
 
8.0% notes due June 2021 (a)
   
     
     
     
650
     
866
     
963
 
4.75% notes due January 2022 (a)
   
672
     
869
     
910
     
700
     
936
     
951
 
3.75% notes due February 2023 (a)
   
646
     
831
     
820
     
670
     
891
     
858
 
8.5% notes due June 2024
   
600
     
779
     
902
     
600
     
806
     
935
 
6.125% notes due October 2035
   
609
     
777
     
832
     
609
     
804
     
801
 
6.0% notes due August 2040
   
491
     
634
     
643
     
491
     
658
     
623
 
6.25% notes due July 2041
   
795
     
1,020
     
1,079
     
795
     
1,055
     
1,043
 
5.2% notes due March 2042
   
399
     
511
     
483
     
399
     
528
     
477
 
5.4% notes due February 2043
   
377
     
484
     
461
     
377
     
500
     
450
 
     
4,847
     
6,238
     
6,478
     
6,141
     
8,180
     
8,257
 
                                                 
Antamina term loan due April 2020
   
23
     
29
     
29
     
23
     
30
     
30
 
Other
   
90
     
118
     
118
     
99
     
133
     
133
 
     
4,960
     
6,385
     
6,625
     
6,263
     
8,343
     
8,420
 
                                                 
Less current portion of long-term debt
   
(63
)
   
(82
)
   
(82
)
   
(74
)
   
(99
)
   
(99
)
 
 
$
4,897
   
$
6,303
   
$
6,543
   
$
6,189
   
$
8,244
   
$
8,321
 

The fair values of debt are determined using market values, if available, and discounted cash flows based on our cost of borrowing where market values are not available. The latter are considered Level 2 fair value measurements with significant other observable inputs on the fair value hierarchy (Note 11).

51    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

6. DEBT, continued

a) Note Purchases

During the first two quarters of 2017, we purchased US$1.26 billion aggregate principal amount of our outstanding notes pursuant to cash tender offers, make-whole redemptions and open-market purchases of which US$260 million was purchased in the second quarter. The principal amount of notes purchased was US$278 million of 3.00% notes due 2019, US$280 million of 4.50% notes due January 2021, US$650 million of 8.00% notes due June 2021 (June 2021 notes), US$28 million of 4.75% notes due 2022 and US$24 million of 3.75% notes due 2023. The total cost of the purchases, which was funded from cash on hand, including the premiums, was US$1.36 billion. We recorded a pre-tax accounting charge of $216 million ($159 million after-tax) in non-operating income (expense) (Note 4) in connection with these purchases, of which $38 million ($27 million after-tax) related to the second quarter purchases. The accounting charge of $216 million included $75 million relating to the write-off of the prepayment option recorded in other assets for the June 2021 notes (Note 6(b)).

b) Embedded Prepayment Options

The June 2021 notes and 2024 notes include prepayment options that are considered to be embedded derivatives. During the second quarter, the aggregate principal amount of the outstanding June 2021 notes was purchased and the prepayment option asset was written off (Note 6(a)). At June 30, 2017, the prepayment option included in the 2024 notes is recorded as other assets on the balance sheet at a fair value of $105 million, based on current market interest rates for a similar instrument and our credit spread. For the three months ended June 30, 2017, the value of the 2024 prepayment option and the June 2021 prepayment option, up to the date of purchase, increased by $23 million, which has been recorded as a gain in non-operating income (expense) (Note 4).

c) Revolving Facilities

At June 30, 2017, we had two committed revolving credit facilities in the amounts of US$3.0 billion and US$1.2 billion, respectively. The US$3.0 billion facility is available until July 2020 and is undrawn at June 30, 2017. The US$1.2 billion facility is available until June 2019 and has an aggregate of US$804 million in outstanding letters of credit drawn against it at June 30, 2017.

Under our US$3.0 billion and US$1.2 billion facilities, our uncommitted credit facilities and certain hedging lines, we have provided subsidiary guarantees for the benefit of the credit facilities. As a result our obligations under these agreements are guaranteed on a senior unsecured basis by Teck Metals Ltd (TML), Teck Coal Partnership, Teck South American Holdings Ltd., TCL U.S. Holdings Ltd., Teck Alaska Incorporated and Teck Highland Valley Copper Partnership, each a wholly owned subsidiary of Teck.

Any amounts drawn under the committed revolving credit facilities can be repaid at any time and are due in full at maturity. Amounts outstanding under the US$3.0 billion facility bear interest at LIBOR plus an applicable margin based on our credit ratings. Amounts outstanding under the US$1.2 billion facility bear interest at LIBOR plus an applicable margin based on our leverage ratio. Both facilities require that our total debt-to-capitalization ratio, which was 0.26 to 1.0 at June 30, 2017, not exceed 0.5 to 1.0.

When our credit ratings are below investment grade, we are required to deliver letters of credit to satisfy financial security requirements under power purchase agreements at Quebrada Blanca and transportation, tank storage and pipeline capacity agreements for our interest in Fort Hills. At June 30, 2017, we had an aggregate of US$834 million in letters of credit outstanding for these security requirements. These letters of credit will be terminated if and when we regain investment grade ratings or reduced if and when certain project milestones are reached.

52    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

6. DEBT, continued

We maintain uncommitted bilateral credit facilities primarily for the issuance of letters of credit to support our future reclamation obligations. As at June 30, 2017, we were party to various uncommitted credit facilities providing for a total of $1.48 billion of capacity and the aggregate outstanding letters of credit issued thereunder were $1.25 billion. In addition to the letters of credit outstanding under these uncommitted credit facilities, we also had stand-alone letters of credit of $336 million outstanding at June 30, 2017, which were not issued under a credit facility. These uncommitted credit facilities and stand-alone letters of credit are typically renewed on an annual basis.

We also have $305 million in surety bonds outstanding at June 30, 2017 to support current and future reclamation obligations.


7. EQUITY
 
a) Share-Based Compensation
 
During the first two quarters of 2017, we granted 2,010,520 Class B subordinate voting share options to employees. These options have a weighted average exercise price of $27.79, a term of 10 years and vest in equal amounts over three years. The weighted average fair value of Class B subordinate voting share options issued was estimated at $8.32 per share option at the grant date using the Black-Scholes option-pricing model. The option valuations were based on an average expected option life of 4 years, a risk-free interest rate of 1.06%, a dividend yield of 2.20% and an expected volatility of 42%.

We have issued and outstanding deferred share units, restricted share units, performance and performance deferred share units (collectively referred to as units). Deferred and restricted share units are granted to both employees and directors. Performance and performance deferred share units are granted to employees only. During the first two quarters of 2017, we issued 947,194 units to employees and directors. Deferred and restricted share units issued vest immediately for directors and vest in three years for employees. Performance and performance deferred share units vest in three years. Furthermore, the performance and performance deferred share units have performance vesting criteria that may result in 0% to 200% of units ultimately vesting. The total number of units outstanding at June 30, 2017 was 8,273,029.

A share-based compensation recovery of $15 million (2016 – $42 million compensation expense) and a share-based compensation expense of $9 million (2016 – $69 million) was recorded for the three and six months ended June 30, 2017, respectively, in respect of all outstanding share options and units.

b) Accumulated Other Comprehensive Income (Loss)

 
 
June 30,
   
June 30,
 
(CAD$ in millions)
 
2017
   
2016
 
Currency translation differences
 
$
306
   
$
354
 
Unrealized gain on available-for-sale financial assets (net of tax of $(3) and $(4))
   
29
     
27
 
Share of other comprehensive income of associates and joint ventures
   
(1
)
   
3
 
 
 
$
334
   
$
384
 

53    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

7. EQUITY, continued

c) Dividends

Dividends of $0.10 per share (totaling $58 million) were paid on June 30, 2017 on our Class A common and Class B subordinate voting shares to shareholders of record on June 15, 2017.


8. SEGMENTED INFORMATION
 
Based on the primary products we produce and our development projects, we have five reportable segments – steelmaking coal, copper, zinc, energy and corporate - which is the way we report information to our Chief Executive Officer. The corporate segment includes all of our initiatives in other commodities, our corporate growth activities and groups that provide administrative, technical, financial and other support to all of our business units. Other operating expenses include general and administration costs, exploration, research and development, and other operating income (expense). Sales between segments are carried out on terms that arm’s-length parties would use. Total assets does not include intra-group receivables between segments. Deferred tax assets and liabilities have been allocated amongst segments.

   
Three months ended June 30, 2017
 
(CAD$ in millions)
 
Steelmaking
Coal
   
Copper
   
Zinc
   
Energy
   
Corporate
   
Total
 
Segment revenues
 
$
1,596
   
$
562
   
$
781
   
$
   
$
   
$
2,939
 
Less: Inter-segment revenues
   
     
     
(121
)
   
     
     
(121
)
Revenues
   
1,596
     
562
     
660
     
     
     
2,818
 
Cost of sales
   
(811
)
   
(434
)
   
(507
)
   
     
     
(1,752
)
Gross profit (loss)
   
785
     
128
     
153
     
     
     
1,066
 
Other operating income (expenses)
   
(20
)
   
(29
)
   
     
(7
)
   
(38
)
   
(94
)
Profit from operations
   
765
     
99
     
153
     
(7
)
   
(38
)
   
972
 
                                                 
Net finance expense
   
(10
)
   
(14
)
   
(10
)
   
(4
)
   
(20
)
   
(58
)
Non-operating income (expenses)
   
(10
)
   
6
     
(2
)
   
     
2
     
(4
)
Share of losses of associates and
   joint ventures
   
     
     
     
     
3
     
3
 
Profit before taxes
   
745
     
91
     
141
     
(11
)
   
(53
)
   
913
 
Capital expenditures
 
$
142
   
$
93
   
$
53
   
$
212
   
$
2
   
$
502
 

54    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

8. SEGMENTED INFORMATION, continued

   
Three months ended June 30, 2016
 
(CAD$ in millions)
 
Steelmaking
Coal
   
Copper
   
Zinc
   
Energy
   
Corporate
   
Total
 
Segment revenues
 
$
678
   
$
517
   
$
627
   
$
1
   
$
   
$
1,823
 
Less: Inter-segment revenues
   
     
     
(83
)
   
     
     
(83
)
Revenues
   
678
     
517
     
544
     
1
     
     
1,740
 
Cost of sales
   
(626
)
   
(455
)
   
(445
)
   
(2
)
   
     
(1,528
)
Gross profit (loss)
   
52
     
62
     
99
     
(1
)
   
     
212
 
Other operating income (expense)
   
(8
)
   
9
     
(1
)
   
4
     
(70
)
   
(66
)
Profit (loss) from operations
   
44
     
71
     
98
     
3
     
(70
)
   
146
 
                                                 
Net finance expense
   
(5
)
   
(10
)
   
(5
)
   
(1
)
   
(61
)
   
(82
)
Non-operating income (expense)
   
     
(1
)
   
(2
)
   
     
(4
)
   
(7
)
Share of income of associates
   and joint ventures
   
     
1
     
     
     
1
     
2
 
Profit (loss) before taxes
   
39
     
61
     
91
     
2
     
(134
)
   
59
 
Capital expenditures
 
$
84
   
$
75
   
$
50
   
$
237
   
$
1
   
$
447
 

   
Six months ended June 30, 2017
 
(CAD$ in millions)
 
Steelmaking
Coal
   
Copper
   
Zinc
   
Energy
   
Corporate
   
Total
 
                                     
Segment revenues
 
$
3,262
   
$
1,075
   
$
1,630
   
$
   
$
   
$
5,967
 
Less: Inter-segment revenues
   
     
     
(255
)
   
     
     
(255
)
Revenues
   
3,262
     
1,075
     
1,375
     
     
     
5,712
 
Cost of sales
   
(1,497
)
   
(904
)
   
(1,058
)
   
     
     
(3,459
)
Gross profit
   
1,765
     
171
     
317
     
     
     
2,253
 
Other operating income (expense)
   
(37
)
   
(11
)
   
8
     
(14
)
   
(82
)
   
(136
)
Profit (loss) from operations
   
1,728
     
160
     
325
     
(14
)
   
(82
)
   
2,117
 
                                                 
Net finance expense
   
(19
)
   
(25
)
   
(20
)
   
(5
)
   
(65
)
   
(134
)
Non-operating income (expense)
   
(20
)
   
6
     
(4
)
   
     
(131
)
   
(149
)
Share of income of associates and
   joint ventures
   
     
1
     
     
     
3
     
4
 
Profit (loss) before taxes
   
1,689
     
142
     
301
     
(19
)
   
(275
)
   
1,838
 
Capital expenditures
   
299
     
174
     
104
     
430
     
3
     
1,010
 
Goodwill
   
702
     
398
     
     
     
     
1,100
 
Total assets
   
14,705
     
9,223
     
3,613
     
4,625
     
2,732
     
34,898
 
Net assets
 
$
8,883
   
$
5,681
   
$
2,589
   
$
4,083
   
$
(2,612
)
 
$
18,624
 

 
55    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)
 
 
8.
SEGMENTED INFORMATION, continued

   
Six months ended June 30, 2016
 
(CAD$ in millions)
 
Steelmaking
Coal
   
Copper
   
Zinc
   
Energy
   
Corporate
   
Total
 
Segment revenues
 
$
1,343
   
$
996
   
$
1,262
   
$
1
   
$
   
$
3,602
 
Less: Inter-segment revenues
   
     
     
(164
)
   
     
     
(164
)
Revenues
   
1,343
     
996
     
1,098
     
1
     
     
3,438
 
Cost of sales
   
(1,284
)
   
(875
)
   
(909
)
   
(3
)
   
     
(3,071
)
Gross profit
   
59
     
121
     
189
     
(2
)
   
     
367
 
Other operating income (expense)
   
(37
)
   
40
     
(8
)
   
3
     
(101
)
   
(103
)
Profit (loss) from operations
   
22
     
161
     
181
     
1
     
(101
)
   
264
 
                                                 
Net finance expense
   
(10
)
   
(13
)
   
(12
)
   
(1
)
   
(134
)
   
(170
)
Non-operating income (expense)
   
(4
)
   
(2
)
   
(9
)
   
     
98
     
83
 
Share of income of associates and
   joint ventures
   
     
2
     
     
     
1
     
3
 
Profit (loss) before taxes
   
8
     
148
     
160
     
     
(136
)
   
180
 
Capital expenditures
   
190
     
156
     
101
     
456
     
1
     
904
 
Goodwill
   
702
     
397
     
     
     
     
1,099
 
Total assets
   
14,497
     
9,348
     
3,307
     
3,855
     
2,904
     
33,911
 
Net assets
 
$
9,968
   
$
5,953
   
$
2,513
   
$
3,449
   
$
(5,305
)
 
$
16,578
 


9. CONTINGENCIES

We consider provisions for all our outstanding and pending legal claims to be adequate. The final outcome with respect to actions outstanding or pending as at June 30, 2017, or with respect to future claims, cannot be predicted with certainty. Significant contingencies not disclosed elsewhere in the notes to our financial statements are as follows:

Upper Columbia River Basin

Teck American Inc. (TAI) continues studies under the 2006 settlement agreement with the U.S. Environmental Protection Agency (EPA) to conduct a remedial investigation on the Upper Columbia River in Washington State. Residential soil testing within the study site has identified certain properties where remediation is required. TAI and EPA reached an agreement regarding the remediation to be undertaken in 2015, which has been completed, and additional sampling has been conducted which suggests that limited additional time-critical remediation will be required.
56    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

9. CONTINGENCIES, continued

The Lake Roosevelt litigation involving TML in the Federal District Court for the Eastern District of Washington continues. In September 2012, TML entered into an agreement with the plaintiffs, agreeing that certain facts were established for purposes of the litigation. The agreement stipulated that some portion of the slag discharged from TML’s Trail Operations into the Columbia River between 1896 and 1995, and some portion of the effluent discharged from Trail Operations, have been transported to and are present in the Upper Columbia River in the United States, and that some hazardous substances from the slag and effluent have been released into the environment within the United States. In December 2012, the Court found in favour of the plaintiffs in phase one of the case, issuing a declaratory judgment that TML is liable under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for response costs, the amount of which will be determined in later phases of the case. In August 2016 the trial court judge ruled in favour of the Tribal plaintiffs awarding approximately $9 million in past response costs and that decision, along with certain other findings in the first phase of the case, is under appeal in the Ninth Circuit Court of Appeals.

A District Court ruling in favour of plaintiffs on a motion seeking recovery from TML for environmental response costs, and in a subsequent proceeding, natural resource damages and assessment costs, arising from the alleged deposition of hazardous substances in the United States from aerial emissions from TML's Trail Operations was overturned on appeal in the Ninth Circuit in July 2016, with the result that alleged damages associated with air emissions are no longer part of the case.

A hearing with respect to natural resource damages and assessment costs is expected to follow after resolution of appeals with respect to issues raised in the first phase of the litigation and completion of the remedial investigation and feasibility study being undertaken by TAI.

There is no assurance that we will ultimately be successful in our defence of the litigation or that we or our affiliates will not be faced with further liability in relation to this matter. Until the studies contemplated by the EPA settlement agreement and additional damage assessments are completed, it is not possible to estimate the extent and cost, if any, of any additional remediation or restoration that may be required or to assess our potential liability for damages. The studies may conclude, on the basis of risk, cost, technical feasibility or other grounds, that no remediation other than some residential soil removal should be undertaken. If other remediation is required and damage to resources found, the cost of that remediation may be material.


10. SEASONALITY OF SALES
 
Due to ice conditions, the port serving our Red Dog mine is normally only able to ship concentrates from July to October each year. As a result, zinc and lead concentrate sales volumes are generally higher in the third and fourth quarter of each year than in the first and second quarter. Depending on commodity prices, this could result in Red Dog’s profits and cash flows being higher in the last two quarters of the year as finished inventories are sold.

57    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

11. FAIR VALUE MEASUREMENTS

Certain of our financial assets and liabilities are measured at fair value on a recurring basis and classified in their entirety based on the lowest level of input that is significant to the fair value measurement. Certain non-financial assets and liabilities may also be measured at fair value on a non-recurring basis. There are three levels of the fair value hierarchy that prioritize the inputs to valuation techniques used to measure fair value, with Level 1 inputs having the highest priority. The levels and the valuation techniques used to value our financial assets and liabilities are described below:

Level 1 – Quoted Prices in Active Markets for Identical Assets

Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities.

Cash equivalents and marketable equity securities are valued using quoted market prices in active markets. Accordingly, these items are included in Level 1 of the fair value hierarchy.

Level 2 – Significant Other Observable Inputs

Quoted prices in markets that are not active, quoted prices for similar assets or liabilities in active markets, or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability.

Derivative instruments and embedded derivatives are included in Level 2 of the fair value hierarchy as they are valued using pricing models or discounted cash flow models. These models require a variety of inputs, including, but not limited to, market prices, forward price curves, yield curves, and credit spreads. These inputs are obtained from or corroborated with the market. Also included in Level 2 are settlements receivable and settlements payable from provisional pricing on concentrate sales and purchases because they are valued using quoted market prices for forward curves for copper, zinc and lead.

Level 3 – Significant Unobservable Inputs

Unobservable (supported by little or no market activity) prices.

We include investments in debt securities in Level 3 of the fair value hierarchy because they trade infrequently and have little price transparency. We review the fair value of these instruments periodically and estimate an impairment charge based on management’s best estimates, which are unobservable inputs.

58    Teck Resources Limited 2017 Second Quarter News Release

Teck Resources Limited
Notes to Condensed Interim Consolidated Financial Statements
(Unaudited)

11. FAIR VALUE MEASUREMENTS, continued

The fair values of our financial assets and liabilities measured at fair value on a recurring basis at June 30, 2017 and December 31, 2016 are summarized in the following table:

(CAD$ in millions)
 
June 30, 2017
   
December 31, 2016
 
   
Level 1
   
Level 2
   
Level 3
   
Total
   
Level 1
   
Level 2
   
Level 3
   
Total
 
Financial assets
                                               
Cash equivalents
 
$
614
   
$
   
$
   
$
614
   
$
1,153
   
$
   
$
   
$
1,153
 
Marketable equity securities
   
104
     
     
     
104
     
95
     
     
     
95
 
Debt securities
   
65
     
     
4
     
69
     
68
     
     
11
     
79
 
Settlements receivable
   
     
479
     
     
479
     
     
795
     
     
795
 
Derivative instruments
   and embedded derivatives
   
     
121
     
     
121
     
     
142
     
     
142
 
   
$
783
   
$
600
   
$
4
   
$
1,387
   
$
1,316
   
$
937
   
$
11
   
$
2,264
 
                                                                 
Financial liabilities
                                                               
Derivative instruments
   and embedded derivatives
 
$
   
$
20
   
$
   
$
20
   
$
   
$
27
   
$
   
$
27
 
Settlements payable
   
     
34
     
     
34
     
     
43
     
     
43
 
   
$
   
$
54
   
$
   
$
54
   
$
   
$
70
   
$
   
$
70
 

For our non-financial assets and liabilities measured at fair value on a non-recurring basis, no fair value measurements were made as at June 30, 2017.

As at December 31, 2016, we measured certain non-financial assets at their recoverable amounts using a FVLCD basis, which is classified as a Level 3 measurement.

 
 
 
59    Teck Resources Limited 2017 Second Quarter News Release