XML 27 R15.htm IDEA: XBRL DOCUMENT v3.24.3
Property, Plant and Equipment-Net
3 Months Ended
Sep. 30, 2024
Property, Plant and Equipment, Net [Abstract]  
Property, Plant and Equipment-Net
Property, plant and equipment—net consists of the following:
 September 30, 
2024
December 31, 
2023
 (in millions)
Land$115 $114 
Machinery and equipment13,766 13,716 
Buildings and improvements1,014 1,020 
Construction in progress548 394 
Property, plant and equipment(1)
15,443 15,244 
Less: Accumulated depreciation and amortization8,627 8,103 
Property, plant and equipment—net$6,816 $7,141 
_______________________________________________________________________________
(1)As of September 30, 2024 and December 31, 2023, we had property, plant and equipment that was accrued but unpaid of $122 million and $68 million, respectively. As of September 30, 2023 and December 31, 2022, we had property, plant and equipment that was accrued but unpaid of $80 million and $53 million, respectively.
Depreciation and amortization related to property, plant and equipment was $229 million and $701 million for the three and nine months ended September 30, 2024, respectively, and $211 million and $633 million for the three and nine months ended September 30, 2023, respectively.
Plant turnarounds—Scheduled inspections, replacements and overhauls of plant machinery and equipment at our continuous process manufacturing facilities during a full plant shutdown are referred to as plant turnarounds. The expenditures related to plant turnarounds are capitalized in property, plant and equipment when incurred.
Scheduled replacements and overhauls of plant machinery and equipment during a plant turnaround include the dismantling, repair or replacement and installation of various components including piping, valves, motors, turbines, pumps, compressors and heat exchangers and the replacement of catalysts. Scheduled inspections, including required safety inspections which entail the disassembly of various components such as steam boilers, pressure vessels and other equipment requiring safety certifications, are also conducted during plant turnarounds. Internal employee costs and overhead amounts are not considered plant turnaround costs and are not capitalized.
The following is a summary of capitalized plant turnaround costs:
 Nine months ended 
 September 30,
 20242023
 (in millions)
Net capitalized plant turnaround costs as of January 1$352 $312 
Additions120 121 
Depreciation(134)(95)
Effect of exchange rate changes and other— (4)
Net capitalized plant turnaround costs as of September 30
$338 $334