Prepared for:
Coeur Mining, Inc.
|
Prepared by:
Mr Christopher Pascoe, RM SME
Mr. Brandon MacDougall, P.E.
Mr. Matthew Bradford, RM SME
Mr. Matthew Hoffer, P.G.
|
|
Report current as at:
December 31, 2021
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
CONTENTS
|
||
|
1.0
|
EXECUTIVE SUMMARY
|
1-1
|
|
1.1
|
Introduction
|
1-1
|
|
1.2
|
Terms of Reference
|
1-1
|
|
1.3
|
Property Setting
|
1-1
|
|
1.4
|
Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements
|
1-2
|
|
1.5
|
Geology and Mineralization
|
1-2
|
|
1.6
|
History and Exploration
|
1-3
|
|
1.7
|
Drilling and Sampling
|
1-3
|
|
1.8
|
Data Verification
|
1-4
|
|
1.9
|
Metallurgical Test Work
|
1-5
|
|
1.10
|
Mineral Resource Estimation
|
1-6
|
|
1.10.1
|
Estimation Methodology
|
1-6
|
|
1.10.2
|
Mineral Resource Statement
|
1-7
|
|
1.10.3
|
Factors That May Affect the Mineral Resource Estimate
|
1-8
|
|
1.11
|
Mineral Reserve Estimation
|
1-9
|
|
1.11.1
|
Estimation Methodology
|
1-9
|
|
1.11.2
|
Mineral Reserve Statement
|
1-9
|
|
1.11.3
|
Factors That May Affect the Mineral Reserve Estimate
|
1-10
|
|
1.12
|
Mining Methods
|
1-10
|
|
1.13
|
Recovery Methods
|
1-11
|
|
1.14
|
Infrastructure
|
1-12
|
|
1.15
|
Markets and Contracts
|
1-13
|
|
1.15.1
|
Market Studies
|
1-13
|
|
1.15.2
|
Commodity Pricing
|
1-13
|
|
1.15.3
|
Contracts
|
1-14
|
|
1.16
|
Environmental, Permitting and Social Considerations
|
1-14
|
|
1.16.1
|
Environmental Studies and Monitoring
|
1-14
|
|
1.16.2
|
Closure and Reclamation Considerations
|
1-14
|
|
1.16.3
|
Permitting
|
1-14
|
|
1.16.4
|
Social Considerations, Plans, Negotiations and Agreements
|
1-15
|
|
1.17
|
Capital Cost Estimates
|
1-15
|
|
1.18
|
Operating Cost Estimates
|
1-15
|
|
1.19
|
Economic Analysis
|
1-18
|
|
1.19.1
|
Forward-Looking Information Caution
|
1-18
|
|
1.19.2
|
Methodology and Assumptions
|
1-18
|
|
1.19.3
|
Economic Analysis
|
1-18
|
|
1.19.4
|
Sensitivity Analysis
|
1-19
|
|
1.20
|
Risks and Opportunities
|
1-19
|
|
1.20.1
|
Risks
|
1-19
|
|
1.20.2
|
Opportunities
|
1-21
|
|
1.21
|
Conclusions
|
1-21
|
|
1.22
|
Recommendations
|
1-21
|
|
2.0
|
INTRODUCTION
|
2-1
|
|
2.1
|
Registrant
|
2-1
|
|
2.2
|
Terms of Reference
|
2-1
|
|
2.2.1
|
Report Purpose
|
2-1
|
|
2.2.2
|
Terms of Reference
|
2-1
|
|
2.3
|
Qualified Persons
|
2-4
|
|
2.4
|
Site Visits and Scope of Personal Inspection
|
2-4
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
2.5
|
Report Date
|
2-4
|
|
2.6
|
Information Sources and References
|
2-5
|
|
2.7
|
Previous Technical Report Summaries
|
2-5
|
|
3.0
|
PROPERTY DESCRIPTION
|
3-1
|
|
3.1
|
Property Location
|
3-1
|
|
3.2
|
Ownership
|
3-1
|
|
3.3
|
Mineral Title
|
3-1
|
|
3.3.1
|
Tenure Holdings
|
3-1
|
|
3.3.2
|
Tenure Maintenance Requirements
|
3-1
|
|
3.4
|
Property Agreements
|
3-4
|
|
3.4.1
|
Pershing County Road Maintenance Agreement
|
3-4
|
|
3.4.2
|
Pipeline, Electric Power Line, and Telephone Line License
|
3-4
|
|
3.4.3
|
Rights of Way
|
3-4
|
|
3.5
|
Surface Rights
|
3-5
|
|
3.6
|
Water Rights
|
3-5
|
|
3.7
|
Royalties
|
3-5
|
|
3.7.1
|
Asarco Royalty
|
3-5
|
|
3.7.2
|
Nelsen, Stice, and Kilrain Royalty
|
3-7
|
|
3.7.3
|
Davis Royalty
|
3-7
|
|
3.7.4
|
Midway Gold US Inc. and Barrick Royalty
|
3-7
|
|
3.8
|
Encumbrances
|
3-7
|
|
3.8.1
|
Credit Agreement
|
3-7
|
|
3.8.2
|
Permitting Requirements
|
3-8
|
|
3.8.3
|
Permitting Timelines
|
3-8
|
|
3.8.4
|
Permit Conditions
|
3-8
|
|
3.8.5
|
Violations and Fines
|
3-8
|
|
3.9
|
Significant Factors and Risks That May Affect Access, Title or Work Programs
|
3-8
|
|
4.0
|
ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY
|
4-1
|
|
4.1
|
Physiography
|
4-1
|
|
4.2
|
Accessibility
|
4-1
|
|
4.3
|
Climate
|
4-1
|
|
4.4
|
Infrastructure
|
4-2
|
|
5.0
|
HISTORY
|
5-1
|
|
5.1
|
Project Ownership History
|
5-1
|
|
5.2
|
Exploration and Development History
|
5-1
|
|
6.0
|
GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT
|
6-1
|
|
6.1
|
Deposit Type
|
6-1
|
|
6.2
|
Regional Geology
|
6-1
|
|
6.3
|
Local Geology
|
6-3
|
|
6.3.1
|
Lithologies
|
6-3
|
|
6.3.2
|
Structure
|
6-6
|
|
6.3.3
|
Metamorphism and Alteration
|
6-6
|
|
6.3.4
|
Mineralization
|
6-6
|
|
6.4
|
Property Geology
|
6-7
|
|
6.4.1
|
Rochester
|
6-7
|
|
6.4.1.1
|
Deposit Dimensions
|
6-7
|
|
6.4.1.2
|
Lithologies
|
6-7
|
|
6.4.1.3
|
Structure
|
6-7
|
|
6.4.1.4
|
Alteration
|
6-8
|
|
6.4.1.5
|
Mineralization
|
6-8
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
6.4.2
|
Nevada Packard
|
6-11
|
|
6.4.2.1
|
Deposit Dimensions
|
6-11
|
|
6.4.2.2
|
Lithologies
|
6-11
|
|
6.4.2.3
|
Structure
|
6-11
|
|
6.4.2.4
|
Alteration
|
6-11
|
|
6.4.2.5
|
Mineralization
|
6-11
|
|
7.0
|
EXPLORATION
|
7-1
|
|
7.1
|
Exploration
|
7-1
|
|
7.1.1
|
Grids and Surveys
|
7-1
|
|
7.1.2
|
Geological Mapping
|
7-1
|
|
7.1.3
|
Geochemistry
|
7-1
|
|
7.1.4
|
Geophysics
|
7-2
|
|
7.1.5
|
Qualified Person’s Interpretation of the Exploration Information
|
7-2
|
|
7.1.6
|
Exploration Potential
|
7-2
|
|
7.2
|
Drilling
|
7-4
|
|
7.2.1
|
Overview
|
7-4
|
|
7.2.2
|
Drilling Excluded For Estimation Purposes
|
7-4
|
|
7.2.3
|
Drill Methods
|
7-4
|
|
7.2.4
|
Logging
|
7-16
|
|
7.2.5
|
Recovery
|
7-18
|
|
7.2.6
|
Collar Surveys
|
7-18
|
|
7.2.7
|
Down Hole Surveys
|
7-18
|
|
7.2.8
|
Comment on Material Results and Interpretation
|
7-18
|
|
7.3
|
Hydrogeology
|
7-19
|
|
7.3.1
|
Sampling Methods and Laboratory Determinations
|
7-19
|
|
7.3.2
|
Hydrogeology
|
7-19
|
|
7.3.3
|
Comment on Results
|
7-20
|
|
7.3.4
|
Groundwater Models
|
7-20
|
|
7.3.5
|
Water Balance
|
7-21
|
|
7.4
|
Geotechnical
|
7-21
|
|
7.4.1
|
Sampling Methods and Laboratory Determinations
|
7-21
|
|
7.4.2
|
Comment on Results
|
7-22
|
|
8.0
|
SAMPLE PREPARATION, ANALYSES, AND SECURITY
|
8-1
|
|
8.1
|
Sampling Methods
|
8-1
|
|
8.1.1
|
Reverse Circulation
|
8-1
|
|
8.1.2
|
Core
|
8-1
|
|
8.1.3
|
Grade Control
|
8-1
|
|
8.2
|
Sample Security Methods
|
8-2
|
|
8.3
|
Density Determinations
|
8-2
|
|
8.4
|
Analytical and Test Laboratories
|
8-2
|
|
8.5
|
Sample Preparation
|
8-3
|
|
8.5.1
|
Pre-2008
|
8-3
|
|
8.5.2
|
2008–Current
|
8-3
|
|
8.6
|
Analysis
|
8-3
|
|
8.6.1
|
Coeur Pre-2008
|
8-3
|
|
8.6.2
|
2008–2011
|
8-4
|
|
8.6.3
|
2012–Current
|
8-4
|
|
8.6.4
|
Multi-element Analysis
|
8-6
|
|
8.6.5
|
Alio Gold
|
8-7
|
|
8.7
|
Quality Assurance and Quality Control
|
8-7
|
|
8.7.1
|
Coeur Pre-2008
|
8-7
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
8.7.2
|
2008–2015
|
8-8
|
|
8.7.3
|
2016–Current
|
8-8
|
|
8.7.4
|
Alio Gold Results
|
8-9
|
|
8.8
|
Database
|
8-9
|
|
8.9
|
Qualified Person’s Opinion on Sample Preparation, Security, and Analytical Procedures
|
8-9
|
|
9.0
|
DATA VERIFICATION
|
9-1
|
|
9.1
|
Internal Data Verification
|
9-1
|
|
9.1.1
|
Rochester Review
|
9-1
|
|
9.1.2
|
Nevada Packard Review
|
9-2
|
|
9.1.3
|
Nevada Packard Stockpiles
|
9-3
|
|
9.1.4
|
South and Charlie Stockpiles
|
9-4
|
|
9.1.5
|
Rochester In-Pit Stockpile
|
9-4
|
|
9.2
|
External Data Verification
|
9-4
|
|
9.3
|
Data Verification by Qualified Person
|
9-5
|
|
9.4
|
Qualified Person’s Opinion on Data Adequacy
|
9-5
|
|
10.0
|
MINERAL PROCESSING AND METALLURGICAL TESTING
|
10-1
|
|
10.1
|
Test Laboratories
|
10-1
|
|
10.2
|
Metallurgical Test Work
|
10-1
|
|
10.2.1
|
Rochester
|
10-1
|
|
10.2.2
|
Packard
|
10-1
|
|
10.2.3
|
Current Metallurgical Testing
|
10-2
|
|
10.3
|
Recovery Estimates
|
10-3
|
|
10.4
|
Metallurgical Variability
|
10-7
|
|
10.5
|
Deleterious Elements
|
10-7
|
|
10.6
|
Qualified Person’s Opinion on Data Adequacy
|
10-8
|
|
11.0
|
MINERAL RESOURCE ESTIMATES
|
11-1
|
|
11.1
|
Introduction
|
11-1
|
|
11.2
|
Geological Model
|
11-1
|
|
11.3
|
Exploratory Data Analysis
|
11-3
|
|
11.4
|
Density
|
11-3
|
|
11.5
|
Composites
|
11-3
|
|
11.6
|
Grade Capping/Outlier Restrictions
|
11-4
|
|
11.7
|
Variography
|
11-4
|
|
11.8
|
Interpolation
|
11-4
|
|
11.9
|
Block Model Validation
|
11-8
|
|
11.10
|
Classification of Mineral Resources
|
11-9
|
|
11.10.1
|
Mineral Resource Confidence Classification
|
11-9
|
|
11.10.2
|
Uncertainties Considered During Confidence Classification
|
11-9
|
|
11.11
|
Reasonable Prospects of Economic Extraction
|
11-9
|
|
11.11.1
|
Input Assumptions
|
11-9
|
|
11.11.2
|
Commodity Price
|
11-13
|
|
11.11.3
|
Cut-off
|
11-14
|
|
11.11.4
|
QP Statement
|
11-14
|
|
11.12
|
Mineral Resource Statement
|
11-15
|
|
11.13
|
Uncertainties (Factors) That May Affect the Mineral Resource Estimate
|
11-20
|
|
12.0
|
MINERAL RESERVE ESTIMATES
|
12-1
|
|
12.1
|
Introduction
|
12-1
|
|
12.2
|
Development of Mining Case
|
12-1
|
|
12.3
|
Designs
|
12-1
|
|
12.4
|
Input Parameters
|
12-1
|
|
12.5
|
Net Smelter Return Cut-off
|
12-2
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
12.6
|
Cut-Off Grades
|
12-2
|
|
12.7
|
Surface Topography
|
12-3
|
|
12.8
|
Density and Moisture
|
12-3
|
|
12.9
|
Dilution and Mine Losses
|
12-3
|
|
12.10
|
Mineral Reserve Statement
|
12-4
|
|
12.11
|
Uncertainties (Factors) That May Affect the Mineral Reserve Estimate
|
12-4
|
|
13.0
|
MINING METHODS
|
13-1
|
|
13.1
|
Introduction
|
13-1
|
|
13.2
|
Geotechnical Considerations
|
13-1
|
|
13.3
|
Hydrogeological Considerations
|
13-1
|
|
13.4
|
Design Considerations
|
13-2
|
|
13.5
|
Blasting and Explosives
|
13-3
|
|
13.6
|
Grade Control and Production Monitoring
|
13-3
|
|
13.7
|
Waste Rock and Backfill
|
13-6
|
|
13.8
|
Production Schedule
|
13-6
|
|
13.9
|
Equipment
|
13-11
|
|
13.10
|
Personnel
|
13-11
|
|
14.0
|
RECOVERY METHODS
|
14-1
|
|
14.1
|
Process Method Selection
|
14-1
|
|
14.2
|
Flowsheet
|
14-1
|
|
14.3
|
Process Plant
|
14-1
|
|
14.3.1
|
Overview
|
14-1
|
|
14.3.2
|
Heap Leach Pads
|
14-4
|
|
14.3.3
|
Merrill-Crowe Plant
|
14-5
|
|
14.4
|
Equipment Sizing
|
14-6
|
|
14.5
|
Power and Consumables
|
14-6
|
|
14.6
|
Personnel
|
14-6
|
|
15.0
|
INFRASTRUCTURE
|
15-1
|
|
15.1
|
Roads and Logistics
|
15-3
|
|
15.2
|
Stockpiles
|
15-3
|
|
15.3
|
Waste Rock Storage Facilities
|
15-5
|
|
15.4
|
Water Management
|
15-5
|
|
15.5
|
Water Supply
|
15-5
|
|
15.6
|
Power and Electrical
|
15-6
|
|
15.7
|
Fuel
|
15-7
|
|
16.0
|
MARKET STUDIES AND CONTRACTS
|
16-1
|
|
16.1
|
Markets
|
16-1
|
|
16.2
|
Commodity Price Forecasts
|
16-1
|
|
16.3
|
Contracts
|
16-2
|
|
16.4
|
QP Statement
|
16-3
|
|
17.0
|
ENVIRONMENTAL STUDIES, PERMITTING, AND PLANS, NEGOTIATIONS, OR AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS
|
17-1
|
|
17.1
|
Baseline and Supporting Studies
|
17-1
|
|
17.2
|
Environmental Considerations/Monitoring Programs
|
17-1
|
|
17.2.1
|
Environmental Protection Measures
|
17-1
|
|
17.2.2
|
Jurisdictional Wetlands and Waters of the United States
|
17-2
|
|
17.3
|
Closure and Reclamation Considerations
|
17-2
|
|
17.4
|
Permitting
|
17-5
|
|
17.4.1
|
Current Permits
|
17-5
|
|
17.4.2
|
POA 11
|
17-5
|
|
17.5
|
Social Considerations, Plans, Negotiations and Agreements
|
17-5
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
17.6
|
Qualified Person’s Opinion on Adequacy of Current Plans to Address Issues
|
17-8
|
|
18.0
|
CAPITAL AND OPERATING COSTS
|
18-1
|
|
18.1
|
Introduction
|
18-1
|
|
18.2
|
Capital Cost Estimates
|
18-1
|
|
18.2.1
|
Basis of Estimate
|
18-1
|
|
18.2.2
|
Capital Cost Summary
|
18-2
|
|
18.3
|
Operating Cost Estimates
|
18-2
|
|
18.3.1
|
Basis of Estimate
|
18-2
|
|
18.3.2
|
Operating Cost Summary
|
18-2
|
|
18.4
|
QP Statement
|
18-5
|
|
19.0
|
ECONOMIC ANALYSIS
|
19-1
|
|
19.1
|
Forward-looking Information Caution
|
19-1
|
|
19.2
|
Methodology Used
|
19-1
|
|
19.3
|
Financial Model Parameters
|
19-1
|
|
19.3.1
|
Mineral Resource, Mineral Reserve, and Mine Life
|
19-1
|
|
19.3.2
|
Metallurgical Recoveries
|
19-1
|
|
19.3.3
|
Smelting and Refining Terms
|
19-2
|
|
19.3.4
|
Metal Prices
|
19-2
|
|
19.3.5
|
Capital and Operating Costs
|
19-2
|
|
19.3.6
|
Working Capital
|
19-2
|
|
19.3.7
|
Taxes and Royalties
|
19-2
|
|
19.3.8
|
Closure Costs and Salvage Value
|
19-2
|
|
19.3.9
|
Financing
|
19-2
|
|
19.3.10
|
Inflation
|
19-3
|
|
19.4
|
Economic Analysis
|
19-3
|
|
19.5
|
Sensitivity Analysis
|
19-3
|
|
20.0
|
ADJACENT PROPERTIES
|
20-1
|
|
21.0
|
OTHER RELEVANT DATA AND INFORMATION
|
21-1
|
|
22.0
|
INTERPRETATION AND CONCLUSIONS
|
22-1
|
|
22.1
|
Introduction
|
22-1
|
|
22.2
|
Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements
|
22-1
|
|
22.3
|
Geology and Mineralization
|
22-1
|
|
22.4
|
Exploration, Drilling, and Sampling
|
22-1
|
|
22.5
|
Data Verification
|
22-2
|
|
22.6
|
Metallurgical Test Work
|
22-2
|
|
22.7
|
Mineral Resource Estimates
|
22-3
|
|
22.8
|
Mineral Reserve Estimates
|
22-3
|
|
22.9
|
Mining Methods
|
22-4
|
|
22.10
|
Recovery Methods
|
22-4
|
|
22.11
|
Infrastructure
|
22-4
|
|
22.12
|
Market Studies
|
22-5
|
|
22.13
|
Environmental, Permitting and Social Considerations
|
22-6
|
|
22.14
|
Capital Cost Estimates
|
22-6
|
|
22.15
|
Operating Cost Estimates
|
22-7
|
|
22.16
|
Economic Analysis
|
22-7
|
|
22.17
|
Risks and Opportunities
|
22-7
|
|
22.17.1
|
Risks
|
22-7
|
|
22.17.2
|
Opportunities
|
22-8
|
|
22.18
|
Conclusions
|
22-9
|
|
23.0
|
RECOMMENDATIONS
|
23-1
|
|
24.0
|
REFERENCES
|
24-1
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
24.1
|
Bibliography
|
24-1
|
|
24.2
|
Abbreviations and Units of Measure
|
24-2
|
|
24.3
|
Glossary of Terms
|
24-6
|
|
25.0
|
RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT
|
25-1
|
|
25.1
|
Introduction
|
25-1
|
|
25.2
|
Macroeconomic Trends
|
25-1
|
|
25.3
|
Markets
|
25-1
|
|
25.4
|
Legal Matters
|
25-1
|
|
25.5
|
Environmental Matters
|
25-1
|
|
25.6
|
Stakeholder Accommodations
|
25-2
|
|
25.7
|
Governmental Factors
|
25-2
|
|
25.8
|
Internal Controls
|
25-2
|
|
25.8.1
|
Exploration and Drilling
|
25-2
|
|
25.8.2
|
Mineral Resource and Mineral Reserve Estimates
|
25-3
|
|
25.8.3
|
Risk Assessments
|
25-3
|
|
TABLES
|
||
|
Table 1‑1:
|
Summary of Gold and Silver Measured and Indicated Mineral Resources, Rochester, Nevada Packard, and Stockpiles, as at December 31, 2021 (based on US$1,700/oz gold
price and US$22/oz silver price)
|
1-8
|
|
Table 1‑2:
|
Summary of Gold and Silver Inferred Mineral Resources, Rochester, Nevada Packard, and Stockpiles, as at December 31, 2021 (based on US$1,700/oz gold price and
US$22/oz silver price))
|
1-8
|
|
Table 1‑3:
|
Summary of Gold and Silver Proven and Probable Mineral Reserve Estimates, as at December 31, 2021 (based on US$1,400/oz gold price and US$20/oz silver price)
|
1-11
|
|
Table 1‑4:
|
Capital Cost Estimate Summary
|
1-16
|
|
Table 1‑5:
|
Operating Cost Estimate Summary
|
1-17
|
|
Table 1‑6:
|
Summary Cashflow Table
|
1-19
|
|
Table 1‑7:
|
NPV Sensitivity
|
1-20
|
|
Table 2‑1:
|
QP Chapter Responsibilities
|
2-5
|
|
Table 3‑1:
|
Mineral Tenure Summary Table
|
3-2
|
|
Table 5‑1:
|
Exploration and Development History
|
5-2
|
|
Table 7‑1:
|
Property Drill Summary Table
|
7-5
|
|
Table 7‑2:
|
Drill Summary Table, Rochester
|
7-11
|
|
Table 7‑3:
|
Drill Summary Table, Nevada Packard
|
7-12
|
|
Table 8‑1:
|
Historical Primary and Secondary Laboratory Analysis Methods (2008–2011)
|
8-5
|
|
Table 10‑1:
|
Metallurgical Test Work Summary Table
|
10-3
|
|
Table 10‑2:
|
Leach Pad Recoveries to Date
|
10-4
|
|
Table 10‑3:
|
Historical Crushed and ROM Product Recoveries
|
10-4
|
|
Table 10‑4:
|
Stage III Crushed and ROM Product Recoveries
|
10-6
|
|
Table 10‑5:
|
Stage VI Recovery Confidence Intervals
|
10-6
|
|
Table 10‑6:
|
Ultimate Recovery Summary by Ore Type
|
10-8
|
|
Table 11‑1:
|
Capping Statistics for Rochester Silver Composites
|
11-5
|
|
Table 11‑2:
|
Capping Statistics for Rochester Gold Composites
|
11-6
|
|
Table 11‑3:
|
Capping Statistics for Nevada Packard Silver Composites
|
11-7
|
|
Table 11‑4:
|
Capping Statistics for Nevada Packard Gold Composites
|
11-7
|
|
Table 11‑5:
|
Confidence Classifications
|
11-10
|
|
Table 11‑6:
|
Operating Cost and Cut-offs for Mineral Resource Estimates
|
11-13
|
|
Table 11‑7:
|
Metallurgical Process Recoveries Used in Rochester Mineral Resources NSR Cutoff Calculations
|
11-15
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Table 11‑8:
|
Gold and Silver Measured and Indicated Mineral Resources, Rochester, as at December 31, 2021 (based on US$1,700/oz gold price and US$22/oz silver price)
|
11-16
|
|
Table 11‑9:
|
Gold and Silver Inferred Mineral Resources, Rochester, as at December 31, 2021 (based on US$1,700/oz gold price and US$22/oz silver price)
|
11-16
|
|
Table 11‑10:
|
Gold and Silver Measured and Indicated Mineral Resources, Nevada Packard, as at December 31, 2021 (based on US$1,700/oz gold price and US$22/oz silver price)
|
11-16
|
|
Table 11‑11:
|
Gold and Silver Inferred Mineral Resources, Nevada Packard, as at December 31, 2021 (based on US$1,700/oz gold price and US$22/oz silver price)
|
11-17
|
|
Table 11‑12:
|
Gold and Silver Measured and Indicated Mineral Resources, Rochester Stockpile (South-Charlie and In-pit), as at December 31, 2021 (based on US$1,700/oz gold price
and US$22/oz silver price)
|
11-17
|
|
Table 11‑13:
|
Gold and Silver Inferred Mineral Resources, Rochester Stockpile (South-Charlie and In-pit), as at December 31, 2021 (based on US$1,700/oz gold price and US$22/oz
silver price)
|
11-17
|
|
Table 11‑14:
|
Gold and Silver Measured and Indicated Mineral Resources, Nevada Packard Stockpile as at December 31, 2021 (based on US$1,700/oz gold price and US$22/oz silver
price)
|
11-18
|
|
Table 11‑15:
|
Gold and Silver Inferred Mineral Resources, Nevada Packard Stockpile Inferred Mineral Resource Statement as at December 31, 2021 (based on US$1,700/oz gold price
and US$22/oz silver price)
|
11-18
|
|
Table 11‑16:
|
Summary of Gold and Silver Measured and Indicated Mineral Resources, Rochester, Nevada Packard, and Stockpiles, as at December 31, 2021 (based on US$1,700/oz gold
price and US$22/oz silver price)
|
11-19
|
|
Table 11‑17:
|
Summary of Gold and Silver Inferred Mineral Resources, Rochester, Nevada Packard, and Stockpiles, as at December 31, 2021 (based on US$1,700/oz gold price and
US$22/oz silver price))
|
11-19
|
|
Table 12‑1:
|
Pit Shell Input Parameters
|
12-2
|
|
Table 12‑2:
|
LOM Operating Cost and Cut-offs for Mineral Reserve Estimates
|
12-3
|
|
Table 12‑3:
|
Gold and Silver Proven and Probable Mineral Reserves, Rochester, as at December 31, 2021 (based on US$1,400/oz gold price and US$20/oz silver price)
|
12-5
|
|
Table 12‑4:
|
Gold and Silver Proven and Probable Mineral Reserves, Nevada Packard, as at December 31, 2021 (based on US$1,400/oz gold price and US$20/oz silver price)
|
12-5
|
|
Table 12‑5:
|
Gold and Silver Proven and Probable Mineral Reserves, Rochester Stockpile (South and Charlie) as at December 31, 2021 (based on US$1,400/oz gold price and US$20/oz
silver price)
|
12-6
|
|
Table 12‑6:
|
Gold and Silver Proven and Probable Mineral Reserves, Nevada Packard Stockpile, as at December 31, 2021 (based on US$1,400/oz gold price and US$20/oz silver price)
|
12-6
|
|
Table 12‑7:
|
Summary of Gold and Silver Mineral Reserve Estimates, as at December 31, 2021 (based on US$1,400/oz gold price and US$20/oz silver price)
|
12-7
|
|
Table 13‑1:
|
Rochester Zone Solid Pit Slope Design Criteria
|
13-2
|
|
Table 13‑2:
|
Nevada Packard Pit Slope Design Criteria by Material Type
|
13-2
|
|
Table 13‑3:
|
Pit Design Assumptions
|
13-3
|
|
Table 13‑4:
|
Rochester LOM Production Schedule (2022–2028)
|
13-7
|
|
Table 13‑5:
|
Rochester LOM Production Schedule (2029–2034)
|
13-8
|
|
Table 13‑6:
|
Nevada Packard LOM Production Schedule
|
13-9
|
|
Table 13‑7:
|
Combined LOM Production Schedule, Rochester and Nevada Packard
|
13-10
|
|
Table 13‑8:
|
LOM Equipment List
|
13-11
|
|
Table 14‑1:
|
Approximate Heap Leach Volumes
|
14-5
|
|
Table 14‑2:
|
Stage IV Heap Leach Pad Design Criteria
|
14-6
|
|
Table 14‑3:
|
Major Process Equipment
|
14-7
|
|
Table 14‑4
|
Power Requirements
|
14-8
|
|
Table 17‑1:
|
Monitoring Components, Permit, Plans and Agencies
|
17-3
|
|
Table 17‑2:
|
Rochester Pit Waste Rock Management Procedures
|
17-4
|
|
Table 18‑1:
|
Estimated Capital Expenditures by Year ($M)
|
18-3
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Table 18‑2:
|
Operating Costs by Year ($M)
|
18-4
|
|
Table 19‑1:
|
Tax Rates for Primary Taxes
|
19-3
|
|
Table 19‑2:
|
Cashflow Summary Table
|
19-4
|
|
Table 19‑3:
|
Annualized Cashflow (2022–2035)
|
19-5
|
|
Table 19‑4:
|
Annualized Cashflow (2036–2040)
|
19-6
|
|
Table 19‑5:
|
NPV Sensitivity
|
19-7
|
|
FIGURES
|
||
|
Figure 2‑1:
|
Project Location Plan
|
2-2
|
|
Figure 2‑2:
|
Mining Operations Layout Plan
|
2-3
|
|
Figure 3‑1:
|
Mineral Tenure Location Map
|
3-3
|
|
Figure 3‑2:
|
Claims Subject to Royalties Plan
|
3-6
|
|
Figure 6‑1:
|
Regional Geology Plan
|
6-2
|
|
Figure 6‑2:
|
Project Geology Plan
|
6-4
|
|
Figure 6‑3:
|
Stratigraphic Column
|
6-5
|
|
Figure 6‑4:
|
Geological Plan, Rochester
|
6-9
|
|
Figure 6‑5:
|
Geological Cross Section, Rochester
|
6-10
|
|
Figure 6‑6:
|
Geological Plan, Nevada Packard
|
6-12
|
|
Figure 6‑7:
|
Geological Cross Section, Nevada Packard
|
6-13
|
|
Figure 7‑1:
|
Exploration Prospects
|
7-3
|
|
Figure 7‑2:
|
Project Drill Collar Location Plan
|
7-10
|
|
Figure 7‑3:
|
Drill Collar Location Plan, Rochester
|
7-13
|
|
Figure 7‑4:
|
Drill Collar Location Plan, Nevada Packard
|
7-14
|
|
Figure 7‑5:
|
Rochester Stockpile Drill Collar Location Map
|
7-15
|
|
Figure 7‑6:
|
Nevada Packard Stockpile Drill Collar Location Map
|
7-16
|
|
Figure 11‑1:
|
Rochester and Nevada Packard Model Areas
|
11-2
|
|
Figure 11‑2:
|
Cross-Sectional View Of Rochester Model Classification
|
11-11
|
|
Figure 11‑3:
|
Cross-Sectional View Of South-Charlie Stockpile Model Classification
|
11-11
|
|
Figure 11‑4:
|
Cross-Sectional View Of Rochester In Pit Stockpile Model Classification
|
11-12
|
|
Figure 11‑5:
|
Cross-sectional View Of Nevada Packard Model Classification
|
11-12
|
|
Figure 11‑6:
|
Cross-sectional View Of Nevada Packard Stockpile Model Classification
|
11-13
|
|
Figure 13‑1:
|
2020 Rochester LOM Pit Design (final pit outline)
|
13-4
|
|
Figure 13‑2:
|
2020 Nevada Packard LOM Pit Design (final pit outline)
|
13-5
|
|
Figure 14‑1:
|
Process Flowsheet, Rochester
|
14-2
|
|
Figure 15‑1:
|
POA 11 Authorized Facilities at Rochester
|
15-4
|
|
APPENDICES
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
1.0
|
EXECUTIVE SUMMARY
|
| 1.1 |
Introduction
|
| 1.2 |
Terms of Reference
|
| 1.3 |
Property Setting
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.4 |
Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements
|
| 1.5 |
Geology and Mineralization
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.6 |
History and Exploration
|
| 1.7 |
Drilling and Sampling
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Gold: one assay ton fire assay, atomic absorption spectroscopy (AAS); fire assay with gravimetric finish; inductively-coupled plasma (ICP) finish
|
| • |
Silver: fire assay with AAS finish; fire assay with gravimetric finish; ICP finish; ICP atomic emission spectroscopy (AES) finish; ICP emission spectroscopy (ES) finish; ICP optical
emission spectroscopy (OES) finish;
|
| • |
Total sulfur: LECO;
|
| • |
Multi-element: 33-element suite using ICP-ES; 35 element suite using ICP-ES; 45-element suite using ICP-ES or ICP mass spectrometry (MS).
|
| 1.8 |
Data Verification
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.9 |
Metallurgical Test Work
|
| • |
Daily samples: contained moisture, size fractions and assayed for precious metal content. Data generated from these daily samples is used to characterize daily production; dry tons
produced from each ore source and gold and silver quantities delivered to the leach pad from each ore source;
|
| • |
Monthly column leach tests and bottle roll leach tests: recovery trends for gold and silver, size by grade recovery, reagent consumption, and permeability. Results are used to
forecast leach pad recoveries.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.10 |
Mineral Resource Estimation
|
| 1.10.1 |
Estimation Methodology
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.10.2 |
Mineral Resource Statement
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR
Cut-off
(US$/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Au
|
Ag
|
Au
|
Ag
|
Au
|
Ag
|
|||
|
Measured
|
191,889,000
|
0.002
|
0.29
|
372,000
|
56,573,000
|
1.50–2.65
|
15.2–93.7
|
0–61.0
|
|
Indicated
|
39,565,000
|
0.002
|
0.33
|
74,000
|
12,932,000
|
1.50–2.65
|
15.2–93.7
|
0–61.0
|
|
Total measured and indicated
|
231,454,000
|
0.002
|
0.30
|
443,000
|
69,505,000
|
1.50–2.65
|
15.2–93.7
|
0–61.0
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR
Cut-off
(US$/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Au
|
Ag
|
Au
|
Ag
|
Au
|
Ag
|
|||
|
Inferred
|
128,410,000
|
0.002
|
0.30
|
243,000
|
38,626,000
|
1.50–2.65
|
15.2–93.7
|
0–59.5
|
| 1. |
The mineral resource estimates are current as of December 31, 2021, and are reported using the definitions in Item 1300 of Regulation S–K (17 CFR Part 229) (SK1300).
|
| 2. |
The reference point for the mineral resource estimate is in situ and stockpile. The Qualified Person for the estimate is Mr. Matthew Bradford, RM SME, a Coeur employee.
|
| 3. |
Mineral resources are reported exclusive of mineral reserves on a 100% ownership basis.
|
| 4. |
Mineral resources for Rochester and Nevada Packard are tabulated within a confining pit shell that uses the following input parameters: metal price Au = $1,700/oz and Ag = $22/oz;
oxide recovery Au = 77.7–93.7% and Ag = 59–61%; sulfide recovery Au = 15.2–77.7% and Ag = 0.0–59% with a net smelter return cutoff of $2.55–$3.70/st oxide and $2.65/st sulfide, where the NSR is calculated as resource net smelter return (NSR)
= silver grade (oz/ton) * silver recovery (%) * [silver price ($/oz) - refining cost ($/oz)] + gold grade (oz/ton) * gold recovery (%) * [gold price ($/oz) - refining cost ($/oz)]; and variable pit slope angles that approximately average 43º
over the life-of-mine.
|
| 5. |
Rounding of short tons, grades, and troy ounces, as required by reporting guidelines, may result in apparent differences between tons, grades, and contained metal contents.
|
| 1.10.3 |
Factors That May Affect the Mineral Resource Estimate
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.11 |
Mineral Reserve Estimation
|
| 1.11.1 |
Estimation Methodology
|
| • |
In situ (open pit): 0.078 ton/ft3;
|
| • |
Stockpile: 0.057 ton/ft3.
|
| • |
Rochester: oxide: US$2.55/st; sulfide US$2.65/st;
|
| • |
Nevada Packard: oxide: US$3.70/st. There is no sulfide material mined at Nevada Packard.
|
| 1.11.2 |
Mineral Reserve Statement
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.11.3 |
Factors That May Affect the Mineral Reserve Estimate
|
| 1.12 |
Mining Methods
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons
(Mst)
|
Average Grade
(oz/st)
|
Contained Ounces
(koz) |
NSR
Cut-off
(US$/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Ag
|
Au
|
Ag
|
Au
|
Ag
|
Au
|
|||
|
Total proven
|
386,008
|
0.388
|
0.003
|
149,652
|
998
|
2.55–2.65
|
27–61
|
71-95
|
|
Total probable
|
31,769
|
0.365
|
0.003
|
11,593
|
82
|
2.55–2.65
|
27–61
|
71-95
|
|
Total Proven & Probable
|
417,777
|
0.386
|
0.003
|
161,245
|
1,080
|
2.55–2.65
|
27–61
|
71-95
|
| 6. |
The mineral resource estimates are current as of December 31, 2021, and are reported using the definitions in Item 1300 of Regulation S–K (17 CFR Part 229) (SK1300).
|
| 7. |
The reference point for the mineral reserve estimate is the point of delivery to the heap leach facilities. The Qualified Person for the estimate is Mr. Brandon MacDougall, P.E., a
Coeur Rochester employee.
|
| 8. |
Mineral reserve estimates are tabulated within a confining pit shell and use the following input parameters: gold price of US$1,400/oz Au and silver price of US$20/oz Au; Rochester
oxide recovery Au = 85% and Ag = 59%; Nevada Packard oxide recovery Au = 95% and Ag = 61%; ROM recovery Au = 71% and Ag = 27%; with a Rochester net smelter return cutoff of $2.55/st oxide and US$2.65/st sulfide, and a Packard net smelter
return cutoff of $3.70, where the NSR is calculated as resource net smelter return (NSR) = silver grade (oz/ton) * silver recovery (%) * [silver price ($/oz) - refining cost ($/oz)] + gold grade (oz/ton) * gold recovery (%) * [gold price
($/oz) - refining cost ($/oz)]; variable pit slope angles that approximately average 43º over the life-of-mine.
|
| 9. |
Rounding of short tons, grades, and troy ounces, as required by reporting guidelines, may result in apparent differences between tons, grades, and contained metal contents
|
| 1.13 |
Recovery Methods
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.14 |
Infrastructure
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.15 |
Markets and Contracts
|
| 1.15.1 |
Market Studies
|
| 1.15.2 |
Commodity Pricing
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.15.3 |
Contracts
|
| 1.16 |
Environmental, Permitting and Social Considerations
|
| 1.16.1 |
Environmental Studies and Monitoring
|
| 1.16.2 |
Closure and Reclamation Considerations
|
| 1.16.3 |
Permitting
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.16.4 |
Social Considerations, Plans, Negotiations and Agreements
|
| 1.17 |
Capital Cost Estimates
|
| 1.18 |
Operating Cost Estimates
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Years
|
2022
|
2023
|
2024
|
2025
|
2026
|
2027
|
2028
|
2029
|
2030
|
|
POA 11/Development
|
237,356
|
151,114
|
|||||||
|
Sustaining
|
27,850
|
45,449
|
32,624
|
55,800
|
28,679
|
21,530
|
4,689
|
1,680
|
1,744
|
|
Nevada Packard
|
7,305
|
41,394
|
359
|
359
|
359
|
359
|
|||
|
New Leases
|
(32,245)
|
||||||||
|
Total
|
232,961
|
196,563
|
32,624
|
63,105
|
70,073
|
21,889
|
5,048
|
2,039
|
2,103
|
|
Years
|
2031
|
2032
|
2033
|
2034
|
2035
|
2036
|
2037
|
2038
|
Total
|
|
POA 11/Development
|
388,470
|
||||||||
|
Sustaining
|
8,695
|
1,619
|
1,700
|
1,500
|
233,559
|
||||
|
Nevada Packard
|
359
|
359
|
359
|
51,212
|
|||||
|
New Leases
|
(32,245)
|
||||||||
|
Total
|
9,054
|
1,978
|
2,059
|
1,500
|
640,996
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Years
|
Units
|
2022
|
2023
|
2024
|
2025
|
2026
|
2027
|
2028
|
2029
|
2030
|
|
Mining
|
$US (1,000)
|
46,021
|
59,732
|
68,656
|
64,648
|
81,575
|
71,916
|
94,129
|
70,171
|
97,726
|
|
$/st moved
|
1.90
|
1.46
|
1.39
|
1.41
|
1.35
|
1.46
|
1.38
|
1.44
|
1.36
|
|
|
Process
|
$US (1,000)
|
60,201
|
65,016
|
74,159
|
71,679
|
67,936
|
80,098
|
80,662
|
81,666
|
82,341
|
|
$/st placed
|
3.54
|
4.29
|
2.31
|
2.23
|
2.07
|
2.09
|
2.09
|
2.14
|
2.16
|
|
|
G&A
|
$US (1,000)
|
21,503
|
21,654
|
22,280
|
22,600
|
21,944
|
22,972
|
22,326
|
22,314
|
22,804
|
|
$/st placed
|
1.26
|
1.43
|
0.70
|
0.70
|
0.67
|
0.60
|
0.58
|
0.59
|
0.60
|
|
|
Selling Cost
|
$US (1,000)
|
1,205
|
1,422
|
2,240
|
2,829
|
2,834
|
2,084
|
2,035
|
2,367
|
2,885
|
|
Total Operating Costs
|
$US (1,000)
|
128,503
|
147,823
|
167,335
|
161,819
|
174,289
|
177,131
|
199,291
|
176,671
|
205,883
|
|
$/st placed
|
7.58
|
9.76
|
5.22
|
5.03
|
5.30
|
4.62
|
5.15
|
4.64
|
5.40
|
|
|
Years
|
2031
|
2032
|
2033
|
2034
|
2035
|
2036
|
2037
|
2038
|
Total
|
|
|
Mining
|
$US (1,000)
|
125,072
|
71,804
|
71,649
|
27,417
|
949,796
|
||||
|
$/st moved
|
1.30
|
1.31
|
1.35
|
1.10
|
1.38
|
|||||
|
Process
|
$US (1,000)
|
81,313
|
83,235
|
70,248
|
53,202
|
13,947
|
6,626
|
2,126
|
2,133
|
976,624
|
|
$/st placed
|
2.10
|
2.17
|
2.11
|
2.13
|
2.34
|
|||||
|
G&A
|
$US (1,000)
|
22,038
|
22,358
|
21,296
|
19,293
|
2,749
|
915
|
692
|
374
|
290,112
|
|
$/st placed
|
0.57
|
0.58
|
0.64
|
0.77
|
0.69
|
|||||
|
Selling Cost
|
$US (1,000)
|
2,671
|
2,772
|
2,093
|
1,795
|
1,148
|
211
|
17
|
1
|
30,027
|
|
Total Operating Costs
|
$US (1,000)
|
230,666
|
179,450
|
165,340
|
101,725
|
17,844
|
7,752
|
2,872
|
2,508
|
2,247,329
|
|
$/st placed
|
5.97
|
4.67
|
4.98
|
4.07
|
5.38
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.19 |
Economic Analysis
|
| 1.19.1 |
Forward-Looking Information Caution
|
| 1.19.2 |
Methodology and Assumptions
|
| 1.19.3 |
Economic Analysis
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
|
LOM Total
|
|
Gross Revenue
|
3,800.2
|
|
Operating Costs
|
|
|
Mining
|
(949.8)
|
|
Process
|
(976.6)
|
|
G&A
|
(290.1)
|
|
Selling
|
(30.0)
|
|
Total Operating Costs
|
(2,246.6)
|
|
Other Costs
|
(1.2)
|
|
Operating Cashflow
|
1,552.5
|
|
Capital Expenditures
|
(641.0)
|
|
Reclamation
|
(175.1)
|
|
Cash Flow bef. Taxes
|
736.4
|
|
Tax
|
(48.9)
|
|
Total Free Cash Flow
|
687.5
|
|
NPV (5%)
|
348.1
|
| 1.19.4 |
Sensitivity Analysis
|
| 1.20 |
Risks and Opportunities
|
| 1.20.1 |
Risks
|
| • |
Changes to metallurgical recovery assumptions could affect revenues and operating costs. These changes could be due to inability to produce a crushed product with the HPGR that meets
specification in terms of top-size or particle size distribution, or other material properties of the ore are different than base case assumptions. This could require revisions to cut-off grades and mineral reserve estimates or could require
additional capital cost to upgrade the planned ore flow system;
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Parameter
|
-20%
|
-10%
|
-5%
|
Base
|
5%
|
10%
|
20%
|
|
Metal price
|
(144.8)
|
101.8
|
224.9
|
348.1
|
470.0
|
591.5
|
833.2
|
|
Operating cost
|
661.3
|
505.2
|
426.8
|
348.1
|
268.7
|
189.3
|
30.4
|
|
Capital cost
|
459.6
|
403.9
|
376.0
|
348.1
|
320.1
|
292.0
|
235.9
|
|
Grade
|
(156.5)
|
96.0
|
222.0
|
348.1
|
472.9
|
597.4
|
844.5
|
| • |
Coeur’s ability to timely complete POA 11, Nevada Packard or other future mine expansion and mine life extension projects on budget is dependent on numerous factors, many of which
are outside of our control, including, among others, availability of funding on acceptable terms, timing of receipt of permits and approvals from regulatory authorities, extreme weather events, obtaining materials and equipment and
construction, engineering and other services at favorable prices and terms, and disputes with third-party providers of materials, equipment or services. The construction services related to POA 11 will be performed by contractors, which
creates a risk of delays or additional costs to the project resulting from inability of contractor to complete work;
|
| • |
Commodity price increases for key consumables such diesel, electricity, tires and other consumables could negatively impact operating costs and also the stated mineral reserves and
mineral resources;
|
| • |
Labor cost increases or productivity decreases could also impact the stated mineral reserves and mineral resources, or impact the economic analysis that supports the mineral
reserves;
|
| • |
Geotechnical and hydrological assumptions used in mine planning are based on historical performance, and to date historical performance has been a reasonable predictor of current
conditions. As the mine gets deeper, any changes to the geotechnical and hydrological assumptions could affect mine planning, affect capital cost estimates if any major rehabilitation is required due to a geotechnical or hydrological event,
affect operating costs due to mitigation measures that may need to be imposed, and impact the economic analysis that supports the mineral reserve estimates;
|
| • |
Changes in climate could result in drought and associated potential water shortages that could impact operating cost and ability to operate.
|
| • |
Assumptions that the long-term reclamation and mitigation of the Rochester Operations can be appropriately managed within the estimated closure timeframes and closure cost estimates;
|
| • |
Political risk from challenges to:
|
| o |
Mining licenses;
|
| o |
Environmental permits;
|
| o |
Coeur’s right to operate;
|
| • |
Changes to assumptions as to governmental tax or royalty rates, such as taxation rate increases or new taxation or royalty imposts.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 1.20.2 |
Opportunities
|
| • |
Conversion of some or all of the measured and indicated mineral resources currently reported exclusive of mineral reserves to mineral reserves, with appropriate supporting studies;
|
| • |
Upgrade of some or all of the inferred mineral resources to higher-confidence categories, such that such better-confidence material could be used in mineral reserve estimation;
|
| • |
Exploration of the broader district for additional silver and gold targets;
|
| • |
Higher metal prices than forecast could present upside sales opportunities and potentially an increase in predicted Project economics;
|
| • |
Potential to find or gain access to new ore sources that could be processed at the existing Limerick Canyon leach pad.
|
| 1.21 |
Conclusions
|
| 1.22 |
Recommendations
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
2.0
|
INTRODUCTION
|
| 2.1 |
Registrant
|
| 2.2 |
Terms of Reference
|
| 2.2.1 |
Report Purpose
|
| 2.2.2 |
Terms of Reference
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 2.3 |
Qualified Persons
|
| • |
Mr. Christopher Pascoe, RM SME, Senior Director, Technical Services;
|
| • |
Mr. Brandon MacDougall, P.E., Engineering Superintendent; Coeur Rochester
|
| • |
Mr. Matthew Bradford, RM SME, Geology Superintendent; Coeur Rochester
|
| • |
Mr. Matthew Hoffer, P.G., Senior Manager, Geology.
|
| 2.4 |
Site Visits and Scope of Personal Inspection
|
| 2.5 |
Report Date
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Chapter Responsibility
|
|
|
Mr. Chris Pascoe
|
1.1, 1.2, 1.3, 1.4, 1.9,1.13,1.15, 1.16, 1.17, 1.18, 1.19, 1.20, 1.21, 1.22, 2,, 3,4, 10,14,16,17,18, 19, 20, 21, 22.1, 22.2, 22.12, 22.13, 22.14, 22.15, 22.16,
22.17, 22.18, 22.6, 23, 24, 25.
|
|
Mr. Brandon MacDougall
|
1.1, 1.2, 1.3, 1.11, 1.12, 1.14, 1.15, 1.16, 1.17, 1.18, 1.20, 1.22, 4, 5, , 12, 13, 15, 16, 17, 18, 22.1, 22.2, 22.8, 22.9, 22.11, 22.12, 22.13, 22.14, 22.15,
22.17, 23, 24, 25
|
|
Mr. Matthew Hoffer
|
|
|
Mr. Matthew Bradford
|
1.1, 1.2, 1.10, 1.20, 1.22, 2, 6, 8, 9, 11, 22.1, 22.3, 22.5, 22.7, 22.17, 23, 24, 25
|
| 2.6 |
Information Sources and References
|
| 2.7 |
Previous Technical Report Summaries
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
3.0
|
PROPERTY DESCRIPTION
|
| 3.1 |
Property Location
|
| • |
Rochester open pit: 402045 E, 4460050 N, UTM Zone 11T;
|
| • |
Nevada Packard open pit: 400600 E, 4456675 N, UTM Zone 11T.
|
| 3.2 |
Ownership
|
| 3.3 |
Mineral Title
|
| 3.3.1 |
Tenure Holdings
|
| 3.3.2 |
Tenure Maintenance Requirements
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Claims Group
|
Claim Type
|
Number of Claims
|
Area
(net acres)
|
|
Coeur Rochester Owned
|
Patented lode
|
21
|
357
|
|
Federal unpatented placer
|
6
|
120
|
|
|
Federal unpatented lode
|
761
|
11,625
|
|
|
Federal unpatented mill site
|
0
|
0
|
|
|
Fee Lands
|
35
|
4,793
|
|
|
Coeur Rochester Leased
|
Patented lode
|
0
|
0
|
|
Patented mill site
|
0
|
0
|
|
|
Federal unpatented mill site
|
0
|
0
|
|
|
Federal unpatented lode
|
13
|
269
|
|
|
Fee Lands
|
0
|
00
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 3.4 |
Property Agreements
|
| 3.4.1 |
Pershing County Road Maintenance Agreement
|
| 3.4.2 |
Pipeline, Electric Power Line, and Telephone Line License
|
| 3.4.3 |
Rights of Way
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 3.5 |
Surface Rights
|
| 3.6 |
Water Rights
|
| 3.7 |
Royalties
|
| 3.7.1 |
Asarco Royalty
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 3.7.2 |
Nelsen, Stice, and Kilrain Royalty
|
| 3.7.3 |
Davis Royalty
|
| 3.7.4 |
Midway Gold US Inc. and Barrick Royalty
|
| 3.8 |
Encumbrances
|
| 3.8.1 |
Credit Agreement
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 3.8.2 |
Permitting Requirements
|
| 3.8.3 |
Permitting Timelines
|
| 3.8.4 |
Permit Conditions
|
| 3.8.5 |
Violations and Fines
|
| 3.9 |
Significant Factors and Risks That May Affect Access, Title or Work Programs
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
4.0
|
ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY
|
| 4.1 |
Physiography
|
| 4.2 |
Accessibility
|
| 4.3 |
Climate
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 4.4 |
Infrastructure
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
5.0
|
HISTORY
|
| 5.1 |
Project Ownership History
|
| 5.2 |
Exploration and Development History
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Year
|
Operator
|
Comment
|
|
1860s
|
Unknown
|
Rochester District discovered, mining in district commenced. Initial focus on underground exploitation, later on placer mining.
|
|
1911–
1912
|
Joseph Nenzel
|
Discovered high-grade silver mineralization on west slope of Nenzel Hill
|
|
1912
|
Dick Keyworth and partners
|
Discovered high-grade silver mineralization at Nevada Packard, sold interest to Frank Margrave Et. Al.
|
|
1912–
1917
|
Rochester Hills Mining Co., Rochester Mines Co., Nevada Packard Mines Co.
|
Four mining areas established within Rochester District, Nenzel Hill at the eastern head of Rochester Canyon; Lincoln and Independence Hills; north and south slopes of the lower end of
Rochester Canyon; and the Nevada Packard Mine south of Rochester Canyon
|
|
1918–
1935
|
Rochester Silver Corp., Nenzel Crown Point Mining Co.,
|
Production of silver, gold, lead, copper, zinc, antimony, tungsten, dumortierite, and andalusite. Nevada Packard mill closed in 1923, Lower Rochester mill closed in 1929.
|
|
1935–
1961
|
Rochester Consolidated Mines Co., Western Properties Co.
|
Limited development and exploration, no production
|
|
1961–
1969
|
Silver State Mines Co.
|
Expansion of historic underground workings, grab sample campaign, limited drilling
|
|
1969–
1980
|
Cordero Mining Company
|
Exploration campaign using a mud rotary drill at Rochester
|
|
1969–
1983
|
Asarco
|
Exploration drilling in the Nenzel Hill area of Rochester. Drilling consisted of mud rotary and RC drill holes.
|
|
1970s
|
Cordero Mining Company
|
Cordero Mining Company holds Nevada Packard property under bond and lease, performs reconnaissance exploration at Nevada Packard
|
|
D.Z. Exploration
|
Exploration using a percussion drill rig at Rochester
|
|
|
1977–
1978
|
D.Z. Exploration
|
Drilling in Nevada Packard area. Completed production scale heap leach test work on historical dump material, with facilities to crush, agglomerate, and refine
|
|
1979
|
D.Z. Exploration
|
Nevada Packard mine permitting initiated
|
|
1980–
1983
|
D.Z. Exploration
|
Production scale metallurgical test work on a 100,000 st test was performed in 1981 on 70,000 st of newly-mined material and 30,000 st of historical dump material. Recoveries were lower than
expected and the mine was placed on hold. Eight 1,600 st heaps were constructed through 1983, which tested the recoveries of different sized crushed ore, agglomerated with and without cyanide.
|
|
1983
|
Coeur
|
Coeur acquired the Rochester property from Asarco
|
|
1983–
2021
|
Coeur
|
Coeur completes several exploration drilling campaigns at Rochester.
|
|
1986
|
Coeur
|
An initial Plan of Operations (PoO) was approved by the BLM and Nevada Division of Environmental Protection (NDEP). Coeur commenced mining operations at the Rochester project in September.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
1987
|
Nevada Packard Joint Venture
|
Daile Scholz leased Nevada Packard surface and mineral rights from Frank (Jr.) and Wilton Margrave.
|
|
Nevada Packard Joint Venture and Wharf Resources
|
Exploration drilling consisting of RC holes and HQ core holes at Nevada Packard; Economic studies indicated a negative return with the addition of crushing and processing facilities. Wharf
Resources subsequently terminated the agreement.
|
|
|
1996
|
Coeur
|
Coeur Rochester entered into lease agreements with Scholz and Margrave for the Nevada Packard project area.
|
|
1997
|
Mapping and sampling program at Nevada Packard; results not encouraging. Focus shifted to shallower mineralization potential
|
|
|
1998
|
Initiated a development/confirmation drill program to check assay data generated by Scholz and Margrave. Silver grades were confirmed, but average gold grades dropped from 0.0074 oz/t Au to
0.0044 oz/t Au. Entered into buyout negotiations with Scholz. Completed mineral resource estimate.
|
|
|
1999
|
Buyout negotiations were completed for Nevada Packard area
|
|
|
2000–
2021
|
Additional drilling in Nevada Packard area
|
|
|
2007–
2011
|
Coeur shuts down operations at Rochester and Packard and begins residual leaching of existing heap leach pads
|
|
|
2011
|
Coeur resumes active mining operations at Rochester
|
|
|
2012
|
Rye Patch Gold
|
Completed exploration holes on the Nevada Packard deposit; information subsequently acquired by Coeur in 2018 following acquisition of Alio Gold.
|
|
2012-
2021
|
Coeur
|
Coeur maintains mining operations
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
6.0
|
GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT
|
| 6.1 |
Deposit Type
|
| 6.2 |
Regional Geology
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 6.3 |
Local Geology
|
| 6.3.1 |
Lithologies
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 6.3.2 |
Structure
|
| 6.3.3 |
Metamorphism and Alteration
|
| 6.3.4 |
Mineralization
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 6.4 |
Property Geology
|
| 6.4.1 |
Rochester
|
| 6.4.1.1 |
Deposit Dimensions
|
| 6.4.1.2 |
Lithologies
|
| 6.4.1.3 |
Structure
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 6.4.1.4 |
Alteration
|
| 6.4.1.5 |
Mineralization
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 6.4.2 |
Nevada Packard
|
| 6.4.2.1 |
Deposit Dimensions
|
| 6.4.2.2 |
Lithologies
|
| 6.4.2.3 |
Structure
|
| 6.4.2.4 |
Alteration
|
| 6.4.2.5 |
Mineralization
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 7.1 |
Exploration
|
| 7.1.1 |
Grids and Surveys
|
| 7.1.2 |
Geological Mapping
|
| 7.1.3 |
Geochemistry
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 7.1.4 |
Geophysics
|
| 7.1.5 |
Qualified Person’s Interpretation of the Exploration Information
|
| 7.1.6 |
Exploration Potential
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 7.2 |
Drilling
|
| 7.2.1 |
Overview
|
| 7.2.2 |
Drilling Excluded For Estimation Purposes
|
| 7.2.3 |
Drill Methods
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Year
|
Operator
|
Area
|
Number
of
Sonic
Holes
|
Sonic
Footage
|
Number
of
Core
Holes
|
Core
Footage
|
Number
of RC
Holes
|
RC
Footage
|
|
Unknown
|
Unknown
|
Rochester
|
—
|
—
|
4
|
1,681
|
3
|
870
|
|
Nevada Packard
|
—
|
—
|
—
|
—
|
104
|
18,011
|
||
|
Sub-total
|
—
|
—
|
—
|
—
|
107
|
18,881
|
||
|
Pre-1971
|
N/A
|
N/A
|
—
|
—
|
—
|
—
|
—
|
—
|
|
1971
|
Asarco
|
Rochester
|
—
|
—
|
—
|
—
|
3
|
1,120
|
|
Sub-total
|
—
|
—
|
—
|
—
|
3
|
1,120
|
||
|
1972–1979
|
N/A
|
N/A
|
—
|
—
|
—
|
—
|
—
|
—
|
|
1980
|
Asarco
|
Rochester
|
—
|
—
|
—
|
—
|
5
|
2,010
|
|
Sub-total
|
—
|
—
|
—
|
—
|
5
|
2,010
|
||
|
1981–1985
|
N/A
|
N/A
|
—
|
—
|
—
|
—
|
—
|
—
|
|
1986
|
Unknown
|
Rochester
|
—
|
—
|
—
|
—
|
6
|
3,350
|
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
14
|
5,040
|
|
|
Sub-total
|
—
|
—
|
—
|
—
|
20
|
8,390
|
||
|
1987
|
Unknown
|
Rochester
|
1
|
580
|
—
|
—
|
103
|
48,015
|
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
86
|
32,755
|
|
|
Sub-total
|
1
|
580
|
—
|
—
|
189
|
80,770
|
||
|
1988
|
Unknown
|
Rochester
|
—
|
—
|
—
|
—
|
159
|
82,861
|
|
Rochester
|
—
|
—
|
—
|
—
|
58
|
26,075
|
||
|
Coeur
|
Nevada Packard
|
—
|
—
|
—
|
—
|
16
|
6,380
|
|
|
Sub-total
|
—
|
—
|
—
|
—
|
233
|
115,316
|
||
|
1989
|
Unknown
|
Rochester
|
—
|
—
|
—
|
—
|
130
|
79,630
|
|
Rochester
|
—
|
—
|
—
|
—
|
107
|
53,063
|
||
|
Coeur
|
Nevada Packard
|
—
|
—
|
—
|
—
|
3
|
830
|
|
|
Sub-total
|
—
|
—
|
–
|
–
|
240
|
133,523
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Year
|
Operator
|
Area
|
Number
of
Sonic
Holes
|
Sonic
Footage
|
Number
of
Core
Holes
|
Core
Footage
|
Number
of
RC
Holes
|
RC
Footage
|
|
1990
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
159
|
75,706
|
|
Sub-total
|
—
|
—
|
—
|
—
|
159
|
75,706
|
||
|
1991
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
75
|
53,120
|
|
Sub-total
|
—
|
—
|
—
|
—
|
75
|
53,120
|
||
|
1992
|
N/A
|
N/A
|
—
|
—
|
—
|
—
|
—
|
—
|
|
1993
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
1
|
500
|
|
Sub-total
|
—
|
—
|
—
|
—
|
1
|
500
|
||
|
1994
|
N/A
|
N/A
|
—
|
—
|
—
|
—
|
—
|
—
|
|
1995
|
Coeur
|
Rochester
|
—
|
—
|
1
|
460
|
—
|
—
|
|
Sub-total
|
—
|
—
|
1
|
460
|
—
|
—
|
||
|
1996
|
N/A
|
N/A
|
—
|
—
|
—
|
—
|
—
|
—
|
|
1997
|
Coeur
|
Rochester
|
—
|
—
|
10
|
3,114
|
6
|
2,300
|
|
Nevada Packard
|
—
|
—
|
—
|
—
|
11
|
9,720
|
||
|
Sub-total
|
—
|
—
|
10
|
3,114
|
17
|
12,020
|
||
|
1998
|
Coeur
|
Nevada Packard
|
—
|
—
|
3
|
437
|
—
|
—
|
|
Sub-total
|
—
|
—
|
3
|
437
|
—
|
—
|
||
|
1999
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
5
|
2,500
|
|
Sub-total
|
—
|
—
|
—
|
—
|
5
|
2,500
|
||
|
2000
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
25
|
9,940
|
|
Sub-total
|
—
|
—
|
—
|
—
|
25
|
9,940
|
||
|
2001
|
Unknown
|
Rochester
|
—
|
—
|
4
|
1,942
|
—
|
—
|
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
2
|
700
|
|
|
Sub-total
|
—
|
—
|
4
|
1,942
|
2
|
700
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Year
|
Operator
|
Area
|
Number
of
Sonic
Holes
|
Sonic
Footage
|
Number
of
Core
Holes
|
Core
Footage
|
Number
of RC
Holes
|
RC
Footage
|
|
2002
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
5
|
1,800
|
|
Sub-total
|
—
|
—
|
—
|
—
|
5
|
1,800
|
||
|
2003
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
1
|
280
|
|
Sub-total
|
—
|
—
|
—
|
—
|
1
|
280
|
||
|
2004
|
N/A
|
N/A
|
—
|
—
|
—
|
—
|
—
|
—
|
|
2005
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
10
|
4,780
|
|
Sub-total
|
—
|
—
|
—
|
—
|
10
|
4,780
|
||
|
2006
|
NA
|
N/A
|
—
|
—
|
—
|
—
|
—
|
—
|
|
2007
|
Coeur
|
Rochester
|
—
|
—
|
7
|
3,005
|
—
|
—
|
|
Sub-total
|
—
|
—
|
7
|
3,005
|
—
|
—
|
||
|
2008
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
5
|
2,045
|
|
Nevada Packard
|
—
|
—
|
—
|
—
|
1
|
415
|
||
|
Sub-total
|
—
|
—
|
—
|
—
|
6
|
2,460
|
||
|
2009
|
Coeur
|
Nevada Packard
|
—
|
—
|
—
|
—
|
2
|
1,080
|
|
Sub-total
|
—
|
—
|
—
|
—
|
2
|
1,080
|
||
|
2010
|
Coeur
|
Nevada Packard
|
—
|
—
|
—
|
—
|
33
|
13.750
|
|
Sub-total
|
—
|
—
|
—
|
—
|
33
|
13,750
|
||
|
2011
|
Coeur
|
Rochester
|
—
|
—
|
5
|
3,770
|
56
|
36,495
|
|
Nevada Packard
|
—
|
—
|
1
|
2,121
|
96
|
43,650
|
||
|
Stockpile
|
—
|
—
|
—
|
—
|
122
|
16,219
|
||
|
Sub-total
|
—
|
—
|
6
|
5,890
|
274
|
96,364
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Year
|
Operator
|
Area
|
Number
of
Sonic
Holes
|
Sonic
Footage
|
Number
of Core
Holes
|
Core
Footage
|
Number
of RC
Holes
|
RC
Footage
|
|
2012
|
RPG
|
Rochester
|
—
|
—
|
—
|
—
|
26
|
21,900
|
|
Nevada Packard
|
—
|
—
|
—
|
—
|
38
|
20,765
|
||
|
Rochester
|
—
|
—
|
—
|
—
|
65
|
31,620
|
||
|
Coeur
|
Nevada Packard
|
—
|
—
|
—
|
—
|
22
|
10,170
|
|
|
Stockpile
|
40
|
7,591
|
—
|
—
|
420
|
88,680
|
||
|
Sub-total
|
40
|
7,591
|
—
|
—
|
571
|
173,135
|
||
|
2013
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
56
|
39,810
|
|
Stockpile
|
—
|
—
|
—
|
—
|
750
|
127,280
|
||
|
Sub-total
|
—
|
—
|
—
|
—
|
806
|
167,090
|
||
|
2014
|
Coeur
|
Rochester
|
—
|
—
|
5
|
3,457
|
156
|
138,160
|
|
Nevada Packard
|
—
|
—
|
—
|
—
|
22
|
16,050
|
||
|
Sub-total
|
—
|
—
|
5
|
3,457
|
178
|
154,210
|
||
|
2015
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
52
|
38,710
|
|
Nevada Packard
|
—
|
—
|
—
|
—
|
38
|
34,620
|
||
|
Sub-total
|
—
|
—
|
—
|
—
|
90
|
73,330
|
||
|
2016
|
Coeur
|
Rochester
|
—
|
—
|
8,786
|
119
|
82,600
|
|
|
Nevada Packard
|
—
|
—
|
—
|
—
|
10
|
7,960
|
||
|
Sub-total
|
—
|
—
|
796
|
129
|
90,560
|
|||
|
2017
|
Coeur
|
Rochester
|
—
|
—
|
2
|
2,118
|
47
|
42,740
|
|
Sub-total
|
—
|
—
|
2
|
2,118
|
47
|
42,740
|
||
|
2018
|
Coeur
|
Rochester
|
—
|
—
|
—
|
—
|
62
|
35,590
|
|
Nevada Packard
|
—
|
—
|
—
|
—
|
9
|
6,520
|
||
|
Sub-total
|
—
|
—
|
—
|
—
|
71
|
42,110
|
||
|
2019
|
Coeur
|
Rochester
|
—
|
—
|
7
|
7,171
|
—
|
—
|
|
Sub-total
|
—
|
—
|
7
|
7,171
|
—
|
—
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Year
|
Operator
|
Area
|
Number
of
Sonic
Holes
|
Sonic
Footage
|
Number
of Core
Holes
|
Core
Footage
|
Number
of RC
Holes
|
RC
Footage
|
|
2020
|
Coeur
|
Rochester
|
—
|
—
|
22
|
25,697
|
40
|
31,310
|
|
Sub-total
|
—
|
—
|
22
|
25,697
|
40
|
31,310
|
||
|
2021
|
Coeur
|
Rochester
|
—
|
—
|
19
|
18, 882
|
61
|
59,934
|
|
Nevada Packard
|
—
|
—
|
8
|
6,502
|
21
|
19,005
|
||
|
Sub-total
|
—
|
—
|
26
|
23,561
|
79
|
75,565
|
||
|
All
|
All
|
Rochester
|
1
|
580
|
91
|
78,402
|
1,700
|
1,044,455
|
|
Nevada Packard
|
—
|
—
|
15
|
9,059
|
322
|
190,915
|
||
|
Stockpile
|
40
|
7,591
|
—
|
—
|
1,292
|
232,179
|
||
|
Total
|
41
|
8,171
|
106
|
87,461
|
3,314
|
1,467,549
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Year
|
Number of
Core Holes
|
Core
Footage
|
Number of
RC Holes
|
RC
Footage
|
|
Unknown
|
5
|
1,882
|
554
|
249,812
|
|
1986
|
—
|
—
|
14
|
7,020
|
|
1987
|
—
|
—
|
182
|
79,100
|
|
1988
|
—
|
—
|
216
|
108,506
|
|
1989
|
—
|
—
|
221
|
125,563
|
|
1990
|
—
|
—
|
158
|
75,106
|
|
1991
|
—
|
—
|
75
|
53,120
|
|
1993
|
—
|
—
|
1
|
500
|
|
1995
|
1
|
460
|
—
|
—
|
|
1997
|
10
|
3,114
|
6
|
2,300
|
|
1999
|
—
|
—
|
5
|
2,500
|
|
2000
|
—
|
—
|
24
|
9,540
|
|
2001
|
3
|
1,681
|
3
|
962
|
|
2002
|
—
|
—
|
5
|
1,800
|
|
2003
|
—
|
—
|
1
|
280
|
|
2005
|
—
|
—
|
10
|
4,780
|
|
2007
|
2
|
1,123
|
—
|
—
|
|
2008
|
—
|
—
|
5
|
2,045
|
|
2011
|
3
|
2,145
|
55
|
36,035
|
|
2012
|
—
|
—
|
62
|
30,060
|
|
2013
|
—
|
—
|
55
|
39,810
|
|
2014
|
5
|
3,457
|
156
|
138,160
|
|
2015
|
—
|
—
|
52
|
38,710
|
|
2016
|
9
|
8,786
|
119
|
82,600
|
|
2017
|
2
|
2,118
|
47
|
42,740
|
|
2018
|
—
|
—
|
51
|
29,900
|
|
2019
|
7
|
7,171
|
—
|
—
|
|
2020
|
20
|
24,725
|
38
|
29,060
|
|
2021
|
6
|
3,585
|
34
|
36,900
|
|
All
|
73
|
60,247
|
2,149
|
1,226,909
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Year
|
Number of
Core Holes
|
Core Footage
|
Number of
RC Holes
|
RC Footage
|
|
Unknown
|
1
|
142
|
457
|
121,825
|
|
1988
|
—
|
—
|
16
|
6,380
|
|
1989
|
—
|
—
|
3
|
830
|
|
1997
|
—
|
—
|
10
|
8,820
|
|
1998
|
3
|
437
|
—
|
—
|
|
2010
|
—
|
—
|
30
|
12,290
|
|
2011
|
3
|
1,298
|
80
|
34,530
|
|
2012
|
—
|
—
|
34
|
17,805
|
|
2014
|
—
|
—
|
22
|
16,050
|
|
2015
|
—
|
—
|
38
|
34,620
|
|
2016
|
—
|
—
|
10
|
7,960
|
|
2018
|
—
|
—
|
9
|
6,520
|
|
All
|
7
|
1,877
|
709
|
267,630
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

| 7.2.4 |
Logging
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Total recovery;
|
| • |
Solid core recovery;
|
| • |
Rock quality designation (RQD);
|
| • |
Natural fracture count;
|
| • |
ISRM strength index;
|
| • |
Weathering/alteration index;
|
| • |
Footage of zones of breccia, gouge and/or broken core.
|
| • |
Lithology;
|
| • |
Mineralization;
|
| • |
Alteration;
|
| • |
Structure;
|
| • |
Veining;
|
| • |
Oxide mineralization;
|
| • |
Detailed discontinuity attributes.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 7.2.5 |
Recovery
|
| 7.2.6 |
Collar Surveys
|
| 7.2.7 |
Down Hole Surveys
|
| 7.2.8 |
Comment on Material Results and Interpretation
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 7.3 |
Hydrogeology
|
| 7.3.1 |
Sampling Methods and Laboratory Determinations
|
| 7.3.2 |
Hydrogeology
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 7.3.3 |
Comment on Results
|
| 7.3.4 |
Groundwater Models
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 7.3.5 |
Water Balance
|
| 7.4 |
Geotechnical
|
| 7.4.1 |
Sampling Methods and Laboratory Determinations
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 7.4.2 |
Comment on Results
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
8.0
|
SAMPLE PREPARATION, ANALYSES, AND SECURITY
|
| 8.1 |
Sampling Methods
|
| 8.1.1 |
Reverse Circulation
|
| 8.1.2 |
Core
|
| 8.1.3 |
Grade Control
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 8.2 |
Sample Security Methods
|
| 8.3 |
Density Determinations
|
| 8.4 |
Analytical and Test Laboratories
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
American Assay Laboratories, located in Sparks, Nevada; independent of Coeur and had ISO-IEC 17025 accreditations;
|
| • |
ALS Chemex, located in Sparks, Nevada (ALS); independent of Coeur and had ISO 9001 accreditations;
|
| • |
Pinnacle Laboratories, located in Lovelock, Nevada; independent of Coeur and had ANSI/ISO/IEC Standard 17025:2005; Testing Laboratory TL-484 accreditations;
|
| • |
Inspectorate/Bureau Veritas Laboratory, located in Sparks, Nevada; independent of Coeur and had ISO-ISD 9002 accreditations;
|
| • |
Skyline Laboratories, located in Tucson, Arizona; independent of Coeur and had ISO/IEC 17025:2005 accreditations;
|
| • |
McClelland Laboratories Inc., located in Sparks, Nevada (McClelland); independent of Coeur and had ISO 17025:2005; Testing Laboratory TL-466 accreditations.
|
| 8.5 |
Sample Preparation
|
| 8.5.1 |
Pre-2008
|
| 8.5.2 |
2008–Current
|
| 8.6 |
Analysis
|
| 8.6.1 |
Coeur Pre-2008
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 8.6.2 |
2008–2011
|
| 8.6.3 |
2012–Current
|
| • |
Silver: Ag FA-3 (gravimetric finish; 0.001 lower detection limit; 29.2 oz/st upper detection limit) and Ag FA-9 (inductively-coupled plasma (ICP) finish; 0.003 oz/st lower detection limit, 2.92 oz/st upper detection limit);
|
| • |
Gold: Au FA-2 (gravimetric finish; 0.005 oz/st lower detection limit, 29.2 oz/st upper detection limit) and Au FA-9 (ICP finish; 0.001 oz/st lower detection limit, 0.088 oz/st upper detection limit).
|
| • |
Silver: 4A-AA (0.03 oz/st lower detection limit, 2.92 oz/st upper detection limit), four-acid digestion with AAS finish, and GV-AuAg, (0.10 oz/st lower detection limit, 292.0 oz/st upper detection limit), 30 g fire assay with gravimetric
finish;
|
| • |
Gold: FA-30-AA-Au (0.001 oz/st lower detection limit, 0.234 oz/st upper detection limit), 30 g fire assay with AAS finish and GV-AuAg, (0.005 oz/st lower detection limit, 292.0 oz/st upper detection limit), 30 g fire assay with gravimetric
finish.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Laboratory
|
Element
|
Analysis Name
|
Analysis Methodology
|
Lower Detection
Limit (oz/st)
|
Upper Detection
Limit (oz/st)
|
|
Inspectorate Reno
|
Ag
|
AR-TR
|
Aqua regia 2-acid digest (AA finish)
|
0.003
|
5.83
|
|
Inspectorate Reno
|
Ag
|
AuAg-1AT-ICP
|
1AT fire assay (ICP Finish)
|
0.03
|
2.92
|
|
Inspectorate Reno
|
Ag
|
AuAg-1AT-GV
|
1AT fire assay (grav finish)
|
0.146
|
291.7
|
|
Inspectorate Reno
|
Au
|
AuAg-1AT-AA
|
1AT fire assay (AA finish)
|
0.0001
|
0.29
|
|
Inspectorate Reno
|
Au
|
AuAg-1AT-ICP
|
1AT fire assay (ICP finish)
|
0.001
|
0.29
|
|
Inspectorate Reno
|
Au
|
AuAg-1AT-GV
|
1AT fire assay (grav finish)
|
0.029
|
29.17
|
|
American Assay
|
Ag
|
D4A
|
4-acid digest (ICP-OES finish)
|
0.006
|
2.92
|
|
American Assay
|
Ag
|
Ag(G)_GRAV
|
30 g Fire Assay (grav finish)
|
0.2
|
29167
|
|
American Assay
|
Au
|
FA30
|
30 g fire assay (aa finish)
|
0.0001
|
0.29
|
|
American Assay
|
Au
|
Au(G)_GRAV
|
30 g fire assay (grav finish)
|
0.001
|
29167
|
|
ALS-Chemex
|
Ag
|
Ag-AA61
|
4-acid digest (AAS finish)
|
0.001
|
2.92
|
|
ALS-Chemex
|
Ag
|
Ag-GRA21
|
30 g fire assay (grav finish)
|
0.146
|
291.7
|
|
ALS-Chemex
|
Au
|
AA23
|
30 g fire assay (AA finish)
|
0.0001
|
0.29
|
|
ALS-Chemex
|
Au
|
Au-GRA21
|
30 g fire assay (grav finish)
|
0.001
|
291.7
|
|
Pinnacle
|
Ag
|
AAS-2A-Ag
|
Aqua Regia 2-acid digest (AA finish)
|
0.01
|
0.29
|
|
Pinnacle
|
Ag
|
Ag-FAG-30
|
30 g fire assay (grav finish)
|
0.1
|
291.7
|
|
Pinnacle
|
Au
|
Au-FA-30
|
30 g fire assay (AA finish)
|
0.001
|
0.29
|
|
Pinnacle
|
Au
|
Au-FAG-30
|
30 g fire assay (grav finish)
|
0.005
|
291.7
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Silver: Ag-GRA21 (0.1 oz/st lower detection limit, 292 oz/st upper detection limit), 30 g fire assay with gravimetric finish, and Ag-OG62b, (0.03 oz/st lower detection limit, 21.9 oz/st upper detection limit), four-acid digestion with ICP
atomic emission spectroscopy (AES) finish;
|
| • |
Gold: Au-GRA21 (0.001 oz/st lower detection limit, 292 oz/st upper detection limit), 30 g fire assay with gravimetric finish and Au-AA23, (0.0001 oz/st lower detection limit, 0.292 z/st upper detection limit), 30 g fire assay with AAS
finish.
|
| • |
Silver: MA300 (0.15 oz/st lower detection limit, 58.3 oz/st upper detection limit), four-acid digestion with ICP emission spectroscopy (ES) finish, and FA530, (5.83 oz/st lower detection limit, 292.0 oz/st upper detection limit), 30 g fire
assay with gravimetric finish;
|
| • |
Gold: FA430 (0.001 oz/st lower detection limit, 2.92 oz/st upper detection limit), 30 g fire assay with AA finish, and FA530, (0.26 oz/st lower detection limit, 291.7 oz/st upper detection limit), 30 g fire assay with gravimetric finish.
|
| • |
Silver: MA401 (0.029 oz/st lower detection limit, 23.3 oz/st upper detection limit), four-acid digestion with AAS finish.
|
| 8.6.4 |
Multi-element Analysis
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
TC000: LECO analysis for total sulfur and total carbon;
|
| • |
MA300: Multi-acid digestion with ICP-ES finish for 35 elements;
|
| • |
MA200: Multi-acid digestion with ICP-ES/mass spectrometry (MS) finish for 45 elements.
|
| • |
ME-ICP61: Four-acid digestion with ICP-ES finish for 33 elements.
|
| 8.6.5 |
Alio Gold
|
| • |
Silver: D4A (0.006 oz/st lower detection limit, 2.92 oz/st upper detection limit), four-acid digestion with ICP optical emission spectroscopy (OES) finish, and Ag(G)-GRAV, (0.20 oz/st lower detection limit, no limit to upper detection
limit), 30 g fire assay with gravimetric finish;
|
| • |
Gold: FA30 (0.0001 oz/st lower detection limit, 0.29 oz/st upper detection limit), 30 g fire assay with AAS finish.
|
| 8.7 |
Quality Assurance and Quality Control
|
| 8.7.1 |
Coeur Pre-2008
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 8.7.2 |
2008–2015
|
| 8.7.3 |
2016–Current
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 8.7.4 |
Alio Gold Results
|
| 8.8 |
Database
|
| 8.9 |
Qualified Person’s Opinion on Sample Preparation, Security, and Analytical Procedures
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 9.1 |
Internal Data Verification
|
| 9.1.1 |
Rochester Review
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 9.1.2 |
Nevada Packard Review
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 9.1.3 |
Nevada Packard Stockpiles
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 9.1.4 |
South and Charlie Stockpiles
|
| • |
Location correlated with surrounding drill holes;
|
| • |
Vertical location relative to topographic surfaces;
|
| • |
Downhole dip and azimuth deviation.
|
| 9.1.5 |
Rochester In-Pit Stockpile
|
| 9.2 |
External Data Verification
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 9.3 |
Data Verification by Qualified Person
|
| 9.4 |
Qualified Person’s Opinion on Data Adequacy
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 10.1 |
Test Laboratories
|
| 10.2 |
Metallurgical Test Work
|
| 10.2.1 |
Rochester
|
| 10.2.2 |
Packard
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 10.2.3 |
Current Metallurgical Testing
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
In House Test work
|
Daily Composite
|
Monthly Composite
|
|
Au/Ag assay
|
X
|
X
|
|
Gradation
|
X
|
X
|
|
% moisture
|
X
|
X
|
|
Permeability
|
X
|
|
|
Column leach
|
X
|
|
|
Bottle roll
|
X
|
| 10.3 |
Recovery Estimates
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Leach
Pad
|
Contained
Gold
(oz)
|
Gold
Recovered
(oz)
|
Gold
Recovery
(%)
|
Silver
Contained
(oz)
|
Silver
Recovered
(oz)
|
Silver
Recovery
(%)
|
|
Stage I (complete)
|
260,008
|
235,743
|
91
|
39,497,785
|
22,186,395
|
56
|
|
Stage II
(in-progress)
|
430,459
|
421,225
|
98
|
64,400,171
|
39,219,857
|
61
|
|
Stage III
(in-progress)
|
303,191
|
285,494
|
94
|
51,853,943
|
24,998,071
|
48
|
|
Stage IV
(in-progress)
|
1,053,351
|
902,262
|
86
|
135,328,128
|
81,379,587
|
60
|
|
Total
|
2,047,009
|
1,844,724
|
90
|
291,080,027
|
167,783,910
|
58
|
|
Leaching
Years |
Leaching
Days
|
Cone Crushed
Ore
|
Historical ROM
Ore
|
Packard Crushed
Ore
|
|||
|
% Recovery
|
% Recovery
|
||||||
|
Ag
|
Au
|
Ag
|
Au
|
Ag
|
Au
|
||
|
30
|
30.5
|
73.1
|
10.4
|
51.0
|
30.5
|
73.1
|
|
|
60
|
35.5
|
76.0
|
12.5
|
53.5
|
35.5
|
76.0
|
|
|
90
|
38.2
|
77.7
|
13.7
|
55.0
|
38.2
|
77.7
|
|
|
180
|
42.6
|
80.6
|
15.8
|
57.6
|
42.6
|
80.6
|
|
|
1
|
365
|
46.8
|
83.5
|
18.0
|
60.2
|
46.8
|
83.5
|
|
2
|
730
|
50.6
|
86.4
|
20.1
|
62.7
|
50.6
|
86.4
|
|
5
|
1,825
|
55.2
|
90.2
|
22.9
|
66.1
|
55.2
|
90.2
|
|
10
|
3,650
|
58.4
|
93.0
|
25.0
|
68.7
|
58.4
|
93.0
|
|
20
|
7,300
|
61.4
|
95.9
|
27.1
|
71.2
|
61.4
|
95.9
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Leaching Years
|
Leaching Days
|
Stage 3 Crushed
|
Stage 3 ROM
|
||
|
% Recovery
|
|||||
|
Ag
|
Au
|
Ag
|
Au
|
||
|
30
|
26.3
|
76.4
|
1.7
|
65.0
|
|
|
60
|
31.1
|
78.8
|
6.2
|
68.2
|
|
|
90
|
33.9
|
80.1
|
8.8
|
70.0
|
|
|
180
|
38.7
|
82.5
|
13.3
|
73.1
|
|
|
1
|
365
|
43.6
|
84.9
|
17.9
|
76.3
|
|
5
|
1,826
|
54.8
|
90.4
|
28.4
|
83.6
|
|
10
|
3,653
|
59.6
|
92.8
|
32.9
|
86.7
|
|
20
|
7,305
|
64.5
|
95.2
|
37.4
|
89.8
|
|
Leaching Years
|
Leaching Days
|
% Recovery Stage VI
|
|||||
|
25th Percentile
|
50th Percentile
|
75th Percentile
|
|||||
|
Ag
|
Au
|
Ag
|
Au
|
Ag
|
Au
|
||
|
30
|
51.3%
|
82.9%
|
46.2%
|
78.4%
|
42.2%
|
75.1%
|
|
|
60
|
57.4%
|
86.1%
|
51.8%
|
81.5%
|
47.2%
|
78.0%
|
|
|
90
|
59.9%
|
87.3%
|
54.0%
|
82.6%
|
49.3%
|
79.1%
|
|
|
180
|
62.6%
|
88.6%
|
56.5%
|
83.8%
|
51.5%
|
80.3%
|
|
|
1
|
365
|
64.2%
|
89.3%
|
57.9%
|
84.5%
|
52.8%
|
81.0%
|
|
2
|
730
|
65.0%
|
89.7%
|
58.6%
|
84.9%
|
53.5%
|
81.3%
|
|
5
|
1825
|
65.5%
|
89.9%
|
59.1%
|
85.1%
|
53.9%
|
81.5%
|
|
10
|
3650
|
65.7%
|
90.0%
|
59.2%
|
85.2%
|
54.0%
|
81.6%
|
|
20
|
7300
|
65.9%
|
90.1%
|
59.4%
|
85.3%
|
54.2%
|
81.7%
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 10.4 |
Metallurgical Variability
|
| • |
Ag: Recovery = (59.4)(-1.89*TS^2+1.81*TS+.667);
|
| • |
Au: Recovery = (85.3)(-0.267*TS+1.09).
|
| 10.5 |
Deleterious Elements
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Ore Product
|
Ultimate Recovery (20 Years)
|
|
|
Silver
(%)
|
Gold
(%)
|
|
|
Historical cone crushed product
|
61.4
|
95.9
|
|
Packard cone crushed product
|
61.4
|
95.9
|
|
Traditional ROM
|
27.1
|
71.2
|
|
Stage 3 ROM
|
37.4
|
89.8
|
|
Stage 4 current config.
|
56.1
|
82.4
|
|
Stage 4 HPGR post pre-screen and side plate
|
59.4
|
85.3
|
|
Stage 6 HPGR
|
59.4
|
90.1
|
| 10.6 |
Qualified Person’s Opinion on Data Adequacy
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 11.1 |
Introduction
|
| • |
Rochester mine mineral resource estimate (amenable to open pit mining methods), updated October 5, 2021 (effective date December 31, 2021);
|
| • |
Rochester in-pit stockpile mineral resource estimate completed October 5, 2021 (effective date December 31, 2021);
|
| • |
South and Charlie stockpile mineral resource estimate completed December 31, 2013. Re-blocking exercise was completed September 30, 2020 to go from a model framework of 50 x 50 x 25 ft to 50 x 50 x 30 ft (effective date December 31, 2021);
|
| • |
Nevada Packard mineral resource (amenable to open pit mining methods), updated August 31, 2020 (effective date December 31, 2021);
|
| • |
Nevada Packard stockpile mineral resource estimate completed December 31, 2015. Re-blocking exercise was completed August 31, 2020 to go from a model framework of 50 x 50 x 25 ft to 50 x 50 x 30 ft (effective date December 31, 2021).
|
| 11.2 |
Geological Model
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 11.3 |
Exploratory Data Analysis
|
| 11.4 |
Density
|
| 11.5 |
Composites
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 11.6 |
Grade Capping/Outlier Restrictions
|
| 11.7 |
Variography
|
| 11.8 |
Interpolation
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Domain
|
7100
|
7221
|
7200
|
7300
|
7400
|
7500
|
7600
|
7630
|
7700
|
7800
|
7830
|
Total
|
|
Composite cap
|
22.25
|
0.3
|
9.0
|
NA
|
4.12
|
14.2
|
NA
|
5.0
|
8.4
|
1.2
|
NA
|
NA
|
|
Total samples
|
63,179
|
1,792
|
11,257
|
428
|
17,223
|
9,964
|
847
|
2,061
|
10,478
|
2,903
|
1,000
|
121,131
|
|
Samples capped
|
2
|
11
|
8
|
0
|
13
|
4
|
0
|
6
|
3
|
8
|
0
|
55
|
|
Raw mean
|
0.528
|
0.031
|
0.259
|
0.045
|
0.207
|
0.389
|
0.120
|
0.260
|
0.253
|
0.060
|
0.287
|
0.392
|
|
Raw STDEV
|
0.957
|
0.075
|
0.635
|
0.086
|
0.362
|
0.807
|
0.267
|
0.591
|
0.505
|
0.270
|
0.498
|
0.802
|
|
Raw CV
|
1.812
|
2.423
|
2.453
|
1.899
|
1.745
|
2.076
|
2.234
|
2.273
|
1.997
|
4.484
|
1.734
|
2.044
|
|
Capped mean
|
0.527
|
0.029
|
0.255
|
0.045
|
0.205
|
0.387
|
0.120
|
0.254
|
0.252
|
0.053
|
0.287
|
0.391
|
|
Capped STDEV
|
0.916
|
0.047
|
0.565
|
0.086
|
0.327
|
0.753
|
0.267
|
0.513
|
0.474
|
0.112
|
0.498
|
0.762
|
|
Capped CV
|
1.739
|
1.622
|
2.214
|
1.899
|
1.591
|
1.948
|
2.234
|
2.020
|
1.882
|
2.104
|
1.734
|
1.949
|
|
% data affected
|
0.0
|
0.7
|
0.1
|
0.0
|
0.1
|
0.0
|
0.0
|
0.3
|
0.0
|
0.3
|
0.0
|
0.05
|
|
% mean change
|
-0.2
|
-7.3
|
-1.3
|
0.0
|
-1.0
|
-0.6
|
0.0
|
-2.3
|
-0.5
|
-11.9
|
0.0
|
-0.4
|
|
% CV change
|
-4.1
|
-33.1
|
-9.7
|
0.0
|
-8.8
|
-6.2
|
0.0
|
-11.1
|
-5.8
|
-53.1
|
0.0
|
-4.6
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Domain
|
7100
|
7221
|
7200
|
7300
|
7400
|
7500
|
7600
|
7630
|
7700
|
7800
|
7830
|
Total
|
|
Composite cap
|
0.15
|
NA
|
0.08
|
NA
|
0.05
|
0.101
|
NA
|
0.025
|
0.07
|
0.025
|
0.025
|
NA
|
|
Total samples
|
63,199
|
1,792
|
11,257
|
428
|
17,223
|
9,964
|
847
|
2,081
|
10,451
|
2,903
|
1,000
|
121,172
|
|
Samples capped
|
62
|
0
|
62
|
0
|
37
|
12
|
0
|
11
|
19
|
1
|
5
|
209
|
|
Raw mean
|
0.004
|
0.001
|
0.005
|
0.001
|
0.002
|
0.003
|
0.001
|
0.002
|
0.002
|
0.001
|
0.002
|
0.003
|
|
Raw STDEV
|
0.016
|
0.001
|
0.037
|
0.002
|
0.009
|
0.020
|
0.001
|
0.030
|
0.010
|
0.001
|
0.004
|
0.018
|
|
Raw CV
|
3.961
|
1.713
|
7.834
|
1.320
|
4.681
|
7.399
|
2.167
|
14.303
|
4.647
|
1.492
|
2.212
|
5.524
|
|
Capped mean
|
0.004
|
0.001
|
0.003
|
0.001
|
0.002
|
0.002
|
0.001
|
0.001
|
0.002
|
0.001
|
0.002
|
0.003
|
|
Capped STDEV
|
0.009
|
0.001
|
0.009
|
0.002
|
0.004
|
0.005
|
0.001
|
0.003
|
0.005
|
0.001
|
0.003
|
0.008
|
|
Capped CV
|
2.395
|
1.713
|
2.526
|
1.320
|
2.248
|
2.226
|
2.167
|
2.180
|
2.341
|
1.279
|
1.820
|
2.546
|
|
% data affected
|
0.1
|
0.0
|
0.6
|
0.0
|
0.2
|
0.1
|
0.0
|
0.5
|
0.2
|
0.0
|
0.5
|
0.2
|
|
% mean change
|
-4.7
|
0.0
|
-27.0
|
0.0
|
-11.0
|
-11.0
|
0.0
|
-37.0
|
-8.5
|
-0.8
|
-4.9
|
-9.1
|
|
% CV change
|
-39.5
|
0.0
|
-67.8
|
0.0
|
-52.0
|
-69.9
|
0.0
|
-84.8
|
-49.6
|
-14.2
|
-17.7
|
-53.9
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Domain
|
100_800
|
200
|
300
|
400
|
500
|
700
|
Total
|
|
Composite cap
|
4.65
|
17.6
|
3.9
|
6.8
|
6.65
|
1.75
|
NA
|
|
Total samples
|
4,823
|
7,324
|
3,548
|
3,488
|
1,916
|
4,802
|
25,901
|
|
Samples capped
|
5
|
4
|
4
|
3
|
6
|
13
|
35
|
|
Raw mean
|
0.172
|
0.574
|
0.179
|
0.212
|
0.398
|
0.084
|
0.292
|
|
Raw STDEV
|
0.461
|
1.307
|
0.369
|
0.529
|
1.544
|
0.287
|
0.899
|
|
Raw CV
|
2.680
|
2.279
|
2.066
|
2.492
|
3.878
|
3.423
|
3.074
|
|
Capped mean
|
0.168
|
0.567
|
0.175
|
0.209
|
0.357
|
0.077
|
0.285
|
|
Capped STDEV
|
0.367
|
1.170
|
0.314
|
0.472
|
0.772
|
0.158
|
0.735
|
|
Capped CV
|
2.186
|
2.062
|
1.792
|
2.255
|
2.161
|
2.046
|
2.583
|
|
% data affected
|
0.1%
|
0.1%
|
0.1%
|
0.1%
|
0.3%
|
0.3%
|
0.14%
|
|
% mean change
|
-2.6%
|
-1.1%
|
-1.9%
|
-1.5%
|
-10.3%
|
-8.0%
|
-2.65%
|
|
% CV change
|
-18.4%
|
-9.5%
|
-13.3%
|
-9.5%
|
-44.3%
|
-40.2%
|
-16.0%
|
|
Domain
|
100_800
|
200
|
300
|
400
|
500
|
700
|
Total
|
|
Total Samples
|
4,629
|
6,753
|
3,301
|
3,325
|
1,856
|
4,753
|
24,617
|
|
Composite cap
|
NA
|
0.09
|
0.03
|
0.026
|
0.027
|
0.012
|
NA
|
|
Samples capped
|
0
|
7
|
8
|
14
|
6
|
4
|
39
|
|
Raw mean
|
0.001
|
0.003
|
0.001
|
0.001
|
0.002
|
0.000
|
0.001
|
|
Raw STDEV
|
0.002
|
0.008
|
0.004
|
0.007
|
0.003
|
0.002
|
0.005
|
|
Raw CV
|
2.513
|
2.896
|
3.235
|
5.730
|
2.202
|
6.233
|
3.759
|
|
Capped mean
|
0.001
|
0.003
|
0.001
|
0.001
|
0.001
|
0.000
|
0.001
|
|
Capped STDEV
|
0.002
|
0.006
|
0.003
|
0.002
|
0.003
|
0.001
|
0.004
|
|
Capped CV
|
2.513
|
2.308
|
2.255
|
2.455
|
1.981
|
2.628
|
2.790
|
|
% data affected
|
0.0
|
0.1
|
0.2
|
0.4
|
0.3
|
0.1
|
0.16
|
|
% mean change
|
0.0
|
-3.2
|
-5.9
|
-18.4
|
-2.6
|
-9.0
|
-5.04
|
|
% CV change
|
0.0
|
-20.3
|
-30.3
|
-57.2
|
-10.0
|
-57.8
|
-25.8
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 11.9 |
Block Model Validation
|
| • |
Visual validation of model results to composites completed by stepping through east-west and north–south cross- sections spaced 100 ft apart as well as plan view sections placed at mid-block elevations (30 ft spacing);
|
| • |
Grade-tonnage curves looking at the average grade of OK, NN, and ID2 estimates at a 0.00 oz/st cut-off;
|
| • |
X, Y, Z swath plots;
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Comparison of block model statistics to the sample assay and composite statistics;
|
| • |
Comparison of grade-tonnage curves to the original estimate;
|
| • |
Reconciliation with available blast-hole data by comparing the resource OK estimate to an ID2 blast-hole model for the Rochester and Nevada Packard models.
|
| 11.10 |
Classification of Mineral Resources
|
| 11.10.1 |
Mineral Resource Confidence Classification
|
| 11.10.2 |
Uncertainties Considered During Confidence Classification
|
| 11.11 |
Reasonable Prospects of Economic Extraction
|
| 11.11.1 |
Input Assumptions
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Model
|
Confidence Classification
|
Criteria
|
|
Rochester
|
Measured
|
Distances from nearest composite of 60–135 ft, min 8 composites, min 5 drill holes
|
|
Indicated
|
Distances from nearest composite of 100–175 ft, min 5 composites, min 3 drill holes
|
|
|
Inferred
|
Distances from nearest composite of 195–330 ft, min 2 composites, min 1 drill hole
|
|
|
South and Charlie stockpile
|
Measured
|
Distance from nearest composite of ≤80 ft, min 3 drill holes
|
|
Indicated
|
Distance from nearest composite of ≤160 ft, min 2 drill holes
|
|
|
Inferred
|
Distance from nearest composite of >160 ft, min 2 drill holes; any block estimated in second pass
|
|
|
Rochester in-pit stockpile
|
Measured
|
Distance from nearest composite of ≤80 ft, min 3 drill holes
|
|
Indicated
|
Distance from nearest composite of ≤160 ft, min 2 drill holes
|
|
|
Inferred
|
Distance from nearest composite of >160 ft, min 1 drill hole
|
|
|
Nevada Packard
|
Measured
|
Distances from nearest composite of 75–100 ft, min 12 composites, min 5 drill holes
|
|
Indicated
|
Distances from nearest composite of 105–160 ft, min 7 composites, min 3 drill holes
|
|
|
Inferred
|
Distances from nearest composite of 165–280 ft, min 3 composites, min 1 drill hole
|
|
|
Nevada Packard stockpile
|
Indicated
|
Distances from nearest composite of <100 ft, >3 composites, >2 drill holes
|
|
Inferred
|
Distances from nearest composite of <200 ft, >1 composite, >1 drill hole; any block estimated in second pass
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|


![]() |
Rochester Operations
Nevada
Technical Report Summary
|


![]() |
Rochester Operations
Nevada
Technical Report Summary
|

|
Item
|
Unit
|
Rochester
|
Nevada Packard
|
|
Mining
|
$/ton
|
1.30
|
1.30
|
|
Crushing and processing oxide
|
$/ton crushed
|
2.05
|
3.50
|
|
Crushing and processing sulfide
|
$/ton crushed
|
2.15
|
N/A
|
|
Processing ROM
|
$/ton
|
1.00
|
N/A
|
|
G&A
|
$/ton crushed
|
0.50
|
0.20
|
|
Break-even NSR cut-off, oxide
|
$/ton
|
2.55
|
3.70
|
|
Break-even NSR cut-off, sulfide
|
$/ton
|
2.65
|
n/a
|
|
Break-even NSR cut-off, ROM
|
$/ton
|
1.50
|
n/a
|
| 11.11.2 |
Commodity Price
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 11.11.3 |
Cut-off
|
| • |
Resource net smelter return (NSR) = silver grade (oz/ton) * silver recovery (%) * [silver price ($/oz) - refining cost ($/oz)] + gold grade (oz/ton) * gold recovery (%) * [gold price ($/oz) - refining cost ($/oz)].
|
| 11.11.4 |
QP Statement
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Material
|
Ag Recovery (Crusher Ore)
|
Au Recovery (Crusher Ore)
|
Ag Recovery (ROM)
|
Au Recovery (ROM)
|
|
Oxide
|
59.4%
|
= (85.3%)*(-0.267*Total-Sulfur+1.09)
|
27.1%
|
71.2%
|
|
Sulfide (≥0.7% Total-Sulfur)
|
= (59.4%)*(-1.89*Total-Sulf^2+
1.81*Total-Sulf+0.667)
|
0.0%
|
||
| 11.12 |
Mineral Resource Statement
|
| • |
Rochester: Table 11‑8 and Table 11‑9;
|
| • |
Nevada Packard: Table 11‑10 and Table 11‑11;
|
| • |
Rochester stockpiles (South-Charlie and in-pit): Table 11‑12 and Table 11‑13;
|
| • |
Nevada Packard stockpiles: Table 11‑14 and Table 11‑15;
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons (st)
|
Average
Grade
|
Contained Ounces
|
NSR Cut-off
($/st)
|
Recovery
(%)
|
|||||
|
(oz/st)
|
(oz)
|
|||||||||
|
Au
|
Ag
|
Au
|
Ag
|
Oxide
|
Sulfide
|
ROM
|
Au
|
Ag
|
||
|
Measured
|
155,049,000
|
0.002
|
0.29
|
313,000
|
44,695,000
|
2.55
|
2.65
|
1.50
|
15.2–93.7
|
0.0–59.5
|
|
Indicated
|
24,325,000
|
0.002
|
0.34
|
51,000
|
8,353,000
|
2.55
|
2.65
|
1.50
|
41.6–93.7
|
0.0–59.5
|
|
Total measured and indicated
|
179,374,000
|
0.002
|
0.30
|
363,000
|
53,048,000
|
2.55
|
2.65
|
1.50
|
15.2–93.7
|
0.0–59.5
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR Cut-off
($/st)
|
Recovery
(%)
|
|||||
|
Au
|
Ag
|
Au
|
Ag
|
Oxide
|
Sulfide
|
ROM
|
Au
|
Ag
|
||
|
Inferred
|
104,833,000
|
0.002
|
0.29
|
201,000
|
30,307,000
|
2.55
|
2.65
|
1.50
|
40.8–93.7
|
0.0–59.5
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR Cut-
off
($/st)
|
Recovery
(%)
|
|||
|
Au
|
Ag
|
Au
|
Ag
|
Oxide
|
Au
|
Ag
|
||
|
Measured
|
20,558,000
|
0.002
|
0.33
|
39,000
|
6,754,000
|
3.70
|
92.0
|
61.0
|
|
Indicated
|
2,060,000
|
0.002
|
0.25
|
5,000
|
509,000
|
3.70
|
92.0
|
61.0
|
|
Total measured and indicated
|
22,618,000
|
0.002
|
0.32
|
43,000
|
7,263,000
|
3.70
|
92.0
|
61.0
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons
(st)
|
Average Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR
Cut-off
($/st)
|
Recovery
(%)
|
|||
|
Au
|
Ag
|
Au
|
Ag
|
Oxide
|
Au
|
Ag
|
||
|
Inferred
|
5,287,000
|
0.002
|
0.36
|
11,000
|
1,913,000
|
3.70
|
92.0
|
61.0
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR Cut-off
($/st)
|
Recovery
(%)
|
|||||
|
Au
|
Ag
|
Au
|
Ag
|
Oxide
|
Sulfide
|
ROM
|
Au
|
Ag
|
||
|
Measured
|
16,282,000
|
0.001
|
0.31
|
20,000
|
5,124,000
|
2.55
|
2.65
|
1.50
|
93.7
|
59.0
|
|
Indicated
|
12,946,000
|
0.001
|
0.31
|
18,000
|
3,960,000
|
2.55
|
2.65
|
1.50
|
93.7
|
59.0
|
|
Total measured and indicated
|
29,228,000
|
0.001
|
0.31
|
37,000
|
9,084,000
|
2.55
|
2.65
|
1.50
|
93.7
|
59.0
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR Cut-off
($/st)
|
Recovery
(%)
|
|||||
|
Au
|
Ag
|
Au
|
Ag
|
Oxide
|
Sulfide
|
ROM
|
Au
|
Ag
|
||
|
Inferred
|
17,233,000
|
0.002
|
0.34
|
29,000
|
5,884,000
|
2.55
|
2.65
|
1.50
|
93.7
|
59.0
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR
Cut-off
($/st)
|
Recovery
(%)
|
|||
|
Au
|
Ag
|
Au
|
Ag
|
Oxide
|
Au
|
Ag
|
||
|
Measured
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
|
Indicated
|
234,000
|
—
|
0.47
|
—
|
110,000
|
3.70
|
92.0
|
61.0
|
|
Total measured and indicated
|
234,000
|
—
|
0.47
|
—
|
110,000
|
3.70
|
92.0
|
61.0
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR
Cut-off
($/st)
|
Recovery
(%)
|
|||
|
Au
|
Ag
|
Au
|
Ag
|
Oxide
|
Au
|
Ag
|
||
|
Inferred
|
1,057,000
|
0.002
|
0.49
|
2,000
|
522,000
|
3.70
|
92.0
|
61.0
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR
Cut-off
(US$/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Au
|
Ag
|
Au
|
Ag
|
Au
|
Ag
|
|||
|
Measured
|
191,889,000
|
0.002
|
0.29
|
372,000
|
56,573,000
|
1.50–2.65
|
15.2–93.7
|
0–61.0
|
|
Indicated
|
39,565,000
|
0.002
|
0.33
|
74,000
|
12,932,000
|
1.50–2.65
|
15.2–93.7
|
0–61.0
|
|
Total measured and indicated
|
231,454,000
|
0.002
|
0.30
|
443,000
|
69,505,000
|
1.50–2.65
|
15.2–93.7
|
0–61.0
|
|
Category
|
Tons
(st)
|
Average
Grade
(oz/st)
|
Contained Ounces
(oz)
|
NSR
Cut-off
(US$/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Au
|
Ag
|
Au
|
Ag
|
Au
|
Ag
|
|||
|
Inferred
|
128,410,000
|
0.002
|
0.30
|
243,000
|
38,626,000
|
1.50–2.65
|
15.2–93.7
|
0–61.0
|
| 1. |
The mineral resource estimates are current as of December 31, 2021, and are reported using the definitions in SK1300.
|
| 2. |
The reference point for the mineral resource estimate is in situ and stockpile. The Qualified Person for the estimate is Mr. Matthew Bradford, RM SME, a Coeur employee.
|
| 3. |
Mineral resources are reported exclusive of mineral reserves on a 100% ownership basis.
|
| 4. |
Mineral resources for Rochester and Nevada Packard are tabulated within a confining pit shell that uses the following input parameters: metal price Au = $1,700/oz and Ag = $22/oz; oxide recovery Au = 77.7%-93.7% and Ag = 59%-61%; sulfide
recovery Au = 15.2%-77.7% and Ag = 0.0%-59% with a net smelter return cutoff of $2.55–$3.70/st oxide and $2.65/st sulfide, where the NSR is calculated as resource net smelter return (NSR) = silver grade (oz/ton) * silver recovery (%) * [silver
price ($/oz) - refining cost ($/oz)] + gold grade (oz/ton) * gold recovery (%) * [gold price ($/oz) - refining cost ($/oz)]; and variable pit slope angles that approximately average 43º over the life-of-mine.
|
| 5. |
Rounding of short tons, grades, and troy ounces, as required by reporting guidelines, may result in apparent differences between tons, grades, and contained metal contents.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 11.13 |
Uncertainties (Factors) That May Affect the Mineral Resource Estimate
|
| • |
Metal price and exchange rate assumptions;
|
| • |
Changes to the assumptions used to generate the NSR grade cut-off grade;
|
| • |
Changes in local interpretations of mineralization geometry and continuity of mineralized zones;
|
| • |
Changes to geological and mineralization shape and geological and grade continuity assumptions;
|
| o |
Additional drilling, which may change confidence category classification in the pit margins from those assumed in the current pit optimization;
|
| o |
Additional sampling that may redefine the silver and/or gold grade estimates in certain areas of the resource estimation;
|
| • |
Density and domain assignments;
|
| • |
Changes to geotechnical, mining and metallurgical recovery assumptions;
|
| • |
Changes to the input and design parameter assumptions that pertain to the assumptions for open pit mining or stockpile rehandling constraining the estimates;
|
| • |
Assumptions as to the continued ability to access the site, retain mineral and surface rights titles, maintain environment and other regulatory permits, and maintain the social license to operate.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 12.1 |
Introduction
|
| 12.2 |
Development of Mining Case
|
| 12.3 |
Designs
|
| 12.4 |
Input Parameters
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Parameter
|
Rochester
|
Nevada Packard
|
Backfill
|
|
Bench height (ft.)
|
30
|
30
|
30
|
|
Batter angle (degrees)
|
Variable
|
Variable
|
45
|
|
Catch bench (ft.)
|
Variable
|
Variable
|
20
|
|
Minimum mining width (ft.)
|
80
|
||
|
Road design width (ft.)
|
88
|
||
|
Haul road grade (maximum; %)
|
10
|
||
| 12.5 |
Net Smelter Return Cut-off
|
| • |
NSR = ((gold price – refining cost) * gold recovery * gold block grade) + ((silver price – refining cost) * silver recovery * silver block grade)
|
| o |
Gold price: US$1,400/oz;
|
| o |
Silver price: US$20/oz;
|
| o |
Gold recovery: Rochester in oxide: 85%; in sulfide: Variable according to total sulfur percentage, expressed as Recovery = (86 X (-0.267 xTotal Sulfur + 1.09))/100; Nevada Packard in oxide: 95%;
|
| o |
Silver recovery: Rochester in oxide: 59%; in sulfide: Variable according to total sulfur percentage, expressed as Recovery = (59 X (-1.89 x Total Sulfur^2 + 1.81 x Total Sulfur + 0.667))/100; Nevada Packard in oxide: 61%;
|
| o |
Refining cost: $0.35/oz.
|
| 12.6 |
Cut-Off Grades
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Item
|
Unit
|
Rochester
|
Nevada Packard
|
|
Crushing and processing oxide
|
$/ton crushed
|
2.05
|
3.50
|
|
Crushing and processing sulfide
|
$/ton crushed
|
2.15
|
n/a
|
|
G&A
|
$/ton crushed
|
0.55
|
0.20
|
|
Break even NSR cut-off, oxide
|
$/ton
|
2.55
|
3.70
|
|
Break even NSR cut-off, sulfide
|
$/ton
|
2.65
|
n/a
|
|
Rehandle cost
|
$/ton
|
0.98
|
1.05
|
|
Sub-NSR cut-off
|
$/ton
|
3.53
|
4.75
|
| 12.7 |
Surface Topography
|
| 12.8 |
Density and Moisture
|
| • |
In-situ (open pit): 0.078 ton/ft3.
|
| • |
Stockpile: 0.057 ton/ft3;
|
| 12.9 |
Dilution and Mine Losses
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 12.10 |
Mineral Reserve Statement
|
| • |
Rochester: Table 12‑3;
|
| • |
Nevada Packard: Table 12‑4;
|
| • |
Rochester stockpiles (South-Charlie and in-pit): Table 12‑5;
|
| • |
Nevada Packard stockpiles: Table 12‑6;
|
| 12.11 |
Uncertainties (Factors) That May Affect the Mineral Reserve Estimate
|
| • |
Commodity prices: the mineral reserve estimates are sensitive to metal prices. Coeur’s current strategy is to sell most of the metal production at spot prices, exposing the company to both positive and negative changes in the market, both
of which are outside of the company’s control;
|
| • |
Metallurgical recovery: changes in metallurgical recovery could also have an impact on the mineral reserve estimates;
|
| • |
Operating costs: higher or lower operating costs than those assumed could also affect the mineral reserve estimates. Operating costs could increase over the life of the Project, due to factors outside of the company’s control;
|
| • |
Geotechnical: unforeseen geotechnical issues could lead to additional dilution, difficulty accessing portions of the orebody, or sterilization of broken or in situ ore. There are sufficient management controls in place to effectively
mitigate geotechnical risks. Designed pit slopes have been evaluated for stability in several geotechnical studies and are regularly evaluated by the engineering group at the mine. The QP considers that sufficient controls are in place for
the Rochester Operations to effectively manage geotechnical risk, and the risk of significant impact on the mineral reserve estimate is low;
|
| • |
Hydrogeological: unexpected hydrogeological conditions could cause issues with access and extraction of areas of the mineral reserve due to higher than anticipated rates of water ingress. The QP considers the risk of encountering
hydrogeological conditions which would significantly affect the mineral reserve estimate over the remaining LOM is low;
|
| • |
Permitting and social license: inability to maintain, renew, or obtain environmental and other regulatory permits, to retain mineral and surface right titles, to maintain site access, and to maintain social license to operate could result
in the inability to extract some or all of the mineral reserve.
|
| • |
A crushing circuit using HPGR technology was commissioned in 2019, and, in 2020, the operation obtained permitting for, and began construction of POA 11, which is a significant additional expansion, including the construction of a new leach
pad, a crushing facility equipped with two HPGR units, processing facilities and related infrastructure to support the extension of Rochester’s mine life.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons
(Mst)
|
Average Grade
|
Contained Ounces
|
NSR
Cut-
off
($/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Ag
(oz/st)
|
Au
(oz/st)
|
Ag
(koz)
|
Au
(koz)
|
Ag
|
Au
|
|||
|
Proven
|
338,323
|
0.376
|
0.003
|
127,340
|
884
|
2.55–2.65
|
27-59
|
71-85
|
|
Probable
|
22,174
|
0.349
|
0.003
|
7,730
|
60
|
2.55–2.65
|
27-59
|
71-85
|
|
Total proven and probable
|
360,497
|
0.375
|
0.003
|
135,070
|
944
|
2.55–2.65
|
27-59
|
71-85
|
|
Category
|
Tons
(Mst)
|
Average
Grade
|
Contained
Ounces
|
NSR
Cut-
off
($/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Ag
(oz/st)
|
Au
(oz/st)
|
Ag
(koz)
|
Au
(koz)
|
Ag
|
Au
|
|||
|
Proven
|
34,231
|
0.502
|
0.002
|
17,183
|
84
|
3.70
|
61
|
95
|
|
Probable
|
1,014
|
0.363
|
0.002
|
368
|
2
|
3.70
|
61
|
95
|
|
Total proven and probable
|
35,245
|
0.498
|
0.002
|
17,551
|
86
|
3.70
|
61
|
95
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons
(Mst)
|
Average
Grade
|
Contained
Ounces
|
NSRCut-
off
($/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Ag
(oz/st)
|
Au
(oz/st)
|
Ag
(koz)
|
Au
(koz)
|
Ag
|
Au
|
|||
|
Proven
|
13,454
|
0.381
|
0.002
|
5,129
|
30
|
2.55–2.65
|
27-59
|
71-85
|
|
Probable
|
7,035
|
0.381
|
0.003
|
2,683
|
18
|
2.55–2.65
|
27-59
|
71-85
|
|
Total proven and probable
|
20,489
|
0.381
|
0.002
|
7,812
|
48
|
2.55–2.65
|
27-59
|
71-85
|
|
Category
|
Tons
(Mst)
|
Average
Grade
|
Contained
Ounces |
NSR Cut-off
($/st)
|
Metallurgical
Recovery
(%)
|
|||
|
Ag
(oz/st)
|
Au
(oz/st)
|
Ag
(koz)
|
Au
(koz)
|
Ag
|
Au
|
|||
|
Proven
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
|
Probable
|
1,546
|
0.525
|
0.001
|
812
|
2
|
3.70
|
61
|
95
|
|
Total proven and probable
|
1,546
|
0.525
|
0.001
|
812
|
2
|
3.70
|
61
|
95
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Category
|
Tons
(Mst)
|
Average Grade
(oz/st)
|
Contained Ounces
(koz)
|
NSR
Cut-off
(US$/st)
|
Metallurgical Recovery
(%)
|
|||
|
Ag
|
Au
|
Ag
|
Au
|
Ag
|
Au
|
|||
|
Total proven
|
386,008
|
0.388
|
0.003
|
149,652
|
998
|
2.55–2.65
|
27–61
|
71-95
|
|
Total probable
|
31,769
|
0.365
|
0.003
|
11,593
|
82
|
2.55–2.65
|
27–61
|
71-95
|
|
Total Proven & Probable
|
417,777
|
0.386
|
0.003
|
161,245
|
1,080
|
2.55–2.65
|
27–61
|
71-95
|
| 1. |
The mineral resource estimates are current as of December 31, 2021, and are reported using the definitions in Item 1300 of Regulation S–K (17 CFR Part 229) (SK1300).
|
| 1. |
The reference point for the mineral reserve estimate is the point of delivery to the heap leach facilities. The Qualified Person for the estimate is Mr. Brandon MacDougall, P.E., a Coeur Rochester employee.
|
| 2. |
Mineral reserve estimates are tabulated within a confining pit shell and use the following input parameters: gold price of US$1,400/oz Au and silver price of US$20/oz Au; Rochester oxide recovery Au = 85% and Ag = 59%; Nevada Packard oxide
recovery Au = 95% and Ag = 61%; ROM recovery Au = 71% and Ag = 27%; with a Rochester net smelter return cutoff of $2.55/st oxide and US$2.65/st sulfide, and a Packard net smelter return cutoff of $3.70, where the NSR is calculated as resource
net smelter return (NSR) = silver grade (oz/ton) * silver recovery (%) * [silver price ($/oz) - refining cost ($/oz)] + gold grade (oz/ton) * gold recovery (%) * [gold price ($/oz) - refining cost ($/oz)]; variable pit slope angles that
approximately average 43º over the life-of-mine.
|
| 3. |
Rounding of short tons, grades, and troy ounces, as required by reporting guidelines, may result in apparent differences between tons, grades, and contained metal contents
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 13.1 |
Introduction
|
| 13.2 |
Geotechnical Considerations
|
| 13.3 |
Hydrogeological Considerations
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Zone Solid Description
|
Overall
Slope
(º)
|
Catch Bench
Width
(ft.)
|
Bench Face
Angle
(º)
|
Inter-Ramp
Angle
(º)
|
|
Undefined
|
20
|
0
|
0
|
0
|
|
North wall
|
47
|
20
|
70
|
57
|
|
North to east transition
|
45
|
25
|
70
|
55
|
|
East wall
|
49
|
20
|
70
|
52
|
|
South sector 1
|
45
|
25
|
70
|
49
|
|
South sector 2 Weaver
|
34
|
25
|
59
|
42
|
|
South sector 2 Rochester
|
39
|
25
|
64
|
45
|
|
South sector 3
|
51
|
23
|
70
|
51
|
|
West sector
|
42
|
20
|
70
|
52
|
|
West to north transition
|
40
|
20
|
65
|
49
|
|
Internal
|
45
|
25
|
64
|
45
|
|
Backfill/leach, unconsolidated
|
27
|
20
|
62
|
27
|
|
Default
|
45
|
25
|
64
|
45
|
|
Material Description
|
Overall
Slope
(º)
|
Catch Bench
Width
(ft.)
|
Bench Face
Angle
(º)
|
Inter-Ramp
Angle
(º)
|
|
In-situ (oxide)
|
52.4
|
25
|
70
|
52.4
|
|
Unconsolidated (backfill/stockpile)
|
37
|
25
|
47
|
37
|
| 13.4 |
Design Considerations
|
| • |
Shift schedule: two-12-hour shifts/day, seven days/week, 52 weeks/year
|
| • |
Operating standby time: 1.8 hours/shift.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Item
|
Unit
|
Rochester
|
Nevada Packard
|
|
Bench height
|
ft
|
30
|
30
|
|
Catch bench vertical spacing
|
ft
|
30–60
|
60
|
|
Minimum mining width between phases
|
ft
|
120
|
240
|
|
Double lane haul road design width
|
ft
|
88
|
88
|
|
Single lane haul road design width
|
ft
|
65
|
65
|
|
Max haul road gradient
|
%
|
10
|
10
|
|
Rolling resistance
|
%
|
2
|
2
|
| 13.5 |
Blasting and Explosives
|
| 13.6 |
Grade Control and Production Monitoring
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 13.7 |
Waste Rock and Backfill
|
| 13.8 |
Production Schedule
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Units
|
2022
|
2023
|
2024
|
2025
|
2026
|
2027
|
2028
|
|
|
Crusher ore
|
t x 1,000
|
11,602
|
14,937
|
29,644
|
30,048
|
30,137
|
30,860
|
30,225
|
|
To stockpile
|
t x 1,000
|
3,600
|
15,626
|
5,032
|
3,112
|
1,993
|
1,189
|
1,800
|
|
ROM ore
|
t x 1,000
|
5,411
|
205
|
36
|
190
|
870
|
308
|
679
|
|
Spent leach
|
t x 1,000
|
—
|
—
|
1,758
|
5,441
|
10,672
|
—
|
—
|
|
Waste
|
t x 1,000
|
3,668
|
10,259
|
10,395
|
5,080
|
14,812
|
5,800
|
23,965
|
|
Total mined tons
|
t x 1,000
|
24,281
|
41,028
|
46,865
|
43,870
|
58,485
|
38,157
|
56,669
|
|
Rehandle
|
t x 1,000
|
—
|
—
|
2,356
|
1,952
|
1,863
|
1,140
|
1,775
|
|
Total moved tons
|
t x 1,000
|
24,281
|
41,028
|
49,221
|
45,822
|
60,348
|
49,297
|
68,444
|
|
Crushed ore
|
t x 1,000
|
11,602
|
14,937
|
32,000
|
32,000
|
32,000
|
32,000
|
32,000
|
|
ROM ore
|
t x 1,000
|
5,411
|
205
|
36
|
190
|
870
|
308
|
679
|
|
Total placed ore
|
t x 1,000
|
17,013
|
15,143
|
32,036
|
32,190
|
32,870
|
32,308
|
32,679
|
|
Silver grade
|
oz/st
|
0.39
|
0.42
|
0.45
|
0.53
|
0.34
|
0.39
|
0.26
|
|
Placed silver
|
oz x 1,000
|
6,705
|
6,304
|
14,377
|
16,990
|
11,157
|
12,573
|
8,572
|
|
Gold grade
|
oz/st
|
0.003
|
0.003
|
0.002
|
0.003
|
0.003
|
0.004
|
0.002
|
|
Placed gold
|
oz x 1,000
|
56
|
46
|
75
|
99
|
84
|
124
|
58
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Units
|
2029
|
2030
|
2031
|
2032
|
2033
|
2034
|
LOM
Total
|
|
|
Crusher ore
|
t x 1,000
|
29,236
|
32,000
|
28,014
|
32,000
|
30,921
|
—
|
329,623
|
|
To stockpile
|
t x 1,000
|
955
|
2,043
|
306
|
169
|
—
|
—
|
35,824
|
|
ROM ore
|
t x 1,000
|
101
|
102
|
662
|
445
|
432
|
—
|
9,442
|
|
Spent leach
|
t x 1,000
|
75
|
16,093
|
-
|
-
|
-
|
—
|
34,040
|
|
Waste
|
t x 1,000
|
7,775
|
14,598
|
56,092
|
10,269
|
19,189
|
—
|
181,903
|
|
Total mined tons
|
t x 1,000
|
38,142
|
64,837
|
85,073
|
42,883
|
50,542
|
—
|
590,832
|
|
Rehandle
|
t x 1,000
|
2,764
|
—
|
3,986
|
—
|
1,079
|
25,004
|
41,920
|
|
Total moved tons
|
t x 1,000
|
48,850
|
71,814
|
96,054
|
54,072
|
53,202
|
25,004
|
687,437
|
|
Crushed ore
|
t x 1,000
|
32,000
|
32,000
|
32,000
|
32,000
|
32,000
|
25,004
|
371,543
|
|
ROM ore
|
t x 1,000
|
101
|
102
|
662
|
445
|
432
|
—
|
9,442
|
|
Total placed ore
|
t x 1,000
|
32,101
|
32,102
|
32,662
|
32,445
|
32,432
|
25,004
|
380,985
|
|
Silver grade
|
oz/st
|
0.36
|
0.47
|
0.38
|
0.39
|
0.27
|
0.23
|
0.38
|
|
Placed silver
|
oz x 1,000
|
11,461
|
14,994
|
12,370
|
12,768
|
8,829
|
5,782
|
142,881
|
|
Gold grade
|
oz/st
|
0.002
|
0.002
|
0.002
|
0.003
|
0.003
|
0.002
|
0.003
|
|
Placed gold
|
oz x 1,000
|
69
|
74
|
78
|
102
|
86
|
40
|
991
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Units
|
2027
|
2028
|
2029
|
2030
|
2031
|
2032
|
2033
|
Total
|
|
|
Crusher ore
|
t x 1,000
|
6,000
|
6,000
|
6,000
|
6,000
|
6,000
|
6,000
|
790
|
36,790
|
|
To stockpile
|
t x 1,000
|
2,079
|
2,958
|
869
|
0
|
—
|
—
|
—
|
5,907
|
|
ROM ore
|
t x 1,000
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
|
Waste
|
t x 1,000
|
1,921
|
1,042
|
1,074
|
977
|
995
|
72
|
—
|
6,080
|
|
Total mined tons
|
t x 1,000
|
10,000
|
10,000
|
7,943
|
6,977
|
6,995
|
6,072
|
790
|
48,778
|
|
Rehandle
|
t x 1,000
|
—
|
—
|
—
|
—
|
—
|
5,117
|
790
|
5,907
|
|
Total moved tons
|
t x 1,000
|
10,000
|
10,000
|
7,943
|
6,977
|
6,995
|
11,189
|
1,581
|
54,685
|
|
Crushed ore
|
t x 1,000
|
6,000
|
6,000
|
6,000
|
6,000
|
6,000
|
6,000
|
790
|
36,790
|
|
ROM ore
|
t x 1,000
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
|
Total placed ore
|
t x 1,000
|
6,000
|
6,000
|
6,000
|
6,000
|
6,000
|
6,000
|
790
|
36,790
|
|
Silver grade
|
oz/st
|
0.44
|
0.74
|
0.63
|
0.44
|
0.44
|
0.34
|
0.28
|
0.50
|
|
Placed silver
|
oz x 1,000
|
2,670
|
4,410
|
3,765
|
2,652
|
2,624
|
2,018
|
224
|
18,363
|
|
Gold grade
|
oz/st
|
0.002
|
0.002
|
0.002
|
0.003
|
0.003
|
0.002
|
0.001
|
0.002
|
|
Placed gold
|
oz x 1,000
|
13
|
15
|
14
|
17
|
17
|
11
|
1
|
88
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Units
|
2022
|
2023
|
2024
|
2025
|
2026
|
2027
|
2028
|
|
|
Crusher ore
|
t x 1,000
|
11,602
|
14,937
|
29,644
|
30,048
|
30,137
|
36,860
|
36,225
|
|
To stockpile
|
t x 1,000
|
3,600
|
15,626
|
6,790
|
8,553
|
12,665
|
3,268
|
4,758
|
|
ROM ore
|
t x 1,000
|
5,411
|
205
|
36
|
190
|
870
|
308
|
679
|
|
Waste
|
t x 1,000
|
3,668
|
10,259
|
10,395
|
5,080
|
14,812
|
7,721
|
25,007
|
|
Total mined tons
|
t x 1,000
|
24,281
|
41,028
|
46,865
|
43,870
|
58,485
|
48,157
|
66,669
|
|
Rehandle
|
t x 1,000
|
-
|
-
|
2,356
|
1,952
|
1,863
|
1,140
|
1,775
|
|
Total moved tons
|
t x 1,000
|
24,281
|
41,028
|
49,221
|
45,822
|
60,348
|
49,297
|
68,444
|
|
Crushed ore
|
t x 1,000
|
11,602
|
14,937
|
32,000
|
32,000
|
32,000
|
38,000
|
38,000
|
|
ROM ore
|
t x 1,000
|
5,411
|
205
|
36
|
190
|
870
|
308
|
679
|
|
Total placed ore
|
t x 1,000
|
17,013
|
15,143
|
32,036
|
32,190
|
32,870
|
38,308
|
38,679
|
|
Silver grade
|
oz/st
|
0.39
|
0.42
|
0.45
|
0.53
|
0.34
|
0.40
|
0.34
|
|
Placed silver
|
oz x 1,000
|
6,705
|
6,304
|
14,377
|
16,990
|
11,157
|
15,242
|
12,982
|
|
Gold grade
|
oz/st
|
0.003
|
0.003
|
0.002
|
0.003
|
0.003
|
0.004
|
0.002
|
|
Placed gold
|
oz x 1,000
|
56
|
46
|
75
|
99
|
84
|
137
|
72
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Units
|
2029
|
2030
|
2031
|
2032
|
2033
|
2034
|
LOM
Total
|
|
|
Crusher ore
|
t x 1,000
|
35,236
|
38,000
|
34,014
|
38,000
|
31,711
|
0
|
366,414
|
|
To stockpile
|
t x 1,000
|
1824
|
2,043
|
306
|
169
|
0
|
0
|
41,731
|
|
ROM ore
|
t x 1,000
|
101
|
102
|
662
|
445
|
432
|
0
|
9,441
|
|
Spent leach
|
t x 1,000
|
75
|
16,093
|
0
|
0
|
0
|
0
|
34,039
|
|
Waste
|
t x 1,000
|
8,849
|
15,575
|
57,087
|
10,341
|
19,189
|
0
|
187,983
|
|
Total mined tons
|
t x 1,000
|
46,085
|
71,814
|
92,068
|
48,955
|
51,332
|
0
|
639,609
|
|
Rehandle
|
t x 1,000
|
2,764
|
0
|
3,986
|
5117
|
1,869
|
25,004
|
47,826
|
|
Total moved tons
|
t x 1,000
|
56,793
|
78,791
|
103,049
|
65,261
|
54,783
|
25,004
|
742,122
|
|
Crushed ore
|
t x 1,000
|
38,000
|
38,000
|
38,000
|
38,000
|
32,790
|
25,004
|
408,333
|
|
ROM ore
|
t x 1,000
|
101
|
102
|
662
|
445
|
432
|
0
|
9,441
|
|
Total placed ore
|
t x 1,000
|
38,101
|
38,102
|
38,662
|
38,445
|
33,222
|
25,004
|
417,775
|
|
Silver grade
|
oz/st
|
0.40
|
0.46
|
0.39
|
0.38
|
0.27
|
0.23
|
0.39
|
|
Placed silver
|
oz x 1,000
|
15,226
|
17,646
|
14,994
|
14,786
|
9,053
|
5,782
|
161,245
|
|
Gold grade
|
oz/st
|
0.002
|
0.002
|
0.002
|
0.003
|
0.003
|
0.002
|
0.003
|
|
Placed gold
|
oz x 1,000
|
83
|
91
|
95
|
113
|
87
|
40
|
1,079
|
| 13.9 |
Equipment
|
| 13.10 |
Personnel
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Item
|
Number of Units
|
|
Loading unit
|
4
|
|
Haul truck (160 st capacity)
|
29
|
|
Blasthole drill
|
4
|
|
Track dozer
|
4
|
|
Water truck
|
2
|
|
Road grader
|
3
|
|
Rubber tired dozer
|
1
|
|
Utility loader
|
1
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 14.1 |
Process Method Selection
|
| 14.2 |
Flowsheet
|
| 14.3 |
Process Plant
|
| 14.3.1 |
Overview
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
![]() |
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 14.3.2 |
Heap Leach Pads
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Leach Pad Volume
|
Contained Tons
(Mst)
|
Design Tons
(Mst)
|
Remaining
Capacity
(%)
|
|
Stage I (complete)
|
23.8
|
23.8
|
0
|
|
Stage II (in-progress)
|
47.3
|
47.3
|
0
|
|
Stage III (in-progress)
|
91.8
|
91.8
|
0
|
|
Stage IV (in-progress)
|
153.3
|
180
|
15
|
|
Stage V (future)
|
0
|
50
|
100
|
|
Stage VI (future)
|
1.8
|
300
|
99
|
|
Nevada Packard (future)
|
0
|
60
|
100
|
|
Total
|
318
|
752.9
|
58
|
| 14.3.3 |
Merrill-Crowe Plant
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Parameter
|
Unit
|
Value
|
|
Capacity
|
st
|
300,000,000
|
|
Phases
|
3
|
|
|
Max depth to liner
|
ft
|
400
|
|
Leach cycle
|
Days
|
30
|
|
Max application rate
|
gal/min/ft2
|
0.005
|
|
Pregnant solution flow
|
gpm
|
13,750
|
| 14.4 |
Equipment Sizing
|
| 14.5 |
Power and Consumables
|
| 14.6 |
Personnel
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Rochester Plant and Leach
|
Rochester Crusher
|
Limerick Plant and Leach
|
Limerick Crusher
|
|
Press feed pump 1
|
Primary crusher
|
Press feed pump A
|
Gyratory
|
|
Press feed pump 2
|
Primary crusher MCC
|
Press feed pump B
|
Primary discharge CV
|
|
East Deaerator Pump
|
Metal removal MCC
|
Press feed pump C
|
Primary discharge apron FDR
|
|
West deaerator pump
|
Secondary crusher MP800
|
Press feed pump standby
|
Coarse ore stockpile CV
|
|
Barren booster pump
|
Secondary MCC
|
Vacuum pump A
|
Coarse ore stockpile reclaim CV
|
|
Clarifier feed pump
|
Secondary crusher MP1000
|
Vacuum pump B
|
Coarse Ore Reclaim Apron FDR
|
|
North vacuum pump
|
Old tertiary crusher MCC
|
Vacuum pump Standby
|
Secondary crusher (MP1000)
|
|
South vacuum pump
|
MRS apron feeder
|
Deaerator FDR pump A
|
Secondary crusher (MP1000)
|
|
Retorts
|
MRS CV-1
|
Deaerator FDR pump B
|
Secondary crushing product CV
|
|
Barren pump P1A
|
Primary apron feeder
|
Precoat pump
|
Secondary screen FDR #1
|
|
Barren pump P2
|
Primary A-belt
|
Barren wash pump
|
Secondary screen FDR #2
|
|
Barren pump P1B
|
Secondary vibrating grizzly
|
Preg pump A
|
Secondary screen #1
|
|
Stage IV north pump
|
Secondary feeder belt
|
Preg pump B
|
Secondary screen #2
|
|
Stage IV south pump
|
Secondary B-belt
|
Preg pump C
|
Secondary crushed reclaim CV
|
|
|
Secondary stacker
|
Preg pump D - standby
|
Secondary crushed reclaim FDR
|
|
|
Tertiary CV-104
|
Barren pump A
|
HPGR #1 feeder
|
|
|
Tertiary CV-105
|
Barren pump B
|
HPGR #2 feeder
|
|
|
Tertiary CV-106
|
Barren pump C
|
Tertiary HPGR #1 float motor
|
|
|
HPGR fixed drive motor
|
Barren pump D - standby
|
Tertiary HPGR #1 fixed motor
|
|
|
HPGR float drive motor
|
|
Tertiary HPGR #2 float motor
|
|
|
HPGR MCC Misc
|
|
Tertiary HPGR #2 fixed motor
|
|
|
Tertiary CV-107
|
|
Tertiary HPGR #1 cooler
|
|
|
Tertiary CV-108
|
|
Tertiary HPGR #2 cooler
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
|
Overland CV-118
|
|
Tertiary crushing product CV
|
|
|
Overland CV-119
|
|
Tertiary HPGR #1 hydraulic
|
|
|
Overland CV-120
|
|
Tertiary HPGR #2 hydraulic
|
|
|
Overland CV-121
|
|
Final Product Loadout CV
|
|
|
|
|
Final product loadout reclaim FDR
|
|
Location
|
Estimated Power in KWH
|
||
|
2022
|
2023
|
2024
|
|
|
Rochester crusher
|
31,113,027
|
24,771,715
|
-
|
|
Rochester process plant totals
|
10,804,122
|
9,263,509
|
9,288,888
|
|
Rochester leaching totals
|
36,020,307
|
23,263,850
|
9,319,739
|
|
Limerick crusher totals
|
—
|
21,761,324
|
73,067,796
|
|
Limerick process plant totals
|
—
|
7,604,046
|
16,565,956
|
|
Limerick leaching totals
|
—
|
13,197,038
|
31,569,386
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Two open pits (Rochester and Nevada Packard)
|
| • |
Crusher and conveyor system;
|
| • |
3 active heap leach pads (Stage II, Stage III, and Stage IV), 1 reclaimed heap leach pad (Stage I), 1 heap leach pad under construction (Stage VI), and 1 permitted heap leach pad (Stage V);
|
| • |
7 waste rock storage facilities (WRSFs);
|
| • |
Powerlines;
|
| • |
Production and monitoring water wells;
|
| • |
Contingency ponds;
|
| • |
Potable water treatment plant;
|
| • |
Water pipelines;
|
| • |
Site buildings, including:
|
| o |
Administration offices;
|
| o |
Security shacks;
|
| o |
Maintenance buildings (crusher, process, electro/mechanical and mobile equipment);
|
| o |
Warehouse;
|
| o |
Ambulance barn;
|
| o |
Laboratory (assay and metallurgical);
|
| o |
Geology core shed;
|
| o |
Merrill-Crowe processing plant;
|
| o |
Refinery;
|
| • |
Access, light vehicle, and haul roads;
|
| • |
Consumables storage;
|
| • |
Security and fencing;
|
| • |
Explosives magazines;
|
| • |
Upper and lower parking areas;
|
| • |
Data and communications infrastructure.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Expansion of the existing permitted disturbance area by 2,815.4 acres;
|
| • |
Expansion of the Rochester pit and the Nevada Packard pit. The bottom of the Rochester pit will extend below groundwater;
|
| • |
Removal of a portion of the existing Stage I heap leach pad and a portion of the Stage II heap leach pad, along with relocation of the existing solution pipelines and utilities from the Stage III heap leach pad to the existing process
plant. Spent ore will be relocated to one of the remaining heap leach pads;
|
| • |
Expansion of the South and West WRSFs to provide 297 Mst of additional storage capacity and expansion of the Nevada Packard WRSF to add 45 Mst of waste rock storage capacity;
|
| • |
Construction and operation of the Limerick Canyon Stage VI heap leach pad, designed to provide 300 Mst of leaching capacity, and the Nevada Packard heap leach pad that will accommodate 60 Mst of leaching capacity;
|
| • |
Construction and operation of the Rochester Stage VI and Nevada Packard Merrill- Crowe process facilities, designed for an application rate on the heap leach pads of 13,750 gpm and 5,000 gpm, respectively;
|
| • |
Construction and operation of the Stage VI crushing and screening facility, designed to handle 60,000 st of ore. Associated infrastructure includes the Stage VI heap leach pad conveyor system, truck loadout, and ore stockpile;
|
| • |
Installation of a crusher at Nevada Packard and construction and operation of a conveyor system, associated loadout, and ore stockpile;
|
| • |
Construction and maintenance of new stormwater diversions sized to convey the 100-year, 24-hour storm event, with sediment collection basins;
|
| • |
Construction of a new Stage VI haul road to from the Stage IV heap leach pad to allow placement of material on the new heap leach plant;
|
| • |
Construction of a barren distribution pipeline from the Stage IV heap leach pad to the proposed Stage VI barren line to respond to process solution demands, reduce the drain-down in existing heap leach pads, and improve closure efficiency.
The pipeline will follow the proposed Stage VI haul road corridor;
|
| • |
Construction of a light vehicle access road from the Stage VI crushing and screening facility to the Stage VI truck loadout, and construction of a light vehicle access road along the perimeter of Stage VI heap leach pad from the truck
loadout to the Stage VI process facility
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Construction and maintenance of a haul road from the Nevada Packard pit to the Packard crushing and screening facility and a light vehicle access road from the Nevada Packard process facility to the existing access road northeast of the
Nevada Packard pit;
|
| • |
Widening and partial relocation of the existing Packard Flat Road;
|
| • |
Installation of a new water conveyance pipeline from existing production wells to the closed process circuit and installation of a new production water well to support the Nevada Packard operations;
|
| • |
Construction of six new growth media stockpiles;
|
| • |
Upgrades to the electrical utility system to support the proposed infrastructure at Limerick Canyon and Nevada Packard;
|
| • |
Construction and operation of ancillary facilities associated with the Limerick Canyon and Nevada Packard operations.
|
| 15.1 |
Roads and Logistics
|
| 15.2 |
Stockpiles
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 15.3 |
Waste Rock Storage Facilities
|
| 15.4 |
Water Management
|
| 15.5 |
Water Supply
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 15.6 |
Power and Electrical
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 15.7 |
Fuel
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 16.1 |
Markets
|
| 16.2 |
Commodity Price Forecasts
|
| • |
Mineral reserves:
|
| o |
US$1,400/oz Au;
|
| o |
US$20/oz Ag;
|
| • |
Mineral resources:
|
| o |
US$1,700/oz Au;
|
| o |
US$22/oz Ag.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 16.3 |
Contracts
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 16.4 |
QP Statement
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
17.0
|
ENVIRONMENTAL STUDIES, PERMITTING, AND PLANS, NEGOTIATIONS, OR AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS
|
| 17.1 |
Baseline and Supporting Studies
|
| 17.2 |
Environmental Considerations/Monitoring Programs
|
| 17.2.1 |
Environmental Protection Measures
|
| • |
Cultural resources;
|
| • |
Native American religious concerns;
|
| • |
Paleontological resources;
|
| • |
Survey monuments;
|
| • |
Air quality;
|
| • |
Drill hole abandonment;
|
| • |
Noxious weeds and non-native weed species;
|
| • |
Growth media management;
|
| • |
Fire protection;
|
| • |
Wildlife including Special Status Species and migratory birds;
|
| • |
Safety and security;
|
| • |
Waste management;
|
| • |
Erosion, sedimentation, and surface water quality;
|
| • |
Acid rock drainage;
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Spills and releases;
|
| • |
Reclamation;
|
| • |
Visual resources and lighting.
|
| 17.2.2 |
Jurisdictional Wetlands and Waters of the United States
|
| 17.3 |
Closure and Reclamation Considerations
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Monitoring Component
|
Permit/Plan and Agency
|
|
Air quality
|
Throughput, Emissions, Fuel Use, and Stack Testing
NDEP Bureau of Air Pollution Control
|
|
Solid waste
|
Landfill Visual Inspections (when in use)
NDEP Solid Waste Branch
|
|
Hazardous waste
|
90-Day Storage Area Weekly Visual Inspections
Satellite Storage Area Weekly Visual Inspections
RCRA Container Storage Area Weekly Visual Inspections
NDEP Bureau of Sustainable Materials Management
|
|
Explosives
|
Weekly Visual Magazine Inspection
Bureau of Alcohol, Tobacco, Firearms, and Explosives
|
|
Water
|
Process Water, Surface Water and Groundwater Quality and Quantity
NDEP Bureau of Mining Regulation and Reclamation
Inspection of Stormwater BMPs
NDEP Bureau of Water Pollution Control
Water Usage
Nevada Division of Water Resources
|
|
Noxious weeds
|
Periodic Noxious Weed Surveys and Weed Management Plan
BLM – under the Plan of Operations
|
|
Reclamation
|
Reclamation Revegetation Success
NDEP Bureau of Mining Regulation and Reclamation – under the Reclamation Permit
BLM – under the Plan of Operations
|
|
Slope stability
|
Visual Inspections
BLM and NDEP Bureau of Mining Regulation and Reclamation
|
|
Waste and ore rock chemistry
|
Waste Rock and Ore Analysis
NDEP Bureau of Mining Regulation and Reclamation
BLM – under the Plan of Operations
|
|
Wildlife
|
Wildlife Mortality
Wildlife Protection Measures (fencing, bird balls, barriers)
Nevada Department of Wildlife
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Classification
|
Management
|
|
PAG
|
Ex-pit WRSFs – encapsulate with non-PAG
|
|
In-pit WRSFs above saturated zone1 – encapsulate with non-PAG
|
|
|
Non-PAG
|
Ex-pit WRSFs
|
|
In-pit PAG encapsulation amended to achieve ANP:AGP > 3
|
|
|
In-pit WRSFs above saturated zone1
|
|
|
Used as construction material
|
|
|
Non-PAG
w/< 0.05 wt% Total Sulfur
|
Ex-pit WRSFs
|
|
In-pit PAG encapsulation without amendment
|
|
|
In-pit WRSFs above saturated zone1
|
|
|
Pit backfill within saturated zone1 amended to achieve ANP:AGP > 3
|
|
|
Used as construction material
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 17.4 |
Permitting
|
| 17.4.1 |
Current Permits
|
| 17.4.2 |
POA 11
|
| 17.5 |
Social Considerations, Plans, Negotiations and Agreements
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Agency
|
Permit or Approval
|
Expiration Date
|
|
NDEP Bureau of Air Pollution Control
|
Class II Air Permit #AP1044-0063
|
April 6, 2025
|
|
Mercury Control Program #AP1044-2242
|
Life of Project
|
|
|
Surface Area Disturbance Permit #AP1629-4340
|
February 11, 2026
|
|
|
NDEP Bureau of Air Quality Planning
|
Open Burn Variances
|
Applied for as needed
|
|
NDEP Bureau of Mining Regulation and Reclamation
|
Reclamation Permit #0087 (Rochester)
|
Life of Project
|
|
Reclamation Permit #0270 (Wilco Exploration)
|
Life of Project
|
|
|
Water Pollution Control Permit #NEV0050037
|
July 1, 2025
|
|
|
NDEP Bureau of Safe Drinking Water
|
Public Water System #PE-3076-12NTNC
|
Annual renewal (Oct)
|
|
Potable Water Treatment System Permit #PE-3076-TP02-12NTNC
|
Annual renewal (Oct)
|
|
|
Temporary Potable System for POA 11 Construction #PE-0006603-20A
|
Annual renewal (Oct)
|
|
|
NDEP Bureau of Sustainable Materials Management
|
Hazardous Waste ID #NVD-986767572
|
Life of Project
|
|
Solid Waste Class III Landfill Waiver #SWMI-14-30
|
Life of Project
|
|
|
NDEP Bureau of Water Pollution Control
|
General Stormwater Permit #NVR300000-MSW166
|
February 28, 2018 (Administratively continued by NDEP)
|
|
General Septic Permit #GNEVOSDS09-L0028
|
May 8, 2014 (Administratively continued by NDEP)
|
|
|
Temporary Septic Holding Tanks Permit POA 11 Project Trailer #GNEVTHT09-0018
|
February 26, 2022
|
|
|
Temporary Septic Holding Tanks Permit POA 11 Washrooms & Breakrooms #GNEVTHT09-0019
|
December 14, 2021
|
|
|
Permanent Septic Holding Tank Permit to Construct - Process Facilities #GNEVPHT09-0034
|
May 14, 2022
|
|
|
Permanent Septic Holding Tank Permit to Construct - Primary Crushing Control Room #GNEVPHT09-0033
|
May 14, 2022
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Agency
|
Permit or Approval
|
Expiration Date
|
|
Nevada Department of Wildlife
|
Industrial Artificial Pond Permit Rochester #40341
|
June 30, 2025
|
|
Industrial Artificial Pond Permit Limerick #40632
|
April 30, 2026
|
|
|
Nevada Division of Water Resources
|
Water Right #87503 (Well PW-2B)
|
Life of Project - PBU EOT due July 31, 2022
|
|
Water Right #87509 (Well PW-4A)
|
Life of Project - PBU EOT due July 31, 2022
|
|
|
Water Right #87504 (Well PW-3A)
|
Life of Project - PBU EOT due July 31, 2024
|
|
|
Water Right #87505 (C-4 Corridor)
|
Life of Project – POC & PBU EOT due July 31, 2023
|
|
|
Water Right #87506 (SAC)
|
Life of Project - PBU EOT due July 31, 2024
|
|
|
Water Right #87507 (CBC)
|
Life of Project - PBU EOT due July 31, 2024
|
|
|
Water Right #87508 (Well PW-1B)
|
Life of Project - PBU EOT due July 31, 2022
|
|
|
Water Right #81234 (New Packard)
|
Life of Project – POC & PBU EOT due Sept. 4, 2023
|
|
|
Water Right #81235 (Packard Well)
|
Life of Project – PBU EOT filed Sept. 15, 2021
|
|
|
Water Right #87510 (Stage V Underdrain)
|
Life of Project – POC & PBU EOT due July 31, 2023
|
|
|
Water Right #87511 (Stage IV Underdrain)
|
Life of Project - PBU EOT due July 31, 2024
|
|
|
Temporary Water Right #91142T
|
Filed Sept. 17, 2021
|
|
|
Temporary Water Right #91143T
|
Filed Sept. 17, 2021
|
|
|
Temporary Water Right #91144T
|
Filed Sept. 17, 2021
|
|
|
Stage III Contingency Pond Dam Safety Permit #J-721
|
Life of Project
|
|
|
Stage V Contingency Pond Dam Safety Permit to Construct #J-723
|
February 4, 2022
|
|
|
Stage VI Contingency Pond Dam Safety Permit to Construct #J-771
|
April 9, 2022
|
|
|
Temporary Discharge Waiver #DW-177
|
June 25, 2022
|
|
|
Nevada Board for the Regulation of Liquefied Petroleum Gas
|
Class 5 License #5-3875-01
|
Annual renewal (Jan)
|
|
Nevada State Fire Marshall
|
Hazardous Materials Permit #FDID 14000
|
Annual renewal (Feb)
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Agency
|
Permit or Approval
|
Expiration Date
|
|
Nevada State Business License
|
Business License #NV19851018129
|
Annual renewal (Oct)
|
|
Pershing County Business License
|
Business License #5270
|
Annual renewal (Jun)
|
|
U.S. Department of the Interior Bureau of Land Management, Winnemucca District Office
|
Rochester Mine Plan of Operations Casefile #NVN-064629
|
Life of Project
|
|
Reclamation Bond NVN-064629
|
Life of Project
|
|
|
Lincoln Hill Exploration Plan of Operations Casefile #NVN-100074
|
Undergoing NEPA
|
|
|
ROW – Microwave Comm Site #NVN-050235
|
December 31, 2050
|
|
|
ROW – Access Road #NVN-042727
|
December 31, 2035
|
|
|
Notice – Buena Vista Playa Exploration #NVN-089944
|
July 24, 2022
|
|
|
Notice – Gold Ridge #NVN-089244
|
Expired – Not released
|
|
|
Notice – Lincoln Hill Exploration #NVN-098613
|
September 14, 2023
|
|
|
Programmatic Agreement - Cultural Resources
|
Life of Project
|
|
|
U.S. Army Corps of Engineers
|
Jurisdictional Determination #SPK-2000-25123
|
October 16, 2023
|
|
U.S. Bureau of Alcohol, Tobacco, Firearms and Explosives
|
User of Explosives Permit #9-NV-027-33-3E-92862
|
May 1, 2022
|
|
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
|
Hazardous Materials Transportation General Permit HM Company ID #051785
|
June 30, 2024
|
|
U.S. Environmental Protection Agency
|
Toxic Release Inventory #89419CRRCH180EX - Form R’s
|
Annual Report (July 1)
|
|
Toxic Substances Control Act - Form U’s
|
September 30, 2026
(Report)
|
|
|
RCRA #NVD-986767572 – EPA Hazardous Waste ID Number
|
Life of Project
|
|
|
RCRA #NVD-986767572 - Biennial Report
|
March 1, 2022
Biennial report
|
|
|
U.S. Federal Communications Commission
|
Radio Station Authorization - Call sign #WNFH594
|
December 18, 2030
|
|
Microwave Authorization - Call sign #WQWW580
|
December 9, 2025
|
|
|
Microwave Authorization - Call sign #WQWW582
|
December 9, 2025
|
|
|
Microwave Authorization - Call sign #WQWW583
|
December 9, 2025
|
|
|
Microwave Authorization - Call sign #WQWW584
|
December 9, 2025
|
|
|
Radio Service - Call sign #WQGA721
|
November 29, 2021
|
|
|
Radio Service - Call sign #WQIZ530
|
August 27, 2026
|
| 17.6 |
Qualified Person’s Opinion on Adequacy of Current Plans to Address Issues
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
18.0
|
CAPITAL AND OPERATING COSTS
|
| 18.1 |
Introduction
|
| 18.2 |
Capital Cost Estimates
|
| 18.2.1 |
Basis of Estimate
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 18.2.2 |
Capital Cost Summary
|
| 18.3 |
Operating Cost Estimates
|
| 18.3.1 |
Basis of Estimate
|
| 18.3.2 |
Operating Cost Summary
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Years
|
2022
|
2023
|
2024
|
2025
|
2026
|
2027
|
2028
|
2029
|
2030
|
|
POA 11/Development
|
237,356
|
151,114
|
|||||||
|
Sustaining
|
27,850
|
45,449
|
32,624
|
55,800
|
28,679
|
21,530
|
4,689
|
1,680
|
1,744
|
|
Nevada Packard
|
7,305
|
41,394
|
359
|
359
|
359
|
359
|
|||
|
New Leases
|
(32,245)
|
||||||||
|
Total
|
232,961
|
196,563
|
32,624
|
63,105
|
70,073
|
21,889
|
5,048
|
2,039
|
2,103
|
|
Years
|
2031
|
2032
|
2033
|
2034
|
2035
|
2036
|
2037
|
2038
|
Total
|
|
POA 11/Development
|
388,470
|
||||||||
|
Sustaining
|
8,695
|
1,619
|
1,700
|
1,500
|
233,559
|
||||
|
Nevada Packard
|
359
|
359
|
359
|
51,212
|
|||||
|
New Leases
|
(32,245)
|
||||||||
|
Total
|
9,054
|
1,978
|
2,059
|
1,500
|
640,996
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Years
|
Units
|
2022
|
2023
|
2024
|
2025
|
2026
|
2027
|
2028
|
2029
|
2030
|
|
Mining
|
$US (1,000)
|
46,021
|
59,732
|
68,656
|
64,648
|
81,575
|
71,916
|
94,129
|
70,171
|
97,726
|
|
$/st moved
|
1.90
|
1.46
|
1.39
|
1.41
|
1.35
|
1.46
|
1.38
|
1.44
|
1.36
|
|
|
Process
|
$US (1,000)
|
60,201
|
65,016
|
74,159
|
71,679
|
67,936
|
80,098
|
80,662
|
81,666
|
82,341
|
|
$/st placed
|
3.54
|
4.29
|
2.31
|
2.23
|
2.07
|
2.09
|
2.09
|
2.14
|
2.16
|
|
|
G&A
|
$US (1,000)
|
21,503
|
21,654
|
22,280
|
22,600
|
21,944
|
22,972
|
22,326
|
22,314
|
22,804
|
|
$/st placed
|
1.26
|
1.43
|
0.70
|
0.70
|
0.67
|
0.60
|
0.58
|
0.59
|
0.60
|
|
|
Selling Cost
|
$US (1,000)
|
1,205
|
1,422
|
2,240
|
2,829
|
2,834
|
2,084
|
2,035
|
2,367
|
2,885
|
|
Total Operating Costs
|
$US (1,000)
|
128931
|
147,823
|
167,335
|
161,819
|
174,289
|
177,070
|
199,152
|
176,517
|
205,775
|
|
$/st placed
|
7.58
|
9.76
|
5.22
|
5.03
|
5.30
|
4.62
|
5.15
|
4.63
|
5.40
|
|
|
Years
|
2031
|
2032
|
2033
|
2034
|
2035
|
2036
|
2037
|
2038
|
Total
|
|
|
Mining
|
$US (1,000)
|
125,072
|
71,804
|
71,649
|
27,417
|
949,796
|
||||
|
$/st moved
|
1.30
|
1.31
|
1.35
|
1.10
|
1.38
|
|||||
|
Process
|
$US (1,000)
|
81,313
|
83,235
|
70,248
|
53,202
|
13,947
|
6,626
|
2,126
|
2,133
|
976,624
|
|
$/st placed
|
2.10
|
2.17
|
2.11
|
2.13
|
2.34
|
|||||
|
G&A
|
$US (1,000)
|
22,038
|
22,358
|
21,296
|
19,293
|
2,749
|
915
|
692
|
374
|
290,112
|
|
$/st placed
|
0.57
|
0.58
|
0.64
|
0.77
|
0.69
|
|||||
|
Selling Cost
|
$US (1,000)
|
2,671
|
2,772
|
2,093
|
1,795
|
1,148
|
211
|
17
|
1
|
30,027
|
|
Total Operating Costs
|
$US (1,000)
|
230,551
|
179,349
|
165,286
|
101,706
|
17,844
|
7,752
|
2,872
|
2,508
|
2,246,559
|
|
$/st placed
|
5.96
|
4.67
|
4.98
|
4.07
|
5.38
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 18.4 |
QP Statement
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
19.0
|
ECONOMIC ANALYSIS
|
| 19.1 |
Forward-looking Information Caution
|
| 19.2 |
Methodology Used
|
| 19.3 |
Financial Model Parameters
|
| 19.3.1 |
Mineral Resource, Mineral Reserve, and Mine Life
|
| 19.3.2 |
Metallurgical Recoveries
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 19.3.3 |
Smelting and Refining Terms
|
| 19.3.4 |
Metal Prices
|
| 19.3.5 |
Capital and Operating Costs
|
| 19.3.6 |
Working Capital
|
| 19.3.7 |
Taxes and Royalties
|
| 19.3.8 |
Closure Costs and Salvage Value
|
| 19.3.9 |
Financing
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Tax Type
|
Tax Rate
|
|
Net Proceeds of Minerals Tax
|
5%
|
|
Sales & Use Tax
|
7.1%
|
|
Nevada Unemployment Insurance Rate
|
1.5% for wages up to $26,900
|
|
Mining Property Tax
|
3.0968%
|
|
Modified Business Tax
|
1.17% on total wages more than $62,500
|
|
NV Gold and Silver Mining Excise Tax
|
0.75% of revenue above $20 million upto $150 million
|
|
1.1% of revenue above $150 million
|
| 19.3.10 |
Inflation
|
| 19.4 |
Economic Analysis
|
| 19.5 |
Sensitivity Analysis
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
LOM Total
|
|
|
Gross Revenue
|
3,800.2
|
|
Operating Costs
|
|
|
Mining
|
(949.8)
|
|
Process
|
(976.6)
|
|
G&A
|
(290.1)
|
|
Selling
|
(30.0)
|
|
Total Operating Costs
|
(2,246.6)
|
|
Other Costs
|
(1.2)
|
|
Operating Cashflow
|
1,552.5
|
|
Capital Expenditures
|
(641.0)
|
|
Reclamation
|
(175.1)
|
|
Cash Flow bef. Taxes
|
736.4
|
|
Tax
|
(48.9)
|
|
Total Free Cash Flow
|
687.5
|
|
NPV (5%)
|
348.1
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
2022
|
2023
|
2024
|
2025
|
2026
|
2027
|
2028
|
2029
|
2030
|
2031
|
2032
|
2033
|
2034
|
2035
|
|
|
Gross Revenue
|
146.2
|
191.9
|
259.4
|
330.3
|
349.1
|
290.3
|
260.4
|
279.5
|
331.6
|
247.7
|
333.3
|
276.6
|
297.8
|
172.6
|
|
Operating Costs
|
||||||||||||||
|
Mining
|
(46.0)
|
(59.7)
|
(68.7)
|
(64.6)
|
(81.6)
|
(71.9)
|
(94.1)
|
(70.2)
|
(97.7)
|
(125.1)
|
(71.1)
|
(71.6)
|
(27.4)
|
0.0
|
|
Process
|
(60.2)
|
(65.0)
|
(74.2)
|
(71.7)
|
(67.9)
|
(80.1)
|
(80.7)
|
(81.7)
|
(82.3)
|
(81.3)
|
(83.2)
|
(70.2)
|
(53.2)
|
(13.9)
|
|
G&A
|
(21.5)
|
(21.7)
|
(22.3)
|
(22.6)
|
(21.9)
|
(23.0)
|
(22.3)
|
(22.3)
|
(22.8)
|
(22.0)
|
(22.4)
|
(21.3)
|
(19.3)
|
(2.7)
|
|
Selling
|
(1.2)
|
(1.4)
|
(2.2)
|
(2.9)
|
(2.8)
|
(2.1)
|
(2.0)
|
(2.4)
|
(2.9)
|
(2.1)
|
(2.7)
|
(2.1)
|
(1.8)
|
(1.1)
|
|
Total Operating Costs
|
(128.9)
|
(147.8)
|
(167.3)
|
(161.8)
|
(174.3)
|
(177.1)
|
(199.2)
|
(176.5)
|
(205.8)
|
(230.6)
|
(179.3)
|
(165.3)
|
(101.7)
|
(17.8)
|
|
Other Costs
|
(0.9)
|
(0.1)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
(0.0)
|
|
Operating Cashflow
|
16.4
|
44.0
|
92.1
|
168.5
|
174.8
|
113.2
|
61.2
|
103.0
|
125.8
|
17.1
|
153.9
|
111.3
|
196.1
|
154.8
|
|
Capital Expenditures
|
(233.0)
|
(196.6)
|
(32.6)
|
(63.1)
|
(70.1)
|
(21.9)
|
(5.0)
|
(2.0)
|
(2.1)
|
(9.1)
|
(2.0)
|
(2.1)
|
(1.5)
|
0.0
|
|
Reclamation
|
0.0
|
0.0
|
0.0
|
0.0
|
(1.5)
|
(2.1)
|
(12.0)
|
(13.3)
|
(14.1)
|
(17.7)
|
(16.8)
|
(7.8)
|
(4.8)
|
(7.4)
|
|
Cash Flow bef. Taxes
|
(216.6)
|
(152.6)
|
59.4
|
105.4
|
103.2
|
89.2
|
44.2
|
87.6
|
109.6
|
(9.6)
|
135.2
|
101.4
|
189.8
|
147.4
|
|
Tax
|
(11.5)
|
(7.6)
|
0.1
|
(3.1)
|
(4.6)
|
(1.6)
|
(1.2)
|
(0.5)
|
(0.2)
|
(1.3)
|
0.6
|
(1.0)
|
(7.3)
|
(7.4)
|
|
Total Free Cash Flow
|
(228.1)
|
(160.2)
|
59.6
|
102.3
|
98.5
|
87.7
|
43.0
|
87.0
|
109.4
|
(10.9)
|
135.8
|
100.5
|
182.5
|
140.0
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
2036
|
2037
|
2038
|
2039
|
2040
|
LOM
|
|
|
Gross Revenue
|
30.9
|
2.5
|
0.1
|
0.0
|
0.0
|
3,800.2
|
|
Operating Costs
|
||||||
|
Mining
|
0.0
|
0.0
|
0.0
|
0.0
|
0.0
|
(949.8)
|
|
Process
|
(6.6)
|
(2.2)
|
(2.1)
|
(0.0)
|
0.0
|
(976.6)
|
|
G&A
|
(0.9)
|
(0.7)
|
(0.4)
|
0.0
|
0.0
|
(290.1)
|
|
Selling
|
(0.2)
|
(0.0)
|
(0.0)
|
(0.0)
|
0.0
|
(30.0)
|
|
Total Operating Costs
|
(7.8)
|
(2.9)
|
(2.5)
|
(0.0)
|
0.0
|
(2,246.6)
|
|
Other Costs
|
(0.0)
|
0.0
|
0.0
|
0.0
|
0.0
|
(1.2)
|
|
Operating Cashflow
|
23.2
|
(0.4)
|
(2.4)
|
0.0
|
0.0
|
1,552.5
|
|
Capital Expenditures
|
0.0
|
0.0
|
0.0
|
0.0
|
0.0
|
(641.0)
|
|
Reclamation
|
(4.9)
|
(12.0)
|
(11.9)
|
(11.3)
|
(37.5)
|
(175.1)
|
|
Cash Flow bef. Taxes
|
18.3
|
(12.4)
|
(14.2)
|
(11.3)
|
(37.5)
|
736.4
|
|
Tax
|
(2.3)
|
0.0
|
(0.0)
|
(0.1)
|
0.0
|
(48.9)
|
|
Total Free Cash Flow
|
15.9
|
(12.4)
|
(14.3)
|
(11.4)
|
(37.5)
|
687.5
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Parameter
|
-20%
|
-10%
|
-5%
|
Base
|
5%
|
10%
|
20%
|
|
Metal price
|
(144.8)
|
101.8
|
224.9
|
348.1
|
470.0
|
591.5
|
833.2
|
|
Operating cost
|
661.3
|
505.2
|
426.8
|
348.1
|
268.7
|
189.3
|
30.4
|
|
Capital cost
|
459.6
|
403.9
|
376.0
|
348.1
|
320.1
|
292.0
|
235.9
|
|
Grade
|
(156.5)
|
96.0
|
222.0
|
348.1
|
472.9
|
597.4
|
844.5
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
20.0
|
ADJACENT PROPERTIES
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
21.0
|
OTHER RELEVANT DATA AND INFORMATION
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
22.0
|
INTERPRETATION AND CONCLUSIONS
|
| 22.1 |
Introduction
|
| 22.2 |
Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements
|
| 22.3 |
Geology and Mineralization
|
| 22.4 |
Exploration, Drilling, and Sampling
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 22.5 |
Data Verification
|
| 22.6 |
Metallurgical Test Work
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 22.7 |
Mineral Resource Estimates
|
| 22.8 |
Mineral Reserve Estimates
|
| • |
Rochester: oxide: US$2.55/st; sulfide US$2.65/st;
|
| • |
Nevada Packard: oxide: US$3.70/st.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 22.9 |
Mining Methods
|
| 22.10 |
Recovery Methods
|
| 22.11 |
Infrastructure
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 22.12 |
Market Studies
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 22.13 |
Environmental, Permitting and Social Considerations
|
| 22.14 |
Capital Cost Estimates
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 22.15 |
Operating Cost Estimates
|
| 22.16 |
Economic Analysis
|
| 22.17 |
Risks and Opportunities
|
| 22.17.1 |
Risks
|
| • |
Changes to metallurgical recovery assumptions could affect revenues and operating costs. These changes could be due to inability to produce a crushed product with the HPGR that meets
specification in terms of top-size or particle size distribution, or other material properties of the ore are different than base case assumptions. This could require revisions to cut-off grades and mineral reserve estimates or could require
additional capital cost to upgrade the planned ore flow system;
|
| • |
Coeur’s ability to timely complete POA 11, Nevada Packard or other future mine expansion and mine life extension projects on budget is dependent on numerous factors, many of which
are outside of our control, including, among others, availability of funding on acceptable terms, timing of receipt of permits and approvals from regulatory authorities, extreme weather events, obtaining materials and equipment and
construction, engineering and other services at favorable prices and terms, and disputes with third-party providers of materials, equipment or services. The construction services related to POA 11 will be performed by contractors, which
creates a risk of delays or additional costs to the project resulting from inability of contractor to complete work;
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Commodity price increases for key consumables such diesel, electricity, tires and other consumables could negatively impact operating costs and also the stated mineral reserves and
mineral resources;
|
| • |
Labor cost increases or productivity decreases could also impact the stated mineral reserves and mineral resources, or impact the economic analysis that supports the mineral
reserves;
|
| • |
Geotechnical and hydrological assumptions used in mine planning are based on historical performance, and to date historical performance has been a reasonable predictor of current
conditions. As the mine gets deeper, any changes to the geotechnical and hydrological assumptions could affect mine planning, affect capital cost estimates if any major rehabilitation is required due to a geotechnical or hydrological event,
affect operating costs due to mitigation measures that may need to be imposed, and impact the economic analysis that supports the mineral reserve estimates;
|
| • |
Changes in climate could result in drought and associated potential water shortages and extreme weather events such as greater-than-100-year storm events as occurred in October 2021
that could impact operating cost and ability to operate.
|
| • |
Assumptions that the long-term reclamation and mitigation of the Rochester Operations can be appropriately managed within the estimated closure timeframes and closure cost estimates;
|
| • |
Political risk from challenges to:
|
| o |
Mining licenses;
|
| o |
Environmental permits;
|
| o |
Coeur’s right to operate;
|
| • |
Changes to assumptions as to governmental tax or royalty rates, such as taxation rate increases or new taxation or royalty imposts.
|
| 22.17.2 |
Opportunities
|
| • |
Conversion of some or all of the measured and indicated mineral resources currently reported exclusive of mineral reserves to mineral reserves, with appropriate supporting studies;
|
| • |
Upgrade of some or all of the inferred mineral resources to higher-confidence categories, such that such better-confidence material could be used in mineral reserve estimation;
|
| • |
Exploration of the broader district for additional silver and gold targets;
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Higher metal prices than forecast could present upside sales opportunities and potentially an increase in predicted Project economics;
|
| • |
Potential to find or gain access to new ore sources that could be processed at the existing Limerick Canyon leach pad.
|
| 22.18 |
Conclusions
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
23.0
|
RECOMMENDATIONS
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
24.0
|
REFERENCES
|
| 24.1 |
Bibliography
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 24.2 |
Abbreviations and Units of Measure
|
|
Abbreviation/Symbol
|
Definition
|
|
'
|
seconds (geographic)
|
|
'
|
foot/feet
|
|
"
|
minutes (geographic)
|
|
"
|
inches
|
|
#
|
number
|
|
%
|
percent
|
|
/
|
per
|
|
<
|
less than
|
|
>
|
greater than
|
|
µm
|
micrometer (micron)
|
|
a
|
annum/ year
|
|
Å
|
angstroms
|
|
asl
|
above sea level
|
|
BQ
|
1.44 inch core size
|
|
c.
|
circa
|
|
d
|
day
|
|
d/wk
|
days per week
|
|
dmt
|
dry metric tonne
|
|
fineness
|
parts per thousand of gold in an alloy
|
|
ft
|
feet
|
|
ft3
|
cubic foot/cubic feet
|
|
ft3/ton
|
cubic feet per ton
|
|
g
|
gram
|
|
Ga
|
billion years ago
|
|
HP
|
horsepower
|
|
HQ
|
2.5 inch core size
|
|
in
|
inches
|
|
km
|
kilometer
|
|
koz
|
thousand ounces
|
|
kV
|
kilovolt
|
|
kVA
|
kilovolt–ampere
|
|
kW
|
kilowatt
|
|
kWh
|
kilowatt hour
|
|
lb
|
pound
|
|
M
|
million
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Abbreviation/Symbol
|
Definition
|
|
m
|
meter
|
|
Ma
|
million years ago
|
|
mesh
|
size based on the number of openings in one inch of screen
|
|
Mft
|
million feet
|
|
mi
|
mile/miles
|
|
Mlb
|
million pounds
|
|
Moz
|
million ounces
|
|
Mt
|
million tons
|
|
Mt/a
|
million tons per annum
|
|
MW
|
megawatts
|
|
NQ
|
1.87 inch core size
|
|
º
|
degrees
|
|
ºC
|
degrees Celsius
|
|
ºF
|
degrees Fahrenheit
|
|
oz
|
ounce/ounces (troy ounce)
|
|
oz/t
|
ounces per ton
|
|
pH
|
measure of the acidity or alkalinity of a solution
|
|
pop
|
population
|
|
ppb
|
parts per billion
|
|
ppm
|
parts per million
|
|
PQ
|
3.35 inch core size
|
|
t
|
US ton (short ton), 2000 pounds
|
|
t/a
|
tons per annum (tons per year)
|
|
t/d
|
tons per day
|
|
t/h
|
tons per hour
|
|
TDS
|
total dissolved solids
|
|
TSS
|
total suspended solids
|
|
wt%
|
weight percent
|
|
®
|
registered name
|
|
AA
|
atomic absorption spectroscopy
|
|
ANC
|
acid-neutralizing capacity
|
|
ANP
|
acid-neutralizing potential
|
|
ARD
|
acid-rock drainage
|
|
AuAA
|
cyanide-soluble gold
|
|
AuEq
|
gold equivalent
|
|
AuFA
|
fire assay
|
|
AuPR
|
Preg-rob gold
|
|
AuSF
|
screen fire assay
|
|
AusIMM
|
Australasian Institute of Mining and Metallurgy
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Abbreviation/Symbol
|
Definition
|
|
BFA
|
bench face angle
|
|
BLM
|
US Bureau of Land Management
|
|
C.P.G.
|
Certified Professional Geologist
|
|
Capex
|
Capital expenditure
|
|
CIL
|
carbon-in-leach
|
|
CIM
|
Canadian Institute of Mining, Metallurgy and Petroleum
|
|
CNwad
|
acid-dissociable cyanide
|
|
CRM
|
certified reference material
|
|
CST
|
cleaner scavenger tailings
|
|
CTOT
|
carbon total
|
|
Cu Eq
|
copper equivalent
|
|
CuCN
|
cyanide-soluble copper
|
|
E
|
east
|
|
EIS
|
Environmental Impact Statement
|
|
EOM
|
end of month
|
|
EOY
|
End-of-year
|
|
GPS
|
global positioning system
|
|
GSM
|
Groupe Spécial Mobile
|
|
H
|
horizontal
|
|
HPGR
|
high pressure grinding rolls
|
|
ICP
|
inductively-couple plasma
|
|
ICP-MS
|
inductively-coupled plasma mass spectrometry
|
|
ICP-OES
|
inductively-coupled plasma optical emission spectrometry
|
|
ID
|
inverse distance interpolation; number after indicates the power, eg ID6 indicates inverse distance to the 6th
power.
|
|
JCR
|
joint condition rating
|
|
JORC
|
The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists
and Minerals Council of Australia
|
|
KV
|
kriging variance
|
|
L–G
|
Lerchs–Grossman
|
|
LOM
|
life-of-mine
|
|
LSK
|
large-scale kinetic
|
|
MAusIMM
|
Member of the Australasian Institute of Mining and Metallurgy
|
|
MIK
|
multiple-indicator kriging
|
|
MWMS
|
Mine Water Management System
|
|
MWMT
|
meteoric water mobility testing
|
|
N
|
north
|
|
NAG
|
net acid generation/net acid generating
|
|
NAPP
|
net acid-producing potential
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Abbreviation/Symbol
|
Definition
|
|
NI 43-101
|
Canadian National Instrument 43-101 “Standards of Disclosure for Mineral Companies”
|
|
NN
|
nearest-neighbor (
|
|
NNP
|
net neutralizing potential
|
|
NSR
|
net smelter return
|
|
NW
|
northwest
|
|
OK
|
ordinary kriging
|
|
Opex
|
Operating expenditure
|
|
P.Eng.
|
Professional Engineer
|
|
P.Geol
|
Professional Geologist
|
|
PAG
|
potentially acid-generating (
|
|
PLI
|
point load index
|
|
PoO
|
Plan of Operations
|
|
PSI
|
yield strength
|
|
QA/QC
|
quality assurance and quality control
|
|
QLT
|
quick leach test
|
|
QP
|
Qualified Person
|
|
RAB
|
rotary air blast
|
|
RC
|
reverse circulation
|
|
RMR
|
rock mass rating
|
|
ROM
|
Run-of-mine
|
|
RQD
|
rock quality designation
|
|
S
|
south
|
|
SAG
|
semi-autogenous grind
|
|
SE
|
southeast
|
|
SEIS
|
Supplemental Environmental Impact Statement
|
|
SG
|
specific gravity
|
|
SMU
|
selective mining unit
|
|
SRM
|
standard reference material
|
|
SS
|
sulfide sulfur
|
|
ST
|
scavenger tailings
|
|
STOT
|
Sulphur total
|
|
SX-EW
|
solvent extraction–electrowin
|
|
TF
|
tonnage factor
|
|
Topo
|
topography
|
|
UHF
|
ultra-high frequency
|
|
USGS
|
United States Geological Survey
|
|
V
|
Vertical
|
|
VHF
|
very high frequency
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Abbreviation/Symbol
|
Definition
|
|
W
|
west
|
|
XRD
|
X-ray diffraction
|
|
XRF
|
X-ray fluorescence
|
| 24.3 |
Glossary of Terms
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
autogenous grinding
|
The process of grinding in a rotating mill which uses as a grinding medium large pieces or pebbles of the ore being ground, instead of conventional steel balls or
rods.
|
|
Avoca
|
An underground mining method where stopes are advanced according to ground stability conditions, and progressively backfilled in conjunction with the mining. This
avoids separate cycles for mining and backfilling activities in a stope location.
|
|
azimuth
|
The direction of one object from another, usually expressed as an angle in degrees relative to true north. Azimuths are usually measured in the clockwise
direction, thus an azimuth of 90 degrees indicates that the second object is due east of the first.
|
|
background concentration
|
Naturally-occurring concentrations of compounds of environmental concern
|
|
ball mill
|
A piece of milling equipment used to grind ore into small particles. It is a cylindrical shaped steel container filled with steel balls into which crushed ore is
fed. The ball mill is rotated causing the balls themselves to cascade, which in turn grinds the ore.
|
|
beneficiation
|
Physical treatment of crude ore to improve its quality for some specific purpose. Also called mineral processing.
|
|
bio-oxidation
|
A hydrometallurgical process where bacteria assist in the oxidation of sulphide minerals.
|
|
block caving
|
Large massive ore bodies may be broken up and removed by this method with a minimum of direct handling of the ore required. Generally, these deposits are of such a
size that they would be mined by open-pit methods if the overburden were not so thick. Application of this method begins with the driving of horizontal crosscuts below the bottom of the ore body, or below that portion which is to be mined at
this stage. From these passages, inclined raises are driven upward to the level of the bottom of the mass which is to be broken. Subsequently, a layer is mined so as to undercut the ore mass and allow it to settle and break up. Broken ore
descends through the raises and can be dropped into mine cars for transport to the surface. When waste material appears at the outlet of a raise it signifies exhaustion of the ore in that interval. If the ore extends to a greater depth, the
entire process can be continued by mining out the mass which contained the previous working passage.
|
|
Bond work index (BWi)
|
A measure of the energy required to break an ore to a nominal product size, determined in laboratory testing, and used to calculate the required power in a grinding
circuit design.
|
|
bullion
|
Unrefined gold and/or silver mixtures that have been melted and cast into a bar or ingot.
|
|
carbon-in-column (CIC)
|
A method of recovering gold and silver from pregnant solution from the heap leaching process by adsorption of the precious metals onto fine carbon suspended by
up-flow of solution through a tank.
|
|
carbon-in-leach (CIL)
|
A method of recovering gold and silver from fine ground ore by simultaneous dissolution and adsorption of the precious metals onto fine carbon in an agitated tank
of ore solids/solution slurry. The carbon flows counter currently to the head of the leaching circuit.
|
|
carbon-in-pulp (CIP)
|
A method of recovering gold and silver from fine ground ore by adsorption of the precious metals onto fine carbon in an agitated tank of ore solids/solution slurry.
This recovery step in the process follows the leaching process which is done in similarly agitated tanks, but without contained carbon.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
carbonaceous
|
Containing graphitic or hydrocarbon species, e.g. in an ore or concentrate; such materials generally present some challenge in processing, e.g. preg-robbing
characteristics.
|
|
Caro’s acid
|
A reagent (H2SO5)generated through the combination of hydrogen peroxide and sulfuric acid, used in cyanide destruction and detoxification.
|
|
comminution/crushing/grinding
|
Crushing and/or grinding of ore by impact and abrasion. Usually, the word "crushing" is used for dry methods and "grinding" for wet methods. Also, "crushing"
usually denotes reducing the size of coarse rock while "grinding" usually refers to the reduction of the fine sizes.
|
|
concentrate
|
The concentrate is the valuable product from mineral processing, as opposed to the tailing, which contains the waste minerals. The concentrate represents a smaller
volume than the original ore
|
|
counter-current decantation (CCD)
|
A process where a slurry is thickened and washed in multiple stages, where clean water is added to the last thickener, and overflows from each thickener are
progressively transferred to the previous thickener, countercurrent to the flow of thickened slurry.
|
|
critical path
|
Sequence of activities through a project network from start to finish, the sum of whose durations determines the overall project duration. Note: there may be more
than one such path. (The path through a series of activities, taking into account interdependencies, in which the late completion of activities will have an impact on the project end date or delay a key milestone.)
|
|
crosscut
|
A horizontal opening driven across the course of a vein or structure, or in general across the strike of the rock formation; a connection from a shaft to an ore
structure.
|
|
crown pillar
|
An ore pillar at the top of an open stope left for wall support and protection from wall sloughing above
|
|
cut and fill stoping
|
If it is undesirable to leave broken ore in the stope during mining operations (as in shrinkage stoping), the lower portion of the stope can be filled with waste
rock and/or mill tailings. In this case, ore is removed as soon as it has been broken from overhead, and the stope filled with waste to within a few feet of the mining surface. This method eliminates or reduces the waste disposal problem
associated with mining as well as preventing collapse of the ground at the surface.
|
|
cut-off grade
|
A grade level below which the material is not “ore” and considered to be uneconomical to mine and process. The minimum grade of ore used to establish reserves.
|
|
cyanidation
|
A method of extracting gold or silver by dissolving it in a weak solution of sodium cyanide.
|
|
data verification
|
The process of confirming that data has been generated with proper procedures, has been accurately transcribed from the original source and is suitable to be used
for mineral resource and mineral reserve estimation
|
|
decline
|
A sloping underground opening for machine access from level to level or from the surface. Also called a ramp.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
density
|
The mass per unit volume of a substance, commonly expressed in grams/ cubic centimeter.
|
|
depletion
|
The decrease in quantity of ore in a deposit or property resulting from extraction or production.
|
|
development
|
Often refers to the construction of a new mine or; Is the underground work carried out for the purpose of reaching and opening up a mineral deposit. It includes
shaft sinking, cross-cutting, drifting and raising.
|
|
development property
|
a property that is being prepared for mineral production or a material expansion of current production, and for which economic viability has been demonstrated by a
pre-feasibility or feasibility study.
|
|
diabase
|
US terminology for an intrusive rock whose main components are labradorite and pyroxene, and characterized by an ophiolitic texture. Corresponds to a diorite.
|
|
diamictite
|
A poorly or non-sorted conglomerate or breccia with a wide range of clasts, up to 25% of them gravel sized (greater than 2 mm)
|
|
dilution
|
Waste of low-grade rock which is unavoidably removed along with the ore in the mining process.
|
|
disclosure
|
Any oral statement or written disclosure made by or on behalf of an issuer and intended to be, or reasonably likely to be, made available to the public in a
jurisdiction of Canada, whether or not filed under securities legislation, but does not include written disclosure that is made available to the public only by reason of having been filed with a government or agency of government pursuant to
a requirement of law other than securities legislation.
|
|
discounted cash flow (DCF)
|
Concept of relating future cash inflows and outflows over the life of a project or operation to a common base value thereby allowing more validity to comparison of
projects with different durations and rates of cash flow.
|
|
drift
|
A horizontal mining passage underground. A drift usually follows the ore vein, as distinguished from a crosscut, which intersects it.
|
|
early-stage exploration property
|
A property for which the technical report being filed has no current mineral resources or mineral reserves defined; and no drilling or trenching proposed
|
|
Areas of land owned by the property owner, but in which other parties, such as utility companies, may have limited rights granted for a specific purpose.
|
|
|
effective date
|
With reference to a technical report, the date of the most recent scientific or technical information included in the technical report.
|
|
electrowinning.
|
The removal of precious metals from solution by the passage of current through an electrowinning cell. A direct current supply is connected to the anode and
cathode. As current passes through the cell, metal is deposited on the cathode. When sufficient metal has been deposited on the cathode, it is removed from the cell and the sludge rinsed off the plate and dried for further treatment.
|
|
elution
|
Recovery of the gold from the activated carbon into solution before zinc precipitation or electro-winning.
|
|
EM
|
Geophysical method, electromagnetic system, measures the earth's response to electromagnetic signals transmitted by an induction coil
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
hanging wall
|
The wall or rock on the upper or top side of a vein or ore deposit.
|
|
heap leaching
|
A process whereby valuable metals, usually gold and silver, are leached from a heap or pad of crushed ore by leaching solutions percolating down through the heap
and collected from a sloping, impermeable liner below the pad.
|
|
high pressure grinding rolls (HPGR)
|
A type of crushing machine consisting of two large studded rolls that rotate inwards and apply a high pressure compressive force to break rocks.
|
|
historical estimate
|
An estimate of the quantity, grade, or metal or mineral content of a deposit that an issuer has not verified as a current mineral resource or mineral reserve, and
which was prepared before the issuer acquiring, or entering into an agreement to acquire, an interest in the property that contains the deposit
|
|
hydrometallurgy
|
A type of extractive metallurgy utilizing aqueous solutions/solvents to extract the metal value from an ore or concentrate. Leaching is the predominant type of
hydrometallurgy.
|
|
Indicated Mineral Resource
|
An ‘Indicated Mineral Resource’ is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be
estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed
and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be
reasonably assumed.
|
|
Inferred Mineral Resource
|
An ‘Inferred Mineral Resource’ is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and
limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits,
workings and drill holes.
|
|
initial public offering (IPO)
|
A corporation’s first offering of stock to the public, usually by subscription from a group of investment dealers
|
|
internal rate of return (IRR)
|
The rate of return at which the Net Present Value of a project is zero; the rate at which the present value of cash inflows is equal to the present value of the
cash outflows.
|
|
IP
|
Geophysical method, induced polarization; used to directly detect scattered primary sulfide mineralization. Most metal sulfides produce IP effects, e.g.
chalcopyrite, bornite, chalcocite, pyrite, pyrrhotite
|
|
JORC code
|
The Australasian Code for Reporting of Mineral Resources and Ore Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and
Metallurgy, Australian Institute of Geoscientists and Mineral Council of Australia, as amended. Provides minimum standards for public reporting to ensure that investors and their advisers have all the information they would reasonably
require for forming a reliable opinion on the results and estimates being reported. Adopted by the ASX for reporting ore body size and mineral concentrations.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
Knelson concentrator
|
a high-speed centrifuge that combines centrifugally enhanced gravitational force with a patented fluidization process to recover precious metals
|
|
leucogabbro
|
Light-colored gabbro
|
|
leucotroctolite
|
A plutonic rock, equivalent to a gabbro, composed primarily of calcic plagioclase, light-colored
|
|
lherzolite
|
A plutonic rock, in which olivine is dominant over orthopyroxene and clinopyroxene, a two-pyroxene peridotite.
|
|
liberation
|
Freeing, by comminution, of particles of specific mineral from their interlock with other constituents of the ore.
|
|
life of mine (LOM)
|
Number of years that the operation is planning to mine and treat ore, and is taken from the current mine plan based on the current evaluation of ore reserves.
|
|
lithogeochemistry
|
The chemistry of rocks within the lithosphere, such as rock, lake, stream, and soil sediments
|
|
lixiviant
|
A leach liquor used to dissolve a constituent in an ore, for example a cyanide solution used to dissolve gold.
|
|
locked cycle flotation test
|
A standard laboratory flotation test where certain intermediate streams are recycled into previous separation stages and the test is repeated across a number of
cycles. This test provides a more realistic prediction of the overall recovery and concentrate grade that would be achieved in an actual flotation circuit, compared with a more simple batch flotation test.
|
|
lopolith
|
Large, concordant, typically layered igneous intrusion, usually lenticular in shape.
|
|
magnetic separation
|
Use of permanent or electro-magnets to remove relatively strong ferromagnetic particles from para- and dia-magnetic ores.
|
|
Measured Mineral Resource
|
A ‘Measured Mineral Resource’ is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well
established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate
is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both
geological and grade continuity.
|
|
melagabbro
|
A plutonic rock in which the plagioclase content divided by the total plagioclase, olivine and pyroxene content is between 10 and 35.
|
|
merger
|
A voluntary combination of two or more companies whereby both stocks are merged into one.
|
|
Merrill-Crowe (M-C) circuit
|
A process which recovers precious metals from solution by first clarifying the solution, then removing the air contained in the clarified solution, and then
precipitating the gold and silver from the solution by injecting zinc dust into the solution. The valuable sludge is collected in a filter press for drying and further treatment
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
mill
|
Includes any ore mill, sampling works, concentration, and any crushing, grinding, or screening plant used at, and in connection with, an excavation or mine.
|
|
mineral project
|
Any exploration, development or production activity, including a royalty or similar interest in these activities, in respect of diamonds, natural solid inorganic
material, or natural solid fossilized organic material including base and precious metals, coal, and industrial minerals
|
|
Mineral Reserve
|
A Mineral Reserve is the economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This
Study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Mineral Reserve includes diluting
materials and allowances for losses that may occur when the material is mined.
|
|
Mineral Resource
|
A Mineral Resource is a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and
precious metals, coal, and industrial minerals in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological
characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge.
|
|
mining claim
|
A description by boundaries of real property in which metal ore and/or minerals may be located.
|
|
Monte Carlo simulation
|
A technique used to estimate the likely range of outcomes from a complex process by simulating the process under randomly selected conditions a large number of
times.
|
|
net present value (NPV)
|
The present value of the difference between the future cash flows associated with a project and the investment required for acquiring the project. Aggregate of
future net cash flows discounted back to a common base date, usually the present. NPV is an indicator of how much value an investment or project adds to a company.
|
|
net smelter return royalty (NSR)
|
A defined percentage of the gross revenue from a resource extraction operation, less a proportionate share of transportation, insurance, and processing costs.
|
|
open pit
|
A mine that is entirely on the surface. Also referred to as open-cut or open-cast mine.
|
|
open stope
|
In competent rock, it is possible to remove all of a moderate sized ore body, resulting in an opening of considerable size. Such large, irregularly-shaped openings
are called stopes. The mining of large inclined ore bodies often requires leaving horizontal pillars across the stope at intervals in order to prevent collapse of the walls.
|
|
orogeny
|
A process in which a section of the earth's crust is folded and deformed by lateral compression to form a mountain range
|
|
ounce (oz) (troy)
|
Used in imperial statistics. A kilogram is equal to 32.1507 ounces. A troy ounce is equal to 31.1035 grams.
|
|
overburden
|
Material of any nature, consolidated or unconsolidated, that overlies a deposit of ore that is to be mined.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
pebble crushing
|
A crushing process on screened larger particles that exit through the grates of a SAG mill. Such particles (typically approx. 50 mm diameter) are not efficiently
broken in the SAG mill and are therefore removed and broken, typically using a cone crusher. The crushed pebbles are then fed to a grinding mill for further breakage.
|
|
penalty elements
|
Elements that when recovered to a flotation concentrate, attract a penalty payment from the smelting customer. This is because those elements are deleterious, and
cause quality, environmental or cost issues for the smelter. Includes elements such as As, Hg and Pb.
|
|
peridotite
|
A plutonic rock which has a mafic content equal to or greater than 90, and the olivine content, divided by the total plagioclase, orthopyroxene and clinopyroxene
content is greater than 40.
|
|
petrography
|
Branch of geology that deals with the description and classification of rocks.
|
|
phyllic alteration
|
Minerals include quartz-sericite-pyrite
|
|
plant
|
A group of buildings, and especially to their contained equipment, in which a process or function is carried out; on a mine it will include warehouses, hoisting
equipment, compressors, repair shops, offices, mill or concentrator.
|
|
portal.
|
The surface entrance to a tunnel or adit
|
|
potassic alteration
|
A relatively high temperature type of alteration which results from potassium enrichment. Characterized by biotite, K-feldspar, adularia.
|
|
poudinge
|
Local DRC name for conglomerate unit
|
|
preg-robbing
|
A characteristic of certain ores, typically that contain carbonaceous species, where dissolved gold is reabsorbed by these species, leading to an overall reduction
in gold recovery. Such ores require more complex treatment circuits to maximize gold recovery.
|
|
preliminary economic assessment
|
A study, other than a pre-feasibility or feasibility study, that includes an economic analysis of the potential viability of mineral resources
|
|
preliminary feasibility study, pre-feasibility study
|
A comprehensive study of the viability of a mineral project that has advanced to a stage where the mining method, in the case of underground mining, or the pit
configuration, in the case of an open pit, has been established and an effective method of mineral processing has been determined, and includes a financial analysis based on reasonable assumptions of technical, engineering, legal, operating,
economic, social, and environmental factors and the evaluation of other relevant factors which are sufficient for a qualified person, acting reasonably, to determine if all or part of the mineral resource may be classified as a mineral
reserve
|
|
Probable Mineral Reserve
|
A ‘Probable Mineral Reserve’ is the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at least a
Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.
|
|
producing issuer
|
An issuer with annual audited financial statements that disclose gross revenue, derived from mining operations, of at least $30 million Canadian for the issuer’s
most recently completed financial year; and gross revenue, derived from mining operations, of at least $90 million Canadian in the aggregate for the issuer’s three most recently completed financial years
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
propylitic
|
Characteristic greenish colour. Minerals include chlorite, actinolite and epidote. Typically contains the assemblage quartz-chlorite-carbonate
|
|
Proven Mineral Reserve
|
A ‘Proven Mineral Reserve’ is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study
must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.
|
|
pyrometallurgy
|
A type of extractive metallurgy where furnace treatments at high temperature are used to separate the metal values from an ore or concentrate. The waste product is
removed as slag and/or gases. Smelting and refining are common pyrometallurgical processes.
|
|
quebrada
|
Gorge or ravine
|
|
raise
|
A vertical or inclined underground working that has been excavated from the bottom upward
|
|
reclamation
|
The restoration of a site after mining or exploration activity is completed.
|
|
refining
|
A high temperature process in which impure metal is reacted with flux to reduce the impurities. The metal is collected in a molten layer and the impurities in a
slag layer. Refining results in the production of a marketable material.
|
|
refractory
|
Gold mineralization normally requiring more sophisticated processing technology for extraction, such as roasting or autoclaving under pressure.
|
|
Resistivity
|
Observation of electric fields caused by current introduced into the ground as a means of studying earth resistivity in geophysical exploration. Resistivity is the
property of a material that resists the flow of electrical current
|
|
A parcel of land granted by deed or easement for construction and maintenance according to a designated use. This may include highways, streets, canals, ditches,
or other uses
|
|
|
roasting
|
A high temperature oxidation process for refractory ores or concentrates. The material is reacted with air (possibly enriched with oxygen) to convert sulfur in
sulfides to sulfur dioxide. Other constituents in ore (e.g. C, Fe) are also oxidized. The resulting calcine can then be leached with cyanide, resulting in economic gold recoveries.
|
|
rock quality designation (RQD)
|
A measure of the competency of a rock, determined by the number of fractures in a given length of drill core. For example, a friable ore will have many fractures
and a low RQD.
|
|
rod mill
|
A rotating cylindrical mill which employs steel rods as a grinding medium.
|
|
room and pillar
|
This method is suitable for level deposits that are fairly uniform in thickness. It consists of excavating drifts (horizontal passages) in a rectilinear pattern so
that evenly spaced pillars are left to support the overlying material. A fairly large portion of the ore (40–50%) must be left in place. Sometimes the remaining ore is recovered by removing or shaving the pillars as the mine is vacated,
allowing the overhead to collapse or making future collapse more likely
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
royalty
|
An amount of money paid at regular intervals by the lessee or operator of an exploration or mining property to the owner of the ground. Generally based on a
specific amount per tonne or a percentage of the total production or profits. Also, the fee paid for the right to use a patented process.
|
|
run-of-mine
|
A term used to describe ore of average grade for the deposit.
|
|
semi-autogenous grinding (SAG)
|
A method of grinding rock into fine powder whereby the grinding media consists of larger chunks of rocks and steel balls.
|
|
shaft
|
A vertical or inclined excavation for the purpose of opening and servicing a mine. It is usually equipped with a hoist at the top, which lowers and raises a
conveyance for handling men and material
|
|
shrinkage stoping
|
In this method, mining is carried out from the bottom of an inclined or vertical ore body upwards, as in open stoping. However, most of the broken ore is allowed
to remain in the stope in order both to support the stope walls and to provide a working platform for the overhead mining operations. Ore is withdrawn from chutes in the bottom of the stope in order to maintain the correct amount of open
space for working. When mining is completed in a particular stope, the remaining ore is withdrawn, and the walls are allowed to collapse.
|
|
solvent extraction-electrowinning (SX-EW)
|
A metallurgical technique primarily applied to copper ores, in which metal is dissolved from the rock by organic solvents and recovered from solution by
electrolysis.
|
|
specific gravity
|
The weight of a substance compared with the weight of an equal volume of pure water at 4°C.
|
|
Squid TEM
|
Geophysical method. High temperature superconducting quantum interference device (SQUID) magnetometers have been developed in a collaborative project between BHP
and CSIRO specifically for application in airborne time domain electromagnetic (TEM) surveying to improve the performance of the system in detection of conductors with longer decay time constants, particularly in the presence of a conductive
overburden
|
|
stope
|
An excavation in a mine, other than development workings, made for the purpose of extracting ore.
|
|
strike length
|
The horizontal distance along the long axis of a structural surface, rock unit, mineral deposit or geochemical anomaly.
|
|
strip ratio
|
The ratio of waste tons to ore tons mined calculated as total tonnes mined less ore tonnes mined divided by ore tonnes mined.
|
|
stripping ratio
|
The ratio of tonnes removed as waste, to the number of tonnes of ore removed from an open pit mine.
|
|
sublevel caving
|
In this method, relatively small blocks of ore within a vertical or steeply sloping vein are undercut within a stope and allowed to settle and break up. The broken
ore is then scraped into raises and dropped into mine cars.
|
|
supergene
|
Mineral enrichment produced by the chemical remobilization of metals in an oxidised or transitional environment.
|
|
t10
|
A parameter determined in a standard breakage test (the Drop Weight test) used to predict the size of a SAG mill.
|
|
tailings
|
Material rejected from a mill after the recoverable valuable minerals have been extracted.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Term
|
Definition
|
|
taxitic
|
Volcanic rock texture that appears to be of clastic derivation because of the mixture of materials of varying texture and structure from the same flow.
|
|
tillite
|
Sedimentary rock that consists of consolidated masses of unweathered blocks (large, angular, detached rock bodies) and glacial till.
|
|
total free cashflow
|
Revenue less operating costs, selling expences, capital, reclamation and taxes.
|
|
tunnel
|
A horizontal underground passage that is open at both ends; the term is loosely applied in many cases to an adit, which is open at only one end
|
|
uniaxial compressive strength
|
A measure of the strength of a rock, which can be determined through laboratory testing, and used both for predicting ground stability underground, and the relative
difficulty of crushing.
|
|
VTEM
|
Geophysical method, versatile time-domain electromagnetic system, used to detect conductive substances at shallow depths in the Earth's crust
|
|
wacke
|
A sandstone that consists of a mixed variety of angular and unsorted (or poorly sorted) mineral and rock fragments within an abundant matrix of clay and fine silt.
|
|
World Geodetic Reference System of 1984 (WGS-84)-
|
The United States Defense Mapping Agency's Datum. This datum is a global datum based on electronic technology which is still to some degree classified. Data on the
relationship of as many as 65 different datums to WGS-84 is available to the public. As a result, WGS-84 is becoming the base datum for the processing and conversion of data from one datum to any other datum. The Global Positioning System
(GPS) is based on this datum.
|
|
written disclosure
|
Any writing, picture, map, or other printed representation whether produced, stored or disseminated on paper or electronically, including websites.
|
|
A grouping of three numbers which designate the position of a point in relation to a common reference frame. In common usage, the X and Y coordinate fix the
horizontal position of the point, and Z refers to the elevation.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
25.0
|
RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT
|
| 25.1 |
Introduction
|
| 25.2 |
Macroeconomic Trends
|
| • |
Information relating to inflation, interest rates, discount rates, taxes.
|
| 25.3 |
Markets
|
| • |
Information relating to market studies/markets for product, market entry strategies, marketing and sales contracts, product valuation, product specifications, refining and treatment
charges, transportation costs, agency relationships, material contracts (e.g. mining, concentrating, smelting, refining, transportation, handling, hedging arrangements, and forward sales contracts), and contract status (in place, renewals).
|
| 25.4 |
Legal Matters
|
| • |
Information relating to the corporate ownership interest, the mineral tenure (concessions, payments to retain, obligation to meet expenditure/reporting of work conducted), surface
rights, water rights (water take allowances), royalties, encumbrances, easements and rights-of-way, violations and fines, permitting requirements, ability to maintain and renew permits
|
| 25.5 |
Environmental Matters
|
| • |
Information relating to baseline and supporting studies for environmental permitting, environmental permitting and monitoring requirements, ability to maintain and renew permits,
emissions controls, closure planning, closure and reclamation bonding and bonding requirements, sustainability accommodations, and monitoring for and compliance with requirements relating to protected areas and protected species.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| 25.6 |
Stakeholder Accommodations
|
| • |
Information relating to social and stakeholder baseline and supporting studies, hiring and training policies for workforce from local communities, partnerships with stakeholders
(including national, regional, and state mining associations; trade organizations; state and local chambers of commerce; economic development organizations; non-government organizations; and, state and federal governments), and the community
relations plan.
|
| 25.7 |
Governmental Factors
|
| 25.8 |
Internal Controls
|
| 25.8.1 |
Exploration and Drilling
|
| • |
Written procedures and guidelines to support preferred sampling methods and approaches; periodic compliance reviews of adherence to such written procedures and guidelines;
|
| • |
Maintenance of a complete chain-of-custody, ensuring the traceability and integrity of the samples at all handling stages from collection, transportation, sample preparation and
analysis to long-term sample storage;
|
| • |
Geological logs are checked and verified, and there is a physical sign-off to attest to the validation protocol required;
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
| • |
Quality control checks on collar and downhole survey data for errors or significant deviations;
|
| • |
Appropriate types of quality control samples are inserted into the sample stream at appropriate frequencies to assess analytical data quality;
|
| • |
Third-party fully certified labs are used for assays used in public disclosure or resource models
|
| • |
Regular inspection of analytical and sample preparation facilities by appropriately experienced Coeur personnel;
|
| • |
QA/QC data are regularly verified to ensure that outliers sample mix-ups, contamination, or laboratory biases during the sample preparation and analysis steps are correctly
identified, mitigated or remediated. Changes to database entries are required be documented;
|
| • |
Database upload and verification procedures to ensure the accuracy and integrity of the data being entered into the Project database(s). These are typically performed using software
data-checking routines. Changes to database entries are required to be documented. Data are subject to regular backups.
|
| 25.8.2 |
Mineral Resource and Mineral Reserve Estimates
|
| • |
Prior to use in mineral resource or mineral reserve estimation, the selected data to support estimation are downloaded from the database into a project file and reviewed for
improbable entries and high values;
|
| • |
Written procedures and guidelines are used to support estimation methods and approaches;
|
| • |
Completion of annual technical statements on each mineral resource and mineral reserve estimate by qualified persons. These technical statements include evaluation of modifying and
technical factors, incorporate available reconciliation data, and are based on a cashflow analysis;
|
| • |
Internal reviews of block models, mineral resources and mineral reserves using a “layered responsibility” approach with Qualified Person involvement at the site and corporate levels;
|
| 25.8.3 |
Risk Assessments
|
| • |
Active monitoring programs such as mill performance, geotechnical networks, water sampling, waste management;
|
| • |
Regular review of markets, commodity and price forecasts by internal specialists; reviews of competitor activities;
|
| • |
Regular reviews of stakeholder concerns, accommodations to stakeholder concerns and ongoing community consultation;
|
| • |
Monitoring of key permits and obligations such as tenures, surface rights, mine environmental and operating permits, agreements and regulatory changes to ensure all reporting and
payment obligations have been met to keep those items in good standing.
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial Number
|
Lead File Number
|
Legacy Serial Number
|
Royalty
|
Claim Name
|
County
|
Case Disposition
|
Claim Type
|
Next Payment Due Date
|
Date Of Location
|
Meridian Township Range Section
|
Quadrant
|
|
NV101452332
|
NV101452332
|
NMC39595
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
CROWN HILLS NO. 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
8/22/1972
|
21 0280N 0340E 014
|
SW
|
|
NV101493000
|
NV101493000
|
NMC39574
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
CROWN HILLS NO. 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
8/22/1972
|
21 0280N 0340E 014
|
NW
|
|
SW
|
|||||||||||
|
21 0280N 0340E 015
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
NV101498910
|
NV101498910
|
NMC39594
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
CROWN HILLS NO. 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
8/22/1972
|
21 0280N 0340E 014
|
SW
|
|
21 0280N 0340E 015
|
SE
|
||||||||||
|
NV101542019
|
NV101542019
|
NMC39593
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
CROWN HILLS NO. 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
8/22/1972
|
21 0280N 0340E 014
|
NW
|
|
SW
|
|||||||||||
|
21 0280N 0340E 015
|
SE
|
||||||||||
|
NV101459582
|
NV101459582
|
NMC140863
|
3% NSR (Solidus)
|
HMS 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
12/5/1979
|
21 0280N 0340E 011
|
NW
|
|
NV101478182
|
NV101478182
|
NMC140862
|
3% NSR (Solidus)
|
HMS 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
12/5/1979
|
21 0280N 0340E 011
|
NW
|
|
NV101480081
|
NV101480081
|
NMC140864
|
3% NSR (Solidus)
|
HMS 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
12/5/1979
|
21 0280N 0340E 011
|
NW
|
|
NV101345410
|
NV101345410
|
NMC140941
|
3% NSR (Solidus)
|
HMS 84
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
1/24/1980
|
21 0280N 0340E 014
|
NW
|
|
NV101499467
|
NV101499467
|
NMC140942
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
HMS 85
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
1/24/1980
|
21 0280N 0340E 014
|
NW
|
|
SW
|
|||||||||||
|
NV101454239
|
NV101454239
|
NMC140944
|
3% NSR (Solidus)
|
HMS 87
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
1/25/1980
|
21 0280N 0340E 014
|
SW
|
|
NV101547449
|
NV101547449
|
NMC140943
|
3% NSR (Solidus)
|
HMS 86
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
1/25/1980
|
21 0280N 0340E 014
|
SW
|
|
NV101304801
|
NV101304801
|
NMC349508
|
3% NSR (Solidus)
|
SDB-1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/5/1985
|
21 0280N 0340E 004
|
SE
|
|
NV101348715
|
NV101348715
|
NMC349510
|
3% NSR (Solidus)
|
SDB-3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/5/1985
|
21 0280N 0340E 004
|
SE
|
|
NV101479231
|
NV101479231
|
NMC349511
|
3% NSR (Solidus)
|
SDB-4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/5/1985
|
21 0280N 0340E 004
|
SE
|
|
NV101755547
|
NV101755547
|
NMC349509
|
3% NSR (Solidus)
|
SDB-2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/5/1985
|
21 0280N 0340E 004
|
SE
|
|
NV101303111
|
NV101303111
|
NMC349512
|
3% NSR (Solidus)
|
SDB-5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/6/1985
|
21 0280N 0340E 004
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101478101
|
NV101478101
|
NMC349513
|
3% NSR (Solidus)
|
SDB-6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/6/1985
|
21 0280N 0340E 004
|
SE
|
|
NV101301769
|
NV101301769
|
NMC364282
|
3% NSR (Solidus)
|
IDA #12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
SE
|
|
NV101302768
|
NV101302768
|
NMC364286
|
3% NSR (Solidus)
|
IDA #16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
SE
|
|
|
21 0280N 0340E 017
|
NE
|
||||||||||
|
NV101305162
|
NV101305162
|
NMC364284
|
3% NSR (Solidus)
|
IDA #14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
SE
|
|
NV101349904
|
NV101349904
|
NMC364288
|
3% NSR (Solidus)
|
IDA #18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
SE
|
|
21 0280N 0340E 017
|
NE
|
||||||||||
|
NV101405719
|
NV101405719
|
NMC364290
|
3% NSR (Solidus)
|
IDA #20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
SE
|
|
SW
|
|||||||||||
|
21 0280N 0340E 017
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101406736
|
NV101406736
|
NMC364292
|
3% NSR (Solidus)
|
IDA #22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
SW
|
|
|
21 0280N 0340E 017
|
NW
|
||||||||||
|
NV101520828
|
NV101520828
|
NMC364295
|
3% NSR (Solidus)
|
IDA #25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
NW
|
|
SW
|
|||||||||||
|
NV101602899
|
NV101602899
|
NMC364293
|
3% NSR (Solidus)
|
IDA #23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
SW
|
|
NV101609073
|
NV101609073
|
NMC364291
|
3% NSR (Solidus)
|
IDA #21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
SE
|
|
SW
|
|||||||||||
|
NV101731204
|
NV101731204
|
NMC364289
|
3% NSR (Solidus)
|
IDA #19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
SE
|
|
NV101731513
|
NV101731513
|
NMC364283
|
3% NSR (Solidus)
|
IDA #13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
SE
|
|
|
NV101756716
|
NV101756716
|
NMC364285
|
3% NSR (Solidus)
|
IDA #15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 008
|
SE
|
|
NV101758195
|
NV101758195
|
NMC364287
|
3% NSR (Solidus)
|
IDA #17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/11/1986
|
21 0280N 0340E 017
|
NE
|
|
NV101401214
|
NV101401214
|
NMC364392
|
3% NSR (Solidus)
|
SHO #32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/18/1986
|
21 0280N 0340E 002
|
SE
|
|
SW
|
|||||||||||
|
NV101479506
|
NV101479506
|
NMC364365
|
3% NSR (Solidus)
|
SHO #5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/18/1986
|
21 0280N 0340E 003
|
SE
|
|
NV101607345
|
NV101607345
|
NMC364364
|
3% NSR (Solidus)
|
SHO #4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/18/1986
|
21 0280N 0340E 002
|
SW
|
|
NV101301257
|
NV101301257
|
NMC364386
|
3% NSR (Solidus)
|
SHO #26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/19/1986
|
21 0280N 0340E 002
|
SW
|
|
NV101302915
|
NV101302915
|
NMC364384
|
3% NSR (Solidus)
|
SHO #24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/19/1986
|
21 0280N 0340E 002
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101304393
|
NV101304393
|
NMC364390
|
3% NSR (Solidus)
|
SHO #30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/19/1986
|
21 0280N 0340E 002
|
SW
|
|
NV101305061
|
NV101305061
|
NMC364388
|
3% NSR (Solidus)
|
SHO #28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/19/1986
|
21 0280N 0340E 002
|
SW
|
|
NV101460198
|
NV101460198
|
NMC364363
|
3% NSR (Solidus)
|
SHO #3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/19/1986
|
21 0280N 0340E 002
|
SE
|
|
SW
|
|||||||||||
|
NV101608367
|
NV101608367
|
NMC364394
|
3% NSR (Solidus)
|
SHO #34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/19/1986
|
21 0280N 0340E 002
|
SE
|
|
NV101453173
|
NV101453173
|
NMC364370
|
3% NSR (Solidus)
|
SHO #10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/20/1986
|
21 0280N 0340E 003
|
SW
|
|
NV101453344
|
NV101453344
|
NMC364371
|
3% NSR (Solidus)
|
SHO #11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SW
|
|
|
21 0280N 0340E 004
|
SE
|
||||||||||
|
NV101458053
|
NV101458053
|
NMC364372
|
3% NSR (Solidus)
|
SHO #12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/20/1986
|
21 0280N 0340E 003
|
SW
|
|
NV101495583
|
NV101495583
|
NMC364368
|
3% NSR (Solidus)
|
SHO #8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/20/1986
|
21 0280N 0340E 003
|
SW
|
|
21 0280N 0340E 004
|
SE
|
||||||||||
|
NV101601776
|
NV101601776
|
NMC364367
|
3% NSR (Solidus)
|
SHO #7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/20/1986
|
21 0280N 0340E 003
|
SW
|
|
NV101604000
|
NV101604000
|
NMC364366
|
3% NSR (Solidus)
|
SHO #6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/20/1986
|
21 0280N 0340E 003
|
SE
|
|
SW
|
|||||||||||
|
NV101752967
|
NV101752967
|
NMC364369
|
3% NSR (Solidus)
|
SHO #9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/20/1986
|
21 0280N 0340E 003
|
SW
|
|
21 0280N 0340E 004
|
SE
|
||||||||||
|
NV101340729
|
NV101340729
|
NMC371073
|
3% NSR (Solidus)
|
PORCUPINE # 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
NE
|
|
NV101345612
|
NV101345612
|
NMC371079
|
3% NSR (Solidus)
|
PORCUPINE # 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
SE
|
|
NV101348210
|
NV101348210
|
NMC371082
|
3% NSR (Solidus)
|
PORCUPINE # 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
SE
|
|
SW
|
|||||||||||
|
NV101400907
|
NV101400907
|
NMC371076
|
3% NSR (Solidus)
|
PORCUPINE # 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
SE
|
|
SW
|
|||||||||||
|
NV101403311
|
NV101403311
|
NMC371072
|
3% NSR (Solidus)
|
PORCUPINE # 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
NE
|
|
NW
|
|||||||||||
|
NV101403911
|
NV101403911
|
NMC371078
|
3% NSR (Solidus)
|
PORCUPINE # 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SE
|
|
|
SW
|
|||||||||||
|
NV101405483
|
NV101405483
|
NMC371074
|
3% NSR (Solidus)
|
PORCUPINE # 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
NE
|
|
|
NW
|
|||||||||||
|
NV101459683
|
NV101459683
|
NMC371075
|
3% NSR (Solidus)
|
PORCUPINE # 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101496977
|
NV101496977
|
NMC371077
|
3% NSR (Solidus)
|
PORCUPINE # 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
SE
|
|
NV101508064
|
NV101508064
|
NMC371081
|
3% NSR (Solidus)
|
PORCUPINE # 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
SE
|
|
NV101600985
|
NV101600985
|
NMC371080
|
3% NSR (Solidus)
|
PORCUPINE # 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/20/1986
|
21 0280N 0340E 014
|
SE
|
|
SW
|
|||||||||||
|
NV102524546
|
NV102524546
|
NMC925039
|
3% NSR (Solidus)
|
SV 146
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/11/2006
|
21 0280N 0340E 014
|
SE
|
|
NV101318354
|
NV101318354
|
NMC925200
|
3% NSR (Solidus)
|
SV 327
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/15/2006
|
21 0280N 0340E 005
|
SE
|
|
SW
|
|||||||||||
|
NV101318355
|
NV101318355
|
NMC925201
|
3% NSR (Solidus)
|
SV 328
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 005
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 008
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101318356
|
NV101318356
|
NMC925202
|
3% NSR (Solidus)
|
SV 329
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 005
|
SE
|
|
|
NV101318357
|
NV101318357
|
NMC925203
|
3% NSR (Solidus)
|
SV 330
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 005
|
SE
|
|
|
21 0280N 0340E 008
|
NE
|
||||||||||
|
NV101318358
|
NV101318358
|
NMC925204
|
3% NSR (Solidus)
|
SV 331
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 005
|
SE
|
|
|
NV101318359
|
NV101318359
|
NMC925205
|
3% NSR (Solidus)
|
SV 332
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 005
|
SE
|
|
|
21 0280N 0340E 008
|
NE
|
||||||||||
|
NV101318360
|
NV101318360
|
NMC925206
|
3% NSR (Solidus)
|
SV 333
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 005
|
SE
|
|
|
NV101318361
|
NV101318361
|
NMC925207
|
3% NSR (Solidus)
|
SV 334
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 005
|
SE
|
|
|
21 0280N 0340E 008
|
NE
|
||||||||||
|
NV101318362
|
NV101318362
|
NMC925208
|
3% NSR (Solidus)
|
SV 335
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SW
|
|
|
21 0280N 0340E 005
|
SE
|
||||||||||
|
NV101319584
|
NV101319584
|
NMC925209
|
3% NSR (Solidus)
|
SV 336
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SW
|
|
|
21 0280N 0340E 005
|
SE
|
||||||||||
|
21 0280N 0340E 008
|
NE
|
||||||||||
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
NV101319589
|
NV101319589
|
NMC925214
|
3% NSR (Solidus)
|
SV 341
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NW
|
|
|
NV101319590
|
NV101319590
|
NMC925215
|
3% NSR (Solidus)
|
SV 342
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NW
|
|
|
SW
|
|||||||||||
|
NV101319591
|
NV101319591
|
NMC925216
|
3% NSR (Solidus)
|
SV 343
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101319592
|
NV101319592
|
NMC925217
|
3% NSR (Solidus)
|
SV 344
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101319593
|
NV101319593
|
NMC925218
|
3% NSR (Solidus)
|
SV 345
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
NV101319594
|
NV101319594
|
NMC925219
|
3% NSR (Solidus)
|
SV 346
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
SE
|
|||||||||||
|
NV101319595
|
NV101319595
|
NMC925220
|
3% NSR (Solidus)
|
SV 347
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
NV101319596
|
NV101319596
|
NMC925221
|
3% NSR (Solidus)
|
SV 348
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
SE
|
|||||||||||
|
NV101319597
|
NV101319597
|
NMC925222
|
3% NSR (Solidus)
|
SV 349
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
NV101319598
|
NV101319598
|
NMC925223
|
3% NSR (Solidus)
|
SV 350
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
SE
|
|||||||||||
|
NV101319599
|
NV101319599
|
NMC925224
|
3% NSR (Solidus)
|
SV 351
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
NV101319600
|
NV101319600
|
NMC925225
|
3% NSR (Solidus)
|
SV 352
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
SE
|
|||||||||||
|
NV101319601
|
NV101319601
|
NMC925226
|
3% NSR (Solidus)
|
SV 353
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
NV101319602
|
NV101319602
|
NMC925227
|
3% NSR (Solidus)
|
SV 354
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NW
|
|
|
SW
|
|||||||||||
|
NV101313556
|
NV101313556
|
NMC925109
|
3% NSR (Solidus)
|
SV 216
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/17/2006
|
21 0280N 0340E 002
|
SE
|
|
NV101313557
|
NV101313557
|
NMC925110
|
3% NSR (Solidus)
|
SV 217
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 002
|
SE
|
|
|
NV101313558
|
NV101313558
|
NMC925111
|
3% NSR (Solidus)
|
SV 218
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 002
|
SE
|
|
|
21 0280N 0340E 011
|
NE
|
||||||||||
|
NV101313559
|
NV101313559
|
NMC925112
|
3% NSR (Solidus)
|
SV 219
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 001
|
SW
|
|
|
21 0280N 0340E 002
|
SE
|
||||||||||
|
NV101313560
|
NV101313560
|
NMC925113
|
3% NSR (Solidus)
|
SV 220
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 001
|
SW
|
|
|
21 0280N 0340E 002
|
SE
|
||||||||||
|
21 0280N 0340E 011
|
NE
|
||||||||||
|
21 0280N 0340E 012
|
NW
|
||||||||||
|
NV101319603
|
NV101319603
|
NMC925228
|
3% NSR (Solidus)
|
SV 355
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
4/13/2006
|
21 0280N 0340E 008
|
SE
|
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101651280
|
NV101651280
|
NMC1034799
|
3% NSR (Solidus)
|
SHO 5A
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/1/2010
|
21 0280N 0340E 002
|
SW
|
|
21 0280N 0340E 003
|
NW
|
||||||||||
|
NV101651281
|
NV101651281
|
NMC1034800
|
3% NSR (Solidus)
|
HMS 4A
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 002
|
SW
|
|
|
21 0280N 0340E 003
|
SE
|
||||||||||
|
21 0280N 0340E 010
|
NE
|
||||||||||
|
21 0280N 0340E 011
|
NW
|
||||||||||
|
NV101651279
|
NV101651279
|
NMC1034798
|
3% NSR (Solidus)
|
SHO 4A
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
11/8/2010
|
21 0280N 0340E 002
|
SW
|
|
NV101502550
|
NV101502550
|
NMC1062742
|
3% NSR (Solidus)
|
SVB 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/18/2011
|
21 0280N 0340E 004
|
SE
|
|
SW
|
|||||||||||
|
21 0280N 0340E 009
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101502551
|
NV101502551
|
NMC1062743
|
3% NSR (Solidus)
|
SVB 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SE
|
|
|
SW
|
|||||||||||
|
NV101508610
|
NV101508610
|
NMC1061421
|
N 433
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
12/13/2011
|
21 0280N 0340E 008
|
NE
|
|
|
SE
|
|||||||||||
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101508611
|
NV101508611
|
NMC1061424
|
N 436
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
SE
|
||
|
21 0280N 0340E 009
|
SW
|
||||||||||
|
21 0280N 0340E 016
|
NW
|
||||||||||
|
21 0280N 0340E 017
|
NE
|
||||||||||
|
NV101757864
|
NV101757864
|
NMC1066726
|
X 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
1/9/2012
|
21 0280N 0340E 033
|
NE
|
|
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101757865
|
NV101757865
|
NMC1066727
|
X 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
NV101759022
|
NV101759022
|
NMC1066728
|
X 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
1/9/2012
|
21 0280N 0340E 034
|
NW
|
|
|
NV101759023
|
NV101759023
|
NMC1066729
|
X 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
NV101759024
|
NV101759024
|
NMC1066730
|
X 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101759025
|
NV101759025
|
NMC1066731
|
X 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101759026
|
NV101759026
|
NMC1066732
|
X 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NV101759027
|
NV101759027
|
NMC1066733
|
X 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
NV101759028
|
NV101759028
|
NMC1066734
|
X 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NV101759029
|
NV101759029
|
NMC1066735
|
X 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
NV101759030
|
NV101759030
|
NMC1066736
|
X 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NV101759031
|
NV101759031
|
NMC1066737
|
X 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
NV101759032
|
NV101759032
|
NMC1066738
|
X 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NV101759033
|
NV101759033
|
NMC1066739
|
X 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
NV101759034
|
NV101759034
|
NMC1066740
|
X 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SW
|
||
|
21 0280N 0340E 027
|
SE
|
||||||||||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
21 0280N 0340E 035
|
NW
|
||||||||||
|
NV101759035
|
NV101759035
|
NMC1066741
|
X 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
21 0280N 0340E 035
|
NW
|
||||||||||
|
NV101759036
|
NV101759036
|
NMC1066742
|
X 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101759037
|
NV101759037
|
NMC1066743
|
X 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 003
|
NW
|
||
|
21 0280N 0340E 033
|
SE
|
||||||||||
|
21 0280N 0340E 034
|
SW
|
||||||||||
|
NV101759038
|
NV101759038
|
NMC1066744
|
X 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
SW
|
|||||||||||
|
NV101759039
|
NV101759039
|
NMC1066745
|
X 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 003
|
NW
|
||
|
21 0280N 0340E 034
|
SW
|
||||||||||
|
NV101759040
|
NV101759040
|
NMC1066746
|
X 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101759041
|
NV101759041
|
NMC1066747
|
X 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 003
|
NW
|
||
|
21 0280N 0340E 034
|
SW
|
||||||||||
|
NV101759042
|
NV101759042
|
NMC1066748
|
X 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
SW
|
|||||||||||
|
NV101759043
|
NV101759043
|
NMC1066749
|
X 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 003
|
NE
|
||
|
NW
|
|||||||||||
|
21 0280N 0340E 034
|
SW
|
||||||||||
|
NV101780422
|
NV101780422
|
NMC1066750
|
X 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101780423
|
NV101780423
|
NMC1066751
|
X 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 003
|
NE
|
||
|
21 0280N 0340E 034
|
SE
|
||||||||||
|
SW
|
|||||||||||
|
NV101780424
|
NV101780424
|
NMC1066752
|
X 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
SE
|
|||||||||||
|
NV101780425
|
NV101780425
|
NMC1066753
|
X 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 003
|
NE
|
||
|
21 0280N 0340E 034
|
SE
|
||||||||||
|
NV101780426
|
NV101780426
|
NMC1066754
|
X 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
SE
|
|||||||||||
|
NV101780427
|
NV101780427
|
NMC1066755
|
X 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 003
|
NE
|
||
|
21 0280N 0340E 034
|
SE
|
||||||||||
|
NV101780428
|
NV101780428
|
NMC1066756
|
X 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
SE
|
|||||||||||
|
NV101780429
|
NV101780429
|
NMC1066757
|
X 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NW
|
||
|
21 0270N 0340E 003
|
NE
|
||||||||||
|
21 0280N 0340E 034
|
SE
|
||||||||||
|
NV101780430
|
NV101780430
|
NMC1066758
|
X 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
SE
|
|||||||||||
|
NV101780431
|
NV101780431
|
NMC1066759
|
X 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NW
|
||
|
21 0280N 0340E 034
|
SE
|
||||||||||
|
NV101780432
|
NV101780432
|
NMC1066760
|
X 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 035
|
NW
|
||||||||||
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101780433
|
NV101780433
|
NMC1066761
|
X 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NW
|
||
|
21 0280N 0340E 034
|
SE
|
||||||||||
|
21 0280N 0340E 035
|
SW
|
||||||||||
|
NV101865210
|
NV101865210
|
NMC1096902
|
3% NSR (Solidus)
|
SVB 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/14/2013
|
21 0280N 0340E 008
|
SE
|
|
NV101865450
|
NV101865450
|
NMC1096912
|
3% NSR (Solidus)
|
SVB 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/28/2013
|
21 0280N 0340E 002
|
SW
|
|
NV101865451
|
NV101865451
|
NMC1096913
|
3% NSR (Solidus)
|
SVB 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 002
|
SE
|
|
|
SW
|
|||||||||||
|
NV101865208
|
NV101865208
|
NMC1096900
|
3% NSR (Solidus)
|
SVB 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/29/2013
|
21 0280N 0340E 008
|
NE
|
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
NV101865209
|
NV101865209
|
NMC1096901
|
3% NSR (Solidus)
|
SVB 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 008
|
NE
|
|
|
SE
|
|||||||||||
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101354525
|
NV101354525
|
NMC1094138
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 009
|
SE
|
|
21 0280N 0340E 010
|
SW
|
||||||||||
|
21 0280N 0340E 015
|
NW
|
||||||||||
|
21 0280N 0340E 016
|
NE
|
||||||||||
|
NV101354526
|
NV101354526
|
NMC1094139
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SW
|
|
|
21 0280N 0340E 015
|
NW
|
||||||||||
|
NV101354527
|
NV101354527
|
NMC1094140
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NW
|
|
|
NV101354528
|
NV101354528
|
NMC1094141
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NW
|
|
|
NV101354529
|
NV101354529
|
NMC1094142
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NW
|
|
|
NV101354530
|
NV101354530
|
NMC1094143
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NE
|
|
|
NW
|
|||||||||||
|
NV101354531
|
NV101354531
|
NMC1094144
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NE
|
|
|
NV101354532
|
NV101354532
|
NMC1094145
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NE
|
|
|
NV101354533
|
NV101354533
|
NMC1094146
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NE
|
|
|
NV101354534
|
NV101354534
|
NMC1094147
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
NW
|
|
|
21 0280N 0340E 015
|
NE
|
||||||||||
|
NV101354535
|
NV101354535
|
NMC1094148
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NW
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 016
|
NE
|
||||||||||
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101354536
|
NV101354536
|
NMC1094149
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NW
|
|
|
SW
|
|||||||||||
|
NV101355357
|
NV101355357
|
NMC1094150
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 015
|
NW
|
|
SW
|
|||||||||||
|
NV101355358
|
NV101355358
|
NMC1094151
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NW
|
|
|
SW
|
|||||||||||
|
NV101355359
|
NV101355359
|
NMC1094152
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NW
|
|
|
SW
|
|||||||||||
|
NV101355360
|
NV101355360
|
NMC1094153
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NE
|
|
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101355361
|
NV101355361
|
NMC1094154
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NE
|
|
|
SE
|
|||||||||||
|
NV101355362
|
NV101355362
|
NMC1094155
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NE
|
|
|
SE
|
|||||||||||
|
NV101355363
|
NV101355363
|
NMC1094156
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
NE
|
|
|
SE
|
|||||||||||
|
NV101355364
|
NV101355364
|
NMC1094157
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
NW
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 015
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
NV101355365
|
NV101355365
|
NMC1094158
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
21 0280N 0340E 016
|
SE
|
||||||||||
|
NV101355366
|
NV101355366
|
NMC1094159
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
NV101355367
|
NV101355367
|
NMC1094160
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
NV101355368
|
NV101355368
|
NMC1094161
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
NV101355369
|
NV101355369
|
NMC1094162
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
NV101355370
|
NV101355370
|
NMC1094163
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101355371
|
NV101355371
|
NMC1094164
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
NV101355372
|
NV101355372
|
NMC1094165
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
NV101355373
|
NV101355373
|
NMC1094166
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
NV101355374
|
NV101355374
|
NMC1094167
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SW
|
|
|
21 0280N 0340E 015
|
SE
|
||||||||||
|
NV101355375
|
NV101355375
|
NMC1094168
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
21 0280N 0340E 022
|
NW
|
||||||||||
|
NV101355376
|
NV101355376
|
NMC1094169
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
21 0280N 0340E 022
|
NW
|
||||||||||
|
NV101355377
|
NV101355377
|
NMC1094170
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
21 0280N 0340E 022
|
NW
|
||||||||||
|
NV101356351
|
NV101356351
|
NMC1094171
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 015
|
SW
|
|
21 0280N 0340E 022
|
NW
|
||||||||||
|
NV101356352
|
NV101356352
|
NMC1094172
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 022
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101356353
|
NV101356353
|
NMC1094173
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
21 0280N 0340E 022
|
NE
|
||||||||||
|
NV101356354
|
NV101356354
|
NMC1094174
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
21 0280N 0340E 022
|
NE
|
||||||||||
|
NV101356355
|
NV101356355
|
NMC1094175
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
21 0280N 0340E 022
|
NE
|
||||||||||
|
NV101356356
|
NV101356356
|
NMC1094176
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DREADNOUGHT 39
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SE
|
|
|
21 0280N 0340E 022
|
NE
|
||||||||||
|
NV101356362
|
NV101356362
|
NMC1094182
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 009
|
SE
|
|
21 0280N 0340E 016
|
NE
|
||||||||||
|
NV101356363
|
NV101356363
|
NMC1094183
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
21 0280N 0340E 016
|
NE
|
||||||||||
|
NV101356364
|
NV101356364
|
NMC1094184
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
21 0280N 0340E 016
|
NE
|
||||||||||
|
NV101356365
|
NV101356365
|
NMC1094185
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
21 0280N 0340E 016
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101357342
|
NV101357342
|
NMC1094192
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 016
|
NE
|
|
SE
|
|||||||||||
|
NV101357343
|
NV101357343
|
NMC1094193
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NE
|
|
|
SE
|
|||||||||||
|
NV101357344
|
NV101357344
|
NMC1094194
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NE
|
|
|
SE
|
|||||||||||
|
NV101357345
|
NV101357345
|
NMC1094195
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NE
|
|
|
SE
|
|||||||||||
|
NV101357351
|
NV101357351
|
NMC1094201
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 016
|
SE
|
|
NV101357352
|
NV101357352
|
NMC1094202
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SE
|
|
|
NV101357353
|
NV101357353
|
NMC1094203
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SE
|
|
|
NV101357354
|
NV101357354
|
NMC1094204
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SE
|
|
|
NV101357355
|
NV101357355
|
NMC1094205
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SE
|
|
|
NV101357361
|
NV101357361
|
NMC1094211
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 016
|
SE
|
|
21 0280N 0340E 021
|
NE
|
||||||||||
|
NV101357362
|
NV101357362
|
NMC1094212
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SE
|
|
|
21 0280N 0340E 021
|
NE
|
||||||||||
|
NV101358339
|
NV101358339
|
NMC1094213
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 016
|
SE
|
|
21 0280N 0340E 021
|
NE
|
||||||||||
|
NV101485532
|
NV101485532
|
NMC1094291
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 004
|
SE
|
|
SW
|
|||||||||||
|
21 0280N 0340E 009
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101485533
|
NV101485533
|
NMC1094292
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SE
|
|
|
21 0280N 0340E 009
|
NE
|
||||||||||
|
NV101485534
|
NV101485534
|
NMC1094293
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SE
|
|
|
21 0280N 0340E 009
|
NE
|
||||||||||
|
NV101485535
|
NV101485535
|
NMC1094294
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SE
|
|
|
21 0280N 0340E 009
|
NE
|
||||||||||
|
NV101485536
|
NV101485536
|
NMC1094295
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SE
|
|
|
21 0280N 0340E 009
|
NE
|
||||||||||
|
NV101485537
|
NV101485537
|
NMC1094296
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101486522
|
NV101486522
|
NMC1094297
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 009
|
NE
|
|
NV101486523
|
NV101486523
|
NMC1094298
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
NV101486524
|
NV101486524
|
NMC1094299
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
NV101486525
|
NV101486525
|
NMC1094300
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
NV101486526
|
NV101486526
|
NMC1094301
|
SABRE 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NW
|
||
|
SW
|
|||||||||||
|
NV101486527
|
NV101486527
|
NMC1094302
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NW
|
|
|
SW
|
|||||||||||
|
NV101486528
|
NV101486528
|
NMC1094303
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NW
|
|
|
SW
|
|||||||||||
|
NV101486529
|
NV101486529
|
NMC1094304
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NW
|
|
|
SW
|
|||||||||||
|
NV101486530
|
NV101486530
|
NMC1094305
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101486531
|
NV101486531
|
NMC1094306
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
SE
|
|||||||||||
|
NV101486532
|
NV101486532
|
NMC1094307
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
SE
|
|||||||||||
|
NV101486533
|
NV101486533
|
NMC1094308
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
SE
|
|||||||||||
|
NV101486534
|
NV101486534
|
NMC1094309
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
SE
|
|||||||||||
|
NV101486535
|
NV101486535
|
NMC1094310
|
SABRE 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SW
|
||
|
NV101486536
|
NV101486536
|
NMC1094311
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SW
|
|
|
NV101486537
|
NV101486537
|
NMC1094312
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SW
|
|
|
NV101486538
|
NV101486538
|
NMC1094313
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101486539
|
NV101486539
|
NMC1094314
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
SW
|
|||||||||||
|
NV101486540
|
NV101486540
|
NMC1094315
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
NV101486541
|
NV101486541
|
NMC1094316
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
NV101486542
|
NV101486542
|
NMC1094317
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
NV101487529
|
NV101487529
|
NMC1094318
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
SABRE 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/7/2013
|
21 0280N 0340E 009
|
SE
|
|
NV101354556
|
NV101354556
|
NMC1094484
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/8/2013
|
21 0280N 0340E 022
|
NW
|
|
NV101354557
|
NV101354557
|
NMC1094485
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NW
|
|
|
NV101355378
|
NV101355378
|
NMC1094486
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/8/2013
|
21 0280N 0340E 022
|
NW
|
|
NV101355379
|
NV101355379
|
NMC1094487
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NW
|
|
|
NV101355380
|
NV101355380
|
NMC1094488
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
NW
|
|||||||||||
|
NV101355381
|
NV101355381
|
NMC1094489
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
NV101355382
|
NV101355382
|
NMC1094490
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
NV101355383
|
NV101355383
|
NMC1094491
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
NV101355384
|
NV101355384
|
NMC1094492
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
21 0280N 0340E 023
|
NW
|
||||||||||
|
NV101355385
|
NV101355385
|
NMC1094493
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NW
|
|
|
SW
|
|||||||||||
|
NV101355386
|
NV101355386
|
NMC1094494
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NW
|
|
|
SW
|
|||||||||||
|
NV101355387
|
NV101355387
|
NMC1094495
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NW
|
|
|
SW
|
|||||||||||
|
NV101355388
|
NV101355388
|
NMC1094496
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NW
|
|
|
SW
|
|||||||||||
|
NV101355389
|
NV101355389
|
NMC1094497
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101355390
|
NV101355390
|
NMC1094498
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
SE
|
|||||||||||
|
NV101355391
|
NV101355391
|
NMC1094499
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
SE
|
|||||||||||
|
NV101355392
|
NV101355392
|
NMC1094500
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
SE
|
|||||||||||
|
NV101355393
|
NV101355393
|
NMC1094501
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
NE
|
|
|
SE
|
|||||||||||
|
21 0280N 0340E 023
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101355394
|
NV101355394
|
NMC1094502
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SW
|
|
|
NV101355395
|
NV101355395
|
NMC1094503
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SW
|
|
|
NV101356376
|
NV101356376
|
NMC1094511
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/8/2013
|
21 0280N 0340E 022
|
SW
|
|
21 0280N 0340E 027
|
NW
|
||||||||||
|
NV101356377
|
NV101356377
|
NMC1094512
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SW
|
|
|
21 0280N 0340E 027
|
NW
|
||||||||||
|
NV101487530
|
NV101487530
|
NMC1094319
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/8/2013
|
21 0280N 0340E 003
|
SW
|
|
21 0280N 0340E 004
|
SE
|
||||||||||
|
21 0280N 0340E 009
|
NE
|
||||||||||
|
21 0280N 0340E 010
|
NW
|
||||||||||
|
NV101487531
|
NV101487531
|
NMC1094320
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SW
|
|
|
21 0280N 0340E 010
|
NW
|
||||||||||
|
NV101487532
|
NV101487532
|
NMC1094321
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SW
|
|
|
21 0280N 0340E 010
|
NW
|
||||||||||
|
NV101487533
|
NV101487533
|
NMC1094322
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SW
|
|
|
21 0280N 0340E 010
|
NW
|
||||||||||
|
NV101487534
|
NV101487534
|
NMC1094323
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SW
|
|
|
21 0280N 0340E 010
|
NW
|
||||||||||
|
NV101487535
|
NV101487535
|
NMC1094324
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 010
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101487536
|
NV101487536
|
NMC1094325
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SE
|
|
|
21 0280N 0340E 010
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101487537
|
NV101487537
|
NMC1094326
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SE
|
|
|
21 0280N 0340E 010
|
NE
|
||||||||||
|
NV101487538
|
NV101487538
|
NMC1094327
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 003
|
SE
|
|
|
21 0280N 0340E 010
|
NE
|
||||||||||
|
NV101487539
|
NV101487539
|
NMC1094328
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 002
|
SW
|
|
|
21 0280N 0340E 003
|
SE
|
||||||||||
|
21 0280N 0340E 010
|
NE
|
||||||||||
|
21 0280N 0340E 011
|
NW
|
||||||||||
|
NV101487540
|
NV101487540
|
NMC1094329
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
NE
|
|
|
21 0280N 0340E 010
|
NW
|
||||||||||
|
NV101487541
|
NV101487541
|
NMC1094330
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NW
|
|
|
NV101487542
|
NV101487542
|
NMC1094331
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NW
|
|
|
NV101487543
|
NV101487543
|
NMC1094332
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NW
|
|
|
NV101487544
|
NV101487544
|
NMC1094333
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NW
|
|
|
NV101487545
|
NV101487545
|
NMC1094334
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
NW
|
|||||||||||
|
NV101487546
|
NV101487546
|
NMC1094335
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
NV101487547
|
NV101487547
|
NMC1094336
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
NV101487548
|
NV101487548
|
NMC1094337
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
NV101487549
|
NV101487549
|
NMC1094338
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
21 0280N 0340E 011
|
NW
|
||||||||||
|
NV101488537
|
NV101488537
|
NMC1094339
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/8/2013
|
21 0280N 0340E 009
|
NE
|
|
SE
|
|||||||||||
|
21 0280N 0340E 010
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101488538
|
NV101488538
|
NMC1094340
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NW
|
|
|
SW
|
|||||||||||
|
NV101488539
|
NV101488539
|
NMC1094341
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NW
|
|
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101488540
|
NV101488540
|
NMC1094342
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NW
|
|
|
SW
|
|||||||||||
|
NV101488541
|
NV101488541
|
NMC1094343
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NW
|
|
|
SW
|
|||||||||||
|
NV101488542
|
NV101488542
|
NMC1094344
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101488543
|
NV101488543
|
NMC1094345
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
SE
|
|||||||||||
|
NV101488544
|
NV101488544
|
NMC1094346
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
SE
|
|||||||||||
|
NV101488545
|
NV101488545
|
NMC1094347
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
SE
|
|||||||||||
|
NV101488546
|
NV101488546
|
NMC1094348
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
NE
|
|
|
SE
|
|||||||||||
|
21 0280N 0340E 011
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101488547
|
NV101488547
|
NMC1094349
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
21 0280N 0340E 010
|
SW
|
||||||||||
|
NV101488548
|
NV101488548
|
NMC1094350
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SW
|
|
|
21 0280N 0340E 015
|
NW
|
||||||||||
|
NV101488549
|
NV101488549
|
NMC1094351
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SW
|
|
|
21 0280N 0340E 015
|
NW
|
||||||||||
|
NV101488550
|
NV101488550
|
NMC1094352
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SW
|
|
|
21 0280N 0340E 015
|
NW
|
||||||||||
|
NV101488551
|
NV101488551
|
NMC1094353
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SW
|
|
|
21 0280N 0340E 015
|
NW
|
||||||||||
|
NV101488552
|
NV101488552
|
NMC1094354
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 015
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101488553
|
NV101488553
|
NMC1094355
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SE
|
|
|
21 0280N 0340E 015
|
NE
|
||||||||||
|
NV101488554
|
NV101488554
|
NMC1094356
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SE
|
|
|
21 0280N 0340E 015
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101488555
|
NV101488555
|
NMC1094357
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 39
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SE
|
|
|
21 0280N 0340E 015
|
NE
|
||||||||||
|
NV101488556
|
NV101488556
|
NMC1094358
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
LEONIDAS 40
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 010
|
SE
|
|
|
21 0280N 0340E 011
|
SW
|
||||||||||
|
21 0280N 0340E 014
|
NW
|
||||||||||
|
21 0280N 0340E 015
|
NE
|
||||||||||
|
NV101351587
|
NV101351587
|
NMC1094422
|
RAMPART 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 017
|
SW
|
|
|
21 0280N 0340E 018
|
SE
|
||||||||||
|
NV101352558
|
NV101352558
|
NMC1094423
|
RAMPART 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 017
|
SW
|
|
|
NV101352559
|
NV101352559
|
NMC1094424
|
RAMPART 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SW
|
||
|
NV101352560
|
NV101352560
|
NMC1094425
|
RAMPART 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SW
|
||
|
NV101352561
|
NV101352561
|
NMC1094426
|
RAMPART 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SW
|
||
|
NV101352562
|
NV101352562
|
NMC1094427
|
RAMPART 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SE
|
||
|
SW
|
|||||||||||
|
NV101352563
|
NV101352563
|
NMC1094428
|
RAMPART 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SE
|
||
|
NV101352564
|
NV101352564
|
NMC1094429
|
RAMPART 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SE
|
||
|
NV101352565
|
NV101352565
|
NMC1094430
|
RAMPART 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SE
|
||
|
NV101352566
|
NV101352566
|
NMC1094431
|
RAMPART 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SW
|
||
|
21 0280N 0340E 017
|
SE
|
||||||||||
|
NV101352567
|
NV101352567
|
NMC1094432
|
RAMPART 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SW
|
||
|
21 0280N 0340E 018
|
SE
|
||||||||||
|
21 0280N 0340E 019
|
NE
|
||||||||||
|
21 0280N 0340E 020
|
NW
|
||||||||||
|
NV101352568
|
NV101352568
|
NMC1094433
|
RAMPART 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SW
|
||
|
21 0280N 0340E 020
|
NW
|
||||||||||
|
NV101352569
|
NV101352569
|
NMC1094434
|
RAMPART 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SW
|
||
|
21 0280N 0340E 020
|
NW
|
||||||||||
|
NV101352570
|
NV101352570
|
NMC1094435
|
RAMPART 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SW
|
||
|
21 0280N 0340E 020
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101352571
|
NV101352571
|
NMC1094436
|
RAMPART 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SW
|
||
|
21 0280N 0340E 020
|
NW
|
||||||||||
|
NV101352572
|
NV101352572
|
NMC1094437
|
RAMPART 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SE
|
||
|
21 0280N 0340E 020
|
NE
|
||||||||||
|
NV101352573
|
NV101352573
|
NMC1094438
|
RAMPART 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SE
|
||
|
21 0280N 0340E 020
|
NE
|
||||||||||
|
NV101352574
|
NV101352574
|
NMC1094439
|
RAMPART 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SE
|
||
|
21 0280N 0340E 020
|
NE
|
||||||||||
|
NV101352575
|
NV101352575
|
NMC1094440
|
RAMPART 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 017
|
SE
|
||
|
21 0280N 0340E 020
|
NE
|
||||||||||
|
NV101352576
|
NV101352576
|
NMC1094441
|
RAMPART 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SW
|
||
|
21 0280N 0340E 017
|
SE
|
||||||||||
|
21 0280N 0340E 020
|
NE
|
||||||||||
|
21 0280N 0340E 021
|
NW
|
||||||||||
|
NV101355396
|
NV101355396
|
NMC1094504
|
KING SOLOMON 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 022
|
SW
|
|
|
NV101355397
|
NV101355397
|
NMC1094505
|
KING SOLOMON 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SW
|
||
|
NV101355398
|
NV101355398
|
NMC1094506
|
KING SOLOMON 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
||
|
SW
|
|||||||||||
|
NV101356357
|
NV101356357
|
NMC1094177
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 009
|
SW
|
|
21 0280N 0340E 016
|
NW
|
||||||||||
|
NV101356358
|
NV101356358
|
NMC1094178
|
DAUNTLESS 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SW
|
||
|
21 0280N 0340E 016
|
NW
|
||||||||||
|
NV101356359
|
NV101356359
|
NMC1094179
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SW
|
|
|
21 0280N 0340E 016
|
NW
|
||||||||||
|
NV101356360
|
NV101356360
|
NMC1094180
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SW
|
|
|
21 0280N 0340E 016
|
NW
|
||||||||||
|
NV101356361
|
NV101356361
|
NMC1094181
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 009
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 016
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101356366
|
NV101356366
|
NMC1094186
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 016
|
NW
|
|
SW
|
|||||||||||
|
21 0280N 0340E 017
|
NE
|
||||||||||
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101356367
|
NV101356367
|
NMC1094187
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NW
|
|
|
SW
|
|||||||||||
|
NV101356368
|
NV101356368
|
NMC1094188
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NW
|
|
|
SW
|
|||||||||||
|
NV101356369
|
NV101356369
|
NMC1094189
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NW
|
|
|
NV101356370
|
NV101356370
|
NMC1094190
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NW
|
|
|
NV101356371
|
NV101356371
|
NMC1094191
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NE
|
|
|
NW
|
|||||||||||
|
NV101356372
|
NV101356372
|
NMC1094507
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
NV101356373
|
NV101356373
|
NMC1094508
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
NV101356374
|
NV101356374
|
NMC1094509
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
NV101356375
|
NV101356375
|
NMC1094510
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
21 0280N 0340E 023
|
SW
|
||||||||||
|
NV101356378
|
NV101356378
|
NMC1094513
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 022
|
SW
|
|
21 0280N 0340E 027
|
NW
|
||||||||||
|
NV101356379
|
NV101356379
|
NMC1094514
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SW
|
|
|
21 0280N 0340E 027
|
NW
|
||||||||||
|
NV101356380
|
NV101356380
|
NMC1094515
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 027
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101356381
|
NV101356381
|
NMC1094516
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
21 0280N 0340E 027
|
NE
|
||||||||||
|
NV101356382
|
NV101356382
|
NMC1094517
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
21 0280N 0340E 027
|
NE
|
||||||||||
|
NV101356383
|
NV101356383
|
NMC1094518
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
21 0280N 0340E 027
|
NE
|
||||||||||
|
NV101356384
|
NV101356384
|
NMC1094519
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
KING SOLOMON 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 022
|
SE
|
|
|
21 0280N 0340E 023
|
SW
|
||||||||||
|
21 0280N 0340E 026
|
NW
|
||||||||||
|
21 0280N 0340E 027
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101357346
|
NV101357346
|
NMC1094196
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 016
|
SW
|
|
NV101357347
|
NV101357347
|
NMC1094197
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SW
|
|
|
NV101357348
|
NV101357348
|
NMC1094198
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SW
|
|
|
NV101357349
|
NV101357349
|
NMC1094199
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SW
|
|
|
NV101357350
|
NV101357350
|
NMC1094200
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SE
|
|
|
SW
|
|||||||||||
|
NV101357356
|
NV101357356
|
NMC1094206
|
DAUNTLESS 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 016
|
SW
|
|
|
21 0280N 0340E 021
|
NW
|
||||||||||
|
NV101357357
|
NV101357357
|
NMC1094207
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SW
|
|
|
21 0280N 0340E 021
|
NW
|
||||||||||
|
NV101357358
|
NV101357358
|
NMC1094208
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SW
|
|
|
21 0280N 0340E 021
|
NW
|
||||||||||
|
NV101357359
|
NV101357359
|
NMC1094209
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SW
|
|
|
21 0280N 0340E 021
|
NW
|
||||||||||
|
NV101357360
|
NV101357360
|
NMC1094210
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
DAUNTLESS 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 021
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101358340
|
NV101358340
|
NMC1094214
|
DAUNTLESS X
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/9/2013
|
21 0280N 0340E 016
|
NE
|
|
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101358341
|
NV101358341
|
NMC1094215
|
DAUNTLESS Y
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 016
|
NW
|
||
|
SW
|
|||||||||||
|
NV101350559
|
NV101350559
|
NMC1094381
|
INDOMITABLE 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/10/2013
|
21 0280N 0340E 028
|
SW
|
|
|
21 0280N 0340E 033
|
NW
|
||||||||||
|
NV101350560
|
NV101350560
|
NMC1094382
|
INDOMITABLE 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 033
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101350561
|
NV101350561
|
NMC1094383
|
INDOMITABLE 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SE
|
||
|
21 0280N 0340E 033
|
NE
|
||||||||||
|
NV101350562
|
NV101350562
|
NMC1094384
|
INDOMITABLE 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SE
|
||
|
21 0280N 0340E 033
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101350563
|
NV101350563
|
NMC1094385
|
INDOMITABLE 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SE
|
||
|
21 0280N 0340E 033
|
NE
|
||||||||||
|
NV101350564
|
NV101350564
|
NMC1094386
|
INDOMITABLE 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SE
|
||
|
21 0280N 0340E 033
|
NE
|
||||||||||
|
NV101350565
|
NV101350565
|
NMC1094387
|
INDOMITABLE 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NW
|
||
|
NV101350566
|
NV101350566
|
NMC1094388
|
INDOMITABLE 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NW
|
||
|
NV101350567
|
NV101350567
|
NMC1094389
|
INDOMITABLE 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NW
|
||
|
NV101350568
|
NV101350568
|
NMC1094390
|
INDOMITABLE 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NW
|
||
|
NV101350569
|
NV101350569
|
NMC1094391
|
INDOMITABLE 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NE
|
||
|
NW
|
|||||||||||
|
NV101350570
|
NV101350570
|
NMC1094392
|
INDOMITABLE 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NE
|
||
|
NV101350571
|
NV101350571
|
NMC1094393
|
INDOMITABLE 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NE
|
||
|
NV101350572
|
NV101350572
|
NMC1094394
|
INDOMITABLE 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NW
|
||
|
SW
|
|||||||||||
|
NV101350573
|
NV101350573
|
NMC1094395
|
INDOMITABLE 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NW
|
||
|
SW
|
|||||||||||
|
NV101350574
|
NV101350574
|
NMC1094396
|
INDOMITABLE 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 033
|
NW
|
||
|
SW
|
|||||||||||
|
NV101356385
|
NV101356385
|
NMC1094520
|
SIR WINSTON 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/10/2013
|
21 0280N 0340E 019
|
SE
|
|
|
21 0280N 0340E 020
|
SW
|
||||||||||
|
21 0280N 0340E 029
|
NW
|
||||||||||
|
21 0280N 0340E 030
|
NE
|
||||||||||
|
NV101356386
|
NV101356386
|
NMC1094521
|
SIR WINSTON 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SW
|
||
|
21 0280N 0340E 029
|
NW
|
||||||||||
|
NV101356387
|
NV101356387
|
NMC1094522
|
SIR WINSTON 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SW
|
||
|
21 0280N 0340E 029
|
NW
|
||||||||||
|
NV101356388
|
NV101356388
|
NMC1094523
|
SIR WINSTON 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NW
|
||
|
21 0280N 0340E 030
|
NE
|
||||||||||
|
NV101356389
|
NV101356389
|
NMC1094524
|
SIR WINSTON 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101356390
|
NV101356390
|
NMC1094525
|
SIR WINSTON 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NW
|
||
|
NV101356391
|
NV101356391
|
NMC1094526
|
SIR WINSTON 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NW
|
||
|
NV101356392
|
NV101356392
|
NMC1094527
|
SIR WINSTON 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NW
|
||
|
NV101357363
|
NV101357363
|
NMC1094528
|
SIR WINSTON 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/10/2013
|
21 0280N 0340E 029
|
NE
|
|
|
NW
|
|||||||||||
|
NV101357364
|
NV101357364
|
NMC1094529
|
SIR WINSTON 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NE
|
||
|
NV101357365
|
NV101357365
|
NMC1094530
|
SIR WINSTON 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NE
|
||
|
NV101357366
|
NV101357366
|
NMC1094531
|
SIR WINSTON 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NE
|
||
|
NV101357367
|
NV101357367
|
NMC1094532
|
SIR WINSTON 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NW
|
||
|
21 0280N 0340E 029
|
NE
|
||||||||||
|
NV101357368
|
NV101357368
|
NMC1094533
|
SIR WINSTON 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NW
|
||
|
SW
|
|||||||||||
|
NV101357369
|
NV101357369
|
NMC1094534
|
SIR WINSTON 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NW
|
||
|
SW
|
|||||||||||
|
NV101357370
|
NV101357370
|
NMC1094535
|
SIR WINSTON 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101357371
|
NV101357371
|
NMC1094536
|
SIR WINSTON 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NE
|
||
|
SE
|
|||||||||||
|
NV101357372
|
NV101357372
|
NMC1094537
|
SIR WINSTON 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NE
|
||
|
SE
|
|||||||||||
|
NV101357373
|
NV101357373
|
NMC1094538
|
SIR WINSTON 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NE
|
||
|
SE
|
|||||||||||
|
NV101357374
|
NV101357374
|
NMC1094539
|
SIR WINSTON 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NE
|
||
|
SE
|
|||||||||||
|
NV101357375
|
NV101357375
|
NMC1094540
|
SIR WINSTON 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NW
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 029
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
NV101357376
|
NV101357376
|
NMC1094541
|
SIR WINSTON 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101357377
|
NV101357377
|
NMC1094542
|
SIR WINSTON 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SW
|
||
|
NV101357378
|
NV101357378
|
NMC1094543
|
SIR WINSTON 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SE
|
||
|
SW
|
|||||||||||
|
NV101357379
|
NV101357379
|
NMC1094544
|
SIR WINSTON 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SE
|
||
|
NV101357380
|
NV101357380
|
NMC1094545
|
SIR WINSTON 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SE
|
||
|
NV101357381
|
NV101357381
|
NMC1094546
|
SIR WINSTON 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SE
|
||
|
NV101357382
|
NV101357382
|
NMC1094547
|
SIR WINSTON 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SW
|
||
|
21 0280N 0340E 029
|
SE
|
||||||||||
|
21 0280N 0340E 032
|
NE
|
||||||||||
|
21 0280N 0340E 033
|
NW
|
||||||||||
|
NV101358342
|
NV101358342
|
NMC1094216
|
MINUTEMEN 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/10/2013
|
21 0280N 0330E 024
|
SE
|
|
|
21 0280N 0330E 025
|
NE
|
||||||||||
|
21 0280N 0340E 019
|
SW
|
||||||||||
|
21 0280N 0340E 030
|
NW
|
||||||||||
|
NV101358343
|
NV101358343
|
NMC1094217
|
MINUTEMEN 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SW
|
||
|
21 0280N 0340E 030
|
NW
|
||||||||||
|
NV101358344
|
NV101358344
|
NMC1094218
|
MINUTEMEN 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SW
|
||
|
21 0280N 0340E 030
|
NW
|
||||||||||
|
NV101358345
|
NV101358345
|
NMC1094219
|
MINUTEMEN 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SW
|
||
|
21 0280N 0340E 030
|
NW
|
||||||||||
|
NV101358346
|
NV101358346
|
NMC1094220
|
MINUTEMEN 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SW
|
||
|
21 0280N 0340E 030
|
NW
|
||||||||||
|
NV101358347
|
NV101358347
|
NMC1094221
|
MINUTEMEN 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 030
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101358348
|
NV101358348
|
NMC1094222
|
MINUTEMEN 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SE
|
||
|
21 0280N 0340E 030
|
NE
|
||||||||||
|
NV101358349
|
NV101358349
|
NMC1094223
|
MINUTEMEN 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SE
|
||
|
21 0280N 0340E 030
|
NE
|
||||||||||
|
NV101358350
|
NV101358350
|
NMC1094224
|
MINUTEMEN 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SE
|
||
|
21 0280N 0340E 030
|
NE
|
||||||||||
|
NV101358351
|
NV101358351
|
NMC1094225
|
MINUTEMEN 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SE
|
||
|
21 0280N 0340E 030
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101358352
|
NV101358352
|
NMC1094226
|
MINUTEMEN 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
NE
|
||
|
21 0280N 0340E 030
|
NW
|
||||||||||
|
NV101358353
|
NV101358353
|
NMC1094227
|
MINUTEMEN 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NW
|
||
|
NV101358354
|
NV101358354
|
NMC1094228
|
MINUTEMEN 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NW
|
||
|
NV101358355
|
NV101358355
|
NMC1094229
|
MINUTEMEN 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NW
|
||
|
NV101358356
|
NV101358356
|
NMC1094230
|
MINUTEMEN 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NW
|
||
|
NV101358357
|
NV101358357
|
NMC1094231
|
MINUTEMEN 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
NW
|
|||||||||||
|
NV101358358
|
NV101358358
|
NMC1094232
|
MINUTEMEN 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
NV101358359
|
NV101358359
|
NMC1094233
|
MINUTEMEN 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
NV101359369
|
NV101359369
|
NMC1094234
|
MINUTEMEN 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/10/2013
|
21 0280N 0340E 030
|
NE
|
|
|
NV101359370
|
NV101359370
|
NMC1094235
|
MINUTEMEN 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
NV101359371
|
NV101359371
|
NMC1094236
|
MINUTEMEN 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 030
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101359372
|
NV101359372
|
NMC1094237
|
MINUTEMEN 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NW
|
||
|
SW
|
|||||||||||
|
NV101359373
|
NV101359373
|
NMC1094238
|
MINUTEMEN 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NW
|
||
|
SW
|
|||||||||||
|
NV101359374
|
NV101359374
|
NMC1094239
|
MINUTEMEN 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NW
|
||
|
SW
|
|||||||||||
|
NV101359375
|
NV101359375
|
NMC1094240
|
MINUTEMEN 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101359376
|
NV101359376
|
NMC1094241
|
MINUTEMEN 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101359377
|
NV101359377
|
NMC1094242
|
MINUTEMEN 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
SE
|
|||||||||||
|
NV101359378
|
NV101359378
|
NMC1094243
|
MINUTEMEN 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
SE
|
|||||||||||
|
NV101359379
|
NV101359379
|
NMC1094244
|
MINUTEMEN 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
NE
|
||
|
SE
|
|||||||||||
|
NV101359380
|
NV101359380
|
NMC1094245
|
MINUTEMEN 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
NW
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 030
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
NV101359381
|
NV101359381
|
NMC1094246
|
MINUTEMEN 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SE
|
||
|
21 0280N 0330E 036
|
NE
|
||||||||||
|
21 0280N 0340E 030
|
SW
|
||||||||||
|
21 0280N 0340E 031
|
NW
|
||||||||||
|
NV101359382
|
NV101359382
|
NMC1094247
|
MINUTEMEN 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
SW
|
||
|
21 0280N 0340E 031
|
NW
|
||||||||||
|
NV101359383
|
NV101359383
|
NMC1094248
|
MINUTEMEN 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
SW
|
||
|
21 0280N 0340E 031
|
NW
|
||||||||||
|
NV101359384
|
NV101359384
|
NMC1094249
|
MINUTEMEN 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
SW
|
||
|
21 0280N 0340E 031
|
NW
|
||||||||||
|
NV101359385
|
NV101359385
|
NMC1094250
|
MINUTEMEN 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 031
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101359386
|
NV101359386
|
NMC1094251
|
MINUTEMEN 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
SE
|
||
|
21 0280N 0340E 031
|
NE
|
||||||||||
|
NV101359387
|
NV101359387
|
NMC1094252
|
MINUTEMEN 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
SE
|
||
|
21 0280N 0340E 031
|
NE
|
||||||||||
|
NV101359388
|
NV101359388
|
NMC1094253
|
MINUTEMEN 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
SE
|
||
|
21 0280N 0340E 031
|
NE
|
||||||||||
|
NV101359389
|
NV101359389
|
NMC1094254
|
MINUTEMEN 39
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 030
|
SE
|
||
|
21 0280N 0340E 031
|
NE
|
||||||||||
|
NV101360393
|
NV101360393
|
NMC1094255
|
MINUTEMEN 40
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/10/2013
|
21 0280N 0340E 029
|
SW
|
|
|
21 0280N 0340E 030
|
SE
|
||||||||||
|
21 0280N 0340E 031
|
NE
|
||||||||||
|
21 0280N 0340E 032
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101488557
|
NV101488557
|
NMC1094359
|
INDOMITABLE 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/10/2013
|
21 0280N 0340E 028
|
NW
|
|
|
NV101489537
|
NV101489537
|
NMC1094360
|
INDOMITABLE 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/10/2013
|
21 0280N 0340E 028
|
NW
|
|
|
NV101489538
|
NV101489538
|
NMC1094361
|
INDOMITABLE 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NW
|
||
|
NV101489539
|
NV101489539
|
NMC1094362
|
INDOMITABLE 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NW
|
||
|
NV101489540
|
NV101489540
|
NMC1094363
|
INDOMITABLE 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
NW
|
|||||||||||
|
NV101489541
|
NV101489541
|
NMC1094364
|
INDOMITABLE 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
NV101489542
|
NV101489542
|
NMC1094365
|
INDOMITABLE 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
NV101489543
|
NV101489543
|
NMC1094366
|
INDOMITABLE 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
NV101489544
|
NV101489544
|
NMC1094367
|
INDOMITABLE 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
NV101489545
|
NV101489545
|
NMC1094368
|
INDOMITABLE 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
21 0280N 0340E 028
|
NE
|
||||||||||
|
NV101489546
|
NV101489546
|
NMC1094369
|
INDOMITABLE 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NW
|
||
|
SW
|
|||||||||||
|
NV101489547
|
NV101489547
|
NMC1094370
|
INDOMITABLE 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NW
|
||
|
SW
|
|||||||||||
|
NV101489548
|
NV101489548
|
NMC1094371
|
INDOMITABLE 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NW
|
||
|
SW
|
|||||||||||
|
NV101489549
|
NV101489549
|
NMC1094372
|
INDOMITABLE 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NW
|
||
|
SW
|
|||||||||||
|
NV101489550
|
NV101489550
|
NMC1094373
|
INDOMITABLE 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101489551
|
NV101489551
|
NMC1094374
|
INDOMITABLE 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
SE
|
|||||||||||
|
NV101489552
|
NV101489552
|
NMC1094375
|
INDOMITABLE 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
SE
|
|||||||||||
|
NV101489553
|
NV101489553
|
NMC1094376
|
INDOMITABLE 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101489554
|
NV101489554
|
NMC1094377
|
INDOMITABLE 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
NE
|
||
|
SE
|
|||||||||||
|
NV101489555
|
NV101489555
|
NMC1094378
|
INDOMITABLE 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SW
|
||
|
21 0280N 0340E 033
|
NW
|
||||||||||
|
NV101489556
|
NV101489556
|
NMC1094379
|
INDOMITABLE 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SW
|
||
|
21 0280N 0340E 033
|
NW
|
||||||||||
|
NV101489557
|
NV101489557
|
NMC1094380
|
INDOMITABLE 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 028
|
SW
|
||
|
21 0280N 0340E 033
|
NW
|
||||||||||
|
NV101350575
|
NV101350575
|
NMC1094397
|
TOMAHAWK 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/11/2013
|
21 0280N 0340E 027
|
NW
|
|
|
NV101350576
|
NV101350576
|
NMC1094398
|
TOMAHAWK 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
NV101350577
|
NV101350577
|
NMC1094399
|
TOMAHAWK 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
NV101350578
|
NV101350578
|
NMC1094400
|
TOMAHAWK 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
NV101350579
|
NV101350579
|
NMC1094401
|
TOMAHAWK 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NE
|
||
|
NW
|
|||||||||||
|
NV101351567
|
NV101351567
|
NMC1094402
|
TOMAHAWK 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/11/2013
|
21 0280N 0340E 027
|
NE
|
|
|
NV101351568
|
NV101351568
|
NMC1094403
|
TOMAHAWK 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NE
|
||
|
NV101351569
|
NV101351569
|
NMC1094404
|
TOMAHAWK 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
21 0280N 0340E 027
|
NE
|
||||||||||
|
NV101351570
|
NV101351570
|
NMC1094405
|
TOMAHAWK 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 028
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
NV101351571
|
NV101351571
|
NMC1094406
|
TOMAHAWK 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
SW
|
|||||||||||
|
NV101351572
|
NV101351572
|
NMC1094407
|
TOMAHAWK 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
SW
|
|||||||||||
|
NV101351573
|
NV101351573
|
NMC1094408
|
TOMAHAWK 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
SW
|
|||||||||||
|
NV101351574
|
NV101351574
|
NMC1094409
|
TOMAHAWK 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NW
|
||
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101351575
|
NV101351575
|
NMC1094410
|
TOMAHAWK 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101351576
|
NV101351576
|
NMC1094411
|
TOMAHAWK 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NE
|
||
|
SE
|
|||||||||||
|
NV101351577
|
NV101351577
|
NMC1094412
|
TOMAHAWK 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
NE
|
||
|
SE
|
|||||||||||
|
NV101351578
|
NV101351578
|
NMC1094413
|
TOMAHAWK 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SW
|
||
|
21 0280N 0340E 028
|
SE
|
||||||||||
|
21 0280N 0340E 033
|
NE
|
||||||||||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101351579
|
NV101351579
|
NMC1094414
|
TOMAHAWK 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SW
|
||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101351580
|
NV101351580
|
NMC1094415
|
TOMAHAWK 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SW
|
||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101351581
|
NV101351581
|
NMC1094416
|
TOMAHAWK 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SW
|
||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101351582
|
NV101351582
|
NMC1094417
|
TOMAHAWK 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SW
|
||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101351583
|
NV101351583
|
NMC1094418
|
TOMAHAWK 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101351584
|
NV101351584
|
NMC1094419
|
TOMAHAWK 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NV101351585
|
NV101351585
|
NMC1094420
|
TOMAHAWK 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NV101351586
|
NV101351586
|
NMC1094421
|
TOMAHAWK 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SE
|
||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
NV101358360
|
NV101358360
|
NMC1094548
|
ARCHON 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/11/2013
|
21 0280N 0340E 029
|
SW
|
|
|
21 0280N 0340E 032
|
NW
|
||||||||||
|
NV101358361
|
NV101358361
|
NMC1094549
|
ARCHON 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SW
|
||
|
21 0280N 0340E 032
|
NW
|
||||||||||
|
NV101358362
|
NV101358362
|
NMC1094550
|
ARCHON 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SW
|
||
|
21 0280N 0340E 032
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101358363
|
NV101358363
|
NMC1094551
|
ARCHON 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SW
|
||
|
21 0280N 0340E 032
|
NW
|
||||||||||
|
NV101358364
|
NV101358364
|
NMC1094552
|
ARCHON 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SW
|
||
|
21 0280N 0340E 032
|
NW
|
||||||||||
|
NV101358365
|
NV101358365
|
NMC1094553
|
ARCHON 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SW
|
||
|
21 0280N 0340E 032
|
NW
|
||||||||||
|
NV101358366
|
NV101358366
|
NMC1094554
|
ARCHON 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 032
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101358367
|
NV101358367
|
NMC1094555
|
ARCHON 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SE
|
||
|
21 0280N 0340E 032
|
NE
|
||||||||||
|
NV101358368
|
NV101358368
|
NMC1094556
|
ARCHON 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SE
|
||
|
21 0280N 0340E 032
|
NE
|
||||||||||
|
NV101358369
|
NV101358369
|
NMC1094557
|
ARCHON 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 029
|
SE
|
||
|
21 0280N 0340E 032
|
NE
|
||||||||||
|
NV101358370
|
NV101358370
|
NMC1094558
|
ARCHON 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 031
|
NE
|
||
|
21 0280N 0340E 032
|
NW
|
||||||||||
|
NV101358371
|
NV101358371
|
NMC1094559
|
ARCHON 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NW
|
||
|
NV101358372
|
NV101358372
|
NMC1094560
|
ARCHON 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NW
|
||
|
NV101358373
|
NV101358373
|
NMC1094561
|
ARCHON 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NW
|
||
|
NV101358374
|
NV101358374
|
NMC1094562
|
ARCHON 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NW
|
||
|
NV101358375
|
NV101358375
|
NMC1094563
|
ARCHON 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
NW
|
|||||||||||
|
NV101358376
|
NV101358376
|
NMC1094564
|
ARCHON 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
NV101358377
|
NV101358377
|
NMC1094565
|
ARCHON 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
NV101358378
|
NV101358378
|
NMC1094566
|
ARCHON 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
NV101358379
|
NV101358379
|
NMC1094567
|
ARCHON 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
21 0280N 0340E 033
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101359390
|
NV101359390
|
NMC1094568
|
ARCHON 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/11/2013
|
21 0280N 0340E 031
|
NE
|
|
|
SE
|
|||||||||||
|
21 0280N 0340E 032
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101359391
|
NV101359391
|
NMC1094569
|
ARCHON 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NW
|
||
|
SW
|
|||||||||||
|
NV101359392
|
NV101359392
|
NMC1094570
|
ARCHON 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NW
|
||
|
SW
|
|||||||||||
|
NV101359393
|
NV101359393
|
NMC1094571
|
ARCHON 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NW
|
||
|
SW
|
|||||||||||
|
NV101359394
|
NV101359394
|
NMC1094572
|
ARCHON 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NW
|
||
|
SW
|
|||||||||||
|
NV101359395
|
NV101359395
|
NMC1094573
|
ARCHON 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101359396
|
NV101359396
|
NMC1094574
|
ARCHON 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
SE
|
|||||||||||
|
NV101359397
|
NV101359397
|
NMC1094575
|
ARCHON 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
SE
|
|||||||||||
|
NV101359398
|
NV101359398
|
NMC1094576
|
ARCHON 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
SE
|
|||||||||||
|
NV101359399
|
NV101359399
|
NMC1094577
|
ARCHON 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
SE
|
|||||||||||
|
NV101359400
|
NV101359400
|
NMC1094578
|
ARCHON 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 033
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101359549
|
NV101359549
|
NMC1094579
|
ARCHON 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 031
|
SE
|
||
|
21 0280N 0340E 032
|
SW
|
||||||||||
|
NV101359550
|
NV101359550
|
NMC1094580
|
ARCHON 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SW
|
||
|
NV101359551
|
NV101359551
|
NMC1094581
|
ARCHON 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SW
|
||
|
NV101359552
|
NV101359552
|
NMC1094582
|
ARCHON 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101359553
|
NV101359553
|
NMC1094583
|
ARCHON 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SW
|
||
|
NV101359554
|
NV101359554
|
NMC1094584
|
ARCHON 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SE
|
||
|
SW
|
|||||||||||
|
NV101359555
|
NV101359555
|
NMC1094585
|
ARCHON 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SE
|
||
|
NV101359556
|
NV101359556
|
NMC1094586
|
ARCHON 39
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SE
|
||
|
NV101359557
|
NV101359557
|
NMC1094587
|
ARCHON 40
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SE
|
||
|
NV101359558
|
NV101359558
|
NMC1094588
|
ARCHON 41
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 032
|
SE
|
||
|
NV101450538
|
NV101450538
|
NMC1094589
|
ARCHON 42
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/11/2013
|
21 0280N 0340E 032
|
SE
|
|
|
21 0280N 0340E 033
|
SW
|
||||||||||
|
NV101450539
|
NV101450539
|
NMC1094590
|
ARCHON 43
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NW
|
||
|
21 0280N 0340E 031
|
SE
|
||||||||||
|
21 0280N 0340E 032
|
SW
|
||||||||||
|
NV101450540
|
NV101450540
|
NMC1094591
|
ARCHON 44
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NW
|
||
|
21 0280N 0340E 032
|
SW
|
||||||||||
|
NV101450541
|
NV101450541
|
NMC1094592
|
ARCHON 45
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NW
|
||
|
21 0280N 0340E 032
|
SW
|
||||||||||
|
NV101450542
|
NV101450542
|
NMC1094593
|
ARCHON 46
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NW
|
||
|
21 0280N 0340E 032
|
SW
|
||||||||||
|
NV101450543
|
NV101450543
|
NMC1094594
|
ARCHON 47
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NE
|
||
|
NW
|
|||||||||||
|
21 0280N 0340E 032
|
SW
|
||||||||||
|
NV101450544
|
NV101450544
|
NMC1094595
|
ARCHON 48
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NE
|
||
|
21 0280N 0340E 032
|
SE
|
||||||||||
|
SW
|
|||||||||||
|
NV101450545
|
NV101450545
|
NMC1094596
|
ARCHON 49
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NE
|
||
|
21 0280N 0340E 032
|
SE
|
||||||||||
|
NV101450546
|
NV101450546
|
NMC1094597
|
ARCHON 50
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NE
|
||
|
21 0280N 0340E 032
|
SE
|
||||||||||
|
NV101450547
|
NV101450547
|
NMC1094598
|
ARCHON 51
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 005
|
NE
|
||
|
21 0280N 0340E 032
|
SE
|
||||||||||
|
NV101450548
|
NV101450548
|
NMC1094599
|
ARCHON 52
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 004
|
NW
|
||
|
21 0270N 0340E 005
|
NE
|
||||||||||
|
21 0280N 0340E 032
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101450549
|
NV101450549
|
NMC1094600
|
ARCHON 53
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 004
|
NW
|
||
|
21 0280N 0340E 032
|
SE
|
||||||||||
|
21 0280N 0340E 033
|
SW
|
||||||||||
|
NV101352577
|
NV101352577
|
NMC1094442
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/14/2013
|
21 0280N 0340E 016
|
SE
|
|
21 0280N 0340E 021
|
NE
|
||||||||||
|
NV101352578
|
NV101352578
|
NMC1094443
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 015
|
SW
|
|
|
21 0280N 0340E 016
|
SE
|
||||||||||
|
21 0280N 0340E 021
|
NE
|
||||||||||
|
21 0280N 0340E 022
|
NW
|
||||||||||
|
NV101353537
|
NV101353537
|
NMC1094444
|
WAR EMBLEM 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NW
|
||
|
NV101353538
|
NV101353538
|
NMC1094445
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NW
|
|
|
NV101353539
|
NV101353539
|
NMC1094446
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NW
|
|
|
NV101353540
|
NV101353540
|
NMC1094447
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NW
|
|
|
NV101353541
|
NV101353541
|
NMC1094448
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
NW
|
|||||||||||
|
NV101353542
|
NV101353542
|
NMC1094449
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
NV101353543
|
NV101353543
|
NMC1094450
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
NV101353544
|
NV101353544
|
NMC1094451
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
NV101353545
|
NV101353545
|
NMC1094452
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
NV101353546
|
NV101353546
|
NMC1094453
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
21 0280N 0340E 022
|
NW
|
||||||||||
|
NV101353547
|
NV101353547
|
NMC1094454
|
WAR EMBLEM 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NW
|
||
|
SW
|
|||||||||||
|
NV101353548
|
NV101353548
|
NMC1094455
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NW
|
|
|
SW
|
|||||||||||
|
NV101353549
|
NV101353549
|
NMC1094456
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NW
|
|
|
SW
|
|||||||||||
|
NV101353550
|
NV101353550
|
NMC1094457
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NW
|
|
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101353551
|
NV101353551
|
NMC1094458
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101353552
|
NV101353552
|
NMC1094459
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
SE
|
|||||||||||
|
NV101353553
|
NV101353553
|
NMC1094460
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
SE
|
|||||||||||
|
NV101353554
|
NV101353554
|
NMC1094461
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
SE
|
|||||||||||
|
NV101353555
|
NV101353555
|
NMC1094462
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
SE
|
|||||||||||
|
NV101353556
|
NV101353556
|
NMC1094463
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
NE
|
|
|
SE
|
|||||||||||
|
21 0280N 0340E 022
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101353557
|
NV101353557
|
NMC1094464
|
WAR EMBLEM 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SW
|
||
|
NV101354537
|
NV101354537
|
NMC1094465
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/14/2013
|
21 0280N 0340E 021
|
SW
|
|
NV101354538
|
NV101354538
|
NMC1094466
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SW
|
|
|
NV101354539
|
NV101354539
|
NMC1094467
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SW
|
|
|
NV101354540
|
NV101354540
|
NMC1094468
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
|
|
SW
|
|||||||||||
|
NV101354541
|
NV101354541
|
NMC1094469
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
|
|
NV101354542
|
NV101354542
|
NMC1094470
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
|
|
NV101354543
|
NV101354543
|
NMC1094471
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
WAR EMBLEM 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
|
|
NV101354544
|
NV101354544
|
NMC1094472
|
WAR EMBLEM 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
||
|
NV101354545
|
NV101354545
|
NMC1094473
|
WAR EMBLEM 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
||
|
21 0280N 0340E 022
|
SW
|
||||||||||
|
NV101354546
|
NV101354546
|
NMC1094474
|
WAR EMBLEM 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SW
|
||
|
21 0280N 0340E 028
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101354547
|
NV101354547
|
NMC1094475
|
WAR EMBLEM 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SW
|
||
|
21 0280N 0340E 028
|
NW
|
||||||||||
|
NV101354548
|
NV101354548
|
NMC1094476
|
WAR EMBLEM 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SW
|
||
|
21 0280N 0340E 028
|
NW
|
||||||||||
|
NV101354549
|
NV101354549
|
NMC1094477
|
WAR EMBLEM 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SW
|
||
|
21 0280N 0340E 028
|
NW
|
||||||||||
|
NV101354550
|
NV101354550
|
NMC1094478
|
WAR EMBLEM 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 028
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101354551
|
NV101354551
|
NMC1094479
|
WAR EMBLEM 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
||
|
21 0280N 0340E 028
|
NE
|
||||||||||
|
NV101354552
|
NV101354552
|
NMC1094480
|
WAR EMBLEM 39
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
||
|
21 0280N 0340E 028
|
NE
|
||||||||||
|
NV101354553
|
NV101354553
|
NMC1094481
|
WAR EMBLEM 40
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
||
|
21 0280N 0340E 028
|
NE
|
||||||||||
|
NV101354554
|
NV101354554
|
NMC1094482
|
WAR EMBLEM 41
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
||
|
21 0280N 0340E 028
|
NE
|
||||||||||
|
NV101354555
|
NV101354555
|
NMC1094483
|
WAR EMBLEM 42
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 021
|
SE
|
||
|
21 0280N 0340E 022
|
SW
|
||||||||||
|
21 0280N 0340E 027
|
NW
|
||||||||||
|
21 0280N 0340E 028
|
NE
|
||||||||||
|
NV101360394
|
NV101360394
|
NMC1094256
|
PHALANX 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/14/2013
|
21 0280N 0340E 019
|
NE
|
|
|
21 0280N 0340E 020
|
NW
|
||||||||||
|
NV101360395
|
NV101360395
|
NMC1094257
|
PHALANX 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NW
|
||
|
NV101360396
|
NV101360396
|
NMC1094258
|
PHALANX 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NW
|
||
|
NV101360397
|
NV101360397
|
NMC1094259
|
PHALANX 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NW
|
||
|
NV101360398
|
NV101360398
|
NMC1094260
|
PHALANX 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NW
|
||
|
NV101360399
|
NV101360399
|
NMC1094261
|
PHALANX 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
NV101360400
|
NV101360400
|
NMC1094262
|
PHALANX 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
NV101450525
|
NV101450525
|
NMC1094263
|
PHALANX 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/14/2013
|
21 0280N 0340E 020
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101450526
|
NV101450526
|
NMC1094264
|
PHALANX 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
NV101450527
|
NV101450527
|
NMC1094265
|
PHALANX 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
21 0280N 0340E 021
|
NW
|
||||||||||
|
NV101450528
|
NV101450528
|
NMC1094266
|
PHALANX 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 020
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101450529
|
NV101450529
|
NMC1094267
|
PHALANX 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NW
|
||
|
SW
|
|||||||||||
|
NV101450530
|
NV101450530
|
NMC1094268
|
PHALANX 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NW
|
||
|
SW
|
|||||||||||
|
NV101450531
|
NV101450531
|
NMC1094269
|
PHALANX 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NW
|
||
|
SW
|
|||||||||||
|
NV101450532
|
NV101450532
|
NMC1094270
|
PHALANX 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NW
|
||
|
SW
|
|||||||||||
|
NV101450533
|
NV101450533
|
NMC1094271
|
PHALANX 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101450534
|
NV101450534
|
NMC1094272
|
PHALANX 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
SE
|
|||||||||||
|
NV101450535
|
NV101450535
|
NMC1094273
|
PHALANX 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
SE
|
|||||||||||
|
NV101450536
|
NV101450536
|
NMC1094274
|
PHALANX 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
SE
|
|||||||||||
|
NV101450537
|
NV101450537
|
NMC1094275
|
PHALANX 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 021
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101485517
|
NV101485517
|
NMC1094276
|
PHALANX 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/14/2013
|
21 0280N 0340E 019
|
SE
|
|
|
21 0280N 0340E 020
|
SW
|
||||||||||
|
NV101485518
|
NV101485518
|
NMC1094277
|
PHALANX 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SW
|
||
|
NV101485519
|
NV101485519
|
NMC1094278
|
PHALANX 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101485520
|
NV101485520
|
NMC1094279
|
PHALANX 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SW
|
||
|
NV101485521
|
NV101485521
|
NMC1094280
|
PHALANX 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SW
|
||
|
NV101485522
|
NV101485522
|
NMC1094281
|
PHALANX 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
SW
|
|||||||||||
|
NV101485523
|
NV101485523
|
NMC1094282
|
PHALANX 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
NV101485524
|
NV101485524
|
NMC1094283
|
PHALANX 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
NV101485525
|
NV101485525
|
NMC1094284
|
PHALANX 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
NV101485526
|
NV101485526
|
NMC1094285
|
PHALANX 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
21 0280N 0340E 021
|
SW
|
||||||||||
|
NV101485527
|
NV101485527
|
NMC1094286
|
PHALANX 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 029
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101485528
|
NV101485528
|
NMC1094287
|
PHALANX 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
21 0280N 0340E 029
|
NE
|
||||||||||
|
NV101485529
|
NV101485529
|
NMC1094288
|
PHALANX 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
21 0280N 0340E 029
|
NE
|
||||||||||
|
NV101485530
|
NV101485530
|
NMC1094289
|
PHALANX 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
21 0280N 0340E 029
|
NE
|
||||||||||
|
NV101485531
|
NV101485531
|
NMC1094290
|
PHALANX 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 020
|
SE
|
||
|
21 0280N 0340E 021
|
SW
|
||||||||||
|
21 0280N 0340E 028
|
NW
|
||||||||||
|
21 0280N 0340E 029
|
NE
|
||||||||||
|
NV101358798
|
NV101358798
|
NMC1095352
|
TOLSTOY 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/31/2013
|
21 0280N 0340E 019
|
SE
|
|
|
NV101358799
|
NV101358799
|
NMC1095353
|
TOLSTOY 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SE
|
||
|
NV101358800
|
NV101358800
|
NMC1095354
|
TOLSTOY 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 019
|
SE
|
||
|
NV101359780
|
NV101359780
|
NMC1095355
|
TOLSTOY 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/31/2013
|
21 0280N 0340E 008
|
SE
|
|
|
21 0280N 0340E 009
|
SW
|
||||||||||
|
21 0280N 0340E 016
|
NW
|
||||||||||
|
21 0280N 0340E 017
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101359791
|
NV101359791
|
NMC1095366
|
TOLSTOY 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/31/2013
|
21 0280N 0340E 033
|
NE
|
|
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101359792
|
NV101359792
|
NMC1095367
|
TOLSTOY 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
NV101359793
|
NV101359793
|
NMC1095368
|
TOLSTOY 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
NV101359794
|
NV101359794
|
NMC1095369
|
TOLSTOY 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
NV101359795
|
NV101359795
|
NMC1095370
|
TOLSTOY 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 034
|
NW
|
||
|
NV101359781
|
NV101359781
|
NMC1095356
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
11/1/2013
|
21 0280N 0340E 011
|
SW
|
|
21 0280N 0340E 014
|
NW
|
||||||||||
|
NV101359782
|
NV101359782
|
NMC1095357
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 011
|
SW
|
|
|
21 0280N 0340E 014
|
NW
|
||||||||||
|
NV101359783
|
NV101359783
|
NMC1095358
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 011
|
SW
|
|
|
21 0280N 0340E 014
|
NW
|
||||||||||
|
NV101359784
|
NV101359784
|
NMC1095359
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
NW
|
|
|
SW
|
|||||||||||
|
NV101359785
|
NV101359785
|
NMC1095360
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
NW
|
|
|
SW
|
|||||||||||
|
NV101359786
|
NV101359786
|
NMC1095361
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
NW
|
|
|
SW
|
|||||||||||
|
NV101359787
|
NV101359787
|
NMC1095362
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SW
|
|
|
NV101359788
|
NV101359788
|
NMC1095363
|
TOLSTOY 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SW
|
||
|
NV101359789
|
NV101359789
|
NMC1095364
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SW
|
|
|
NV101359790
|
NV101359790
|
NMC1095365
|
(ASARCO) Sliding Scale NSR 1% - 5%
|
TOLSTOY 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SW
|
|
|
NV101864048
|
NV101864048
|
NMC1096127
|
EMISSARY 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
11/19/2013
|
21 0280N 0330E 025
|
SW
|
|
|
21 0280N 0330E 026
|
SE
|
||||||||||
|
21 0280N 0330E 035
|
NE
|
||||||||||
|
21 0280N 0330E 036
|
NW
|
||||||||||
|
NV101864049
|
NV101864049
|
NMC1096128
|
EMISSARY 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SW
|
||
|
21 0280N 0330E 036
|
NW
|
||||||||||
|
NV101864050
|
NV101864050
|
NMC1096129
|
EMISSARY 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SW
|
||
|
21 0280N 0330E 036
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101864051
|
NV101864051
|
NMC1096130
|
EMISSARY 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SW
|
||
|
21 0280N 0330E 036
|
NW
|
||||||||||
|
NV101864052
|
NV101864052
|
NMC1096131
|
EMISSARY 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SW
|
||
|
21 0280N 0330E 036
|
NW
|
||||||||||
|
NV101864053
|
NV101864053
|
NMC1096132
|
EMISSARY 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0330E 036
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101864054
|
NV101864054
|
NMC1096133
|
EMISSARY 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SE
|
||
|
21 0280N 0330E 036
|
NE
|
||||||||||
|
NV101864055
|
NV101864055
|
NMC1096134
|
EMISSARY 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SE
|
||
|
21 0280N 0330E 036
|
NE
|
||||||||||
|
NV101864056
|
NV101864056
|
NMC1096135
|
EMISSARY 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SE
|
||
|
21 0280N 0330E 036
|
NE
|
||||||||||
|
NV101864057
|
NV101864057
|
NMC1096136
|
EMISSARY 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SE
|
||
|
21 0280N 0330E 036
|
NE
|
||||||||||
|
NV101864058
|
NV101864058
|
NMC1096137
|
EMISSARY 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 025
|
SE
|
||
|
21 0280N 0330E 036
|
NE
|
||||||||||
|
21 0280N 0340E 030
|
SW
|
||||||||||
|
21 0280N 0340E 031
|
NW
|
||||||||||
|
NV101864059
|
NV101864059
|
NMC1096138
|
EMISSARY 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 035
|
NE
|
||
|
21 0280N 0330E 036
|
NW
|
||||||||||
|
NV101864060
|
NV101864060
|
NMC1096139
|
EMISSARY 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NW
|
||
|
NV101864061
|
NV101864061
|
NMC1096140
|
EMISSARY 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NW
|
||
|
NV101864062
|
NV101864062
|
NMC1096141
|
EMISSARY 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NW
|
||
|
NV101864443
|
NV101864443
|
NMC1096142
|
EMISSARY 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
11/19/2013
|
21 0280N 0330E 036
|
NW
|
|
|
NV101864444
|
NV101864444
|
NMC1096143
|
EMISSARY 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
NV101864445
|
NV101864445
|
NMC1096144
|
EMISSARY 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NE
|
||
|
SE
|
|||||||||||
|
NV101864446
|
NV101864446
|
NMC1096145
|
EMISSARY 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NE
|
||
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101864447
|
NV101864447
|
NMC1096146
|
EMISSARY 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NE
|
||
|
SE
|
|||||||||||
|
NV101864448
|
NV101864448
|
NMC1096147
|
EMISSARY 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NE
|
||
|
SE
|
|||||||||||
|
NV101864449
|
NV101864449
|
NMC1096148
|
EMISSARY 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 031
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101864450
|
NV101864450
|
NMC1096149
|
EMISSARY 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 035
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0330E 036
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101864451
|
NV101864451
|
NMC1096150
|
EMISSARY 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NW
|
||
|
SW
|
|||||||||||
|
NV101864452
|
NV101864452
|
NMC1096151
|
EMISSARY 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NW
|
||
|
SW
|
|||||||||||
|
NV101864453
|
NV101864453
|
NMC1096152
|
EMISSARY 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NW
|
||
|
SW
|
|||||||||||
|
NV101864454
|
NV101864454
|
NMC1096153
|
EMISSARY 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
NW
|
||
|
SW
|
|||||||||||
|
NV101864455
|
NV101864455
|
NMC1096154
|
EMISSARY 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
SE
|
||
|
SW
|
|||||||||||
|
NV101864456
|
NV101864456
|
NMC1096155
|
EMISSARY 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
SE
|
||
|
NV101864457
|
NV101864457
|
NMC1096156
|
EMISSARY 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
SE
|
||
|
NV101864458
|
NV101864458
|
NMC1096157
|
EMISSARY 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
SE
|
||
|
NV101864459
|
NV101864459
|
NMC1096158
|
EMISSARY 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
SE
|
||
|
NV101864460
|
NV101864460
|
NMC1096159
|
EMISSARY 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0330E 036
|
SE
|
||
|
21 0280N 0340E 031
|
SW
|
||||||||||
|
NV101864461
|
NV101864461
|
NMC1096160
|
EMISSARY 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NW
|
||
|
21 0280N 0330E 035
|
SE
|
||||||||||
|
21 0280N 0330E 036
|
SW
|
||||||||||
|
NV101864462
|
NV101864462
|
NMC1096161
|
EMISSARY 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NW
|
||
|
21 0280N 0330E 036
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101864463
|
NV101864463
|
NMC1096162
|
EMISSARY 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NW
|
||
|
21 0280N 0330E 036
|
SW
|
||||||||||
|
NV101864822
|
NV101864822
|
NMC1096163
|
EMISSARY 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
11/19/2013
|
21 0270N 0330E 001
|
NW
|
|
|
21 0280N 0330E 036
|
SW
|
||||||||||
|
NV101864823
|
NV101864823
|
NMC1096164
|
EMISSARY 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NE
|
||
|
NW
|
|||||||||||
|
21 0280N 0330E 036
|
SW
|
||||||||||
|
NV101864824
|
NV101864824
|
NMC1096165
|
EMISSARY 39
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NE
|
||
|
21 0280N 0330E 036
|
SE
|
||||||||||
|
SW
|
|||||||||||
|
NV101864825
|
NV101864825
|
NMC1096166
|
EMISSARY 40
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NE
|
||
|
21 0280N 0330E 036
|
SE
|
||||||||||
|
NV101864826
|
NV101864826
|
NMC1096167
|
EMISSARY 41
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NE
|
||
|
21 0280N 0330E 036
|
SE
|
||||||||||
|
NV101864827
|
NV101864827
|
NMC1096168
|
EMISSARY 42
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NE
|
||
|
21 0280N 0330E 036
|
SE
|
||||||||||
|
NV101864828
|
NV101864828
|
NMC1096169
|
EMISSARY 43
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0330E 001
|
NE
|
||
|
21 0270N 0340E 006
|
NW
|
||||||||||
|
21 0280N 0330E 036
|
SE
|
||||||||||
|
NV101864829
|
NV101864829
|
NMC1096170
|
EMISSARY 44
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 006
|
NW
|
||
|
21 0280N 0330E 036
|
SE
|
||||||||||
|
21 0280N 0340E 031
|
SW
|
||||||||||
|
NV101865384
|
NV101865384
|
NMC1100571
|
TOLSTOY 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/7/2014
|
21 0280N 0340E 014
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 023
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101865385
|
NV101865385
|
NMC1100572
|
TOLSTOY 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SE
|
||
|
21 0280N 0340E 023
|
NE
|
||||||||||
|
NV101865386
|
NV101865386
|
NMC1100573
|
TOLSTOY 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 013
|
SW
|
||
|
21 0280N 0340E 014
|
SE
|
||||||||||
|
21 0280N 0340E 023
|
NE
|
||||||||||
|
21 0280N 0340E 024
|
NW
|
||||||||||
|
NV101864737
|
NV101864737
|
NMC1101232
|
TOLSTOY 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
4/3/2014
|
21 0280N 0340E 002
|
SE
|
|
|
SW
|
|||||||||||
|
21 0280N 0340E 011
|
NE
|
||||||||||
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101864738
|
NV101864738
|
NMC1101233
|
TOLSTOY 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 002
|
SE
|
||
|
21 0280N 0340E 011
|
NE
|
||||||||||
|
NV101864739
|
NV101864739
|
NMC1101234
|
TOLSTOY 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 002
|
SE
|
||
|
21 0280N 0340E 011
|
NE
|
||||||||||
|
NV101355815
|
NV101355815
|
NMC1102375
|
CENTURION 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
4/29/2014
|
21 0280N 0340E 022
|
SE
|
|
|
21 0280N 0340E 023
|
SW
|
||||||||||
|
21 0280N 0340E 026
|
NW
|
||||||||||
|
21 0280N 0340E 027
|
NE
|
||||||||||
|
NV101355816
|
NV101355816
|
NMC1102376
|
CENTURION 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SW
|
||
|
21 0280N 0340E 026
|
NW
|
||||||||||
|
NV101355817
|
NV101355817
|
NMC1102377
|
CENTURION 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SW
|
||
|
21 0280N 0340E 026
|
NW
|
||||||||||
|
NV101355818
|
NV101355818
|
NMC1102378
|
CENTURION 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SW
|
||
|
21 0280N 0340E 026
|
NW
|
||||||||||
|
NV101355819
|
NV101355819
|
NMC1102379
|
CENTURION 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SW
|
||
|
21 0280N 0340E 026
|
NW
|
||||||||||
|
NV101355820
|
NV101355820
|
NMC1102380
|
CENTURION 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 026
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101355821
|
NV101355821
|
NMC1102381
|
CENTURION 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SE
|
||
|
21 0280N 0340E 026
|
NE
|
||||||||||
|
NV101355822
|
NV101355822
|
NMC1102382
|
CENTURION 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SE
|
||
|
21 0280N 0340E 026
|
NE
|
||||||||||
|
NV101355823
|
NV101355823
|
NMC1102383
|
CENTURION 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SE
|
||
|
21 0280N 0340E 026
|
NE
|
||||||||||
|
NV101355824
|
NV101355824
|
NMC1102384
|
CENTURION 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 023
|
SE
|
||
|
21 0280N 0340E 024
|
SW
|
||||||||||
|
21 0280N 0340E 025
|
NW
|
||||||||||
|
21 0280N 0340E 026
|
NE
|
||||||||||
|
NV101355825
|
NV101355825
|
NMC1102385
|
CENTURION 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
21 0280N 0340E 027
|
NE
|
||||||||||
|
NV101355826
|
NV101355826
|
NMC1102386
|
CENTURION 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101356777
|
NV101356777
|
NMC1102387
|
CENTURION 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
4/29/2014
|
21 0280N 0340E 026
|
NW
|
|
|
NV101356778
|
NV101356778
|
NMC1102388
|
CENTURION 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
NV101356779
|
NV101356779
|
NMC1102389
|
CENTURION 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
NV101356801
|
NV101356801
|
NMC1102390
|
CENTURION 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NE
|
||
|
NW
|
|||||||||||
|
NV101356802
|
NV101356802
|
NMC1102391
|
CENTURION 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NE
|
||
|
NV101356803
|
NV101356803
|
NMC1102392
|
CENTURION 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NE
|
||
|
NV101356804
|
NV101356804
|
NMC1102393
|
CENTURION 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NE
|
||
|
NV101356805
|
NV101356805
|
NMC1102394
|
CENTURION 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 025
|
NW
|
||
|
21 0280N 0340E 026
|
NE
|
||||||||||
|
NV101356806
|
NV101356806
|
NMC1102395
|
CENTURION 21
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 027
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
NV101356807
|
NV101356807
|
NMC1102396
|
CENTURION 22
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
SW
|
|||||||||||
|
NV101356808
|
NV101356808
|
NMC1102397
|
CENTURION 23
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
SW
|
|||||||||||
|
NV101356809
|
NV101356809
|
NMC1102398
|
CENTURION 24
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
SW
|
|||||||||||
|
NV101356810
|
NV101356810
|
NMC1102399
|
CENTURION 25
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NW
|
||
|
SW
|
|||||||||||
|
NV101356811
|
NV101356811
|
NMC1102400
|
CENTURION 26
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101356812
|
NV101356812
|
NMC1102401
|
CENTURION 27
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NE
|
||
|
SE
|
|||||||||||
|
NV101356813
|
NV101356813
|
NMC1102402
|
CENTURION 28
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NE
|
||
|
SE
|
|||||||||||
|
NV101356814
|
NV101356814
|
NMC1102403
|
CENTURION 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
NE
|
||
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101356815
|
NV101356815
|
NMC1102404
|
CENTURION 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 025
|
NW
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 026
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
NV101356816
|
NV101356816
|
NMC1102405
|
CENTURION 31
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SW
|
||
|
21 0280N 0340E 027
|
SE
|
||||||||||
|
21 0280N 0340E 034
|
NE
|
||||||||||
|
21 0280N 0340E 035
|
NW
|
||||||||||
|
NV101356817
|
NV101356817
|
NMC1102406
|
CENTURION 32
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SW
|
||
|
21 0280N 0340E 035
|
NW
|
||||||||||
|
NV101356818
|
NV101356818
|
NMC1102407
|
CENTURION 33
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SW
|
||
|
21 0280N 0340E 035
|
NW
|
||||||||||
|
NV101357773
|
NV101357773
|
NMC1102408
|
CENTURION 34
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
4/29/2014
|
21 0280N 0340E 026
|
SW
|
|
|
21 0280N 0340E 035
|
NW
|
||||||||||
|
NV101357774
|
NV101357774
|
NMC1102409
|
CENTURION 35
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SW
|
||
|
21 0280N 0340E 035
|
NW
|
||||||||||
|
NV101357775
|
NV101357775
|
NMC1102410
|
CENTURION 36
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SE
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 035
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101357776
|
NV101357776
|
NMC1102411
|
CENTURION 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SE
|
||
|
21 0280N 0340E 035
|
NE
|
||||||||||
|
NV101357777
|
NV101357777
|
NMC1102412
|
CENTURION 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SE
|
||
|
21 0280N 0340E 035
|
NE
|
||||||||||
|
NV101357778
|
NV101357778
|
NMC1102413
|
CENTURION 39
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 026
|
SE
|
||
|
21 0280N 0340E 035
|
NE
|
||||||||||
|
NV101357779
|
NV101357779
|
NMC1102414
|
CENTURION 40
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 025
|
SW
|
||
|
21 0280N 0340E 026
|
SE
|
||||||||||
|
21 0280N 0340E 035
|
NE
|
||||||||||
|
21 0280N 0340E 036
|
NW
|
||||||||||
|
NV101351053
|
NV101351053
|
NMC1102873
|
MAVERICK 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/5/2014
|
21 0270N 0340E 002
|
SW
|
|
|
21 0270N 0340E 011
|
NW
|
||||||||||
|
NV101351054
|
NV101351054
|
NMC1102874
|
MAVERICK 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SW
|
||
|
21 0270N 0340E 011
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101351055
|
NV101351055
|
NMC1102875
|
MAVERICK 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SW
|
||
|
21 0270N 0340E 011
|
NW
|
||||||||||
|
NV101351056
|
NV101351056
|
NMC1102876
|
MAVERICK 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
SW
|
|||||||||||
|
21 0270N 0340E 011
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101351057
|
NV101351057
|
NMC1102877
|
MAVERICK 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
21 0270N 0340E 011
|
NE
|
||||||||||
|
NV101351058
|
NV101351058
|
NMC1102878
|
MAVERICK 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
21 0270N 0340E 011
|
NE
|
||||||||||
|
NV101351059
|
NV101351059
|
NMC1102879
|
MAVERICK 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
21 0270N 0340E 011
|
NE
|
||||||||||
|
NV101351060
|
NV101351060
|
NMC1102880
|
MAVERICK 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
21 0270N 0340E 011
|
NE
|
||||||||||
|
NV101351061
|
NV101351061
|
NMC1102881
|
MAVERICK 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 001
|
SW
|
||
|
21 0270N 0340E 002
|
SE
|
||||||||||
|
21 0270N 0340E 011
|
NE
|
||||||||||
|
21 0270N 0340E 012
|
NW
|
||||||||||
|
NV101351062
|
NV101351062
|
NMC1102882
|
MAVERICK 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 010
|
NE
|
||
|
SE
|
|||||||||||
|
21 0270N 0340E 011
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101351063
|
NV101351063
|
NMC1102883
|
MAVERICK 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NW
|
||
|
SW
|
|||||||||||
|
NV101351064
|
NV101351064
|
NMC1102884
|
MAVERICK 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NW
|
||
|
SW
|
|||||||||||
|
NV101351065
|
NV101351065
|
NMC1102885
|
MAVERICK 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NW
|
||
|
SW
|
|||||||||||
|
NV101351066
|
NV101351066
|
NMC1102886
|
MAVERICK 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
NV101351067
|
NV101351067
|
NMC1102887
|
MAVERICK 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NE
|
||
|
SE
|
|||||||||||
|
NV101351068
|
NV101351068
|
NMC1102888
|
MAVERICK 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NE
|
||
|
SE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101351069
|
NV101351069
|
NMC1102889
|
MAVERICK 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NE
|
||
|
SE
|
|||||||||||
|
NV101351070
|
NV101351070
|
NMC1102890
|
MAVERICK 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NE
|
||
|
SE
|
|||||||||||
|
NV101351071
|
NV101351071
|
NMC1102891
|
MAVERICK 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 011
|
NE
|
||
|
SE
|
|||||||||||
|
21 0270N 0340E 012
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101490022
|
NV101490022
|
NMC1102852
|
BLOCKADE 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
6/5/2014
|
21 0270N 0340E 002
|
NW
|
|
|
SW
|
|||||||||||
|
21 0270N 0340E 003
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
21 0280N 0340E 034
|
SE
|
||||||||||
|
NV101490023
|
NV101490023
|
NMC1102853
|
BLOCKADE 2
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NW
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 034
|
SE
|
||||||||||
|
21 0280N 0340E 035
|
SW
|
||||||||||
|
NV101490024
|
NV101490024
|
NMC1102854
|
BLOCKADE 3
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NW
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 035
|
SW
|
||||||||||
|
NV101490025
|
NV101490025
|
NMC1102855
|
BLOCKADE 4
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NW
|
||
|
SW
|
|||||||||||
|
21 0280N 0340E 035
|
SW
|
||||||||||
|
NV101490026
|
NV101490026
|
NMC1102856
|
BLOCKADE 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NW
|
||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
21 0280N 0340E 035
|
SW
|
||||||||||
|
NV101490027
|
NV101490027
|
NMC1102857
|
BLOCKADE 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NE
|
||
|
NW
|
|||||||||||
|
SE
|
|||||||||||
|
SW
|
|||||||||||
|
21 0280N 0340E 035
|
SW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101490028
|
NV101490028
|
NMC1102858
|
BLOCKADE 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 035
|
SE
|
||||||||||
|
SW
|
|||||||||||
|
NV101490029
|
NV101490029
|
NMC1102859
|
BLOCKADE 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 035
|
SE
|
||||||||||
|
NV101490030
|
NV101490030
|
NMC1102860
|
BLOCKADE 9
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
NE
|
||
|
SE
|
|||||||||||
|
21 0280N 0340E 035
|
SE
|
||||||||||
|
NV101490031
|
NV101490031
|
NMC1102861
|
BLOCKADE 10
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 001
|
NW
|
||
|
SW
|
|||||||||||
|
21 0270N 0340E 002
|
NE
|
||||||||||
|
SE
|
|||||||||||
|
21 0280N 0340E 035
|
SE
|
||||||||||
|
NV101490032
|
NV101490032
|
NMC1102862
|
BLOCKADE 11
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SW
|
||
|
21 0270N 0340E 003
|
SE
|
||||||||||
|
NV101490033
|
NV101490033
|
NMC1102863
|
BLOCKADE 12
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SW
|
||
|
NV101490034
|
NV101490034
|
NMC1102864
|
BLOCKADE 13
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SW
|
||
|
NV101490035
|
NV101490035
|
NMC1102865
|
BLOCKADE 14
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SW
|
||
|
NV101490036
|
NV101490036
|
NMC1102866
|
BLOCKADE 15
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
SW
|
|||||||||||
|
NV101490037
|
NV101490037
|
NMC1102867
|
BLOCKADE 16
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
NV101490038
|
NV101490038
|
NMC1102868
|
BLOCKADE 17
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
NV101490039
|
NV101490039
|
NMC1102869
|
BLOCKADE 18
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
NV101490040
|
NV101490040
|
NMC1102870
|
BLOCKADE 19
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SE
|
||
|
NV101490041
|
NV101490041
|
NMC1102871
|
BLOCKADE 20
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 001
|
SW
|
||
|
21 0270N 0340E 002
|
SE
|
||||||||||
|
NV101490042
|
NV101490042
|
NMC1102872
|
MAVERICK 1
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0270N 0340E 002
|
SW
|
||
|
21 0270N 0340E 003
|
SE
|
||||||||||
|
21 0270N 0340E 010
|
NE
|
||||||||||
|
21 0270N 0340E 011
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial
Number
|
Lead File
Number
|
Legacy Serial
Number
|
Royalty
|
Claim Name
|
County
|
Case
Disposition
|
Claim Type
|
Next Payment
Due Date
|
Date Of
Location
|
Meridian Township
Range Section
|
Quadrant
|
|
NV101450895
|
NV101450895
|
NMC1103419
|
DREADNOUGHT 40
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
7/17/2014
|
21 0280N 0340E 015
|
NE
|
|
|
SE
|
|||||||||||
|
NV101487294
|
NV101487294
|
NMC1105695
|
X 37
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
8/20/2014
|
21 0280N 0340E 027
|
SW
|
|
|
21 0280N 0340E 028
|
SE
|
||||||||||
|
21 0280N 0340E 033
|
NE
|
||||||||||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101488307
|
NV101488307
|
NMC1105696
|
X 38
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
8/20/2014
|
21 0280N 0340E 027
|
SW
|
|
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101488308
|
NV101488308
|
NMC1105697
|
X 39
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SW
|
||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101488309
|
NV101488309
|
NMC1105698
|
X 40
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 027
|
SW
|
||
|
21 0280N 0340E 034
|
NW
|
||||||||||
|
NV101488310
|
NV101488310
|
NMC1105699
|
LYN 84 R
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/8/2014
|
21 0280N 0330E 002
|
NE
|
|
|
NV101352180
|
NV101352180
|
NMC1104442
|
TOLSTOY 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/25/2014
|
21 0280N 0340E 014
|
NW
|
|
|
SW
|
|||||||||||
|
NV101352181
|
NV101352181
|
NMC1104443
|
TOLSTOY 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SW
|
||
|
NV101330776
|
NV101330776
|
NMC1119848
|
3% NSR (Solidus)
|
SHO 66
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
3/10/2016
|
21 0280N 0340E 003
|
SE
|
|
SW
|
|||||||||||
|
NV101883155
|
NV101883155
|
NMC1169409
|
ELLISON #1
|
PERSHING
|
FILED
|
PLACER CLAIM
|
9/1/2022
|
3/27/2018
|
21 0280N 0340E 004
|
SW
|
|
|
NV101883158
|
NV101883158
|
NMC1169412
|
ELLISON #4
|
PERSHING
|
FILED
|
PLACER CLAIM
|
9/1/2022
|
3/27/2018
|
21 0280N 0340E 004
|
SW
|
|
|
NV101883156
|
NV101883156
|
NMC1169410
|
ELLISON #2
|
PERSHING
|
FILED
|
PLACER CLAIM
|
9/1/2022
|
3/28/2018
|
21 0280N 0340E 004
|
SW
|
|
|
NV101883157
|
NV101883157
|
NMC1169411
|
ELLISON #3
|
PERSHING
|
FILED
|
PLACER CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SW
|
||
|
NV101883159
|
NV101883159
|
NMC1169413
|
ELLISON #5
|
PERSHING
|
FILED
|
PLACER CLAIM
|
9/1/2022
|
3/28/2018
|
21 0280N 0340E 004
|
SW
|
|
|
NV101883928
|
NV101883928
|
NMC1169414
|
ELLISON #6
|
PERSHING
|
FILED
|
PLACER CLAIM
|
9/1/2022
|
21 0280N 0340E 004
|
SW
|
||
|
NV101471339
|
NV101471339
|
NMC1154550
|
3% NSR (Solidus)
|
SHO 61B
|
PERSHING
|
FILED
|
LODE CLAIM
|
9/1/2022
|
11/13/2017
|
21 0280N 0340E 003
|
SE
|
|
SW
|
|||||||||||
|
NV101471340
|
NV101471340
|
NMC1154551
|
3% NSR (Solidus)
|
PORCUPIINE 28A
|
PERSHING
|
FILED
|
LODE CLAIM
|
9/1/2022
|
21 0280N 0340E 014
|
SE
|
|
|
NV101508612
|
NV101508612
|
NMC1061499
|
LH 29
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/27/2011
|
21 0280N 0340E 008
|
NE
|
|
|
SE
|
|||||||||||
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
SW
|
|||||||||||
|
NV101508613
|
NV101508613
|
NMC1061500
|
LH 30
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
10/27/2011
|
21 0280N 0340E 008
|
SE
|
|
|
21 0280N 0340E 009
|
SW
|
||||||||||
|
21 0280N 0340E 016
|
NW
|
||||||||||
|
21 0280N 0340E 017
|
NE
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Serial Number
|
Claimant
|
Legacy Serial Number
|
Royalty
|
Claim Name
|
County
|
Case Disposition
|
Claim Type
|
Next Payment Due Date
|
Date Of Location
|
Meridian Township Range Section
|
Quadrant
|
|
NV101319569
|
Genevieve Duffy Pierce
|
NMC925188
|
3% NSR
(Outside of Mine Plan)
|
SV 315
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/17/2006
|
21 0280N 0340E 004
|
SW
|
|
NV101319570
|
Genevieve Duffy Pierce
|
NMC925189
|
3% NSR
(Outside of Mine Plan)
|
SV 316
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/17/2006
|
21 0280N 0340E 004
|
SW
|
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
NV101319571
|
Genevieve Duffy Pierce
|
NMC925190
|
3% NSR
(Outside of Mine Plan)
|
SV 317
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/17/2006
|
21 0280N 0340E 004
|
SE
|
|
SW
|
|||||||||||
|
NV101319572
|
Genevieve Duffy Pierce
|
NMC925191
|
3% NSR
(Outside of Mine Plan)
|
SV 318
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/17/2006
|
21 0280N 0340E 004
|
SE
|
|
SW
|
|||||||||||
|
21 0280N 0340E 009
|
NE
|
||||||||||
|
NW
|
|||||||||||
|
NV101319585
|
Genevieve Duffy Pierce
|
NMC925210
|
3% NSR
(Outside of Mine Plan)
|
SV 337
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/15/2006
|
21 0280N 0340E 004
|
SW
|
|
NV101319586
|
Genevieve Duffy Pierce
|
NMC925211
|
3% NSR
(Outside of Mine Plan)
|
SV 338
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/15/2006
|
21 0280N 0340E 004
|
SW
|
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
NV101319587
|
Genevieve Duffy Pierce
|
NMC925212
|
3% NSR
(Outside of Mine Plan)
|
SV 339
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/15/2006
|
21 0280N 0340E 004
|
SW
|
|
NV101319588
|
Genevieve Duffy Pierce
|
NMC925213
|
3% NSR
(Outside of Mine Plan)
|
SV 340
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
2/15/2006
|
21 0280N 0340E 004
|
SW
|
|
21 0280N 0340E 009
|
NW
|
||||||||||
|
NV101361491
|
Genevieve Duffy Pierce
|
NMC965332
|
3% NSR
(Outside of Mine Plan)
|
DUFFY 5
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/5/2007
|
21 0280N 0340E 004
|
SW
|
|
NV101361492
|
Genevieve Duffy Pierce
|
NMC965333
|
3% NSR
(Outside of Mine Plan)
|
DUFFY 6
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/5/2007
|
21 0280N 0340E 004
|
SE
|
|
SW
|
|||||||||||
|
NV101361493
|
Genevieve Duffy Pierce
|
NMC965334
|
3% NSR
(Outside of Mine Plan)
|
DUFFY 7
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/5/2007
|
21 0280N 0340E 004
|
SW
|
|
NV101361494
|
Genevieve Duffy Pierce
|
NMC965335
|
3% NSR
(Outside of Mine Plan)
|
DUFFY 8
|
PERSHING
|
ACTIVE
|
LODE CLAIM
|
9/1/2022
|
9/5/2007
|
21 0280N 0340E 004
|
SE
|
|
SW
|
|||||||||||
|
NV101605673
|
Dale and Diana Chabino
|
NMC780754
|
3% NSR (Outside of Mine Plan)
|
FREEDOM #2
|
PERSHING
|
ACTIVE
|
PLACER CLAIM
|
9/1/2022
|
11/3/1997
|
21 0280N 0340E 008
|
NE
|
|
NW
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|
|
Claim Name
|
Federal Patent №
|
Assessor’s Parcel №
|
|
Akron Quartz Mine
|
959332
|
15-020-37
|
|
Baltimore
|
886486
|
15-020-36
|
|
Canyon
|
469396
|
|
|
Canyon No. 1
|
469396
|
15-020-30
|
|
Crown Hills
|
537044
|
15-020-35
|
|
Crown Point No. 1
|
537044
|
15-020-35
|
|
Crown Wedge Fraction
|
537044
|
15-020-35
|
|
Dorothea
|
959332
|
15-020-37
|
|
Iditarod
|
959332
|
15-020-37
|
|
Joplin No. 1
|
886486
|
15-020-36
|
|
Joplin No. 2
|
886486
|
15-020-36
|
|
Joplin No. 3
|
886486
|
15-020-36
|
|
Joplin No. 4
|
886486
|
15-020-36
|
|
Joplin No. 5
|
886486
|
15-020-36
|
|
Joplin No. 6
|
886486
|
15-020-36
|
|
Joplin Fraction
|
886486
|
15-020-36
|
|
Packard No. 1
|
959332
|
15-020-37
|
|
Packard No. 2
|
959332
|
15-020-37
|
|
Packard No. 3
|
959332
|
15-020-37
|
|
Packard Fraction959332
|
15-020-37
|
Packard Fraction959332
|
|
West Slope
|
1112519
|
15-020-35
|
![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|

![]() |
Rochester Operations
Nevada
Technical Report Summary
|