Concessions and Authorizations
12 Months Ended
Dec. 31, 2022
Concessions And Authorizations  
Concessions and Authorizations

 

2.Concessions and Authorizations
2.1Concession contracts or authorizations obtained by Copel
     
Concession agreement / authorization of the equity   Interest % Maturity 
Copel DIS Contract 046/1999, extended by 5th addendum to the contract 100  07.07.2045 
Elejor  Contract 125/2001 - HPP Fundão 70  06.11.2040 
  Contract 125/2001 - HPP Santa Clara     05.10.2040 
  Authorization - SHP Fundão I and SHP Santa Clara I - 753/2002 and 757/2002     12.19.2032 
Dona Francisca Energética  Contract 188/1998 - HPP Dona Francisca 23  09.21.2037 
UEG Araucária  Authorization 351/1999  - TPP Araucária (60.9% Copel GET) 20.3  12.23.2029 
Compagás (2.1.1) Concession gas distribution contract  51  07.06.2054 
Usina de Energia Eólica São João S.A. (a) MME Ordinance 173 /2012 - WPP São João 49  03.26.2047 
Usina de Energia Eólica Carnaúba S.A. (a) MME Ordinance 204 /2012 - WPP Carnaúbas 49  04.09.2047 
Usina de Energia Eólica Reduto S.A. (a) MME Ordinance 230 /2012 - WPP Reduto 49  04.16.2047 
Usina de Energia Eólica Santo Cristo S.A. (a) MME Ordinance 233/2012 - WPP Santo Cristo 49  04.18.2047 
(a)Subsidiaries of Voltalia São Miguel do Gostoso I Participações S.A.

Hydroelectric Power Plant - HPP

Small Hydroelectric Plant - SHP

Thermal Power Plant - TPP

Wind Power Plant - WPP

 

2.1.1Compagas

Compagas has a service concession arrangement signed with the Granting Authority, the State of Paraná, effective for 30 years as of July 6, 1994, extended for the same period as of the ending date of the original term, based on article 16 of the State Supplementary Law No. 205/2017. Therefore, the final term of the arrangement was extended to July 6, 2054.

The main requirements for concession renewal, among others, are: adoption of the price-cap regulation model; remuneration based on the weighted average cost of capital (WACC), initially at 9.125% p.a.; definition of the initial Net Regulatory Remuneration Base (BRRL) contemplating the assets not amortized in the current concession, the granting bonus, offset against regulatory liabilities; total estimated Capex of R$2.5 billion to be realized over 30 years; tariff adjustment based on Brazil’s Extended Consumer Price Index (IPCA) variations. The new arrangement was signed on December 26, 2022 and the service concession was extended upon payment of a R$508,000 grant bonus through offsetting of concessionaire credits referring to the previous service concession arrangement in the amount of R$98,000 and financial disbursement of R$410,000 in December 2022.

As a result of this process, the accounts receivable related to concessions was transferred to intangible assets, where the consideration for the grant bonus was also recorded, as shown in Notes 9.2 and 17.3.

2.2Concession contracts or authorizations obtained by Copel Get and its investees
     
Copel GeT   Interest % Maturity 
ONEROUS CONCESSION BY THE USE OF PUBLIC PROPERTY  - UBP    
       
Generation Concession Contract 001/2007 - HPP Gov. Jayme Canet Júnior (Mauá) 51  05.27.2047 
     
Generation Concession Contract 001/2011 - HPP Colíder   100  01.30.2046 
       
Authorization - Ordinance 133/2011 - SHP Cavernoso II    100  12.06.2050 
       
Generation Concession Contract 002/2012 - HPP Baixo Iguaçu 30  12.03.2049 
       
Generation Concession Contract 007/2013      
HPP Apucaraninha    100  01.27.2027 
HPP Chaminé   100  08.02.2028 
HPP Derivação do Rio Jordão   100  06.21.2032 
HPP Cavernoso   100  06.23.2033 
       
PUBLIC SERVICE CONCESSIONS      
       
Generation Concession Contract 045/1999      
TPP Figueira (Note 34.2.6)   100  03.27.2019 
HPP São Jorge (Note 34.2.6)   100  07.24.2026 
HPP Gov. Ney Aminthas de Barros Braga (Segredo)   100  09.25.2032 
HPP Gov. José Richa (Salto Caxias)   100  03.20.2033 
Generation Concession Contract 001/2020      
UHE Guaricana   100  07.21.2028 
       
Authorization - Resolution 278/1999 - WPP Palmas    100  09.29.2029 
       
Dispatch 182/2002 - Hydroeletric Generating Plant - HGP Melissa, HGP Pitangui and    
    HGP Salto do Vau  (only register with ANEEL)   100 -
       
Generation Concession Contract 003/2016 - HPP Gov. Pedro Viriato Parigot de Souza (GPS) 100  01.03.2053 
       
HPP Marumbi - Power generating plant registration: CGH. PH. PR. 001501-6.02 100 -
       
Authorization Aneel 5,373/2015 - HGP Chopim I  (only register with ANEEL) 100 -
       
Concession agreement / authorization of the equity      
UEG Araucária Authorization 351/1999  - TPP Araucária (20,3% - Copel) 60.9  12.23.2029 
Nova Asa Branca I MME Ordinance 267/2011 - WPP Asa Branca I  100  04.25.2046 
Nova Asa Branca II MME Ordinance 333/2011 - WPP Asa Branca II  100  05.31.2046 
Nova Asa Branca III MME Ordinance 334/2011 - WPP Asa Branca III  100  05.31.2046 
Nova Eurus IV MME Ordinance 273/2011 -WPP Eurus IV  100  04.27.2046 
Santa Maria MME Ordinance 274/2012 - WPP SM  100  05.08.2047 
Santa Helena MME Ordinance 207/2012 - WPP Santa Helena  100  04.09.2047 
Ventos de Santo Uriel MME Ordinance 201/2012 - WPP Santo Uriel  100  04.09.2047 
GE Boa Vista MME Ordinance 276 /2011 - WPP Dreen Boa Vista  100  04.28.2046 
GE Farol MME Ordinance 263 /2011 - WPP Farol  100  04.20.2046 
GE Olho D’Água MME Ordinance 343 /2011 - WPP Dreen Olho D'Água  100  06.01.2046 
GE São Bento do Norte MME Ordinance 310 /2011 - WPP Dreen São Bento do Norte  100  05.19.2046 
Esperança do Nordeste MME Ordinance 183/2015 - WPP Esperança do Nordeste 100  05.11.2050 
Paraíso dos Ventos do Nordeste MME Ordinance 182/2015 - WPP Paraíso dos Ventos do Nordeste 100  05.11.2050 
Usina de Energia Eólica Jangada Resolution 3,257/2011 - WPP GE Jangada 100  01.05.2042 
Maria Helena Resolution 3,259/2011 - WPP GE Maria Helena 100  01.05.2042 
Usina de Energia Eólica Potiguar MME Ordinance 179/2015 - WPP Potiguar 100  05.11.2050 
Usina de Energia Eólica Guajiru Resolution 3,256/2011 - WPP Dreen Guajiru 100  01.05.2042 
Usina de Energia Eólica Cutia Resolution 3,258/2011 - WPP Dreen Cutia 100  01.05.2042 
São Bento do Norte I Ordinance 349/2015 - WPP São Bento do Norte I 100  08.04.2050 
São Bento do Norte II  Ordinance 348/2015 - WPP São Bento do Norte II 100  08.04.2050 
São Bento do Norte III Ordinance 347/2015 - WPP São Bento do Norte III  100  08.04.2050 
São Miguel I Ordinance 352/2015 - WPP São Miguel I 100  08.04.2050 
São MigueI lI Ordinance 351/2015 - WPP São Miguel II 100  08.04.2050 
São Miguel III Ordinance 350/2015 - WPP São Miguel III 100  08.04.2050 
Foz do Chopim Authorization 114/2000 - SHP Arturo Andreoli  35.77  08.15.2032 
SHP Bela Vista (Note 16.5.1) Resolution 913/2017 - transfer of title under     
     Resolution 7,802/2019  100  01.02.2041 
F.D.A. Electricity Generation (Note 34.2.6) Generation Concession Contract contract 002/2020 100  12.21.2024 
Jandaíra I Energias Renováveis (Note 16.5.2) Ordinance 140/2020 - WPP Jandaíra I 100  04.02.2055 
Jandaíra II Energias Renováveis (Note 16.5.2) Ordinance 141/2020 - WPP Jandaíra II 100  04.02.2055 
Jandaíra III Energias Renováveis (Note 16.5.2) Ordinance 142/2020 - WPP Jandaíra III 100  04.02.2055 
Jandaíra IV Energias Renováveis (Note 16.5.2) Ordinance 139/2020 - WPP Jandaíra IV 100  04.02.2055 
EOL Potiguar B 141 SPE S.A. Ordinance 02/2019 - WPP Vila Maranhão I 100  01.11.2054 
EOL Potiguar B 142 SPE S.A. Ordinance 12/2019 - WPP Vila Maranhão II 100  01.14.2054 
EOL Potiguar B 143 SPE S.A. Ordinance 13/2019 - WPP Vila Maranhão III 100  01.14.2054 
EOL Potiguar B  61 SPE S.A. Ordinance 453/2019 - WPP Ventos de Vila Mato Grosso I 100  12.06.2054 
Ventos de Vila Paraíba IV SPE S.A  Ordinance 10/2019 - WPP Vila Ceará I 100  01.14.2054 
Copel GeT   Interest % Maturity  Next tariff
review
Transmission lines and substations concession agreements      
Contract 060/2001 - Transmission facilities (sundry Transmission lines and Substations) - extended by the 3rd additive term 100  01.01.2043  2023
Contract 075/2001 - Transmission line 230 kV Bateias - Jaguariaíva 100  08.17.2031  (a)
Contract 006/2008 - Transmission line 230 kV Bateias - Pilarzinho 100  03.17.2038  2023
Contract 027/2009 - Transmission line 525 kV Foz do Iguaçu - Cascavel Oeste 100  11.19.2039  2025
Contract 010/2010 - Transmission line 500 kV Araraquara II - Taubaté  100  10.06.2040  2026
Contract 015/2010 - Substation Cerquilho III 230/138 kV 100  10.06.2040  2026
Contract 022/2012 - Transmission line 230 kV Londrina - Figueira and Transmission line 230 kV Foz do Chopim - Salto Osório 100  08.27.2042  2023
Contract 002/2013 - Transmission line 230 kV Assis - Paraguaçu Paulista II e Substation Paraguaçu Paulista II 230 kV   100  02.25.2043  2023
Contract 005/2014 - Transmission line 230 kV Bateias - Curitiba Norte e Substation Curitiba Norte 230/138 kV 100  01.29.2044  2024
Contract 021/2014 - Transmission line 230 kV Foz do Chopim - Realeza e Substation Realeza 230/138 kV  100  09.05.2044  2025
Contract 022/2014 - Transmission line 500 kV Assis - Londrina 100  09.05.2044  2025
Contract 006/2016 - Transmission line 525 kV Curitiba Leste - Blumenau  100  04.07.2046  2026
Contract 006/2016 - Transmission line 230 kV Baixo Iguaçu - Realeza      
Contract 006/2016 - Transmission line 230 kV Curitiba Centro - Uberaba      
Contract 006/2016 - Substation Medianeira 230/138 kV      
Contract 006/2016 - Substation Curitiba Centro 230/138 kV       
Contract 006/2016 - Substation Andirá Leste 230/138 kV       
         
Concession agreement / authorization of the equity      
Costa Oeste Transmissora Contract 001/2012: 100  01.12.2042  2027
  Transmission line 230 kV Cascavel Oeste - Umuarama      
  Substation Umuarama 230/138 kV      
Caiuá Transmissora  Contract 007/2012: 49  05.10.2042  2027
  Transmission line 230 kV Umuarama - Guaíra      
  Transmission line 230 kV Cascavel Oeste - Cascavel Norte      
  Substation Santa Quitéria 230/138/13,8 kV      
  Substation Cascavel Norte 230/138/13,8 kV      
Marumbi Transmissora Contract 008/2012: 100  05.10.2042  2027
  Transmission line 525 kV Curitiba - Curitiba Leste      
  Substation Curitiba Leste 525/230 kV      
Integração Maranhense Contract 011/2012: Transmission line 500 Kv Açailândia - Miranda II 49  05.10.2042  2027
Matrinchã Transmissora Contract 012/2012: 49  05.10.2042  2027
  Transmission line 500 kV Paranaíta - Cláudia        
  Transmission line 500 kV Cláudia - Paranatinga      
  Transmission line 500 kV Paranatinga - Ribeirãozinho      
  Substation Paranaíta 500 kV      
  Substation Cláudia 500 kV      
  Substation Paranatinga 500 kV      
Guaraciaba Transmissora Contract 013/2012: 49  05.10.2042  2027
  Transmission line 500 kV Ribeirãozinho - Rio Verde Norte      
  Transmission line 500 kV Rio Verde Norte - Marimbondo II       
  Substation Marimbondo II 500 kV      
Paranaíba Transmissora Contract 007/2013: 24.5  05.02.2043  2023
  Transmission line 500 kV Barreiras II - Rio das Éguas      
  Transmission line 500 kV Rio das Éguas - Luziânia      
  Transmission line 500 kV Luziânia - Pirapora 2      
Mata de Santa Genebra Contract 001/2014: 50.1  05.14.2044  2024
  Transmission line 500 kV Itatiba - Bateias      
  Transmission line 500 kV Araraquara 2 - Itatiba      
  Transmission line 500 kV Araraquara 2 - Fernão Dias      
  Substation Santa Bárbara D ́Oeste 440 kV      
  Substation Itatiba 500 kV      
  Substation Fernão Dias 500/440 kV      
Cantareira Transmissora Contract 019/2014: Transmission line Estreito - Fernão Dias  49  09.05.2044  2025
Uirapuru Transmissora Contract 002/2005: Transmission line 525 kV Ivaiporã - Londrina 100  03.04.2035  (a)
(a)Do not undergo tariff review and RAP reduces to 50% in the 16th year.