EX-99.1 2 ego_ex991.htm PRESS RELEASE DATED SEPTEMBER 27, 2021 ego_ex991
 
 
 
Exhibit 99.1
 
 
 
NEWS RELEASE
 
 
TSX: ELD NYSE: EGO
 
September 27, 2021
 
 
 
Eldorado Gold Identifies New Mineralized Lenses at Ormaque; Multiple Styles of High-Grade Mineralization at Bonnefond; Kokarpinar Vein Extension Drilled at Efemcukuru
 
VANCOUVER, BC – Eldorado Gold Corporation (“Eldorado”, the “Company” or “We”) is pleased to provide an update of results from exploration projects at the Lamaque and Efemcukuru operations. Brownfield exploration activities at these sites included a combination of resource conversion drilling, step-out drilling of existing resources and testing new near-mine targets.
 
Ormaque: Infill drilling at the Ormaque deposit at the Lamaque operations has confirmed grade continuity within ore lenses of the maiden inferred resource and has expanded several lenses laterally. Drillholes testing deeper levels identified several new mineralized zones. Notable step-out intercepts include 2.2 metres at 21.3 grams per tonne (g/t) gold (51.4 g/t gold uncapped) and 1.0 metres at 40.4 g/t gold. Intercepts from new zones include 5.3 metres at 25.0 g/t gold and 33.9 metres at 16.5 g/t gold.
 
Bonnefond: Significant drill results from the Bonnefond deposit in the recently acquired Bourlamaque project area (formerly QMX project area) include 50.2 metres at 6.0 g/t gold from an extension veinlet zone within the Bonnefond tonalite and 12.9 metres at 5.1 g/t gold from shear vein hosted mineralization cutting across the tonalite.
 
Efemcukuru: Drilling at Kokarpinar focused on both conversion drilling within inferred resources and testing the previously undrilled Kokarpinar Northwest Splay, with the latter returning intercepts of 1.6 metres at 18.3 g/t gold and 2.1 metres at 8.0 g/t gold.
 
“The strong drill results build on the ongoing success of our exploration programs at the Lamaque and Efemcukuru operations,” said George Burns, President and CEO of Eldorado Gold. “The infill and step-out drilling at Ormaque highlights the quality and growth potential of this recent new discovery, and our teams are rapidly advancing a range of exploration opportunities within the land package obtained through the acquisition of QMX, key to our Canadian growth strategy.”
 
“At Efemcukuru, we have a strong track record of extending mine life through exploration success. The recent resource drilling at the Kokarpinar vein is encouraging and has the potential to significantly extend the current reserve base and mine life. Our exploration team continues to advance drilling in many areas to support our future growth profile at our existing operations.”
 
Note: Gold grades for drillhole intervals listed in this release are capped at 40 g/t gold for Triangle deposit holes and 70 g/t gold for the Ormaque zone. Drillhole intercepts are drillhole lengths; where sufficient geological control exists, estimated true thicknesses of mineralized zones are in Appendix 1.
 
Tables of intercepts from the drilling referenced in this release are included in Appendix 1 and associated drillhole collar coordinates and orientations are listed in Appendix 2.
 
 


 
 
 
Val-d’Or District, Quebec
 
Ormaque Deposit
 
Eldorado announced a maiden inferred resource for the Ormaque deposit on February 22, 2021 totaling 803,000 ounces gold at a grade of 9.5 g/t gold. High gold grades at Ormaque occur within quartz+carbonate+tourmaline veins forming gently south-dipping extension veins and vein arrays, and less commonly, steeply north-dipping shear veins. The mineralized veins at Ormaque have been identified within a corridor extending approximately 550 metres east-west, 300 metres north-south and from 150 to at least 750 metres depth, located roughly midway along the ore haulage decline being constructed between the Triangle mine and the Sigma mill (Figure 1).
 
Figure 1: Geological map of the Lamaque Operations showing mineralized zones and infrastructure referred to in this news release. Inset map shows outline of Lamaque Operations license holdings: Sigma-Lamaque and Sigma 2 outlined in red; Bourlamaque Property in green.
 
 
 
 
Since the maiden Ormaque resource was defined, 34 drill holes totalling 16,494 metres have been completed (Figure 2). The new drilling includes both infill holes within the inferred resource area, drilled for the purpose of confirming grade continuity within the mineralized lenses, and step-out holes targeting extensions of the mineralized zones and testing for new mineralized lenses at depth and along strike.
 
 
 
 
 

Figure 2: Geological map of the Ormaque deposit area, showing collars and traces of drill holes completed since the February 2021 announcement of the maiden inferred resource and surface projection outline of the deposit area. Drillhole collar coordinates and orientations provided in Appendix 2.
 
 
Infill drillholes targeted five of the thicker, more continuous lenses of the deposit (E030, E040, E050, E100 and E140). Results validated the geological model used in the maiden resource, and intersected grades and thicknesses similar to those predicted by the model. The additional level of drilling detail has also enabled refinements to the geological model, the most notable being the definition of several steeply north-dipping high-grade shear veins. Some of the widest mineralized intervals to date are associated with vein arrays occurring where the gently-dipping extension vein lenses intersect these steeper zones.
 
Step-out drilling has also defined extensions to the mineralized lenses outside of the area included in the maiden resource estimate, associated with both extension and shear vein zones. Notable intercepts include:
 
2.15 metres at 21.3 g/t gold (51.4 g/t gold uncapped) in drillhole LS-21-059, representing a 30 metre step-out to the north on zone E100,
 
1.0 metre at 40.4 g/t gold in drillhole LS-21-052, representing an 80 metre step-out to the east on zone E030, and
 
1.05 metres at 38.8 g/t gold in drillhole LS-21-058, representing a 50 metre step-out to the north on zone E050.
 
 
 
 
 
 
Several new mineralized zones that were not included in the maiden resource were also intersected in the infill and step-out drilling programs. These include intercepts of:
 
5.25 metres at 25.0 g/t gold in drillhole LS-21-052 from a sub-vertical shear vein, and
 
multiple intercepts in drillhole LS-21-054, including 5.0 metres at 18.1 g/t gold in a new sub-horizontal zone and 33.9 metres at 16.5 g/t gold from an array of extensional veins with associated tourmaline altered wallrock. The latter is one of the deepest and easternmost intersections at Ormaque (Figure 3).
 
Drilling results at the high-grade Ormaque deposit highlight the resource expansion potential of the known mineralized lenses and through discovery of new lenses where the deposit remains open to the east and at depth. The combination of steeply-dipping shear veins and sub-horizontal extension veins at Ormaque is similar to styles of mineralization mined at the nearby Sigma deposit (historical production of approximately 4.5 million ounces gold), which was mined to a depth of 1.8 kilometres. Exploration to date at Ormaque has only tested the system to about 750 metres.
 
 
 
 
 
 
Figure 3: North-south cross section through the eastern part of the Ormaque Deposit (section line shown on Figure 2) showing geometry of gently-dipping extension vein lenses and more steeply-dipping shear veins, and selected recent drill intercepts from this news release.
 
 
Current drilling at Ormaque is testing extensions of the orebody towards the east below the previously explored Fortune zone (Figure 2). Drilling also commenced at the Mine #3 target 500 metres southwest of Ormaque (Figure 1), following up on several drill intercepts that display similar styles of mineralization and geological controls to those at Ormaque. Around 12,000 metres of drilling are planned for Ormaque, Mine #3, and related nearby targets for the remainder of 2021.
 
Bourlamaque
 
Eldorado completed the acquisition of QMX Gold on April 7, 2021, increasing Eldorado’s land package within the Val-d'Or area by over 500% (Figure 1). The newly acquired properties, now collectively referred to as the Bourlamaque property, include historical producing mines, advanced stage exploration projects and early-stage opportunities. In 2021, exploration drilling by QMX and subsequently by Eldorado at Bourlamaque has focused on the Bonnefond deposit, the River target, and the Bevcon target.
 
 
 
 
 
 
The Bonnefond deposit, located 20 kilometres east of Val-d’Or, has notable geological similarities to the Triangle deposit, including an association with plug-like intrusions and localization of high gold grades within steeply-dipping shear vein systems. However, the intrusions at Bonnefond contain extensive zones of disseminated and veinlet-controlled gold mineralization not found at Triangle. Drilling has been ongoing at Bonnefond throughout the year, targeting both the shear veins and more disseminated styles of mineralization. Notable results from the 2021 drilling at Bonnefond include:
 
Intercepts of 50.2 metres at 5.9 g/t gold, 13.1 metres at 4.3 g/t gold (both from drillhole 17315-20-121W1) and 41.9 metres at 3.2 g/t gold (drillhole 17315-20-148); associated with arrays of quartz-tourmaline-pyrite extension veinlets hosted within the Bonnefond tonalite, and
 
Intercepts of 10.3 metres at 5.1 g/t gold (drillhole 17315-21-161) and 12.9 metres at 5.1 g/t gold (drillhole 17415-21-167A) within subvertical, quartz-carbonate shear veins spatially associated with mafic dykes cutting the Bonnefond tonalite.
 
The River target is located just east of Val-d’Or and approximately 5.5 kilometres northeast of the Sigma Mill. The River target area contains a series of south-dipping mineralized shear zones within the western margin of the Bourlamaque batholith, some of which are aligned along-strike with shear zones formerly mined at the Lac Herbin mine 500 metres to the east (historical production 172,650 ounces gold). Similar styles of mineralization are also present at the nearby historic Ferderber and Dumont mines (historical production of 362,000 ounces gold and 258,000 ounces gold respectively).
 
Eight drillholes totaling 3,490 metres have been completed at the River target in 2021. The best intercepts from the drilling include:
 
16.9 metres at 3.6 g/t gold (drillhole 17421-20-078); and
 
19.6 metres at 9.8 g/t gold (drillhole 17421-21-082).
 
Drilling planned the remainder of 2021 on the Bourlamaque property includes roughly 2000 metres at the River target and testing of a new target area along strike from the previously producing Bevcon mine (historical production of 438,000 ounces gold), located 30 kilometres east of Val-d'Or. The Bevcon target consists of several shear zones along the northern margin of the Bevcon intrusion, which were previously mined at the Bevcon mine. Initial drill testing will include up to 12 drillholes testing a strike length of 400 metres.
 
Efemcukuru, Turkey
 
In 2021, drilling at Efemcukuru has focused on resource conversion and step-out drilling at the Kokarpinar epithermal vein system (Figure 4). Resource conversion drilling has now been completed for three of the six ore shoots at Kokarpinar and will continue through the end of the year on the remaining inferred resource areas. Grades and thicknesses in the resource conversion drilling to date are overall consistent with the inferred resource model, and in several areas returned intercepts with notably higher than expected grades and thicknesses. Examples include:
 
5.6 metres at 35.0 g/t gold (drillhole KPR-045) at Kokarpinar South;
 
14.2 metres at 7.4 g/t gold (drillhole KPR-032) at Kokarpinar Middle; and
 
8.6 metres at 8.3 g/t gold (drillhole KPR-051) from the Kokarpinar Middle splay zone.
 
 
 
 
 
 
Figure 4: Geological map of the Efemcukuru mine area showing traces of exploration and resource conversion drillholes completed in 2021 at the Kokarpinar vein system.
 
 
Three step-out drillholes were completed at the previously undrilled Kokarpinar Northwest Splay zone, targeting areas where numerous high grade gold values were obtained from outcrop samples. Two of the holes intersected significant epithermal vein mineralization, including:
 
1.6 metres at 18.3 g/t gold (drillhole KV-789) and
 
2.1metres at 8.0 g/t gold (drillhole KV-792).
 
Follow-up drilling is planned for late 2021 to test the continuity and lateral extent of high-grade mineralization in this area.
 
 
 
 
 
 
About Eldorado Gold
 
Eldorado is a gold and base metals producer with mining, development and exploration operations in Turkey, Canada, Greece, Romania, and Brazil.  The Company has a highly skilled and dedicated workforce, safe and responsible operations, a portfolio of high-quality assets, and long-term partnerships with local communities.  Eldorado’s common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New York Stock Exchange (NYSE: EGO).
 
Contacts
 
Investor Relations
 
Lisa Wilkinson, VP, Investor Relations
604.757 2237 or 1.888.353.8166
lisa.wilkinsonateldoradogold.com
 
Media
 
Louise McMahon, Director Communications & Public Affairs
604.616 2296 or 1.888.363.8166
louise.mcmahonateldoradogold.com
 
Qualified Persons 
Dr. Peter Lewis P.Geo., Eldorado’s Vice President, Exploration, is the qualified person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") responsible for, and has verified and approved, the scientific and technical disclosure contained in this press release. The scientific and technical disclosure of the exploration results from the Quebec based projects were reviewed and approved by Jacques Simoneau. P.Geo and member in good standing of the Ordre des Géologues du Québec. Eldorado operates its exploration programs according to industry best practices and employs rigorous quality assurance and quality control procedures. All results are based on half-core samples of diamond drill core. For Lamaque, drill core samples were prepared and analyzed at Bourlamaque Laboratories in Val d’Or, Quebec, while the Bourlamaque property samples were analysed at the Swastika Lab in Swastika, Ontario. Drillcore samples For Efemcukuru were prepared at the Company’s sample preparation lab in Cannakale, Turkey and analyzed at ALS Minerals laboratory in Izmir, Turkey.  All Au assays are based on fire assay analysis of a 30 gm charge (50 gm for Efemcukuru)  followed by an atomic adsorption finish.  Samples with Au grades above 5.0 g/t at the Lamaque project and Efemcukuru Project, 10.0 g/t at other projects were re-assayed and completed with a gravimetric finish.  Certified standard reference materials, field duplicate and blank samples were inserted regularly and were closely monitored to ensure the quality of the data.  
 
Cautionary Note about Forward-looking Statements and Information 
Certain of the statements made and information provided in this press release are forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking statements and forward-looking information can be identified by the use of words such as "plans", "expects",  "is expected", "budget", “continue”, “projected”, "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. 
 
Forward-looking statements or information contained in this release include, but are not limited to, statements or information with respect to: our planned future drilling and exploration work programs, including for the remainder of 2021, and the timing and anticipated benefits thereof; our expectations regarding establishment of reserves and resources through our continued exploration programs, the success of our exploration programs at Lamaque and Efemcukuru; the growth potential at Ormaque; growth opportunities within the land acquired through QMX Gold; ability to replace reserves at Efemcukuru;  mineral reserves and resources, our guidance and outlook, including expected production and recoveries of gold, planned capital and exploration expenditures; our expectation as to our future financial and operating performance, expected metallurgical recoveries, gold price outlook; and our strategy, plans and goals, including our proposed exploration, development, construction, permitting and operating plans and priorities, including timelines and schedules. 
 
Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.   
 
 
 
 
We have made certain assumptions about the forward-looking statements and information, including assumptions about: how the world-wide economic and social impact of COVID-19 is managed and the duration and extent of the impact of the COVID-19 pandemic on our operations, the results of our exploration programs; the need for additional financing to explore and develop properties; mineral reserves and resources and metallurgical recoveries, uncertainties involved in the interpretation of drill results and geological tests, the geopolitical, economic, permitting and legal climate that we operate in; the future price of gold and other commodities; the global concentrate market; exchange rates; anticipated costs and expenses; production, the impact of acquisitions, dispositions, suspensions or delays on our business and the ability to achieve our goals. In particular, except where otherwise stated, we have assumed a continuation of existing business operations on substantially the same basis as exists at the time of this release.  
 
Even though our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statement or information will prove to be accurate. Many assumptions may be difficult to predict and are beyond our control.    
 
Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information.  These risks, uncertainties and other factors include, among others: global outbreaks of infectious diseases, including COVID-19; timing and cost of exploration, drilling, work programs, construction, geopolitical and economic climate (global and local), uncertainties involved in the interpretation of drill results and geological tests; the need to obtain additional permits and governmental approvals, risks related to the updating of our resource and reserve models and life of mine plans; mineral tenure and permits; gold and other commodity price volatility; information technology systems risks; continued softening of the global concentrate market, recoveries of gold and other metals; results of test work; revised guidance; risks regarding potential and pending  litigation and arbitration proceedings relating to the Company’s, business, properties and operations; expected impact on reserves and the carrying value; mining operational and development risk; financing risks; foreign country operational risks; risks of sovereign investment; regulatory risks and liabilities including, regulatory environment and restrictions, and environmental regulatory restrictions and liability; discrepancies between actual and estimated production, mineral reserves and resources and metallurgical testing and recoveries; additional funding requirements; currency fluctuations; community and non-governmental organization actions; speculative nature of gold exploration; dilution; share price volatility and the price of our common shares; competition; loss of key employees; and defective title to mineral claims or properties, as well as those risk factors discussed in the sections titled “Forward-Looking Statements” and "Risk factors in our business" in the Company's  most recent Annual Information Form & Form 40-F. The reader is directed to carefully review the detailed risk discussion in our most recent Annual Information Form filed on SEDAR and EDGAR under our Company name, which discussion is incorporated by reference in this release, for a fuller understanding of the risks and uncertainties that affect the Company’s business and operations. 
 
Forward-looking statements and information is designed to help you understand management’s current views of our near and longer term prospects, and it may not be appropriate for other purposes. 
 
There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein.  Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S. 
 
 
 
 
 
 
 
Appendix 1: Tables of Assay Results
 
Table 1: Summary of 2021 drillhole assay results from the Ormaque Deposit. Intercepts are only reported for those intervals above a 10 gram x metre cutoff. Drillhole collar locations, collar orientations, and total lengths are listed in Appendix 2.
 
HOLE-ID
From
To
Length
True Thickness
Au g/t uncapped
Au cap at 70 g/t
Zone

Infill Holes (inside February 21st inferred resource)
LS-20-034M01
589.0
590.7
1.7
 
20.41
 
Shear Vein
and
712.5
713.0
0.5
 
185.61
70.0
 
and
875.75
878.0
2.25
 
7.29
 
 
LS-20-035
418.0
421.0
3.0
1.43
3.36
 
E100
and
430.9
434.3
3.4
1.7
38.08
18.06
E110
and
436.7
439.25
2.55
1.01
6.85
 
S020
LS-20-036
132.5
134.0
1.5
 
18.15
 
 
LS-20-036A
439.7
440.2
0.5
0.43
34.62
 
S010
and
523.1
523.6
0.5
 
28.82
 
 
and
531.75
532.75
1.0
0.54
31.58
 
E160
and
563.8
564.8
1.0
0.55
15.56
 
E170
and
664.25
665.85
1.6
 
16.57
 
 
and
676.3
679.35
3.05
 
9.38
 
Shear Vein
LS-20-037
151.7
152.2
0.5
 
26.98
 
 
and
156.3
156.8
0.5
 
44.25
 
 
and
185.0
187.65
2.65
2.28
14.65
 
E010
incl.
186.0
187.0
1.0
 
37.62
 
 
 and
238.2
238.75
0.55
0.47
193.64
70.0
E020
 and
270.7
279.8
8.3
 
19.58
9.99
 
incl.
271.7
272.7
1.0
 
149.63
70.0
 
 and
276.5
278.5
2.0
1.7
5.12
 
E040
 and
394.3
395.45
1.15
0.97
16.8
 
E110
 and
411.15
416.85
5.70
2.12
6.3
 
S010
 and
523.8
525.0
1.2
 
10.13
 
 
 
 
 
 
 
LS-20-038
591.25
604.75
13.5
 
4.48
 
 
incl.
591.25
596.75
5.5
4.32
5.0
 
E230
and incl.
599.25
604.75
5.5
 
5.89
 
 
LS-20-039A
146.7
148.1
1.4
 
14.9
 
 
and
150.7
151.3
0.6
 
63.84
 
 
LS-20-039B
251.15
252.65
1.5
1.37
114.48
24.89
E030
and
265.0
267.1
2.1
1.88
11.98
 
E040
LS-20-039BM01
259.7
261.2
1.5
1.3
43.44
26.98
E030
 and
273.75
274.8
1.05
0.9
40.73
40.29
E040
 and
316.8
317.8
1.0
0.84
12.53
 
E060
 and
390.65
392.75
2.1
1.59
26.17
23.55
S020
 and
414.75
418.1
3.35
 
9.04
 
 
 and
543.25
548.5
5.25
 
2.4
 
Shear Vein
 and
639.8
643.8
4.0
 
2.79
 
Shear Vein
LS-21-040A
266.35
268.5
2.15
2.11
7.55
 
E050
and
274.3
275.75
1.45
 
29.18
 
 
LS-21-041
228.5
229.02
0.52
0.51
20.22
 
E030
 and
273.6
277.7
4.1
3.99
31.99
16.77
E050
incl.
274.15
274.7
0.55
 
183.48
70.0
 
 and
286.65
288.15
1.5
 
23.12
 
 
 and
305.7
308.9
3.2
3.11
9.59
 
E070
 and
319.4
320.0
0.6
0.59
39.79
 
E080
 and
330.85
331.4
0.55
 
30.98
 
 
 and
340.7
341.8
1.1
1.08
23.54
 
E090
LS-21-042A
284.5
289.0
4.5
4.23
4.04
 
E050
incl.
288.0
288.5
0.5
 
21.52
 
 
LS-21-044A
245.3
245.95
0.65
0.6
133.7
70.0
E030
 and
267.0
270.0
3.0
2.73
4.51
 
E040
 and
296.7
302.85
6.15
5.6
5.06
 
E050
incl.
300.65
302.85
2.2
 
11.12
 
 
 and
311.5
313.0
1.5
 
16.76
 
 
 and
322.3
325.9
3.6
3.22
17.13
15.11
E070
 
 
 
 
LS-21-046
235.2
239.2
4.0
3.54
4.58
 
E020
incl.
238.6
239.2
0.6
 
21.55
 
 
and
253.0
254.5
1.5
1.33
48.91
27.58
E030
incl.
253.5
254.0
0.5
 
133.97
70.0
 
and
256.8
258.3
1.5
 
8.78
 
 
 and
306.35
309.1
2.75
2.4
24.17
 
E050
incl.
306.85
308.1
1.25
 
48.66
 
 
 and
321.75
322.75
1.0
0.85
20.72
 
E060
 and
326.9
327.4
0.5
 
76.35
70.0
 
 and
378.0
378.5
0.5
0.45
31.16
 
E090
 and
387.0
392.1
5.1
3.74
7.88
 
S020
incl.
387.5
388.0
0.5
 
26.57
 
 
and
400.5
401.5
1.0
0.88
13.3
 
E110
LS-21-047
272.85
275.2
2.35
2.26
12.09
 
E050
incl.
273.4
273.9
0.5
 
41.99
 
 
and
281.9
283.55
1.65
 
31.33
26.09
 
incl.
282.45
283.05
0.6
 
84.41
70.0
 
LS-21-048
419.8
420.3
0.5
0.41
25.3
 
E100
 and
446.3
447.3
1.0
 
37.48
35.49
 
 and
493.5
495.5
2.0
 
34.99
28.58
 
incl.
494.5
495.0
0.5
 
95.66
70.0
 
 and
541.5
543.25
1.75
1.5
20.64
 
E140
 and
577.65
579.2
1.55
1.16
139.37
35.54
E160
incl.
578.15
578.65
0.5
 
391.86
70.0
 
LS-21-050
456.9
457.4
0.5
 
36.57
 
 
 and
525.9
526.4
0.5
 
46.38
 
 
 
 
 
 
 and
582.4
582.9
0.5
 
20.21
 
 
LS-21-051
266.2
267.2
1.0
0.88
44.69
35.36
E040
 and
299.25
300.25
1.0
0.87
11.34
 
E050
 and
306.35
307.85
1.5
 
9.48
 
 
 and
359.9
361.25
1.35
 
11.5
 
 
 and
369.9
370.9
1.0
0.89
15.93
 
E090
 and
375.6
376.35
0.75
 
23.15
 
 
 and
393.75
395.25
1.5
 
14.63
 
 
incl.
394.75
395.25
0.5
 
41.89
 
 
and
396.25
397.0
0.75
0.66
21.07
 
E110
LS-21-053
245.3
245.8
0.5
0.48
34.13
 
E040
 and
281.0
284.85
3.85
3.69
9.57
 
E050
incl.
283.75
284.3
0.55
 
56.09
 
 
 and
423.5
427.3
3.8
3.55
10.68
 
E130
incl.
424.1
424.6
0.5
 
67.48
 
 
and
445.7
447.9
2.2
2.18
13.28
 
E140
LS-21-055
275.65
276.3
0.65
 
35.3
 
 
 and
303.35
306.3
2.95
2.43
17.8
 
E050
incl.
305.75
306.3
0.55
 
68.74
 
 
 and
322.45
323.6
1.15
0.92
22.34
 
E060
and
392.15
394.25
2.1
1.76
45.43
36.85
E100
incl.
392.15
392.75
0.6
 
100.04
70.0
 
and incl.
393.75
394.25
0.5
 
69.36
 
 
 and
499.75
505.9
6.15
 
4.12
 
Shear Vein
LS-21-056
238.6
239.1
0.5
0.48
61.06
 
E030
and
282.95
291.35
8.4
8.01
14.31
 
E050
incl.
282.95
286.0
3.05
 
38.0
 
 
 
 
 
 
incl.
290.85
294.5
3.65
 
91.06
41.13
 
 and
291.35
294.5
3.15
 
104.48
46.63
Shear Vein
 and
307.0
309.15
2.15
2.04
7.67
 
E070
 and
316.3
317.6
1.3
 
13.62
 
 
 and
322.65
324.65
2.0
1.93
6.37
 
E080
Step-out Holes (outside February 21st inferred resource)
LS-21-043
510.9
513.5
2.6
 
16.04
 
 
LS-21-045
196.8
197.3
0.5
 
34.65
 
 
and
416.8
420.85
4.05
3.55
6.69
 
E100
incl.
416.8
418.3
1.5
 
15.82
 
 
 and
429.55
430.55
1.0
0.86
11.16
 
E110
 and
458.1
459.6
1.5
 
20.69
 
 
 and
561.0
561.5
0.5
0.41
33.17
 
E160
 and
572.15
573.65
1.5
 
19.68
 
 
 and
743.3
744.3
1.0
0.79
95.26
35.55
E230
 and
807.1
807.6
0.5
 
65.03
 
 
 and
867.5
871.65
4.15
 
18.94
 
 
incl.
868.95
869.9
0.95
 
68.85
 
 
and
871.65
874.0
2.35
 
19.67
 
Shear Vein
incl.
873.3
874.0
0.7
 
44.15
 
 
and
874.0
875.5
1.5
 
9.7
 
 
and
879.3
889.7
10.4
 
20.68
9.19
 
incl.
879.3
879.8
0.5
 
308.92
70.0
 
LS-21-052
224.8
225.8
1.0
0.92
40.39
36.49
E030
incl.
224.8
225.3
0.5
 
77.8
70.0
 
and
382.0
383.0
1.0
0.9
11.75
 
E110
 
 
 
 
and
388.0
389.5
1.5
1.33
90.18
31.38
E120
incl.
388.5
389.0
0.5
 
246.4
70.0
 
 and
421.5
423.5
2.0
1.73
16.55
 
E130
incl.
422.0
422.5
0.5
 
60.38
 
 
 and
460.15
461.65
1.5
 
19.03
 
 
incl.
460.65
461.15
0.5
 
55.79
 
 
 and
486.85
492.1
5.25
1.91
24.96
23.03
S030
LS-21-054
407.55
412.55
5.0
 
18.08
 
 
incl.
410.2
411.55
1.35
 
56.62
 
 
and
419.75
420.25
0.5
 
20.93
 
 
and
435.4
436.9
1.5
1.34
33.83
27.64
E130
incl.
435.9
436.4
0.5
 
88.57
70.0
 
and
477.1
478.1
1.0
0.92
37.29
 
E150
and
716.75
750.65
33.9
 
16.52
12.35
 
incl.
719.75
720.75
1.0
 
34.17
 
 
and incl.
724.0
724.7
0.7
 
130.32
70.0
 
and incl.
732.05
734.85
2.8
 
90.39
60.68
 
and incl.
740.2
740.7
0.5
 
101.87
70.0
 
and incl.
744.0
744.5
0.5
 
64.24
 
 
and
781.25
782.25
1.0
 
21.13
 
 
and
797.8
802.5
4.7
 
4.07
 
 
and
810.35
812.35
2.0
 
5.27
 
 
and
815.75
822.85
7.1
 
21.14
18.46
 
incl.
815.75
816.35
0.6
 
101.75
70.0
 
and incl.
818.55
820.35
1.8
 
41.89
 
 
LS-21-057
50.0
51.5
1.5
 
8.41
 
 
 and
88.5
91.2
2.7
 
30.66
18.6
 
 
 
 
 
incl.
90.1
90.7
0.6
 
124.25
70.0
 
LS-21-058
223.8
224.8
1.0
0.89
39.76
36.06
E020
incl.
224.3
224.8
0.5
 
77.4
70.0
 
 and
246.2
247.25
1.05
0.95
38.78
37.24
E030
incl.
246.7
247.25
0.55
 
72.93
70.0
 
LS-21-059
366.65
368.8
2.15
2.02
51.4
21.27
E100
incl.
367.8
368.3
0.5
 
199.57
70.0
 
 and
378.2
382.55
4.35
3.99
10.12
 
E120
incl.
381.25
382.55
1.3
 
31.58
 
 
LS-21-061
163.5
170.0
6.5
 
6.18
 
 
incl.
163.5
164.0
0.5
 
67.65
 
 
and
214.0
219.0
5.0
 
8.76
 
 
and
252.0
254.0
2.0
1.82
9.96
 
E020
and
287.0
287.5
0.5
0.45
44.88
 
E040
and
318.85
319.35
0.5
0.45
53.17
 
E050
 
 

 
 
 
 
Table 2: Summary of 2021 drillhole assay results from the Bonnefond Deposit. Intercepts are only reported for those intervals above a 10 gram x metre cutoff. Drillhole collar locations, collar orientations, and total lengths are listed in Appendix 2.
 
Drillhole
From (m)
To (m)
Interval (m)
True thickness (m)
Au (g/t)
Zone
17315-20-121W1
459.8
461.8
2.0
1.16
12.25
Bonnefond Tonalitic plug
and
473.0
477.0
4.0
2.29
9.33
Bonnefond Tonalitic plug
and
504.8
508.5
3.7
2.13
6.04
Bonnefond Tonalitic plug
and
610.8
612.3
1.5
0.86
10.68
Bonnefond Tonalitic plug
and
629.1
632.6
3.5
2.0
26.21
Bonnefond Tonalitic plug
and
640.6
690.8
50.2
28.73
5.95
Bonnefond Tonalitic plug
incl.
642.6
644.6
2.0
1.14
70.94
Bonnefond Tonalitic plug
and incl.
670.0
672.0
2.0
1.14
39.51
Bonnefond Tonalitic plug
and
734.0
735.5
1.5
0.86
17.17
Bonnefond Tonalitic plug
and
754.9
756.9
2.0
1.14
8.31
Bonnefond Tonalitic plug
and
768.7
781.8
13.1
7.48
4.32
Bonnefond Tonalitic plug
incl.
772.1
774.1
2.0
1.14
10.13
Bonnefond Tonalitic plug
incl.
778.1
779.8
1.7
0.97
13.25
Bonnefond Tonalitic plug
and
794.5
796.3
1.8
1.03
6.23
Bonnefond Tonalitic plug
and
920.0
922.0
2.0
1.14
8.54
Bonnefond Tonalitic plug
and
1077.0
1079.0
2.0
1.14
55.27
Bonnefond Tonalitic plug
17315-20-132
352.5
375.0
22.5
20.15
3.61
Bonnefond Tonalitic plug
incl.
369.3
375.0
5.7
5.09
10.59
Bonnefond Tonalitic plug
17315-20-148
78.5
88.5
10.0
5.35
3.25
Bonnefond Tonalitic plug
and
120.2
129.9
9.7
5.2
4.92
Bonnefond Tonalitic plug
and
160.0
161.8
1.8
0.95
12.79
Bonnefond Tonalitic plug
and
170.8
172.8
2.0
1.06
14.92
Bonnefond Tonalitic plug
 
 
 
 
 
and
231.1
273.0
41.9
22.0
3.21
Bonnefond Tonalitic plug
incl.
231.1
239.1
8.0
4.21
8.85
Bonnefond Tonalitic plug
and incl.
235.1
239.1
4.0
2.1
15.76
Bonnefond Tonalitic plug
and incl.
265.0
273.0
8.0
4.19
5.36
Bonnefond Tonalitic plug
and
308.4
314.3
5.9
3.1
3.63
Bonnefond Tonalitic plug
and
342.0
349.0
7.0
3.67
3.68
Bonnefond Tonalitic plug
and
382.5
384.0
1.5
0.78
7.17
Bonnefond Tonalitic plug
and
427.5
429.0
1.5
0.78
6.99
Bonnefond Tonalitic plug
and
667.5
669.1
1.6
0.8
6.81
Bonnefond Tonalitic plug
17315-20-149W2
544.7
683.0
138.3
71.57
3.03
Bonnefond Tonalitic plug
incl.
556.3
571.8
15.5
8.12
7.7
Bonnefond Tonalitic plug
and incl.
566.3
568.3
2.0
1.05
37.47
Bonnefond Tonalitic plug
and incl.
654.0
672.1
18.1
6.4
8.0
Gabbro Dyke
and incl.
657.2
659.2
2.0
0.71
36.42
Gabbro Dyke
and incl.
681.0
683.0
2.0
1.01
14.44
Bonnefond Tonalitic plug
and
755.2
765.0
9.8
4.93
3.82
Bonnefond Tonalitic plug
and
974.6
978.0
3.4
1.62
3.88
Bonnefond Tonalitic plug
17315-20-155W1
374.9
378.9
4.0
2.27
3.7
Bonnefond Tonalitic plug
and
634.2
635.6
1.4
0.8
12.76
Bonnefond Tonalitic plug
and
843.4
846.2
2.8
1.62
5.21
Bonnefond Tonalitic plug
and
940.5
942.0
1.5
0.86
21.17
Bonnefond Tonalitic plug
 
 
 
 
 
and
964.5
966.0
1.5
0.86
9.05
Bonnefond Tonalitic plug
and
1009.0
1011.0
2.0
1.15
8.95
Bonnefond Tonalitic plug
and
1015.5
1025.0
9.5
4.1
3.01
Gabbro Dyke
incl.
1017.5
1019.0
1.5
0.65
10.16
Gabbro Dyke
and
1075.5
1084.0
8.5
4.99
13.32
Bonnefond Tonalitic plug
incl.
1075.5
1077.0
1.5
0.88
44.17
Bonnefond Tonalitic plug
and incl.
1080.0
1082.0
2.0
1.17
21.64
Bonnefond Tonalitic plug
17315-20-155W2
530.0
535.8
5.8
3.02
8.81
Bonnefond Tonalitic plug
and
530.0
531.8
1.8
0.94
18.79
Bonnefond Tonalitic plug
and
579.5
586.0
6.5
2.34
6.3
Gabbro Dyke
incl.
581.5
583.0
1.5
0.54
18.28
Gabbro Dyke
and
698.5
700.5
2.0
1.0
5.96
Bonnefond Tonalitic plug
17315-21-128AW1
429.1
430.6
1.5
0.86
14.37
Bonnefond Tonalitic plug
17315-21-161
119.5
123.5
4.0
2.44
3.74
Bonnefond Tonalitic plug
and
172.0
186.0
14.0
8.55
7.26
Bonnefond Tonalitic plug
incl.
172.0
173.0
1.0
0.61
79.57
Bonnefond Tonalitic plug
and
211.0
213.0
2.0
1.22
6.82
Bonnefond Tonalitic plug
and
286.0
311.0
25.0
15.28
6.27
Bonnefond Tonalitic plug
incl.
288.0
290.0
2.0
1.22
59.6
Bonnefond Tonalitic plug
and
406.4
410.4
4.0
1.86
4.26
South Shear
and
487.5
502.0
14.5
8.83
4.62
Bonnefond Tonalitic plug
incl.
487.5
492.9
5.4
3.29
10.58
Bonnefond Tonalitic plug
 
 
 
 
 
and incl.
491.1
492.9
1.8
1.1
17.99
Bonnefond Tonalitic plug
and
521.1
531.4
10.3
4.79
5.06
South Shear
incl.
522.7
524.0
1.3
0.6
20.1
South Shear
and incl.
528.0
529.2
1.2
0.56
10.45
South Shear
17315-21-161W1
408.4
412.0
3.6
2.2
3.43
Bonnefond Tonalitic plug
and
443.2
446.2
3.0
1.83
8.95
Bonnefond Tonalitic plug
and
489.5
491.5
2.0
1.22
8.69
Bonnefond Tonalitic plug
and
545.4
551.0
5.6
2.62
4.33
South Shear
17315-21-161W2
269.9
270.9
1.0
0.56
26.4
Bonnefond Tonalitic plug
and
284.0
286.0
2.0
1.13
66.16
Bonnefond Tonalitic plug
and
303.5
306.2
2.7
1.52
3.87
Bonnefond Tonalitic plug
and
493.5
495.0
1.5
0.84
7.91
Bonnefond Tonalitic plug
and
532.0
534.0
2.0
1.11
6.26
Bonnefond Tonalitic plug
and
554.5
556.0
1.5
0.84
7.78
Bonnefond Tonalitic plug
and
567.7
571.0
3.3
1.83
4.1
Bonnefond Tonalitic plug
and
596.9
598.9
2.0
1.1
8.85
Bonnefond Tonalitic plug
and
808.4
809.9
1.5
0.81
16.32
Bonnefond Tonalitic plug
and
853.5
858.4
4.9
2.6
10.02
Bonnefond Tonalitic plug
and
1161.6
1163.3
1.7
0.88
10.77
Bonnefond Tonalitic plug
17315-21-162
51.0
55.0
4.0
2.23
3.47
Bonnefond Tonalitic plug
and
76.0
78.0
2.0
0.81
5.81
South Shear
and
92.3
95.4
3.1
1.25
5.23
South Shear
and
105.0
107.0
2.0
1.11
7.99
Bonnefond Tonalitic plug
and
130.3
131.9
1.6
0.88
24.39
Bonnefond Tonalitic plug
and
155.9
164.0
8.1
3.26
3.53
South Shear
 
 
 
 
 
and
180.2
184.9
4.7
2.59
3.65
Bonnefond Tonalitic plug
and
218.5
240.3
21.8
12.06
4.18
Bonnefond Tonalitic plug
incl.
218.5
219.7
1.2
0.66
21.08
Bonnefond Tonalitic plug
and incl.
236.5
238.5
2.0
1.11
10.02
Bonnefond Tonalitic plug
and
265.7
267.0
1.3
0.72
10.17
Bonnefond Tonalitic plug
and
425.1
428.6
3.5
1.91
3.54
Bonnefond Tonalitic plug
 and
687.3
706.0
18.7
7.11
3.54
Gabbro Dyke
incl.
699.4
701.2
1.8
0.97
18.59
Bonnefond Tonalitic plug
and
781.0
785.5
4.5
2.37
3.44
Bonnefond Tonalitic plug
17315-21-164
709.9
711.4
1.5
1.46
7.76
South Shear
17315-21-166
683.1
688.8
5.7
5.66
2.91
Bonnefond Tonalitic plug
 and
752.5
756.0
3.5
3.48
5.6
Bonnefond Tonalitic plug
and
798.8
803.2
4.4
4.25
2.89
South Shear
17315-21-167
193.4
195.6
2.2
1.2
19.15
Gabbro Dyke
17315-21-167A
132.1
134.1
2.0
0.86
7.54
Gabbro Dyke
and
988.6
1001.5
12.9
5.07
5.12
Gabbro Dyke
incl.
993.9
995.9
2.0
0.79
20.25
Gabbro Dyke
17315-20-133 to 17315-20-147; 17315-20-149W1; 17315-20-150 to 17315-20-154; 17315-21-105AW2;17315-21-163; 17315-21-165
Below reporting threshold
 
 
 
 
 
 
 
Table 3: Summary of 2021 drillhole assay results from the River Target Area of the Bourlamaque property. Intercepts are only reported for those intervals above a 10 gram x metre cutoff. Drillhole collar locations, collar orientations, and total lengths are listed in Appendix 2.
 
Drillhole
From (m)
 
To (m)
 
Interval
True thickness
Au (g/t)
Zone
17421-20-072
307.5
308.7
1.2
1.2
10.5
Shear B
17421-20-077
193.0
193.5
0.5
0.1
26.4
 
17421-20-078
202.0
218.9
16.9
13.5
3.6
Shear B
incl
218.3
218.9
0.6
0.5
67.23
Shear B
17421-21-079
509.5
510.0
0.5
0.1
91.03
 
17421-21-080
221.5
231.0
9.5
9.4
3.68
Shear B
incl
226.5
227.0
0.5
0.3
46.83
Shear B
17421-21-082
198.5
218.1
19.6
18.9
9.81
Shear B
incl
198.5
199.6
1.1
1.1
15.69
Shear B
and incl
207.8
209.3
1.5
1.5
57.62
Shear B
and incl
211.5
213.0
1.5
1.5
22.64
Shear B
and incl
214.5
215.3
0.8
0.8
38.53
Shear B
17421-21-086
216.0
226.1
10.1
10.0
3.05
Shear B
incl
218.1
218.8
0.7
0.7
28.33
Shear B
17421-20-071; 17421-20-073 to 17421-20-076; 17421-21-081; 17421-21-083 to 17421-21-085
Below reporting threshold
 
 
 
 
 
 
 
Table 4: Summary of 2021 drillhole assay results from the Kokarpinar vein system at the Efemcukuru Mine. Intercepts are only reported for those intervals above a 10 gram x metre cutoff. Drillhole collar locations, collar orientations, and total lengths are listed in Appendix 2.
 
Drillhole
From (m)
To (m)
Interval (m)
True thickness (m)
Au (g/t)
Ag (g/t)
Resource Expansion
Kokarpinar Northwest Splay
KV-789
62.25
63.85
1.6
-
18.26
25.88
KV-792
66.1
68.2
2.1
-
8.03
6.76
KV-790
Below reporting threshold
Resource Conversion
Kokarpinar Middle Vein
KPR-032
344.35
358.5
14.15
11.87
7.37
23.06
KPR-033
345.65
347.65
2
1.93
7.58
176.75
KPR-034
194.1
199.1
5
4.26
17.22
54.78
KPR-035
107.45
108.7
1.25
1.12
11.68
33.0
KPR-040
181.55
182.5
0.95
0.88
16.15
51.84
KPR-041
240
250.7
10.7
7.36
3.79
24.92
KPR-036 to KPR-039; KPR-042 to KPR-044
Below reporting threshold
Kokarpinar Middle Splay
KPR-046
320.6
324.9
4.3
4.2
18.6
13.63
KPR-047
223.05
225.95
2.9
2.45
16.85
28.57
KPR-047
236.4
238.45
2.05
1.8
5.78
6.68
KPR-048
213.15
219.5
6.35
5.33
3.95
12.04
KPR-050
330.3
332.2
1.9
1.73
11.48
16.16
KPR-051
226.4
235
8.6
6.27
8.26
28.83
KPR-056
238.7
240.1
1.4
1.15
8.71
10.0
KPR-057
279.8
281.4
1.6
1.59
9.39
21.0
KPR-059
245
246.7
1.7
1.01
15.31
14.35
KPR-060
344.2
346.1
1.9
1.79
11.44
30.47
KPR-063
332.5
339.4
6.9
6.23
2.52
7.57
KPR-068
265.15
266.3
1.15
0.93
10.84
28.04
KPR-053 to KPR-054; KPR-062; KPR-064
Below reporting threshold
Kokarpinar South Vein
KPR-045
263.15
271.55
8.4
4.87
35.03
16.13
KPR-049
261.3
268.9
7.6
7.22
4.89
9.57
KPR-058
265.5
266.95
1.45
1.45
17.12
23.55
KPR-065
288.3
291.75
3.45
3.05
6.64
9.07
KPR-066
317.05
323.75
6.7
4.2
6.02
6.74
KPR-052; KPR-055; KPR-061; KPR-067
Below reporting threshold
 
 
 
 
 
 
 
 
 
Appendix 2: Collar locations and orientations and total lengths for drillholes listed in this news release.
 
HOLE ID 
EASTING
NORTHING
ELEVATION 
AZIMUTH 
DIP 
LENGTH (metres) 
Underground/ 
Surface 
Lamaque Ormaque Deposit 
LS-20-034M01
295868
5329940
323.9
355
-63
1009.9
Surface
LS-20-035
295654
5330616
317.68
182
-53
594.0
Surface
LS-20-036
295654
5330616
317.77
180
-60
152.7
Surface
LS-20-036A
295654
5330616
317.77
180
-64
728.5
Surface
LS-20-037
295652
5330111
324.69
358
-62
692.9
Surface
LS-20-038
295816
5330635
316.42
180
-75
749.0
Surface
LS-20-039A
295653
5330111
324.71
2
-60
189.3
Surface
LS-20-039B
295652
5330111
324.39
357
-58
268.5
Surface
LS-20-039BM01
295650
5330110
324.2
357
-58
721.8
Surface
LS-21-040A
295612
5330104
324
355
-79
342.2
Surface
LS-21-041
295612
5330104
324
2
-71
404.1
Surface
LS-21-042A
295642
5330069
324
358
-65
299.9
Surface
LS-21-043
295577
5329877
324
357
-59
619.3
Surface
LS-21-044A
295642
5330069
324
357
-62
405.0
Surface
LS-21-045
295655
5329917
324
354
-58
955.0
Surface
LS-21-046
295680
5330076
324
358
-57
418.2
Surface
LS-21-047
295680
5330076
324
354
-69
299.9
Surface
LS-21-048
295723
5329921
323
352
-53
601.5
Surface
 
 
 
 
 
LS-21-050
295723
5329921
323
3
-56
600.9
Surface
LS-21-051
295723
5330010
324
355
-58
451.2
Surface
LS-21-052
295887
5330066
324
356
-60
618.9
Surface
LS-21-053
295725
5330066
324
19
-64
528.8
Surface
LS-21-054
295898
5329993
324
356
-62
847.5
Surface
LS-21-055
295771
5330070
324
357
-56
547.0
Surface
LS-21-056
295612
5330102
324
357
-70
498.8
Surface
LS-21-057
295819
5330195
324
356
-59
399.3
Surface
LS-21-058
295759
5330140
326
358
-60
522.6
Surface
LS-21-059
295686
5330186
325
0
-62
453.0
Surface
LS-21-061
295507
5330095
325
0
-58
500.35
Surface
Efemcukuru Kokarpinar 
KPR-032
498027
4239399
658
236
-58
372.6
Surface 
KPR-033
498007
4239422
657
234
-55
369.9
Surface 
KPR-034
497904
4239304
576
248
-72
225.2
Surface 
KPR-035
497834
4239270
547
241
-69
133.9
Surface 
KPR-036
497834
4239271
547
192
-72
134.7
Surface 
KPR-037
497903
4239304
576
254
-65
212.3
Surface 
KPR-038
497834
4239270
547
193
-59
121.7
Surface 
KPR-039
498007
4239422
657
236
-62
373.3
Surface 
KPR-040
497903
4239303
576
215
-65
209.3
Surface 
KPR-041
497950
4239296
581
263
-78
260
Surface 
KPR-042
497904
4239304
576
240
-59
192
Surface 
KPR-043
498008
4239422
657
228
-65
386.7
Surface 
 
 
 
 
 
KPR-044
497951
4239297
581
239
-75
243.5
Surface 
KPR-046
498625
4238959
623
212
-33
340.5
Surface 
KPR-047
498540
4238769
720
197
-68
254.4
Surface 
KPR-048
498540
4238769
720
193
-60
239.2
Surface 
KPR-050
498625
4238960
623
216
-36
345.9
Surface 
KPR-051
498540
4238769
720
186
-64
249.7
Surface 
KPR-053
498540
4238769
720
204
-53
233.4
Surface 
KPR-054
498626
4238960
623
207
-36
338.9
Surface 
KPR-056
498540
4238770
720
206
-73
278.5
Surface 
KPR-057
498625
4238961
623
217
-45
356.1
Surface 
KPR-059
498539
4238767
720
222
-71
279.8
Surface 
KPR-060
498625
4238961
623
223
-42
356.2
Surface 
KPR-062
498539
4238766
720
239
-70
272.6
Surface
KPR-063
498624
4238960
623
221
-30
352.8
Surface
KPR-064
498543
4238768
720
189
-75
287.5
Surface
KPR-068
498542
4238768
720
168
-72
287.9
Surface
KPR-045
498902
4238524
817
193
-54
285.5
Surface
KPR-049
498902
4238523
817
188
-45
283.7
Surface
KPR-052
498902
4238523
817
187
-37
282.2
Surface
KPR-055
498901
4238524
817
198
-37
282
Surface
KPR-058
498904
4238528
817
198
-51
286.8
Surface
KPR-061
498904
4238529
816
198
-62
298.5
Surface
KPR-065
498906
4238529
816
182
-58
299.8
Surface
 
 
 
 
 
KPR-066
498898
4238520
816
190
-77
337.5
Surface
KPR-067
498904
4238530
816
170
-69
336.2
Surface
KV-789
497312
4239903
447
230
-45
82.2
Surface
KV-790
497313
4239897
446
150
-45
170.1
Surface
KV-792
497312
4239897
446
185
-45
80
Surface
Bourlamaque Bonnefond
17315-20-121W1
315670
5331264
344
10
-70
753
Surface
17315-20-132
315523
5331554
343
137
-50
378
Surface
17315-20-148
315749
5331249
339
10
-68
741
Surface
17315-20-149W2
315705
5331256
340
27
-69
762
Surface
17315-20-155W1
315618
5331247
345
27
-69
834
Surface
17315-20-155W2
315618
5331247
345
27
-69
756
Surface
17315-21-128AW1
315618
5331247
345
10
-70
427
Surface
17315-21-161
315744
5331249
340
27
-69
735
Surface
17315-21-161W1
315748
5331249
345
27
-69
399
Surface
17315-21-161W2
315744
5331249
340
27
-70
1017
Surface
17315-21-162
315796
5331255
340
26
-68
1101
Surface
17315-21-164
315924
5331755
340
179
-78
1000
Surface
17315-21-166
315830
5331753
342
161
-80
987
Surface
17315-21-167
315514
5331208
340
45
-75
213
Surface
17315-21-167A
315517
5331209
340
45
-65
1117
Surface
Bourlamaque River
17421-20-072
299677
5334499
300
360
-60
501
Surface
17421-20-077
299627
5334445
300
360
-60
462
Surface
17421-20-078
299731.3
5334674.3
300
56
-59
275
Surface
17421-21-079
299879.3
5334624.7
300
5
-60
516
Surface
17421-21-080
299818.9
5334605.8
300
360
-52
306
Surface
17421-21-082
299818.9
5334605.8
300
350
-52
306
Surface
17421-21-086
299788.6
5334591.4
300
350
-60
405
Surface