EX-99.2 3 drilltables.htm EX. 99.2 UNDERGROUND INFILL DRILLING TABLES DATED JANUARY 12, 2006 TABLE 1

[drilltables001.jpg]


TABLE 1

NEW AFTON COPPER – GOLD PROJECT


RESULTS OF UNDERGROUND INFILL DRILLING - SECTIONS 12E and 28E

January 12, 2006


DDH

Azimuth*

Depth* (m)

Dip*

(deg.)

Interval

From (m)

To

(m)

Length (m)

True Thickness (m)*

Cu %

Au g/t

Ag g/t

Pd g/t

Cu Eq**

(%)

Section 12E

            

UA-39

155.0

510

-62.5

A

342.0

352.0

10.0

3.8

0.35

0.94

0.00

0.00

1.00

   

B

418.0

452.0

34.0

12.8

1.27

0.73

2.35

0.00

1.76

   

C

504.0

509.9

5.9

1.6

2.14

1.25

3.33

0.21

3.05

Section 28E

            

UA-48

140.0

319

-27.0

 

132.0

230.0

98.0

84.6

1.05

0.52

1.68

0.01

1.40

    

Including

196.0

230.0

34.0

30.3

1.26

0.82

1.88

0.02

1.81

    

And

202.0

228.0

26.0

23.2

1.46

1.01

2.18

0.02

2.14

              

UA-49

137.0

554

-60.0

A

204.0

210.0

6.0

3.0

1.95

1.39

2.57

0.00

2.87

    

B

262.0

284.0

22.0

11.0

1.57

1.57

1.90

0.00

2.60

    

C

340.0

420.0

80.0

34.0

1.31

1.30

1.97

0.14

2.21

    

D

526.0

552.0

26.0

12.0

1.53

1.76

2.20

0.18

2.74

              

*   Numbers rounded to nearest whole number  ** Copper Equivalent

Price assumptions used to calculate Copper Equivalent – Cu = $0.85/lb; Au = $375/oz; Ag = $5.25/oz; Pd = $200/oz




[drilltables002.jpg]


TABLE 2

NEW AFTON COPPER – GOLD PROJECT


RESULTS OF UNDERGROUND INFILL DRILLING - SECTION 32E

January 12, 2006


DDH

Azimuth*

Depth* (m)

Dip*

(deg.)

Interval

From (m)

To

(m)

Length (m)

True Thickness (m)*

Cu %

Au g/t

Ag g/t

Pd g/t

Cu Eq**

(%)

UA-44

130.0

393

-48.0

 

148.0

366.0

218.0

143.0

1.32

1.08

2.03

0.16

2.09

   

Including

148.0

308.0

160.0

104.0

1.57

1.26

2.45

0.10

2.44

   

And

148.0

296.0

148.0

96.0

1.65

1.32

2.60

0.10

2.56

             

UA-45

130.0

356

-34.5

 

124.0

286.0

162

126.0

1.44

1.07

2.41

0.04

2.17

    

Including

142.0

282.0

140.0

109.0

1.60

1.22

2.68

0.04

2.42

    

And

150.0

252.0

102.0

80.0

1.81

1.40

2.94

0.04

2.75

              

UA-46

130.0

271

-20.0

 

130.0

238.0

108.0

100.0

1.35

0.83

2.57

0.01

1.91

     

184.0

238.0

54.0

50.7

1.79

1.33

3.84

0.02

2.68

              

UA-47

130.0

488

-56.5

178.0

396.0

218.0

116.5

1.07

0.91

1.50

0.13

1.72

    

Including

178.0

360.0

182.0

97.5

1.20

1.01

1.69

0.13

1.91

    

And

178.0

328.0

150.0

81.0

1.29

1.07

1.81

0.13

2.04

    

And

178.0

274.0

96.0

52.0

1.52

1.23

2.07

0.03

2.34

    

And

340.0

360.0

20.0

10.5

1.17

1.07

1.63

0.15

1.92

    

And

386.0

396.0

10.0

5.5

1.10

1.08

1.50

0.26

1.90

              

*   Numbers rounded to nearest whole number  ** Copper Equivalent

Price assumptions used to calculate Copper Equivalent – Cu = $0.85/lb; Au = $375/oz; Ag = $5.25/oz; Pd = $200/oz

 



[drilltables003.jpg]


TABLE 3

NEW AFTON COPPER – GOLD PROJECT


RESULTS OF UNDERGROUND INFILL DRILLING - SECTION 60E

January 12, 2006


DDH

Azimuth*

Depth* (m)

Dip*

(deg.)

Interval

From (m)

To

(m)

Length (m)

True Thickness (m)*

Cu %

Au g/t

Ag g/t

Pd g/t

Cu Eq**

(%)

UA-40A

130.0

483

-54.0

 

286.0

470.0

184.0

105.0

0.77

1.32

2.52

0.20

1.70

    

Including

286.0

398.0

112.0

64.0

1.00

1.28

2.89

0.14

1.89

    

And

302.0

358.0

56.0

32.0

1.26

2.02

3.59

0.14

2.64

    

And

414.0

426.0

12.0

7.1

0.96

1.81

1.98

0.31

2.24

    

And

438.0

470.0

32

18.8

0.43

2.22

3.47

0.41

2.03

    

And

454.0

470.0

16.0

9.4

0.47

3.31

4.66

0.64

2.86

              

UA-41

130.0

359

-45.0

 

212.0

356.0

144.0

102.5

1.18

1.04

1.86

0.09

1.90

    

Including

260.0

302.0

42.0

29.7

1.59

2.15

1.45

0.12

3.03

    

And

318.0

338.0

20.0

14.1

1.09

1.52

4.74

0.18

2.17

              

UA-42

130.0

272

-29.0

 

166.0

240.0

74.0

64.7

0.99

0.70

1.66

0.13

1.50

    

Including

202.0

240.0

38.0

33.2

0.93

1.27

2.18

0.25

1.85

    

And

214.0

228.0

14.0

12.2

1.48

2.63

3.40

0.31

3.31

              

UA-43

130.0

231

-15.5

 

156.0

216.0

60.0

57.8

0.95

1.13

2.10

0.19

1.76

    

Including

186.0

216.0

30.0

28.9

1.12

1.55

1.83

0.19

2.20

    

And

200.0

216.0

16.0

15.4

1.47

2.25

2.53

0.24

3.02

              

*   Numbers rounded to nearest whole number  ** Copper Equivalent

Price assumptions used to calculate Copper Equivalent – Cu = $0.85/lb; Au = $375/oz; Ag = $5.25/oz; Pd = $200/oz