EX-2 3 drillresults.htm DRILLING RESULTS CC Filed by Filing Services Canada Inc. 403-717-3898

NEW GOLD INC.


TABLE 1

NEW AFTON COPPER – GOLD PROJECT


RESULTS OF UNDERGROUND EXPLORATION AND INFILL DRILLING - SECTIONS 10E and 36E

April 4, 2006



DDH

Azimuth*

Depth (m)

Dip*

(deg.)

Interval

From (m)

To

(m)

Length (m)

True Thickness (m)*

Cu %

Au g/t

Ag g/t

Pd g/t

Cu Eq**

(%)

Section 10E

            

UA-66

126

645.6

-64

 

624.0

645.6

21.6

Unknown1

2.27

2.05

4.76

0.10

3.67

             

Section 36E

            

UA-53

116

371.3

-33

A

124

242

118

95

1.82

1.32

2.94

0.06

2.71

    

Including

140

212

72

59

2.05

1.46

3.20

0.05

3.04

    

And

220

242

22

18

2.19

2.01

3.68

0.15

3.58

    

B

272

302

30

24

1.19

1.13

5.68

0.11

2.01

              

UA-54

120

520.6

-53

A

162

398

236

136

1.34

1.01

1.70

0.16

2.06

    

Including

222

320

98

57

1.95

1.32

2.25

0.16

2.87

    

B

500

514

14

8

0.53

0.90

1.09

0.19

1.18

              

*Numbers rounded to nearest whole number

 ** Copper Equivalent

Price assumptions used to calculate Copper Equivalent – Cu = $0.85/lb; Au = $375/oz; Ag = $5.25/oz; Pd = $200/oz

1 Insufficient data available to determine geometry to calculate true thickness












NEW GOLD INC.


TABLE 2

NEW AFTON COPPER – GOLD PROJECT


RESULTS OF UNDERGROUND INFILL DRILLING - SECTIONS 44E and 52E

April 4, 2006



DDH

Azimuth*

Depth (m)

Dip*

(deg.)

Interval

From (m)

To

(m)

Length (m)

True Thickness (m)*

Cu %

Au g/t

Ag g/t

Pd g/t

Cu Eq**

(%)

Section 44E

            

UA-50

138

355.1

-37

A

156

196

40

31

1.81

1.29

3.09

0.03

2.68

    

Including

174

196

22

17

2.39

1.94

4.04

0.05

3.69

    

B

230

276

46

35

1.10

1.13

1.32

0.37

1.96

              

UA-51

140

509.0

-54

A

284

326

42

24

2.07

1.75

2.89

0.20

3.29

Section 52E

            

UA-56

120

308.8

-25

A

152

184

32

28

1.71

1.38

3.68

0.04

2.65

    

B

206

250

44

38

0.57

0.63

1.05

0.20

1.05

              

UA-57

120

353.0

-45

A

254

276

22

14

1.28

1.16

1.98

0.10

2.08

    

B

316

328

12

8

1.16

1.11

3.60

0.13

1.95

              

*Numbers rounded to nearest whole number

 ** Copper Equivalent

Price assumptions used to calculate Copper Equivalent – Cu = $0.85/lb; Au = $375/oz; Ag = $5.25/oz; Pd = $200/oz













NEW GOLD INC.


TABLE 3

NEW AFTON COPPER – GOLD PROJECT


RESULTS OF UNDERGROUND INFILL DRILLING - SECTION 80E

April 4, 2006



DDH

Azimuth*

Depth (m)

Dip*

(deg.)

Interval

From (m)

To

(m)

Length (m)

True Thickness (m)*

Cu %

Au g/t

Ag g/t

Pd g/t

Cu Eq**

(%)

Section 80E

            

UA-60

317

340.8

-26

A

150

216

66

56

1.49

0.45

2.84

0.05

1.82

    

Including

164

198

34

29

2.34

0.52

4.08

0.01

2.72

              

UA-61

317

441.4

-38

A

108

130

22

17

0.53

0.69

3.02

0.25

1.09

    

B

170

254

84

63

1.84

0.48

3.95

0.01

2.19

             

UA-62

317

360.3

-48

A

214

308

94

56

1.96

0.34

4.47

0.01

2.22

    

Including

224

244

20

13

3.05

0.82

8.67

0.03

3.67

    

B

318

358

40

24

2.59

1.13

10.06

0.08

3.44

   

Contained Within

214

358

144

86

2.02

0.54

5.72

0.03

2.43

              

*Numbers rounded to nearest whole number

 ** Copper Equivalent

Price assumptions used to calculate Copper Equivalent – Cu = $0.85/lb; Au = $375/oz; Ag = $5.25/oz; Pd = $200/oz