Highlights:
At the Marigold mine, we conducted Mineral Resource development drilling in the Mackay North area and the Valmy property with the objective to convert Mineral Resources to Mineral Reserves. Highlighted results include:
At HideOut, drillhole MR6270 intersected 1.96 g/t gold over 93.0 meters from 144.8 meters below surface;
At Valmy, drillhole MR6283 intersected 1.65 g/t gold over 59.4 meters from 91.4 meters below surface; and
At Terry Zone North, drillhole MR6185 intersected 1.56 g/t gold over 39.6 meters from 176.8 meters below surface.
Completed the Assay Program at the Marigold mine with results consistent with our 2015 results that contribute to a longer dated production and cost outlook for the Marigold mine later in the third quarter.
The Seabee Gold Operation reports positive exploration drill results from an area outside existing Mineral Resources down plunge from the Santoy 8A production area. Highlighted results include:
At Santoy 8A, drillhole SUG-16-912 intersected 39.06 g/t gold over 2.7 meters of true width;
At Santoy 8A, drillhole SUG-16-908 intersected 15.38 g/t gold over 6.0 meters of true width; and
At Santoy 9A, drillhole JOY-16-701 intersected 52.80 g/t gold over 2.1 meters of true width, as previously reported.

Paul Benson, President and CEO said, “We are pleased with the positive exploration results at the Mackay North area at Marigold, where we continue to encounter mineralization with higher gold grades outside current Mineral Reserves. In addition, we are focused on driving exploration efforts at the Valmy property to add to and convert Mineral Resources. We also look forward to providing a revised outlook for the Marigold mine in the third quarter, based on our Assay Program, operational improvements and exploration results.”

“At the Seabee Gold Operation, exploration results in a new mineralized area demonstrate continuity and potential to add to our Mineral Resources at the Santoy mine complex. The ultimate goal of our work at both operations is mine life extension and improved operating margins.”

Page 1




Marigold mine, U.S.

Exploration activities in the second quarter of 2016 at the Marigold mine focused on drilling at each of the HideOut, Terry Zone North (“TZN”) and 8 South pit extension (“8SX”) areas and on the adjacent Valmy property. The objective of these drilling activities is to convert Mineral Resources to Mineral Reserves and to expand Mineral Resources, in certain instances. Two track–mounted rigs completed 15,575 meters of reverse circulation drilling in 73 drillholes on our targets, where previous results show potential for Mineral Resource additions. At TZN, mineralization is open to the south, while the 500-meter long corridor between the HideOut and the 8SX areas has only two drillholes and remains open to the north and south, respectively.

Figure 1 shows a plan map of drilling activities during the second quarter. Drill results demonstrate the presence and continuity of higher-grade structures with additional drillhole results pending. The best result from this period’s drilling program was drillhole MR6270, which intersected 1.96 g/t gold over 93.0 meters, including 5.01 g/t over 32.0 meters at HideOut. At TZN, the best result was drillhole MR6185, which intersected 1.56 g/t over 39.6 meters, including 3.92 g/t over 13.7 meters. Table 1 lists all drill results for the second quarter of 2016, while Table 2 lists the collar coordinates and drillhole lengths.

Exploration results continue to illustrate the potential to expand the existing Mineral Resources estimate. Indicated Mineral Resources at HideOut and the 8 South areas totaled 350,000 ounces of gold as at December 31, 2015.

Valmy Property

Drilling at the Valmy property, including the Valmy and Mud pits, commenced in May 2016, with 3,275 meters of reverse circulation drilling in 17 drillholes completed during the second quarter. The most notable drill result is drillhole MR6283, which intersected 1.65 g/t gold over 59.4 meters from 91.4 meters below surface. The Valmy mineralization is open to the south, and in the second half of 2016 we expect to drill outside of the current pit areas, including the eastern extension of the Basalt pit mineralization.

Indicated Mineral Resources at the Basalt pit, on Marigold tenures, comprised 80,000 ounces of gold, while Inferred Mineral Resources at the Valmy property totaled 300,000 ounces of gold as at December 31, 2015, respectively.

Assay Program

During the second quarter 2016, we assayed 27,079 samples pursuant to our assay program (the “Assay Program”) initiated in 2015. This was completed during the quarter with a total of 52,600 samples assayed in 2016. Results of the Assay Program in 2016 are consistent with results achieved in 2015 and provide better spatial definition of the lower grade portions of the Mackay pit.

The results of the Mackay North area exploration activities and the Assay Program are being applied, where applicable, to the Marigold life of mine plan. Based on this work and considering other improvements to the operation, including the addition of three haul trucks, we expect to disclose longer dated production and cost outlook for the Marigold mine later in the third quarter of 2016.

Seabee Gold Operation, Canada

For 2016, the operation planned 65,000 meters of underground drilling and 18,000 meters of surface drilling to increase and convert Mineral Resources. During the second quarter, exploration activities have focused on the Santoy mine complex.


Page 2





Since March 2016, a total of 67 drillholes have been drilled to infill the Santoy Gap 9A, 9B and 9C mineralized quartz vein structures. During the first half of 2016, 29,775 meters were drilled underground at the Santoy mine complex for infill and exploration purposes. We drilled six holes in a new area down plunge from the Santoy 8A structure that returned gold grades above Mineral Resource cut-off grade, and intend to conduct further drilling in this area. Figure 2 shows the Santoy mine complex drill results relative to its Mineral Resources estimate as at December 31, 2015, projected onto a longitudinal section. Table 3 lists all drill results for the Santoy mine complex received in the second quarter of 2016.

At the Seabee mine, five holes of a planned seven-hole drill program were completed on the 15 Vein target, which is a mineralized structure offset along the 19 shear. At the Carr target, located near surface, four kilometers along strike to the north from the Santoy mine complex, we drilled approximately 2,500 meters in nine drillholes over a two-kilometer strike length. At the Herb West target, located 2,200 meters west-north-west of the Seabee mine, we drilled approximately 1,130 meters in four drillholes. Results from drillholes at these three targets revealed quartz-vein structures with gold-bearing mineralization and warrant follow-up drilling.

Next Steps

During the second half of 2016 at the Seabee Gold Operation, our focus will be on infill drilling at the Santoy Gap to convert Inferred Mineral Resources to Mineral Reserves. At surface, our drilling focus for the second half will be on exploring laterally and down plunge to extend mineralization at the Santoy mine complex.

All drilling and exploration results will be included in an updated estimate for the Seabee Gold Operation reported in our annual 2016 Mineral Reserves and Mineral Resources statement to be published in the first quarter of 2017.



Page 3



Figure 1. Drillhole location plan map for the 2016 exploration drill program at the Marigold mine, Nevada, U.S.












Page 4



Figure 2. Longitudinal section for the 2016 exploration drill program at Santoy mine complex, Seabee Gold Operation, Saskatchewan, Canada.


Page 5




Table 1. Drillhole results from the second quarter of the 2016 exploration drill program at the Marigold mine, Nevada, U.S.

Hole ID
From (meters)
To (meters)
Width (meters)
Gold Grade (g/tonne)
Area/Comment
MR6184
 
 
 
 
Hole Abandoned
MR6185
108.2
112.8
4.6
0.21
TZN
 
128.0
141.7
13.7
0.15
 
 
176.8
216.4
39.6
1.56
 
 
176.8
190.5
13.7
3.92
(including)
 
216.4
222.5
6.1
0.46
 
 
233.2
242.3
9.1
0.19
 
MR6217
0.0
89.9
89.9
0.12
Hideout
 
169.2
225.6
56.4
0.22
 
 
242.3
245.4
3.0
0.19
 
MR6220
0.0
94.5
94.5
0.13
8Sx Mineralized Stockpile
MR6222
0.0
64.0
64.0
0.10
8Sx Mineralized Stockpile
MR6223
0.0
103.6
103.6
0.10
8Sx Mineralized Stockpile
MR6225
0.0
76.2
76.2
0.08
HideOut
 
190.5
214.9
24.4
1.18
 
 
202.7
214.9
12.2
2.19
(including)
 
216.4
217.9
1.5
0.57
 
 
222.5
234.7
12.2
0.36
 
 
246.9
249.9
3.0
0.12
 
MR6226
0.0
99.1
99.1
0.15
HideOut
 
298.7
301.8
3.0
0.23
 
MR6227
0.0
109.7
109.7
0.12
8Sx Mineralized Stockpile
MR6228
134.1
163.1
29.0
0.26
TZN
 
189.0
210.3
21.3
1.75
 
 
198.1
210.3
12.2
2.69
(including)
 
210.3
228.6
18.3
0.19
 
MR6229
0.0
79.2
79.2
0.10
HideOut
 
150.9
201.2
50.3
1.27
 
 
182.9
195.1
12.2
2.72
(including)
MR6230
125.0
167.6
42.7
0.69
TZN
 
140.2
147.8
7.6
2.16
(including)
 
173.7
199.6
25.9
0.61
 
MR6231
97.5
163.1
65.5
0.35
TZN
 
121.9
126.5
4.6
2.21
(including)
 
176.8
184.4
7.6
0.41
 
 
184.4
199.6
15.2
0.16
 
MR6232
88.4
172.2
83.8
0.51
TZN
 
149.4
157.0
7.6
2.06
(including)
 
172.2
182.9
10.7
0.99
 
 
182.9
199.6
16.8
0.65
 
MR6233
0.0
73.2
73.2
0.15
HideOut

Page 6



Hole ID
From (meters)
To (meters)
Width (meters)
Gold Grade (g/tonne)
Area/Comment
 
73.2
86.9
13.7
0.13
 
 
106.7
112.8
6.1
0.19
 
MR6234
0.0
74.7
74.7
0.07
HideOut
 
74.7
86.9
12.2
0.28
 
 
102.1
105.2
3.0
0.14
 
 
121.9
126.5
4.6
0.64
 
MR6235
0.0
74.7
74.7
0.13
HideOut
 
93.0
94.5
1.5
0.13
 
MR6236
0.0
68.6
68.6
0.10
HideOut
 
80.8
96.0
15.2
0.48
 
MR6237
44.2
47.2
3.0
0.13
TZN
 
74.7
117.3
42.7
0.22
 
 
135.6
179.8
44.2
0.75
 
 
179.8
198.1
18.3
0.95
 
MR6238
88.4
100.6
12.2
0.25
TZN
 
121.9
128.0
6.1
0.27
 
 
138.7
167.6
29.0
0.38
 
 
155.4
158.5
3.0
1.87
(including)
 
176.8
185.9
9.1
0.50
 
MR6239
97.5
135.6
38.1
0.15
TZN
 
147.8
164.6
16.8
0.89
 
 
147.8
155.4
7.6
1.70
(including)
MR6240
67.1
70.1
3.0
0.19
TZN
 
106.7
149.4
42.7
0.85
 
 
112.8
117.3
4.6
3.99
(including)
 
224.0
233.2
9.1
0.25
 
MR6241
93.0
103.6
10.7
0.23
TZN
 
128.0
161.5
33.5
0.39
 
MR6242
106.7
109.7
3.0
0.13
TZN
MR6243
176.8
182.9
6.1
0.58
TZN
 
190.5
201.2
10.7
0.95
 
 
201.2
214.9
13.7
1.13
 
 
207.3
210.3
3.0
2.47
(including)
MR6244
0.0
73.2
73.2
0.09
HideOut
 
205.7
242.3
36.6
1.06
 
 
214.9
221.0
6.1
2.91
(including)
 
257.6
271.3
13.7
0.17
 
 
278.9
280.4
1.5
0.12
 
 
288.0
294.1
6.1
0.24
 
MR6245
68.6
71.6
3.0
0.19
TZN
 
82.3
83.8
1.5
0.29
 
 
128.0
129.5
1.5
0.21
 
 
146.3
161.5
15.2
0.24
 
 
192.0
207.3
15.2
1.47
 
 
198.1
202.7
4.6
3.54
(including)

Page 7



Hole ID
From (meters)
To (meters)
Width (meters)
Gold Grade (g/tonne)
Area/Comment
MR6246
51.8
68.6
16.8
0.21
TZN
 
97.5
99.1
1.5
0.14
 
 
111.3
152.4
41.1
0.44
 
 
169.2
179.8
10.7
0.36
 
MR6247
0.0
82.3
82.3
0.11
HideOut
 
192.0
242.3
50.3
0.21
 
MR6248
59.4
62.5
3.0
0.15
TZN
 
138.7
140.2
1.5
0.26
 
 
167.6
184.4
16.8
0.37
 
 
198.1
199.6
1.5
0.17
 
 
205.7
227.1
21.3
0.76
 
MR6249
80.8
82.3
1.5
0.36
TZN
 
89.9
91.4
1.5
0.38
 
 
99.1
100.6
1.5
0.12
 
 
134.1
135.6
1.5
0.12
 
 
153.9
173.7
19.8
0.63
 
 
207.3
211.8
4.6
0.94
 
 
211.8
217.9
6.1
0.47
 
MR6250
0.0
82.3
82.3
0.09
HideOut
 
135.6
157.0
21.3
0.23
 
 
176.8
178.3
1.5
0.12
 
MR6251
0.0
100.6
100.6
0.09
HideOut
 
169.2
239.3
70.1
1.10
 
 
178.3
214.9
36.6
1.91
(including)
 
245.4
246.9
1.5
0.98
 
 
257.6
260.6
3.0
0.29
 
MR6252
109.7
143.3
33.5
0.15
TZN
 
150.9
178.3
27.4
0.41
 
 
192.0
208.8
16.8
1.10
 
 
208.8
230.1
21.3
1.05
 
MR6253
100.6
138.7
38.1
0.52
TZN
 
103.6
106.7
3.0
3.87
(including)
 
170.7
175.3
4.6
0.18
 
 
266.7
291.1
24.4
0.58
 
MRA6254
21.3
27.4
6.1
0.11
TZN
 
128.0
135.6
7.6
0.21
 
 
259.1
307.8
48.8
1.09
 
MRA6255
45.7
53.3
7.6
0.59
8SX
 
182.9
217.9
35.1
1.09
 
 
187.5
196.6
9.1
3.44
(including)
 
272.8
285.0
12.2
0.12
 
MRA6256
0.0
9.1
9.1
0.37
8SX
 
178.3
240.8
62.5
0.39
 
 
208.8
216.4
7.6
1.40
(including)
 
249.9
256.0
6.1
0.16
 

Page 8



Hole ID
From (meters)
To (meters)
Width (meters)
Gold Grade (g/tonne)
Area/Comment
MRA6257
53.3
54.9
1.5
0.13
TZN
 
59.4
62.5
3.0
0.12
 
 
93.0
94.5
1.5
0.16
 
 
246.9
271.3
24.4
1.59
 
 
256.0
271.3
15.2
2.41
(including)
 
271.3
288.0
16.8
0.71
 
MRA6258
0.0
44.2
44.2
0.10
8SX
 
155.4
173.7
18.3
0.20
 
 
182.9
192.0
9.1
0.18
 
MRA6259
0.0
10.7
10.7
0.12
8SX
 
246.9
298.7
51.8
0.77
 
 
263.7
277.4
13.7
1.84
(including)
 
298.7
309.4
10.7
0.48
 
 
309.4
335.3
25.9
0.30
 
MRA6260
18.3
19.8
1.5
0.15
8SX
 
109.7
140.2
30.5
1.45
 
 
112.8
123.4
10.7
3.72
(including)
MRA6261
0.0
22.9
22.9
0.07
8SX
 
170.7
184.4
13.7
0.24
 
 
195.1
196.6
1.5
0.12
 
MRA6262
3.0
33.5
30.5
0.24
Mud
 
51.8
53.3
1.5
0.25
 
 
126.5
134.1
7.6
0.12
 
 
143.3
147.8
4.6
0.13
 
 
147.8
153.9
6.1
0.44
 
MRA6263
24.4
25.9
1.5
0.24
Mud
 
38.1
99.1
61.0
0.24
 
 
149.4
153.9
4.6
0.11
 
MRA6264
0.0
4.6
4.6
0.28
Mud
 
13.7
22.9
9.1
0.20
 
 
120.4
125.0
4.6
0.71
 
MRA6265
12.2
29.0
16.8
0.19
Mud
 
35.1
82.3
47.2
0.36
 
MRA6266
67.1
74.7
7.6
0.46
Mud
 
82.3
89.9
7.6
0.46
 
MRA6267
0.0
9.1
9.1
1.39
Mud
 
0.0
1.5
1.5
7.24
(including)
 
15.2
24.4
9.1
0.36
 
 
144.8
149.4
4.6
0.11
 
MRA6268
16.8
38.1
21.3
0.28
Mud
 
45.7
70.1
24.4
0.39
 
MRA6269
80.8
86.9
6.1
0.30
Mud
MR6270
0.0
83.8
83.8
0.11
HideOut
 
137.2
138.7
1.5
0.13
 
 
144.8
237.7
93.0
1.96
 

Page 9



Hole ID
From (meters)
To (meters)
Width (meters)
Gold Grade (g/tonne)
Area/Comment
 
167.6
199.6
32.0
5.01
(including)
MR6271
0.0
82.3
82.3
0.18
HideOut
 
131.1
134.1
3.0
0.15
 
 
141.7
173.7
32.0
0.34
 
MR6272
48.8
51.8
3.0
0.12
TZN
 
112.8
126.5
13.7
0.13
 
 
138.7
155.4
16.8
0.47
 
 
169.2
189.0
19.8
0.92
 
 
176.8
179.8
3.0
2.49
(including)
 
189.0
198.1
9.1
0.25
 
MR6273
103.6
112.8
9.1
0.27
TZN
 
123.4
131.1
7.6
0.44
 
 
138.7
143.3
4.6
0.16
 
 
164.6
182.9
18.3
0.29
 
MR6274
115.8
118.9
3.0
0.23
TZN
 
125.0
143.3
18.3
0.40
 
 
163.1
167.6
4.6
0.42
 
 
173.7
187.5
13.7
4.14
 
 
184.4
187.5
3.0
9.84
(including)
 
187.5
198.1
10.7
0.77
 
MR6275
146.3
161.5
15.2
0.22
Valmy
 
167.6
173.7
6.1
0.13
 
 
190.5
193.5
3.0
0.34
 
 
216.4
217.9
1.5
0.15
 
 
224.0
227.1
3.0
0.20
 
 
256.0
257.6
1.5
0.52
 
MR6276
59.4
62.5
3.0
0.11
Mud
 
80.8
83.8
3.0
0.14
 
 
152.4
153.9
1.5
0.18
 
 
158.5
170.7
12.2
0.11
 
MR6277
3.0
4.6
1.5
0.11
Mud
 
18.3
24.4
6.1
0.21
 
 
53.3
64.0
10.7
1.65
 
 
54.9
57.9
3.0
4.81
(including)
MR6278
12.2
32.0
19.8
1.36
Mud
 
18.3
24.4
6.1
3.43
(including)
MR6279
 
 
 
NSV
Mud
MRA6280
19.8
25.9
6.1
0.32
Mud
 
57.9
62.5
4.6
0.24
 
 
157.0
160.0
3.0
0.55
 
MRA6281
0.0
70.1
70.1
0.27
HideOut
MR6283
91.4
150.9
59.4
1.65
Valmy
 
106.7
120.4
13.7
3.22
 
 
141.7
147.8
6.1
3.12
 
 
160.0
164.6
4.6
0.56
 

Page 10



Hole ID
From (meters)
To (meters)
Width (meters)
Gold Grade (g/tonne)
Area/Comment
 
196.6
208.8
12.2
0.16
 
 
275.8
278.9
3.0
0.15
 
 
285.0
289.6
4.6
0.12
 
MR6284
22.9
25.9
3.0
0.11
Valmy
 
57.9
62.5
4.6
0.37
 
 
112.8
121.9
9.1
0.12
 
 
163.1
205.7
42.7
0.20
 
 
283.5
286.5
3.0
0.15
 
 
371.9
373.4
1.5
0.34
 
 
382.5
385.6
3.0
0.20
 
MR6285
70.1
71.6
1.5
0.11
Valmy
 
79.2
80.8
1.5
0.13
 
 
112.8
115.8
3.0
0.12
 
 
163.1
169.2
6.1
0.14
 
 
195.1
205.7
10.7
0.37
 
MRA6292
0.0
74.7
74.7
0.06
HideOut
 
121.9
161.5
39.6
0.86
 
 
169.2
184.4
15.2
0.19
 
 
198.1
201.2
3.0
0.45
 
 
230.1
240.8
10.7
0.11
 
MRA6293
0.0
68.6
68.6
0.11
HideOut
 
102.1
103.6
1.5
0.10
 
MRA6293B
0.0
76.2
76.2
0.08
HideOut
 
102.1
129.5
27.4
1.11
 
MRA6294
0.0
70.1
70.1
0.09
HideOut
 
97.5
99.1
1.5
0.11
 
 
108.2
161.5
53.3
0.73
 
 
239.3
249.9
10.7
0.21
 
MRA6295
0.0
61.0
61.0
0.07
HideOut
 
61.0
91.4
30.5
0.46
 
MRA6297
0.0
68.6
68.6
0.13
HideOut
 
96.0
103.6
7.6
0.52
 
MRA6298
0.0
54.9
54.9
0.14
HideOut

Notes: Width in meters represents downhole intersected length, which may or may not be a true thickness of the mineralization. NSV means “no significant values”.












Page 11




Table 2. Drillhole collars from the second quarter of the 2016 exploration drill program at the Marigold mine, Nevada, U.S.

HOLE ID
UTM-N (Nad27 Zone11)
UTM-E (Nad27 Zone11)
Elevation (masl)
Azimuth (deg.)
Dip (deg.)
Length (meters)
Area
MR6184
4510440
485358
1496
90
-90
123
TZN
MR6185
4510291
485204
1501
247
-89
245
TZN
MR6217
4508969
485809
1605
283
-89
276
HideOut
MR6220
4510009
486121
1501
0
-90
94
8SX
MR6222
4509948
486133
1500
0
-90
64
8SX
MR6223
4509801
486292
1498
90
-90
140
8SX
MR6225
4509152
485835
1593
200
-90
276
HideOut
MR6226
4509463
485880
1607
54
-90
306
HideOut
MR6227
4509364
485910
1608
0
-90
110
8SX
MR6228
4510383
485291
1498
18
-90
230
TZN
MR6229
4508918
485850
1605
233
-90
245
HideOut
MR6230
4510472
485321
1496
338
-89
200
TZN
MR6231
4510501
485355
1494
72
-89
200
TZN
MR6232
4510533
485386
1493
113
-90
200
TZN
MR6233
4508809
485939
1589
75
-89
154
HideOut
MR6234
4508770
486016
1597
16
-89
245
HideOut
MR6235
4508773
485953
1590
302
-89
245
HideOut
MR6236
4508763
485980
1590
158
-90
245
HideOut
MR6237
4510509
485416
1494
103
-90
200
TZN
MR6238
4510447
485418
1495
226
-90
203
TZN
MR6239
4510389
485408
1496
202
-89
200
TZN
MR6240
4510440
485479
1494
66
-89
239
TZN
MR6241
4510412
485452
1495
34
-90
200
TZN
MR6242
4510354
485449
1496
4
-89
215
TZN
MR6243
4510471
485573
1492
291
-89
215
TZN
MR6244
4509104
485812
1593
115
-90
294
HideOut
MR6245
4510228
485326
1501
90
-90
245
TZN
MR6246
4510198
485385
1500
100
-89
230
TZN
MR6247
4508949
485784
1605
319
-90
270
HideOut
MR6248
4510163
485385
1502
44
-89
245
TZN
MR6249
4510189
485329
1502
314
-90
245
TZN
MR6250
4508919
485871
1605
351
-89
215
HideOut
MR6251
4508980
485849
1604
213
-90
261
HideOut
MR6252
4510503
485302
1495
154
-90
230
TZN
MR6253
4510048
485344
1504
299
-90
291
TZN
MRA6254
4510048
485345
1504
89
-63
315
TZN
MRA6255
4509705
486091
1524
269
-75
325
8SX
MRA6256
4509620
486072
1523
268
-70
337
8SX
MRA6257
4510084
485367
1503
89
-58
288
TZN
MRA6258
4509790
486214
1500
267
-59
245
8SX

Page 12



HOLE ID
UTM-N (Nad27 Zone11)
UTM-E (Nad27 Zone11)
Elevation (masl)
Azimuth (deg.)
Dip (deg.)
Length (meters)
Area
MRA6259
4509650
486041
1523
271
-59
337
8SX
MRA6260
4509687
486289
1500
268
-73
169
8SX
MRA6261
4509675
486130
1525
90
-59
215
8SX
MRA6262
4506390
486776
1640
265
-54
154
Mud Pit
MRA6263
4506388
486839
1640
270
-56
154
Mud Pit
MRA6264
4506419
486738
1640
269
-57
154
Mud Pit
MRA6265
4506421
486812
1640
270
-55
123
Mud Pit
MRA6266
4506418
486857
1639
271
-64
154
Mud Pit
MRA6267
4506450
486743
1640
271
-64
154
Mud Pit
MRA6268
4506450
486808
1639
269
-69
215
Mud Pit
MRA6269
4506450
486856
1639
271
-69
123
Mud Pit
MR6270
4508889
485832
1605
306
-89
245
HideOut
MR6271
4508889
485874
1605
249
-90
230
HideOut
MR6272
4510259
485343
1500
51
-89
215
TZN
MR6273
4510260
485220
1501
194
-89
215
TZN
MR6274
4510382
485338
1497
359
-89
215
TZN
MR6275
4504499
487145
1863
318
-90
283
Valmy
MR6276
4506431
486451
1656
156
-90
215
Mud Pit
MR6277
4506480
486797
1639
270
-90
154
Mud Pit
MR6278
4506481
486759
1640
41
-89
163
Mud Pit
MR6279
4506480
486833
1639
98
-89
105
Mud Pit
MRA6280
4506389
486807
1641
267
-54
197
Mud Pit
MR6281
4508978
485851
1604
0
-90
70
HideOut
MR6283
4504493
487111
1864
132
-89
290
Valmy
MR6284
4504468
487182
1871
31
-90
398
Valmy
MR6285
4504466
487210
1872
235
-90
239
Valmy
MRA6292
4508805
485825
1578
348
-80
245
HideOut
MRA6293
4508804
485856
1581
180
-80
123
HideOut
MRA6293B
4508806
485855
1581
345
-80
142
HideOut
MRA6294
4508807
485854
1581
344
-80
261
HideOut
MRA6295
4508788
485833
1578
179
-80
123
HideOut
MRA6297
4508804
485885
1584
343
-80
233
HideOut
MRA6298
4508794
485883
1583
178
-79
154
HideOut

Notes: This table reports all the drillholes completed during the second quarter of 2016. The numerical gaps in the drillhole sequence result from drillholes reported previously or drillholes expected to be drilled in the third quarter of 2016.












Page 13




Table 3. Drillhole results from the second quarter 2016 exploration drill program at the Seabee Gold Operation, Saskatchewan, Canada.

Hole ID
From (meters)
To (meters)
Mine E (midpoint)
Mine N (midpoint)
Elevation (midpoint)
Gold (g/t)*
True Width (meters)
Zone
SUG-16-012
129.3
130.1
3955
4930
-358
0.06
0.8
9A
SUG-16-013
159.0
162.4
3956
4920
-391
0.05
3.2
9A
SUG-16-014
152.6
166.9
3917
4974
-423
1.65
11.3
9A
SUG-16-015
131.9
133.3
3931
4948
-383
0.10
1.3
9A
SUG-16-016
152.9
157.0
3922
4975
-408
10.83
3.4
9A
SUG-16-017
145.3
147.2
3919
4960
-406
0.10
1.6
9A
SUG-16-018
114.6
116.0
3891
4954
-372
0.10
1.3
9C
SUG-16-018
134.4
138.0
3890
4944
-390
5.65
3.3
9A
SUG-16-019
127.8
130.4
3896
4935
-375
22.88
2.5
9A
SUG-16-020
120.3
125.5
3887
4965
-384
2.40
4.4
9C
SUG-16-020
140.8
147.0
3886
4958
-403
2.19
5.3
9B
SUG-16-020
152.8
156.5
3885
4954
-413
0.50
3.2
9A
SUG-16-021
136.3
142.5
3872
4975
-402
21.06
4.7
9C
SUG-16-021
154.3
160.6
3869
4971
-419
28.64
4.9
9B
SUG-16-021
166.2
176.8
3867
4968
-433
1.25
8.2
9A
SUG-16-022
165.3
175.0
3880
4989
-436
0.90
6.9
9C
SUG-16-023
159.4
167.3
3898
4975
-428
16.17
6.3
9C
SUG-16-023
172.7
175.8
3899
4973
-438
2.54
2.5
9A
SUG-16-024
135.7
136.2
3916
4934
-384
0.23
0.5
9A
SUG-16-025
130.3
132.0
3927
4924
-369
0.10
1.7
9A
SUG-16-026
131.6
132.0
3943
4913
-355
0.01
0.4
9A
SUG-16-027
131.2
138.1
3980
4933
-356
3.47
6.0
9A
SUG-16-028
153.8
159.4
3933
4973
-417
2.13
4.3
9C
SUG-16-028
165.9
167.9
3935
4970
-427
0.58
1.6
9A
SUG-16-029
151.6
156.5
4004
4945
-374
3.70
3.8
9A
SUG-16-030
165.0
168.7
3954
4982
-425
1.81
2.8
9A
SUG-16-031
193.7
195.0
4015
4987
-424
7.67
0.9
9A
SUG-16-032
246.2
246.8
4068
4998
-453
0.01
0.4
9A
SUG-16-033
270.0
277.1
4021
5210
-409
3.03
1.7
HWZ
SUG-16-300
181.1
181.9
4097
4977
-381
0.07
0.4
9A
SUG-16-301
238.8
239.2
4038
4985
-406
0.01
0.2
9A
SUG-16-303
219.0
224.5
4029
4966
-372
1.78
1.9
9A
SUG-16-304
189.3
191.9
4066
4948
-366
0.02
1.2
9A
SUG-16-305
168.7
169.1
4074
4929
-335
0.01
0.2
9A
SUG-16-306
199.5
203.0
4251
4796
-127
5.08
1.4
9A
SUG-16-307
138.9
150.0
4266
4848
-159
20.14
4.0
9A
SUG-16-308
153.0
161.2
4285
4848
-153
27.28
2.7
9A
SUG-16-309
50.4
51.8
3767
4819
-202
0.27
1.1
9C
SUG-16-310
13.7
15.0
3793
4800
-221
0.10
0.9
9A
SUG-16-310
41.2
41.7
3773
4817
-215
19.13
0.4
9B
SUG-16-310
57.1
61.4
3760
4829
-210
1.92
3.0
9C
SUG-16-311
15.1
16.8
3791
4802
-224
6.28
1.0
9A
SUG-16-311
70.2
72.3
3752
4841
-225
0.10
1.2
9C
SUG-16-312
15.5
16.0
3793
4799
-214
0.01
0.4
9A

Page 14



Hole ID
From (meters)
To (meters)
Mine E (midpoint)
Mine N (midpoint)
Elevation (midpoint)
Gold (g/t)*
True Width (meters)
Zone
SUG-16-312
45.0
46.5
3776
4816
-196
0.57
1.3
9C
SUG-16-313
14.5
15.0
3793
4802
-223
9.97
0.3
9A
SUG-16-313
56.5
60.1
3765
4835
-218
0.26
2.6
9C
SUG-16-314
7.7
10.8
3796
4797
-222
0.29
1.9
9A
SUG-16-314
48.5
51.4
3763
4817
-210
0.04
1.8
9C
SUG-16-315
6.8
7.4
3799
4797
-221
0.87
0.5
9A
SUG-16-315
40.3
42.0
3777
4818
-205
4.38
1.4
9C
SUG-16-316
43.1
44.4
3783
4817
-192
0.01
1.2
9C
SUG-16-317
13.0
15.2
3795
4804
-225
8.88
1.4
9A
SUG-16-317
50.0
55.8
3771
4835
-225
8.83
3.9
9C
SUG-16-318
10.4
11.9
3800
4803
-221
2.77
1.4
9A
SUG-16-318
37.6
39.5
3790
4827
-212
23.53
1.7
9C
SUG-16-319
13.8
16.5
3800
4808
-225
0.94
2.1
9A
SUG-16-319
50.5
52.5
3790
4843
-224
0.11
1.6
9C
SUG-16-320
10.9
12.9
3803
4805
-222
1.39
1.8
9A
SUG-16-320
40.6
41.7
3797
4833
-215
0.43
1.0
9C
SUG-16-321
8.5
10.2
3804
4800
-217
1.56
1.7
9A
SUG-16-321
34.8
38.0
3799
4819
-198
8.48
3.2
9C
SUG-16-322
9.4
11.0
3806
4803
-219
5.07
1.6
9A
SUG-16-322
37.8
40.3
3807
4828
-206
1.38
2.5
9C
SUG-16-323
36.9
39.7
3810
4822
-201
2.76
2.8
9C
SUG-16-324
9.7
12.5
3808
4804
-222
5.55
2.6
9A
SUG-16-324
35.7
36.4
3812
4827
-213
0.50
0.7
9B
SUG-16-324
41.5
42.1
3812
4832
-211
0.73
0.6
9C
SUG-16-325
18.0
19.0
3812
4810
-221
1.40
0.9
9A
SUG-16-325
28.7
34.5
3816
4822
-217
2.32
5.0
9B
SUG-16-325
46.0
48.6
3821
4836
-213
3.95
2.2
9C
SUG-16-326
17.2
21.0
3816
4807
-215
1.00
3.2
9A
SUG-16-326
30.5
35.5
3823
4816
-208
2.01
4.2
9B
SUG-16-326
46.1
50.3
3831
4827
-200
5.08
3.5
9C
SUG-16-327
14.0
17.1
3816
4801
-215
26.84
2.5
9A
SUG-16-327
50.4
52.4
3834
4821
-191
2.90
1.6
9C
SUG-16-328
10.2
12.6
3811
4802
-219
9.96
2.3
9A
SUG-16-328
40.3
43.2
3820
4826
-202
5.08
2.7
9C
SUG-16-329
12.5
15.7
3814
4801
-216
0.93
2.8
9A
SUG-16-329
46.1
47.7
3827
4821
-193
1.17
1.4
9C
SUG-16-901
400.8
406.5
4456
5240
-551
1.76
2.0
8a
SUG-16-902
475.3
494.0
4429
5296
-617
0.26
8.1
8a
SUG-16-903
441.3
454.5
4329
5254
-553
4.62
5.4
8a
SUG-16-904
580.2
583.2
4307
5340
-675
0.09
2.2
8a
SUG-16-905
678.0
683.7
4260
5411
-742
0.18
1.2
8a
SUG-16-906
313.5
318.7
4396
5132
-446
1.92
3.8
8a
SUG-16-907
378.9
388.3
4292
5158
-467
9.38
4.8
8a
SUG-16-908
331.4
340.8
4355
5139
-451
15.38
6.0
8a
SUG-16-909
424.3
431.8
4230
5125
-471
4.51
3.8
8a
SUG-16-910
373.3
381.1
4334
5168
-488
2.69
3.1
8a
SUG-16-911
387.4
389.9
4289
5156
-471
12.60
1.3
8a
SUG-16-912
387.2
392.4
4301
5167
-481
39.06
2.7
8a

Page 15



Hole ID
From (meters)
To (meters)
Mine E (midpoint)
Mine N (midpoint)
Elevation (midpoint)
Gold (g/t)*
True Width (meters)
Zone
SUG-16-913
392.5
399.0
4354
5202
-515
0.55
2.8
8a
SUG-16-914
421.9
426.1
4296
5204
-517
4.92
2.1
8a

* Gold values cut to 75 g/t. Intersection midpoints determined where mineralized structure intersected or projected. Width determined from average plane dipping 52 degrees towards 356 degrees azimuth in mine grid space.
Note: Drillholes SUG-16-034, SUG-16-302 and SUG-16-900 did not encounter zone intersections.

Sampling and Analytical Procedures

All drill samples in respect of the Marigold mine drilling program were sent for processing and analysis to the offices of American Assay Laboratories, Inc. (“AAL”) in Sparks, Nevada which is an ISO 17025 accredited laboratory independent from Silver Standard. Fire assay was completed on a 30 gram sample (AAL method code FA-PB30-ICP) with an Inductively Coupled Plasma (“ICP”) finish after a two acid digestion. Samples with assay results greater than 10 g/t were fire assayed on a 30 gram sample (AAL method code Grav Au30) with a gravimetric finish. We employ a rigorous Quality Assurance/Quality Control (“QA/QC”) program, which includes real-time assay quality monitoring through the regular insertion of blanks, duplicates, and certified reference material, as well as reviewing laboratory-provided QA/QC data.

All drill samples in respect of the Seabee Gold Operation drilling program were assayed by our onsite non-accredited assay laboratory, which is not independent from Silver Standard. Duplicate check assays were conducted at site as well as at TSL Laboratories in Saskatoon, which is independent from Silver Standard. Results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological and/or structural criteria. Two hundred gram samples were pulverized until greater than 80 percent passes through 150 mesh screen. Thirty gram pulp samples were then analyzed for gold by fire assay with gravimetric finish (0.01 grams per tonne detection limit).

Qualified Persons

The scientific and technical data contained in this news release relating to the Marigold mine has been reviewed and approved by James N. Carver, SME Registered Member and a Qualified Person under National Instrument 43-101 — Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Carver is our Chief Geologist at the Marigold mine. The scientific and technical data contained in this news release relating to the Seabee Gold Operation has been reviewed and approved by F. Carl Edmunds, P. Geo., a Qualified Person under NI 43-101. Mr. Edmunds is our Chief Geologist, Exploration.

About Silver Standard

Silver Standard is a Canadian-based precious metals producer with three wholly-owned and operated mines, including the Marigold gold mine in Nevada, U.S., the Seabee Gold Operation in Saskatchewan, Canada and the Pirquitas silver mine in Jujuy Province, Argentina. We also have two feasibility stage projects and an extensive portfolio of exploration properties throughout North and South America. We are committed to delivering safe production through relentless emphasis on Operational Excellence. We are also focused on growing production and Mineral Reserves through the exploration and acquisition of assets for accretive growth, while maintaining financial strength.

SOURCE: Silver Standard Resources Inc.






Page 16




For further information contact:
W. John DeCooman, Jr.
Vice President, Business Development and Strategy
Silver Standard Resources Inc.
Vancouver, BC 
N.A. toll-free: +1 (888) 338-0046
All others: +1 (604) 689-3846
E-Mail: invest@silverstandard.com


To receive Silver Standard’s news releases by e-mail, please register using the Silver Standard website at www.silverstandard.com.


Cautionary Note Regarding Forward-Looking Statements:
This news release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking statements”) concerning the anticipated developments in our operations in future periods, and other events or conditions that may occur or exist in the future. All statements, other than statements of historical fact, are forward-looking statements.

Generally, forward-looking statements can be identified by the use of words or phrases such as “expects,” “anticipates,” “plans,” “projects,” “estimates,” “assumes,” “intends,” “strategy,” “goals,” “objectives,” “potential,” or variations thereof, or stating that certain actions, events or results “may,” “could,” “would,” “might” or “will” be taken, occur or be achieved, or the negative of any of these terms or similar expressions. The forward-looking statements in this news release relate to, among other things: our ability to add Mineral Resources and Mineral Reserves at the Marigold mine and the Seabee Gold Operation; future production of gold, silver and other metals; estimated production rates for gold, silver and other metals produced by us; ongoing or future development plans and capital replacement, improvement or remediation programs; and our plans and expectations for our properties and operations.

These forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied, including, without limitation, the following: uncertainty of production, development plans and cost estimates for the Marigold mine and the Seabee Gold Operation; our ability to replace Mineral Reserves; our ability to complete and successfully integrate an announced acquisition; commodity price fluctuations; political or economic instability and unexpected regulatory changes; currency fluctuations; the possibility of future losses; general economic conditions; counterparty and market risks related to the sale of our concentrate and metals; uncertainty in the accuracy of Mineral Reserves and Mineral Resources estimates and in our ability to extract mineralization profitably; differences in U.S. and Canadian practices for reporting Mineral Reserves and Mineral Resources; lack of suitable infrastructure or damage to existing infrastructure; future development risks, including start-up delays and cost overruns; our ability to obtain adequate financing for further exploration and development programs and opportunities; uncertainty in acquiring additional commercially mineable mineral rights; delays in obtaining or failure to obtain governmental permits, or non-compliance with our permits; our ability to attract and retain qualified personnel and management; potential labour unrest; the impact of governmental regulations, including health, safety and environmental regulations, including increased costs and restrictions on operations due to compliance with such regulations; reclamation and closure requirements for our mineral properties; social and economic changes following closure of a mine; unpredictable risks and hazards related to the development and operation of a mine or mineral property that are beyond our control; indigenous peoples' title claims and rights to consultation and accommodation may affect our existing operations as well as development projects and future acquisitions; assessments by taxation authorities in multiple jurisdictions, including the recent reassessment by the Canada Revenue Agency; claims and legal proceedings, including adverse rulings in litigation against us and/or our directors or officers; compliance with anti-corruption laws and internal controls, and increased regulatory compliance costs; complying with emerging climate change regulations and the impact of climate change; uncertainties related to title to our mineral properties and the ability to obtain surface rights; the sufficiency of our insurance coverage; civil disobedience in the countries where our mineral properties are located; operational safety and security risks; actions required to be taken by us under human rights law; competition in the mining industry for mineral properties; shortage or poor quality of equipment or supplies; an event of default under our convertible notes may

Page 17



significantly reduce our liquidity and adversely affect our business; failure to meet covenants under our senior secured revolving credit facility; conflicts of interest that could arise from certain of our directors' involvement with other natural resource companies; information systems security threats; and those other various risks and uncertainties identified under the heading “Risk Factors” in our most recent Annual Information Form filed with the Canadian securities regulatory authorities and included in our most recent Annual Report on Form 40-F filed with the U.S. Securities and Exchange Commission (“SEC”).

This list is not exhaustive of the factors that may affect any of our forward-looking statements. Our forward-looking statements are based on what our management currently considers to be reasonable assumptions, beliefs, expectations and opinions based on the information currently available to it. Assumptions have been made regarding, among other things, our ability to carry on our exploration and development activities, our ability to meet our obligations under our property agreements, the timing and results of drilling programs, the discovery of Mineral Resources and Mineral Reserves on our mineral properties, the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction and operation of our projects, the price of the minerals we produce, the costs of operating and exploration expenditures, our ability to operate in a safe, efficient and effective manner, our ability to obtain financing as and when required and on reasonable terms and our ability to continue operating the Marigold mine and the Seabee Gold Operation. You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. We cannot assure you that actual events, performance or results will be consistent with these forward-looking statements, and management’s assumptions may prove to be incorrect. Our forward-looking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and we do not assume any obligation to update forward-looking statements if circumstances or management’s beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.

Cautionary Note to U.S. Investors
This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and the Mineral Resources estimates are made in accordance with NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ significantly from the requirements of the SEC set out in SEC Industry Guide 7. Consequently, Mineral Reserves and Mineral Resources information included in this news release is not comparable to similar information that would generally be disclosed by domestic U.S. reporting companies subject to the reporting and disclosure requirements of the SEC. Under SEC standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically produced or extracted at the time the reserve determination is made. In addition, the SEC’s disclosure standards normally do not permit the inclusion of information concerning “Measured Mineral Resources,” “Indicated Mineral Resources” or “Inferred Mineral Resources” or other descriptions of the amount of mineralization in mineral deposits that do not constitute “reserves” by U.S. standards in documents filed with the SEC. U.S. investors should understand that “Inferred Mineral Resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Moreover, the requirements of NI 43-101 for identification of “reserves” are also not the same as those of the SEC, and reserves reported by us in compliance with NI 43-101 may not qualify as “reserves” under SEC standards. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

Page 18