image_0.jpg
News Release
December 12, 2022
SSR MINING ANNOUNCES POSITIVE EXPLORATION RESULTS AT SEABEE
Santoy Highlights Include True Width Intercepts of 29 g/t Au over 2.1 Meters, 31 g/t Au Over 1.9 Meters
Porky Main and Porky West Drilling Returns Broad Intercepts of Near Surface Mineralization, Potential for Future Open Pit Development
DENVER – SSR Mining Inc. (NASDAQ/TSX: SSRM, ASX: SSR) (“SSR Mining” or the “Company”) is pleased to announce results from 377 diamond drill holes completed at the Seabee property in Saskatchewan, Canada, for the September, 2021 to November, 2022 exploration period (the “Exploration Period”). These results build upon, and are subsequent to, the Seabee 2021 Technical Report Summary (the “2021 Seabee TRS”), which highlighted a six-year Mineral Reserve life averaging approximately 96,000 ounces of annual gold production. The life of mine plan in the 2021 TRS was based on 580,000 ounces of Proven and Probable Mineral Reserves calculated using a cut-off grade of 2.5 g/t Au and a 1.8 meter minimum mining width.
Activity during the Exploration Period included both near-mine resource development drilling adjacent to current underground infrastructure at the Santoy Mine Complex (“Santoy”), as well as more regional activity across the Seabee property (Figure 1). Notably, the regional exploration activity included drilling at the Porky Main and Porky West targets, with results to-date returning broad intercepts of near-surface mineralization potentially amenable to open pit mining in the future. Additional regional exploration included the initial delineation of the Shane target, which remains open along strike and is located adjacent to the Santoy Road that connects the mine to the Seabee processing facility.
A total of 279 resource development drill holes were completed at Santoy during the Exploration Period. Santoy is the source of the current production feed for the Seabee processing plant and contributes the entirety of the existing Seabee Mineral Reserves. Exploration activity at Santoy aims to extend existing mineralization, upgrade Mineral Resources to Mineral Reserves, and provide greater confidence in currently defined Mineral Reserves for future mine planning purposes. Drilling focused on areas immediately adjacent to current mine development, with the positive results indicting possible continuity of the mineralization currently being mined and demonstrating potential for Mineral Reserve growth and mine life extensions.
Step-out drilling highlights from Santoy include (see Figure 2) (see Table 1) (all intercepts true width):
SUG-22-605: 28.9 g/t Au over 2.1 meters from 217 meters
SUG-21-043: 8.3 g/t Au over 8.9 meters from 212 meters
oIncluding: 31.3 g/t Au over 1.9 meters from 212 meters
Drilling highlights from currently defined Mineral Resource blocks not included in the 2021 Seabee TRS life of mine plan include (all intercepts true width):
SUG-22-945: 17.7 g/t Au over 3.7 meters from 175 meters
SUG-22-923: 18.9 g/t Au over 1.9 meters from 155 meters
SUG-21-402: 6.1 g/t Au over 5.8 meters from 50 meters
oIncluding: 18.6 g/t Au over 2.0 meters from 55 meters
SSR Mining Inc.
PAGE 1



Rod Antal, President and CEO of SSR Mining, said, “Building on Seabee’s long history of successfully replacing depletion, drilling activity continues to focus on defining and converting additional Mineral Reserves at Santoy, supporting the potential for mine life extensions at Seabee. At the same time, exploration has progressed at more regional targets as we endeavor to define a longer-term production pathway for the asset. These results from the Shane, Porky Main, and Porky West targets illustrate the significant brownfield growth potential for Seabee and could potentially represent future production opportunities for the mine. While still an early-stage opportunity, the broad, near surface intercepts suggest the potential for open pit mining at the Porky targets in the future. Given the number of prospective targets at Seabee, we currently expect to expand our exploration program at the mine again in 2023 as we look for ways to aggressively advance these opportunities towards potential development.”
The Porky Main and Porky West targets are located approximately four kilometers north-northwest of the Seabee processing facility. SSR Mining completed nearly 10,800 meters of drilling (53 diamond drill holes) at the Porky targets in 2022. Porky Main and Porky West 2022 drilling highlights include (see Figure 3 and Figure 4) (see Table 2) (all intercepts core length):
PKY-22-028: 1.9 g/t Au over 31.3 meters from 51 meters
PKY-22-007: 1.3 g/t Au over 23.7 meters from 6 meters
PKY-22-005: 5.5 g/t Au over 9.3 meters from 83 meters
GAS-22-165: 12.8 g/t Au over 11.1 meters from 214 meters
The Shane target represents the intersection of a number of historical zones of gold mineralization at various stages of exploration maturity. SSR Mining completed over 19,600 meters (45 diamond drill holes) of drilling at Shane targeting five structures including the S1, S2, S3, S4 and the Shane Hangingwall (“Shane HW”) structures. This recent drilling, combined with past operator exploration, has resulted in approximately 30,000 meters of drilling across almost 100 diamond drill holes at the target. Shane drilling highlights include (see Figure 5) (see Table 3) (all intercepts true width):
SHA-21-046: 54.3 g/t Au over 4.6 meters from 175 meters
oIncluding: 172.0 g/t over 1.0 meter from 175 meters
SHA-22-057: 12.3 g/t Au over 2.1 meters from 111 meters
SHA-21-053: 11.9 g/t Au over 2.3 meters from 383 meters
Table 1: Significant gold intercepts from recent drilling at Santoy.
Hole ID
From
(m)
To
(m)
True Width
(m)
Gold
(g/t Au)
Zone
SUG-21-043212.0221.08.98.3SHW 1
Including212.0213.91.931.3SHW 1
SUG-21-37833.750.59.018.68A
SUG-21-37946.571.010.110.38A
SUG-22-605217.0221.52.128.98A HW
SUG-21-40034.539.44.822.28A
SUG-22-945174.6178.63.717.79A
SUG-22-923154.8156.81.918.99C
SUG-22-907215.8217.41.375.09A
SUG-22-922162.2165.22.927.89A
SUG-22-925152.5155.93.322.09A
SUG-21-40249.658.25.86.18A
Including54.757.12.018.68A
Notes: All Santoy drilling intercepts reflect true width intersections. Santoy results are cut to 75 g/t Au. For complete drillhole results from Santoy during the Exploration Period, see Appendix Table 4 and Table 7. Santoy Hangingwall denoted as “SHW”, Hangingwall denoted as “HW”.
SSR Mining Inc.
PAGE 2



image_1.jpg
Figure 1: Plan map of the Seabee property, highlighting existing infrastructure and exploration targets.
Overview of the Porky Main and Porky West Targets
The Porky Main and Porky West targets are located approximately four kilometers north-northwest of the Seabee processing facility. Mineralization occurs along a 12 kilometer long openly folded unconformity, separating arenaceous sedimentary rocks of the Rae Lake synform to the north from mafic volcanic rocks of the Seabee mine area to the south. Both Porky Main and Porky West are characterized by the same calc-silicate alteration package, however, the unconformity and arenites host most of the auriferous quartz veins at the Porky West deposit.
Porky Main and Porky West were discovered in 2002. A Mineral Resource is currently defined at Porky West and contributed 52,000 tonnes of Measured and Indicated Mineral Resources at 5.0 g/t Au and 516,000 tonnes of Inferred Mineral Resource at 4.4 g/t Au in the 2021 Seabee TRS. However, previous exploration activity at both Porky Main and Porky West envisaged satellite underground operations. As described above, more recent interpretation suggests the potential for open pit mining at the targets in the future, which will be evaluated through additional drilling, as well as geotechnical and metallurgical analysis going forward.





SSR Mining Inc.
PAGE 3



Table 2: Significant gold intercepts from recent drilling at the Porky Main and Porky West targets.
Hole ID
From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
Zone
GAS-22-165214.4227.011.112.8Porky West
PKY-22-00350.555.04.50.2Porky Main
59.564.04.54.5
82.089.57.51.5
93.5102.08.50.6
112.1117.05.04.3
123.0131.48.47.4
PKY-22-02851.082.331.31.9Porky West
GAS-22-153165.0177.09.26.0Porky West
GAS-22-159178.0195.016.53.2Porky West
PKY-22-00547.354.87.52.6Porky Main
60.875.014.20.6
83.092.39.35.5
PKY-22-00616.524.07.50.4Porky Main
33.239.26.00.6
54.258.74.50.9
93.6102.18.55.9
GAS-22-161213.1230.014.73.0Porky West
PKY-22-023149.0165.016.02.5Porky West
PKY-22-0076.330.023.71.3Porky Main
55.962.06.10.5
66.571.04.50.2
Notes: All Porky Main and Porky West drilling intercepts reflect core length intersections. Porky Main and Porky West results are uncut, reported at a 0.3 g/t Au cut-off and include a maximum of three meters internal dilution. For complete drillhole results for the Porky Main and Porky West targets during the Exploration Period, see Appendix Table 5 and Table 8.
Overview of the Shane Target
The Shane target is located adjacent to the Santoy Road, which connects the Santoy Mine Complex to the Seabee processing facility and is paralleled by the main powerline feeding Santoy. Drilling in the vicinity of the currently defined Shane target was first completed in 2002 and 47 diamond drill holes have been completed by past operators totaling over 10,000 meters, which identified a number of gold bearing zones at various stages of exploration maturity. During the Exploration Period, SSR Mining drilled 45 diamond drill holes at the Shane target totaling over 19,600 meters.
The focus of SSR Mining’s drilling at Shane has been to advance exploration at Shane's S1, S2, S3 and S4 targets as a proof of concept for exploring the property more broadly. The S1-S3 targets are located along the hangingwall, footwall and within the steeply south dipping Pine Lake Conglomerate (“PLC”); a kilometer scale, east striking unit preserved in a sinistral shear zone known as the Pine Lake Shear Zone (“PLSZ”). The plunge of S1 mineralization continues over approximately 500 meters. The S4 target is hosted within a mafic volcanic unit 50 meters north of the PLSZ. All four targets are planar and roughly sub-parallel to the contact of the PLC.
During the exploration of these zones a new target was discovered in a southeast striking, more moderately dipping splay of the PLSZ named the Shane HW. The Shane HW structure returned the highest grade and broadest mineralized intervals of the program highlighting the importance of structures oriented oblique to the PLSZ for future exploration. Economic grades and widths were encountered on all five structures tested with the most continuous mineralization encountered on the S1 structure. Step out holes have traced the host lithology to a depth of approximately 700 meters. While still early stage, the Shane target represents a target for follow up exploration and resource development drilling going forward.
SSR Mining Inc.
PAGE 4



Table 3: Significant gold intercepts from recent drilling at the Shane target.
Hole ID
From
(m)
To
(m)
True Width
(m)
Gold
(g/t Au)
Zone
SHA-21-046175.3181.04.654.3Shane HW
Including175.3177.01.0172.0Shane HW
SHA-21-053382.5386.42.311.9S1
SHA-22-057111.3114.62.112.3S1
SHA-21-039271.9275.73.17.1S1
SHA-22-084403.8407.02.48.3S3
Notes: All Shane drilling intercepts reflect true width intersections. Shane results are uncut. For complete drillholes results for the Shane target during the Exploration Period, see Appendix Table 6 and Table 9.
Seabee Property Overview
SSR Mining’s Seabee property is 100% owned and includes the Fisher claims, of which the acquisition of 100% ownership was completed in 2022. Near mine activity during the Exploration Period focused on Mineral Resource conversion at the 8A, 9A, and Santoy Hanging Wall (“SHW”) zones. During the Exploration Period, a total of 377 diamond drill holes were completed across the Seabee property, including 253 holes drilled from underground drives at Santoy totaling over 45,200 meters. Following the completion of a new underground drill chamber in the third quarter of 2022, the Company initiated drilling of the high grade zone mined in the first quarter of 2022. Results from these activities are expected in the coming months and will be used to guide mine planning, including the evaluation of additional mining in this high grade zone, during 2023.
The 2021 Seabee TRS highlighted a six-year Mineral Reserve life averaging approximately 96,000 ounces of annual gold production. The life of mine plan was based on 580,000 ounces of Proven and Probable Mineral Reserves calculated using a cut-off grade of 2.5 g/t Au and a 1.8 meter minimum mining width. Exploration continues to focus on extending the Mineral Reserve life of the Santoy Mine Complex while simultaneously conducting more regional activity to evaluate the longer-term development potential of the multitude of exploration targets across the broader Seabee property.
Seabee Property Exploration Figures
image_2.jpg
Figure 2. Longitudinal section of the Santoy Mine Complex showing select intercepts outside of the Mineral Reserve blocks incorporated in the 2021 Seabee TRS.
SSR Mining Inc.
PAGE 5



image_3.jpg
Figure 3. Plan view of the Porky West target highlighting the diamond drill holes (DDH) completed in the area.
image_4.jpg
Figure 4. Plan view of the Porky Main target highlighting the diamond drill holes (DDH) completed in the area.
SSR Mining Inc.
PAGE 6



image_5.jpg
Figure 5. Plan view of the Shane target highlighting a subset of the drilling completed in the area to-date.

Technical Procedural Information Sampling and Analytical Procedures
All drill samples in respect of the Seabee underground drilling program and some samples from the surface program were assayed by our onsite non-accredited assay laboratory, which is not independent from SSR Mining. Surface drilling samples not analyzed by our onsite assay laboratory were analyzed at SRC Geoanalytical Laboratories Inc. (“SRC”) in Saskatoon, Saskatchewan, which also serves as the QAQC laboratory for our onsite lab. Duplicate check assays were conducted at site as well as at SRC, which is independent from SSR Mining. Mean results of the spot checks were consistent with those reported. Sampling interval was established by minimum or maximum sampling lengths and geological and/or structural criteria.
Seabee’s site lab typically prepares two hundred-gram samples that were pulverized until greater than 80 percent passed through a 150-mesh screen. Thirty-gram pulp samples were then analyzed for gold by fire assay with gravimetric finish (0.01 g/t gold detection limit). SRC prepares a minus-150 mesh pulp (95% passing) weighing 250 grams from a minus 10 mesh coarse crush reject. Fire assay with Atomic Absorption finish was completed on a 30-gram aliquot to produce gold analytical results with a 0.005 g/t gold detection limit. Fire assay with gravimetric finish was prepared on those samples with greater than 3 g/t gold.
External review of data and processes relating to Seabee exploration data has been completed by independent consultant Carl Edmunds in November 2022. There were no adverse material results detected and the QA/QC indicates the information collected is acceptable, and the database can be used for further studies.

SSR Mining Inc.
PAGE 7



Qualified Persons
The scientific and technical data contained in this news release relating to exploration activity at the Seabee property has been reviewed and approved by Anders Carlson, P.Geo., Senior Manager, Exploration, and a qualified person for purposes of Subpart 1300 of Regulation S-K and National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Scientific and technical data in this news release relating to resource development activity at the Seabee property has been reviewed and approved by Jeffrey Kulas, P.Geo., Manager, Resource Development, and a qualified person for purposes of Subpart 1300 of Regulation S-K and National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
You are encouraged to also review the 2021 Seabee TRS, which is available on SSR Mining’s Current Report on Form 8-K filed with the Securities and Exchange Commission’s EDGAR system (sec.gov) on September 29, 2022. You are encouraged to also review the 2021 Seabee TRS, which is available on SSR Mining’s Current Report on Form 8-K filed with the Securities and Exchange Commission’s EDGAR system (sec.gov) on September 29, 2022.
About SSR Mining
SSR Mining Inc. is a leading, free cash flow focused gold company with four producing assets located in the USA, Türkiye, Canada, and Argentina, combined with a global pipeline of high-quality development and exploration assets. In 2021, the four operating assets produced approximately 794,000 gold-equivalent ounces. SSR Mining is listed under the ticker symbol SSRM on the NASDAQ and the TSX, and SSR on the ASX.
SSR Mining Contacts:
F. Edward Farid, Executive Vice President, Chief Corporate Development Officer
Alex Hunchak, Director, Corporate Development and Investor Relations

SSR Mining Inc.
E-Mail: invest@ssrmining.com
Phone: +1 (888) 338-0046

To receive SSR Mining’s news releases by e-mail, please register using the SSR Mining website at www.ssrmining.com.

SSR Mining Inc.
PAGE 8



Cautionary Note Regarding Forward-Looking Information

Except for statements of historical fact relating to us, certain statements contained in this news release constitute forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking information”) within the meaning of applicable securities laws. Forward-looking information may be contained in this document and our other public filings. Forward-looking information relates to statements concerning our outlook and anticipated events or results and, in some cases, can be identified by terminology such as “may”, “will”, “could”, “should”, “expect”, “plan”, “anticipate”, “believe”, “intend”, “estimate”, “projects”, “predict”, “potential”, “continue” or other similar expressions concerning matters that are not historical facts.

Forward-looking information and statements in this news release are based on certain key expectations and assumptions made by us. Although we believe that the expectations and assumptions on which such forward-looking information and statements are based are reasonable, undue reliance should not be placed on the forward-looking information and statements because we can give no assurance that they will prove to be correct. Forward-looking information and statements are subject to various risks and uncertainties which could cause actual results and experience to differ materially from the anticipated results or expectations expressed in this news release. The key risks and uncertainties include, but are not limited to: local and global political and economic conditions; governmental and regulatory requirements and actions by governmental authorities, including changes in government policy, government ownership requirements, changes in environmental, tax and other laws or regulations and the interpretation thereof; developments with respect to the COVID-19 pandemic, including the duration, severity and scope of the pandemic and potential impacts on mining operations; and other risk factors detailed from time to time in our reports filed with the Securities and Exchange Commission on EDGAR and the Canadian securities regulatory authorities on SEDAR.

Forward-looking information and statements in this news release include any statements concerning, among other things: preliminary cost reporting in this document; production, grade, operating, cost, and capital expenditure guidance; our operational and development targets and catalysts and the impact of any suspension on operations; forecasts and outlook, including related to production guidance; timing and expectations regarding the impact of any interruptions caused on our operations; the results of any gold reconciliations; the ability to discover additional gold ore; matters relating to proposed exploration; communications with local stakeholders; maintaining community and government relations; negotiations of joint ventures; negotiation and completion of transactions; commodity prices; Mineral Resources, Mineral Reserves, conversion of Mineral Resources, realization of Mineral Reserves, and the existence or realization of Mineral Resource estimates; the development approach; the timing and amount of future production; the timing of studies, announcements, and analysis; the timing of construction and development of proposed mines and process facilities; capital and operating expenditures; economic conditions; availability of sufficient financing; exploration plans; receipt of regulatory approvals; and any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, environmental, regulatory, and political matters that may influence or be influenced by future events or conditions.True width intervals are calculated using the current geometric interpretation of mineralized structures. Continued exploration activity could result in updates to those interpretations that impacts the calculation of true widths.

Such forward-looking information and statements are based on a number of material factors and assumptions, including, but not limited in any manner to, those disclosed in any other of our filings on EDGAR and SEDAR, and include: the inherent speculative nature of exploration results; the ability to explore; communications with local stakeholders; maintaining community and governmental relations; status of negotiations of joint ventures; weather conditions at our operations; commodity prices; the ultimate determination of and realization of Mineral Reserves; existence or realization of Mineral Resources; the development approach; availability and receipt of required approvals, titles, licenses and permits; sufficient working capital to develop and operate the mines and implement development plans; access to adequate services and supplies; foreign currency exchange rates; interest rates; access to capital markets and associated cost of funds; availability of a qualified work force; ability to negotiate, finalize, and execute relevant agreements; lack of social opposition to our mines or facilities; lack of legal challenges with respect to our properties; the timing and amount of future production; the ability to meet production, cost, and capital expenditure targets; timing and ability to produce studies and analyses; capital and operating expenditures; economic conditions; availability of sufficient financing; the ultimate ability to mine, process, and sell mineral products on economically favorable terms; and any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social, geopolitical, regulatory and political factors that may influence future events or conditions. While we consider these factors and assumptions to be reasonable based on information currently available to us, they may prove to be incorrect.

The above list is not exhaustive of the factors that may affect any of the Company’s forward-looking information. You should not place undue reliance on forward-looking information and statements. Forward-looking information and statements are only predictions based on our current expectations and our projections about future events. Actual results may vary from such forward-looking information for a variety of reasons including, but not limited to, risks and uncertainties disclosed in our filings on our website at www.ssrmining.com, on SEDAR at www.sedar.com, on EDGAR at www.sec.gov and on the ASX at www.asx.com.au and other unforeseen events or circumstances. Other than as required by law, we do not intend, and undertake no obligation to update any forward-looking information to reflect, among other things, new information or future events. The information contained on, or that may be accessed through, our website is not incorporated by reference into, and is not a part of, this document.

Qualified Persons

The scientific and technical information concerning our mineral projects in this news release have been reviewed and approved by a “qualified person” under S-K 1300. For details on the “qualified persons” approving such information, a description of the key assumptions, parameters and methods used to estimate mineral reserves and mineral resources for SSR Mining Inc.’s material properties included in this news release, as well as data verification procedures and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, sociopolitical, marketing or other relevant factors, please review the Technical Report Summaries for each of the Company’s material properties which are available at www.sec.gov.


SSR Mining Inc.
PAGE 9



Table 4: All drill holes completed at Santoy during the Exploration Period.
Hole ID
From
(m)
To
(m)
True Width (m)
Gold
(g/t Au)
Zone
SUG-21-035222.5226.02.80.5SHW 1
SUG-21-036229.5235.55.30.1SHW 1
SUG-21-037205.5210.54.40.3SHW 1
SUG-21-038216.0220.54.00.1SHW 1
SUG-21-039237.5242.54.53.3SHW 1
SUG-21-040246.0251.45.01.5SHW 1
SUG-21-041226.5231.54.80.1SHW 1
SUG-21-042215.5222.06.20.3SHW 1
SUG-21-043212.0221.08.98.3SHW 1
Including212.0213.91.931.3SHW 1
SUG-21-044217.2224.97.40.5SHW 1
SUG-21-045220.5225.64.60.2SHW 1
SUG-21-046208.5211.52.90.2SHW 1
SUG-21-047197.0202.65.43.9SHW 1
SUG-21-048204.0210.05.71.5SHW 1
SUG-21-049205.0215.59.74.6SHW 1
SUG-21-050212.5214.51.80.5SHW 1
SUG-21-051221.5225.53.40.1SHW 1
239.0247.06.91.1SHW2
SUG-21-052NSI
SUG-21-053329.0330.10.90.1SHW
SUG-21-054203.5205.52.00.0SHW
SUG-21-055187.5191.54.00.1SHW
SUG-21-056176.0180.04.00.1SHW
SUG-21-057195.5199.53.80.2SHW
SUG-21-058186.0192.04.90.0SHW
SUG-21-059225.0229.53.70.3SHW
SUG-21-060NSI
SUG-21-061212.0213.51.50.1SHW
SUG-21-062182.5188.05.51.2SHW
SUG-21-063193.5198.04.55.6SHW
SUG-21-064211.5213.01.34.1SHW
SUG-21-065234.0235.00.91.1SHW
SUG-21-066202.5210.07.30.0SHW
SUG-21-37642.051.74.55.18A
SUG-21-37728.341.08.66.98A
SUG-21-37833.750.59.018.68A
SUG-21-37946.571.010.110.38A
SUG-21-38025.138.411.27.78A
SUG-21-38156.861.32.411.88A
SUG-21-38263.766.91.22.78A
SUG-21-38343.445.51.40.38A
SUG-21-38453.154.90.911.38A
SUG-21-38576.879.51.226.48A
SUG-21-38679.581.20.51.08A
SUG-21-38787.595.22.77.38A
SUG-21-38899.6111.52.91.18A
SUG-21-38971.580.03.56.28A
SUG-21-39084.597.03.66.58A
SUG-21-39187.0111.05.51.28A
SUG-21-39265.571.22.44.78A
SUG-21-39375.791.75.51.88A
SSR Mining Inc.
PAGE 10



SUG-21-39471.589.09.81.98A
SUG-21-39576.594.08.50.68A
SUG-21-39680.088.82.111.68A
SUG-21-39787.7101.74.75.98A
SUG-21-39865.968.71.08.18A
SUG-21-39935.538.72.13.98A
SUG-21-40034.539.44.822.28A
SUG-21-40144.448.83.215.38A
SUG-21-40249.658.25.86.18A
Including54.757.12.018.68A
SUG-21-40338.543.54.212.18A
SUG-21-40438.342.62.70.48A
SUG-21-40549.852.51.329.98A
SUG-21-616151.1154.63.00.18A
SUG-21-618138.2142.42.10.18A
289.0295.02.96.8
SUG-21-619209.2209.70.11.28A
SUG-21-620NSI
SUG-21-621119.0124.33.10.78A
SUG-21-622NSI
SUG-21-623NSI
SUG-21-624NSI
SUG-21-625128.9131.81.60.08A
SUG-21-626138.0140.51.31.68A
SUG-21-627159.0164.53.30.48A
SUG-21-628NSI
SUG-21-629388.6393.40.72.2926
SUG-21-630193.1196.42.31.48A
225.2226.50.90.18AFW
SUG-21-631246.0255.05.51.68A
SUG-21-632279.0290.04.10.08A
SUG-21-912224.3227.11.06.6SHW 1
SUG-21-913238.1240.82.30.1SHW 1
266.5270.03.02.2SHW 2
SUG-21-914211.5214.02.112.6SHW 1
SUG-21-915264.0267.62.61.2SHW 1
SUG-21-916231.1236.73.61.1SHW 1
268.0272.83.16.3SHW2
SUG-21-917NSI
SUG-22-001182.0182.80.86.4SHW
SUG-22-002206.5208.01.45.2SHW
SUG-22-003196.5208.411.81.1SHW
SUG-22-004195.0199.54.50.5SHW
SUG-22-005189.0192.03.00.8SHW
SUG-22-006222.0232.510.10.2SHW
SUG-22-00769.884.513.50.9GHW
SUG-22-00892.5110.514.50.6GHW
SUG-22-009158.5171.06.10.9GHW
SUG-22-010196.6217.17.21.4GHW
SUG-22-01145.6104.554.60.4GHW
SUG-22-01262.2120.044.80.7GHW
SUG-22-01354.869.78.51.3GHW
SUG-22-01447.267.08.30.8GHW
SUG-22-01539.477.02.81.1GHW
SSR Mining Inc.
PAGE 11



SUG-22-01650.368.910.61.0GHW
SUG-22-017190.0196.05.01.7SHW 2
SUG-22-30034.037.52.20.28A
SUG-22-30160.363.11.23.98A
SUG-22-30245.653.03.712.28A
SUG-22-30357.063.83.12.88A
SUG-22-304136.4153.06.610.28A
SUG-22-30576.581.01.60.18A
SUG-22-30655.764.04.50.18A
SUG-22-30777.584.02.37.98A
SUG-22-30862.086.710.21.18A
SUG-22-30962.164.31.40.08A
SUG-22-31052.458.53.10.08A
SUG-22-31193.0105.04.50.88A
SUG-22-31287.089.51.00.18A
SUG-22-31354.056.51.80.08A
SUG-22-31437.043.01.56.58A
SUG-22-31564.569.13.30.18A
SUG-22-31666.371.23.40.18A
SUG-22-31726.038.510.63.78A
SUG-22-31836.753.012.93.48A
SUG-22-31952.364.55.710.58A
SUG-22-32046.554.75.31.58A
SUG-22-32146.363.07.80.88A
SUG-22-32251.071.07.50.38A
SUG-22-32340.463.115.51.68A
SUG-22-32447.965.28.30.48A
SUG-22-32544.055.06.40.18A
SUG-22-32673.080.03.87.78A
SUG-22-32766.371.53.33.58A
SUG-22-32854.756.21.20.28A
SUG-22-32977.180.01.30.48A
SUG-22-33045.050.85.22.38A
SUG-22-33150.156.14.40.78A
SUG-22-33267.871.72.01.08A
SUG-22-33382.286.21.60.18A
SUG-22-33481.988.12.70.08A
SUG-22-33568.574.93.52.28A
SUG-22-33654.960.43.81.58A
SUG-22-33782.095.55.40.78A
SUG-22-33872.083.54.90.28A
SUG-22-33958.262.62.21.08A
SUG-22-34063.770.72.80.08A
SUG-22-34147.852.22.56.48A
SUG-22-34273.579.52.17.18A
SUG-22-343102.0108.22.015.38A
SUG-22-344107.1109.40.70.78A
SUG-22-34591.695.71.52.08A
SUG-22-34654.560.02.60.08A
SUG-22-34748.451.01.40.18A
SUG-22-34861.066.22.00.08A
SUG-22-34940.045.23.516.78A
SUG-22-35024.228.42.40.48AFW
47.350.31.710.78A
SSR Mining Inc.
PAGE 12



SUG-22-35120.121.00.58.58AFW
45.752.13.51.88A
SUG-22-35218.120.61.70.58AFW
32.037.33.71.78A
SUG-22-35331.340.16.23.88A
SUG-22-35425.330.84.90.88A
SUG-22-35631.634.02.05.68A
SUG-22-35721.222.20.70.28AFW
33.336.02.08.58A
SUG-22-35832.043.74.35.08AFW
65.569.51.42.08A
SUG-22-35931.536.53.613.88A
SUG-22-36031.432.50.61.28AFW
43.570.513.93.68A
SUG-22-36136.046.38.12.18A
SUG-22-36234.138.84.49.98A
SUG-22-36327.027.70.50.48AFW
40.948.35.32.48A
SUG-22-36422.724.91.90.88AFW
32.243.19.46.98A
SUG-22-36530.645.09.65.18AFW
52.053.10.742.88A
SUG-22-36639.548.03.87.58AFW
62.373.45.11.48A
SUG-22-36736.447.75.66.68AFW
56.685.014.01.28A
SUG-22-36843.147.31.80.18AFW
56.975.08.00.68A
SUG-22-36930.231.81.13.08AFW
34.557.115.92.78A
SUG-22-37032.157.514.27.88AFW
63.076.57.40.68A
SUG-22-37142.263.510.32.68AFW
81.085.62.30.18A
SUG-22-37228.039.08.11.48AFW
40.054.210.25.68A
SUG-22-37332.045.18.37.78AFW
46.575.017.93.88A
SUG-22-37442.048.73.713.68AFW
57.072.58.82.78A
SUG-22-375NSI
SUG-22-37641.044.01.52.28AFW
52.559.43.40.18A
SUG-22-37733.237.72.70.28AFW
45.250.33.11.58A
SUG-22-37838.839.50.30.18AFW
55.261.73.21.18A
SUG-22-37927.829.51.20.18AFW
37.944.54.46.58A
SUG-22-38024.926.81.51.28AFW
32.939.04.90.88A
SUG-22-38130.430.90.30.18AFW
40.144.02.41.58A
SSR Mining Inc.
PAGE 13



SUG-22-38234.038.23.40.08AFW
38.245.05.50.68A
SUG-22-38331.734.02.110.18A
SUG-22-38431.534.02.31.08A
SUG-22-38539.751.36.51.88AFW
56.770.57.61.58A
SUG-22-38625.127.31.90.18AFW
34.340.35.29.68A
SUG-22-38725.030.04.50.48AFW
33.241.67.53.28A
SUG-22-38833.142.56.82.78AFW
42.554.68.63.28A
SUG-22-38932.545.47.33.88AFW
45.458.57.43.38A
SUG-22-39040.057.710.77.28AFW
57.774.09.92.68A
SUG-22-39138.041.63.30.68A
SUG-22-39242.850.54.41.48AFW
66.067.50.92.08A
SUG-22-39342.055.26.74.88AFW
61.565.31.92.48A
Including49.055.22.87.18A
SUG-22-600271.0273.00.712.48A
293.5297.81.60.28AFW
SUG-22-601226.4234.03.21.78A
250.0263.05.40.88AFW
SUG-22-602268.5274.52.24.08A
290.2295.72.211.78AFW
SUG-22-603334.5336.00.51.48A
372.0375.01.03.88AFW
SUG-22-604203.6209.42.22.6Unknown
316.0333.66.30.18A
SUG-22-605217.0221.52.128.98AHW
SUG-22-606331.8349.47.40.08A
SUG-22-607170.7175.42.33.58AHW
309.3315.33.10.08A
SUG-22-608260.9264.01.80.08A
SUG-22-609198.2201.22.00.18A
SUG-22-610128.1129.71.52.38A
SUG-22-611141.5147.04.92.58A
SUG-22-612130.1136.96.41.68A
SUG-22-900166.0168.52.21.59C
192.0192.50.432.59A
SUG-22-901206.1208.31.60.09C
224.0228.53.30.59A
SUG-22-902231.2232.30.70.09C
255.0257.31.612.79A
SUG-22-903257.9261.40.712.09C
SUG-22-904175.5179.02.93.99C
204.0210.05.11.79A
SUG-22-905152.0155.00.94.29C
181.9185.71.20.19A
SUG-22-906142.0154.22.40.19C
163.4165.10.34.59A
SSR Mining Inc.
PAGE 14



SUG-22-907193.8199.24.20.49C
215.8217.41.375.09A
SUG-22-908235.0238.52.50.69A
SUG-22-909229.0231.52.01.89A
SUG-22-910219.4227.46.20.19A
SUG-22-911186.8188.71.627.39C
192.5194.11.43.59A
SUG-22-912288.5292.02.20.39C
312.5316.02.20.79A
SUG-22-913262.7264.91.40.09C
290.7294.32.20.99A
SUG-22-914221.4222.10.50.09C
252.8259.54.51.19A
SUG-22-915224.5226.71.40.09C
257.9259.00.75.09A
SUG-22-916189.5193.52.90.19C
227.5231.53.08.99A
SUG-22-917173.8176.82.40.99C
213.6215.51.611.59A
SUG-22-918166.5169.22.31.29C
181.4185.43.41.09A
SUG-22-919173.3183.28.61.89C
187.6189.92.00.09A
SUG-22-920153.1157.43.811.49C
163.5165.61.85.59A
SUG-22-921156.9163.05.53.59C
175.2177.72.30.59A
SUG-22-922145.2149.84.44.29C
162.2165.22.927.89A
SUG-22-923154.8156.81.918.99C
160.5161.71.17.79A
SUG-22-924146.0149.02.99.89C
153.7155.11.40.19A
SUG-22-925143.7145.71.91.39C
152.5155.93.322.09A
SUG-22-926139.4142.02.60.19C
152.0154.52.50.89A
SUG-22-927146.0149.02.90.19C
156.0160.74.63.89A
SUG-22-928141.7143.51.70.19C
150.0155.55.21.39A
SUG-22-929175.0179.03.70.29C
SUG-22-930162.0170.57.20.29C
186.1187.41.10.09A
SUG-22-931151.0155.43.50.49C
159.9163.32.75.69A
SUG-22-932153.4164.07.60.29C
183.4184.00.40.09A
SUG-22-933172.1174.11.60.09C
198.5200.31.40.09A
SUG-22-934144.5148.33.80.39C
161.5165.74.20.09A
SUG-22-935140.9143.12.20.29C
183.0186.03.00.19A
SSR Mining Inc.
PAGE 15



SUG-22-936141.3144.43.00.29C
182.8183.60.80.29A
SUG-22-937164.0168.54.10.19C
186.9196.89.00.09A
SUG-22-938185.0191.54.80.39C
206.2207.91.30.09A
SUG-22-939148.5150.62.12.19C
164.5168.53.90.09A
SUG-22-940145.5147.01.51.89C
164.5166.51.90.29A
SUG-22-941149.5152.12.40.19C
163.5164.50.90.29A
SUG-22-942203.8205.91.30.29C
SUG-22-943147.5149.51.90.19C
162.0164.01.90.29A
SUG-22-944183.0186.02.411.19C
198.4202.73.40.09A
SUG-22-945162.6164.51.70.19C
174.6178.63.717.79A
JOY-21-961207.1209.01.43.0SHW 2
217.0220.72.70.1SHW 1
JOY-21-96261.065.54.11.7609
231.5235.43.60.4SHW 2
248.1250.01.80.3SHW 1
JOY-21-963272.9281.05.90.2SHW 1
JOY-21-964282.1287.35.00.28G
323.1331.68.00.08F
JOY-21-965292.0305.210.70.08G
332.0333.21.00.18F
JOY-21-966334.1337.52.40.08G
370.1371.61.10.08F
JOY-21-967272.1275.12.60.18G
293.2293.90.60.08F
JOY-21-968304.8308.53.33.58G
JOY-21-969NSI
JOY-21-970NSI
JOY-21-971283.6288.54.20.38G
330.0331.00.90.18F
JOY-21-972170.9171.20.33.58A
JOY-21-973NSI
JOY-21-974NSI
JOY-21-975401.4404.22.21.68A
JOY-22-976NSI
JOY-22-977NSI
JOY-22-978NSI
JOY-22-979NSI
JOY-22-980NSI
JOY-22-981NSI
JOY-22-982506.0509.73.74.19C
519.3524.04.60.59A
JOY-22-983530.6532.61.90.49C
544.2546.82.50.39A
JOY-22-984804.9810.55.10.0621
SSR Mining Inc.
PAGE 16



JOY-22-985NSI
JOY-22-986570.7574.33.20.99C
581.1585.03.50.99A
Notes: All Santoy drilling intercepts reflect true width intersections. Santoy results are cut to 75 g/t Au.
NSI – No Significant Intercepts

Table 5: All drill holes completed at Porky Main and Porky West during the Exploration Period.
Hole ID
From
(m)
To
(m)
Interval
(m)
Gold
(g/t Au)
Zone
GAS-22-142257.0265.57.94.8Porky West
GAS-22-143229.5232.52.81.4Porky West
GAS-22-144200.0205.55.32.7Porky West
GAS-22-145289.6294.74.04.4Porky West
GAS-22-146255.9261.04.53.0Porky West
GAS-22-147253.0259.04.11.0Porky West
GAS-22-149216.8219.01.93.0Porky West
GAS-22-150201.0205.03.60.2Porky West
GAS-22-151185.2197.09.10.4Porky West
GAS-22-152160.3169.99.02.4Porky West
GAS-22-153165.0177.09.26.0Porky West
GAS-22-154185.9192.74.60.3Porky West
GAS-22-155151.2159.47.93.8Porky West
GAS-22-156145.5153.37.82.2Porky West
GAS-22-157139.8147.06.51.4Porky West
GAS-22-158185.5191.05.14.4Porky West
GAS-22-159178.0195.016.53.2Porky West
GAS-22-160182.1194.812.32.9Porky West
GAS-22-161213.1230.014.73.0Porky West
GAS-22-162232.1246.012.21.1Porky West
GAS-22-165214.4227.011.112.8Porky West
GAS-22-172446.4450.84.23.0Porky West
PKY-22-00125.230.04.80.3Porky Main
42.559.016.50.8
PKY-22-00213.616.63.00.6Porky Main
20.524.43.90.7
39.043.84.81.3
69.072.03.05.5
94.6101.26.61.9
PKY-22-00350.555.04.50.2Porky Main
59.564.04.54.5
82.089.57.51.5
93.5102.08.50.6
112.1117.05.04.3
123.0131.48.47.4
PKY-22-00473.687.013.40.9Porky Main
91.599.07.50.4
121.5126.04.50.7
140.5144.84.30.3
152.3156.84.50.8
PKY-22-00547.354.87.52.6Porky Main
60.875.014.20.6
83.092.39.35.5
SSR Mining Inc.
PAGE 17



PKY-22-00616.524.07.50.4Porky Main
33.239.26.00.6
54.258.74.50.9
93.6102.18.55.9
PKY-22-0076.330.023.71.3Porky Main
55.962.06.10.5
66.571.04.50.2
PKY-22-00810.123.613.50.3Porky Main
PKY-22-00913.236.323.10.7Porky Main
60.563.53.00.7
93.097.54.50.6
PKY-22-01085.092.57.52.2Porky Main
104.5109.04.50.2
PKY-22-011NSIPorky Main
PKY-22-01235.642.67.00.4Porky Main
PKY-22-01353.662.08.40.5Porky Main
PKY-22-014NSIPorky Main
PKY-22-01535.258.323.10.8Porky Main
PKY-22-01699.7102.73.00.6Porky Main
121.8127.35.50.7
PKY-22-01753.057.54.50.9Porky Main
PKY-22-018NSIPorky West
PKY-22-01964.067.83.81.1Porky West
PKY-22-02049.055.06.00.3Porky West
102.0113.511.50.5
PKY-22-021NSIPorky West
PKY-22-02212.015.33.31.9Porky West
PKY-22-022ANSIPorky West
PKY-22-023149.0165.016.02.5Porky West
PKY-22-024135.5146.010.50.7Porky West
158.4164.46.00.4
PKY-22-025107.3111.54.22.5Porky West
125.0131.06.02.2
137.0140.03.00.6
PKY-22-025ANSIPorky West
PKY-22-02659.767.07.32.1Porky West
128.0148.320.30.5
PKY-22-02738.042.94.90.9Porky West
47.351.84.51.5
82.185.02.90.8
97.5117.019.50.7
121.5124.53.00.6
PKY-22-02851.082.331.31.9Porky West
PKY-22-02959.964.44.50.4Porky West
Notes: All Porky Main and Porky West drilling intercepts reflect core length intersections. Porky Main and Porky West results are uncut, reported at a 0.3 g/t Au cut-off and include a maximum of three meters internal dilution.
NSI – No Significant Intercepts


SSR Mining Inc.
PAGE 18



Table 6: All drill holes completed at the Shane target during the Exploration Period.
Hole IDFrom
(m)
To
(m)
True Width
(m)
Gold
(Au g/t)
Zone
SHA-21-039155.9158.11.84.2Shane HW
271.9275.73.17.1S1
380.7383.42.21.7S4
SHA-21-040252.8262.26.10.2Shane HW
329.6331.51.34.8S1
450.2455.33.50.3S4
SHA-21-041 NSINo Zone
SHA-21-042 NSINo Zone
SHA-21-046175.3181.04.654.3Shane HW
Including175.3177.01.0172.0Shane HW
315.0323.87.22.1S1
SHA-21-047201.7205.82.50.2Shane HW
390.7392.91.43.0S1
SHA-21-048301.2306.94.42.0S1
SHA-21-049176.5179.72.17.5Shane HW
SHA-21-050197.4202.02.70.2Shane HW
SHA-21-051177.2189.911.82.7Shane HW
SHA-21-052290.2293.82.70.3S1
361.0363.41.81.3S2
390.2391.91.33.6S3
396.3399.32.32.5S4
SHA-21-053303.2306.01.60.4Shane HW
382.5386.42.311.9S1
412.4414.41.20.7S2
SHA-22-055103.7105.41.21.1S1
160.2162.21.42.7S2
186.1189.12.21.7S3
208.3212.32.90.3S4
SHA-22-05688.091.52.70.1S1
100.8103.11.80.9S2
134.1135.10.80.0S3
173.6174.60.84.0S4
SHA-22-057111.3114.62.112.3S1
120.0122.51.60.0S2
178.5182.52.70.8S3
SHA-22-058154.1158.72.21.7S1
164.5169.52.43.2S2
SHA-22-059111.8112.40.40.0S1
129.0131.01.50.0S2
SHA-22-060126.0129.92.31.3S1
155.9158.31.50.3S2
241.5243.31.10.3S3
257.3258.60.81.0S4
SHA-22-061155.6157.60.90.6S1
226.0229.41.60.1S2
261.4266.62.50.3S3
326.8328.10.60.8S4
SHA-22-063259.0261.01.10.7Shane HW
SHA-22-064225.0230.51.80.2Shane HW
SSR Mining Inc.
PAGE 19



SHA-22-065136.0140.62.56.5S1
164.0167.72.00.5S2
241.5244.51.70.7S3
286.1288.71.53.1S4
SHA-22-066196.0197.61.07.9S1
246.9249.11.53.6S2
311.0313.01.40.0S3
325.4325.80.30.0S4
SHA-22-067226.0227.20.62.6S1
272.0277.02.70.5S2
SHA-22-06810.512.81.10.0S4
52.653.60.50.1S3
138.8140.81.11.6S1
SHA-22-06970.172.30.86.9S3
142.5144.00.60.0S2
178.0183.22.21.8S1
SHA-22-07054.056.00.90.0S3
141.9143.00.50.0S2
174.0175.40.71.2S1
SHA-22-07173.676.71.22.5S3
163.0166.31.30.2S2
200.5207.52.93.4S1
SHA-22-07261.062.00.40.4S3
196.1202.02.52.0S1
SHA-22-073369.8373.42.01.0Shane HW
476.0478.01.10.9S1
530.6533.11.40.5S2
556.0559.01.70.9S3
SHA-22-074402.6406.02.25.5S1
SHA-22-075314.5318.32.81.2S1
SHA-22-076285.0288.42.91.5S1
372.3374.01.52.7S4
SHA-22-077370.0373.02.00.5S1
SHA-22-078777.0782.63.50.1S1
796.0800.02.60.2S2
SHA-22-079721.4726.13.10.3S1
761.5763.81.50.0S2
SHA-22-080779.8781.51.00.0S1
SHA-22-08145.046.00.40.1Unknown
494.8496.40.84.1S1
SHA-22-082366.4367.60.80.1S1
372.0373.51.10.0S2
433.6436.52.10.0S3
464.4472.76.00.5S4
SHA-22-083441.7445.42.01.5S1
472.0473.00.50.0S2
552.7555.11.30.8S3
613.8617.92.30.4S4
SHA-22-084217.5218.50.70.1Shane HW
331.5336.03.32.6S1
371.5373.01.10.1S2
403.8407.02.48.3S3
SSR Mining Inc.
PAGE 20



SHA-22-08528.332.02.21.6Unknown
226.1228.11.41.0Shane HW
366.5372.74.30.7S1
399.4402.32.00.7S2
422.4445.015.50.0S3
459.1461.71.90.4S4
SHA-22-08626.628.91.52.0Unknown
199.4202.21.92.5Shane HW
365.0369.53.20.2S1
411.2413.31.50.2S2
442.6443.50.60.4S3
489.3491.71.70.3S4
SHA-22-089714.6717.11.60.8S1
742.4744.31.21.4S2
787.0789.31.50.1S3
820.3825.93.70.9S4
SHA-22-090736.4740.02.21.8S1
766.4770.62.60.1S2
821.0822.00.60.1S3
Notes: All Shane drilling intercepts reflect true width intersections. Shane results are uncut.
NSI – No Significant Intercepts


SSR Mining Inc.
PAGE 21



Supporting Drilling Information to SSR Mining Announcement

This document provides supporting drill collar locations and composite assay results for the Shane property drilling program referenced in the announcement “SSR Mining Announces Positive Exploration Results at Seabee”, December 8, 2022. Drill collar locations are surveyed in UTM Zone 13N, NAD83 grid using differential GPS in units of meters. The elevation datum is CGG2013.

Table 7: Supporting collar coordinates for surface drill holes at Santoy.
Hole IDEastingNorthingElevation
(m)
Azimuth
(deg.)
Dip
(deg.)
EOH Depth
(m)
JOY-21-9615998926170220438245-50258
JOY-21-9626000866170053442160-52426
JOY-21-9636000866170053442150-55426
JOY-21-9646002636169616442210-45510
JOY-21-9656002636169616442210-55525
JOY-21-9666002636169616442215-72621
JOY-21-9676002636169616442225-65402
JOY-21-9686002706169620443220-50375
JOY-21-9696002706169620442205-65396
JOY-21-9706002686169620443200-45366
JOY-21-9716002696169620443205-55375
JOY-21-9726001566169317461205-55876
JOY-21-9736001566169317461215-75426
JOY-21-9746003056169258460200-47426
JOY-21-9756003056169258460200-67465
JOY-22-9765985866171056455178-45528
JOY-22-9775985866171056455178-65444
JOY-22-9785985866171056455178-75408
JOY-22-9795984476171121459178-45372
JOY-22-9805984476171121459178-65381
JOY-22-9815984476171121459178-88396
JOY-22-9825991746171155436180-58591
JOY-22-9835991746171155436180-67636.4
JOY-22-9845991746171155436198-65942
JOY-22-9855991746171155436198-72333
JOY-22-9865991746171156435198-72654


SSR Mining Inc.
PAGE 22



Table 8: Collar coordinates for drill holes at the Porky Main and Porky West targets.
Hole IDEastingNorthing
Elevation
(m)
Azimuth
(deg.)
Dip
(deg.)
EOH Depth
(m)
GAS-22-142584574617488746734-69300
GAS-22-143584575617488946635-59270
GAS-22-144584575617488946635-46252
GAS-22-145584600617484646535-70340
GAS-22-146584600617484646535-62321
GAS-22-147584630617488346435-72300
GAS-22-149584686617484545741-58255
GAS-22-150584686617484545741-50362
GAS-22-151584729617487146435-64270
GAS-22-152584729617487146435-50264
GAS-22-153584757617488746635-64261
GAS-22-154584757617488746635-72291
GAS-22-155584757617488746630-55237
GAS-22-156584757617488746615-48246
GAS-22-157584757617488746625-48258
GAS-22-158584813617489146732-69327
GAS-22-159584813617489146732-54252
GAS-22-160584841617489046432-55318
GAS-22-161584841617489046425-71306
GAS-22-162584841617489046440-72360
GAS-22-165584947617491746315-72363
GAS-22-172584566617461746025-45522
PKY-22-001585874617426745464-47111
PKY-22-002585859617431445664-47102
PKY-22-003585822617432145765-45135
PKY-22-004585768617437146165-52160
PKY-22-005585798617437246465-50162
PKY-22-006585838617435946065-48162
PKY-22-007585837617440446065-48120
PKY-22-008585818617443446568-4590
PKY-22-009585803617441146662-50120
PKY-22-010585746617441646365-50162
PKY-22-011585712617445646365-50150
PKY-22-012585761617445246765-50132
PKY-22-013585739617449246665-49120
PKY-22-014585699617453446951-51111
PKY-22-015585717617451946765-57111
PKY-22-016585674617450646774-48150
PKY-22-017585675617452146658-51141
PKY-22-01858505461749924568-45132
PKY-22-019585026617495246016-55132
PKY-22-02058498261750054594-50144
PKY-22-02158502161749934608-45141
PKY-22-02258491561750134625-4277
PKY-22-022A58491561750134625-5381
PKY-22-02358493061749364615-52165
PKY-22-02458489061749534638-45192
PKY-22-02558480561749124673-44141
PKY-22-025A58480561749134642-4588
PKY-22-026584837617495046210-43171
PKY-22-02758485561749954608-45150
SSR Mining Inc.
PAGE 23



PKY-22-02858482261750064574-45141
PKY-22-02958475361749754614-45120

Table 9: Collar coordinates for drill holes at the Shane target.
Hole IDEastingNorthing
Elevation
(m)
Azimuth
(deg.)
Dip
(deg.)
Length
(m)
SHA-21-039593064617159345440-48432
SHA-21-040593064617159345417-65546
SHA-21-041592482617192243810-48420
SHA-21-042592482617192243810-62455
SHA-21-046593064617159345440-58345
SHA-21-047593064617159345440-68432
SHA-21-048593064617159345457-48345
SHA-21-049593064617159345457-58438
SHA-21-050593064617159345457-65486
SHA-21-051593062617159045415-45387
SHA-21-05259307461715904530-58465
SHA-21-05359307461715904530-75462
SHA-22-055593361617161244645-45240
SHA-22-05659336161716124460-50180
SHA-22-05759336161716124460-62270
SHA-22-05859336161716124470-72231
SHA-22-059593305617164444322-55171
SHA-22-060593305617164444322-65291
SHA-22-061593305617164444322-75351
SHA-22-0635933136171657444225-45276
SHA-22-0645933136171657444250-45261
SHA-22-06559330261716464450-68300
SHA-22-066593302617159444530-70396
SHA-22-067593302617159444545-70411
SHA-22-0685933136171805444190-50192
SHA-22-0695933136171805444190-58231
SHA-22-0705933136171805445205-55210
SHA-22-0715933146171804446210-60250
SHA-22-0725933136171804444220-55225
SHA-22-073593044617156745522-76561
SHA-22-074593045617156745622-70501
SHA-22-075593045617156745622-55480
SHA-22-076593045617156745622-48441
SHA-22-077592995617160645320-68531
SHA-22-078592857617146245215-73825
SHA-22-07959285761714634545-73822
SHA-22-0805928546171463452352-73810
SHA-22-081592995617160645320-78501
SHA-22-082592922617165045620-70531
SHA-22-083592922617164945525-77672
SHA-22-084593048617156345730-54411
SHA-22-085593048617156545835-64513
SHA-22-086593048617156545848-54500
SHA-22-089592669617151545522-71879
SHA-22-090592668617151345212-72927

SSR Mining Inc.
PAGE 24