XML 415 R59.htm IDEA: XBRL DOCUMENT v3.25.1
CONCESSION ARRANGEMENTS RIGHTS (Tables)
12 Months Ended
Dec. 31, 2024
Disclosure of detailed information about service concession arrangements [abstract]  
Schedule of balance of assets in concession arrangements

The following is the balance of the assets in concession arrangements registered in the Group as of December 31, 2024 and 2023:

December 31, 2024

December 31, 2023

Financial assets at fair value

 

Ps.

4,181,835

Ps.

3,830,916

Financial asset at amortized cost (1)

 

15,078,406

13,981,904

Total financial assets in concession arrangements rights (2)

Ps.

19,260,241

Ps.

17,812,820

Intangible assets

 

14,314,560

13,557,267

Total assets in concession arrangements rights

 

Ps

33,574,801

Ps.

31,370,087

(1)As of December 31, 2024 and 2023, the balance of the financial asset at amortized cost includes an impairment expense of Ps. (709) and Ps. (223) respectively, see note 16.1.
(2)See note 12.1, “Contract assets”.
Schedule of changes in financial assets in concession arrangements

Energy and Gas

Infrastructure

At fair value

At amortized cost

Total

At amortized cost

Total

Balance as of January 1, 2022

 

Ps.

3,228,480

Ps.

Ps.

3,228,480

Ps.

9,853,052

Ps.

13,081,532

Additions or new concession arrangements

4,575

4,575

1,690,450

1,695,025

Collections during the year

 

(732,647)

(732,647)

Adjustment to fair value

 

278,751

278,751

278,751

Accrued interest

 

1,831,326

1,831,326

Impairment expense

 

(1,220)

(1,220)

Effect of movements in exchange rates

249

249

249

Balance as of December 31, 2022

 

Ps.

3,507,231

Ps.

4,824

Ps.

3,512,055

Ps.

12,640,961

Ps.

16,153,016

Additions or new concession arrangements (1)

118,109

118,109

877,884

995,993

Collections during the year

 

(1,144,396)

(1,144,396)

Adjustment to fair value

 

323,685

323,685

323,685

Accrued interest

 

1,493,115

1,493,115

Impairment expense

(223)

(223)

Effect of movements in exchange rates

(8,370)

(8,370)

(8,370)

Balance as of December 31, 2023

 

Ps.

3,830,916

Ps.

114,563

Ps.

3,945,479

Ps.

13,867,341

Ps.

17,812,820

Additions or new concession arrangements (1)

 

76,572

76,572

1,100,702

1,177,274

Collections during the year

 

(74,231)

(74,231)

(897,403)

(971,634)

Adjustment to fair value

 

350,919

350,919

350,919

Accrued interest

 

861,175

861,175

Impairment expense

(709)

(709)

Effect of movements in exchange rates

 

30,396

30,396

30,396

Balance as of December 31, 2024

 

Ps.

4,181,835

Ps.

147,300

Ps.

4,329,135

Ps.

14,931,106

Ps.

19,260,241

(1)Includes work progress on the Covioriente and Covipacífico concessions; as of December 31, 2024 Ps. 523,216 and Ps. 541,065 respectively; as of December 31, 2023 Ps. 715,573 and Ps. 130,105 respectively and as of December 31, 2022 Ps. 1,043,138 and Ps. 621,988 respectively.

Schedule of movements of the main concession arrangements under intangible assets

The following table shows the movements of the main concession arrangements in Grupo Aval’s subsidiaries under intangible assets during years ended at December 31, 2024, 2023 and 2022:

Cost

Energy and Gas

Infrastructure

Total

Balance as of January 1, 2022

 

Ps.

5,893,832

Ps.

6,418,058

 

Ps.

12,311,890

Additions (1)

 

809,085

1,103,283

 

1,912,368

Reclassification to / from PPE

 

113

 

113

Withdrawals

 

(11,724)

 

(11,724)

Effect of movements in exchange rates

547,529

 

547,529

Balance as of December 31, 2022

 

Ps.

7,238,835

Ps.

7,521,341

 

Ps.

14,760,176

Cost

Energy and Gas

Infrastructure

Total

Additions (1)

 

588,454

714,489

 

1,302,943

Reclassification to / from PPE

 

229

4,041

 

4,270

Withdrawals

 

(6,489)

 

(6,489)

Effect of movements in exchange rates

 

(712,856)

 

(712,856)

Balance as of December 31, 2023

 

Ps.

7,108,173

Ps.

8,239,871

 

Ps.

15,348,044

Additions (1)

 

741,423

708

 

742,131

Reclassification to / from PPE

 

244

 

244

Transfer to non-current assets held for sale

(33,400)

(33,400)

Withdrawals

 

(21,794)

 

(21,794)

Effect of movements in exchange rates

 

472,522

 

472,522

Balance as of December 31, 2024

 

Ps.

8,267,168

Ps.

8,240,579

 

Ps.

16,507,747

Accumulated Amortization

 

Energy and Gas

Infrastructure

Total

Balance as of January 1, 2022

 

Ps.

(1,055,525)

Ps.

(146,847)

 

Ps.

(1,202,372)

Amortization of the year

 

(253,692)

(19,016)

 

(272,708)

Withdrawals

 

835

 

835

Effect of movements in exchange rates

 

(30,801)

 

(30,801)

Balance as of December 31, 2022

 

Ps.

(1,339,183)

Ps.

(165,863)

 

Ps.

(1,505,046)

Amortization of the year

 

(277,702)

(39,385)

 

(317,087)

Reclassification to / from PPE

(2,184)

(2,184)

Withdrawals

 

289

 

289

Effect of movements in exchange rates

 

41,062

 

41,062

Balance as of December 31, 2023

 

Ps.

(1,575,534)

Ps.

(207,432)

 

Ps.

(1,782,966)

Amortization of the year

 

(303,951)

(93,095)

 

(397,046)

Reclassification to / from PPE

18

18

Transfer to non-current assets held for sale

26,426

26,426

Withdrawals

 

6,997

 

6,997

Effect of movements in exchange rates

 

(37,931)

 

(37,931)

Balance as of December 31, 2024

 

Ps.

(1,883,975)

Ps.

(300,527)

 

Ps.

(2,184,502)

Impairment loss

Energy and Gas

Infrastructure

Total

Balance as of January 1, 2022

Ps.

(7,146)

Ps.

(4,256)

Ps.

(11,402)

Period impairment charge

(665)

(357)

(1,022)

Balance as of December 31, 2022

Ps.

(7,811)

Ps.

(4,613)

Ps.

(12,424)

Period impairment charge

4,613

4,613

Balance as of December 31, 2023

Ps.

(7,811)

Ps.

Ps.

(7,811)

Period impairment charge

(874)

(874)

Balance as of December 31, 2024

Ps.

(8,685)

Ps.

Ps.

(8,685)

Total Intangible Assets

 

Energy and Gas

Infrastructure

Total

Balance as of January 1, 2022

 

Ps.

4,831,161

Ps.

6,266,955

 

Ps.

11,098,116

Cost

 

1,345,003

1,103,283

 

2,448,286

Amortization

 

(283,658)

(19,016)

 

(302,674)

Impairment loss

(665)

(357)

(1,022)

Balance as of December 31, 2022

 

Ps.

5,891,841

Ps.

7,350,865

 

Ps.

13,242,706

Cost

 

(130,662)

718,530

 

587,868

Amortization

 

(236,351)

(41,569)

 

(277,920)

Impairment loss

4,613

4,613

Balance as of December 31, 2023

 

Ps.

5,524,828

Ps.

8,032,439

 

Ps.

13,557,267

Cost

 

1,158,995

708

 

1,159,703

Amortization

 

(308,441)

(93,095)

 

(401,536)

Impairment loss

(874)

(874)

Balance as of December 31, 2024

 

Ps.

6,374,508

Ps.

7,940,052

 

Ps.

14,314,560

(1)Gas and Energy, includes borrowing costs capitalized for Ps. 39,433 as of December 31, 2024; Ps. 31,672 as of December 31, 2023 and Ps. 26,134 as of December 31, 2022 with a capitalized interest rate (weighted average) of 9.84%, 12.17% and 8.98% respectively.
Schedule of main concession contracts granted

The following is a summary of the main concession contracts granted to Grupo Aval’s subsidiaries as of December 31, 2024:

Year of

Concession

Contract

construction

% Work

Concession

Owner

Recognition

Business and country

Objective

Current stage

date

start

Progress

end date

Gas and Energy

Surtigas S.A. E.S.P.

Fair value / Intangible assets

Energy and Gas Colombia

Purchase, storage, packaging and distribution of gases derived from hydrocarbons.

Operation

03/1984 to 04/1994

1984

100

%

2034 to 2045

Transmetano E.S.P. S.A.

Fair value / Intangible assets

Energy and Gas Colombia

Construction, operation and maintenance of gas transportation systems.

Operation

08/1994

1996

100

%

2044

Promigas S.A. E.S.P.

Fair value / Intangible assets

Energy and Gas Colombia

Purchase, sale, transportation, distribution, exploitation and exploration of natural gas, oil and hydrocarbons in general.

Operation

05/1976 to 11/1994

1976

100

%

2026 to 2044

Promioriente S.A. E.S.P.

Fair value / Intangible assets

Energy and Gas Colombia

Construction, operation and maintenance of gas pipelines.

Operation

09/1995

1995

100

%

2045

Gases de Occidente S.A. E.S.P.

Fair value / Intangible assets

Energy and Gas Colombia

Transportation and distribution of liquefied petroleum gas and natural gas.

Operation

08/1998

1998

100

%

2047

Compañía Energética de Occidente S.A. E.S.P. (1)

Intangible assets

Energy and Gas Colombia

Administrative, operational, technical and commercial management for the provision of electrical energy.

Operation and maintenance

01/2010

2010

100

%

2035

Sociedad Portuaria El Cayao S.A. E.S.P.

Intangible assets

Energy and Gas Colombia

Construction, maintenance and administration of ports.

Operation

07/2015

2015

100

%

2035

Gases del Pacífico S.A.C.

Amortized cost / Intangible assets

Energy and Gas Perú

Purchase, sale, production, commercialization of energy in any of its forms.

Operation

10/2013

2015

100

%

2034

Gases del Norte del Perú S.A.C.

Amortized cost / Intangible assets

Energy and Gas Perú

Construction and distribution service of natural gas.

Construction and Operation

11/2019

2020

96.83

%

2051

Infrastructure

Proyectos de Infraestructura S.A.

Intangible assets

Infrastructure Colombia

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

Operation

12/1993

1994

100

%

2033

Concesiones CCFC S.A.S.

Intangible assets

Infrastructure Colombia

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

Liquidation

06/1995

2001

100

%

2024

Concesionaria Panamericana S.A.S.

Amortized cost / Intangible assets

Infrastructure Colombia

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

Construction, Operation and maintenance

12/1997

2009

100

%

2035

Concesionaria Vial del Pacífico S.A.S.

Amortized cost

Infrastructure Colombia

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

Construction

09/2014

2018

96.26

%

2043

Concesionaria Nueva Vía del Mar S.A.S.

Amortized cost

Infrastructure Colombia

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

Preconstruction

01/2015

2024

4.11

%

2044

Concesionaria Vial Andina S.A.S.

Intangible assets

Infrastructure Colombia

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

Operation and maintenance

06/2015

2016

100

%

2054

Concesionaria Vial Del Oriente S.A.S.

Amortized cost

Infrastructure Colombia

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

Construction

07/2015

2018

97.77

%

2043

(1)  The concession has an investment commitment for the expansion, replacement and improvement of the infrastructure which as of December 2024 has an advance of 58.34%.