 TRANSALTA CORPORATION

 SECOND QUARTER REPORT FOR 2013

 

 



MANAGEMENT’S DISCUSSION AND ANALYSIS


This Management’s Discussion and Analysis (“MD&A”) contains forward-looking statements.  These statements are based on certain estimates and assumptions and involve risks and uncertainties.  Actual results may differ materially.  See the
Forward-Looking Statements section of this MD&A for additional information.


This MD&A should be read in conjunction with the unaudited interim condensed consolidated financial statements of TransAlta Corporation as at and for the three and six months ended June 30, 2013 and 2012, and should also be read in conjunction with the audited consolidated financial statements and MD&A contained within our 2012 Annual Report.  In this MD&A, unless the context otherwise requires, ‘we’, ‘our’, ‘us’, the ‘Corporation’, and ‘TransAlta’ refers to TransAlta Corporation and its subsidiaries.  The consolidated financial statements have been prepared in accordance with International Financial Reporting Standards (“IFRS”).  All tabular amounts in the following discussion are in millions of Canadian dollars unless otherwise noted.  This MD&A is dated
July 29, 2013.  Additional information respecting TransAlta, including its Annual Information Form, is available on SEDAR at www.sedar.com.



RESULTS OF OPERATIONS


The results of operations are presented on a consolidated basis and by business segment.  We have three business segments: Generation, Energy Trading, and Corporate.  In this MD&A, the impact of foreign exchange fluctuations on foreign currency denominated transactions and balances is discussed with the relevant Condensed Consolidated Statements of Earnings (Loss) and Condensed Consolidated Statements of Financial Position items.  While individual line items in the Condensed Consolidated Statements of Financial Position may be impacted by foreign exchange fluctuations, the net impact of the translation of these items relating to foreign operations to our presentation currency is reflected in Accumulated Other Comprehensive Income (Loss) (“AOCI”) in the equity section of the Condensed Consolidated Statements of Financial Position.

 

TRANSALTA CORPORATION / Q2 2013


HIGHLIGHTS


Second Quarter Highlights


Generation Results


§

Comparable gross margins for Generation operations, which does not include finance lease income, were consistent quarter over quarter primarily due to higher margins in Western Canadian hydro, wind, and gas in response to strong market prices; and lower market curtailments offset by lower contract pricing at Centralia Thermal, unfavourable coal pricing.  Comparable gross margins were also reduced by unrealized mark-to-market movements.

§

Total finance lease income increased $10 million in the quarter due to the new Solomon finance lease.

§

Overall availability, including finance leases and equity investments, adjusted for economic dispatching at Centralia, was 81.8 per cent compared to 87.2 per cent in 2012.  The decrease in availability is primarily due to higher unplanned outages at the Alberta coal Power Purchase Arrangement (“PPA”) facilities, primarily driven by the Keephills Unit 1 force majeure outage, partially offset by lower planned outages at the Alberta coal facilities.

 

  

TRANSALTA CORPORATION / Q2 2013  1

   

 

§

Overall availability, including finance leases and equity investments, was 72.1 per cent compared to 81.6 per cent in 2012.  

§

Overall production decreased 164 gigawatt hours (“GWh”) to 8,110 GWh compared to 2012.  

§

Comparable Operations, Maintenance, and Administration (“OM&A”) costs increased $5 million to $110 million compared to the same period in 2012 due to higher emergent costs, higher routine maintenance costs, and higher costs that are recoverable through PPAs, partially offset by lower compensation costs.  This increase is partially offset by savings in OM&A in our other segments.

 

 


Energy Trading Results


§

Energy Trading gross margins increased $25 million to $14 million quarter over quarter, due to strong trading performance across all markets and prudent management of risk.  The increase in comparable earnings is primarily due to higher earnings in the Energy Trading segment driven by strong trading performance across all markets.


Financial Highlights


§

Funds from Operations (“FFO”) increased $34 million to $184 million compared to the prior year.

§

Comparable Earnings Before Interest, Taxes, Depreciation, and Amortization (“EBITDA”) increased $54 million in the quarter to $247 million compared to 2012.  

§

Comparable earnings were $9 million ($0.03 per share), up from a comparable loss of $23 million ($0.10 per share) in 2012.  The increase in comparable earnings is primarily due to higher earnings in the Energy Trading segment driven by favourable effects of pricing on trading positions held and higher finance lease income due to the new Solomon finance lease.

§

Reported net earnings attributable to common shareholders were $15 million ($0.06 net earnings per share), up from net losses attributable to common shareholders of $798 million ($3.52 net loss per share) in 2012.  The change is driven by an increase in comparable gross margin of $34 million and the following non-comparable amounts, net of tax:

§

Decrease in asset impairment charges of $360 million

§

Decrease in impact of Sundance Units 1 and 2 arbitration of $184 million

§

Decrease in income tax expense related to writeoff of deferred income tax assets of $169 million

§

Impact of de-designated hedges of $49 million

§

On June 26, 2013, we announced the creation of TransAlta Renewables Inc. (“TransAlta Renewables”), an entity which will provide investors with the opportunity to invest directly in a highly contracted portfolio of renewable power generation facilities. The creation of TransAlta Renewables provides us with a focused vehicle for pursuing and funding growth opportunities in the renewable power generation sector.  


Year-To-Date Highlights


Generation Results


§

Comparable gross margins for Generation operations, which doesn’t include finance lease income, decreased $5 million to $712 million year over year, primarily due to lower contract pricing at Centralia Thermal and unfavourable coal pricing; partially offset by lower planned outages at Alberta coal facilities; higher margins in Western Canadian hydro, wind, and gas in response to strong market prices; and lower market curtailments.  Comparable gross margins were also reduced by unrealized mark-to-market movements.

§

Total finance lease income increased $19 million year over year due to the new Solomon finance lease.

§

Overall availability, including finance leases and equity investments, adjusted for economic dispatching at Centralia, was 86.6 per cent compared to 89.5 per cent in 2012.  The decrease in availability is primarily due to higher unplanned outages at the Alberta coal PPA facilities, primarily driven by the Keephills Unit 1 force majeure outage, partially offset by lower planned outages at the Alberta coal facilities.

 

  

TRANSALTA CORPORATION / Q2 2013  2

   

 

§

Overall availability, including finance leases and equity investments, was 81.7 per cent compared to 86.7 per cent in 2012.  

§

Overall production increased 1,039 GWh to 18,754 GWh compared to 2012.  

§

OM&A costs are comparable to the same period in 2012.


Energy Trading Results


§

Energy Trading gross margins increased $25 million to $31 million period over period, due to strong trading performance across all markets and prudent management of risk.  The increase in comparable earnings is primarily due to higher earnings in the Energy Trading segment driven by strong trading performance across all markets.


Financial Highlights


§

FFO increased $37 million to $376 million compared to the prior year.

§

Comparable EBITDA increased $68 million to $514 million compared to 2012.  

§

Comparable earnings were $41 million ($0.16 per share), up from $21 million ($0.09 per share) in 2012.  The increase in comparable earnings is primarily due to higher earnings in the Energy Trading segment driven by favourable effects of pricing on trading positions held, higher finance lease income due to the Solomon finance lease, and OM&A savings in the Corporate Segment.

§

Reported net earnings attributable to common shareholders were $4 million ($0.02 net earnings per share), up from net losses attributable to common shareholders of $710 million ($3.14 net loss per share) in 2012.  The change is driven by an increase in comparable gross margin of $40 million and the following non-comparable amounts, net of tax:

§

Decrease in asset impairment charges of $360 million

§

Decrease in impact of Sundance Units 1 and 2 arbitration of $184 million

§

Decrease in income tax expense related to writeoff of deferred income tax assets of $169 million

§

Net loss impact of de-designated hedges of $33 million

§

Loss on assumption of pension obligations of $22 million due to the assumption of mining operations at the Highvale Mine and related pension obligations for mine employees


  

TRANSALTA CORPORATION / Q2 2013  3

   



The following table depicts key financial results and statistical operating data:1


 

 

3 months ended June 30

6 months ended June 30

 

 

2013

2012

2013

2012

Availability (%)(1)

72.1

81.6

81.7

86.7

Adjusted availability (%)(1),(2)

81.8

87.2

86.6

89.5

Production (GWh)(1)

8,110

8,274

18,754

17,715

Revenues

542

398

1,082

1,042

Gross margin(3)

 

355

256

694

725

Comparable gross margin(4)

 

363

329

743

703

Operating income (loss)(3)

 

83

(396)

159

(225)

Comparable operating income(4)

 

102

54

230

176

Net earnings (loss) attributable to common shareholders

15

(798)

4

(710)

Net earnings (loss) per share attributable to common
 shareholders, basic and diluted

0.06

(3.52)

0.02

(3.14)

Comparable net earnings (loss) per share(4)

0.03

(0.10)

0.16

0.09

Comparable EBITDA(4)

247

193

514

446

Funds from operations(4)

184

150

376

339

Funds from operations per share(4)

0.70

0.66

1.45

1.50

Cash flow from operating activities

 

92

78

348

261

Free cash flow (deficiency)(4)

9

(34)

85

(24)

Dividends paid per common share

0.29

0.29

0.58

0.58



As at     June 30, 2013 Dec. 31, 2012
Total assets     9,456 9,462
Total long-term liabilities     5,060 4,729


 

AVAILABILITY & PRODUCTION


Availability for the three and six months ended June 30, 2013 decreased compared to the same periods in 2012 primarily due to higher unplanned outages at the Alberta coal PPA facilities, primarily driven by the Keephills Unit 1 force majeure outage, and higher planned and unplanned outages at Centralia Thermal, partially offset by lower planned outages at the Alberta coal facilities.


Production for the three months ended June 30, 2013 decreased 164 GWh compared to the same period in 2012 primarily due to higher unplanned outages at the Alberta coal PPA facilities, primarily driven by the Keephills Unit 1 force majeure outage, higher planned and unplanned outages at Centralia Thermal, and unfavourable conditions at natural gas-fired facilities, partially offset by lower economic dispatching at Centralia Thermal, higher PPA customer demand, lower planned outages at the Alberta coal facilities, and lower market curtailments.

 

  

TRANSALTA CORPORATION / Q2 2013  4

   

 


1() Availability and production includes all generating assets (generation operations, finance leases, and equity investments).


(2) Adjusted for economic dispatching at Centralia Thermal.


(3) These items are Additional IFRS Measures.  Refer to the Additional IFRS Measures section of this MD&A for further discussion of these items.


(4) These items are not defined under IFRS.  Presenting these items from period to period provides management and investors with the ability to evaluate earnings trends more readily in comparison with prior periods’ results.  Refer to the Non-IFRS Measures section of this MD&A for further discussion of these items, including, where applicable, reconciliations to measures calculated in accordance with IFRS.  

 

  

TRANSALTA CORPORATION / Q2 2013  5

   


 

For the six months ended June 30, 2013, production increased 1,039 GWh compared to the same period in 2012 primarily due to lower economic dispatching at Centralia Thermal, lower planned outages at the Alberta coal facilities, higher PPA customer demand, and lower market curtailments, partially offset by higher unplanned outages at the Alberta coal PPA facilities, primarily driven by the Keephills Unit 1 force majeure outage, and higher planned and unplanned outages at Centralia Thermal.



NET EARNINGS ATTRIBUTABLE TO COMMON SHAREHOLDERS


The primary factors contributing to the change in net earnings attributable to common shareholders for the three and six months ended June 30, 2013 are presented below:


 

3 months ended June 30

6 months ended June 30

Net loss attributable to common shareholders, 2012

(798)

(710)

Decrease in Generation comparable gross margins

(1)

(5)

Mark-to-market movements and de-designations
  on hedges - Generation

75

(51)

Increase in Energy Trading gross margins

25

25

Decrease in operations, maintenance, and administration costs

-

13

Decrease in depreciation and amortization expense

8

10

Increase in gain on sale of assets

10

7

Decrease in asset impairment charges

365

365

Decrease in coal inventory writedown

6

26

Increase in finance lease income

10

19

Increase in reversal of restructuring charges

2

2

Decrease (increase) in equity loss

2

(2)

Increase in loss on assumption of pension obligations

-

(29)

Decrease in impact of Sundance Units 1 and 2 arbitration

247

247

Decrease in income tax expense

65

84

Increase in preferred share dividends

(4)

(6)

Other

3

9

Net earnings attributable to common shareholders, 2013

15

4


Generation comparable gross margins for the three and six months ended June 30, 2013, excluding the impact of mark-to-market movements on de-designations, decreased by $1 million and $5 million, respectively, compared to the same periods in 2012, as there was lower contract pricing at Centralia Thermal, and unfavourable coal pricing; partially offset by higher margins in Western Canadian hydro, wind, and gas in response to strong market prices; lower planned outages at Alberta coal facilities; and lower market curtailments.


Mark-to-market movements increased for the three months ended June 30, 2013 compared to the same period in 2012 due to the recognition of lower mark-to-market gains in 2012 resulting from certain power hedging relationships being deemed ineffective.


Mark-to-market movements decreased for the six months ended June 30, 2013 compared to the same period in 2012 due to the recognition of higher mark-to-market gains in 2012 resulting from certain power hedging relationships being deemed ineffective and released from AOCI to net earnings.


For the three and six months ended June 30, 2013, Energy Trading gross margins increased compared to the same periods in 2012 due to strong trading performance across all markets and prudent management of risk.  The increase in comparable earnings is primarily due to higher earnings in the Energy Trading segment driven by strong trading performance across all markets.

 

  

TRANSALTA CORPORATION / Q2 2013  6

   

 


OM&A costs for the six months ended June 30, 2013 decreased compared to the same period in 2012 primarily due to lower compensation costs as a result of organizational restructuring in the fourth quarter of 2012 and a continued focus on costs.


Depreciation and amortization expense for the three and six months ended June 30, 2013 decreased compared to the same periods in 2012 primarily due to a lower depreciable base caused by asset impairments, the change in the economic useful lives of Alberta coal-fired plants resulting from amendments to Canadian federal regulations in 2012, and a decrease in asset retirements, partially offset by an increased asset base through acquiring new assets and the commencement of commercial operations of New Richmond.


The increase in the gain on sale of assets in the three and six months ended June 30, 2013 compared to the same periods in 2012 is due to the sale of land during the second quarter of 2013.


Coal inventory has been written down to its net realizable value at our Centralia plant.  The writedown for the three and six months ended June 30, 2013 is lower compared to the same periods in 2012 due to an increase in prices in the Pacific Northwest and a decrease in delivered coal costs.


Finance lease income for the three and six months ended June 30, 2013 increased compared to the same periods in 2012 due to the acquisition of the Solomon Power station.  We began receiving lease payments in the fourth quarter of 2012.


Reversal of restructuring charges for the three and six months ended June 30, 2013 increased compared to the same periods in 2012 due to a reduction in our total expected costs.


Equity loss for the three months ended June 30, 2013 decreased compared to the same period in 2012 primarily due to favourable pricing, partially offset by higher unplanned outages at CE Generation, LLC (“CE Gen”).


For the six months ended June 30, 2013, equity loss increased compared to the same period in 2012 primarily due to higher planned outages at CE Gen and unfavourable pricing.


Pension obligations for the six months ended June 30, 2013 increased compared to the same period in 2012 due to assuming certain pension obligations during the first quarter related to assuming operating and management control of the Highvale Mine.  


For the three and six months ended June 30, 2013, the impact of the Sundance Units 1 and 2 arbitration decreased compared to the same periods in 2012.  The impact of the arbitration ruling was recorded during the second quarter of 2012.


Income tax expense for the three and six months ended June 30, 2013 decreased compared to the same periods in 2012 due to the income tax effect on non-comparable items that were recorded during the second quarter of 2012.


The preferred share dividends for the three and six months ended June 30, 2013 increased compared to the same periods in 2012 due to a higher balance of preferred shares outstanding during 2013.  



FUNDS FROM OPERATIONS AND FREE CASH FLOW (DEFICIENCY)


FFO for the three and six months ended June 30, 2013 increased $34 million and $37 million, respectively, compared to the same period in 2012 to $184 million and $376 million, respectively, due to higher comparable net earnings, after excluding the impact of Sundance Units 1 and 2 arbitration in 2012.

 

  

TRANSALTA CORPORATION / Q2 2013  7

   


Free cash flow (deficiency) for the three months ended June 30, 2013 increased $43 million compared to the same period in 2012 due to higher net earnings and lower sustaining capital expenditures, partially offset by higher cash dividends paid.


For the six months ended June 30, 2013, free cash flow (deficiency) increased $109 million compared to the same period in 2012 due to higher net earnings, lower cash dividends paid as a result of increased participation in the Premium DividendTM, Dividend Reinvestment and Optional Common Share Purchase Plan (the “Plan”), and lower sustaining capital expenditures



SIGNIFICANT EVENTS


Three months ended June 30, 2013


TransAlta Renewables Inc.


On June 26, 2013, we announced the launch and creation of TransAlta Renewables, an entity which will provide investors with the opportunity to invest directly in a highly contracted portfolio of renewable power generation facilities.  We will be the sponsor and manager of TransAlta Renewables and will provide TransAlta Renewables with its initial asset base.  A preliminary prospectus qualifying the initial public offering of TransAlta Renewables common shares to the public (the “Offering”) was filed on
June 26, 2013.


We intend to transfer 1,112 net megawatts (“MW”) of highly contracted wind and hydro power generation assets to TransAlta Renewables upon completion of the Offering.  We will be the primary source of growth of TransAlta Renewables’ portfolio of renewable power generation assets, by providing TransAlta Renewables with the opportunity to purchase, or participate in the development of, renewable power generation facilities with stable, long-term, contracted cash flows.  The creation of TransAlta Renewables provides us with a focused vehicle for pursuing and funding growth opportunities in the renewable power generation sector.  Upon completion of the Offering, we will retain control of and fully consolidate TransAlta Renewables. 


Completion of the Offering is subject to, and conditional upon, the receipt of all necessary approvals, including regulatory approvals.  The Offering is expected to close in August 2013.


Update on Hydro Facilities Due to Southern Alberta Flooding


As a result of extremely high rainfall in southern Alberta and inflows to our reservoirs, we were required, and continue, to manage the water flow through our hydro systems safely and efficiently under these difficult circumstances.  We continue to monitor and adjust the flow of water through our hydro system to accommodate fluctuations in water levels.  Several of the hydro facilities we operate in Alberta in the Bow River Basin have been impacted by the flooding events and are currently being inspected and tested to determine the extent of the damage.  We continue to assess any financial impacts through the third quarter and believe that we have sufficient insurance coverage for this damage, subject to a $5 million deductible. 


City of Riverside


On June 18, 2013, we announced that CalEnergy, LLC (“CalEnergy”), a joint venture with MidAmerican Energy Holdings Company, had executed an 86 MW long-term contract for renewable geothermal power with the City of Riverside which runs from 2016 to 2039.  CalEnergy will purchase the power from CE Gen’s portfolio of geothermal generating facilities in California’s Imperial Valley.


  

TRANSALTA CORPORATION / Q2 2013  8

   


Sundance Units 1 and 2


On Dec. 16, 2010 and Dec. 19, 2010, Unit 1 and Unit 2, respectively, of our Sundance facility were shut down due to conditions observed in the boilers at both units.  On Feb. 8, 2011, we issued a notice of termination for destruction based on the determination that the units could not be economically restored to service under the terms of the PPA.  On July 20, 2012, an arbitration panel concluded that Units 1 and 2 were not to be economically destroyed and required the units to be restored to service.  However, the panel affirmed that the event met the criteria of force majeure beginning Nov. 20, 2011 and continuing until such a time as each unit is returned to service.  The cost to repair Sundance Units 1 and 2 is estimated at approximately $215 million and are expected to start generating production in the third and fourth quarter of 2013, respectively.  The total estimated spend has increased by $25 million due to additional scope of work for balance of plant systems and equipment as well as higher labour costs due to an increase in rates.  This work is being performed concurrently with the boiler repairs to prevent the need for a later outage for this work. 


We expect an earlier return-to-service date of Aug. 6 for Sundance Unit 1.


Premium DividendTM Program


On May 8, 2013, we announced that as a result of the current low share price environment, we are suspending the Premium Dividend™ component of the Plan following the payment of the quarterly dividend on July 1, 2013.  Our Dividend Reinvestment and Optional Common Share Purchase Plan, separate components of the Plan, remain effective in accordance with their current terms.


Keephills Unit 1


On March 5, 2013, an outage occurred at Unit 1 of our Keephills facility due to a winding failure found in the generator.  Upon completion of the initial repair work, further condition testing and analysis identified greater winding degradation requiring a full rewind of the generator.  In response to the event, we gave notice of a High Impact Low Probability event and claimed force majeure relief under the PPA.  In the event of a force majeure, we are entitled to continue to receive our PPA capacity payment and are protected under the terms of the PPA from having to pay availability penalties.  As a result, we do not expect the outage to have a material financial impact on the Corporation.  We are working with the original equipment manufacturer of the generator to safely return the Unit to service, which is expected to be October 2013.  


Six months ended June 30, 2013


New Richmond


On March 13, 2013, our 68 MW New Richmond wind farm began commercial operations.  The total cost of the project remains at approximately $212 million.


SunHills Mining Limited Partnership


Effective Jan. 17, 2013, we assumed, through our wholly owned SunHills Mining Limited Partnership (“SunHills”), operations and management control of the Highvale Mine from Prairie Mines and Royalty Ltd. (“PMRL”).  PMRL employees working at the Highvale Mine were offered employment by SunHills which agreed to assume responsibility for certain pension plan and pension funding obligations, which we had previously funded through the payments made under the PMRL mining contracts.  As a result, a pre-tax loss of $29 million was recognized during the first quarter, along with the corresponding liabilities.  


We also entered into finance leases for certain mining equipment that was in use, or committed to, by PMRL in mining operations.  As a result, $8 million and $29 million in mining equipment have been capitalized to PP&E and the related finance lease obligations recognized during three and six months ended June 30, 2013.  At the end of the lease term, we are eligible to purchase the assets, for a nominal amount.  

 

  

TRANSALTA CORPORATION / Q2 2013  9

   

 


Change in Estimates - Useful Lives


During the first quarter, management completed a comprehensive review of the estimated useful lives of our hydro assets, having regard for, among other things, our economic life cycle maintenance program and the existing condition of the assets.  As a result, depreciation was reduced by $1 million and $2 million for the three and six months ended June 30, 2013, respectively.  Pre-tax depreciation expense is expected to be reduced by $5 million for the year ended Dec. 31, 2013 and by $5 million annually thereafter.


Centralia Coal Inventory Writedown


During the three and six months ended June 30, 2013, we recognized a pre-tax writedown of $2 million and $16 million, respectively, related to the coal inventory at our Centralia plant to write the inventory down to its net realizable value.



SUBSEQUENT EVENTS


Centralia Thermal


On July 25, 2012, we announced that we entered into an 11-year agreement to provide electricity from the Centralia Thermal plant to Puget Sound Energy (“PSE”).  The agreement was approved, with conditions, by the Washington Utilities and Transportation Commission (“WUTC”) on Jan. 9, 2013.  On Jan. 23, 2013, it was announced that PSE had filed a petition for reconsideration of certain conditions within the decision issued by the WUTC.  On June 25, 2013, regulatory approval was confirmed by the WUTC and as of July 5, 2013, the contract is in effect in accordance with the WUTC’s terms and conditions.



BUSINESS ENVIRONMENT


We operate in a variety of business environments to generate electricity, find buyers for the power we generate, and arrange for its transmission.  The major markets we operate in are Western Canada, the Western United States (“U.S.”), and Eastern Canada.  For a further description of the regions in which we operate as well as the impact of prices of electricity and natural gas upon our financial results, refer to our 2012 Annual MD&A.


Contracted Cash Flows


During the second quarter of 2013, approximately 90 per cent of our consolidated power portfolio was contracted through the use of PPAs and other long-term contracts.  We also entered into short-term physical and financial contracts for the remaining volumes, which are primarily for periods of up to five years.  The average prices of these contracts for the balance of 2013 are approximately $60 per megawatt hour (“MWh”) in Alberta and approximately U.S.$40 per MWh in the Pacific Northwest.  


  

TRANSALTA CORPORATION / Q2 2013  10

   



Electricity Prices


Please refer to the Business Environment section of our 2012 Annual MD&A for a full discussion of the spot electricity market and the impact of electricity prices on our business, as well as our strategy to hedge our risks associated with changes in these prices.


The average spot electricity prices for the three and six months ended June 30, 2013 and 2012 in our three major markets are shown in the following graphs.




For the three months ended June 30, 2013, average spot prices in Alberta increased compared to the same period in 2012 primarily due to tighter supply.  In the Pacific Northwest, average spot prices increased due to lower hydro generation and higher natural gas prices.  The average spot prices in Ontario increased compared to 2012 due to higher natural gas prices.

 

  

TRANSALTA CORPORATION / Q2 2013  11

   

 



For the six months ended June 30, 2013, average spot prices in Alberta increased compared to the same period in 2012 primarily due to tighter supply.  In the Pacific Northwest, average spot prices increased due to higher natural gas prices and lower hydro generation.  The average spot prices in Ontario increased compared to 2012 due to higher natural gas prices.


Over the balance of 2013, power prices in Alberta are expected to be comparable to 2012 based on increased supply in the market.  However, prices can vary based on supply and weather conditions.  In the Pacific Northwest, we expect prices to be modestly stronger than in 2012; however, we expect that overall prices will still remain weak due to low natural gas prices and slow load growth.





  

TRANSALTA CORPORATION / Q2 2013  12

   

Spark Spreads


Please refer to the Business Environment section of our 2012 Annual MD&A for a full discussion of spark spreads and the impact of spark spreads on our business.


The average spark spreads for the three and six months ended June 30, 2013 and 2012 in our three major markets are shown in the following graphs.


[ex132008.gif]

(1) For a 7,000 British Thermal Units per Kilowatt hour heat rate plant.


For the three months ended June 30, 2013, average spark spreads increased in Alberta compared to the same period in 2012 due to higher prices driven by tighter supply.  In the Pacific Northwest, average spark spreads increased due to lower hydro generation. For the three months ended June 30, 2013, average spark spreads decreased in Ontario compared to the same period in 2012 due to an increase in supply as a result of nuclear generating plants returning to service in the quarter.


  

TRANSALTA CORPORATION / Q2 2013  13

   

[ex132010.gif]

(1) For a 7,000 British Thermal Units per Kilowatt hour heat rate plant.


For the six months ended June 30, 2013, average spark spreads increased in Alberta compared to the same period in 2012 due to higher prices driven by tighter supply.  In the Pacific Northwest, average spark spreads increased due to lower hydro generation.  For the six months ended June 30, 2013, average spark spreads decreased in Ontario compared to the same period in 2012 due to an increase in supply as a result of nuclear generating plants returning to service.




  

TRANSALTA CORPORATION / Q2 2013  14

   

GENERATION:  TransAlta owns and operates hydro, wind, natural gas-fired and coal-fired facilities, and related mining operations in Canada, the U.S., and Australia.  Generation revenues and overall profitability are derived from the availability and production of electricity and steam as well as ancillary services such as system support.  For a full listing of all of our generating assets and the regions in which they operate, refer to the Plant Summary section of our 2012 Annual MD&A.


Generation Operations:  During the first quarter of 2013, we began commercial operations at New Richmond, a 68 MW wind farm in Québec.  At June 30, 2013, our generating assets had 8,268 MW of gross generating capacity(1) in operation (7,926 MW net ownership interest) and 560 MW under restoration in the Sundance Units 1 and 2 major project.  The following information excludes assets that are accounted for as a finance lease or using the equity method, which are discussed separately within this discussion of the Generation Segment.


The results of Generation Operations are as follows:


 

 

2013

 

2012

3 months ended June 30

Total

Comparable adjustments(2)

Comparable
total(2)

Per installed
MWh

 

Comparable
total(2)

Per installed
MWh

Revenues

 

528

8

536

29.68

 

492

27.43

Fuel and purchased power

187

-

187

10.36

 

142

7.92

Gross margin

341

8

349

19.32

 

350

19.51

Operations, maintenance, and administration

111

(1)

110

6.09

 

105

5.85

Depreciation and amortization

125

-

125

6.92

 

134

7.47

Inventory writedown

2

-

2

0.11

 

9

0.50

Reversal of restructuring charges

(1)

1

-

-

 

-

-

Taxes, other than income taxes

8

-

8

0.44

 

7

0.39

Intersegment cost allocation

3

-

3

0.17

 

4

0.22

Operating income

93

8

101

5.59

 

91

5.08

Installed capacity (GWh)

18,058

 

18,058

 

 

17,937

 

Production (GWh)

7,592

 

7,592

 

 

7,852

 

Availability (%)

70.8

 

70.8

 

 

81.1

 

Adjusted availability (%)(3)

80.5

 

80.5

 

 

86.7

 



  

TRANSALTA CORPORATION / Q2 2013  15

   

2



1() We measure capacity as net maximum capacity (see glossary for definition of this and other key terms), which is consistent with industry standards.  Capacity figures represent capacity owned and in operation unless otherwise stated.


(2) Comparable figures are not defined under IFRS.  Refer to the Non-IFRS Measures section of this MD&A for further discussion of these items, including, where applicable, reconciliations to net earnings attributable to common shareholders and cash flow from operating activities.


2(3) Adjusted for economic dispatching at Centralia Thermal.

 


 

 

2013

 

2012

6 months ended June 30

Total

Comparable
adjustments

Comparable
total

Per installed
MWh

 

Comparable
total

Per installed
MWh

Revenues

 

1,051

49

1,100

30.63

 

1,034

28.89

Fuel and purchased power

388

-

388

10.80

 

317

8.86

Gross margin

663

49

712

19.83

 

717

20.03

Operations, maintenance and administration

205

(1)

204

5.68

 

204

5.70

Depreciation and amortization

247

-

247

6.88

 

258

7.21

Inventory writedown

16

-

16

0.45

 

9

0.25

Reversal of restructuring charges

(1)

1

-

-

 

-

-

Taxes, other than income taxes

15

-

15

0.42

 

14

0.39

Intersegment cost allocation

7

-

7

0.19

 

7

0.20

Operating income

174

49

223

6.21

 

225

6.28

Installed capacity (GWh)

35,914

 

35,914

 

 

35,788

 

Production (GWh)

17,704

 

17,704

 

 

16,765

 

Availability (%)

81.1

 

81.1

 

 

86.3

 

Adjusted availability (%)

86.0

 

86.0

 

 

89.1

 


The outages at Centralia Thermal did not negatively impact our gross margins for the three and six months ended June 30, 2013 as we were able to extend our planned outages to take advantage of lower market prices to purchase power on the market to fulfill our power contracts.  Generation availability, after adjusting for economic dispatching, was 80.5 per cent and 86.0 per cent for the three and six months ended June 30, 2013, respectively.  For the three and six months ended June 30, 2012, Generation availability, after adjusting for economic dispatching, was 86.7 per cent and 89.1 per cent, respectively.


Generation Operations Production and Comparable Gross Margins


Production volumes, comparable revenues, fuel and purchased power expenses, and comparable gross margins based on geographical regions and fuel types are presented below.

3 months ended June 30, 2013

Production (GWh)

Installed (GWh)

Comparable revenues

Comparable fuel & purchased power

Comparable
gross margin

Comparable revenues per
installed MWh

Comparable fuel & purchased power per installed MWh

Comparable
gross margin per
installed MWh

 

 

 

 

 

 

 

 

 

Coal

4,509

7,003

188

96

92

26.85

13.71

13.14

Gas

562

778

38

8

30

48.84

10.28

38.56

Renewables

854

2,921

88

4

84

30.13

1.37

28.76

Total Western Canada

5,925

10,702

314

108

206

29.34

10.09

19.25

 

 

 

 

 

 

 

 

 

Gas

794

1,638

96

47

49

58.61

28.69

29.92

Renewables

397

1,592

40

2

38

25.13

1.26

23.87

Total Eastern Canada

1,191

3,230

136

49

87

42.11

15.17

26.94

 

 

 

 

 

 

 

 

 

Coal

132

2,929

52

18

34

17.75

6.15

11.60

Gas

344

1,197

34

12

22

28.40

10.03

18.37

Total International

476

4,126

86

30

56

20.84

7.27

13.57

 

7,592

18,058

536

187

349

29.68

10.36

19.32

 

  

TRANSALTA CORPORATION / Q2 2013  16

   

 


3 months ended June 30, 2012

Production (GWh)

Installed (GWh)

Comparable revenues

Comparable
fuel &
purchased
power

Comparable gross margin

Comparable revenues per
installed MWh

Comparable fuel
& purchased
power per
installed MWh

Comparable
gross margin per
installed MWh

 

 

 

 

 

 

 

 

 

Coal

4,732

7,032

215

85

130

30.57

12.09

18.48

Gas

546

778

21

4

17

26.99

5.14

21.85

Renewables

935

2,921

47

3

44

16.09

1.03

15.06

Total Western Canada

6,213

10,731

283

92

191

26.37

8.57

17.80

 

 

 

 

 

 

 

 

 

Gas

958

1,638

86

37

49

52.50

22.59

29.91

Renewables

335

1,442

32

2

30

22.19

1.39

20.80

Total Eastern Canada

1,293

3,080

118

39

79

38.31

12.66

25.65

 

 

 

 

 

 

 

 

 

Coal

-

2,929

63

5

58

21.51

1.71

19.80

Gas

346

1,197

28

6

22

23.39

5.01

18.38

Total International

346

4,126

91

11

80

22.06

2.67

19.39

 

7,852

17,937

492

142

350

27.43

7.92

19.51


6 months ended June 30, 2013

Production (GWh)

Installed (GWh)

Comparable revenues

Comparable fuel & purchased power

Comparable
gross margin

Comparable revenues per
installed MWh

Comparable fuel & purchased power per installed MWh

Comparable
gross margin per
installed MWh

 

 

 

 

 

 

 

 

 

Coal

9,784

13,929

416

190

226

29.87

13.64

16.23

Gas

1,230

1,547

68

15

53

43.96

9.70

34.26

Renewables

1,593

5,810

144

7

137

24.78

1.20

23.58

Total Western Canada

12,607

21,286

628

212

416

29.50

9.96

19.54

 

 

 

 

 

 

 

 

 

Gas

1,795

3,257

201

98

103

61.71

30.09

31.62

Renewables

822

3,165

82

4

78

25.91

1.26

24.65

Total Eastern Canada

2,617

6,422

283

102

181

44.07

15.88

28.19

 

 

 

 

 

 

 

 

 

Coal

1,810

5,825

123

49

74

21.12

8.41

12.71

Gas

670

2,381

66

25

41

27.72

10.50

17.22

Total International

2,480

8,206

189

74

115

23.03

9.02

14.01

 

17,704

35,914

1,100

388

712

30.63

10.80

19.83



  

TRANSALTA CORPORATION / Q2 2013  17

   



6 months ended June 30, 2012

Production (GWh)

Installed (GWh)

Comparable revenues

Comparable
fuel &
purchased
power

Comparable gross margin

Comparable revenues per
installed MWh

Comparable fuel
& purchased
power per
installed MWh

Comparable
gross margin per
installed MWh

 

 

 

 

 

 

 

 

 

Coal

9,995

13,976

425

166

259

30.41

11.88

18.53

Gas

1,250

1,556

52

10

42

33.42

6.43

26.99

Renewables

1,686

5,842

95

6

89

16.26

1.03

15.23

Total Western Canada

12,931

21,374

572

182

390

26.76

8.52

18.24

 

 

 

 

 

 

 

 

 

Gas

1,961

3,276

185

80

105

56.47

24.42

32.05

Renewables

795

2,886

77

4

73

26.68

1.39

25.29

Total Eastern Canada

2,756

6,162

262

84

178

42.52

13.63

28.89

 

 

 

 

 

 

 

 

 

Coal

404

5,858

145

37

108

24.75

6.32

18.43

Gas

674

2,394

55

14

41

22.97

5.85

17.12

Total International

1,078

8,252

200

51

149

24.24

6.18

18.06

 

16,765

35,788

1,034

317

717

28.89

8.86

20.03


Western Canada


Our Western Canada assets consist of coal, natural gas, hydro, and wind facilities.  Refer to the Discussion of Segmented Results section of our 2012 Annual MD&A for further details on our Western Canadian operations.


The primary factors contributing to the change in production for the three and six months ended June 30, 2013 are presented below:


 

 

3 months ended
June 30

6 months ended
June 30

 

 

(GWh)

(GWh)

Production, 2012

 

6,213

12,931

Higher unplanned outages at the Alberta coal PPA facilities, primarily driven
  by the Keephills Unit 1 force majeure outage

 

(1,046)

(1,402)

Lower hydro volumes

 

(49)

(53)

Lower wind volumes

 

(33)

(41)

Higher (lower) production at natural gas-fired facilities

 

16

(20)

Lower planned outages at the Alberta coal facilities

 

179

462

Higher PPA customer demand

 

447

339

Market curtailments

 

193

304

Lower unplanned outages at Genesee Unit 3 and Keephills Unit 3

 

5

80

Other

 

-

7

Production, 2013

 

5,925

12,607


  

TRANSALTA CORPORATION / Q2 2013  18

   



The primary factors contributing to the change in comparable gross margin for the three and six months ended June 30, 2013 are presented below:


 

 

3 months ended
June 30

6 months ended
June 30

Comparable gross margin, 2012

 

191

390

Higher hydro margins

 

15

21

Lower planned outages at the Alberta coal facilities

 

3

19

Market curtailments

 

7

14

Lower unplanned outages at Genesee Unit 3 and Keephills Unit 3

 

-

4

Unfavourable coal pricing

 

(12)

(15)

Pricing, net of PPA penalties and unrealized mark-to-market movements

 

4

(7)

Higher unplanned outages at the Alberta coal PPA facilities, primarily driven  
  by the Keephills Unit 1 force majeure outage

 

-

(5)

Other

 

(2)

(5)

Comparable gross margin, 2013

 

206

416


Eastern Canada


Our Eastern Canada assets consist of natural gas, hydro, and wind facilities.  Refer to the Discussion of Segmented Results section of our 2012 Annual MD&A for further details on our Eastern Canadian operations.


The primary factors contributing to the change in production for the three and six months ended June 30, 2013 are presented below:


 

 

3 months ended
June 30

6 months ended
June 30

 

 

(GWh)

(GWh)

Production, 2012

 

1,293

2,756

Unfavourable market conditions at natural gas-fired facilities

 

(163)

(165)

Higher (lower) wind volumes

 

23

(8)

Lower hydro volumes

 

(7)

(7)

Commencement of commercial operations of New Richmond

 

43

43

Other

 

2

(2)

Production, 2013

 

1,191

2,617


The primary factors contributing to the change in gross margin for the three and six months ended June 30, 2013 are presented below:


 

 

3 months ended
June 30

6 months ended
June 30

Gross margin, 2012

 

79

178

Commencement of commercial operations of New Richmond

 

5

5

Higher wind volumes

 

2

-

Favourable (unfavourable) contracted gas input costs

 

1

(1)

Other

 

-

(1)

Gross margin, 2013

 

87

181




  

TRANSALTA CORPORATION / Q2 2013  19

   

International


Our International assets consist of coal, natural gas, and hydro facilities in various locations in the U.S., and natural gas and diesel assets in Australia.  Refer to the Discussion of Segmented Results section of our 2012 Annual MD&A for further details on our International operations.


The primary factors contributing to the change in production for the three and six months ended June 30, 2013 are presented below:


 

 

3 months ended
June 30

6 months ended
June 30

 

 

(GWh)

(GWh)

Production, 2012

 

346

1,078

Lower economic dispatching at Centralia Thermal

 

753

2,054

Higher planned and unplanned outages at Centralia Thermal

 

(621)

(646)

Other

 

(2)

(6)

Production, 2013

 

476

2,480


The primary factors contributing to the change in comparable gross margin for the three and six months ended June 30, 2013 are presented below:


 

 

3 months ended
June 30

6 months ended
June 30

Comparable gross margin, 2012

 

80

149

Lower contract pricing, including margins on purchased power

 

(25)

(60)

Coal pricing(1)

 

(1)

22

Other

 

2

4

Comparable gross margin, 2013

 

56

115

1

During the three and six months ended June 30, 2013, we recognized a pre-tax writedown of $2 million and $16 million, respectively, related to the coal inventory at our Centralia plant to write the inventory down to its net realizable value.


Comparable Operations, Maintenance, and Administration Expense


Comparable OM&A expense for the three months ended June 30, 2013 increased $5 million compared to the same period in 2012, primarily due to higher emergent costs, higher routine maintenance costs, higher costs that are recoverable through PPAs, and service allocations from other segments, partially offset by lower compensation costs.


Comparable OM&A expense for the six months ended June 30, 2013 was comparable to the same period in 2012.


1(1)  Coal price includes the impact of the inventory writedown which is not included in gross margin.



  

TRANSALTA CORPORATION / Q2 2013  20

   

Depreciation and Amortization Expense


The primary factors contributing to the change in depreciation and amortization expense for the three and six months ended
June 30, 2013 are presented below:


 

 

3 months ended
June 30

6 months ended
June 30

Depreciation and amortization expense, 2012

 

134

258

Impact of asset impairments

 

(7)

(15)

Change in economic life(1)

 

(4)

(9)

Decrease in asset retirements

 

(7)

(7)

Change in useful lives of hydro assets

 

(1)

(2)

Increase in asset base

 

10

17

Other

 

-

5

Depreciation and amortization expense, 2013

 

125

247

1

Finance Leases


Solomon


On Sept. 28, 2012, we completed the acquisition from Fortescue Metals Group Ltd. (“Fortescue”) of its 125 MW natural gas-fired and diesel-fired Solomon power station in Western Australia for U.S.$318 million.  The facility and associated Power Purchase Agreement (“Agreement”) are accounted for as a finance lease and we began receiving payments under the Agreement in the fourth quarter of 2012.  The facility is currently under construction and is expected to be commissioned during the third quarter of 2013.


Fort Saskatchewan


Fort Saskatchewan is a natural gas-fired facility with a gross generating capacity of 118 MW in operation, of which TransAlta Cogeneration, L.P. has a 60 per cent ownership interest (35 MW net ownership interest).  Key operational information adjusted to reflect our interest in the Fort Saskatchewan facility, which we continue to operate, is summarized below:


 

 

3 months ended June 30

6 months ended June 30

 

 

2013

2012

2013

2012

Availability (%)

95.1

69.5

99.8

86.0

Production (GWh)

126

82

264

219


Availability and production for the three and six months ended June 30, 2013 increased compared to the same periods in 2012 due to lower planned outages.


Total Finance Lease Income


Total finance lease income for the three and six months ended June 30, 2013 increased $10 million and $19 million, respectively, compared to the same periods in 2012 due to the payments we began receiving in October 2012 under the Agreement with Fortescue.


1(1) As a result of amendments to Canadian federal regulations requiring that coal-fired plants be shut down after a maximum of 50 years of operation.  The previous draft regulations proposed shut down after 45 years.  The useful lives of these assets were changed in the third quarter of 2012.


  

TRANSALTA CORPORATION / Q2 2013  21

   

Equity Investments


Our investments in joint ventures are accounted for using the equity method consist of our investments in CE Gen, Wailuku River Hydroelectric, L.P, TAMA Transmission, and CalEnergy.  


Our interests in the CE Gen and Wailuku River Hydroelectric, L.P. joint ventures are comprised of geothermal, natural gas, and hydro facilities in various locations throughout the U.S., with 839 MW of gross generating capacity (390 MW net ownership interest).  The table below summarizes key operational information adjusted to reflect our interest in these investments:


 

 

3 months ended June 30

6 months ended June 30

 

 

2013

2012

2012

2011

Availability (%)

91.9

93.2

89.4

93.1

Production (GWh)

 

 

 

 

Gas

 

68

44

208

135

Renewables

324

296

578

596

Total production

392

340

786

731


Availability for the three months ended June 30, 2013 decreased compared to the same period in 2012 due to higher unplanned outages.


For the six months ended June 30, 2013, availability decreased compared to the same period in 2012 due to higher planned outages.


Production for the three months ended June 30, 2013 increased compared to the same period in 2012 due to higher customer demand, partially offset by higher unplanned outages.


For the six months ended June 30, 2013, production increased compared to the same period in 2012 due to higher customer demand, partially offset by higher planned outages.


Equity loss for the three months ended June 30, 2013 was $3 million compared to equity loss of $5 million for the same period in 2012.  The increase is primarily due to favourable pricing, partially offset by higher unplanned outages.


For the six months ended June 30, 2013, equity loss was $7 million compared to equity loss of $5 million for the same period in 2012.  The increase is primarily due to higher planned outages and unfavourable pricing during the first quarter.


Since 2001, a significant portion of the CE Gen plants have been operating under modified fixed energy price contracts.  Commencing May 1, 2012, the terms of the contracts reverted to a pricing clause that permits the power purchaser to pay their short-run avoided costs (“SRAC”) as the price for power.  The SRAC is linked to the price of natural gas.  There can be no assurances that prices based on the avoided cost of energy after May 1, 2012 will result in revenues equivalent to those realized under the fixed energy price structure.


On June 18, 2013, we announced that CalEnergy, a joint venture with MidAmerican Energy Holdings Company, had executed an
86 MW long-term contract for renewable geothermal power with the City of Riverside which runs from 2016 to 2039.  CalEnergy will purchase the power from CE Gen’s portfolio of geothermal generating facilities in California’s Imperial Valley.



  

TRANSALTA CORPORATION / Q2 2013  22

   

ENERGY TRADING: Derives revenue and earnings from the wholesale trading of electricity and other energy-related commodities and derivatives.  Achieving gross margins, while remaining within Value at Risk (“VaR”) limits, is a key measure of Energy Trading’s activities.  Refer to the Value at Risk and Trading Positions discussion in the Risk Management section of our 2012 Annual MD&A for further discussion on VaR.


Energy Trading utilizes contracts of various durations for the forward purchase and sale of electricity and for the purchase and sale of natural gas and transmission capacity.  If the activities are performed on behalf of the Generation Segment, the results of these activities are included in the Generation Segment.


For a more in-depth discussion of our Energy Trading activities, refer to the Discussion of Segmented Results section of our 2012 Annual MD&A.


The results of the Energy Trading Segment, with all trading results presented on a net basis, are as follows:


 

3 months ended June 30

6 months ended June 30

 

2013

2012

2013

2012

Revenues

14

(11)

31

6

Fuel and purchased power

-

-

-

-

Gross margin

14

(11)

31

6

Operations, maintenance, and administration

6

7

14

14

Depreciation and amortization

-

-

-

-

Intersegment cost allocation

(3)

(4)

(7)

(7)

Operating income (loss)

11

(14)

24

(1)


For the three and six months ended June 30, 2013, Energy Trading gross margins increased compared to the same periods in 2012 due to strong trading performance across all markets and prudent management of risk.  The increase in comparable earnings is primarily due to higher earnings in the Energy Trading segment driven by strong trading performance across all markets.


OM&A expense for the three months ended June 30, 2013 decreased $1 million compared to the same period in 2012 due to lower compensation costs as a result of restructuring in the fourth quarter of 2012.


OM&A expense for the six months ended June 30, 2013 was comparable to the same period in 2012.



CORPORATE: Our Generation and Energy Trading Segments are supported by a Corporate group that provides finance, tax, treasury, legal, regulatory, environmental, health and safety, sustainable development, corporate communications, government and investor relations, information technology, risk management, human resources, internal audit, and other administrative support.


The expenses incurred by the Corporate Segment are as follows:


 

3 months ended June 30

 

6 months ended June 30

 

2013

Comparable adjustments

Comparable total

2012

 

2013

Comparable adjustments

Comparable total

2012

Operations, maintenance, and administration

16

-

16

20

 

29

-

29

42

Depreciation and amortization

6

-

6

5

 

11

-

11

10

Reversal of restructuring charges

(1)

1

-

-

 

(1)

1

-

-

Operating loss

21

1

22

25

 

39

1

40

52



  

TRANSALTA CORPORATION / Q2 2013  23

   

OM&A expense for the three and six months ended June 30, 2013 decreased compared to the same periods in 2012 primarily due to lower compensation costs as a result of restructuring in the fourth quarter of 2012 and a continued focus on costs.


NET INTEREST EXPENSE


The components of net interest expense are shown below:


 

 

3 months ended June 30

6 months ended June 30

 

 

2013

2012

2013

2012

Interest on debt

 

58

58

118

114

Capitalized interest

 

-

(1)

(2)

(1)

Ineffectiveness on hedges

 

-

2

-

2

Interest expense

 

58

59

116

115

Accretion of provisions

 

5

5

9

9

Net interest expense

 

63

64

125

124


The change in net interest expense for the three and six months ended June 30, 2013, compared to the same periods in 2012, is shown below:


 

 

 

 

3 months ended June 30

6 months ended
June 30

Net interest expense, 2012

 

 

 

64

124

Lower (higher) capitalized interest

 

 

1

(1)

Lower interest rates

 

 

(1)

(1)

Unfavourable foreign exchange impacts

 

 

-

1

Lower ineffectiveness on hedges

 

 

(2)

(2)

Higher financing costs

 

 

 

-

1

Higher debt levels

 

 

 

1

3

Net interest expense, 2013

 

 

 

63

125


  

TRANSALTA CORPORATION / Q2 2013  24

   

INCOME TAXES


A reconciliation of income taxes and effective tax rates on earnings, excluding non-comparable items, is presented below:


 

 

3 months ended June 30

6 months ended June 30

 

 

2013

2012

2013

2012

Earnings (loss) before income taxes

 

44

(712)

35

(602)

Income attributable to non-controlling interests

 

(9)

(5)

(19)

(18)

Equity loss

 

3

5

7

5

Impacts associated with certain de-designated and
  ineffective hedges

 

8

83

49

(2)

Asset impairment charges

 

-

365

-

365

Inventory writedown

 

-

(1)

-

33

Reversal of restructuring charges

 

(2)

-

(2)

-

Gain on sale of assets

 

(10)

-

(10)

(3)

Sundance Units 1 and 2 arbitration

 

-

247

-

247

Loss on assumption of pension obligations

 

-

-

29

-

Other non-comparable items

 

1

1

1

1

Earnings (loss) attributable to TransAlta
  shareholders, excluding non-comparable items,
  subject to tax

 

35

(17)

90

26

Income tax expense (recovery)

 

10

75

(7)

77

Income tax recovery (expense) related to impacts associated
  with certain de-designated and ineffective hedges

 

3

29

17

(1)

Income tax recovery related to asset impairment charges

 

-

5

-

5

Income tax recovery related to inventory writedown

 

-

-

-

12

Income tax expense related to gain on sale of assets

 

(1)

-

(1)

(1)

Income tax recovery related to Sundance Units 1 and 2
  arbitration

 

-

63

-

63

Income tax expense related to writeoff of deferred
 income tax assets

 

-

(169)

-

(169)

Income tax recovery related to deferred tax rate adjustment

 

1

-

7

-

Income tax recovery related to the resolution of certain
  outstanding tax matters

 

-

-

-

9

Income tax expense related to changes in corporate
 income tax rates

 

-

(8)

-

(8)

Income tax recovery related to loss on assumption of
  pension obligations

 

-

-

7

-

Income tax expense (recovery) excluding
  non-comparable items

 

13

(5)

23

(13)

Effective tax rate on earnings (loss) attributable to
  TransAlta shareholders excluding non-comparable
  items (%)

 

37

29

26

(50)

 

The income tax expense excluding non-comparable items for the three months ended June 30, 2013 increased compared to the same period in 2012 due to higher comparable earnings.


The income tax expense excluding non-comparable items for the six months ended June 30, 2013 increased compared to the same period in 2012 due to higher comparable earnings and the positive resolution of certain tax contingency matters in the prior year.

 

  

TRANSALTA CORPORATION / Q2 2013  25

   

 


The effective tax rate on earnings attributable to TransAlta shareholders excluding non-comparable items for the three and six months ended June 30, 2013 increased compared to the same periods in 2012 due to changes in the amount of earnings between the jurisdictions in which pre-tax income is earned, the effect of certain deductions that do not fluctuate with earnings, and due to the positive resolution of certain tax contingency matters in the prior period.



NON-CONTROLLING INTERESTS


Net earnings attributable to non-controlling interests for the three months ended June 30, 2013 increased compared to the same period in 2012, primarily due to higher earnings at TransAlta Cogeneration, L.P.


Net earnings attributable to non-controlling interests for the six months ended June 30, 2013 was comparable to the same period in 2012.



FINANCIAL POSITION


The following chart highlights significant changes in the Condensed Consolidated Statements of Financial Position from
Dec. 31, 2012 to June 30, 2013:


 

Increase/

 

 

 

(Decrease)

 

Primary factors explaining change

Cash and cash equivalents

40

 

Timing of receipts and payments

Accounts receivable

(148)

 

Timing of customer receipts

Prepaid expenses

33

 

Prepayment of annual insurance premiums, royalties, and service agreements

Inventory

29

 

Increase in overburden removal activity, and higher average coal costs partially offset by writedown of coal inventory

Investments

13

 

Additions to equity investments and favourable foreign exchange rates

Finance lease receivable (current

and long-term)

16

 

Favourable foreign exchange rates

Property, plant, and equipment, net

72

 

Additions partially offset by depreciation

Deferred income tax assets

30

 

Tax benefits of losses related to U.S. operations

Risk management assets (current

and long-term)

(100)

 

Price movements and changes in underlying positions and settlements

Other assets

10

 

Increase in long-term prepaids

Accounts payable and accrued liabilities

(121)

 

Timing of payments and lower capital accruals

Dividends payable

(18)

 

Increased dividends due to increased in total shares outstanding

Long-term debt (including current portion)

243

 

Increased borrowings under credit facilities and unfavourable foreign exchange rates

Finance lease obligation (including current portion)

25

 

Finance lease for mining equipment at the Highvale Mine

Decommissioning and other provisions (current and long-term)

14

 

Increase in decommissioning provisions

Deferred income tax liabilities

(21)

 

Increased income tax provisions

Risk management liabilities (current and

long-term)

(77)

 

Price movements and changes in underlying positions and settlements

Equity attributable to shareholders

(46)

 

Net earnings for the period, share dividends, and issuance of common shares

 

  

TRANSALTA CORPORATION / Q2 2013  26

   

 

 

FINANCIAL INSTRUMENTS


Refer to Note 16 of the notes to the audited consolidated financial statements within our 2012 Annual Report and Note 13 of our interim condensed consolidated financial statements as at and for the three and six months ended June 30, 2013 for details on Financial Instruments.  Refer to the Risk Management section of our 2012 Annual Report and Note 14 of our interim condensed consolidated financial statements for further details on our risks and how we manage them.  Our risk management profile and practices have not changed materially from Dec. 31, 2012.


Energy Trading may enter into commodity transactions involving non-standard features for which market observable data is not available.  These are defined under IFRS as Level III financial instruments.  Level III financial instruments are not traded in an active market and fair value is, therefore, developed using valuation models based upon internally developed assumptions or inputs.  Our
Level III fair values are determined using data such as unit availability, transmission congestion, or demand profiles.  Fair values are validated on a quarterly basis by using reasonably possible alternative assumptions as inputs to valuation techniques, and any material differences are disclosed in the notes to the financial statements.


We also have various contracts with terms that extend beyond five years.  As forward price forecasts are not available for the full period of these contracts, the value of these contracts must be derived by reference to a forecast that is based on a combination of external and internal fundamental modeling, including discounting.  As a result, these contracts are classified in Level III.  These contracts are for specified prices with counterparties that we believe to be creditworthy.


At June 30, 2013, total Level III financial instruments had a net asset carrying value of $11 million (Dec. 31, 2012 - $31 million net asset).


Certain of our hedging relationships had previously been de-designated and deemed ineffective for accounting purposes.  The hedges were in respect of power production and the associated gains remain in AOCI until the underlying production occurs or until such time that the production has been assessed as highly probable not to occur.  No gains related to these previously
de-designated hedges were reclassified to earnings during the three and six months ended June 30, 2013 (June 30, 2012 - nil and $75 million pre-tax gain, respectively).


As at June 30, 2013, cumulative gains of $4 million, related to these and other cash flow hedges that were de-designated and no longer meet the criteria for hedge accounting, continued to be deferred in AOCI and will be reclassified to net earnings as the forecasted transactions occur or if the forecasted transactions are assessed as highly probable not to occur. 


  

TRANSALTA CORPORATION / Q2 2013  27

   

STATEMENTS OF CASH FLOWS


The following charts highlight significant changes in the Condensed Consolidated Statements of Cash Flows for the three and six months ended June 30, 2013 compared to the same periods in 2012:


3 months ended June 30

2013

2012

Primary factors explaining change

Cash and cash equivalents, beginning
   of period

50

31

 

Provided by (used in):

 

 

 

Operating activities

92

78

Higher cash earnings of $35 million, partially offset by unfavourable changes in working capital of $21 million, net of a $204 million impact associated with the Sundance Units 1 and 2 arbitration in 2012

 

 

 

 

Investing activities

(160)

(175)

Decrease in additions to PP&E and intangibles of $24 million and an increase in realized gains on financial instruments of $22 million, partially offset by a net negative impact of $14 million related to changes in collateral received from or paid to counterparties, an unfavourable change in non-cash investing working capital balances of $12 million, and an increase in equity investments of $10 million

 

 

 

 

Financing activities

86

127

Decrease in borrowings under credit facilities of $11 million, an increase in common share cash dividends of $20 million, an increase in preferred share cash dividends of $4 million and a decrease in finance lease obligation of $4 million

Translation of foreign currency cash

(1)

-

 

Cash and cash equivalents, end of period

67

61

 


6 months ended June 30

2013

2012

Primary factors explaining change

Cash and cash equivalents, beginning
   of period

27

49

 

Provided by (used in):

 

 

 

Operating activities

348

261

Higher cash earnings of $25 million and favourable changes in working capital of $62 million, net of a $204 million impact associated with the Sundance Units 1 and 2 arbitration in 2012

 

 

 

 

Investing activities

(310)

(339)

Decrease in additions to PP&E and intangibles of $35 million and an increase in realized gains on financial instruments of $22 million, partially offset by a net negative impact of $6 million related to changes in collateral received from or paid to counterparties, an unfavourable change in non-cash investing working capital balances of $19 million, and an increase in equity investments of $10 million

 

 

 

 

Financing activities

2

90

Decrease in borrowings under credit facilities of $84 million, an increase in preferred share cash dividends of $5 million and a decrease in finance lease obligation of $4 million, partially offset by a decrease in common share cash dividends of $5 million due to dividends reinvested through the dividend reinvestment plan

Cash and cash equivalents, end of period

67

61

 

 

  

TRANSALTA CORPORATION / Q2 2013  28

   



LIQUIDITY AND CAPITAL RESOURCES


Liquidity risk arises from our ability to meet general funding needs, engage in trading and hedging activities, and manage the assets, liabilities, and capital structure of the Corporation.  Liquidity risk is managed by maintaining sufficient liquid financial resources to fund obligations as they come due in the most cost-effective manner.


Our liquidity needs are met through a variety of sources, including cash generated from operations, borrowings under our long-term credit facilities, and long-term debt or equity issued under our Canadian and U.S. shelf registrations.  Our primary uses of funds are operational expenses, capital expenditures, dividends, distributions to non-controlling limited partners, and interest and principal payments on debt securities.


Debt


Long-term debt totalled $4.5 billion as at June 30, 2013 compared to $4.2 billion as at Dec. 31, 2012.  Long-term debt increased from Dec. 31, 2012 primarily due to higher borrowings under our syndicated credit facility and unfavourable changes in foreign exchange rates.  


Credit Facilities


At June 30, 2013, we had a total of $2.1 billion (Dec. 31, 2012 - $2.0 billion) of committed credit facilities, of which $0.7 billion
(Dec. 31, 2012 - $0.8 billion) is not drawn and is available, subject to customary borrowing conditions.  At June 30, 2013, the
$1.4 billion (Dec. 31, 2012 - $1.3 billion) of credit utilized under these facilities was comprised of actual drawings of $1.1 billion
(Dec. 31, 2012 - $1.0 billion) and letters of credit of $0.3 billion (Dec. 31, 2012 - $0.3 billion).  These facilities are comprised of a
$1.5 billion committed syndicated bank facility that matures in 2017, with the remainder comprised of bilateral credit facilities, of which $0.3 billion matures in 2017 and $0.2 billion matures in the fourth quarter of 2014.  We anticipate renewing these facilities, based on reasonable commercial terms, prior to their maturities.


In addition to the $0.7 billion available under the credit facilities, we also have $60 million of available cash.


Share Capital

 

On July 29, 2013, we had 266.3 million common shares outstanding, 12.0 million Series A, 11.0 million Series C, and 9.0 million
Series E first preferred shares outstanding.   At June 30, 2013, we had 262.1 million (Dec. 31, 2012 - 254.7 million) common shares issued and outstanding.  At June 30, 2013, we also had 32.0 million (Dec. 31, 2012 - 32.0 million) preferred shares issued and outstanding.


We issue common shares for cash proceeds, on exercise of stock options and other share-based payment plans, or for reinvestment of dividends.  During February 2012, we added a Premium DividendTM component to the Plan.  Please refer to Note 28 of our audited consolidated financial statements within our 2012 Annual Report for additional information regarding the amendments.  On May 8, 2013, we announced that as a result of the current low share price environment, we are suspending the Premium Dividend™ component of the Plan following the payment of the quarterly dividend on July 1, 2013.  Our Dividend Reinvestment and Optional Common Share Purchase Plan, separate components of the Plan, remain effective in accordance with their current terms.



  

TRANSALTA CORPORATION / Q2 2013  29

   

 

During the three months ended June 30, 2013, 3.7 million (June 30, 2012 - 2.4 million) common shares were issued for $53 million
(June 30, 2012 - $43 million), which was primarily comprised of dividends reinvested under the terms of the Plan.  During the six months ended June 30, 2013, 7.4 million (June 30, 2012 - 3.4 million) common shares were issued for $106 million
(June 30, 2012 - $64 million), which was primarily comprised of dividends reinvested under the terms of the Plan.  


Guarantee Contracts


We have obligations to issue letters of credit and cash collateral to secure potential liabilities to certain parties, including those related to potential environmental obligations, energy trading activities, hedging activities, and purchase obligations.  At
June 30, 2013, we provided letters of credit totalling $341 million (Dec. 31, 2012 - $336 million) and cash collateral of $18 million
(Dec. 31, 2012 - $19 million).  These letters of credit and cash collateral secure certain amounts included on our Condensed Consolidated Statements of Financial Position under risk management liabilities and decommissioning and other provisions.


Commitments


During March 2013, the New Richmond wind farm commenced operations and as such, the 15 year long-term service agreement for repairs and maintenance became effective.  The future payments over the term of the agreement are approximately $42 million. 



CLIMATE CHANGE AND THE ENVIRONMENT


In Alberta, there are requirements for coal-fired generation units to implement additional air emission controls for oxides of nitrogen (“NOx”), sulphur dioxide (“SO2”), and particulate matter, once they reach the end of their respective PPAs, in most cases at 2020.  These regulatory requirements were developed by the province in 2004 as a result of multi-stakeholder discussions under Alberta’s Clean Air Strategic Alliance (“CASA”).  However, the release of the federal Greenhouse Gas (“GHG”) regulations may create a potential misalignment between the CASA air pollutant requirements and schedules, and the GHG retirement schedules for older coal plants, which in themselves will result in significant reductions of NOx, SO2, and particulates.  We are in discussions with the provincial government to ensure coordination between GHG and air pollutant regulations, such that emission reduction objectives are achieved in the most effective manner while taking into consideration the reliability and cost of Alberta’s generation supply.


In the U.S., on June 25, 2013, President Obama announced his Climate Action Plan, which sets out plans for GHG emission standards to be imposed by the Environmental Protection Agency (“EPA”) for new and existing power plants.  Standards for new units are pending and standards for existing units are to be finalized by June 2015.  State implementation plans are to be completed a year later.  There will be few additional details as to how existing coal (and potentially natural gas) units might be treated until the EPA releases a draft rule.


In December 2011, the EPA issued national standards for mercury emissions from power plants.  Existing sources will have up to four years to comply.  We have already voluntarily installed mercury capture technology at our Centralia coal-fired plant, and began full capture operations in early 2012.  We have also installed additional technology to further reduce NOx, consistent with the Washington State Bill passed in April 2011.


  

TRANSALTA CORPORATION / Q2 2013  30

   

 

We continue to make operational improvements and investments to our existing generating facilities to reduce the environmental impact of generating electricity.  We installed mercury control equipment at our Alberta Thermal operations in 2010 in order to meet the province’s 70 per cent reduction objectives, and voluntarily at our Centralia coal-fired plant in 2012. Our Keephills Unit 3 plant began operations in September 2011 using supercritical combustion technology to maximize thermal efficiency, as well as SO2 capture and low NOx combustion technology, which is consistent with the technology that is currently in use at Genesee Unit 3.  Uprate projects completed at our Keephills and Sundance plants are expected to improve the energy and emissions efficiency of those units.



2013 OUTLOOK


Business Environment


Power Prices


Over the balance of 2013, power prices in Alberta are expected to be marginally weaker than 2012.  However, prices can vary based on supply and weather conditions.  In the Pacific Northwest, we expect prices to be modestly stronger than in 2012; however, we expect that overall prices will still remain weak due to low natural gas prices and slow load growth.


Environmental Legislation


The finalization of the federal Canadian GHG regulations for coal-fired power has initiated further activities.  We are in discussions with the provincial government to ensure coordination between GHG and air pollutant regulations, such that emission reduction objectives are achieved in the most effective manner while taking into consideration the reliability and cost of Alberta’s generation supply.  This may provide additional flexibility to coal-fired generators in meeting the regulatory requirements.  For further information on the Canadian GHG regulations, please refer to the Significant Events section of our 2012 Annual MD&A.


In addition, there are ongoing discussions between the federal and provincial governments regarding a national Air Quality Management System for air pollutants.  In Alberta’s recently released Clean Air Strategy, the province indicated that its provincial air quality management system will operationalize any national system.  Our current outlook is that, for Alberta, provincial regulations will be considered as equivalent to any future national framework.


On Jan. 21, 2013, the Ontario government released a discussion paper for public input on reducing GHG emissions in the province, with the stated intent of developing GHG regulations for all major industrial sectors by 2015.  No specific targets or regulatory approaches have yet been proposed.


In the U.S., the President’s Climate Action Plan provides an indication of how GHG regulation of existing fossil-fuel based generation may unfold, although we expect the implementation process to take several years.  Our agreement with Washington State, established in April 2011, provides regulatory clarity at the state level regarding an emissions regime related to the Centralia Coal plant until 2025.  We expect this agreement may mitigate separate federal action from the EPA.  Additionally, new federal air pollutant regulations for the power sector are anticipated, but are not expected to directly affect our coal-fired operations in Washington State.  


Beginning in 2013, direct deliveries of power to the California Independent System Operator are subject to a compliance obligation established by the California Air Resources Board’s (“CARB”) cap and trade program.  As CARB continues to finalize their regulations, we will stay at the forefront of regulatory changes to enable us to remain in compliance with the cap and trade program.

 

  

TRANSALTA CORPORATION / Q2 2013  31

   

 


In Australia, the carbon tax implemented in July 2012 remains in place.  As of July 1, 2013, the tax increased to AUS$24.15 per tonne.  Subsequently, the Australian government announced that they would accelerate the transition to a cap and trade market to become effective in July 2014. At that point expectations are that the carbon price will drop. While TransAlta’s gas-fired operations are subject to the tax, all related costs are flowed to contracted customers.


We continue to closely monitor the progress and risks associated with environmental legislation changes on our future operations.


The siting, construction, and operation of electrical energy facilities requires interaction with many stakeholders.  Recently, certain stakeholders have brought actions against government agencies and owners over alleged adverse impacts of wind projects.  We are monitoring these claims in order to assess the risk associated with these activities.


Economic Environment


In 2013, we expect slow to moderate growth in Alberta and Australia, and low growth in other markets.  We continue to monitor global events and their potential impact on the economy and our supplier and commodity counterparty relationships.


We had no material counterparty losses in the second quarter of 2013.  We continue to monitor counterparty credit risk and have established risk management policies to mitigate counterparty risk.  We do not anticipate any material change to our existing credit practices and continue to deal primarily with investment grade counterparties.  


Operations


Capacity, Production, and Availability


Generating capacity is expected to increase for the remainder of 2013 due to Sundance Units 1 and 2 returning to service.  Prior to the effect of any economic dispatching, overall production is expected to increase for the remainder 2013 due to lower planned outages, Sundance Units 1 and 2 returning to service, and the completion of the New Richmond wind farm.  Adjusted availability, excluding the extended outages at Centralia Thermal, is expected to be in the range of 87 to 89 per cent in 2013 due to lower planned outages across the fleet.


On Dec. 16, 2010 and Dec. 19, 2010, Unit 1 and Unit 2, respectively, of our Sundance facility were shut down due to conditions observed in the boilers at both units.  On Feb. 8, 2011, we issued a notice of termination for destruction based on the determination that the units could not be economically restored to service under the terms of the PPA.  On July 20, 2012, an arbitration panel concluded that Units 1 and 2 were not to be economically destroyed and required the units to be restored to service.  However, the panel affirmed that the event met the criteria of force majeure beginning Nov. 20, 2011 and continuing until such a time as each unit is returned to service.  The cost to repair Sundance Units 1 and 2 is estimated at approximately $215 million and are expected to start generating production in the third and fourth quarter of 2013, respectively.  The total estimated spend has increased by $25 million due to additional scope of work for balance of plant systems and equipment as well as higher labour costs due to an increase in rates.  This work is being performed concurrently with the boiler repairs to prevent the need for a later outage for this work. 


We expect an earlier return-to-service date of Aug. 6 for Sundance Unit 1.


Contracted Cash Flows


Through the use of Alberta PPAs, long-term contracts, and other short-term physical and financial contracts, on average, approximately 75 per cent of our capacity is contracted over the next seven years.  On an aggregated portfolio basis, depending on market conditions, we target being up to 90 per cent contracted for the upcoming calendar year.  As at the end of the second quarter of 2013, approximately 89 per cent of our 2013 capacity was contracted.  The average prices of our short-term physical and financial contracts for the balance of 2013 are approximately $60 per MWh in Alberta and approximately U.S.$40 per MWh in the Pacific Northwest.    

 

  

TRANSALTA CORPORATION / Q2 2013  32

   

 


Fuel Costs


Mining coal in Alberta is subject to cost increases due to greater overburden removal, inflation, capital investments, and commodity prices.  Seasonal variations in coal costs at our Alberta mine are minimized through the application of standard costing.  In January 2013, we assumed, through SunHills, operating and management control of the Highvale Mine from PMRL.  Coal costs for 2013, on a standard cost per tonne basis, are expected to be five to seven per cent higher than 2012 due to a decrease in tonnes delivered.


Although we own the Centralia mine in the State of Washington, it is not currently operational.  Fuel at Centralia Thermal is purchased from external suppliers in the Powder River Basin and delivered by rail.  The delivered cost of fuel per MWh for 2013 is expected to decrease between six to eight per cent.  


The value of coal inventories is assessed for impairment at the end of each reporting period.  If the inventory is impaired, further charges will be recognized in net earnings.  For more information on the inventory impairment charges recorded in 2013, please refer to the Significant Events section of this MD&A.


We purchase natural gas from outside companies coincident with production or have it supplied by our customers, thereby minimizing our risk to changes in prices.  The continued success of unconventional gas production in North America could reduce the year-to-year volatility of prices in the near term.


We closely monitor the risks associated with changes in electricity and input fuel prices on our future operations and, where we consider it appropriate, use various physical and financial instruments to hedge our assets and operations from such price risks.


Operations, Maintenance, and Administration Costs


OM&A costs for 2013 are expected to be consistent or up to two per cent higher than OM&A costs in 2012 due to potential emergent maintenance work in the generation fleet and lower leasing recoveries.  Entering 2013 we expected our OM&A to be consistent with 2012 OM&A, with costs savings from our organizational restructuring offset by additional costs as Sundance Units 1 and 2 are returned to service and the commencement of operations at our New Richmond wind farm. 


Energy Trading


Earnings from our Energy Trading Segment are affected by prices in the market, overall strategies adopted, and changes in legislation.  We continuously monitor both the market and our exposure in order to maximize earnings while still maintaining an acceptable risk profile.  Our target is for Energy Trading to contribute between $40 million and $60 million in gross margin for 2013.


Exposure to Fluctuations in Foreign Currencies


Our strategy is to minimize the impact of fluctuations in the Canadian dollar against the U.S. dollar, Euro, and Australian dollar by offsetting foreign denominated assets with foreign denominated liabilities and by entering into foreign exchange contracts.  We also have foreign denominated expenses, including interest charges, which largely offset our net foreign denominated revenues.


  

TRANSALTA CORPORATION / Q2 2013  33

   

Net Interest Expense


Net interest expense for 2013 is expected to increase compared to 2012 due to higher debt levels and lower capitalized interest.  However, changes in interest rates and in the value of the Canadian dollar relative to the U.S. dollar can affect the amount of net interest expense incurred.


Liquidity and Capital Resources


If there is increased volatility in power and natural gas markets, or if market trading activities increase, we may need additional liquidity in the future.  We expect to maintain adequate available liquidity under our committed credit facilities.

 

Accounting Estimates


A number of our accounting estimates, including those outlined in the Critical Accounting Policies and Estimates section of our 2012 Annual MD&A, are based on the current economic environment and outlook.  As a result of the current economic environment, market fluctuations could impact, among other things, future commodity prices, foreign exchange rates, and interest rates, which could, in turn, impact future earnings and the unrealized gains or losses associated with our risk management assets and liabilities and asset valuation for our asset impairment calculations. 


Income Taxes


The effective tax rate on earnings excluding non-comparable items for 2013 is expected to be approximately 17 to 22 per cent, which is lower than the statutory tax rate of 25 per cent, due to changes in the amount of earnings between the jurisdictions in which pre-tax income is earned and the effect of certain deductions that do not fluctuate with earnings.


  

TRANSALTA CORPORATION / Q2 2013  34

   



Capital Expenditures


Our major projects are focused on sustaining our current operations and supporting our growth strategy.  


Growth and Major Project Expenditures


We have one major project with a targeted completion date of Q4 2013.  A summary is outlined below:


 

Total Project

 

2013

Target

 

 

 

Estimated spend

Spent to date(1)

 

Estimated spend

Spent to date(1)

completion
date

 

Details

 

 

 

 

 

 

 

 

 

Growth

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Richmond

212

217

 

15 - 25

29

Commercial
operations
began
Q1 2013

 

A 68 MW wind farm in Québec

 

 

 

 

 

 

 

 

 

Major projects

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sundance Units 1 and 2

215

149

 

155 - 170

105

Q3 2013 and
Q4 2013

 

Sundance Units 1 and 2 comprising 560 MW of our Sundance power plant

Total major projects and growth

427

366

 

170 - 195

134

 

 

 

1

The total estimated spend for Sundance Units 1 and 2 has increased by $25 million due to additional scope of work for balance of plant systems and equipment as well as higher labour costs due to an increase in rates.  This work is being performed concurrently with the boiler repairs to prevent the need for a later outage for this work. 


The total estimated spend for New Richmond is less than the amount incurred to date due to estimated recoveries to be received in 2013.


Transmission


For the three and six months ended June 30, 2013, a total of $2 million and $4 million, respectively, was spent on transmission projects.  The estimated spend for 2013 on transmission projects is $7 million.  Transmission projects consist of the major maintenance and reconfiguration of Alberta’s transmission networks to increase capacity of power flow in the lines. 


1 (1) Represents amounts spent as of June 30, 2013.  During 2013, we also had a reduction of costs of $1 million on facilities that had previously commenced operations.



  

TRANSALTA CORPORATION / Q2 2013  35

   

 

Sustaining Capital and Productivity Expenditures(1)


For 2013, our estimate for total sustaining capital and productivity expenditures, net of any contributions received, is allocated among the following:


Category

Description

 

 

Expected
cost

Spent to
date
(1)

 

 

 

 

 

 

 

 

Routine capital

Expenditures to maintain our existing generating capacity

90 - 100

33

Mining equipment and
   land purchases

Expenditures related to mining equipment and
   land purchases

40 - 50

20

Finance leases

Payments related to mining equipment under finance leases

0 - 10

4

Planned major maintenance

Regularly scheduled major maintenance

165 - 185

95

Total sustaining expenditures

 

 

 

 

295 - 345

152

Productivity capital

Projects to improve power production efficiency

30 - 50

10

Total sustaining and productivity expenditures

 

 

325 - 395

162

1

During the six months, we acquired $29 million of mining equipment under finance leases and we made principal repayments of
$4 million.


Our planned major maintenance program relates to regularly scheduled major maintenance activities and includes costs related to inspection, repair and maintenance, and replacement of existing components. It excludes amounts for day-to-day routine maintenance, unplanned maintenance activities, and minor inspections and overhauls, which are expensed as incurred.  Details of the 2013 planned major maintenance program are outlined as follows:


 

 

 

 

Coal

Gas and Renewables

Expected
spend
in 2013

Spent
to date
(1)

Capitalized

 

 

 

90 - 105

75 - 80

165 - 185

95

Expensed

 

 

 

-

0 - 5

0 - 5

-

 

 

 

 

90 - 105

75 - 85

165 - 190

95

 

 

 

 

 

 

 

 

 

 

 

 

Coal

Gas and Renewables

Expected
total

Lost
to date

GWh lost

 

 

 

1,660 - 1,670

420 - 430

2,080 - 2,100

1,264


Financing


Financing for these capital expenditures is expected to be provided by cash flow from operating activities, existing borrowing capacity, reinvested dividends under the Plan, and capital markets.  The funds required for committed growth, sustaining capital, and productivity projects are not expected to be significantly impacted by the current economic environment due to the highly contracted nature of our cash flows, our financial position, and the amount of capital available to us under existing committed credit facilities.



1() Represents amounts incurred as of June 30, 2013.



  

TRANSALTA CORPORATION / Q2 2013  36

   

ACCOUNTING CHANGES


Adoption of New or Amended IFRS


On Jan. 1, 2013, we adopted the following new accounting standards that were previously issued by the International Accounting Standards Board (“IASB”):


IFRS 10 Consolidated Financial Statements


IFRS 10 replaces the parts of International Accounting Standard (“IAS”) 27 Consolidated and Separate Financial Statements that deal with consolidated financial statements and Standing Interpretations Committee (“SIC”) Interpretation 12 Consolidation - Special Purpose Entities.  IFRS 10 defines the principle of control, establishes control as the basis for determining when entities are to be consolidated, and provides guidance on how to apply the principle of control to identify whether an investor controls an investee.  Under IFRS 10, an investor controls an investee when it has all of the following: (i) power over the investee; (ii) exposure, or rights, to variable returns from the investee; and (iii) the ability to affect those returns.


We applied IFRS 10 retrospectively by reassessing whether, on Jan. 1, 2013, we had control of all of our previously consolidated entities.  As a result of adopting IFRS 10, no changes arose in the entities we controlled and consolidated.  


IFRS 11 Joint Arrangements


IFRS 11 replaces IAS 31 Interests in Joint Ventures and SIC-13 Jointly Controlled Entities – Non-Monetary Contributions by Venturers.  IFRS 11 provides for a principles-based approach to the accounting for joint arrangements that requires an entity to recognize its contractual rights and obligations arising from its involvement in joint arrangements.  A joint arrangement is an arrangement in which two or more parties have joint control.  Under IFRS 11, joint arrangements are classified as either a joint operation or a joint venture, whereas under IAS 31, they were classified as a jointly controlled asset, jointly controlled operation or a jointly controlled entity.  IFRS 11 requires the use of the equity method of accounting for interests in joint ventures, whereas IAS 31 permitted a choice of the equity method or proportionate consolidation for jointly controlled entities.  Under IFRS 11, for joint operations, each party recognizes its respective share of the assets, liabilities, revenues and expenses of the arrangement, generally resulting in proportionate consolidation accounting. 


We applied IFRS 11 retrospectively by reassessing the type of, and accounting for, each joint arrangement in existence at
Jan. 1, 2013.  No significant impacts resulted.


IFRS 12 Disclosure of Interests in Other Entities


IFRS 12 contains enhanced disclosure requirements about an entity’s interests in subsidiaries, joint arrangements, associates, and consolidated and unconsolidated structured entities (special purpose entities).  The objective of IFRS 12 is that an entity should disclose information that helps financial statement users evaluate the nature of, and risks associated with, its interests in other entities and the effects of those interests on its financial statements.  Disclosures arising from the adoption of IFRS 12 can be found in Notes 9, 12, and 20 of our interim consolidated financial statements.


  

TRANSALTA CORPORATION / Q2 2013  37

   


IFRS 13 Fair Value Measurement


IFRS 13 establishes a single source of guidance for all fair value measurements required by other IFRS, clarifies the definition of fair value, and enhances disclosures about fair value measurements.  IFRS 13 applies when other IFRS require or permit fair value measurements or disclosures.  IFRS 13 specifies how an entity should measure fair value and disclose fair value information.  It does not specify when an entity should measure an asset, a liability, or its own equity instrument at fair value.  Our adoption of
IFRS 13, prospectively on Jan. 1, 2013, did not have a material financial impact upon the consolidated financial position or results of operations, however, certain new or enhanced disclosures are required and can be found in Note 13 of our interim consolidated financial statements.


IAS 1 Presentation of Financial Statements


Amendments to IAS 1 Presentation of Financial Statements issued in June 2011 were intended to improve the consistency and clarity of the presentation of items of comprehensive income by requiring that items presented in OCI be grouped on the basis of whether they are at some point reclassified from OCI to net earnings or not.  The Consolidated Statements of Comprehensive Income (Loss) have been reorganized to comply with the required groupings.  


IAS 19 Employee Benefits


Amendments to IAS 19 Employee Benefits are intended to improve the recognition, presentation, and disclosure of defined benefit plans.  The amendments require the recognition of changes in defined benefit obligations and in fair value of plan assets when they occur, thus eliminating the “corridor approach” previously permitted.  All actuarial gains and losses must be recognized immediately through other comprehensive income and the net pension liability or asset recognized at the full amount of the plan deficit or surplus.  Additional changes relate to the presentation, into three components, of changes in defined benefit obligations and plan assets: service cost and net interest cost is recognized in net earnings and remeasurements are recognized in other comprehensive income.  The net interest cost introduced in these amendments removes the concept of expected return on plan assets that was previously recognized in net earnings.


We calculate the net interest cost for our defined benefit plans by applying the discount rate at the beginning of the reporting period to the net defined benefit liability at the beginning of the reporting period.  An expected return on plan assets is no longer calculated and recognized as part of pension expense.  The elimination of the corridor method had no impact as we have, since adoption of IFRS, recognized actuarial gains and losses in OCI in the period in which they occurred.  


On adoption, we applied the amendments retrospectively.  The impacts as at Dec. 31, 2012 and Jan 1, 2012, respectively, were an increase in the cumulative prior periods’ pre-tax pension expense of $17 million and $11 million ($12 million and $8 million after-tax, respectively), as a result of the application of the net interest cost requirements.


For the three and six months ended June 30, 2012, OM&A expense increased by $2 million and $3 million, respectively, as a result of increased pension expense.  Net after-tax actuarial losses on defined benefit plans as reported in OCI decreased by $1 million and $2 million, respectively, and basic and diluted net earnings per share attributable to common shareholders decreased by $0.01 and $0.01, respectively.    




  

TRANSALTA CORPORATION / Q2 2013  38

   

 

Interpretation 20 Stripping Costs in the Production Phase of a Surface Mine (“IFRIC 20”)


IFRIC 20 clarifies the requirements for accounting for stripping costs in the production phase of a surface mine.  Stripping costs are costs associated with the process of removing waste from a surface mine in order to gain access to mineral ore deposits.  The Interpretation clarifies when production stripping should lead to the recognition of an asset and how that asset should be measured, both initially and in subsequent periods.


We recognize a stripping activity asset for our Highvale mine when all of the following are met: (i) it is probable that the future benefit associated with improved access to the coal reserves associated with the stripping activity will be realized; (ii) the component of the coal reserve to which access has been improved can be identified; and (iii) the costs related to the stripping activity associated with that component can be measured reliably.  Costs include those directly incurred to perform the stripping activity as well as an allocation of directly attributable overheads.  The resulting stripping activity asset is amortized on a unit-of-production basis over the expected useful life of the identified component that it relates to.  The amortization is recognized as a component of the standard cost of coal inventory.


As required by the transitional provision of IFRIC 20, we applied the Interpretation to production stripping costs incurred on or after Jan 1, 2011, which will be the earliest comparative period presented within our annual financial statements for the year ended
Dec. 31, 2013.  The impacts on the Condensed Consolidated Statements of Financial Position as at Dec. 31, 2012 were to recognize $9 million in costs as a stripping activity asset, increase coal inventory by $2 million, both classified within Inventory, increase Deferred income tax liabilities by $3 million, and decrease Retained deficit by $8 million.  The impacts on the Condensed Consolidated Statements of Financial Position as at Jan. 1, 2012 were to recognize $9 million in costs as a stripping activity asset, decrease coal inventory by $2 million, both classified within Inventory, increase Deferred income tax liabilities by $2 million, and increase Retained earnings by $5 million.


The impact of this change in accounting policy on the three and six months ended June 30, 2012 was not material.


IFRS 7 Financial Instruments: Disclosures


Amendments to IFRS 7 include disclosures about all recognized financial instruments that are set off in accordance with IAS 32.  The amendments also require disclosure of information about recognized financial instruments subject to enforceable master netting arrangements and similar agreements even if they are not set off under IAS 32.  The resulting disclosures can be found in Note 14 of our interim consolidated financial statements.


Annual Improvements 2009-2011


In May 2012, the IASB issued a collection of necessary, non-urgent amendments to several IFRS resulting from its annual improvements process.  We have applied the amendments, as applicable, on Jan. 1, 2013.  None of the amendments, which are generally technical and narrow in scope, had a material financial impact upon the consolidated financial position or results of operations.



FUTURE ACCOUNTING CHANGES


Additional new or amended accounting standards that have been previously issued by the IASB but are not yet effective, and have not yet been applied, are as follows:  IFRS 9 Financial Instruments, IAS 32 Financial Instruments: Presentation, and Investment Entities (Amendments to IFRS 10 and 11 and IAS 27).  Please refer to the Future Accounting Changes section of our 2012 Annual MD&A for more information.  

 

  

TRANSALTA CORPORATION / Q2 2013  39

   

 

 

ADDITIONAL IFRS MEASURES


An additional IFRS measure is a line item, heading, or subtotal that is relevant to an understanding of the financial statements but is not a minimum line item mandated under IFRS, or the presentation of a financial measure that is relevant to an understanding of the financial statements but is not presented elsewhere in the financial statements.  We have included line items entitled “gross margin” and “operating income (loss)” in our Condensed Consolidated Statements of Earnings (Loss) for the three and six months ended
June 30, 2013 and 2012.  Presenting these line items provides management and investors with a measurement of ongoing operating performance that is readily comparable from period to period.



NON-IFRS MEASURES


We evaluate our performance and the performance of our business segments using a variety of measures.  Those discussed below, and elsewhere in this MD&A, are not defined under IFRS and, therefore, should not be considered in isolation or as an alternative to or to be more meaningful than net earnings attributable to common shareholders or cash flow from operating activities, as determined in accordance with IFRS, when assessing our financial performance or liquidity.  These Non-IFRS measures are not necessarily comparable to a similarly titled measure of another company.


Presenting earnings on a comparable basis, comparable gross margin, comparable operating income, and comparable EBITDA from period to period provides management and investors with supplemental information to evaluate earnings trends in comparison with results from prior periods.  In calculating these items, we exclude the impact related to certain hedges that are either
de-designated or deemed ineffective for accounting purposes, as management believes that these transactions are not representative of our business operations.  As these gains (losses) have already been recognized in earnings in current or prior periods, future reported earnings will be lower; however, the expected cash flows from these contracts will not change.  In calculating comparable earnings measures we have also excluded the 2012 coal inventory writedown, as the recognition of the writedown is related to the hedges that were de-designated or deemed ineffective during prior quarters.  


Other adjustments to earnings, such as the income tax recovery related to the deferred tax rate adjustment, the income tax recovery related to the resolution of certain outstanding tax matters, the loss on assumption of pension obligations, the gain on sale of assets, the reversal of restructuring charges, the flood recovery costs, asset impairment charges, the impact of the Sundance Units 1 and 2 arbitration, the income tax expense related to the writeoff of deferred income tax assets, the income tax expense related to changes in corporate income tax rates, and the writeoff of Project Pioneer costs have also been excluded as management believes these transactions are not representative of our business operations.  Earnings on a comparable basis per share are calculated using the weighted average common shares outstanding during the period.  


Comparable operating income and EBITDA also include the earnings from the finance lease facilities that we operate.  The finance lease income is used as a proxy for the operating income and EBITDA of these facilities.



  

TRANSALTA CORPORATION / Q2 2013  40

   

Net Earnings on a Comparable Basis


Net earnings on a comparable basis are reconciled to net earnings attributable to common shareholders below:


 

 

 

 

 

3 months ended June 30

6 months ended June 30

 

 

 

2013

2012

2013

2012

Net earnings (loss) attributable to common shareholders

15

(798)

4

(710)

Impacts associated with certain de-designated and
  ineffective hedges, net of tax

5

54

32

(1)

Asset impairment charges, net of tax

-

360

-

360

Inventory writedown, net of tax

 

-

(1)

-

21

Reversal of restructuring charges, net of tax

 

(2)

-

(2)

-

Sundance Units 1 and 2 arbitration, net of tax

 

-

184

-

184

Income tax expense related to writeoff of deferred
  income tax assets

 

-

169

-

169

Income tax recovery related to deferred tax rate
  adjustment

 

(1)

-

(7)

-

Income tax recovery related to the resolution of certain
  outstanding tax matters

 

-

-

-

(9)

Income tax expense related to changes in corporate
 income tax rates

 

-

8

-

8

Gain on sale of assets, net of tax

(9)

-

(9)

(2)

Writeoff of Project Pioneer costs, net of tax

 

-

1

-

1

Loss on assumption of pension obligations, net of tax

-

-

22

-

Flood related maintenance costs, net of tax

1

-

1

-

Net earnings (loss) on a comparable basis

 

9

(23)

41

21

 

 

 

 

 

 

 

 

 

Weighted average number of common shares
  outstanding in the period

262

227

260

226

Net earnings (loss) on a comparable basis per share

0.03

(0.10)

0.16

0.09


Comparable Gross Margin


Comparable gross margin is calculated as follows:


 

 

 

 

 

3 months ended June 30

6 months ended June 30

 

 

 

2013

2012

2013

2012

Gross margin

 

 

 

355

256

694

725

Impacts associated with certain de-designated and
  ineffective hedges

 

8

83

49

(2)

Impacts to revenue associated with Sundance
  Units 1 and 2(1)

-

(10)

-

(20)

Comparable gross margin

 

363

329

743

703





1

1(1) The results have been adjusted retroactively for the impact of Sundance Units 1 and 2.  Comparative figures have also been adjusted in this table only to provide period over period comparability.


  

TRANSALTA CORPORATION / Q2 2013  41

   


Comparable Operating Income


A reconciliation of comparable operating income is as follows:


 

 

 

 

 

3 months ended June 30

6 months ended June 30

 

 

 

2013

2012

2013

2012

Operating income (loss)

 

 

83

(396)

159

(225)

Impacts associated with certain de-designated and
  ineffective hedges

 

8

83

49

(2)

Asset impairment charges

 

-

365

-

365

Inventory writedown

-

(1)

-

33

Reversal of restructuring charges

(2)

-

(2)

-

Finance lease income

12

2

23

4

Flood related maintenance costs

1

-

1

-

Writeoff of Project Pioneer costs

-

1

-

1

Comparable operating income

 

102

54

230

176


Comparable EBITDA


Presenting comparable EBITDA from period to period provides management and investors with a proxy for the amount of cash generated from operating activities before net interest expense, non-controlling interests, income taxes, and working capital adjustments.


A reconciliation of comparable EBITDA to operating income is as follows:


 

 

 

 

 

3 months ended June 30

6 months ended June 30

 

 

 

2013

2012

2013

2012

Operating income (loss)

 

 

83

(396)

159

(225)

Asset impairment charges

 

 

-

365

-

365

Inventory writedown

 

 

-

(1)

-

33

Reversal of restructuring charges

 

(2)

-

(2)

-

Finance lease income

 

 

12

2

23

4

Depreciation and amortization per the Consolidated
  Statements of Cash Flows(1)

 

145

149

284

290

Impacts associated with certain de-designated and
  ineffective hedges

 

8

83

49

(2)

Impacts to revenue associated with Sundance
  Units 1 and 2

 

-

(10)

-

(20)

Flood related maintenance costs

1

-

1

-

Writeoff of Project Pioneer costs

-

1

-

1

Comparable EBITDA

 

 

247

193

514

446



1

1(1) To calculate comparable EBITDA, we use depreciation and amortization per the Condensed Consolidated Statements of Cash Flows in order to account for depreciation related to mine assets, which is included in fuel and purchased power on the Condensed Consolidated Statements of Earnings.



  

TRANSALTA CORPORATION / Q2 2013  42

   

 

Funds from Operations and Funds from Operations per Share


Presenting funds from operations and funds from operations per share from period to period provides management and investors with a proxy for the amount of cash generated from operating activities, before changes in working capital, and provides the ability to evaluate cash flow trends more readily in comparison with results from prior periods.  Funds from operations per share is calculated as follows using the weighted average number of common shares outstanding during the period:


 

 

 

 

 

3 months ended June 30

6 months ended June 30

 

 

 

2013

2012

2013

2012

Cash flow from operating activities

 

92

78

348

261

Impacts to working capital associated with Sundance
  Units 1 and 2 arbitration

 

-

204

-

204

Payment of restructuring costs

 

-

-

4

-

Timing of payments related to assumption of
  pension obligations

 

(2)

-

7

-

Flood related maintenance costs

1

-

1

-

Change in non-cash operating working capital balances

 

93

(132)

16

(126)

Funds from operations

 

 

184

150

376

339

Weighted average number of common shares
  outstanding in the period

 

262

227

260

226

Funds from operations per share

 

0.70

0.66

1.45

1.50


Free Cash Flow (Deficiency)


Free cash flow (deficiency) represents the amount of cash generated from operations by our business, before changes in working capital that is available to invest in growth initiatives, make scheduled principal repayments of debt, pay additional common share dividends, or repurchase common shares.  Changes in working capital are excluded so as to not distort free cash flow with changes that we consider temporary in nature, reflecting, among other things, the impact of seasonal factors and the timing of capital projects.  


Sustaining capital and productivity expenditures for the three months ended June 30, 2013 represent total additions to property, plant, and equipment and intangibles per the Condensed Consolidated Statements of Cash Flows less $60 million that we have invested in projects and growth.  For the same period in 2012, we invested $45 million in projects and growth.  For the six months ended June 30, 2013 and 2012, we invested $137 million and $82 million, respectively, in projects and growth.  



  

TRANSALTA CORPORATION / Q2 2013  43

   

The reconciliation between cash flow from operating activities and free cash flow is outlined below:


 

3 months ended June 30

6 months ended June 30

 

2013

2012

2013

2012

Cash flow from operating activities

92

78

348

261

Add (deduct):

 

 

 

 

Impacts to working capital associated with Sundance
    Units 1 and 2 arbitration

-

204

-

204

Changes in non-cash operating working capital

93

(132)

16

(126)

Sustaining capital and productivity expenditures

(107)

(141)

(162)

(248)

Dividends paid on common shares(1)

(43)

(23)

(63)

(68)

Dividends paid on preferred shares

(10)

(6)

(19)

(14)

Distributions paid to subsidiaries' non-controlling interests

(16)

(14)

(35)

(33)

Free cash flow (deficiency)

9

(34)

85

(24)

1

We seek to maintain sufficient cash balances and committed credit facilities to fund periodic net cash outflows related to our business.



SELECTED QUARTERLY INFORMATION

 

 

 

 

Q3 2012

Q4 2012

Q1 2013

Q2 2013

 

 

 

 

 

 

 

 

Revenue

 

 

522

646

540

542

Net earnings (loss) attributable to common shareholders

 

56

39

(11)

15

Net earnings (loss) per share attributable to common shareholders,
   basic and diluted

0.24

0.15

(0.04)

0.06

Comparable earnings per share

 

 

0.18

0.22

0.12

0.03

 

 

 

 

 

 

 

 

 

 

 

 

Q3 2011

Q4 2011

Q1 2012

Q2 2012

 

 

 

 

 

 

 

 

Revenue

 

 

613

688

644

398

Net earnings (loss) attributable to common shareholders

 

50

24

88

(798)

Net earnings (loss) per share attributable to common shareholders,
   basic and diluted

0.22

0.11

0.39

(3.52)

Comparable earnings (loss) per share

 

 

0.27

0.13

0.20

(0.10)


Basic and diluted earnings per share attributable to common shareholders and comparable earnings per share are calculated each period using the weighted average common shares outstanding during the period.  As a result, the sum of the earnings per share for the four quarters making up the calendar year may sometimes differ from the annual earnings per share.



DISCLOSURE CONTROLS AND PROCEDURES


Management has evaluated, with the participation of our Chief Executive Officer and Chief Financial Officer, the effectiveness of our disclosure controls and procedures as of the end of the period covered by this report.  Disclosure controls and procedures refer to controls and other procedures designed to ensure that information required to be disclosed in the reports we file or submit under the Securities Exchange Act of 1934 (“Exchange Act”) are recorded, processed, summarized, and reported within the time periods specified in the rules and forms of the Securities and Exchange Commission.  Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by us in our reports that we file or submit under the Exchange Act is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding our required disclosure.  In designing and evaluating our disclosure controls and procedures, management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving the desired control objectives, and management is required to apply its judgment in evaluating and implementing possible controls and procedures.  

 

 

(1) Net of dividends reinvested under the Plan.

  

TRANSALTA CORPORATION / Q2 2013  44

   

There has been no change in the internal control over financial reporting during the period covered by this report that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.  Based on the foregoing evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that, as of June 30, 2013, the end of the period covered by this report, our disclosure controls and procedures were effective at a reasonable assurance level.



FORWARD-LOOKING STATEMENTS


This MD&A, the documents incorporated herein by reference, and other reports and filings made with the securities regulatory authorities include forward-looking statements.  All forward-looking statements are based on our beliefs as well as assumptions based on information available at the time the assumption was made and on management’s experience and perception of historical trends, current conditions, and expected future developments, as well as other factors deemed appropriate in the circumstances.  Forward-looking statements are not facts, but only predictions and generally can be identified by the use of statements that include phrases such as “may”, “will”, “believe”, “expect”, “anticipate”, “intend”, “plan”, “foresee”, “potential”, “enable”, “continue”, or other comparable terminology.  These statements are not guarantees of our future performance and are subject to risks, uncertainties, and other important factors that could cause our actual performance to be materially different from that projected.


In particular, this MD&A contains forward-looking statements pertaining to the following: expectations relating to the timing and completion of the Offering, the timing and the completion and commissioning of projects under development, including uprates and major projects, and their attendant costs; our estimated spend on matters relating to the recent flood in Alberta, spend on growth and sustaining capital and productivity projects; expectations in terms of the cost of operations, capital spend, and maintenance, and the variability of those costs; the impact of certain hedges on future reported earnings and cash flows; expectations related to future earnings and cash flow from operating and contracting activities; estimates of fuel supply and demand conditions and the costs of procuring fuel; expectations for demand for electricity in both the short term and long term, and the resulting impact on electricity prices; expected impacts of fewer anticipated turnarounds, load growth, increased capacity, and natural gas costs on power prices; expectations in respect of generation availability, capacity, and production; expected financing of our capital expenditures; expected governmental regulatory regimes and legislation and their expected impact on us, as well as the cost of complying with resulting regulations and laws; our trading strategy and the risk involved in these strategies; estimates of future tax rates, future tax expense, and the adequacy of tax provisions; accounting estimates; anticipated growth rates in our markets; expectations for the outcome of existing or potential legal and contractual claims; expectations for the ability to access capital markets at reasonable terms; the estimated impact of changes in interest rates and the value of the Canadian dollar relative to the U.S. dollar; the monitoring of our exposure to liquidity risk; expectations in respect to the global economic environment; our credit practices; the estimated contribution of Energy Trading activities to gross margin; and expectations relating to the establishment of TransAlta Renewables and the successful completion of the Offering.


Factors that may adversely impact our forward-looking statements include risks relating to: fluctuations in market prices and the availability of fuel supplies required to generate electricity; our ability to contract our generation for prices that will provide expected returns; the regulatory and political environments in the jurisdictions in which we operate; environmental requirements and changes in, or liabilities under, these requirements; changes in general economic conditions including interest rates; operational risks involving our facilities, including unplanned outages at such facilities; disruptions in the transmission and distribution of electricity; the effects of weather; disruptions in the source of fuels, water, or wind required to operate our facilities; natural disasters; the threat of domestic terrorism and cyber-attacks; equipment failure; energy trading risks; industry risk and competition; fluctuations in the value of foreign currencies and foreign political risks; the need for additional financing; structural subordination of securities; counterparty credit risk; insurance coverage; our provision for income taxes; legal and contractual proceedings involving the Corporation; reliance on key personnel; labour relations matters; development projects and acquisitions; and the satisfactory receipt of applicable regulatory approvals for, and the successful marketing of, the Offering.  The foregoing risk factors, among others, are described in further detail in the Risk Management section of our 2012 Annual MD&A and under the heading “Risk Factors” in our 2013 Annual Information Form.

 

  

TRANSALTA CORPORATION / Q2 2013  45

   

 


Readers are urged to consider these factors carefully in evaluating the forward-looking statements and are cautioned not to place undue reliance on these forward-looking statements.  The forward-looking statements included in this document are made only as of the date hereof and we do not undertake to publicly update these forward-looking statements to reflect new information, future events or otherwise, except as required by applicable laws.  In light of these risks, uncertainties, and assumptions, the
forward-looking events might occur to a different extent or at a different time than we have described, or might not occur.  We cannot assure that projected results or events will be achieved.




  

TRANSALTA CORPORATION / Q2 2013  46

   

 

SUPPLEMENTAL INFORMATION

 

 

 

June 30, 2013

Dec. 31, 2012

 

 

 

 

 

Closing market price (TSX) ($)

 

 

14.41

15.12

 

 

 

 

 

Price range for the last 12 months (TSX) ($)

High

 

16.86

21.37

 

 

 

 

 

 

Low

 

12.91

14.11

 

 

 

 

 

Debt to invested capital (%)

 

 

57.2

55.6

 

 

 

 

 

Debt to invested capital excluding non-recourse debt (%)(1)

 

 

55.0

53.3

 

 

 

 

 

Debt to invested capital including finance lease obligation and non-recourse debt (%)

57.3

55.6

 

 

 

 

 

Return on equity attributable to common shareholders (%)

 

 

4.5

(23.7)

 

 

 

 

 

Comparable return on equity attributable to common shareholders(1), (2) (%)

 

 

6.3

4.5

 

 

 

 

 

Return on capital employed(2) (%)

 

 

5.3

(3.1)

 

 

 

 

 

Comparable return on capital employed(1), (2) (%)

 

 

6.2

5.3

 

 

 

 

 

Cash dividends per share(2) ($)

 

 

1.16

1.16

 

 

 

 

 

Price to comparable earnings ratio(2) (times)

 

 

25.3

30.2

 

 

 

 

 

Earnings coverage(2) (times)

 

 

1.6

(1.2)

 

 

 

 

 

Dividend payout ratio based on net earnings(2) (%)

 

 

293.9

(44.1)

 

 

 

 

 

Dividend payout ratio based on comparable earnings(1), (2) (%)

 

 

212.4

231.6

 

 

 

 

 

Dividend payout ratio based on funds from operations(1), (2), (3) (%)

 

 

35.6

34.7

 

 

 

 

 

Dividend yield(2) (%)

 

 

8.0

7.7

 

 

 

 

 

Adjusted cash flow to debt(2), (3) (%)

 

 

18.6

19.0

 

 

 

 

 

Adjusted cash flow to interest coverage(2), (3) (times)

 

 

4.5

4.4

(1) These ratios incorporate items that are not defined under IFRS.  None of these measurements should be used in isolation or as a substitute for the Corporation’s reported financial performance or position as presented in accordance with IFRS.  These ratios are useful complementary measurements for assessing the Corporation’s financial performance, efficiency, and liquidity and are common in the reports of other companies but may differ by definition and application.  For a reconciliation of the Non-IFRS measures used in this calculation, refer to the Non-IFRS Measures section of this MD&A.

 

(2)   Last 12 months.


(3) The December 2012 ratios have been adjusted for the impact of the Sundance Units 1 and 2 arbitration.


RATIO FORMULAS


Debt to invested capital = long-term debt including current portion - cash and cash equivalents / long-term debt including current portion + non-controlling interests + equity attributable to shareholders - cash and cash equivalents


Return on equity attributable to common shareholders = net earnings attributable to common shareholders or earnings on a comparable basis / average equity attributable to common shareholders excluding AOCI


Return on capital employed = earnings before non-controlling interests and income taxes + net interest expense or comparable earnings before non-controlling interests and income taxes + net interest expense / average invested capital excluding AOCI


Price to comparable earnings ratio = current period’s closing market price / comparable earnings per share


Earnings coverage = net earnings attributable to common shareholders + income taxes + net interest expense / interest on debt - interest income


Dividend payout ratio = common share dividends / net earnings attributable to common shareholders or earnings on a comparable basis or funds from operations


Dividend yield = dividend per common share / current period’s closing market price


Adjusted cash flow to debt = cash flow from operating activities before changes in working capital / average total debt - average cash and cash equivalents


Adjusted cash flow to interest coverage = cash flow from operating activities before changes in working capital + interest on debt - interest income - capitalized interest / interest on debt - interest income


  

TRANSALTA CORPORATION / Q2 2013  47

   

GLOSSARY OF KEY TERMS


Availability - A measure of the time, expressed as a percentage of continuous operation 24 hours a day, 365 days a year that a generating unit is capable of generating electricity, regardless of whether or not it is actually generating electricity.


British Thermal Units (Btu) - A measure of energy.  The amount of energy required to raise the temperature of one pound of water one degree Fahrenheit, when the water is near 39.2 degrees Fahrenheit.


Capacity - The rated continuous load-carrying ability, expressed in megawatts, of generation equipment.


Derate - To lower the rated electrical capability of a power generating facility or unit.


Force Majeure - Literally means “major force”.  These clauses excuse a party from liability if some unforeseen event beyond the control of that party prevents it from performing its obligations under the contract.


Geothermal Plant - A plant in which the prime mover is a steam turbine.  The turbine is driven either by steam produced from hot water or by natural steam that derives its energy from heat found in rocks or fluids at various depths beneath the surface of the earth.  The energy is extracted by drilling and/or pumping.


Gigawatt - A measure of electric power equal to 1,000 megawatts.


Gigawatt Hour (GWh) - A measure of electricity consumption equivalent to the use of 1,000 megawatts of power over a period of one hour.


Greenhouse Gas (GHG) - Gases having potential to retain heat in the atmosphere, including water vapour, carbon dioxide, methane, nitrous oxide, hydrofluorocarbons, and perfluorocarbons.


Heat Rate - A measure of conversion, expressed as Btu/MWh, of the amount of thermal energy required to generate electrical energy.


Megawatt (MW) - A measure of electric power equal to 1,000,000 watts.


Megawatt Hour (MWh) - A measure of electricity consumption equivalent to the use of 1,000,000 watts of power over a period of one hour.


Net Maximum Capacity - The maximum capacity or effective rating, modified for ambient limitations, that a generating unit or power plant can sustain over a specific period, less the capacity used to supply the demand of station service or auxiliary needs.


Power Purchase Arrangement (PPA) - A long-term arrangement established by regulation for the sale of electric energy from formerly regulated generating units to PPA Buyers.


Renewable Power - Power generated from renewable terrestrial mechanisms including wind, geothermal, and solar with regeneration.


Spark Spread - A measure of gross margin per MW (sales price less cost of natural gas).


Supercritical Combustion Technology: The most advanced coal-combustion technology in Canada employing a supercritical boiler, high-efficiency multi-stage turbine, flue gas desulphurization unit (scrubber), bag house, and low nitrogen oxide burners.


Turbine - A machine for generating rotary mechanical power from the energy of a stream of fluid (such as water, steam, or hot gas).  Turbines convert kinetic energy of fluids to mechanical energy through the principles of impulse and reaction or a mixture of the two.


Turnaround: Periodic planned shutdown of a generating unit for major maintenance and repairs. Duration is normally in weeks. The time is measured from unit shutdown to putting the unit back on line.


Unplanned Outage - The shut down of a generating unit due to an unanticipated breakdown.


Uprate - To increase the rated electrical capability of a power generating facility or unit.


Value at Risk (VaR) - A measure to manage earnings exposure from energy trading activities.



  

TRANSALTA CORPORATION / Q2 2013  48

   

[ex132012.gif]


TransAlta Corporation

110 - 12th Avenue S.W.

Box 1900, Station “M”

Calgary, Alberta Canada T2P 2M1

Phone

403.267.7110


Website

www.transalta.com


CIBC Mellon Trust Company

P.O. Box 7010 Adelaide Street Station

Toronto, Ontario Canada M5C 2W9

Phone

Toll-free in North America: 1.800.387.0825

Toronto or outside North America: 416.643.5500

Fax

416.643.5501

Website

www.cibcmellon.com


FOR MORE INFORMATION


Media and Investor Inquiries

Investor Relations

Phone

1.800.387.3598 in Canada and United States

or 403.267.2520

Fax

403.267.2590

E-mail

investor_relations@transalta.com



  

TRANSALTA CORPORATION / Q2 2013  49