EX-13.2 3 a20220331tacex132mda.htm EX-13.2 Document


TRANSALTA CORPORATION     talogo.jpg
Management’s Discussion and Analysis

First Quarter Report for 2022

This Management’s Discussion and Analysis (“MD&A”) contains forward-looking statements. These statements are based on certain estimates and assumptions and involve risks and uncertainties. Actual results may differ materially. See
the Forward-Looking Statements section of this MD&A for additional information.

Table of Contents
Forward-Looking Statements
M2
Description of the Business
M4
Highlights
M5
Significant and Subsequent Events
M7
Performance by Segment with Supplemental Geographical Information
M8
Alberta Electricity Portfolio
M9
Segmented Financial Performance and Operating Results
Strategy and Capability to Deliver Results
2022 Financial Outlook
Selected Quarterly Information
Financial Position
Financial Capital
Other Consolidated Analysis
Cash Flows
Financial Instruments
Additional IFRS Measures and Non-IFRS Measures
Financial Highlights on a Proportional Basis of TransAlta Renewables
Key Financial Non-IFRS Ratios
Critical Accounting Policies and Estimates
Accounting Changes
Governance and Risk Management
Regulatory Updates
Disclosure Controls and Procedures
This MD&A should be read in conjunction with the unaudited interim condensed consolidated financial statements of TransAlta Corporation as at and for the three months ended March 31, 2022 and 2021, and should also be read in conjunction with the audited annual consolidated financial statements and MD&A ("2021 Annual MD&A") contained within our 2021 Annual Integrated Report. In this MD&A, unless the context otherwise requires, “we”, “our”, “us”, the “Company”, and “TransAlta” refers to TransAlta Corporation and its subsidiaries. Our unaudited interim condensed consolidated financial statements have been prepared in accordance with International Financial Reporting Standards (“IFRS”) International Accounting Standards (“IAS”) 34 Interim Financial Reporting for Canadian publicly accountable enterprises as issued by the International Accounting Standards Board (“IASB”) and in effect at March 31, 2022. All tabular amounts in the following discussion are in millions of Canadian dollars unless otherwise noted. This MD&A is dated May 5, 2022. Additional information respecting TransAlta, including our Annual Information Form ("AIF") for the year ended December 31, 2021, is available on SEDAR at www.sedar.com, on EDGAR at www.sec.gov and on our website at www.transalta.com. Information on or connected to our website is not incorporated by reference herein.




TRANSALTA CORPORATION M1

Management’s Discussion and Analysis

Forward-Looking Statements
This MD&A includes "forward-looking information" within the meaning of applicable Canadian securities laws, and "forward-looking statements" within the meaning of applicable US securities laws, including the US Private Securities Litigation Reform Act of 1995 (collectively referred to herein as "forward-looking statements"). All forward-looking statements are based on our beliefs as well as assumptions based on information available at the time the assumptions were made, and on management's experience and perception of historical trends, current conditions and expected future developments, as well as other factors deemed appropriate in the circumstances. Forward-looking statements are not facts, but only predictions and generally can be identified by the use of statements that include phrases such as "may," "will," "can," "could," "would," "shall," "believe," "expect," "estimate," "anticipate," "intend," "plan," "forecast," "foresee," "potential," "enable," "continue" or other comparable terminology. These statements are not guarantees of our future performance, events or results and are subject to risks, uncertainties and other important factors that could cause our actual performance, events or results to be materially different from that set out in or implied by the forward-looking statements.

In particular, this MD&A contains forward-looking statements including, but not limited to, statements relating to: our Clean Electricity Growth Plan and ability to achieve the target of 2 gigawatts ("GW") of incremental renewables capacity expected to deliver incremental average annual EBITDA of $250 million; the Company's projects under construction, including the timing of commercial operations and the costs of the 200 MW Horizon Hill wind project ("Horizon Hill wind project"), the White Rock East and White Rock West Wind Power Projects ("White Rock Wind Projects"), Northern Goldfields Solar, and the Garden Plain wind project; the Mount Keith transmission expansion, including the timing of commercial operation and expected annual EBITDA; the effectiveness of the capacity commitments of the industrial customers at the Sarnia cogeneration facility; the execution of the Company's early and advanced stage development pipeline, including the size, cost and expected EBITDA from such projects; the expansion of the Company's early stage development pipeline to 5 GW; the proportion of EBITDA to be generated from renewable sources by the end of 2025; the reduction of carbon emissions by 75% from 2015 emissions levels by 2026; the remediation of the Kent Hills 1 and Kent Hills 2 wind facilities, including, the timing and cost of such remediation, the ability to secure waivers in respect of the Kent Hills bonds ("KH Bonds") for any potential event of default, and the impact such incident could have on the Company's revenues and contracts; the expectation that agreements will be entered into with New Brunswick Power Corporation and the terms thereof; the expected impact and quantum of carbon compliance costs; the ability to realize future growth opportunities with BHP (as defined below); regulatory developments and their expected impact on the Company, including the Canadian federal climate plan and the implementation of the major aspects thereof (including increased carbon pricing and increased funding for clean technology); the ability of the Company to realize benefits from Canadian, US and Australian regulatory developments, including receiving funding for clean electricity projects; the potential increase in value of emission reduction credits; the 2022 financial outlook, including adjusted EBITDA, free cash flow ("FCF") and annualized dividend in 2022; sustaining and productivity capital in 2022, including routine capital, planned major maintenance and mine capital; significant planned major outages for 2022 and lost production due to planned major maintenance for 2022; expected power prices in Alberta, Ontario and the Pacific Northwest; AECO gas price assumptions; the cyclicality of the business, including as it relates to maintenance costs, production and loads; expectations regarding refinancing the debt maturing in 2022; and the Company continuing to maintain a strong financial position and significant liquidity.

The forward-looking statements contained in this MD&A are based on many assumptions including, but not limited to, the following: the impacts arising from COVID-19 not becoming significantly more onerous on the Company; no significant changes to applicable laws and regulations beyond those that have already been announced; no significant changes to the fuel and purchased power costs; no material adverse impacts to the long-term investment and credit markets; no significant changes to power price and hedging assumptions including, Alberta spot prices of $90 /MWh to $100/MWh in 2022 and Mid-Columbia spot prices of US$55/MWh to US$65/MWh in 2022; AECO gas prices of between $4.50/GJ and $5.50/GJ; sustaining capital of $150 million to $170 million; the Company's proportionate ownership of TransAlta Renewables Inc. ("TransAlta Renewables") not changing materially; no decline in the dividends to be received from TransAlta Renewables; and the growth of TransAlta Renewables. Forward-looking statements are subject to a number of significant risks and uncertainties that could cause actual plans, performance, results or outcomes to differ materially from current expectations. Factors that may adversely impact what is expressed or implied by forward-looking statements contained in this MD&A include risks relating to: the impact of COVID-19, including more restrictive directives of government and public health authorities; increased force majeure claims; reduced labour availability and ability to continue to staff our operations and facilities; failure to satisfy the conditions precedent to the capacity commitments for each of the industrial offtakers at Sarnia; disruptions to our supply chains, including our ability to secure necessary equipment; our ability to obtain regulatory approvals on the expected timelines or at all in respect of our growth projects; restricted access to capital and increased borrowing costs; changes in short-term and/or long-term electricity supply and demand; fluctuations in market prices, including lower merchant pricing in Alberta, Ontario and Mid-Columbia; reductions in production; increased costs; a higher rate of losses on our accounts




TRANSALTA CORPORATION M2

Management’s Discussion and Analysis

receivables due to credit defaults; impairments and/or write-downs of assets; adverse impacts on our information technology systems and our internal control systems, including increased cyber security threats; commodity risk management and energy trading risks, including the effectiveness of the Company’s risk management tools associated with hedging and trading procedures to protect against significant losses; changes in demand for electricity and capacity and our ability to contract our generation for prices that will provide expected returns and replace contracts as they expire; changes to the legislative, regulatory and political environments in the jurisdictions in which we operate; environmental requirements and changes in, or liabilities under, these requirements; operational risks involving our facilities, including unplanned outages; disruptions in the transmission and distribution of electricity; the effects of weather, including man made or natural disasters and other climate-change related risks; unexpected increases in cost structure; reductions to our generating units’ relative efficiency or capacity factors; disruptions in the source of fuels, including natural gas and coal, as well as the extent of water, solar or wind resources required to operate our facilities; general economic risks, including deterioration of equity markets, increasing interest rates or rising inflation; failure to meet financial expectations; general domestic and international economic and political developments; armed hostilities, including the war in Ukraine and associated impacts; the threat of terrorism, including cyberattacks, adverse diplomatic developments or other similar events that could adversely affect our business; equipment failure and our ability to carry out or have completed the repairs in a cost-effective manner or timely manner or at all, including if the remediation at the Kent Hills wind facilities is more costly or time consuming than expected; inability to come to a commercial agreement with New Brunswick Power Corporation or enter into a waiver and amendments with the Trustee and holders of the KH Bonds; industry risk and competition; fluctuations in the value of foreign currencies; structural subordination of securities; counterparty credit risk; changes to our relationship with, or ownership of, TransAlta Renewables; changes in the payment or receipt of future dividends, including from TransAlta Renewables; risks associated with development projects and acquisitions, including capital costs, permitting, labour and engineering risks, and delays in the construction or commissioning of projects; inadequacy or unavailability of insurance coverage; our provision for income taxes; legal, regulatory and contractual disputes and proceedings involving the Company; reliance on key personnel; and labour relations matters. The foregoing risk factors, among others, are described in further detail in the Governance and Risk Management section of our 2021 Annual MD&A and the Risk Factors section in our AIF for the year ended Dec. 31, 2021.

Readers are urged to consider these factors carefully in evaluating the forward-looking statements, which reflect the Company's expectations only as of the date hereof, and are cautioned not to place undue reliance on them. The forward-looking statements included in this document are made only as of the date hereof and we do not undertake to publicly update these forward-looking statements to reflect new information, future events or otherwise, except as required by applicable laws. The purpose of the financial outlooks contained herein is to give the reader information about management's current expectations and plans and readers are cautioned that such information may not be appropriate for other purposes. In light of these risks, uncertainties and assumptions, the forward-looking statements might occur to a different extent or at a different time than we have described, or might not occur at all. We cannot assure that projected results or events will be achieved.




TRANSALTA CORPORATION M3

Management’s Discussion and Analysis


Description of the Business
Portfolio of Assets
TransAlta is a Canadian corporation and one of Canada's largest publicly traded power generators with over 110 years of operating experience. We own, operate and manage a geographically diversified portfolio of assets utilizing a broad range of fuels that includes water, wind, solar, and natural gas.

The following table provides our consolidated ownership of our facilities across the regions in which we operate as at March 31, 2022:
As at March 31, 2022
HydroWind and Solar
Gas(4)(5)
Energy Transition(6)
Total
Alberta(4)
Gross installed capacity (MW)(1)
834 636 1,960 113 3,543 
Number of facilities17 13 38 
Weighted average contract life(2)(3)
— — 2 
Canada, Excl. Alberta
Gross installed capacity (MW)(1)
91 751 645 — 1,487 
Number of facilities— 21 
Weighted average contract life(3)
— 7 
US
Gross installed capacity (MW)(1)
— 519 29 671 1,219 
Number of facilities— 10 
Weighted average contract life(3)
— 12 7 
Australia
Gross installed capacity (MW)(1)
— — 450 — 450 
Number of facilities— — — 6 
Weighted average contract life(3)
— — 17 — 17 
Total
Gross installed capacity (MW)(1)
925 1,906 3,084 784 6,699 
Number of facilities26 29 17 3 75 
Weighted average contract life(3)
1 9 4 3 5 
(1) Gross installed capacity for consolidated reporting represents 100 per cent output of a facility. Capacity figures for Wind and Solar includes the 100 per cent of Kent Hills wind facilities; Gas includes 100 per cent of the Ottawa and Windsor facilities, 100 per cent of the Poplar Creek facility, 50 per cent of the Sheerness facility, and 60 per cent of the Fort Saskatchewan facility. On March 31, 2022, Sundance Unit 4 was retired such that, subsequent to March 31, 2022, 113 MW will be excluded from the Energy Transition segment.
(2) The weighted average contract life for Hydro, Gas, Energy Transition and certain wind assets in Alberta are nil as it is operating primarily on a merchant basis in the Alberta market. Refer to the Alberta Electricity Portfolio section for more information.
(3) For power generated under long-term power purchase agreements ("PPA"), power hedge contracts and short- and long-term industrial contracts, the PPAs have a weighted average remaining contract life based on gross long-term average gross installed capacity.
(4) The weighted average remaining contract life is related to the contract period for the McBride Lake (38 MW), the 206 MW Windrise wind project ("Windrise"), Poplar Creek facility (115 MW) and the Fort Saskatchewan facility (71 MW), with remaining wind and gas facilities operated on a merchant basis in the Alberta market.
(5) Gas segment includes the segments previously known as Australian Gas and North American Gas and the coal generation assets converted to gas from the segment previously known as Alberta Thermal.
(6) Energy Transition segment includes the segment previously known as Centralia, the coal generation assets not converted to gas (including Sundance Unit 4) and mining assets from the segment previously known as Alberta Thermal.






TRANSALTA CORPORATION M4

Management’s Discussion and Analysis

Highlights
Unaudited Interim Condensed Consolidated Financial Highlights
3 months ended March 31
20222021
Adjusted availability (%)89.1 88.6 
Production (GWh)5,359 5,541 
Revenues735 642 
Fuel and purchased power(1)
238 245 
Carbon compliance19 50 
Operations, maintenance and administration(1)
112 103 
Adjusted EBITDA(2)
266 310 
Earnings before income tax242 21 
Net earnings (loss) attributable to common shareholders186 (30)
Cash flow from operating activities451 257 
Funds from operations(2)
186 211 
Free cash flow(2)
115 129 
Net earnings (loss) per share attributable to common shareholders, basic and diluted0.69 (0.11)
Funds from operations per share(2)(3)
0.69 0.78 
Free cash flow per share(2)(3)
0.42 0.48 
As atMarch 31, 2022Dec. 31, 2021
Total assets9,425 9,226 
Total consolidated net debt(4)
2,342 2,636 
Total long-term liabilities
4,540 4,702 
Total liabilities6,785 6,633 
(1) $2 million related to station service costs for the Hydro segment in the three months ended March 31, 2021 was reclassified from operations, maintenance and administration to fuel and purchased power for comparative purposes. This did not impact previously reported net earnings.
(2) These items are not defined and have no standardized meaning under IFRS. Presenting these items from period to period provides management and investors with the ability to evaluate earnings trends more readily in comparison with prior periods’ results. Please refer to the Segmented Financial Performance and Operating Results section of this MD&A for further discussion of these items, including, where applicable, reconciliations to measures calculated in accordance with IFRS. See also the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.
(3) Funds from operations ("FFO") per share and free cash flow ("FCF") per share are calculated using the weighted average number of common shares outstanding during the period. The weighted average number of common shares outstanding at March 31, 2022 was 271 million shares (March 31, 2021- 270 million shares). Please refer to the Additional IFRS Measures and Non-IFRS Measures section in this MD&A for the purpose of these non-IFRS ratios.
(4) Total consolidated net debt includes long-term debt, including current portion, amounts due under credit facilities, exchangeable securities, US tax equity financing and lease liabilities, net of available cash and cash equivalents, the principal portion of restricted cash on our subsidiary TransAlta OCP LP ("TransAlta OCP") and the fair value of economic hedging instruments on debt. See the table in the Financial Capital section of this MD&A for more details on the composition of total consolidated net debt.


For the three months ended March 31, 2022, results were solid and in line with expectations for all segments with the addition of new contracted assets, namely the Windrise wind facility and North Carolina Solar facility (as defined below) compared to the same period in 2021. The Alberta market pricing was lower in the first quarter of 2022 compared to the same period in 2021 due to fewer planned outages impacting the overall merchant market and no significant weather events.

Adjusted availability for the three months ended March 31, 2022, was 89.1 per cent compared to 88.6 per cent for the same period in 2021. The increase was primarily due to lower planned outages within the Gas segment and Hydro segment. Adjusted availability improved within the Gas segment as there were no planned outages in the current period with the completion of the coal-to-gas conversions in the prior year. These increases in adjusted availability were partially offset by the unplanned outage at the Kent Hills 1 and 2 wind facilities and the early-stage operational issues at the Windrise wind facility in Alberta.





TRANSALTA CORPORATION M5

Management’s Discussion and Analysis

Production for the three months ended March 31, 2022, was 5,359 gigawatt hours ("GWh") compared to 5,541 GWh in the same period in 2021. The decrease in production was primarily due to the retirement of Keephills Unit 1, portfolio optimization activities, and the unplanned outage at the Kent Hills 1 and 2 wind facilities in the Wind and Solar segment. This was partially offset by higher adjusted availability, higher wind resources, higher incremental production at our Ada facility within our Gas segment and incremental production from the newly-commissioned Windrise wind facility and the recently acquired 122 MW portfolio of operating solar sites located in North Carolina (collectively, “North Carolina Solar”), in our Wind and Solar segment.

Revenues for the three months ended March 31, 2022, increased by $93 million compared to the same period in 2021, mainly as a result of the Company capturing higher realized prices within the Alberta market through our optimization activities, an increase in revenues within the Wind and Solar segment from higher wind resources, and the addition of the North Carolina Solar facility and the Windrise wind facility. These increases were partially offset by lower production in the Wind and Solar segment and the Energy Transition segment stemming from the unplanned outage at the Kent Hills 1 and 2 Wind facilities and the retirement of Keephills Unit 1.

Fuel and purchased power costs in the three months ended March 31, 2022, decreased by $7 million compared to same period in 2021. In our Gas segment, our fuel and purchased power costs increased compared to 2021 due to higher natural gas pricing and increased natural gas consumption for our converted units in 2022, partially offset by our hedged positions on gas, lower coal costs, and no mine depreciation occurring in 2022.

Carbon compliance costs for the three months ended March 31, 2022, decreased by $31 million compared to the same period in 2021, primarily due to lower production and reductions in GHG emissions stemming from changes in the fuel mix ratio, as we now operate on natural gas in Alberta, partially offset by an increase in the carbon price per tonne.

Operations, maintenance and administration ("OM&A") expenses for the three months ended March 31, 2022, increased by $9 million compared to the same period in 2021. Variability caused by the total return swap resulted in a unfavourable period over period change of $8 million compared to the same period in 2021. In addition, during 2021, the Company recognized the Canada Emergency Wage Subsidy ("CEWS") of $8 million. Excluding the impact of the total return swap and the CEWS funding, OM&A expenses were lower for the three months ended March 31, 2022, compared to the same period in 2021, due to lower staffing costs, lower incentive payments and lower legal costs.

Adjusted EBITDA for the three months ended March 31, 2022, decreased by $44 million compared to the same period in 2021, largely due to lower adjusted EBITDA at our Gas, Energy Transition, Hydro, and Energy Marketing segments and higher corporate costs. This was partially offset by higher adjusted EBITDA at our Wind and Solar segment. Significant changes in segmented adjusted EBITDA are highlighted in the Segmented Financial Performance and Operating Results section within this MD&A.

Earnings before income taxes for the three months ended March 31, 2022, increased by $221 million compared to the same period in 2021. Net earnings attributable to common shareholders for the three months ended March 31, 2022 was $186 million compared to a loss of $30 million in the same period in 2021. The increase in earnings before income taxes and net earnings attributable to common shareholders in 2022 was largely driven by higher revenues from the Alberta Electricity Portfolio, lower carbon compliance costs and lower depreciation, mainly as a result of the completion of our coal-to-gas conversions and retirement of our coal assets compared to the same period in 2021. In addition, an asset impairment reversal driven by discount rate changes was recognized in 2022 compared to impairment charges in 2021. The higher net earnings attributable to common shareholders was also impacted by higher income tax recoveries in 2022.

Cash flow from operating activities for the three months ended March 31, 2022, increased by $194 million compared to the same period in 2021, primarily due to favourable changes in non-cash working capital and higher revenue attributable to the North American Gas assets, converted gas units and higher revenues in the Wind and Solar segment as well as lower fuel and purchased power and carbon compliance costs as the Company transitioned its units to natural gas.

FCF, one of the Company's key financial metrics, for the three months ended March 31, 2022, totaled $115 million compared to $129 million in the same period in 2021. This represents a decrease of $14 million, driven primarily by lower adjusted EBITDA, higher distributions paid to subsidiaries' non-controlling interests, partially offset by a decrease in sustaining capital spending related to lower planned maintenance turnarounds.





TRANSALTA CORPORATION M6


Management’s Discussion and Analysis
Significant and Subsequent Events
Mount Keith 132kV Transmission Expansion
On May 3, 2022, TransAlta Renewables exercised its option to acquire an economic interest in the expansion of the Mt. Keith 132kV transmission system in Western Australia, to support the Northern Goldfields-based operations of BHP Nickel West ("BHP"). Total construction capital is estimated at approximately AU$50 million to AU$53 million. Southern Cross Energy, a subsidiary of the Company, has entered into an engineering, procurement and construction agreement with ASX-listed GenusPlus Group Ltd for the expansion. The project is being developed under the existing PPA with BHP, which has a term of 15 years. It is expected to be completed in the second half of 2023 and will generate annual EBITDA in the range of AU$6 million to AU$7 million. In addition, the planned completion date should allow at least a portion of the project to qualify for Australia's "Temporary Full Expensing" COVID-19 tax benefit. The project will facilitate the connection of additional generating capacity to our network to support BHP's operations and increase their competitiveness as a supplier of low-carbon nickel.

Sarnia Cogeneration Facility Contract Extensions
The Company recently entered into agreements with three of its large industrial customers at the Sarnia cogeneration facility. The capacity commitments for the large industrial customers have now been extended to 2031, at rates comparable to current contract rates, which, in each case, are subject to the satisfaction of certain conditions, including the Company entering into a new contract with the Ontario Independent Electricity System Operator (the “IESO”). The IESO is conducting a medium-term procurement process for capacity for 2026 and beyond for existing generation. The Company has bid into the process, and is seeking to secure a contract extension for the Sarnia cogeneration facility following the end of the current IESO contract expiring on Dec. 31, 2025. The Company expects the IESO to announce the successful bids in the third quarter of 2022.

Executed Long Term PPA for Remaining 30 MW at Garden Plain
The Company has entered into a long term PPA for the remaining 30 MW of renewable electricity and environmental attributes at the Garden Plain wind farm in Alberta with a new investment-grade globally recognized customer. The 130 MW Garden Plain wind project, which was announced in May 2021 with a 100 MW PPA with Pembina Pipeline Corporation, is now fully contracted with a weighted average contract life of approximately 17 years. Construction is underway with a target commercial operation date in the second half of 2022.

Energy Impact Partners ("EIP") Investment
The Company entered into a commitment to invest US$25 million over the next four years in EIP's Deep Decarbonization Frontier Fund 1 (the “Frontier Fund”). The investment in the Frontier Fund provides the Company with a portfolio approach to investing in emerging technologies and the opportunity to identify, pilot, commercialize and bring to market emerging technologies that will facilitate the transition to net-zero emissions.

Customer Update at White Rock Wind Facilities
During the second quarter of 2022, TransAlta identified Amazon Energy LLC (“Amazon”) as the customer for the 300MW White Rock Wind Projects, to be located in Caddo County, Oklahoma. On Dec. 22, 2021, Amazon and TransAlta entered into two long-term PPAs for the supply of 100 per cent of the generation from the projects. Construction is expected to begin in the second half of 2022 with a target commercial operation date in the second half of 2023.

MSCI Environmental, Social and Governance ("ESG") Rating Upgrade
TransAlta's MSCI ESG Rating was upgraded to 'A' from 'BBB'. The upgrade reflects the Company's strong renewable energy growth compared to peers. In 2021, the Company grew its installed renewable energy capacity by 15 per cent through acquisition and construction of solar and wind facilities, and secured 600 MW in additional renewable energy projects. In line with its goal to reduce carbon emissions by 75 per cent from 2015 emissions levels by 2026, TransAlta completed coal-to-gas conversions of its Canadian coal-fired facilities in 2021, nine years ahead of Alberta’s coal phase-out plan.





TRANSALTA CORPORATION M7


Management’s Discussion and Analysis
Horizon Hill Wind Project and Fully Executed Corporate PPA with Meta
On April 5, 2022, TransAlta executed a long-term PPA with a subsidiary of Meta Platforms Inc., formerly known as Facebook, Inc. ("Meta"), for 100 per cent of the generation from its 200 MW Horizon Hill wind project to be located in Logan County, Oklahoma. Under this agreement, Meta will receive both renewable electricity and environmental attributes. The facility will consist of a total of 34 Vestas turbines with construction expected to begin in late 2022 and a target commercial operation date in the second half of 2023. TransAlta will construct, operate and own the facility. Total construction capital is estimated at approximately US$290 million to US$310 million and is expected to be financed with a combination of existing liquidity and tax equity financing. Over 90 per cent of project costs are captured under executed turbine supply agreements and engineering, procurement and construction agreements. The project is expected to generate average annual EBITDA of approximately US$27 million to US$30 million inclusive of production tax credits.

Normal Course Issuer Bid
On May 25, 2021, the Toronto Stock Exchange ("TSX") accepted the notice filed by the Company to implement a normal course issuer bid ("NCIB") for a portion of our common shares. During the three months ended March 31, 2022, the Company purchased and cancelled a total of 1.4 million common shares at an average price of $12.50 per common share, for a total cost of $18 million.

Refer to the audited annual 2021 consolidated financial statements within our 2021 Annual Integrated Report and our unaudited interim condensed consolidated financial statements for the three months ended March 31, 2022, for significant events impacting both prior and current year results.

Performance by Segment with Supplemental Geographical Information
The following table provides the performance of our facilities across the regions in which we operate:
3 months ended March 31, 2022HydroWind and Solar
Gas(1)
Energy Transition(2)
Energy MarketingCorporate and OtherTotal
Alberta61 30 44 (3) (18)114 
Canada, Excl. Alberta 34 22  27  83 
US 25 2 8   35 
Australia  34    34 
Total adjusted EBITDA(3)
61 89 102 5 27 (18)266 
Earnings before income taxes242 
3 months ended March 31, 2021HydroWind and Solar
Gas(1)
Energy Transition(2)
Energy MarketingCorporate and OtherTotal
Alberta77 12 49 — (8)134 
Canada, Excl. Alberta— 41 22 — 43 — 106 
US— 23 12 — — 38 
Australia— — 32 — — — 32 
Total adjusted EBITDA(3)
77 76 106 16 43 (8)310 
Earnings before income taxes21 
(1) Gas segment includes the segments previously known as Australian Gas and North American Gas and the coal generation assets converted to gas from the segment previously known as Alberta Thermal.
(2) Energy Transition segment includes the segment previously known as Centralia and the coal generation assets not converted to gas and mining assets from the segment previously known as Alberta Thermal.
(3) Adjusted EBITDA is not defined and has no standardized meaning under IFRS. Presenting this from period to period provides management and investors with the ability to evaluate earnings trends more readily in comparison with prior periods’ results. Please refer to the Segmented Financial Performance and Operating Results section of this MD&A for further discussion of these items, including, where applicable, reconciliations to measures calculated in accordance with IFRS. See also the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.







TRANSALTA CORPORATION M8


Management’s Discussion and Analysis
Alberta Electricity Portfolio
Approximately 53 per cent of our gross installed capacity is located in Alberta. Our portfolio of merchant assets in Alberta is a combination of hydro facilities, wind facilities, a battery storage facility and converted natural gas-fired thermal facilities. Optimization of facilities is driven by the diversity in fuel types, which enables portfolio management and allows for maximization of operating margins. It also provides us with capacity that can be monetized as ancillary services or dispatched into the energy market during times of supply tightness. A portion of the installed generation capacity in the portfolio has been hedged to provide cash flow certainty.

Generating capacity in Alberta is subject to market forces, rather than rate regulation. Power from commercial generation is cleared through a wholesale electricity market. Power is dispatched in accordance with an economic merit order administered by the Alberta Electric System Operator ("AESO"), based upon offers by generators to sell power in the real-time energy-only market. Our merchant Alberta fleet operates under this framework and we internally manage our offers to sell power.
20222021
3 months ended March 31HydroWind & SolarGasEnergy TransitionTotalHydroWind & SolarGasEnergy TransitionTotal
Total Production (GWh)(1)
336 503 1,718 19 2,576 327 334 1,830 423 2,914 
Revenues(2)
74 35 161 5 275 87 19 150 45 301 
Fuel and purchased power4 5 85 4 98 57 19 78 
Carbon compliance  15 1 16 — — 32 11 43 
Gross margin(1)
70 30 61  161 86 18 61 15 180 
(1) Units in the Gas and Energy Transition segments in prior period operated on coal.
(2) Adjustments to revenues include the impact of unrealized mark-to-market gains or losses.

For the three months ended March 31, 2022, the Alberta Electricity Portfolio generated 2,576 GWh of production, a decrease of 338 GWh compared to the same period in 2021. Production was impacted by dispatch optimization and the retirement of Keephills Unit 1 on Dec. 31, 2021. On March 31, 2022, Sundance Unit 4 was retired, further reducing the Alberta Electricity Portfolio capacity by 113 GWh.

Gross margin for the three months ended March 31, 2022, was $161 million, a decrease of $19 million compared to the same period in 2021. Gross margin was impacted mainly as a result of weaker market conditions in February as compared to the same period in 2021. Ancillary services revenue from the Hydro segment was also lower in February as a result of these market conditions. In addition, the Gas and Energy Transition segment results were impacted by lower production due to higher dispatch optimization in response to market conditions, and higher gas costs, which was partially offset by our gas hedge positions, lower carbon costs, and higher realized prices in Alberta. The decrease in gross margins were partially offset by higher gross margins in the Wind and Solar segment mainly due to higher production and higher realized prices.





TRANSALTA CORPORATION M9


Management’s Discussion and Analysis
The following table provides information for the Company's Alberta Electricity Portfolio:
3 months ended March 31
20222021
Spot power price average per MWh$90 $95 
Natural gas price (AECO) per GJ$4.50 $2.89 
Carbon cost per tonne$50 $40 
Realized merchant power price per MWh(1)
$107 $103 
Hydro energy realized power price per MWh$108 $117 
Hydro ancillary realized price per MWh$45 $67 
Wind energy realized power price per MWh$58 $44 
Gas and Energy Transition realized power price per MWh$103 $105 
Hedged Volume1,738 1,601 
Hedge position (percentage)(2)
83 47 
Hedged power price average per MWh$84 $64 
Fuel and purchased power per MWh(3)
$56 $35 
Carbon compliance cost per MWh(3)
$9 $19 
(1) Realized power price for the Alberta Electricity Portfolio is the average price realized as a result of the Company's merchant power sales (excluding assets under long term contract) and portfolio optimization activities divided by total GWh produced.
(2) Represents the percentage of production sold forward at the end of the reporting period for the Gas assets only. The hedge program is focused primarily on generation from the merchant Gas and Energy Transition assets.
(3) Fuel and purchased power per MWh and carbon compliance cost per MWh are calculated on production from carbon-emitting generation segments in Gas and Energy Transition.

The average pool price decreased from $95/MWh for the three months ending March 31, 2021 to $90/MWh for the same period in 2022. Pool prices were lower on average for the quarter compared to 2021, mainly as a result of fewer Heating degree days ("HDD") as well as fewer planned and unplanned outages across the provincial gas assets.

For the period ended March 31, 2022, the realized power price per MWh of production increased by $4 per MWh, compared with the same period in 2021, primarily due to the optimization of production for our Hydro, Wind, and Gas segments during periods of favourable pricing. The realized prices include gains and losses from hedging positions that are entered into in order to mitigate the impact of unfavourable market pricing.

For the period ended March 31, 2022, the Hydro ancillary realized power price decreased due to lower pool prices and as a result of increased competition within the ancillary services market compared with the same period in 2021.

For the period ended March 31, 2022, the fuel and purchased power cost per MWh of production increased by $21 per MWh compared to the same period in 2021 due to higher natural gas pricing and higher fixed gas transportation costs, partially offset by our hedge positions for gas prices and lower mine depreciation being recognized due to the cessation of mining operations in 2021.

For the period ended March 31, 2022, carbon compliance costs per MWh of production decreased by $10 per MWh compared with the same period in 2021, primarily due to changes in fuel ratios as we increased our natural gas combustion versus coal, as well as lower production, which was partially offset by an increase in carbon tax price from $40 per tonne to $50 per tonne. The shift in fuel ratio effectively lowered our greenhouse gas ("GHG") compliance costs as natural gas combustion produces less GHG emissions than coal combustion.





TRANSALTA CORPORATION M10


Segmented Financial Performance and Operating Results
Reporting Segment Changes
Segmented information is prepared on the same basis that the Company manages its business, evaluates financial results, and makes key operating decisions. With the completion of the Clean Energy Transition plan and the announcement of our strategic focus on customer-centred renewable generation, the Company realigned its current operating segments during the fourth quarter of 2021, to better reflect the Company's current strategic focus and to align with the Company's Clean Electricity Growth Plan. The segment reporting changes reflect a corresponding change in how the President and Chief Executive Officer assesses the performance of the Company.

The primary changes are the elimination of the Alberta Thermal and the Centralia segments and the reorganization of the North American Gas and Australia Gas segments into a new "Gas" segment. The Alberta Thermal facilities that have been converted to gas are included in the Gas segment. The remaining assets previously included in Alberta Thermal, including the mining assets and those facilities not converted to gas and the remaining Centralia unit are included in a new "Energy Transition" segment. No changes have been made to the Hydro, Wind and Solar, Energy Marketing or the Corporate and Other segments. Prior year's metrics were restated to reflect the re-alignment of the operating segments.

Consolidated Results
The following table reflects the generation and summary financial information on a consolidated basis for each of our segments:
LTA Generation (GWh)(1)
Actual Production (GWh)(2)
Adjusted EBITDA(3)
As at March 31,202220212022202120222021
Hydro408 408 372 360 61 77 
Wind and Solar1,453 1,170 1,269 1,131 89 76 
Renewables1,861 1,578 1,641 1,491 150 153 
Gas2,665 2,635 102 106 
Energy Transition1,053 1,415 5 16 
Energy Marketing27 43 
Corporate and Other(18)(8)
Total5,359 5,541 266 310 
Total earnings before income taxes242 21 
(1) Long term average production ("LTA (GWh)") is calculated based on our portfolio as at March 31, 2022 on an annualized basis from the average annual energy yield predicted from our simulation model based on historical resource data performed over a period of typically 30-35 years for the Wind and Solar segments and 36 years for Hydro segment. LTA (GWh) for Energy Transition is not considered as we are currently transitioning these units completely by the end of 2025 and the LTA (GWh) for Gas is not considered as its is largely dependent on market conditions and merchant demand. LTA (GWh) for the three months ending March 31, 2022, excluding Kent Hills 1 and 2 wind facilities which are currently not in operation, is approximately 1,347 GWh.
(2) Actual production levels are compared against the long-term average to highlight the impact of an important factor that affects the variability in our business results. In the short-term, for each segment for Hydro and Wind and Solar, the conditions will vary from one period to the next and over time facilities will continue to produce in line with their long-term averages, which have proven to be reliable indicators of performance.
(3) These items are not defined and have no standardized meaning under IFRS. Please refer to below in this MD&A for further discussion of these items, including, where applicable, reconciliations to measures calculated in accordance with IFRS. See also the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.




TRANSALTA CORPORATION M11


Hydro
3 months ended March 31
20222021
Gross installed capacity (MW)925925
LTA (GWh)408 408 
Availability (%)96.7 91.9 
Production
Energy contract
Other Hydro energy (GWh)(1)
36 40 
Energy merchant
Alberta Hydro Assets (GWh)336 320 
Total energy production (GWh)372 360 
Ancillary service volumes (GWh)(3)
742 749 
Alberta Hydro Assets(1)
37 39 
Other Hydro Assets and other revenue(1)(2)
7 
Alberta Hydro Ancillary services(3)
33 50 
Total gross revenues77 92 
Net payment relating to Alberta Hydro PPA(4)
 (3)
Revenues77 89 
Fuel and purchased power(5)
4 
Gross margin73 86 
Operations, maintenance and administration(5)
11 
Taxes, other than income taxes1 
Adjusted EBITDA61 77 
Supplemental Information:
Gross Revenues per MWh
Alberta Hydro Assets energy ($/MWh)110122
Alberta Hydro Assets ancillary ($/MWh)4567
Sustaining capital6 
(1) Alberta Hydro Assets include 13 hydro facilities on the Bow and North Saskatchewan river systems. Other Hydro energy include our hydro facilities in BC and Ontario, hydro facilities in Alberta other than the Alberta Hydro Assets, and transmission revenues.
(2) Other revenue includes revenues from our transmission business and other contractual arrangements including the flood mitigation agreement with the Alberta government and black start services.
(3) Ancillary services as described in the AESO Consolidated Authoritative Document Glossary.
(4) The net payment relating to the Alberta Hydro PPA represents the Company's financial obligations for notional amounts of energy and ancillary services in accordance with the Alberta Hydro PPA that expired on Dec. 31, 2020. The amount in the first quarter of 2021 related to adjustments for the final payment under the Alberta PPA.
(5) $2 million related to station service costs for the Hydro segment in the three months ended March 31, 2021 was reclassified from operations, maintenance and administration to fuel and purchased power for comparative purposes. This did not impact previously reported net earnings.

Availability for the three months ended March 31, 2022, increased by 5 per cent compared to the same period in 2021, primarily due to lower planned outages at our Alberta Hydro assets.

Production for the three months ended March 31, 2022, increased by 12 GWh compared to the same period in 2021, mainly due to water resource optimization at our Alberta Hydro assets.

Ancillary service volumes for the three months ended March 31, 2022, were in line with 2021.

Adjusted EBITDA for the three months ended March 31, 2022, decreased by $16 million compared to the same period in 2021, primarily due to lower ancillary service pricing in the Alberta market as well as higher operations, maintenance and administration costs due to increased insurance and additional costs related to asset optimization of the Alberta Hydro Assets in the merchant market. For further discussion on the Alberta market conditions and pricing, refer to the 2022 Financial Outlook section and Alberta Electricity Portfolio section of this MD&A.





TRANSALTA CORPORATION M12


Sustaining capital expenditures for the three months ended March 31, 2022, were consistent with the same period in 2021.

Wind and Solar
3 months ended March 31
20222021
Gross installed capacity (MW)(1)
1,9061,572
LTA (GWh)1,4531,170
Availability (%)78.7 95.1 
Contract production (GWh)909 828 
Merchant production (GWh)360 303 
Total energy production (GWh)1,269 1,131 
Revenues(2)
108 96 
Fuel and purchased power8 
Gross margin(2)
100 92 
Operations, maintenance and administration16 13 
Taxes, other than income taxes2 
Net other operating income(7)— 
Adjusted EBITDA89 76 
Supplemental information:
Sustaining capital41
(1) The gross installed capacity first quarter 2022 includes incremental capacity related to new facilities: Windrise wind facility (206 MW), North Carolina Solar facility (122 MW), and Oldman wind facility (4 MW).
(2) For details of the adjustments to revenues included in adjusted EBITDA, refer to the Additional IFRS and Non-IFRS Measures section of this MD&A.

Availability for the three months ended March 31, 2022, decreased by 16 per cent compared to the same period in 2021, primarily as a result of the unplanned outage at the Kent Hills 1 and 2 Wind facilities and early-stage operational issues related to our Windrise wind facility in Alberta.
Production for the three months ended March 31, 2022, increased 138 GWh compared to 2021, primarily due to higher incremental production from the Windrise wind facility and North Carolina Solar facility and higher wind resources, partially offset by lower production due to the extended site outage at Kent Hills 1 and 2 Wind facilities.

Adjusted EBITDA for the three months ended March 31, 2022 increased by $13 million compared to the same period in 2021, primarily due to incremental revenue from the North Carolina Solar facility and the Windrise wind facility and liquidated damages related to turbine performance at the Windrise wind facility, partially offset by lower production due to the extended site outage at the Kent Hills 1 and 2 wind facilities and higher transmission costs experienced in the period. The prior period recognized a reimbursement as a result of the AESO transmission line loss ruling.

Sustaining capital expenditures for the three months ended March 31, 2022 were $3 million higher compared to the same period in 2021, due to higher maintenance on gearbox components in 2022.




TRANSALTA CORPORATION M13


Gas
3 months ended March 31
20222021
Gross installed capacity (MW)3,084 3,084 
Availability (%)93.8 85.0 
Contract production (GWh)939 923 
Merchant production (GWh)1,741 1,758 
Purchased power (GWh)(15)(46)
Total production (GWh)2,665 2,635 
Revenues(1)
288 260 
Fuel and purchased power(1)
130 80 
Carbon compliance18 39 
Gross margin(1)
140 141 
Operations, maintenance and administration44 42 
Taxes, other than income taxes4 
Net other operating income(10)(10)
Adjusted EBITDA102 106 
Supplemental information:
Sustaining capital5 24 
(1) For details of the adjustments to revenues and fuel and purchased power included in adjusted EBITDA, refer to the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.

The Gas Segment is a new segment as described in the Segmented Financial Performance and Operating Results section of this MD&A. Included in the Gas segment is the previous North American Gas segment, Australian Gas segment and the facilities from the previous Alberta Thermal segment which have been converted to gas. These facilities include Sheerness Units 1 and 2, Keephills Units 2 and 3 and Sundance Unit 6. Previous periods have been adjusted to be comparable to the current period and reflect operations as coal units.

 Availability for the three months ended March 31, 2022, increased by 9 per cent compared to the same period in 2021, primarily as a result of lower planned outages with the completion of the coal-to-gas conversions of Keephills Unit 2 and Sheerness Unit 1 and improved performance at Keephills Unit 3 and Sundance Unit 6.

Production for the three months ended March 31, 2022, increased by 30 GWh compared to the same period in 2021, mainly due to incremental production from our Ada cogeneration facility and higher contracted production in Ontario, partially offset by increased dispatch optimization for our Alberta assets.

Adjusted EBITDA for the three months ended March 31, 2022, decreased by $4 million compared to the same period in 2021, mainly due to higher gas prices and natural gas consumption by our converted units in 2022 and increased provisions. This was partially offset by higher realized merchant pricing in the Alberta market, lower carbon costs associated with the change in fuel ratios as we increased our natural gas combustion and eliminated production with coal, and lower legal fees related to the South Hedland PPA contract settlement. Refer to the Alberta Electricity Portfolio section within this MD&A for further details.

Sustaining capital expenditures for the three months ended March 31, 2022, decreased by $19 million compared to the same period in 2021, mainly due to the timing of the Keephills Unit 2 and Sheerness Unit 1 coal to natural gas conversion outages being completed in 2021.






TRANSALTA CORPORATION M14


Energy Transition
3 months ended March 31
20222021
Gross installed capacity (MW)(1)
784 1,879 
Availability (%)88.5 86.8 
Adjusted availability (%)(2)
88.5 86.8 
Contract sales volume (GWh)820 820 
Merchant sales volume (GWh)1,201 1,573 
Purchased power (GWh)(968)(978)
Total production (GWh)1,053 1,415 
Revenues(3)
117 145 
Fuel and purchased power(3)
94 93 
Carbon compliance1 11 
Gross margin(3)
22 41 
Operations, maintenance and administration16 23 
Taxes, other than income taxes1 
Adjusted EBITDA5 16 
Supplemental information:
Highvale mine reclamation spend21
Centralia mine reclamation spend4 
Sustaining capital— 
(1) The gross installed capacity for the first quarter of 2022 excludes Keephills Unit 1 (395 MW retired on Dec. 31, 2021) and Sundance Unit 5 (406 MW) retired in 2021 and reduced capacity for Sundance Unit 4 (293 MW).
(2) Adjusted for dispatch optimization.
(3) For details of the adjustments to revenues and fuel and purchased power included in adjusted EBITDA, refer to the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.

The Energy Transition segment is a new segment as described in the Segmented Financial Performance and Operating Results section of this MD&A. Included in the Energy Transition segment is the previous Centralia segment, mine assets and the previous Alberta Thermal segment facilities that were not converted to gas. This includes Keephills Unit 1 and Sundance Unit 4. Previous periods have been adjusted to be comparable to the current period.

Adjusted availability for the three months ended March 31, 2022, increased by 2 per cent due to lower unplanned outages and derates at Sundance Unit 4 compared to the same period in 2021.

Production decreased by 362 GWh for the three months ended March 31, 2022, compared to the same period in 2021, primarily due the retirement of Keephills Unit 1.

Adjusted EBITDA decreased by $11 million for the three months ended March 31, 2022, compared to the same period in 2021, primarily due to lower production and higher cost of coal at Centralia, partially offset by lower carbon compliance costs and lower operating costs with the retirement of the Alberta coal units.
Mine reclamation spend for the Highvale and Centralia mines for the three months ended March 31, 2022, increased due to advancement of reclamation activities compared to the same period in 2021.

Consistent with the planned retirements and the conversions of coal-to-gas discussed above, the sustaining capital expenditures for the three months ended March 31, 2022, decreased by $2 million compared to the same period in 2021.






TRANSALTA CORPORATION M15


Energy Marketing
3 months ended March 31
20222021
Revenues(1)
34 53 
Operations, maintenance and administration7 10 
Adjusted EBITDA2743 
(1) For details of the adjustments to revenues included in adjusted EBITDA, refer to the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.

Adjusted EBITDA for the three months ended March 31, 2022, decreased by $16 million compared to the same period in 2021. Results for the quarter were in line with expectations from favourable short-term trading of both physical and financial power and gas products across all North American markets. The higher gross margin for the three months ended March 31, 2021, was due to exceptional short-term volatility in the market. The Energy Marketing team was able to capitalize on short-term volatility in the markets in which we trade without materially changing the risk profile of the business unit.

Corporate
3 months ended March 31
20222021
Operations, maintenance, and administration18 
Adjusted EBITDA(18)(8)
Adjusted EBITDA(18)(8)
Total return swap (gains) losses1 (7)
CEWS funding received (8)
CEWS funding applied to incremental employment1 — 
Adjusted EBITDA excluding impact of total return swap and CEWS(16)(23)
Supplemental information:
Total sustaining capital2 
 

Corporate overhead costs for the three months ended March 31, 2022, increased by $10 million compared to the same period in 2021. These changes were primarily due to the receipt of CEWS funding in 2021 and realized gains in 2021 from the total return swap on our share-based payment plans.

Adjusted EBITDA after removing the impact of the CEWS funding and total return swap for the three months ended March 31, 2022, decreased by $7 million, compared to the same period in 2021. This is primarily due to lower staffing costs, lower incentive payments and lower legal costs, occurring in the current period compared to the same period in 2021.

For the three months ended March 31, 2022, sustaining capital expenditures were consistent with the same period in 2021.





TRANSALTA CORPORATION M16


Strategy and Capability to Deliver Results
The Corporate strategy remains unchanged from that disclosed in the 2021 Annual MD&A.

Our goal is to be a leading customer-centred electricity company, committed to a sustainable future, focused on increasing shareholder value by growing our portfolio of high quality generation facilities with stable and predictable cash flows. Our strategy includes meeting our customer needs for clean, low-cost, reliable electricity and providing operational excellence and continuous improvement in everything we do.

The Company's enhanced focus on renewable generation and storage solutions for customers is driven largely by global decarbonization policies and the increase in demand and growth projections in the renewable sector, namely for companies to achieve their environment, social and governance ("ESG") ambitions. Refer to the ESG sections within our 2021 Annual MD&A for further details.

We expect the Company's adjusted EBITDA generated from renewable sources, including hydro, wind, and solar technologies, to increase from 35 per cent in 2020 to approximately 70 per cent by the end of 2025.

On Sept 28, 2021, the Company announced the strategic targets and a five-year Clean Electricity Growth Plan that sets a focus towards investing in clean energy solutions that meet the needs of our industrial and corporate customers and communities. The Clean Electricity Growth Plan, announced in the third quarter of 2021, will largely be funded from current cash balances, cash generated from operations, and asset-level financing.

As of May 5, 2022, we have made significant progress in achieving our growth goals. Refer to the Accelerated Clean Electricity Growth Plan in this MD&A for further details.
chart-846fe8a30c854f45aad.jpgchart-c66519072317421e82f.jpg chart-fff2b7bccbe44927942.jpg
percentagetrgtachieved.jpg




TRANSALTA CORPORATION M17


Our progress towards achieving our strategic targets is summarized below:
Strategic Targets
GoalsTargetResultsComments
Accelerate Growth in Customer-centred Renewables and Storage
Deliver 2 GW of renewable capacity with an estimated capital investment of $3 billion by the end of 2025. Ahead of Plan
The Company delivered 200 MW of growth in the first quarter with the Horizon Hill wind project.

We have also advanced the Mt Keith 132kV transmission expansion to construction in Australia.

Our cumulative progress towards our target is 800 MW.
Deliver incremental average annual EBITDA of $250 million.Ahead of PlanThe Horizon Hill wind project will add incremental EBITDA of US$27 - US$30 million and the Mt Keith 132kV transmission project will add incremental EBITDA of AU$6 - AU$7 million.

Our cumulative progress towards our incremental EBITDA target is approximately $135 million.
Expand the Company's development pipeline to 5 GW by 2025 to enable a two-fold increase in its renewables fleet between 2025 and 2030.On trackThe Company is evaluating several opportunities to add new development sites to our pipeline. These include acquisitions of individual early stage development sites, small development portfolios and prospecting of new sites.
Take a Targeted Approach to Diversification
Grow our asset base in our core geographies of Canada, Australia and the United States to realize diversification and value creation.
On trackThe Company has successfully added new contracted renewable assets in each of its three core geographies. We have diversified within the US market through our North Carolina Solar acquisition and new Oklahoma investments which also added three new investment-grade customers.
Maintain Our Financial Strength and Capital Allocation DisciplineDeliver strong cash flow from our existing portfolio to allocate towards our funding priorities including growth, dividends and share buybacks.On track
The Company had liquidity of $2.4 billion as of March 31, 2022.

The Company has returned $18 million of share buybacks in the quarter.
Define the Next Generation of Power Solutions and Technologies
Meet the needs of our customers and communities through implementation of innovative power solutions and parallel investments in new complementary sectors by the end of 2025.On track
The Company has established an Energy Innovation team to progress our goals in this area. The team has recently completed an investment in Ekona Power Inc., an early-stage hydrogen production company, in order to pursue commercialization of low cost, net zero aligned, hydrogen. In addition, the Company committed to an investment in EIP's Deep Decarbonization Frontier Fund 1, which provides a portfolio approach to investing in emerging technologies focused on net-zero emissions.
Lead in ESG Policy DevelopmentActively participate in policy development to ensure the electricity we provide contributes to emissions reduction, grid reliability and competitive energy prices to enable the successful evolution of the markets in which we operate and compete.On trackThe Company actively engaged the Government of Canada and Government of Alberta regarding the proposed federal Clean Electricity Standard. Throughout the engagement, TransAlta provided input regarding how to achieve emissions reduction while maintaining necessary reliability and affordability.
Successfully Navigate through the COVID-19 PandemicContinue to maintain an effective response to COVID-19 and plan a safe return to our offices.On track
The Company returned all of its employees to the workplace under a hybrid work model and is guided by local public health authority and government guidelines in all jurisdictions in which it operates to promote the health and safety of all employees and contractors with our health and safety protocols.







TRANSALTA CORPORATION M18


Growth
The Company announced 200 MW of new build projects on April 5, 2022. In addition, the Company has 140 MW in advanced-stage development that it is actively pursuing. The current growth pipeline has a potential capacity ranging from 2,205 - 2,805 MW from projects in the early stages of development.

We are primarily evaluating greenfield opportunities in Alberta, Western Australia and the US along with acquisitions in markets in which we have existing operations.
Projects Under Construction
The following projects have been approved by the Board of Directors, have executed PPAs and are currently under construction. The projects under construction will be financed through existing liquidity in the near term. We will continue to explore project financing or tax equity as a long-term financing solution on an asset-by-asset basis.
 Total project
Target completion date(1)
ProjectTypeRegionMWEstimated
spend
Spent to
date
PPA Term (2)
Average annual EBITDA(3)
Status
Projects Under Construction or Approved for Construction
Canada
Garden Plain(4)
WindAB130$190 $200$45H2 202218$14 - $18
Secured all required permits and approvals
Fully contracted
Site work commenced
On track to be completed on schedule
United States
White Rock WindWindOK300US$460 US$470US$52H2 2023US$42 - US$46
Long term PPAs executed
All major equipment supply and EPC agreements executed
Detailed design and final permitting on track
On track to be completed on schedule
Horizon Hill WindOK200US$290 US$310 US$26H2 2023US$27 - US$30
Long term PPA executed
All major equipment supply and EPC agreements executed
On track to be completed on schedule
Australia
Northern Goldfields SolarHybrid SolarWA48AU$69AU$73AU$29H2 202216AU$9 - AU$10
Full Notice to Proceed issued on Sept. 28, 2021
Land clearing and preparation underway
On track to be completed on schedule
Mount Keith 132kV ExpansionTransmissionWAn/aAU$50AU$ 53AU$—H2 202315AU$6 - AU$7
EPC Agreement executed
On track to be completed on schedule
(1) H2 is defined as the second half of the year.
(2) The PPA term is confidential for the White Rock Wind and Horizon Hill wind projects.
(3) This item is not defined and has no standardized meaning under IFRS and is forward-looking. Please refer to the Additional IFRS measures and Non-IFRS Measures section of this MD&A for further discussion.
(4) The Garden Plain PPA is fully contracted, with Pembina Pipeline Corporation ("Pembina") off taking 100 MW of the total 130 MW capacity of the facility and the remaining 30 MW contracted to an investment-grade globally recognized customer. Refer to the Significant and Subsequent Events section of this MD&A for further details.





TRANSALTA CORPORATION M19


Advanced Stage Development
These projects have detailed engineering, advanced position in the interconnection queue and are progressing off-take opportunities. The following table shows the pipeline of future growth projects currently under advanced stage development:
ProjectTypeRegionGross Installed Capacity (MW)Estimated Spend
Average annual EBITDA(1)
TempestWindAlberta100$190 - $200$19 - $20
SCE Capacity ExpansionGasWestern Australia40AU$80 - AU$100AU$9 - AU$12
(1) This item is not defined and have no standardized meaning under IFRS and is forward-looking. Please refer to the Additional IFRS measures and Non-IFRS Measures section of this MD&A for further discussion.

Early Stage Development
These projects are in the early stages and may or may not move ahead. Generally, these projects will have:
Collected meteorological data;
Begun securing land control;
Started environmental studies;
Confirmed appropriate access to transmission; and
Started preliminary permitting and other regulatory approval processes.

The following table shows the pipeline of future growth projects currently under early stage development:
ProjectTypeRegionGross Installed Capacity (MW)
Early Stage Development
Canada
Riplinger WindWindAlberta300 
Willow Creek 1WindAlberta70 
Willow Creek 2WindAlberta70 
WaterChargerBattery StorageAlberta180 
Sunhills SolarSolarAlberta80 
Alberta Solar OpportunitiesSolarAlberta40 
Canadian Wind OpportunitiesWindVarious250 
Brazeau Pumped HydroHydroAlberta300 - 900
Total1,290 - 1,890
US
Prairie VioletWindIllinois130 
Old TownWindIllinois185 
Big TimberWindPennsylvania50 
Other US Wind ProspectsWindVarious410 
Total775 
Australia
Goldfields ExpansionsGas, Solar, WindWestern Australia90 
South Hedland SolarSolarWestern Australia50 
Total140 
Canada, US and AustraliaTotal2,205 - 2,805





TRANSALTA CORPORATION M20


2022 Financial Outlook
Refer to the 2022 Financial Outlook section in our 2021 Annual MD&A for full details on our Outlook and related assumptions.

The following table outlines our expectations on key financial targets and related assumptions for 2022:
Measure2022 Target2021 Actual
Adjusted EBITDA(1)
$1,065 million - $1,185 million$1,263 million
FCF(1)
$455 million - $555 million$562 million
Dividend$0.20 per share annualized$0.20 per share annualized
(1) These items are not defined and have no standardized meaning under IFRS. Please refer to the Reconciliation of Non-IFRS Measures section of this MD&A for further discussion of these items, including, where applicable, reconciliations to measures calculated in accordance with IFRS. See also the Additional IFRS measures and Non-IFRS Measures section of this MD&A.

Range of key 2022 power and gas price assumptions
MarketOriginal ExpectationsUpdated Expectations
Alberta Spot ($/MWh)$80 - $90$90 - $100
Mid-C Spot (US$/MWh)US$45 - US$55US$55 - US$65
AECO Gas Price ($/GJ)$3.60$4.50 - $5.50
Other assumptions relevant to the 2022 financial outlook
Sustaining capital$150 million - $170 million
Energy Marketing gross margin
$95 million - $115 million

Alberta Hedging
Range of hedging assumptionsQ2 2022Q3 2022Q4 2022Full year 2023
Hedged production (GWh)1,975 1,581 1,334 3,864 
Hedge Price ($/MWh)74 74 70 70 
Hedged gas volumes (GJ)14 million13 million13 million58 million
Hedge gas prices ($/GJ)3.11 2.96 2.96 2.28

Our overall performance for the first quarter of 2022 is within expectations and the Company continues to track against stated guidance for 2022.

Operations
The following provides updates to our original assumptions included in the 2022 Financial Outlook.

Market Pricing
For 2022, we see continuing strong merchant pricing levels in Alberta and the Pacific Northwest as a result of higher natural gas prices across North America. Prices in Alberta for the balance of year are now similar to last year due to higher natural gas prices, which also raises the cost to import power from the Pacific Northwest offsetting fewer planned outages and the forecasted additions of new wind and solar supply expected to achieve commercial operation in late 2022. A major change in 2022 has been a more than $2/GJ increase in AECO natural gas prices that are supporting higher power prices for the balance of year. Weather and demand are also major factors in actual settled prices. Higher quarter-over-quarter pricing in the Pacific Northwest is being impacted by elevated U.S. natural gas prices and a lower than normal hydro outlook resulting from actual weather and hydrology in the year. Ontario power prices for 2022 are expected
to be higher than 2021 due to higher natural gas prices and additional nuclear refurbishment outages.
chart-d9f80ce61fed429498f.jpg





TRANSALTA CORPORATION M21


Kent Hills Wind Facilities Outage
During the first quarter of 2022, the extended outage at Kent Hills 1 and 2 wind facilities continued. Rehabilitation efforts for the foundations are expected to commence during the second quarter of 2022 with the aim of fully returning the wind facility to service during the second half of 2023. The outage is expected to result in foregone revenue of approximately $3.4 million per month on an annualized basis so long as all 50 turbines at Kent Hills 1 and 2 wind facilities are offline, based on average historical wind production, with revenue expected to be earned as the wind turbines are returned to service.

The Kent Hills foundation rehabilitation capital expenditures were originally estimated to range from $75 million to $100 million. The current estimate of net capital expenditures is approximately $120 million, including the cost of replacing the turbine and tower destroyed during the collapse experienced in 2021 and contingency. The cost increase is a result of the adoption of a more robust foundation design, inflationary cost pressures and an accelerated timeline to return the turbines to service ahead of December 2023. We are currently in advanced stages of discussions with New Brunswick Power Corporation and have reached an agreement in principle that provides, among other things, for a term that will now run to Dec. 31, 2045 for each of the existing power purchase agreements. In connection with the potential events of default that may have occurred under the trust indenture governing the terms of the KH Bonds, Kent Hills Wind LP is in active negotiations with the Trustee (as defined below) and the holders of the KH Bonds to obtain a waiver and expects that it will enter into a supplemental indenture during the second quarter of 2022. Refer to the Financial Capital section of this MD&A for further details.

The Company is actively evaluating any options that may be available to recover the rehabilitation costs from third parties and insurance.

Sustaining Capital Expenditures
Our estimate for total sustaining capital is as follows:
CategorySpend as at March 31, 2021Spend to date as at March 31, 2022Expected spend in 2022
Total sustaining capital34 17 $150 -$170

Total sustaining capital expenditures for the three months ended March 31, 2022, were $17 million lower compared to the same period in 2021, mainly due to lower planned major maintenance turnarounds on the coal-to-gas conversions related to Keephills Unit 2 and Sheerness Unit 1.

The Kent Hills foundation rehabilitation capital expenditure has been segregated from our sustaining capital assumptions range due to the extraordinary nature of this expenditure.

Liquidity and Capital Resources
We expect to maintain adequate available liquidity under our committed credit facilities. We currently have access to $2.4 billion in liquidity, including $1.2 billion in cash. We also expect to be well positioned to refinance the upcoming debt maturity in 2022. The funds required for committed growth, sustaining capital and productivity projects are not expected to be significantly impacted by the current economic environment.





TRANSALTA CORPORATION M22


Selected Quarterly Information
Our results are seasonal due to the nature of the electricity market and related fuel costs. Higher maintenance costs are often incurred in the spring and fall when electricity prices are expected to be lower, as electricity prices generally increase in the peak winter and summer months in our main markets due to increased heating and cooling loads. Margins are also typically impacted in the second quarter due to the volume of hydro production resulting from spring runoff and rainfall in the Pacific Northwest, which impacts production at Centralia. Typically, hydroelectric facilities generate most of their electricity and revenues during the spring months when melting snow starts feeding watersheds and rivers. Inversely, wind speeds are historically greater during the cold winter months and lower in the warm summer months.
 Q2 2021Q3 2021Q4 2021Q1 2022
Revenues619 850 610 735 
Adjusted EBITDA(1)
302 381 270 266 
Earnings (loss) before income taxes72 (441)(32)242 
Cash flow from operating activities80 610 54 451 
FFO(1)
250 297 213 186 
FCF(1)
138 189 106 115 
Net earnings (loss) attributable to common shareholders(12)(456)(78)186 
Net earnings (loss) per share attributable to common shareholders,
   basic and diluted(2)
(0.04)(1.68)(0.29)0.69 
 Q2 2020Q3 2020Q4 2020Q1 2021
Revenues437 514 544 642 
Adjusted EBITDA(1)
217 256 234 310 
Earnings (loss) before income taxes(52)(129)(168)21 
Cash flow from operating activities121 257 110 257 
FFO(1)
159 193 161 211 
FCF(1)
91 106 52 129 
Net loss attributable to common shareholders(60)(136)(167)(30)
Net loss per share attributable to common shareholders,
   basic and diluted(2)
(0.22)(0.50)(0.61)(0.11)
(1) These items are not defined and have no standardized meaning under IFRS. Refer to the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.
(2) Basic and diluted earnings per share attributable to common shareholders and adjusted earnings per share are calculated each period using the weighted average common shares outstanding during the period. As a result, the sum of the earnings per share for the four quarters making up the calendar year may sometimes differ from the annual earnings per share.
 





TRANSALTA CORPORATION M23


Net earnings (loss) attributable to common shareholders has also been impacted by the following variations and events:
The continued extended outage of the Kent Hills 1 and 2 wind facilities from the fourth quarter of 2021 to the first quarter of 2022;
Liquidated damages receivable related to turbine performance at the Windrise wind facility recorded in the first quarter of 2022;
Lower carbon costs in the first quarter of 2022 related to going off-coal;
Keephills Unit 1 was retired in the fourth quarter of 2021;
Acquisition of the North Carolina Solar facility in the fourth quarter of 2021;
Sundance Unit 5 Repowering was suspended in the third quarter of 2021 and retired during 2021;
Gains relating to the sale of the Pioneer Pipeline in the second quarter of 2021 and gains on sale of Gas equipment in the third quarter of 2021;
The unplanned outages at Sarnia in the second quarter of 2021;
Alberta hydro facilities, Keephills Units 1 and 2 and Sheerness began operating on a merchant basis in the Alberta market effective Jan. 1, 2021;
Revenues declined due to weaker market conditions in 2020 as a result of the COVID-19 pandemic and low oil prices;
Sundance Unit 3 was retired in the third quarter of 2020;
Accelerated plans to shut down the Highvale mine resulted in remaining future royalty payments being recognized as an onerous contract in the third quarter of 2021;
Sheerness going off-coal resulted in the remaining coal supply payments on the existing coal supply agreement being recognized as an onerous contract in the fourth quarter of 2020;
Accelerated shut-down of the Highvale mine, increased mine depreciation included in the cost of coal. Coal inventory write-down incurred in the first three quarters of 2021 and third and fourth quarters of 2020;
Coal-related parts and materials inventory write-down incurred in the second and third quarters of 2021;
The impact of the updated provision estimates for the AESO transmission line loss rule during the first quarter of 2021 and the last three quarters of 2020;
Significant foreign exchange gains in the last three quarters of 2020;
The effects of impairments and reversals during all periods shown;
The effects of changes in decommissioning and restoration provisions for retired assets in all periods shown;
The effects of changes in useful lives of certain assets during the third quarter of 2020; and
Current tax expense increased since the fourth quarter of 2020, mainly due to the Energy Marketing's income nearly doubling between 2020 and 2021. Future tax expense increased due to valuation allowances taken on US and Canadian deferred tax assets and removal of existing coal units and impairment of coal related projects that were suspended. In the first quarter of 2022, the current income tax expense decreased due to Energy Marketing not being taxable. Future tax expense increased due to Base Erosion and Anti-Abuse Tax ("BEAT") adjustments, decreasing the non-operating loss pool in US operations and an increase in the Canadian taxable income.




TRANSALTA CORPORATION M24


Financial Position
The following table highlights significant changes in the unaudited interim condensed consolidated statements of financial position from Dec. 31, 2021, to March 31, 2022:
AssetsMarch 31, 2022Dec. 31, 2021Increase/(decrease)
Current assets
Cash and cash equivalents1,221 947 274 
Trade and other receivables542 651 (109)
Risk management assets514 308 206 
Other current assets(1)
279 291 (12)
Total current assets2,556 2,197 359 
Non-current assets
Risk management assets375 399 (24)
Property, plant and equipment, net5,191 5,320 (129)
Other non-current assets(2)
1,303 1,310 (7)
Total non-current assets6,869 7,029 (160)
Total assets9,425 9,226 199 
Liabilities
Current liabilities
Accounts payable and accrued liabilities841 689 152 
Risk management liabilities459 261 198 
Credit facilities, long-term debt and lease liabilities (current)832 844 (12)
Other current liabilities(3)
113 137 (24)
Total current liabilities2,245 1,931 314 
Non-current liabilities
Credit facilities, long-term debt and lease liabilities2,391 2,423 (32)
Decommissioning and other provisions (long-term)680 779 (99)
Defined benefit obligation and other long term liabilities237 253 (16)
Other non-current liabilities(4)
1,232 1,247 (15)
Total non-current liabilities4,540 4,702 (162)
Total liabilities6,785 6,633 152 
Equity
Equity attributable to shareholders1,695 1,582 113 
Non-controlling interests945 1,011 (66)
Total equity2,640 2,593 47 
Total liabilities and equity9,425 9,226 199 
(1) Includes restricted cash, prepaid expenses, inventory and assets held for sale.
(2) Includes investments, long-term portion of finance lease receivables, right-of-use assets, intangible assets, goodwill, deferred income tax assets and other assets.
(3) Includes current portion of decommissioning and other provisions, current portion of contract liabilities, income taxes payable and dividends payable.
(4) Includes exchangeable securities, deferred income tax liabilities, risk management liabilities (long-term) and contract liabilities.

Significant changes in TransAlta's unaudited interim condensed consolidated statements of financial position were as follows:

Working Capital
The excess of current assets over current liabilities, including the current portion of long-term debt and lease liabilities, was $311 million as at March 31, 2022 (Dec. 31, 2021 - $266 million). Our working capital increased compared to the previous period mainly due to higher cash and cash equivalents due to cash from operations and collateral received. This was partially offset by a $152 million increase in accounts payable and accrued liabilities and a $109 million decrease in trade and other receivables due to lower production in the Gas and Energy Transition segments.




TRANSALTA CORPORATION M25



Current assets increased by $359 million to $2,556 million as at March 31, 2022, from $2,197 million as at Dec. 31, 2021, mainly due to higher cash and cash equivalents and increased risk management assets primarily attributable to volatility in market prices on both existing contracts and new contracts as well as contract settlements. As at March 31, 2022, the Company held $270 million (Dec. 31, 2021 - $18 million) of cash collateral received related to derivative instruments in a net asset position. This was partially offset by reductions in trade and other receivables due to lower production in 2022.

Current liabilities increased by $314 million from $1,931 million as at Dec. 31, 2021 to $2,245 million as at March 31, 2022, mainly due to an increase in risk management liabilities primarily due to volatility in market prices and contract settlements, higher fuel related payables, and higher collateral received for contract positions in accounts payable.

Non-current Assets
Non-current assets at March 31, 2022 are $6,869 million, a decrease of $160 million from $7,029 million as at Dec. 31, 2021. The decrease was primarily due to depreciation, change in estimate of $56 million within PP&E related to increased discount rates on decommissioning and restoration provisions and $14 million unfavourable impact from changes in currency translation. These impacts were partially offset by the construction of the Horizon Hill wind project, White Rock Wind Projects, Northern Goldfields Solar Project, and Garden Plain wind project.

Non-current Liabilities
Non-current liabilities as at March 31, 2022 are $4,540 million, a decrease of $162 million from $4,702 million as at Dec. 31, 2021, mainly due to a $101 million decrease to the total decommissioning and restoration provision as a result of increased discount rates, a $32 million decrease in long-term debt and lease liabilities related to scheduled principal repayments on long-term debt and lease liabilities, and a $23 million change in defined benefit obligation due to changes in discount rate assumptions.

Total Equity
As at March 31, 2022, the increase in total equity of $47 million was mainly due to net earnings for the period of $186 million and actuarial gains on defined benefit plans of $18 million, partially offset by net losses on cash flow hedges of $98 million, distributions to non-controlling interests of $42 million, the effect of share-based payment plans of $15 million, and share repurchases under the NCIB of $18 million.





TRANSALTA CORPORATION M26


Financial Capital
The Company is focused on maintaining a strong balance sheet and financial position to ensure access to sufficient financial capital.

Capital Structure
Our capital structure consists of the following components as shown below:
March 31, 2022Dec. 31, 2021
 $  %  $  %
TransAlta Corporation
Net senior unsecured debt
Recourse debt - CAD debentures251 5 251 
Recourse debt - US senior notes 867 16 888 16 
Other3  — 
Less: cash and cash equivalents(943)(18)(703)(12)
Less: other cash and liquid assets(1)
4 — (19)— 
Net senior unsecured debt182 3 421 
Other debt liabilities
Exchangeable debentures336 6 335 
Non-recourse debt
TAPC Holdings LP bond
101 2 102 
OCP bond252 5 263 
Lease liabilities77 1 78 
Total net debt - TransAlta Corporation948 17 1,199 22 
TransAlta Renewables
Net TransAlta Renewables reported debt
Non-recourse debt
Pingston bond45 1 45 
Melancthon Wolfe Wind bond235 4 235 
New Richmond Wind bond120 2 120 
Kent Hills Wind bond218 4 221 
   Windrise Wind bond 171 3 171 
Lease liabilities22  22 — 
Less: cash and cash equivalents(278)(4)(244)(4)
Debt on TransAlta Renewables Economic Investments
US tax equity financing(2)
125 2 135 
South Hedland non-recourse debt(3)
736 14 732 13 
Total net debt - TransAlta Renewables1,394 26 1,437 25 
Total consolidated net debt(4)(5)
2,342 43 2,636 47 
Non-controlling interests945 18 1,011 18 
Exchangeable preferred securities(5)
400 7 400 
Equity attributable to shareholders
Common shares2,892 54 2,901 51 
Preferred shares942 18 942 17 
Contributed surplus, deficit and accumulated other comprehensive
   income
(2,139)(40)(2,261)(40)
Total capital5,382 100 5,629 100 
(1) Includes principal portion of OCP restricted cash in 2021 and fair value asset (liability) of hedging instruments on debt.
(2) TransAlta Renewables has an economic interest in the entities holding these debts.
(3) TransAlta Renewables has an economic interest in the Australia entities, which includes the AU$795 million senior secured notes.
(4) The tax equity financing for Skookumchuck, an equity accounted joint venture, is not represented in these amounts.
(5) The total consolidated net debt excludes the exchangeable preferred securities as they are considered equity with dividend payments for credit purposes.





TRANSALTA CORPORATION M27


Between 2022 and 2024, we have $1,067 million of debt maturing, including $502 million of recourse debt, with the balance mainly related to scheduled non-recourse debt repayments. The Company has classified the entire carrying value outstanding of $218 million for the KH Bonds as a current liability as at March 31, 2022 and upon obtaining a waiver and supplemental indenture, will reclassify to non-current liabilities. We currently expect to refinance the senior notes maturing in 2022.

Credit Facilities
The Company's credit facilities are summarized in the table below:
As at March 31, 2022Facility
size
UtilizedAvailable
capacity
Maturity
date
Outstanding letters of credit(1)
Actual drawings
TransAlta Corporation
Committed syndicated bank facility(2)
1,250658592Q2 2025
Canadian committed bilateral credit facilities24021723Q2 2023
TransAlta Renewables
Committed credit facility(2)
70098602Q2 2025
Total2,1909731,217
(1) TransAlta has obligations to issue letters of credit and cash collateral to secure potential liabilities to certain parties, including those related to potential environmental obligations, commodity risk management and hedging activities, pension plan obligations, construction projects and purchase obligations. At March 31, 2022, we provided cash collateral of $20 million.
(2) TransAlta has letters of credit of $184 million and TransAlta Renewables has letters of credit of $98 million issued from uncommitted demand facilities; these obligations are backstopped and reduce the available capacity on the committed credit facilities.

Non-Recourse Debt
The Melancthon Wolfe Wind LP, Pingston Power Inc., TAPC Holdings LP, New Richmond Wind LP, Kent Hills Wind LP, TEC Hedland PTY Ltd notes, Windrise Wind LP and TransAlta OCP LP non-recourse bonds are subject to customary financing conditions and covenants that may restrict the Company’s ability to access funds generated by the facilities’ operations. Upon meeting certain distribution tests, typically performed once per quarter, the funds are able to be distributed by the subsidiary entities to their respective parent entity. These conditions include meeting a debt service coverage ratio prior to distribution, which was met by these entities in the first quarter of 2022, except in relation to the KH Bonds. The next debt service coverage ratio is calculated in the second quarter of 2022.

Following the foundation issues at Kent Hills 1 and 2 Wind facilities, Kent Hills Wind LP has provided notice to BNY Trust Company of Canada, as trustee (the “Trustee”), for the approximately $218 million outstanding non-recourse KH Bonds secured by, among other things, the Kent Hills 1, 2 and 3 wind facilities, that events of default may have occurred under the trust indenture governing the terms of such bonds. Upon the occurrence of any event of default, holders of more than 50 per cent of the outstanding principal amount of the KH Bonds have the right to direct the Trustee to declare the principal and interest on the KH Bonds and all other amounts due, together with any make-whole amount of $23 million (Dec. 31, 2021 — $39 million), to be immediately due and payable and to direct the Trustee to exercise rights against certain collateral. The Company is in negotiations to obtain a waiver and expects to enter into a supplemental indenture during the second quarter of 2022. The Company continues to work towards bringing the site back to full operations. Refer to the 2022 Financial Outlook section of this MD&A for further details on the Kent Hills wind facilities outage.





TRANSALTA CORPORATION M28


Returns to Providers of Capital
Net Interest Expense
The components of net interest expense are shown below:
3 months ended March 31
20222021
Interest on debt41 40 
Interest on exchangeable debentures7 
Interest on exchangeable preferred shares7 7 
Interest income(3)(3)
Capitalized interest(1)(5)
Interest on lease liabilities1 
Credit facility fees, bank charges and other interest6 
Tax shield on tax equity financing 
Other 
Accretion of provisions9 
Net interest expense67 63 

Net interest expense for the three months ended March 31, 2022, was consistent with the same period in 2021.

Share Capital
The following tables outline the common and preferred shares issued and outstanding:
As atMay 5, 2022March 31, 2022Dec. 31, 2021
 
Number of shares (millions)
Common shares issued and outstanding, end of period270.6270.6 269.9 
Preferred shares   
Series A9.6 9.6 9.6 
Series B2.4 2.4 2.4 
Series C11.0 11.0 11.0 
Series E9.0 9.0 9.0 
Series G6.6 6.6 6.6 
Preferred shares issued and outstanding in equity, end of period38.6 38.6 38.6 
Series I - Exchangeable Securities(1)
0.4 0.4 0.4 
Preferred shares issued and outstanding, end of period39.0 39.0 39.0 
(1) Brookfield invested $400 million in consideration for redeemable, retractable, first preferred shares. For accounting purposes, these preferred share are considered debt and disclosed as such in the consolidated financial statements.

Non-Controlling Interests
As at March 31, 2022, the Company owns 60.1 per cent (March 31, 2021 - 60.1 per cent) of TransAlta Renewables. TransAlta Renewables is a publicly traded company whose common shares are listed on the TSX under the symbol “RNW.” TransAlta Renewables holds a diversified, highly contracted portfolio of assets with comparatively lower carbon intensity.

We also own 50.01 per cent (March 31, 2021 - 50.01 per cent) of TA Cogen, which owns, operates or has an interest in five natural-gas-fired facilities (Ottawa, Windsor, Fort Saskatchewan and Sheerness Unit 1 and Unit 2). Since we own a controlling interest in TA Cogen and TransAlta Renewables, we consolidate the entire earnings, assets and liabilities in relation to those assets.





TRANSALTA CORPORATION M29


Reported earnings attributable to non-controlling interests for the three months ended March 31, 2022, increased by $11 million to $20 million compared to the same period in 2021. Earnings from TA Cogen for the three months ended March 31, 2022, decreased compared with the same period in 2021, mainly due to higher gas commodity price, transportation costs and lower realized power price for our Sheerness units. Earnings increased at TransAlta Renewables in 2022 primarily due to higher revenue from the Windrise wind facility and the recognition of liquidated damages related to turbine performance at the Windrise wind facility. This increase was partially offset by lower finance income and the extended site outage at the Kent Hills 1 and 2 wind facilities (see Note 8 of the unaudited interim condensed consolidated financial statements for further details).
 
Other Consolidated Analysis
Commitments
Please refer to our Other Consolidated Analysis section of the 2021 Annual MD&A for a complete listing of commitments we have incurred either directly or through interests in joint operations. The Company has not incurred any additional material contractual commitments, either directly or through its interests in joint operations in the three months ended, March 31, 2022.

For the Kent Hills foundation capital expenditures we are now in the final stages of detailed negotiations for all agreements necessary to receive approvals and commence remediation in the second quarter of 2022. We are expecting the rehabilitation of the wind facilities to fully return the wind facilities to service in the second half of 2023. Refer to the 2022 Financial Outlook section for further details.

For updates on Growth projects, refer to the Strategy and Capability to Deliver Results section of the this MD&A for further details.

Contingencies 
For the current material outstanding contingencies, please refer to Note 36 of the 2021 audited annual consolidated financial statements. There have been no material updates to any of the contingencies in the three month period ended March 31, 2022.

Cash Flows
The following chart highlights significant changes in the consolidated statements of cash flows:
3 months ended March 31
20222021Increase/ (decrease)
Cash and cash equivalents, beginning of period947 703 244 
Provided by (used in):  
Operating activities451 257 194 
Investing activities(72)(111)39 
Financing activities(106)(200)94 
Translation of foreign currency cash1 (1)
Cash and cash equivalents, end of period1,221 648 573 

Cash provided by operating activities for the three months ended March 31, 2022, increased compared with the same period in 2021 primarily due to changes in our non-cash working capital.

Cash used in investing activities for the three months ended March 31, 2022, decreased compared with the same period in 2021, largely due to:
Decreased cash spend on project construction activities in PP&E ($26 million);
Lower non-cash working capital related to the timing of construction payables for the assets under construction ($14 million); and
Higher restricted cash payments related to funding principal debt repayments ($5 million).





TRANSALTA CORPORATION M30


Cash used in financing activities for the three months ended March 31, 2022, decreased compared with the same period in 2021, largely due to:
Lower drawings under the Company's credit facilities ($114 million);
Partially offset by higher common share repurchases under the NCIB ($11 million);
Increased distributions paid to subsidiaries' non-controlling interests ($5 million); and
Higher repayments on long term debt ($7 million).

Financial Instruments
Refer to Note 15 of the notes to the audited annual consolidated financial statements within our 2021 Annual MD&A and Note 9 and 10 of our unaudited interim condensed consolidated financial statements as at and for the three months ended March 31, 2022, for details on Financial Instruments.

We may enter into commodity transactions involving non-standard features for which observable market data is not available. These are defined under IFRS as Level III financial instruments. Level III financial instruments are not traded in an active market and fair value is, therefore, developed using valuation models based upon internally developed assumptions or inputs. Our Level III fair values are determined using data such as unit availability, transmission congestion, or demand profiles. Fair values are validated on a quarterly basis by using reasonably possible alternative assumptions as inputs to valuation techniques, and any material differences are disclosed in the notes to the financial statements.

At March 31, 2022, Level III instruments had a net liability carrying value of $203 million (Dec. 31, 2021 - net asset of $159 million).

Please refer to the Critical Accounting Policies and Estimates section of this MD&A for further details regarding valuation techniques. Our risk management profile and practices have not changed materially from Dec. 31, 2021.

Additional IFRS Measures and Non-IFRS Measures
An additional IFRS measure is a line item, heading or subtotal that is relevant to an understanding of the unaudited interim condensed consolidated financial statements but is not a minimum line item mandated under IFRS, or the presentation of a financial measure that is relevant to an understanding of the consolidated financial statements but is not presented elsewhere in the consolidated financial statements. We have included line items entitled gross margin and operating income (loss) in our unaudited interim condensed consolidated statements of earnings (loss) for the three months ended March 31, 2022 and 2021. Presenting these line items provides management and investors with a measurement of ongoing operating performance that is readily comparable from period to period.

We use a number of financial measures to evaluate our performance and the performance of our business segments, including measures and ratios that are presented on a non-IFRS basis, as described below. Unless otherwise indicated, all amounts are in Canadian dollars and have been derived from our audited annual consolidated financial statements prepared in accordance with IFRS. We believe that these non-IFRS amounts, measures and ratios, read together with our IFRS amounts, provide readers with a better understanding of how management assesses results.

Non-IFRS amounts, measures and ratios do not have standardized meanings under IFRS. They are unlikely to be comparable to similar measures presented by other companies and should not be viewed in isolation from, or as an alternative for, or more meaningful than our IFRS results.

Non-IFRS Financial Measures
Adjusted EBITDA, FFO, FCF, total net debt, total consolidated net debt and adjusted net debt are non-IFRS measures that are presented in this MD&A. See the Segmented Financial Performance and Operating Results, Selected Quarterly Information, Financial Capital and Key Financial Non-IFRS Ratios sections of this MD&A for additional information, including a reconciliation of such non-IFRS measures to the most comparable IFRS measure.
 
Adjusted EBITDA
In the fourth quarter of 2021, comparable EBITDA was relabelled as adjusted EBITDA to align with industry standard terminology. Each business segment assumes responsibility for its operating results measured to adjusted EBITDA. Adjusted EBITDA is an important metric for management that represents our core business profitability. Interest, taxes, depreciation and amortization are not included, as differences in accounting treatments may distort our core business results. In addition, certain reclassifications and adjustments are made to better assess results excluding those items that may not be reflective of ongoing business performance. This presentation may facilitate the readers analysis of trends. Adjusted EBITDA is a non-IFRS measure. The following are descriptions of the adjustments made.




TRANSALTA CORPORATION M31



Adjustments to revenue
Certain assets we own in Canada and in Australia are fully contracted and recorded as finance leases under IFRS. We believe it is more appropriate to reflect the payments we receive under the contracts as a capacity payment in our revenues instead of as finance lease income and a decrease in finance lease receivables.
Adjusted EBITDA is adjusted to exclude the impact of unrealized mark-to-market gains or losses and unrealized foreign exchange gains or losses on commodity transactions.

Adjustments to fuel and purchased power
We adjust for depreciation on our mining equipment included in fuel and purchased power.
We adjust for items resulting from the decision to accelerate being off-coal and accelerating the shut-down of the Highvale mine by the end of 2021 as not reflective of ongoing business performance. Within fuel and purchased power this included coal inventory write-downs.
On the commissioning of the South Hedland facility in July 2017, we prepaid approximately $74 million of electricity transmission and distribution costs. Interest income is recorded on the prepaid funds. We reclassify this interest income as a reduction in the transmission and distribution costs expensed each period to reflect the net cost to the business.

Adjustments to earnings in addition to interest, taxes, depreciation and amortization
Asset impairment charges (reversals) are removed as these are accounting adjustments that impact depreciation and amortization and do not reflect current business performance.
Any gains or losses on asset sales or foreign exchange gains or losses are not included as these are not part of operating income.

Adjustments for equity accounted investments
During the fourth quarter of 2020, we acquired a 49 per cent interest in the Skookumchuck wind facility, which is treated as an equity investment under IFRS and our proportionate share of the net earnings is reflected as equity income on the statement of earnings under IFRS. As this investment is part of our regular power-generating operations, we have included our proportionate share of the adjusted EBITDA of Skookumchuck in our total adjusted EBITDA. In addition, in the Wind and Solar adjusted results, we have included our proportionate share of revenues and expenses to reflect the full operational results of this investment. We have not included EMG's adjusted EBITDA in our total adjusted EBITDA as it does not represent our regular power-generating operations.

Average Annual EBITDA
Average annual EBITDA is a non-IFRS financial measure that is forward-looking, used to show the average annual EBITDA that the project currently under construction is expected to generate upon completion.

Funds From Operations ("FFO")
FFO is an important metric as it provides a proxy for cash generated from operating activities before changes in working capital and provides the ability to evaluate cash flow trends in comparison with results from prior periods. FFO is a non-IFRS measure.

Adjustments to cash from operations
Includes FFO related to the Skookumchuck wind facility, which is treated as an equity accounted investment under IFRS and equity income, net of distributions from joint ventures is included in cash flow from operations under IFRS. As this investment is part of our regular power generating operations, we have included our proportionate share of FFO.
Payments received on finance lease receivables reclassified to reflect cash from operations.
We adjust for items included in cash from operations related to the decision in 2020 to accelerate being off-coal and accelerating the shut-down of the Highvale mine by the end of 2021, and the write-down on parts and material inventory for our coal operations ("Clean energy transition provisions and adjustments").

Free Cash Flow
FCF is an important metric as it represents the amount of cash that is available to invest in growth initiatives, make scheduled principal repayments on debt, repay maturing debt, pay common share dividends or repurchase common shares. Changes in working capital are excluded so FFO and FCF are not distorted by changes that we consider temporary in nature, reflecting, among other things, the impact of seasonal factors and timing of receipts and payments. FCF is a non-IFRS measure.





TRANSALTA CORPORATION M32


Non-IFRS Ratios
FFO per share, FCF per share and adjusted net debt to adjusted EBITDA are non-IFRS ratios that are presented in the MD&A. See the Reconciliation of Cash Flow from Operations to FFO and FCF and Key Financial Non-IFRS Ratios sections of this MD&A for additional information.

FFO per share and FCF per share
FFO per share and FCF per share are calculated using the weighted average number of common shares outstanding during the period. FFO per share and FCF per share is a non-IFRS ratio.

Supplementary Financial Measures
Financial highlights presented on a proportional basis of TransAlta Renewables, deconsolidated adjusted EBITDA, deconsolidated FFO and deconsolidated net debt to deconsolidated adjusted EBITDA are supplementary financial measures the Company uses to present adjusted EBITDA on a deconsolidated basis and excludes the portion of TransAlta Renewables and TA Cogen that are not owned by TransAlta. See the Financial Highlights on a Proportional Basis of TransAlta Renewables and Key Financial Non-IFRS Ratios sections of this MD&A for additional information.

The Alberta Electricity Portfolio metrics disclosed are also supplementary financial measures used to present the gross margin by segment for the Alberta market. See the Alberta Electricity Portfolio section of this MD&A for additional information.





TRANSALTA CORPORATION M33


Reconciliation of Non-IFRS Measures on a Consolidated Basis by Segment
The following table reflects adjusted EBITDA by segment and provides reconciliation to earnings (loss) before income taxes for the period ended March 31, 2022:
Attributable to common shareholders
Hydro
Wind & Solar(1)
GasEnergy TransitionEnergy
Marketing
CorporateTotal
Equity accounted investments(1)
Reclass AdjustmentsIFRS Financials
Revenues77 95 434 106 26 1 739 (4) 735 
Reclassifications and adjustments:
Unrealized mark-to-market
  (gain) loss
 13 (162)11 10  (128) 128  
Decrease in finance lease
  receivable
  11    11  (11) 
Finance lease income  5    5 (5) 
Unrealized foreign exchange
  gain on commodity
    (2) (2) 2  
Adjusted Revenues77 108 288 117 34 1 625 (4)114 735 
Fuel and purchased power4 8 131 94  1 238   238 
Reclassifications and adjustments:
Australian interest income  (1)   (1) 1  
Adjusted fuel and purchased
  power
4 8 130 94  1 237  1 238 
Carbon compliance  18 1   19   19 
Gross margin73 100 140 22 34  369 (4)113 478 
OM&A11 16 44 16 7 18 112   112 
Taxes, other than income taxes1 2 4 1   8   8 
Net other operating income (7)(10)   (17)  (17)
Adjusted EBITDA61 89 102 5 27 (18)266 
Equity income2 
Finance lease income
5 
Depreciation and amortization(117)
Asset impairment reversal
42 
Net interest expense(67)
Foreign exchange gain and other gains2 
Earnings before income taxes
242 
(1) The Skookumchuck wind facility has been included on a proportionate basis in the Wind and Solar segment.




TRANSALTA CORPORATION M34


The following table reflects adjusted EBITDA by segment and provides reconciliation to earnings (loss) before income taxes for the period ended March 31, 2021:
Attributable to common shareholders
Hydro
Wind & Solar(1)
GasEnergy TransitionEnergy
Marketing
CorporateTotal
Equity accounted investments(1)
Reclass AdjustmentsIFRS Financials
Revenues89 91 266 139 61 647 (5)— 642 
Reclassifications and adjustments:
Unrealized mark-to-market
  (gain) loss
— (23)(8)— (20)— 20 — 
Decrease in finance lease
  receivable
— — 10 — — — 10 — (10)— 
Finance lease income— — — — — — (7)— 
Adjusted Revenues89 96 260 145 53 644 (5)642 
Fuel and purchased power(2)
108 129 — 245 — — 245 
Reclassifications and adjustments:
Australian interest income— — (1)— — — (1)— — 
Mine depreciation— — (27)(28)— — (55)— 55 — 
Coal inventory write-down— — — (8)— — (8)— — 
Adjusted fuel and purchased
  power
80 93 — 181 — 64 245 
Carbon compliance39 11 — — 50 — — 50 
Gross margin86 92 141 41 53 — 413 (5)(61)347 
OM&A(2)
13 42 23 10 104 (1)— 103 
Taxes, other than income taxes— — — — 
Net other operating income— — (10)— — — (10)— — (10)
Adjusted EBITDA77 76 106 16 43 (8)310 
Equity income
Finance lease income
Depreciation and amortization(149)
Asset impairment charge(29)
Net interest expense(63)
Foreign exchange gain and other gains
Earnings before income taxes21 
(1) The Skookumchuck wind facility has been included on a proportionate basis in the Wind and Solar segment.
(2) $2 million related to station service costs for the Hydro segment in the three months ended March 31, 2021 was reclassified from operations, maintenance and administration to fuel and purchased power for comparative purposes. This did not impact previously reported net earnings.









TRANSALTA CORPORATION M35


The table below reconciles our cash flow from operating activities to our FFO and FCF:

3 months ended March 31
20222021
Cash flow from operating activities(1)
451 257 
Change in non-cash operating working capital balances(284)(72)
Cash flow from operations before changes in working capital167 185 
Adjustments
Share of adjusted FFO from joint venture(1)
3 
Decrease in finance lease receivable11 10 
Clean energy transition provisions and adjustments(2)
 
Other(3)
5 
FFO(4)
186 211 
Deduct:
Sustaining capital(1)
(17)(34)
Productivity capital(1)— 
Dividends paid on preferred shares(10)(10)
Distributions paid to subsidiaries’ non-controlling interests(42)(37)
Principal payments on lease liabilities(1)
(1)(1)
FCF(4)
115 129 
Weighted average number of common shares outstanding in the period271 270 
FFO per share(4)
0.69 0.78 
FCF per share(4)
0.42 0.48 
(1) Includes our share of amounts for Skookumchuck, an equity accounted joint venture.
(2) Includes write-down on parts and material inventory for our coal operations in 2021 to net realizable value.
(3) Other consists of production tax credits which is a reduction to tax equity debt.
(4) These items are not defined and have no standardized meaning under IFRS. Refer to the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.

The table below bridges our adjusted EBITDA to our FFO and FCF:
3 months ended March 31
20222021
Adjusted EBITDA(1)
266 310 
Provisions10 (5)
Interest expense(2)
(54)(51)
Current income tax expense(2)
(12)(23)
Realized foreign exchange gain (loss)2 (1)
Decommissioning and restoration costs settled(2)
(7)(3)
Other non-cash items(3)
(19)(16)
FFO(4)
186 211 
Deduct:
Sustaining capital(2)
(17)(34)
Productivity capital(1)— 
Dividends paid on preferred shares(10)(10)
Distributions paid to subsidiaries’ non-controlling interests(42)(37)
Principal payments on lease liabilities(2)
(1)(1)
 FCF(4)
115 129 
(1) Adjusted EBITDA is defined in the Additional IFRS Measures and Non-IFRS Measures section and reconciled to earnings (loss) before income taxes above.
(2) Includes our share of amounts for Skookumchuck, an equity accounted joint venture.
(3) Other consists of production tax credits which is a reduction to tax equity debt.
(4) FFO and FCF are defined in the Additional IFRS Measures and Non-IFRS Measures section and reconciled to cash flow from operating activities above.




TRANSALTA CORPORATION M36


Financial Highlights on a Proportional Basis of TransAlta Renewables
The proportionate financial information below reflects TransAlta's share of TransAlta Renewables relative to TransAlta's total consolidated figures. The financial highlights presented on a proportional basis of TransAlta Renewables are supplementary financial measures to reflect TransAlta Renewables' portion of the consolidated figures.

Consolidated Results
The following table reflects the generation and summary financial information on a consolidated basis for the period ended March 31:
Actual Generation (GWh)Adjusted EBITDAEarnings (Loss) before income taxes
As at March 31202220212022202120222021
TransAlta Renewables
Hydro41 40 1 
Wind and Solar(1)
1,269 1,069 88 75 
Gas(1)
935 758 56 53 
Corporate  (6)(6)
TransAlta Renewables before adjustments2,245 1,867 139 123 49 61 
Less: Proportion of TransAlta Renewables not owned by TransAlta Corporation(896)(742)(55)(48)(20)(24)
Portion of TransAlta Renewables owned by TransAlta Corporation1,349 1,125 84 75 29 37 
Add: TransAlta Corporation's owned assets excluding TransAlta Renewables
Hydro331 320 60 76 
Wind and Solar 62 1 
Gas1,730 1,877 46 53 
Energy Transition1,053 1,415 5 16 
Energy Marketing — 27 43 
Corporate — (12)(2)
TransAlta Corporation with Proportionate Share of TransAlta Renewables4,463 4,799 211 262 222 (3)
Non-controlling interests896 742 55 48 20 24 
TransAlta Consolidated5,359 5,541 266 310 242 21 
(1) Wind and Solar and Gas segments include those assets that TransAlta Renewables holds an economic interest in.





TRANSALTA CORPORATION M37


Key Non-IFRS Financial Ratios
The methodologies and ratios used by rating agencies to assess our credit rating are not publicly disclosed. We have developed our own definitions of ratios and targets to help evaluate the strength of our financial position. These metrics and ratios are not defined and have no standardized meaning under IFRS and may not be comparable to those used by other entities or by rating agencies.

Adjusted Net Debt to Adjusted EBITDA
As at Dec. 31March 31, 2022Dec. 31, 2021
Period-end long-term debt(1)
3,223 3,267 
Exchangeable securities336 335 
Less: Cash and cash equivalents(1,221)(947)
Add: 50 per cent of issued preferred shares and exchangeable preferred shares(2)
671 671 
Other(3)
4 (19)
Adjusted net debt(4)
3,013 3,307 
Adjusted EBITDA(5)
1,219 1,263 
Adjusted net debt to adjusted EBITDA (times)
2.5 2.6 
(1) Consists of current and long-term portion of debt, which includes lease liabilities and tax equity financing.
(2) Exchangeable preferred shares are considered equity with dividend payments for credit-rating purposes. For accounting purposes, they are accounted for as debt with interest expense in the unaudited interim condensed consolidated financial statements. For purposes of this ratio, we consider 50 per cent of issued preferred shares, including these, as debt.
(3) Includes principal portion of TransAlta OCP restricted cash (nil for the period ended March 31, 2022) and fair value of hedging instruments on debt (included in risk management assets and/or liabilities on the unaudited interim condensed consolidated statements of financial position).
(4) The tax equity financing for Skookumchuck, an equity accounted joint venture, is not represented in the amounts. Adjusted net debt is not defined and has no standardized meaning under IFRS. Presenting this item from period to period provides management and investors with the ability to evaluate earnings trends more readily in comparison with prior periods’ results. See the Additional IFRS Measures and Non-IFRS Measures section of this MD&A.
(5) Last 12 months.

The Company's capital is managed internally and evaluated by management using a net debt position. We use the adjusted net debt to adjusted EBITDA ratio as a measurement of financial leverage and assess our ability to pay off debt. Our adjusted net debt to adjusted EBITDA ratio was lower than 2021 as a result of lower adjusted EBITDA in the first quarter of 2022, higher cash and cash equivalents, and debt repayments.





TRANSALTA CORPORATION M38


Deconsolidated Adjusted EBITDA by Segment
We invest in our assets directly as well as with joint venture partners. Deconsolidated financial information is a supplementary financial measure, and is not intended to be, presented in accordance with IFRS.

Adjusted EBITDA is a key metric for TransAlta and TransAlta Renewables and provides management and shareholders a representation of core business profitability. Deconsolidated EBITDA is used in key planning and credit metrics and segment results highlight the operating performance of assets held directly at TransAlta that are comparable from period to period.

A reconciliation of adjusted EBITDA to deconsolidated adjusted EBITDA by segment results is set out below:
3 months ended March 31, 20223 months ended March 31, 2021
TransAlta ConsolidatedTransAlta RenewablesTransAlta DeconsolidatedTransAlta ConsolidatedTransAlta RenewablesTransAlta Deconsolidated
Hydro61 1 77 
Wind and Solar89 88 76 75 
Gas102 56 106 53 
Energy Transition5 — 16 — 
Energy Marketing27  43 — 
Corporate(18)(6)(8)(6)
Adjusted EBITDA266 139 127 310 123 187 
Less: TA Cogen adjusted EBITDA(14)(25)
Less: EBITDA from joint venture investments(1)
 (4)
Add: Dividend from TransAlta Renewables38 38 
Add: Dividend from TA Cogen10 
Deconsolidated TransAlta adjusted EBITDA161 199 
(1) As of the second quarter of 2021, our share of amounts for the Skookumchuck equity accounted joint venture is excluded from the TransAlta deconsolidated results due to the sale of its 100 per cent economic interest in the 137 MW Skookumchuck wind facility to TransAlta Renewables.





TRANSALTA CORPORATION M39


Deconsolidated FFO
The Company has set capital allocation targets based on deconsolidated FFO available to shareholders. Deconsolidated financial information is a supplementary financial measure and is not defined and has no standardized meaning under IFRS, and may not be comparable to those used by other entities or by rating agencies. See also the Additional IFRS Measures and Non-IFRS Measures section of this MD&A for further details. Deconsolidated FFO for the period ended March 31, 2022 and 2021 is detailed below:
3 months ended March 31, 20223 months ended March 31, 2021
TransAlta ConsolidatedTransAlta RenewablesTransAlta DeconsolidatedTransAlta ConsolidatedTransAlta RenewablesTransAlta Deconsolidated
Cash flow from operating activities451 103 257 103 
Change in non-cash operating working capital balances(284)(17)(72)(15)
Cash flow from operations before changes in working capital167 86 185 88 
Adjustments:
   Decrease in finance lease receivable11  10 — 
   Clean energy transition provisions and adjustments  — 
Share of FFO from joint venture(1)
3  — 
   Finance income - economic interests (19)— (29)
   FFO - economic interests(2)
 49 — 35 
   Other(3)
5  
FFO186 116 70211 100 111 
Dividend from TransAlta Renewables38 38 
Distributions to TA Cogen's Partner(18)(11)
Less: Share of adjusted FFO from joint venture(1)
 (4)
Deconsolidated TransAlta FFO90 134 
(1) As of the second quarter of 2021, our share of amounts for the Skookumchuck equity accounted joint venture is excluded from the TransAlta deconsolidated results due to the sale of its 100 per cent economic interest in the 137 MW Skookumchuck wind facility to TransAlta Renewables.
(2) FFO - economic interests calculated as Free Cash Flow economic interests plus sustaining capital expenditures economic interests plus/minus currency adjustment less distributions from equity accounted joint venture .
(3) Other consists of production tax credits which is a reduction to tax equity debt less distributions from equity accounted joint venture.





TRANSALTA CORPORATION M40


Deconsolidated Net Debt to Deconsolidated Adjusted EBITDA
In addition to reviewing fully consolidated ratios and results, management reviews net debt to adjusted EBITDA on a deconsolidated basis to highlight TransAlta's financial flexibility, balance sheet strength and leverage. Deconsolidated financial information is a supplementary financial measure and is not defined under IFRS, and may not be comparable to those used by other entities or by rating agencies. See also the Additional IFRS Measures and Non-IFRS Measures section of this MD&A for further details.
As atMarch 31, 2022Dec. 31, 2021
Adjusted net debt(1)
3,013 3,307 
Add: TransAlta Renewables cash and cash equivalents278 244 
Less: TransAlta Renewables long-term debt(811)(814)
Less: US tax equity financing and South Hedland debt(2)
(861)(867)
Deconsolidated net debt1,619 1,870 
Deconsolidated adjusted EBITDA(3)(5)
848 852 
Deconsolidated net debt to deconsolidated adjusted EBITDA(4) (times)
1.9 2.2 
(1) Refer to the Adjusted Net Debt to Adjusted EBITDA calculation under the Key Financial Non-IFRS Ratios section of this MD&A for the reconciliation and composition of Adjusted net debt.
(2) Relates to assets where TransAlta Renewables has economic interests.
(3) Refer to the Deconsolidated Adjusted EBITDA by Segment section of this MD&A for the reconciliation and composition of deconsolidated adjusted EBITDA.
(4) The non-IFRS ratio is not a standardized financial measure under IFRS and might not be comparable to similar financial measures disclosed by other issuers.
(5) Last 12 months

Our deconsolidated net debt to deconsolidated adjusted EBITDA ratio for the three months ended March 31, 2022 decreased compared with 2021, due to lower deconsolidated net debt and lower deconsolidated adjusted EBITDA. Lower deconsolidated net debt is a result of scheduled repayments on corporate debt and an increase in cash balances.

Critical Accounting Policies and Estimates
The preparation of unaudited interim condensed consolidated financial statements requires management to make judgments, estimates and assumptions that could affect the reported amounts of assets, liabilities, revenues, expenses and disclosures of contingent assets and liabilities during the period. These estimates are subject to uncertainty. Actual results could differ from these estimates due to factors such as fluctuations in interest rates, foreign exchange rates, inflation and commodity prices, and changes in economic conditions, legislation and regulations. The following were material changes in estimates in the quarter:

During the three months ended March 31, 2022, the global economy continued to recover from the COVID-19 pandemic. Energy prices have strengthened due to elevated uncertainty of global oil and natural gas supply given the war in Ukraine. Estimates to the extent to which the geopolitical events may, directly or indirectly, impact the Company's operations, financial results and conditions in future periods are also subject to significant uncertainty. Uncertainty related to COVID-19 and the geopolitical events have been considered in our estimates as at and for the period ended March 31, 2022.

Provisions for Decommissioning and Restoration Activities
The Company recognizes provisions for decommissioning and restoration obligations. Initial decommissioning provisions, and subsequent changes thereto, are determined using the Company’s best estimate of the required cash expenditures, adjusted to reflect the risks and uncertainties inherent in the timing and amount of settlement. During the first quarter of 2022, the provision for the decommissioning and restoration obligations decreased as a result of higher discount rates, largely driven by underlying market benchmark yields. Refer to Note 13 of our unaudited interim condensed consolidated financial statements for further details.

Defined benefit obligation
The liability for pension and post-employment benefits and associated costs included in compensation expenses are impacted by estimates related to changes in key actuarial assumptions, including discount rates. As a result of increases in discount rates, largely driven by increases in market benchmark rates, the defined benefit obligation decreased to $205 million as at March 31, 2022 from $228 million as at Dec. 31, 2021.





TRANSALTA CORPORATION M41


Accounting Changes
Current Accounting Policy Changes
The accounting policies adopted in the preparation of the unaudited interim condensed consolidated financial statements are consistent with those followed in the preparation of the Company’s annual consolidated financial statements for the year ended Dec. 31, 2021, except for the adoption of new standards effective as of Jan. 1, 2022.

Amendments to IAS 37 Provisions, Contingent Liabilities and Contingent Assets
On May 14, 2020, the IASB issued Onerous Contracts — Cost of Fulfilling a Contract and amendments to IAS 37 Provisions, Contingent Liabilities and Contingent Assets to specify which costs to include when assessing whether a contract will be loss-making. The amendments are effective for annual periods beginning on or after Jan. 1, 2022 and the Company adopted these amendments as of Jan. 1, 2022. The amendments are effective for contracts for which an entity has not yet fulfilled all its obligations on or after the effective date. No adjustments resulted on adoption of the amendments on Jan 1, 2022.

Future Accounting Policy Changes
Please refer to Note 3 of the audited annual consolidated financial statements for the future accounting policies impacting the Company. In the three months ended, March 31, 2022, no additional future accounting policy changes impacting the Company were identified.

Comparative Figures
 
Certain comparative figures have been reclassified to conform to the current period’s presentation. These reclassifications did not impact previously reported net earnings.

Governance and Risk Management
Our business activities expose us to a variety of risks and opportunities including, but not limited to, regulatory changes, rapidly changing market dynamics and increased volatility in our key commodity markets. Our goal is to manage these risks and opportunities so that we are in a position to develop our business and achieve our goals while remaining reasonably protected from an unacceptable level of risk or financial exposure. We use a multilevel risk management oversight structure to manage the risks and opportunities arising from our business activities, the markets in which we operate and the political environments and structures with which we interface.

Please refer to the Governance and Risk Management section of our 2021 Annual MD&A and Note 10 of our unaudited interim condensed consolidated financial statements for details on our risks and how we manage them. Our risk management profile and practices have not changed materially from Dec. 31, 2021.

Regulatory Updates
Refer to the Policy and Legal Risks discussion in our 2021 annual MD&A for further details that supplement the recent developments as discussed below:

Canada
Federal
On March 15, 2022, the Government of Canada’s Department of Environment and Climate Change Canada (“ECCC”) released a discussion paper (the “ECCC Paper”) regarding a proposed new Clean Electricity Standard ("CES") to achieve a net zero electricity sector in Canada by 2035. The Paper states the government’s intent to institute more stringent regulations on natural gas generation to achieve a net zero grid by 2035. TransAlta is actively engaging with the federal government and provincial governments with a focus on clarifying the implications of the regulatory proposal and emphasizing the important role that our current assets play in delivering reliability, affordability, and competitiveness, as well as decarbonization objectives.

On March 29, 2022, the Government of Canada released the 2030 Emissions Reduction Plan ("ERP"). This broad plan includes a broad set of regulatory, policy, and funding initiatives designed to achieve Canada's national emissions reduction targets. Notably, the ERP relies heavily on electrification of the economy to reach Canada's national goals. TransAlta engaged the government regarding the design of the plan and will continue to engage on relevant initiatives moving forward.

Both the CES and ERP may create new opportunities for the development of renewables and energy storage projects in Canada.





TRANSALTA CORPORATION M42


Federal Carbon Pricing on GHG
The Canadian government released an Output-based Pricing System ("OBPS") consultation paper on Dec. 10, 2021, to initiate a 2022 engagement process. TransAlta made a submission regarding the consultation paper and will closely engage governments regarding the review, amendments and regulatory clarification.

Ontario
Ontario will hold a provincial election on or before June 2, 2022. Ahead of the election, the government is engaged in policy development processes regarding the future of the province's Emissions Performance Standards ("EPS") carbon pricing system, a natural gas transition. and development of a voluntary clean energy credit market.

TransAlta's Ontario thermal assets pass through carbon costs under current contracts, minimizing the impact of any change to the EPS. TransAlta continues to engage the government on its other policy initiatives to mitigate risk and identify areas of potential opportunity.

In 2022, the IESO is moving forward with procurement and planning to meet the upcoming capacity needs in the province. The IESO is running a medium-term request for proposals ("RFP") to procure up to 475 MW of capacity from existing generators. This procurement process has been designed to meet the emerging electricity system needs mid-decade. Proposal submissions were due on April 28, 2022, with the RFP awards scheduled for Aug. 26, 2022. The Company is participating in this process. In addition, TransAlta is participating in IESO consultation on the design for a new long-term RFP procurement design for new generation.

United States
On March 21, 2022, the U.S. Securities and Exchange Commission ("SEC") released proposed rules to enhance and standardize climate-related disclosure for investors. The proposed rules cover climate risk governance and risk management, disclosure of material impacts over all time horizons, impacts on business models, and the impact of climate-related events. The SEC invited comments on the proposed rules before finalization and we anticipate the final rules will face legal challenges. TransAlta currently provides investors with information regarding our climate governance, risks, and performance. We will closely monitor the rule-making and ensure continued alignment with all relevant requirements.

Congress continues to consider options for support for renewable energy and energy storage as a part of its broader budget discussions. TransAlta continues to monitor any potential changes for impacts on our growth plans.

Australia
Australia will hold a national election on May 21, 2022. Parties continue to release policy proposals, including policies related to energy and climate. The opposition Labour Party has promised to increase the "AUS 2030" emissions reduction goal and enhance government support for electrification. However, none of the policies proposed to date present significant adverse risks to TransAlta's performance.

Disclosure Controls and Procedures
Management is responsible for establishing and maintaining adequate internal control over financial reporting (‘‘ICFR’’) and disclosure controls and procedures (“DC&P’’). During the three months ended March 31, 2022, the majority of our workforce supporting and executing our ICFR and DC&P worked remotely. There has been minimal impact to the design and performance of our internal controls.

ICFR is a framework designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of consolidated financial statements for external purposes in accordance with IFRS. Management has used the Internal Control Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework) in order to assess the effectiveness of the Company’s ICFR.

DC&P refer to controls and other procedures designed to ensure that information required to be disclosed in the reports we file or submit under securities legislation is recorded, processed, summarized and reported within the time frame specified in applicable securities legislation. DC&P include, without limitation, controls and procedures designed to ensure that information required to be disclosed by us in our reports that we file or submit under applicable securities legislation is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding our required disclosure.





TRANSALTA CORPORATION M43


Together, the ICFR and DC&P frameworks provide internal control over financial reporting and disclosure. In designing and evaluating our ICFR and DC&P, management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving the desired control objectives and as such may not prevent or detect all misstatements, and management is required to apply its judgment in evaluating and implementing possible controls and procedures. Further, the effectiveness of ICFR is subject to the risk that controls may become inadequate because of changes in conditions or that the degree of compliance with policies or procedures may change.

In accordance with the provisions of NI 52-109 and consistent with U.S. Securities and Exchange Commission guidance, the scope of the evaluation did not include internal controls over financial reporting of North Carolina Solar facility, which the Company acquired on Nov. 5, 2021. The North Carolina Solar facility was excluded from management's evaluation of the effectiveness of the Company's internal control over financial reporting as at Dec. 31, 2021, due to the proximity of the acquisition to year-end. Further details related to the acquisition are disclosed in Note 4 to the Company's audited annual consolidated financial statements for the year ended Dec. 31, 2021.

Consistent with the evaluation at Dec. 31, 2021, the scope of the evaluation does not include controls over financial reporting of the assets acquired through the North Carolina Solar acquisition, which the Company acquired on Nov. 5, 2021. North Carolina Solar facility's total and net assets represented approximately 2 per cent and 3 per cent of the Company's total and net assets, respectively, as at March 31, 2022.

Management has evaluated, with the participation of our Chief Executive Officer and Chief Financial Officer, the effectiveness of our ICFR and DC&P as of the end of the period covered by this MD&A. Based on the foregoing evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that, as at March 31, 2022, the end of the period covered by this MD&A, our ICFR and DC&P were effective.





TRANSALTA CORPORATION M44



Glossary of Key Terms

Alberta Electric System Operator (AESO)
The independent system operator and regulatory authority for the Alberta Interconnected Electric System.

Alberta Hydro Assets
The Company's hydroelectric assets, owned through a wholly owned subsidiary, TransAlta Renewables Inc. These assets are located in Alberta consisting of the Barrier, Bearspaw, Cascade, Ghost, Horseshoe, Interlakes, Kananaskis, Pocaterra, Rundle, Spray, Three Sisters, Bighorn and Brazeau hydro facilities.

Alberta Power Purchase Arrangement (Alberta PPA)
A long-term arrangement established by regulation for the sale of electric energy from formerly regulated generating units to PPA buyers.

Ancillary Services
As defined by the Electric Utilities Act, Ancillary Services are those services required to ensure that the interconnected electric system is operated in a manner that provides a satisfactory level of service with acceptable levels of voltage and frequency.

Alberta Thermal
The business segment previously disclosed as Canadian Coal has been renamed to reflect the ongoing conversion of the boilers to burn gas in place of coal. The segment includes the legacy and converted generating units at our Sundance and Keephills sites and includes the Highvale Mine.

Availability
A measure of time, expressed as a percentage of continuous operation 24 hours a day, 365 days a year, that a generating unit is capable of generating electricity, regardless of whether or not it is actually generating electricity.

Adjusted Availability
Availability is adjusted when economic conditions exist, such that planned routine and major maintenance activities are scheduled to minimize expenditures. In high price environments, actual outage schedules would change to accelerate the generating unit's return to service.

Balancing Pool
The Balancing Pool was established in 1999 by the Government of Alberta to help manage the transition to competition in Alberta's electric industry. Its current obligations and responsibilities are governed by the Electric Utilities Act (effective June 1, 2003) and the Balancing Pool Regulation. For more information go to www.balancingpool.ca.

Carbon Tax
Sets a carbon price per tonne of Greenhouse Gas emissions related to transportation fuels, heating fuels and other small emission sources.




Capacity
The rated continuous load-carrying ability, expressed in megawatts, of generation equipment.

Centralia
The business segment previously disclosed as US Coal has been renamed to reflect the sole asset.

Cogeneration
A generating facility that produces electricity and another form of useful thermal energy (such as heat or steam) used for industrial, commercial, heating or cooling purposes.

Disclosure Controls and Procedures (DC&P)
Refers to controls and other procedures designed to ensure that information required to be disclosed in the reports filed by the Company or submitted under securities legislation is recorded, processed, summarized and reported within the time frame specified in applicable securities legislation. DC&P include, without limitation, controls and procedures designed to ensure that information required to be disclosed by the Company in its reports that it files or submits under applicable securities legislation is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

Dispatch optimization
Purchasing power to fulfill contractual obligations, when economical.

Emission Performance Standards (EPS)
Under the Government of Ontario, emission performance standards establish greenhouse gas (GHG) emissions limits for covered facilities.

Force Majeure
Literally means “greater force.” These clauses excuse a party from liability if some unforeseen event beyond the control of that party prevents it from performing its obligations under the contract.

Free Cash Flow (FCF)
Represents the amount of cash that is available to invest in growth initiatives, make scheduled principal repayments on debt, repay maturing debt, pay common share dividends or repurchase common shares. Amount is calculated as cash generated by the Company through its operations (cash from operations) minus the funds used by the Company for the purchase improvement, or maintenance of the long-term assets to improve the efficiency or capacity of the Company (capital expenditures).





TRANSALTA CORPORATION M45


Funds from Operations (FFO)
Represents a proxy for cash generated from operating activities before changes in working capital and provides the ability to evaluate cash flow trends in comparison with results from prior periods. Amount is calculated as cash flow from operating activities before changes in working capital and is adjusted for transactions and amounts that the Company believes are not representative of ongoing cash flows from operations.

Gigajoule (GJ)
A metric unit of energy commonly used in the energy industry. One GJ equals 947,817 British Thermal Units ("Btu"). One GJ is also equal to 277.8 kilowatt hours ("kWh").

Gigawatt (GW)
A measure of electric power equal to 1,000 megawatts.

Gigawatt hour (GWh)
A measure of electricity consumption equivalent to the use of 1,000 megawatts of power over a period of one hour.

Greenhouse Gas (GHG)
A gas that has the potential to retain heat in the atmosphere, including water vapour, carbon dioxide, methane, nitrous oxide, hydrofluorocarbons and perfluorocarbons.

Heating Degree Days
A measure designed to quantify the demand for energy needed to heat a building. It is the number of degrees that a day's average temperature is below 65° Fahrenheit (18° Celsius), which is the temperature below which buildings need to be heated.

IFRS
International Financial Reporting Standards.

ICFR
Internal control over financial reporting.

KH Bonds
The Kent Hills Wind LP non-recourse project bonds secured by, among other things, the Kent Hills 1, 2 and 3 wind sites.

Megawatt (MW)
A measure of electric power equal to 1,000,000 watts.

Megawatt Hour (MWh)
A measure of electricity consumption equivalent to the use of 1,000,000 watts of power over a period of one hour.

Merchant
A term used to describe assets that are not contracted and are exposed to market pricing.

OM&A
Operations, maintenance and administration costs.

Other Hydro Assets
The Company's hydroelectric assets located in British Columbia, Ontario and assets owned by TransAlta Renewables which include the Taylor, Belly River, Waterton, St. Mary, Upper Mamquam, Pingston, Bone Creek, Akolkolex, Ragged Chute, Misema, Galetta, Appleton and Moose Rapids facilities.

Power Purchase Agreement (PPA)
A long-term commercial agreement for the sale of electric energy to PPA buyers.

PP&E
Property, plant and equipment.

Turbine
A machine for generating rotary mechanical power from the energy of a stream of fluid (such as water, steam or hot gas). Turbines convert the kinetic energy of fluids to mechanical energy through the principles of impulse and reaction or a mixture of the two.

Planned outage
Periodic planned shutdown of a generating unit for major maintenance and repairs. Duration is normally in weeks. The time is measured from unit shutdown to putting the unit back on line.

Unplanned outage
The shutdown of a generating unit due to an unanticipated breakdown.






TRANSALTA CORPORATION M46




TransAlta Corporation
110 - 12th Avenue S.W.
Box 1900, Station “M”
Calgary, Alberta T2P 2M1

Phone
403.267.7110

Website
www.transalta.com

Computershare Trust Company of Canada
Suite 600, 530 - 8th Avenue SW
Calgary, Alberta T2P 3S8

Phone
Toll-free in North America: 1.800.564.6253
Outside North America: 514.982.7555

Fax
Toll-free in North America: 1.800.453.0330
Outside North America: 403.267.6529

Website
www.investorcentre.com


FOR MORE INFORMATION

Investor Inquiries
Phone
Toll-free in North America: 1.800.387.3598
Calgary or Outside North America: 403.267.2520

E-mail
investor_relations@transalta.com

Media Inquiries
Phone
Toll-free 1.855.255.9184
or 403.267.2540

E-mail
TA_Media_Relations@transalta.com





TRANSALTA CORPORATION M47