EX-23.6 7 tm2231259d1_ex23-6.htm EXHIBIT 23.6

 

Exhibit 23.6

 

Canadian Engineering Associates Ltd

104-3300 Highway 7, Unit 384

Concord, ON L4K 0G2

CANADA

 

CONSENT OF THIRD-PARTY QUALIFIED PERSON

 

Canadian Engineering Associates Ltd (“CEA”), in connection with the Registration Statement Post-Effective Amendment No. 2 to Form S-1 on Form S-3 (No. 333-260126) of TMC the metals company Inc. and any further amendments or supplements and/or exhibits thereto (collectively, the “Form S-3”), consent to:

 

  the filing and use of the technical report summary titled “Technical Report Summary--Initial Assessment of the NORI Property, Clarion-Clipperton Zone, Deep Green Metals Inc.” (the “NORI Technical Report”), with an effective date of March 17, 2021 and current as of December 31, 2021, as an exhibit to and referenced in the Form S-3;

 

  the filing and use of the technical report summary titled “Technical Report Summary--Initial Assessment of the TOML Mineral Resource, Clarion-Clipperton Zone, Pacific Ocean, for Deep Green Metals Inc.” (the “TOML Technical Report”), with an effective date of March 17, 2021, as an exhibit to and referenced in the Form S-3;

 

  the use of and references to our name, including our status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Form S-3 and any such NORI Technical Report and TOML Technical Report; and

 

  the information derived, summarized, quoted or referenced from the NORI Technical Report and TOML Technical Report, or portions thereof, that was prepared by us, that we supervised the preparation of and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form S-3.

 

CEA is responsible for, and this consent pertains to, the following Sections of the NORI Technical Report:

 

  Section 10: Mineral processing and metallurgical testing
  Section 14.1: Process design basis
  Section 14.3: Project One
  Section 18.3.2: On-shore capital cost for Project One
  Section 18.6.6: On-shore operating costs – Project One
  Corresponding Subsections of Section 1: Summary
  Corresponding Subsections of Section 22: Interpretation and conclusions
  Corresponding Subsections of Section 23: Recommendations
  Corresponding Subsections of Section 24: References
  Corresponding Subsections of Section 25: Reliance on information provided by the registrant

 

CEA is responsible for, and this consent pertains to, the following Sections of the TOML Technical Report:

 

  Section 10: Mineral processing and metallurgical testing
  Section 11.9.6: Mineral processing and metallurgical testing
  Section 14: Recovery Methods
  Corresponding Subsections of Section 1: Summary
  Corresponding Subsections of Section 22: Interpretation and conclusions
  Corresponding Subsections of Section 23: Recommendations
  Corresponding Subsections of Section 24: References
  Corresponding Subsections of Section 25: Reliance on information provided by the registrant

 

Dated this November 23, 2022

 

/s/ Cameron Harris  
Cameron Harris  
Signature of Authorized Person for  
Canadian Engineering Associates Ltd,  
a Qualified Third-Party Firm