-----BEGIN PRIVACY-ENHANCED MESSAGE-----
Proc-Type: 2001,MIC-CLEAR
Originator-Name: webmaster@www.sec.gov
Originator-Key-Asymmetric:
 MFgwCgYEVQgBAQICAf8DSgAwRwJAW2sNKK9AVtBzYZmr6aGjlWyK3XmZv3dTINen
 TWSM7vrzLADbmYQaionwg5sDW3P6oaM5D3tdezXMm7z1T+B+twIDAQAB
MIC-Info: RSA-MD5,RSA,
 TzwHmJyPgdrjvpvt3S/iyIAnz2UKIPKsWmUR7k1EA0nQbjbqfT3TjCYlClLC9WLZ
 OzPSvjdT9YvdgEu+t2MtOQ==

<SEC-DOCUMENT>0000950120-05-000690.txt : 20051011
<SEC-HEADER>0000950120-05-000690.hdr.sgml : 20051010
<ACCEPTANCE-DATETIME>20051011171045
ACCESSION NUMBER:		0000950120-05-000690
CONFORMED SUBMISSION TYPE:	6-K
PUBLIC DOCUMENT COUNT:		2
CONFORMED PERIOD OF REPORT:	20051007
FILED AS OF DATE:		20051011
DATE AS OF CHANGE:		20051011

FILER:

	COMPANY DATA:	
		COMPANY CONFORMED NAME:			SEABRIDGE GOLD INC
		CENTRAL INDEX KEY:			0001231346
		STANDARD INDUSTRIAL CLASSIFICATION:	GOLD & SILVER ORES [1040]
		IRS NUMBER:				000000000
		STATE OF INCORPORATION:			A6
		FISCAL YEAR END:			1231

	FILING VALUES:
		FORM TYPE:		6-K
		SEC ACT:		1934 Act
		SEC FILE NUMBER:	001-32135
		FILM NUMBER:		051133365

	MAIL ADDRESS:	
		STREET 1:		172 KING ST E
		STREET 2:		3RD FL
		CITY:			TORONTO CANADA
		STATE:			A6
		ZIP:			999999999
</SEC-HEADER>
<DOCUMENT>
<TYPE>6-K
<SEQUENCE>1
<FILENAME>form6k_1007.txt
<DESCRIPTION>FORM 6K
<TEXT>
                       SECURITIES AND EXCHANGE COMMISSION
                              WASHINGTON, DC 20549

                                    FORM 6-K

                        REPORT OF FOREIGN PRIVATE ISSUER

                      PURSUANT TO RULE 13a-16 OR 15d-16 OF
                       THE SECURITIES EXCHANGE ACT OF 1934

FOR THE MONTH OF OCTOBER, 2005

COMMISSION FILE NUMBER 0-50657

                               SEABRIDGE GOLD INC.
             (Exact name of Registrant as specified in its Charter)

        172 KING STREET EAST, 3RD FLOOR, TORONTO, ONTARIO, CANADA M5A 1J3
                    (Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports
under cover Form 20-F or Form 40-F.

               Form 20-F |X|                    Form 40-F |_|

Indicate by check mark if the registrant is submitting the Form 6-K in paper as
permitted by Regulation S-T Rule 101(b)(1):     |_|


NOTE: Regulation S-T Rule 101(b)(1) only permits the submission in paper of a
Form 6-K if submitted solely to provide an attached annual report to security
holders.

Indicate by check mark if the registrant is submitting the Form 6-K in paper as
permitted by Regulation S-T Rule 101(b)(7):     |_|

NOTE: Regulation S-T Rule 101(b)(7) only permits the submission in paper of a
Form 6-K if submitted to furnish a report or other document that the registrant
foreign private issuer must furnish and make public under the laws of the
jurisdiction in which the registrant is incorporated, domiciled or legally
organized (the registrant's "home country"), or under the rules of the home
country exchange on which the registrant's securities are traded, as long as the
report or other document is not a press release, is not required to be and has
not been distributed to the registrant's security holders, and, if discussing a
material event, has already been the subject of a Form 6-K submission or other
Commission filing on EDGAR.

Indicate by check mark whether by furnishing the information contained in this
Form, the registrant is also thereby furnishing the information to the
Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.
               Yes  |_|                         No  |X|

If "Yes" is marked, indicate below the file number assigned to the registrant in
connection with Rule 12g3-2(b):

- ----------


<PAGE>


================================================================================

                                   SIGNATURES

     Pursuant to the requirements of the Securities Exchange Act of 1934, the
registrant has duly caused this report to be signed on its behalf by the
undersigned, thereunto duly authorized. Seabridge Gold Inc. (Registrant)

                                         Seabridge Gold Inc.
                                         (Registrant)

Date: October 7, 2005

                                         By:   /s/ Rudi Fronk
                                            ------------------------------------
                                            Name:  Rudi Fronk
                                            Title: President and C.E.O.

================================================================================


                                    EXHIBITS

Exhibit 99
- ----------
Press release issued October 7, 2005 in which the Registrant announced that,
based on independent analysis, the total gold resource at its 100% owned
Courageous Lake deposit has been increased by 6%. A total of 185,000 ounces have
been added to the measured and indicated categories and 343,000 ounces have been
added to the inferred category. The increase is due to a reduction in the
estimated cut-off grade from 1.0 grams of gold per tonne to 0.83 grams,
reflecting results of the independent Preliminary Assessment study recently
completed on the project .

</TEXT>
</DOCUMENT>
<DOCUMENT>
<TYPE>EX-99
<SEQUENCE>2
<FILENAME>ex99.txt
<DESCRIPTION>NEWS RELEASE
<TEXT>
                               SEABRIDGE GOLD INC.

                                  News Release


                                  NEWS RELEASE

TRADING SYMBOLS:   TSX-V: SEA                              FOR IMMEDIATE RELEASE
                   AMEX: SA                                      OCTOBER 7, 2005

          SEABRIDGE INCREASES GOLD RESOURCES AT COURAGEOUS LAKE PROJECT
        RECENT STUDY WARRANTS LOWER CUT-OFF GRADE FOR RESOURCE DISCLOSURE

TORONTO ... Seabridge Gold announced today that, based on independent analysis,
the total gold resource at its 100% owned Courageous Lake deposit has been
increased by 6%. A total of 185,000 ounces have been added to the measured and
indicated categories and 343,000 ounces have been added to the inferred
category. The increase is due to a reduction in the estimated cut-off grade from
1.0 grams of gold per tonne to 0.83 grams, reflecting results of the independent
Preliminary Assessment study recently completed on the project (see news release
dated September 21, 2005). Gold resources for the project are now stated as
follows:

         COURAGEOUS LAKE GOLD RESOURCES AT 0.83 GRAMS PER TONNE CUT-OFF
<TABLE>
<CAPTION>
- -----------------------------------------------------------------------------------------------------------
              MEASURED                            INDICATED                          INFERRED
- -----------------------------------------------------------------------------------------------------------
   Tonnes       Grade      Ounces       Tonnes     Grade      Ounces       Tonnes      Grade      Ounces
   (000's)      (g/T)      (000's)     (000's)     (g/T)      (000's)     (000's)      (g/T)     (000's)
- -----------------------------------------------------------------------------------------------------------
    <C>          <C>         <C>        <C>         <C>        <C>         <C>         <C>        <C>
    3,378        2.55        277        47,002      2.28       3,445       77,442      2.10       5,229
- -----------------------------------------------------------------------------------------------------------
</TABLE>

In December 2004, Resource Modeling Inc. (RMI) prepared a Technical Report
on Seabridge's Courageous Lake Project located in the Northwest Territories,
Canada. (See: http://www.sedar.com/DisplayCompanyDocuments.do?lang=EN&issuerNo=
00007531). In the Technical Report, RMI calculated and stated a gold resource
estimate for the project in compliance with National Instrument 43-101, based
on a cut-off grade of 1.0 grams of gold per tonne which RMI deemed appropriate
at that time. The RMI model was then incorporated into the Preliminary
Assessment.

The Preliminary Assessment estimated a life of mine average cash operating cost
of US$279 per ounce and a mining cut-off grade of 0.83 grams of gold per tonne.
Micheal J. Lechner and Abdullah Arik of RMI (both of whom are Qualified Persons
under NI-43-101) have reviewed the Preliminary Assessment and have agreed that
the gold resources at Courageous Lake can be stated for public resource
disclosure under National Instrument 43-101 incorporating a cut-off grade of
0.83 grams of gold per tonne.

Seabridge notes that the Preliminary Assessment incorporates inferred mineral
resources that are considered too geologically speculative to have the economic
considerations applied to them that would enable them to be categorized as
mineral reserves and advises that there can therefore be no certainty that the
estimates contained in the Preliminary Assessment will be realized.

Seabridge President and CEO Rudi Fronk said the Company is now evaluating the
potential for a drill program which could further expand resources to the north

        =================================================================
            172 King Street East, 3rd Floor; Toronto, Ontario M5A 1J3
               Telephone: (416) 367-9292 Facsimile: (416) 367-2711


<PAGE>


and south of the known FAT deposit. "The recent Preliminary Assessment confirms
that Courageous Lake's economics can be significantly enhanced by adding four
years of mine life to the current estimate of 8.5 years. We believe this
objective is reasonable based on the drill results obtained earlier this year
which showed that the main mineralized zones of the two kilometer long FAT
deposit likely extend 400 meters to the north and 850 meters to the south."

Seabridge has acquired a 100% interest in eight North American gold projects,
subject to earn-in rights of up to 65% at its Kerr-Sulphurets project and up to
62.5% at its Quartz Mountain project held by potential partners. For a breakdown
of the Company's mineral resources by project and resource category please see
http://www.seabridgegold.net/Resource.htm.


ALL RESOURCE ESTIMATES REPORTED BY THE COMPANY, WITH THE EXCEPTIONS OF THE
HISTORIC ESTIMATES FOR THE GRASSY MOUNTAIN, KERR SULPHURETS AND HOG RANCH
PROJECTS, WERE CALCULATED IN ACCORDANCE WITH THE CANADIAN NATIONAL INSTRUMENT
43-101 AND THE CANADIAN INSTITUTE OF MINING AND METALLURGY CLASSIFICATION
SYSTEM. THESE STANDARDS DIFFER SIGNIFICANTLY FROM THE REQUIREMENTS OF THE U.S.
SECURITIES AND EXCHANGE COMMISSION. MINERAL RESOURCES WHICH ARE NOT MINERAL
RESERVES DO NOT HAVE DEMONSTRATED ECONOMIC VIABILITY.

STATEMENTS RELATING TO THE ESTIMATED OR EXPECTED FUTURE PRODUCTION AND OPERATING
RESULTS AND COSTS AND FINANCIAL CONDITION OF SEABRIDGE, PLANNED WORK AT THE
COMPANY'S PROJECTS AND THE EXPECTED RESULTS OF SUCH WORK ARE FORWARD-LOOKING
STATEMENTS WITHIN THE MEANING OF THE UNITED STATES PRIVATE SECURITIES LITIGATION
REFORM ACT OF 1995. FORWARD-LOOKING STATEMENTS ARE STATEMENTS THAT ARE NOT
HISTORICAL FACTS AND ARE GENERALLY, BUT NOT ALWAYS, IDENTIFIED BY WORDS SUCH AS
THE FOLLOWING: EXPECTS, PLANS, ANTICIPATES, BELIEVES, INTENDS, ESTIMATES,
PROJECTS, ASSUMES, POTENTIAL AND SIMILAR EXPRESSIONS. FORWARD-LOOKING STATEMENTS
ALSO INCLUDE REFERENCE TO EVENTS OR CONDITIONS THAT WILL, WOULD, MAY, COULD OR
SHOULD OCCUR. INFORMATION CONCERNING EXPLORATION RESULTS AND MINERAL RESERVE AND
RESOURCE ESTIMATES MAY ALSO BE DEEMED TO BE FORWARD-LOOKING STATEMENTS, AS IT
CONSTITUTES A PREDICTION OF WHAT MIGHT BE FOUND TO BE PRESENT WHEN AND IF A
PROJECT IS ACTUALLY DEVELOPED. THESE FORWARD-LOOKING STATEMENTS ARE NECESSARILY
BASED UPON A NUMBER OF ESTIMATES AND ASSUMPTIONS THAT, WHILE CONSIDERED
REASONABLE AT THE TIME THEY ARE MADE, ARE INHERENTLY SUBJECT TO A VARIETY OF
RISKS AND UNCERTAINTIES WHICH COULD CAUSE ACTUAL EVENTS OR RESULTS TO DIFFER
MATERIALLY FROM THOSE REFLECTED IN THE FORWARD-LOOKING STATEMENTS, INCLUDING,
WITHOUT LIMITATION: UNCERTAINTIES RELATED TO RAISING SUFFICIENT FINANCING TO
FUND THE PLANNED WORK IN A TIMELY MANNER AND ON ACCEPTABLE TERMS; CHANGES IN
PLANNED WORK RESULTING FROM LOGISTICAL, TECHNICAL OR OTHER FACTORS; THE
POSSIBILITY THAT RESULTS OF WORK WILL NOT FULFILL PROJECTIONS/EXPECTATIONS AND
REALIZE THE PERCEIVED POTENTIAL OF THE COMPANY'S PROJECTS; UNCERTAINTIES
INVOLVED IN THE INTERPRETATION OF DRILLING RESULTS AND OTHER TESTS AND THE
ESTIMATION OF GOLD RESERVES AND RESOURCES; RISK OF ACCIDENTS, EQUIPMENT
BREAKDOWNS AND LABOUR DISPUTES OR OTHER UNANTICIPATED DIFFICULTIES OR
INTERRUPTIONS; THE POSSIBILITY OF ENVIRONMENTAL ISSUES AT THE COMPANY'S
PROJECTS; THE POSSIBILITY OF COST OVERRUNS OR UNANTICIPATED EXPENSES IN WORK
PROGRAMS; THE NEED TO OBTAIN PERMITS AND COMPLY WITH ENVIRONMENTAL LAWS AND
REGULATIONS AND OTHER GOVERNMENT REQUIREMENTS; FLUCTUATIONS IN THE PRICE OF GOLD
AND OTHER RISKS AND UNCERTAINTIES, INCLUDING THOSE DESCRIBED IN THE COMPANY'S
ANNUAL INFORMATION FORM FILED WITH SEDAR IN CANADA (AVAILABLE AT WWW.SEDAR.COM)
FOR THE YEAR ENDED DECEMBER 31, 2004 AND IN THE COMPANY'S 20-F FILED WITH THE
U.S. SECURITIES AND EXCHANGE COMMISSION (AVAILABLE AT WWW.SEC.GOV/EDGAR.SHTML).

FORWARD-LOOKING STATEMENTS ARE BASED ON THE BELIEFS, ESTIMATES AND OPINIONS OF
THE COMPANY'S MANAGEMENT OR ITS INDEPENDENT PROFESSIONAL CONSULTANTS ON THE DATE
THE STATEMENTS ARE MADE.


                                                ON BEHALF OF THE BOARD
                                                "Rudi Fronk," President & C.E.O.


For further information please contact:
Rudi P. Fronk, President and C.E.O.
Tel: (416) 367-9292   o  Fax: (416) 367-2711
Visit our website at www.seabridgegold.net  Email:  info@seabridgegold.net


    The SX-V Exchange has not reviewed and does not accept responsibility for
                    the adequacy or accuracy of this release.
</TEXT>
</DOCUMENT>
</SEC-DOCUMENT>
-----END PRIVACY-ENHANCED MESSAGE-----
