XML 33 R21.htm IDEA: XBRL DOCUMENT v3.23.3
LEASES
9 Months Ended
Sep. 30, 2023
Leases [Abstract]  
LEASES LEASES
Under ASC Topic 842, a lease is a contract, or part of a contract, that conveys the right to control the use of identified property, plant or equipment (i.e., an identified asset) for a period of time in exchange for consideration. The Company’s contracts determined to be, or contain, a lease include explicitly or implicitly identified assets where the Company has the right to substantially all of the economic benefits of the assets and has the ability to direct how and for what purpose the assets are used during the lease term. Leases are classified as either operating or financing. For operating leases, the Company has recognized a lease liability equal to the present value of the remaining lease payments, and a right of use asset equal to the lease liability, subject to certain adjustments, such as for prepaid rents. The Company used its incremental borrowing rate to determine the present value of the lease payments. The Company’s incremental borrowing rate is the rate of interest that it would be charged to borrow, on a collateralized basis, over a similar term, an amount equal to the lease payments in a similar economic environment. The Company determined the incremental borrowing rates for its leases by applying its applicable borrowing rate, with adjustment as appropriate for lease currency and lease term.
The Company enters into contracts to lease real estate, equipment and vehicles. The Company’s most individually significant lease liability relates to a real estate lease with an initial contract lease term of 30 years. The Company’s most significant lease liabilities in aggregate value relate to real estate leases that have initial contract lease terms ranging from 1 to 30 years. Certain leases include renewal, termination or purchase options that were not deemed reasonably assured of exercise under ASC 840. Under ASC Topic 842, the lease term at the lease commencement date is determined based on the non-cancellable period for which the Company has the right to use the underlying asset, together with any periods covered by an option to extend the lease if the Company is reasonably certain to exercise that option, periods covered by an option to terminate the lease if the Company is reasonably certain not to exercise that option, and periods covered by an option to extend (or not to terminate) the lease in which the exercise of the option is controlled by the lessor. The Company considered a number of factors when evaluating whether the options in its lease contracts were reasonably certain of exercise, such as length of time before option exercise, expected value of the leased asset at the end of the initial lease term, importance of the lease to overall operations, costs to negotiate a new lease, and any contractual or economic penalties.
Operating leases result in a straight-line lease expense, while finance leases result in a front-loaded expense pattern. The assets associated with financing leases have been included in property, plant and equipment in the condensed consolidated balance sheet. Depreciation on financing lease assets is included in operating costs on the condensed consolidated statement of comprehensive income (loss). The Company does not sublease any of its material leased assets to third parties and the Company is not party to any lease contracts with related parties. The Company’s lease agreements do not contain any residual value guarantees or restrictive covenants.
ASC Topic 842 includes practical expedient and policy election choices. The Company elected the package of practical expedients available in the standard and, as a result, did not reassess the lease classification of existing leases, did not reassess whether existing contracts are or contain leases and did not reassess the initial direct costs associated with existing leases. The Company did not elect the hindsight practical expedient, and so did not re-evaluate lease term for existing leases.
The Company has made an accounting policy election not to recognize right of use assets and lease liabilities for leases with a lease term of 12 months or less, including renewal options that are reasonably certain to be exercised, that also do not include an option to purchase the underlying asset that is reasonably certain of exercise. Instead, lease payments for these leases are recognized as lease cost on a straight-line basis over the lease term.
ASC Topic 842 includes a number of reassessment and re-measurement requirements for lessees based on certain triggering events or conditions, including whether a contract is or contains a lease, assessment of lease term and purchase options, measurement of lease payments, assessment of lease classification and assessment of the discount rate. The Company reviewed the reassessment and re-measurement requirements and did not identify any events or conditions during the quarter ended September 30, 2023 that required a reassessment or re-measurement. In addition, there were no impairment indicators identified during the quarter ended September 30, 2023 that required an impairment test for the Company’s right-of-use assets or other long-lived assets in accordance with ASC 360-10.
Certain of the Company’s leases include variable lease costs to reimburse the lessor for real estate tax and insurance expenses, and certain non-lease components that transfer a distinct service to the Company, such as common area maintenance services. The Company has elected not to separate the accounting for lease components and non-lease components, for all classes of leased assets.
On August 24, 2022, the Company signed a real estate lease for a future feedstock preprocessing facility in Denver, Pennsylvania with an initial term of 15 years and total minimum lease payments of $52.3 million. The lease is currently expected to commence in the first half of 2024.
In January 2023, the Company signed a real estate lease at the Port of Antwerp-Bruges’ NextGen District, where it plans to build its first purification facility in Europe, with an initial term of 30 years and total minimum lease payments of €27.7 million, subject to annual inflation adjustments. This lease commenced at the end of June 2023.
The components of lease expense and supplemental cash flow information related to leases for the periods are as follows (in thousands):
Three Months Ended September 30,Nine Months Ended September 30,
2023202220232022
Lease cost
Operating lease cost$1,252 $618 $3,042$1,390
Short-term lease cost211 83 795291
   Total lease cost$1,463 $701 $3,837$1,681
Nine Months Ended September 30,
20232022
Other information
Cash paid for amounts included in the measurement of lease liabilities
Operating cash flows from operating leases$2,687$1,829
Right-of-use assets obtained in exchange for new operating lease liabilities$13,084$8,266
Weighted-average remaining lease term (in years) - operating leases15.37.9
Discount rates
Weighted-average discount rate - operating leases6.0 %4.7 %
The supplemental balance sheet information related to leases for the period is as follows (in thousands):
September 30, 2023December 31, 2022
Operating leases
Operating lease right-of-use assets$30,050 $19,136 
Accrued expenses$2,446 $2,188 
Other long-term liabilities27,556 16,620 
   Total operating lease liabilities$30,002 $18,808 
Maturities of the Company’s lease liabilities are as follows (in thousands):
Year EndingOperating Leases
2023 (October through December)$813 
20244,495 
20254,551 
20264,457 
20274,054 
20282,814 
Thereafter29,347 
   Total lease payments50,531 
Less: Imputed interest(20,529)
   Present value of lease liabilities$30,002 
AEDA Sale-leaseback Transaction
On June 30, 2023, PCT entered into a series of agreements with the Development Authority of Augusta, Georgia (the “AEDA”) to construct phase one (“Phase One”) of its first U.S. multi-line facility in Augusta, Georgia. PCT is leasing 150 acres of land (“Real Property”) owned by the AEDA and will construct buildings, building equipment, and other structures (the “Improvements”) on the land. PCT will also acquire and install the necessary processing, warehousing, and other equipment, as well as conveyers and pipelines (the “Equipment”, together with the Real Property and the Improvements, the “Augusta Project”). The Improvements and Equipment will be transferred to the AEDA and leased back by PCT. PCT anticipates that the first portion of Phase One will consist of one purification line, with construction expected to begin by the end of 2023. PCT is obligated to spend at least $440 million toward the construction of Phase One. Construction of the first purification line must be completed by December 31, 2026, but PCT expects that it will be completed sooner. Through September 30, 2023, PCT has invested approximately $77 million for pre-construction engineering and long-lead equipment for the benefit of Phase One investments.
The legal sale-leaseback structure provides local property tax incentives to PCT as lessee of the Augusta Project. PCT will remain the owner of the Improvements and Equipment for accounting purposes during the term of the lease as PCT will have the right to acquire title to the Augusta Project for a nominal amount during the term and at the conclusion of the arrangement, which has an initial expiration date in 2044. The payments PCT makes to the AEDA during the term of the arrangement are not otherwise expected to be material.