XML 132 R112.htm IDEA: XBRL DOCUMENT v3.22.0.1
Schedule III - Real Estate and Accumulated Depreciation (Details) - USD ($)
12 Months Ended
Dec. 31, 2021
Dec. 31, 2020
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances $ 1,924,688,000  
Initial Costs, Land 1,372,755,000  
Initial Costs, Building & Improvements 4,973,408,000  
Costs Capitalized Subsequent to Acquisition 2,307,498,000  
Total Costs, Land 1,372,755,000  
Total Costs, Building & Improvements 7,280,906,000  
Total Costs 8,653,661,000  
Accumulated depreciation (1,339,180,000)  
Real estate, federal income tax basis 8,700,000,000  
Secured debt    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Notes payable 1,714,874,000 $ 1,507,276,000
Secured debt | Hollywood Media Portfolio    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Notes payable 890,186,000 792,186,000
Secured debt | One Westside and 10850 Pico    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Notes payable 241,388,000 $ 106,073,000
Maximum borrowing capacity 414,600,000  
In-substance defeased debt    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Notes payable 128,212,000  
Joint venture partner debt    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Notes payable $ 66,136,000  
Building and improvements    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Estimated useful life 39 years  
Land improvements    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Estimated useful life 15 years  
Office | 875 Howard, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances $ 0  
Initial Costs, Land 18,058,000  
Initial Costs, Building & Improvements 41,046,000  
Costs Capitalized Subsequent to Acquisition 27,838,000  
Total Costs, Land 18,058,000  
Total Costs, Building & Improvements 68,884,000  
Total Costs 86,942,000  
Accumulated depreciation (24,902,000)  
Office | 6040 Sunset, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 1,100,000,000  
Initial Costs, Land 6,599,000  
Initial Costs, Building & Improvements 27,187,000  
Costs Capitalized Subsequent to Acquisition 30,469,000  
Total Costs, Land 6,599,000  
Total Costs, Building & Improvements 57,656,000  
Total Costs 64,255,000  
Accumulated depreciation (21,054,000)  
Office | ICON, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 0  
Costs Capitalized Subsequent to Acquisition 163,685,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 163,685,000  
Total Costs 163,685,000  
Accumulated depreciation (27,274,000)  
Office | CUE, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 0  
Costs Capitalized Subsequent to Acquisition 49,458,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 49,458,000  
Total Costs 49,458,000  
Accumulated depreciation (6,425,000)  
Office | EPIC, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 10,606,000  
Initial Costs, Building & Improvements 0  
Costs Capitalized Subsequent to Acquisition 215,670,000  
Total Costs, Land 10,606,000  
Total Costs, Building & Improvements 215,670,000  
Total Costs 226,276,000  
Accumulated depreciation (17,427,000)  
Office | Del Amo, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 18,000,000  
Costs Capitalized Subsequent to Acquisition 1,923,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 19,923,000  
Total Costs 19,923,000  
Accumulated depreciation (4,710,000)  
Office | 1455 Market, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 41,226,000  
Initial Costs, Building & Improvements 34,990,000  
Costs Capitalized Subsequent to Acquisition 103,947,000  
Total Costs, Land 41,226,000  
Total Costs, Building & Improvements 138,937,000  
Total Costs 180,163,000  
Accumulated depreciation (61,732,000)  
Office | Rincon Center, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 58,251,000  
Initial Costs, Building & Improvements 110,656,000  
Costs Capitalized Subsequent to Acquisition 65,676,000  
Total Costs, Land 58,251,000  
Total Costs, Building & Improvements 176,332,000  
Total Costs 234,583,000  
Accumulated depreciation (47,781,000)  
Office | 10950 Washington, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 17,979,000  
Initial Costs, Building & Improvements 25,110,000  
Costs Capitalized Subsequent to Acquisition 1,303,000  
Total Costs, Land 17,979,000  
Total Costs, Building & Improvements 26,413,000  
Total Costs 44,392,000  
Accumulated depreciation (7,508,000)  
Office | 604 Arizona, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 5,620,000  
Initial Costs, Building & Improvements 14,745,000  
Costs Capitalized Subsequent to Acquisition 4,453,000  
Total Costs, Land 5,620,000  
Total Costs, Building & Improvements 19,198,000  
Total Costs 24,818,000  
Accumulated depreciation (5,819,000)  
Office | 275 Brannan, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 4,187,000  
Initial Costs, Building & Improvements 8,063,000  
Costs Capitalized Subsequent to Acquisition 13,740,000  
Total Costs, Land 4,187,000  
Total Costs, Building & Improvements 21,803,000  
Total Costs 25,990,000  
Accumulated depreciation (8,996,000)  
Office | 625 Second, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 10,744,000  
Initial Costs, Building & Improvements 42,650,000  
Costs Capitalized Subsequent to Acquisition 5,012,000  
Total Costs, Land 10,744,000  
Total Costs, Building & Improvements 47,662,000  
Total Costs 58,406,000  
Accumulated depreciation (12,507,000)  
Office | 6922 Hollywood, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 16,608,000  
Initial Costs, Building & Improvements 72,392,000  
Costs Capitalized Subsequent to Acquisition 28,103,000  
Total Costs, Land 16,608,000  
Total Costs, Building & Improvements 100,495,000  
Total Costs 117,103,000  
Accumulated depreciation (25,751,000)  
Office | 10900 Washington, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 1,400,000  
Initial Costs, Building & Improvements 1,200,000  
Costs Capitalized Subsequent to Acquisition 141,000  
Total Costs, Land 1,400,000  
Total Costs, Building & Improvements 1,341,000  
Total Costs 2,741,000  
Accumulated depreciation (396,000)  
Office | 901 Market, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 17,882,000  
Initial Costs, Building & Improvements 79,305,000  
Costs Capitalized Subsequent to Acquisition 17,395,000  
Total Costs, Land 17,882,000  
Total Costs, Building & Improvements 96,700,000  
Total Costs 114,582,000  
Accumulated depreciation (25,598,000)  
Office | Element LA, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 168,000,000  
Initial Costs, Land 79,769,000  
Initial Costs, Building & Improvements 19,755,000  
Costs Capitalized Subsequent to Acquisition 96,243,000  
Total Costs, Land 79,769,000  
Total Costs, Building & Improvements 115,998,000  
Total Costs 195,767,000  
Accumulated depreciation (25,265,000)  
Office | 3401 Exposition, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 14,120,000  
Initial Costs, Building & Improvements 11,319,000  
Costs Capitalized Subsequent to Acquisition 12,153,000  
Total Costs, Land 14,120,000  
Total Costs, Building & Improvements 23,472,000  
Total Costs 37,592,000  
Accumulated depreciation (6,694,000)  
Office | 505 First, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 22,917,000  
Initial Costs, Building & Improvements 133,034,000  
Costs Capitalized Subsequent to Acquisition 5,382,000  
Total Costs, Land 22,917,000  
Total Costs, Building & Improvements 138,416,000  
Total Costs 161,333,000  
Accumulated depreciation (30,504,000)  
Office | 83 King, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 12,982,000  
Initial Costs, Building & Improvements 51,403,000  
Costs Capitalized Subsequent to Acquisition 11,893,000  
Total Costs, Land 12,982,000  
Total Costs, Building & Improvements 63,296,000  
Total Costs 76,278,000  
Accumulated depreciation (14,191,000)  
Office | Met Park North, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 28,996,000  
Initial Costs, Building & Improvements 71,768,000  
Costs Capitalized Subsequent to Acquisition 1,787,000  
Total Costs, Land 28,996,000  
Total Costs, Building & Improvements 73,555,000  
Total Costs 102,551,000  
Accumulated depreciation (18,946,000)  
Office | Northview Center, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 4,803,000  
Initial Costs, Building & Improvements 41,191,000  
Costs Capitalized Subsequent to Acquisition 4,905,000  
Total Costs, Land 4,803,000  
Total Costs, Building & Improvements 46,096,000  
Total Costs 50,899,000  
Accumulated depreciation (10,560,000)  
Office | 411 First, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 27,684,000  
Initial Costs, Building & Improvements 29,824,000  
Costs Capitalized Subsequent to Acquisition 23,241,000  
Total Costs, Land 27,684,000  
Total Costs, Building & Improvements 53,065,000  
Total Costs 80,749,000  
Accumulated depreciation (12,849,000)  
Office | 450 Alaskan, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 0  
Costs Capitalized Subsequent to Acquisition 86,961,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 86,961,000  
Total Costs 86,961,000  
Accumulated depreciation (11,497,000)  
Office | 95 Jackson, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Initial Costs, Land 0  
Initial Costs, Building & Improvements 0  
Costs Capitalized Subsequent to Acquisition 15,809,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 15,809,000  
Total Costs 15,809,000  
Accumulated depreciation (2,552,000)  
Office | Palo Alto Square, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 326,033,000  
Costs Capitalized Subsequent to Acquisition 42,441,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 368,474,000  
Total Costs 368,474,000  
Accumulated depreciation (88,649,000)  
Office | 3400 Hillview, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 159,641,000  
Costs Capitalized Subsequent to Acquisition (4,988,000)  
Total Costs, Land 0  
Total Costs, Building & Improvements 154,653,000  
Total Costs 154,653,000  
Accumulated depreciation (41,618,000)  
Office | Foothill Research Center, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 133,994,000  
Costs Capitalized Subsequent to Acquisition 16,684,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 150,678,000  
Total Costs 150,678,000  
Accumulated depreciation (44,845,000)  
Office | Page Mill Center, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 147,625,000  
Costs Capitalized Subsequent to Acquisition 23,189,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 170,814,000  
Total Costs 170,814,000  
Accumulated depreciation (41,635,000)  
Office | Clocktower Square, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 93,949,000  
Costs Capitalized Subsequent to Acquisition 17,213,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 111,162,000  
Total Costs 111,162,000  
Accumulated depreciation (20,620,000)  
Office | 3176 Porter, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 34,561,000  
Costs Capitalized Subsequent to Acquisition 690,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 35,251,000  
Total Costs 35,251,000  
Accumulated depreciation (9,455,000)  
Office | Towers at Shore Center, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 72,673,000  
Initial Costs, Building & Improvements 144,188,000  
Costs Capitalized Subsequent to Acquisition 23,131,000  
Total Costs, Land 72,673,000  
Total Costs, Building & Improvements 167,319,000  
Total Costs 239,992,000  
Accumulated depreciation (37,299,000)  
Office | Skyway Landing, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 37,959,000  
Initial Costs, Building & Improvements 63,559,000  
Costs Capitalized Subsequent to Acquisition 2,741,000  
Total Costs, Land 37,959,000  
Total Costs, Building & Improvements 66,300,000  
Total Costs 104,259,000  
Accumulated depreciation (14,385,000)  
Office | Shorebreeze, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 69,448,000  
Initial Costs, Building & Improvements 59,806,000  
Costs Capitalized Subsequent to Acquisition 19,056,000  
Total Costs, Land 69,448,000  
Total Costs, Building & Improvements 78,862,000  
Total Costs 148,310,000  
Accumulated depreciation (18,750,000)  
Office | 555 Twin Dolphin, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 40,614,000  
Initial Costs, Building & Improvements 73,457,000  
Costs Capitalized Subsequent to Acquisition 16,356,000  
Total Costs, Land 40,614,000  
Total Costs, Building & Improvements 89,813,000  
Total Costs 130,427,000  
Accumulated depreciation (17,020,000)  
Office | 333 Twin Dolphin, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 36,441,000  
Initial Costs, Building & Improvements 64,892,000  
Costs Capitalized Subsequent to Acquisition 26,050,000  
Total Costs, Land 36,441,000  
Total Costs, Building & Improvements 90,942,000  
Total Costs 127,383,000  
Accumulated depreciation (22,370,000)  
Office | Metro Center, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 313,683,000  
Costs Capitalized Subsequent to Acquisition 65,707,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 379,390,000  
Total Costs 379,390,000  
Accumulated depreciation (81,859,000)  
Office | Concourse, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 45,085,000  
Initial Costs, Building & Improvements 224,271,000  
Costs Capitalized Subsequent to Acquisition 50,592,000  
Total Costs, Land 45,085,000  
Total Costs, Building & Improvements 274,863,000  
Total Costs 319,948,000  
Accumulated depreciation (56,539,000)  
Office | Gateway, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 33,117,000  
Initial Costs, Building & Improvements 121,217,000  
Costs Capitalized Subsequent to Acquisition 52,944,000  
Total Costs, Land 33,117,000  
Total Costs, Building & Improvements 174,161,000  
Total Costs 207,278,000  
Accumulated depreciation (43,035,000)  
Office | Metro Plaza, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 16,038,000  
Initial Costs, Building & Improvements 106,156,000  
Costs Capitalized Subsequent to Acquisition 61,610,000  
Total Costs, Land 16,038,000  
Total Costs, Building & Improvements 167,766,000  
Total Costs 183,804,000  
Accumulated depreciation (32,694,000)  
Office | 1740 Technology, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 8,052,000  
Initial Costs, Building & Improvements 49,486,000  
Costs Capitalized Subsequent to Acquisition 4,704,000  
Total Costs, Land 8,052,000  
Total Costs, Building & Improvements 54,190,000  
Total Costs 62,242,000  
Accumulated depreciation (9,696,000)  
Office | Skyport Plaza, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 29,033,000  
Initial Costs, Building & Improvements 153,844,000  
Costs Capitalized Subsequent to Acquisition 5,467,000  
Total Costs, Land 29,033,000  
Total Costs, Building & Improvements 159,311,000  
Total Costs 188,344,000  
Accumulated depreciation (28,396,000)  
Office | Techmart, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 66,660,000  
Costs Capitalized Subsequent to Acquisition 19,677,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 86,337,000  
Total Costs 86,337,000  
Accumulated depreciation (18,748,000)  
Office | Fourth & Traction, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 12,140,000  
Initial Costs, Building & Improvements 37,110,000  
Costs Capitalized Subsequent to Acquisition 69,165,000  
Total Costs, Land 12,140,000  
Total Costs, Building & Improvements 106,275,000  
Total Costs 118,415,000  
Accumulated depreciation (17,753,000)  
Office | Maxwell, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 13,040,000  
Initial Costs, Building & Improvements 26,960,000  
Costs Capitalized Subsequent to Acquisition 57,612,000  
Total Costs, Land 13,040,000  
Total Costs, Building & Improvements 84,572,000  
Total Costs 97,612,000  
Accumulated depreciation (10,568,000)  
Office | 11601 Wilshire, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 28,978,000  
Initial Costs, Building & Improvements 321,273,000  
Costs Capitalized Subsequent to Acquisition 65,447,000  
Total Costs, Land 28,978,000  
Total Costs, Building & Improvements 386,720,000  
Total Costs 415,698,000  
Accumulated depreciation (63,180,000)  
Office | Hill7, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 101,000,000  
Initial Costs, Land 36,888,000  
Initial Costs, Building & Improvements 137,079,000  
Costs Capitalized Subsequent to Acquisition 19,488,000  
Total Costs, Land 36,888,000  
Total Costs, Building & Improvements 156,567,000  
Total Costs 193,455,000  
Accumulated depreciation (28,215,000)  
Office | Page Mill Hill, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 131,402,000  
Costs Capitalized Subsequent to Acquisition 11,918,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 143,320,000  
Total Costs 143,320,000  
Accumulated depreciation (24,591,000)  
Office | Harlow, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 7,455,000  
Initial Costs, Building & Improvements 0  
Costs Capitalized Subsequent to Acquisition 69,934,000  
Total Costs, Land 7,455,000  
Total Costs, Building & Improvements 69,934,000  
Total Costs 77,389,000  
Accumulated depreciation (1,387,000)  
Office | One Westside, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 241,388,000  
Initial Costs, Land 110,438,000  
Initial Costs, Building & Improvements 35,011,000  
Costs Capitalized Subsequent to Acquisition 359,848,000  
Total Costs, Land 110,438,000  
Total Costs, Building & Improvements 394,859,000  
Total Costs 505,297,000  
Accumulated depreciation (2,173,000)  
Office | 10850 Pico, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 34,682,000  
Initial Costs, Building & Improvements 16,313,000  
Costs Capitalized Subsequent to Acquisition 1,215,000  
Total Costs, Land 34,682,000  
Total Costs, Building & Improvements 17,528,000  
Total Costs 52,210,000  
Accumulated depreciation (1,803,000)  
Office | Ferry Building, San Francisco Bay Area, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 0  
Initial Costs, Building & Improvements 268,292,000  
Costs Capitalized Subsequent to Acquisition 28,916,000  
Total Costs, Land 0  
Total Costs, Building & Improvements 297,208,000  
Total Costs 297,208,000  
Accumulated depreciation (28,537,000)  
Office | 1918 Eighth, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 314,300,000  
Initial Costs, Land 38,476,000  
Initial Costs, Building & Improvements 545,773,000  
Costs Capitalized Subsequent to Acquisition 25,853,000  
Total Costs, Land 38,476,000  
Total Costs, Building & Improvements 571,626,000  
Total Costs 610,102,000  
Accumulated depreciation (19,687,000)  
Office | 5th and Bell, Greater Seattle, WA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 20,867,000  
Initial Costs, Building & Improvements 82,072,000  
Costs Capitalized Subsequent to Acquisition 31,000  
Total Costs, Land 20,867,000  
Total Costs, Building & Improvements 82,103,000  
Total Costs 102,970,000  
Accumulated depreciation (73,000)  
Studio | Sunset Gower Studios, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 79,320,000  
Initial Costs, Building & Improvements 64,697,000  
Costs Capitalized Subsequent to Acquisition 75,634,000  
Total Costs, Land 79,320,000  
Total Costs, Building & Improvements 140,331,000  
Total Costs 219,651,000  
Accumulated depreciation (38,684,000)  
Studio | Sunset Bronson Studios, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 67,092,000  
Initial Costs, Building & Improvements 32,374,000  
Costs Capitalized Subsequent to Acquisition 46,878,000  
Total Costs, Land 67,092,000  
Total Costs, Building & Improvements 79,252,000  
Total Costs 146,344,000  
Accumulated depreciation (24,617,000)  
Studio | Sunset Las Palmas Studios, Los Angeles, CA    
SEC Schedule III, Real Estate and Accumulated Depreciation    
Encumbrances 0  
Initial Costs, Land 134,488,000  
Initial Costs, Building & Improvements 104,392,000  
Costs Capitalized Subsequent to Acquisition 45,108,000  
Total Costs, Land 134,488,000  
Total Costs, Building & Improvements 149,500,000  
Total Costs 283,988,000  
Accumulated depreciation $ (19,361,000)