XML 97 R84.htm IDEA: XBRL DOCUMENT v3.10.0.1
SCHEDULE III REAL ESTATE AND ACCUMULATED DEPRECIATION - By Property (Details) - USD ($)
$ in Thousands
Dec. 31, 2018
Dec. 31, 2017
Dec. 31, 2016
Dec. 31, 2015
Initial Cost to Company        
Land $ 125,691      
Buildings and Improvements 1,205,553      
Costs Capitalized Subsequent to acquisition 90,212      
Gross Amount at Which Carried As of Year End        
Land 125,691      
Buildings and Improvements 1,295,765      
Total 1,421,456 $ 1,392,122 $ 1,301,563 $ 1,198,686
Accum Deprec 314,875 $ 306,033 $ 275,861 $ 251,265
SNF        
Initial Cost to Company        
Land 49,593      
Buildings and Improvements 463,714      
Costs Capitalized Subsequent to acquisition 51,877      
Gross Amount at Which Carried As of Year End        
Land 49,593      
Buildings and Improvements 515,591      
Total 565,184      
Accum Deprec 172,196      
ALF        
Initial Cost to Company        
Land 70,772      
Buildings and Improvements 695,763      
Costs Capitalized Subsequent to acquisition 37,486      
Gross Amount at Which Carried As of Year End        
Land 70,772      
Buildings and Improvements 733,249      
Total 804,021      
Accum Deprec 142,002      
Other School and Land        
Initial Cost to Company        
Land 2,908      
Buildings and Improvements 7,308      
Costs Capitalized Subsequent to acquisition 849      
Gross Amount at Which Carried As of Year End        
Land 2,908      
Buildings and Improvements 8,157      
Total 11,065      
Accum Deprec 677      
School        
Initial Cost to Company        
Land 1,965      
Buildings and Improvements 7,308      
Costs Capitalized Subsequent to acquisition 849      
Gross Amount at Which Carried As of Year End        
Land 1,965      
Buildings and Improvements 8,157      
Total 10,122      
Accum Deprec 677      
Land        
Initial Cost to Company        
Land 943      
Gross Amount at Which Carried As of Year End        
Land 943      
Total 943      
Properties under Development        
Initial Cost to Company        
Land 2,418      
Buildings and Improvements 38,768      
Gross Amount at Which Carried As of Year End        
Land 2,418      
Buildings and Improvements 38,768      
Total 41,186      
134 Alamogordo, NM | SNF        
Initial Cost to Company        
Land 210      
Buildings and Improvements 2,593      
Costs Capitalized Subsequent to acquisition 641      
Gross Amount at Which Carried As of Year End        
Land 210      
Buildings and Improvements 3,234      
Total 3,444      
Accum Deprec 1,408      
218 Albuquerque, NM | SNF        
Initial Cost to Company        
Land 1,696      
Buildings and Improvements 3,891      
Costs Capitalized Subsequent to acquisition 530      
Gross Amount at Which Carried As of Year End        
Land 1,696      
Buildings and Improvements 4,421      
Total 6,117      
Accum Deprec 1,841      
219 Albuquerque, NM | SNF        
Initial Cost to Company        
Land 1,950      
Buildings and Improvements 8,910      
Costs Capitalized Subsequent to acquisition 207      
Gross Amount at Which Carried As of Year End        
Land 1,950      
Buildings and Improvements 9,117      
Total 11,067      
Accum Deprec 3,670      
220 Albuquerque, NM | SNF        
Initial Cost to Company        
Land 2,463      
Buildings and Improvements 7,647      
Costs Capitalized Subsequent to acquisition 9      
Gross Amount at Which Carried As of Year End        
Land 2,463      
Buildings and Improvements 7,656      
Total 10,119      
Accum Deprec 3,062      
042 Altoona, IA | SNF        
Initial Cost to Company        
Land 105      
Buildings and Improvements 2,309      
Costs Capitalized Subsequent to acquisition 444      
Gross Amount at Which Carried As of Year End        
Land 105      
Buildings and Improvements 2,753      
Total 2,858      
Accum Deprec 1,920      
252 Amarillo, TX | SNF        
Initial Cost to Company        
Land 844      
Costs Capitalized Subsequent to acquisition 7,925      
Gross Amount at Which Carried As of Year End        
Land 844      
Buildings and Improvements 7,925      
Total 8,769      
Accum Deprec 1,871      
214 Aransas Pass, TX | SNF        
Initial Cost to Company        
Land 154      
Buildings and Improvements 1,276      
Costs Capitalized Subsequent to acquisition 589      
Gross Amount at Which Carried As of Year End        
Land 154      
Buildings and Improvements 1,865      
Total 2,019      
Accum Deprec 888      
247 Arlington, TX | SNF        
Initial Cost to Company        
Land 1,016      
Buildings and Improvements 13,649      
Gross Amount at Which Carried As of Year End        
Land 1,016      
Buildings and Improvements 13,649      
Total 14,665      
Accum Deprec 3,801      
221 Beaumont, TX | SNF        
Initial Cost to Company        
Land 370      
Buildings and Improvements 1,141      
Costs Capitalized Subsequent to acquisition 106      
Gross Amount at Which Carried As of Year End        
Land 370      
Buildings and Improvements 1,247      
Total 1,617      
Accum Deprec 541      
213 Beeville, TX | SNF        
Initial Cost to Company        
Land 186      
Buildings and Improvements 1,197      
Costs Capitalized Subsequent to acquisition 70      
Gross Amount at Which Carried As of Year End        
Land 186      
Buildings and Improvements 1,267      
Total 1,453      
Accum Deprec 493      
007 Bradenton, FL | SNF        
Initial Cost to Company        
Land 330      
Buildings and Improvements 2,720      
Costs Capitalized Subsequent to acquisition 160      
Gross Amount at Which Carried As of Year End        
Land 330      
Buildings and Improvements 2,880      
Total 3,210      
Accum Deprec 2,112      
256 Brownwood, TX | SNF        
Initial Cost to Company        
Land 164      
Buildings and Improvements 6,336      
Gross Amount at Which Carried As of Year End        
Land 164      
Buildings and Improvements 6,336      
Total 6,500      
Accum Deprec 1,354      
043 Carroll, IA | SNF        
Initial Cost to Company        
Land 47      
Buildings and Improvements 1,033      
Costs Capitalized Subsequent to acquisition 213      
Gross Amount at Which Carried As of Year End        
Land 47      
Buildings and Improvements 1,246      
Total 1,293      
Accum Deprec 867      
177 Chesapeake, VA | SNF        
Initial Cost to Company        
Land 388      
Buildings and Improvements 3,469      
Costs Capitalized Subsequent to acquisition 2,777      
Gross Amount at Which Carried As of Year End        
Land 388      
Buildings and Improvements 6,246      
Total 6,634      
Accum Deprec 3,395      
257 Cincinnati, OH | SNF        
Initial Cost to Company        
Land 1,890      
Buildings and Improvements 25,110      
Gross Amount at Which Carried As of Year End        
Land 1,890      
Buildings and Improvements 25,110      
Total 27,000      
Accum Deprec 3,694      
125 Clovis, NM | SNF        
Initial Cost to Company        
Land 561      
Buildings and Improvements 5,539      
Costs Capitalized Subsequent to acquisition 307      
Gross Amount at Which Carried As of Year End        
Land 561      
Buildings and Improvements 5,846      
Total 6,407      
Accum Deprec 2,588      
129 Clovis, NM | SNF        
Initial Cost to Company        
Land 598      
Buildings and Improvements 5,902      
Costs Capitalized Subsequent to acquisition 59      
Gross Amount at Which Carried As of Year End        
Land 598      
Buildings and Improvements 5,961      
Total 6,559      
Accum Deprec 2,662      
268 Coldspring, KY | SNF        
Initial Cost to Company        
Land 2,050      
Buildings and Improvements 21,496      
Gross Amount at Which Carried As of Year End        
Land 2,050      
Buildings and Improvements 21,496      
Total 23,546      
Accum Deprec 4,091      
253 Colton, CA | SNF        
Initial Cost to Company        
Land 2,342      
Buildings and Improvements 15,158      
Gross Amount at Which Carried As of Year End        
Land 2,342      
Buildings and Improvements 15,158      
Total 17,500      
Accum Deprec 3,082      
211 Commerce City, CO | SNF        
Initial Cost to Company        
Land 236      
Buildings and Improvements 3,217      
Costs Capitalized Subsequent to acquisition 167      
Gross Amount at Which Carried As of Year End        
Land 236      
Buildings and Improvements 3,384      
Total 3,620      
Accum Deprec 1,529      
212 Commerce City, CO | SNF        
Initial Cost to Company        
Land 161      
Buildings and Improvements 2,160      
Costs Capitalized Subsequent to acquisition 95      
Gross Amount at Which Carried As of Year End        
Land 161      
Buildings and Improvements 2,255      
Total 2,416      
Accum Deprec 999      
246 Crowley, TX | SNF        
Initial Cost to Company        
Land 2,247      
Buildings and Improvements 14,276      
Gross Amount at Which Carried As of Year End        
Land 2,247      
Buildings and Improvements 14,276      
Total 16,523      
Accum Deprec 3,841      
235 Daleville, VA | SNF        
Initial Cost to Company        
Land 279      
Buildings and Improvements 8,382      
Gross Amount at Which Carried As of Year End        
Land 279      
Buildings and Improvements 8,382      
Total 8,661      
Accum Deprec 2,421      
258 Dayton, OH | SNF        
Initial Cost to Company        
Land 373      
Buildings and Improvements 26,627      
Gross Amount at Which Carried As of Year End        
Land 373      
Buildings and Improvements 26,627      
Total 27,000      
Accum Deprec 3,945      
168 Des Moines, IA | SNF        
Initial Cost to Company        
Land 115      
Buildings and Improvements 2,096      
Costs Capitalized Subsequent to acquisition 1,433      
Gross Amount at Which Carried As of Year End        
Land 115      
Buildings and Improvements 3,529      
Total 3,644      
Accum Deprec 2,114      
196 Dresden, TN | SNF        
Initial Cost to Company        
Land 31      
Buildings and Improvements 1,529      
Costs Capitalized Subsequent to acquisition 1,073      
Gross Amount at Which Carried As of Year End        
Land 31      
Buildings and Improvements 2,602      
Total 2,633      
Accum Deprec 1,095      
298 Forth Worth, TX | SNF        
Initial Cost to Company        
Land 2,785      
Buildings and Improvements 7,546      
Gross Amount at Which Carried As of Year End        
Land 2,785      
Buildings and Improvements 7,546      
Total 10,331      
Accum Deprec 1,341      
026 Gardendale, AL | SNF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 7,550      
Costs Capitalized Subsequent to acquisition 2,084      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 9,634      
Total 9,734      
Accum Deprec 5,863      
185 Gardner, KS | SNF        
Initial Cost to Company        
Land 896      
Buildings and Improvements 4,478      
Costs Capitalized Subsequent to acquisition 4,150      
Gross Amount at Which Carried As of Year End        
Land 896      
Buildings and Improvements 8,628      
Total 9,524      
Accum Deprec 3,773      
248 Granbury, TX | SNF        
Initial Cost to Company        
Land 836      
Buildings and Improvements 6,693      
Gross Amount at Which Carried As of Year End        
Land 836      
Buildings and Improvements 6,693      
Total 7,529      
Accum Deprec 2,473      
044 Granger, IA | SNF        
Initial Cost to Company        
Land 62      
Buildings and Improvements 1,356      
Costs Capitalized Subsequent to acquisition 221      
Gross Amount at Which Carried As of Year End        
Land 62      
Buildings and Improvements 1,577      
Total 1,639      
Accum Deprec 1,072      
205 Grapevine, TX | SNF        
Initial Cost to Company        
Land 431      
Buildings and Improvements 1,449      
Costs Capitalized Subsequent to acquisition 188      
Gross Amount at Which Carried As of Year End        
Land 431      
Buildings and Improvements 1,637      
Total 2,068      
Accum Deprec 912      
172 Griffin, GA | SNF        
Initial Cost to Company        
Land 500      
Buildings and Improvements 2,900      
Gross Amount at Which Carried As of Year End        
Land 500      
Buildings and Improvements 2,900      
Total 3,400      
Accum Deprec 1,711      
250 Hewitt, TX | SNF        
Initial Cost to Company        
Land 1,780      
Buildings and Improvements 8,220      
Costs Capitalized Subsequent to acquisition 99      
Gross Amount at Which Carried As of Year End        
Land 1,780      
Buildings and Improvements 8,319      
Total 10,099      
Accum Deprec 1,815      
194 Holyoke, CO | SNF        
Initial Cost to Company        
Land 211      
Buildings and Improvements 1,513      
Costs Capitalized Subsequent to acquisition 283      
Gross Amount at Which Carried As of Year End        
Land 211      
Buildings and Improvements 1,796      
Total 2,007      
Accum Deprec 1,085      
051 Houston, TX | SNF        
Initial Cost to Company        
Land 365      
Buildings and Improvements 3,769      
Costs Capitalized Subsequent to acquisition 1,598      
Gross Amount at Which Carried As of Year End        
Land 365      
Buildings and Improvements 5,367      
Total 5,732      
Accum Deprec 3,508      
054 Houston, TX | SNF        
Initial Cost to Company        
Land 202      
Buildings and Improvements 4,458      
Costs Capitalized Subsequent to acquisition 1,426      
Gross Amount at Which Carried As of Year End        
Land 202      
Buildings and Improvements 5,884      
Total 6,086      
Accum Deprec 3,996      
055 Houston, TX | SNF        
Initial Cost to Company        
Land 202      
Buildings and Improvements 4,458      
Costs Capitalized Subsequent to acquisition 1,359      
Gross Amount at Which Carried As of Year End        
Land 202      
Buildings and Improvements 5,817      
Total 6,019      
Accum Deprec 3,880      
045 Jefferson, IA | SNF        
Initial Cost to Company        
Land 86      
Buildings and Improvements 1,883      
Costs Capitalized Subsequent to acquisition 296      
Gross Amount at Which Carried As of Year End        
Land 86      
Buildings and Improvements 2,179      
Total 2,265      
Accum Deprec 1,464      
008 Lecanto, FL | SNF        
Initial Cost to Company        
Land 351      
Buildings and Improvements 2,665      
Costs Capitalized Subsequent to acquisition 2,737      
Gross Amount at Which Carried As of Year End        
Land 351      
Buildings and Improvements 5,402      
Total 5,753      
Accum Deprec 3,735      
300 Mansfield, TX | SNF        
Initial Cost to Company        
Land 2,890      
Buildings and Improvements 13,110      
Gross Amount at Which Carried As of Year End        
Land 2,890      
Buildings and Improvements 13,110      
Total 16,000      
Accum Deprec 1,424      
053 Mesa, AZ | SNF        
Initial Cost to Company        
Land 305      
Buildings and Improvements 6,909      
Costs Capitalized Subsequent to acquisition 1,876      
Gross Amount at Which Carried As of Year End        
Land 305      
Buildings and Improvements 8,785      
Total 9,090      
Accum Deprec 5,632      
226 Mesa, AZ | SNF        
Initial Cost to Company        
Land 1,095      
Buildings and Improvements 2,330      
Costs Capitalized Subsequent to acquisition 4,673      
Gross Amount at Which Carried As of Year End        
Land 1,095      
Buildings and Improvements 7,003      
Total 8,098      
Accum Deprec 1,407      
242 Mission, TX | SNF        
Initial Cost to Company        
Land 1,111      
Buildings and Improvements 16,602      
Gross Amount at Which Carried As of Year End        
Land 1,111      
Buildings and Improvements 16,602      
Total 17,713      
Accum Deprec 4,014      
115 Nacogdoches, TX | SNF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,738      
Costs Capitalized Subsequent to acquisition 168      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,906      
Total 2,006      
Accum Deprec 1,164      
233 Nacogdoches, TX | SNF        
Initial Cost to Company        
Land 394      
Buildings and Improvements 7,456      
Costs Capitalized Subsequent to acquisition 268      
Gross Amount at Which Carried As of Year End        
Land 394      
Buildings and Improvements 7,724      
Total 8,118      
Accum Deprec 2,077      
249 Nacogdoches, TX | SNF        
Initial Cost to Company        
Land 1,015      
Buildings and Improvements 11,109      
Gross Amount at Which Carried As of Year End        
Land 1,015      
Buildings and Improvements 11,109      
Total 12,124      
Accum Deprec 3,451      
245 Newberry, SC | SNF        
Initial Cost to Company        
Land 439      
Buildings and Improvements 4,639      
Costs Capitalized Subsequent to acquisition 608      
Gross Amount at Which Carried As of Year End        
Land 439      
Buildings and Improvements 5,247      
Total 5,686      
Accum Deprec 1,744      
244 Newberry, SC | SNF        
Initial Cost to Company        
Land 919      
Buildings and Improvements 5,454      
Costs Capitalized Subsequent to acquisition 131      
Gross Amount at Which Carried As of Year End        
Land 919      
Buildings and Improvements 5,585      
Total 6,504      
Accum Deprec 1,634      
046 Norwalk, IA | SNF        
Initial Cost to Company        
Land 47      
Buildings and Improvements 1,033      
Costs Capitalized Subsequent to acquisition 239      
Gross Amount at Which Carried As of Year End        
Land 47      
Buildings and Improvements 1,272      
Total 1,319      
Accum Deprec 895      
176 Olathe, KS | SNF        
Initial Cost to Company        
Land 520      
Buildings and Improvements 1,872      
Costs Capitalized Subsequent to acquisition 313      
Gross Amount at Which Carried As of Year End        
Land 520      
Buildings and Improvements 2,185      
Total 2,705      
Accum Deprec 1,393      
251 Pasadena, TX | SNF        
Initial Cost to Company        
Land 1,155      
Buildings and Improvements 14,345      
Costs Capitalized Subsequent to acquisition 522      
Gross Amount at Which Carried As of Year End        
Land 1,155      
Buildings and Improvements 14,867      
Total 16,022      
Accum Deprec 3,012      
210 Phoenix, AZ | SNF        
Initial Cost to Company        
Land 334      
Buildings and Improvements 3,383      
Costs Capitalized Subsequent to acquisition 456      
Gross Amount at Which Carried As of Year End        
Land 334      
Buildings and Improvements 3,839      
Total 4,173      
Accum Deprec 1,844      
193 Phoenix, AZ | SNF        
Initial Cost to Company        
Land 300      
Buildings and Improvements 9,703      
Costs Capitalized Subsequent to acquisition 92      
Gross Amount at Which Carried As of Year End        
Land 300      
Buildings and Improvements 9,795      
Total 10,095      
Accum Deprec 5,601      
047 Polk City, IA | SNF        
Initial Cost to Company        
Land 63      
Buildings and Improvements 1,376      
Costs Capitalized Subsequent to acquisition 153      
Gross Amount at Which Carried As of Year End        
Land 63      
Buildings and Improvements 1,529      
Total 1,592      
Accum Deprec 1,046      
094 Portland, OR | SNF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,925      
Costs Capitalized Subsequent to acquisition 3,152      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 5,077      
Total 5,177      
Accum Deprec 3,166      
254 Red Oak, TX | SNF        
Initial Cost to Company        
Land 1,427      
Buildings and Improvements 17,173      
Gross Amount at Which Carried As of Year End        
Land 1,427      
Buildings and Improvements 17,173      
Total 18,600      
Accum Deprec 3,479      
124 Richland Hills, TX | SNF        
Initial Cost to Company        
Land 144      
Buildings and Improvements 1,656      
Costs Capitalized Subsequent to acquisition 427      
Gross Amount at Which Carried As of Year End        
Land 144      
Buildings and Improvements 2,083      
Total 2,227      
Accum Deprec 1,155      
197 Ripley, TN | SNF        
Initial Cost to Company        
Land 20      
Buildings and Improvements 985      
Costs Capitalized Subsequent to acquisition 1,638      
Gross Amount at Which Carried As of Year End        
Land 20      
Buildings and Improvements 2,623      
Total 2,643      
Accum Deprec 1,101      
133 Roswell, NM | SNF        
Initial Cost to Company        
Land 568      
Buildings and Improvements 5,235      
Costs Capitalized Subsequent to acquisition 1,396      
Gross Amount at Which Carried As of Year End        
Land 568      
Buildings and Improvements 6,631      
Total 7,199      
Accum Deprec 2,782      
081 Sacramento, CA | SNF        
Initial Cost to Company        
Land 220      
Buildings and Improvements 2,929      
Costs Capitalized Subsequent to acquisition 1,481      
Gross Amount at Which Carried As of Year End        
Land 220      
Buildings and Improvements 4,410      
Total 4,630      
Accum Deprec 2,330      
085 Salina, KS | SNF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,153      
Costs Capitalized Subsequent to acquisition 628      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,781      
Total 1,881      
Accum Deprec 1,201      
281 Slinger, WI | SNF        
Initial Cost to Company        
Land 464      
Buildings and Improvements 13,482      
Gross Amount at Which Carried As of Year End        
Land 464      
Buildings and Improvements 13,482      
Total 13,946      
Accum Deprec 2,040      
234 St. Petersburg, FL | SNF        
Initial Cost to Company        
Land 1,070      
Buildings and Improvements 7,930      
Costs Capitalized Subsequent to acquisition 500      
Gross Amount at Which Carried As of Year End        
Land 1,070      
Buildings and Improvements 8,430      
Total 9,500      
Accum Deprec 2,084      
243 Stephenville TX | SNF        
Initial Cost to Company        
Land 670      
Buildings and Improvements 10,117      
Costs Capitalized Subsequent to acquisition 500      
Gross Amount at Which Carried As of Year End        
Land 670      
Buildings and Improvements 10,617      
Total 11,287      
Accum Deprec 2,627      
225 Tacoma, WA | SNF        
Initial Cost to Company        
Land 723      
Buildings and Improvements 6,401      
Costs Capitalized Subsequent to acquisition 901      
Gross Amount at Which Carried As of Year End        
Land 723      
Buildings and Improvements 7,302      
Total 8,025      
Accum Deprec 3,105      
178 Tappahannock, VA | SNF        
Initial Cost to Company        
Land 375      
Buildings and Improvements 1,327      
Costs Capitalized Subsequent to acquisition 397      
Gross Amount at Which Carried As of Year End        
Land 375      
Buildings and Improvements 1,724      
Total 2,099      
Accum Deprec 1,487      
270 Trinity, FL | SNF        
Initial Cost to Company        
Land 1,653      
Buildings and Improvements 12,748      
Gross Amount at Which Carried As of Year End        
Land 1,653      
Buildings and Improvements 12,748      
Total 14,401      
Accum Deprec 2,131      
192 Tucson, AZ | SNF        
Initial Cost to Company        
Land 276      
Buildings and Improvements 8,924      
Costs Capitalized Subsequent to acquisition 112      
Gross Amount at Which Carried As of Year End        
Land 276      
Buildings and Improvements 9,036      
Total 9,312      
Accum Deprec 5,162      
299 Weatherford, TX | SNF        
Initial Cost to Company        
Land 836      
Buildings and Improvements 11,902      
Gross Amount at Which Carried As of Year End        
Land 836      
Buildings and Improvements 11,902      
Total 12,738      
Accum Deprec 1,726      
236 Wytheville, VA | SNF        
Initial Cost to Company        
Land 647      
Buildings and Improvements 12,167      
Gross Amount at Which Carried As of Year End        
Land 647      
Buildings and Improvements 12,167      
Total 12,814      
Accum Deprec 4,370      
077 Ada, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,650      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,650      
Total 1,750      
Accum Deprec 926      
105 Arvada, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,810      
Costs Capitalized Subsequent to acquisition 6,960      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 9,770      
Total 9,870      
Accum Deprec 2,955      
304 Athens, GA | ALF        
Initial Cost to Company        
Land 1,056      
Buildings and Improvements 13,326      
Gross Amount at Which Carried As of Year End        
Land 1,056      
Buildings and Improvements 13,326      
Total 14,382      
Accum Deprec 948      
063 Athens, TX | ALF        
Initial Cost to Company        
Land 96      
Buildings and Improvements 1,510      
Costs Capitalized Subsequent to acquisition 104      
Gross Amount at Which Carried As of Year End        
Land 96      
Buildings and Improvements 1,614      
Total 1,710      
Accum Deprec 929      
269 Aurora, CO | ALF        
Initial Cost to Company        
Land 850      
Buildings and Improvements 8,583      
Gross Amount at Which Carried As of Year End        
Land 850      
Buildings and Improvements 8,583      
Total 9,433      
Accum Deprec 1,548      
260 Aurora, CO | ALF        
Initial Cost to Company        
Land 831      
Buildings and Improvements 10,071      
Gross Amount at Which Carried As of Year End        
Land 831      
Buildings and Improvements 10,071      
Total 10,902      
Accum Deprec 1,819      
203 Bakersfield, CA | ALF        
Initial Cost to Company        
Land 834      
Buildings and Improvements 11,986      
Costs Capitalized Subsequent to acquisition 812      
Gross Amount at Which Carried As of Year End        
Land 834      
Buildings and Improvements 12,798      
Total 13,632      
Accum Deprec 6,115      
117 Beatrice, NE | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,173      
Costs Capitalized Subsequent to acquisition 183      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,356      
Total 2,456      
Accum Deprec 1,211      
277 Burr Ridge, IL | ALF        
Initial Cost to Company        
Land 1,400      
Buildings and Improvements 11,102      
Gross Amount at Which Carried As of Year End        
Land 1,400      
Buildings and Improvements 11,102      
Total 12,502      
Accum Deprec 1,229      
278 Castle Rock, CO | ALF        
Initial Cost to Company        
Land 759      
Buildings and Improvements 9,041      
Gross Amount at Which Carried As of Year End        
Land 759      
Buildings and Improvements 9,041      
Total 9,800      
Accum Deprec 823      
160 Central, SC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,321      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,321      
Total 2,421      
Accum Deprec 1,050      
263 Chatham, NJ | ALF        
Initial Cost to Company        
Land 5,365      
Buildings and Improvements 36,399      
Gross Amount at Which Carried As of Year End        
Land 5,365      
Buildings and Improvements 36,399      
Total 41,764      
Accum Deprec 6,297      
307 Clovis, CA | ALF        
Initial Cost to Company        
Land 2,542      
Buildings and Improvements 19,126      
Gross Amount at Which Carried As of Year End        
Land 2,542      
Buildings and Improvements 19,126      
Total 21,668      
Accum Deprec 824      
308 Clovis, CA | ALF        
Initial Cost to Company        
Land 3,054      
Buildings and Improvements 14,172      
Gross Amount at Which Carried As of Year End        
Land 3,054      
Buildings and Improvements 14,172      
Total 17,226      
Accum Deprec 587      
279 Corpus Christi, TX | ALF        
Initial Cost to Company        
Land 880      
Buildings and Improvements 11,440      
Gross Amount at Which Carried As of Year End        
Land 880      
Buildings and Improvements 11,440      
Total 12,320      
Accum Deprec 1,166      
292 De Forest, WI | ALF        
Initial Cost to Company        
Land 485      
Buildings and Improvements 5,568      
Costs Capitalized Subsequent to acquisition 8      
Gross Amount at Which Carried As of Year End        
Land 485      
Buildings and Improvements 5,576      
Total 6,061      
Accum Deprec 594      
057 Dodge City, KS | ALF        
Initial Cost to Company        
Land 84      
Buildings and Improvements 1,666      
Costs Capitalized Subsequent to acquisition 4      
Gross Amount at Which Carried As of Year End        
Land 84      
Buildings and Improvements 1,670      
Total 1,754      
Accum Deprec 994      
083 Durant, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,769      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,769      
Total 1,869      
Accum Deprec 977      
107 Edmond, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,365      
Costs Capitalized Subsequent to acquisition 526      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,891      
Total 1,991      
Accum Deprec 1,024      
163 Ft. Collins, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,961      
Costs Capitalized Subsequent to acquisition 3,405      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 6,366      
Total 6,466      
Accum Deprec 2,258      
170 Ft. Collins, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 3,400      
Costs Capitalized Subsequent to acquisition 4,622      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 8,022      
Total 8,122      
Accum Deprec 2,510      
132 Ft. Meyers, FL | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,728      
Costs Capitalized Subsequent to acquisition 9      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,737      
Total 2,837      
Accum Deprec 1,440      
229 Ft. Worth, TX | ALF        
Initial Cost to Company        
Land 333      
Buildings and Improvements 4,385      
Costs Capitalized Subsequent to acquisition 1,028      
Gross Amount at Which Carried As of Year End        
Land 333      
Buildings and Improvements 5,413      
Total 5,746      
Accum Deprec 1,916      
315 Ft. Worth, TX | ALF        
Initial Cost to Company        
Land 1,534      
Buildings and Improvements 11,099      
Gross Amount at Which Carried As of Year End        
Land 1,534      
Buildings and Improvements 11,099      
Total 12,633      
Accum Deprec 158      
100 Fremont ,OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 106      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,541      
Total 2,641      
Accum Deprec 1,363      
267 Frisco, TX | ALF        
Initial Cost to Company        
Land 1,000      
Buildings and Improvements 5,154      
Gross Amount at Which Carried As of Year End        
Land 1,000      
Buildings and Improvements 5,154      
Total 6,154      
Accum Deprec 977      
314 Frisco, TX | ALF        
Initial Cost to Company        
Land 2,216      
Buildings and Improvements 10,417      
Gross Amount at Which Carried As of Year End        
Land 2,216      
Buildings and Improvements 10,417      
Total 12,633      
Accum Deprec 152      
296 Glenview, IL | ALF        
Initial Cost to Company        
Land 2,800      
Buildings and Improvements 14,248      
Gross Amount at Which Carried As of Year End        
Land 2,800      
Buildings and Improvements 14,248      
Total 17,048      
Accum Deprec 568      
167 Goldsboro, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,385      
Costs Capitalized Subsequent to acquisition 1      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,386      
Total 2,486      
Accum Deprec 1,006      
056 Great Bend, KS | ALF        
Initial Cost to Company        
Land 80      
Buildings and Improvements 1,570      
Costs Capitalized Subsequent to acquisition 21      
Gross Amount at Which Carried As of Year End        
Land 80      
Buildings and Improvements 1,591      
Total 1,671      
Accum Deprec 1,052      
102 Greeley, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,310      
Costs Capitalized Subsequent to acquisition 270      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,580      
Total 2,680      
Accum Deprec 1,395      
284 Green Bay, WI | ALF        
Initial Cost to Company        
Land 1,660      
Buildings and Improvements 19,079      
Costs Capitalized Subsequent to acquisition 356      
Gross Amount at Which Carried As of Year End        
Land 1,660      
Buildings and Improvements 19,435      
Total 21,095      
Accum Deprec 2,015      
164 Greenville, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,478      
Costs Capitalized Subsequent to acquisition 2      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,480      
Total 2,580      
Accum Deprec 1,175      
062 Greenville, TX | ALF        
Initial Cost to Company        
Land 42      
Buildings and Improvements 1,565      
Costs Capitalized Subsequent to acquisition 84      
Gross Amount at Which Carried As of Year End        
Land 42      
Buildings and Improvements 1,649      
Total 1,691      
Accum Deprec 947      
161 Greenwood, SC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,638      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,638      
Total 2,738      
Accum Deprec 1,278      
241 Gulf Breeze, FL | ALF        
Initial Cost to Company        
Land 720      
Buildings and Improvements 3,780      
Costs Capitalized Subsequent to acquisition 261      
Gross Amount at Which Carried As of Year End        
Land 720      
Buildings and Improvements 4,041      
Total 4,761      
Accum Deprec 1,093      
295 Jacksonville, FL | ALF        
Initial Cost to Company        
Land 1,389      
Buildings and Improvements 12,756      
Costs Capitalized Subsequent to acquisition 39      
Gross Amount at Which Carried As of Year End        
Land 1,389      
Buildings and Improvements 12,795      
Total 14,184      
Accum Deprec 1,098      
066 Jacksonville, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,900      
Costs Capitalized Subsequent to acquisition 77      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,977      
Total 2,077      
Accum Deprec 1,137      
310 Kansas City, MO | ALF        
Initial Cost to Company        
Land 1,072      
Buildings and Improvements 15,552      
Gross Amount at Which Carried As of Year End        
Land 1,072      
Buildings and Improvements 15,552      
Total 16,624      
Accum Deprec 448      
285 Kenosha, WI | ALF        
Initial Cost to Company        
Land 936      
Buildings and Improvements 12,361      
Costs Capitalized Subsequent to acquisition 165      
Gross Amount at Which Carried As of Year End        
Land 936      
Buildings and Improvements 12,526      
Total 13,462      
Accum Deprec 1,155      
255 Littleton, CO | ALF        
Initial Cost to Company        
Land 1,882      
Buildings and Improvements 8,248      
Gross Amount at Which Carried As of Year End        
Land 1,882      
Buildings and Improvements 8,248      
Total 10,130      
Accum Deprec 1,548      
268 Littleton, CO | ALF        
Initial Cost to Company        
Land 1,200      
Buildings and Improvements 8,688      
Gross Amount at Which Carried As of Year End        
Land 1,200      
Buildings and Improvements 8,688      
Total 9,888      
Accum Deprec 1,690      
148 Longmont, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,640      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,640      
Total 2,740      
Accum Deprec 1,378      
060 Longview, TX | ALF        
Initial Cost to Company        
Land 38      
Buildings and Improvements 1,568      
Costs Capitalized Subsequent to acquisition 127      
Gross Amount at Which Carried As of Year End        
Land 38      
Buildings and Improvements 1,695      
Total 1,733      
Accum Deprec 978      
261 Louisville, CO | ALF        
Initial Cost to Company        
Land 911      
Buildings and Improvements 11,703      
Gross Amount at Which Carried As of Year End        
Land 911      
Buildings and Improvements 11,703      
Total 12,614      
Accum Deprec 2,069      
301 Louisville, KY | ALF        
Initial Cost to Company        
Land 1,021      
Buildings and Improvements 13,157      
Gross Amount at Which Carried As of Year End        
Land 1,021      
Buildings and Improvements 13,157      
Total 14,178      
Accum Deprec 937      
114 Loveland, CO | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,865      
Costs Capitalized Subsequent to acquisition 270      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 3,135      
Total 3,235      
Accum Deprec 1,681      
068 Lufkin, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,950      
Costs Capitalized Subsequent to acquisition 94      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,044      
Total 2,144      
Accum Deprec 1,167      
061 Marshall, TX | ALF        
Initial Cost to Company        
Land 38      
Buildings and Improvements 1,568      
Costs Capitalized Subsequent to acquisition 534      
Gross Amount at Which Carried As of Year End        
Land 38      
Buildings and Improvements 2,102      
Total 2,140      
Accum Deprec 1,235      
293 McHenry, IL | ALF        
Initial Cost to Company        
Land 1,289      
Buildings and Improvements 28,976      
Costs Capitalized Subsequent to acquisition 123      
Gross Amount at Which Carried As of Year End        
Land 1,289      
Buildings and Improvements 29,099      
Total 30,388      
Accum Deprec 2,978      
058 McPherson, KS | ALF        
Initial Cost to Company        
Land 79      
Buildings and Improvements 1,571      
Costs Capitalized Subsequent to acquisition 4      
Gross Amount at Which Carried As of Year End        
Land 79      
Buildings and Improvements 1,575      
Total 1,654      
Accum Deprec 1,041      
316 Medford, OR | ALF        
Initial Cost to Company        
Land 750      
Buildings and Improvements 13,650      
Gross Amount at Which Carried As of Year End        
Land 750      
Buildings and Improvements 13,650      
Total 14,400      
Accum Deprec 144      
239 Merritt Island, FL | ALF        
Initial Cost to Company        
Land 550      
Buildings and Improvements 8,150      
Costs Capitalized Subsequent to acquisition 100      
Gross Amount at Which Carried As of Year End        
Land 550      
Buildings and Improvements 8,250      
Total 8,800      
Accum Deprec 2,107      
104 Millville, NJ | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,825      
Costs Capitalized Subsequent to acquisition 708      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 3,533      
Total 3,633      
Accum Deprec 1,631      
286 Milwaukee, WI | ALF        
Initial Cost to Company        
Land 818      
Buildings and Improvements 8,014      
Costs Capitalized Subsequent to acquisition 56      
Gross Amount at Which Carried As of Year End        
Land 818      
Buildings and Improvements 8,070      
Total 8,888      
Accum Deprec 861      
231 Monroeville, PA | ALF        
Initial Cost to Company        
Land 526      
Buildings and Improvements 5,334      
Costs Capitalized Subsequent to acquisition 435      
Gross Amount at Which Carried As of Year End        
Land 526      
Buildings and Improvements 5,769      
Total 6,295      
Accum Deprec 1,714      
280 Merrells Inlet, SC | ALF        
Initial Cost to Company        
Land 2,490      
Buildings and Improvements 14,185      
Gross Amount at Which Carried As of Year End        
Land 2,490      
Buildings and Improvements 14,185      
Total 16,675      
Accum Deprec 1,207      
294 Murrieta, CA | ALF        
Initial Cost to Company        
Land 2,022      
Buildings and Improvements 11,136      
Gross Amount at Which Carried As of Year End        
Land 2,022      
Buildings and Improvements 11,136      
Total 13,158      
Accum Deprec 993      
289 Neenah, WI | ALF        
Initial Cost to Company        
Land 694      
Buildings and Improvements 20,839      
Costs Capitalized Subsequent to acquisition 212      
Gross Amount at Which Carried As of Year End        
Land 694      
Buildings and Improvements 21,051      
Total 21,745      
Accum Deprec 2,028      
166 New Bern, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,427      
Costs Capitalized Subsequent to acquisition 1      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,428      
Total 2,528      
Accum Deprec 1,044      
118 Newark, OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 275      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,710      
Total 2,810      
Accum Deprec 1,351      
143 Niceville, FL | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,680      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,680      
Total 2,780      
Accum Deprec 1,399      
095 Norfolk, NE | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,123      
Costs Capitalized Subsequent to acquisition 165      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,288      
Total 2,388      
Accum Deprec 1,191      
290 Oshkosh, WI | ALF        
Initial Cost to Company        
Land 1,525      
Buildings and Improvements 9,192      
Costs Capitalized Subsequent to acquisition 108      
Gross Amount at Which Carried As of Year End        
Land 1,525      
Buildings and Improvements 9,300      
Total 10,825      
Accum Deprec 1,930      
291 Oshkosh, WI | ALF        
Initial Cost to Company        
Land 475      
Buildings and Improvements 7,364      
Costs Capitalized Subsequent to acquisition 40      
Gross Amount at Which Carried As of Year End        
Land 475      
Buildings and Improvements 7,404      
Total 7,879      
Accum Deprec 776      
302 Overland Park, KS | ALF        
Initial Cost to Company        
Land 1,951      
Buildings and Improvements 11,882      
Costs Capitalized Subsequent to acquisition 259      
Gross Amount at Which Carried As of Year End        
Land 1,951      
Buildings and Improvements 12,141      
Total 14,092      
Accum Deprec 958      
232 Pittsburgh, PA | ALF        
Initial Cost to Company        
Land 470      
Buildings and Improvements 2,615      
Costs Capitalized Subsequent to acquisition 333      
Gross Amount at Which Carried As of Year End        
Land 470      
Buildings and Improvements 2,948      
Total 3,418      
Accum Deprec 972      
165 Rocky Mount, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,494      
Costs Capitalized Subsequent to acquisition 1      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,495      
Total 2,595      
Accum Deprec 1,103      
059 Salina, KS | ALF        
Initial Cost to Company        
Land 79      
Buildings and Improvements 1,571      
Costs Capitalized Subsequent to acquisition 4      
Gross Amount at Which Carried As of Year End        
Land 79      
Buildings and Improvements 1,575      
Total 1,654      
Accum Deprec 1,041      
084 San Antonio, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,900      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,900      
Total 2,000      
Accum Deprec 1,048      
092 San Antonio, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,055      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,055      
Total 2,155      
Accum Deprec 1,128      
288 Sheboygan, WI | ALF        
Initial Cost to Company        
Land 1,168      
Buildings and Improvements 5,382      
Costs Capitalized Subsequent to acquisition 180      
Gross Amount at Which Carried As of Year End        
Land 1,168      
Buildings and Improvements 5,562      
Total 6,730      
Accum Deprec 660      
149 Shelby, NC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,805      
Costs Capitalized Subsequent to acquisition 2      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,807      
Total 2,907      
Accum Deprec 1,464      
312 Spartanburg, SC | ALF        
Initial Cost to Company        
Land 254      
Buildings and Improvements 9,906      
Costs Capitalized Subsequent to acquisition 1,035      
Gross Amount at Which Carried As of Year End        
Land 254      
Buildings and Improvements 10,941      
Total 11,195      
Accum Deprec 407      
150 Spring Hill, FL | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,650      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,650      
Total 2,750      
Accum Deprec 1,383      
103 Springfield, OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,035      
Costs Capitalized Subsequent to acquisition 270      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,305      
Total 2,405      
Accum Deprec 1,244      
162 Sumter, SC | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,351      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,351      
Total 2,451      
Accum Deprec 1,091      
140 Tallahassee, FL | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 3,075      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 3,075      
Total 3,175      
Accum Deprec 1,608      
098 Tiffin, OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 94      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,529      
Total 2,629      
Accum Deprec 1,346      
282 Tinley Park, IL | ALF        
Initial Cost to Company        
Land 702      
Buildings and Improvements 11,481      
Gross Amount at Which Carried As of Year End        
Land 702      
Buildings and Improvements 11,481      
Total 12,183      
Accum Deprec 1,076      
088 Troy, OH | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 593      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 3,028      
Total 3,128      
Accum Deprec 1,548      
080 Tulsa, OK | ALF        
Initial Cost to Company        
Land 200      
Buildings and Improvements 1,650      
Gross Amount at Which Carried As of Year End        
Land 200      
Buildings and Improvements 1,650      
Total 1,850      
Accum Deprec 919      
093 Tulsa, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,395      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,395      
Total 2,495      
Accum Deprec 1,311      
238 Tupelo, MS | ALF        
Initial Cost to Company        
Land 1,170      
Buildings and Improvements 8,230      
Costs Capitalized Subsequent to acquisition 30      
Gross Amount at Which Carried As of Year End        
Land 1,170      
Buildings and Improvements 8,260      
Total 9,430      
Accum Deprec 2,203      
075 Tyler, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,800      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,800      
Total 1,900      
Accum Deprec 1,008      
202 Vacaville, CA | ALF        
Initial Cost to Company        
Land 1,662      
Buildings and Improvements 11,634      
Costs Capitalized Subsequent to acquisition 1,141      
Gross Amount at Which Carried As of Year End        
Land 1,662      
Buildings and Improvements 12,775      
Total 14,437      
Accum Deprec 6,098      
091 Waco, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,235      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,235      
Total 2,335      
Accum Deprec 1,225      
096 Wahoo, NE | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,318      
Costs Capitalized Subsequent to acquisition 119      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,437      
Total 2,537      
Accum Deprec 1,293      
108 Watauga, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,668      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,668      
Total 1,768      
Accum Deprec 908      
287 Waukesha, WI | ALF        
Initial Cost to Company        
Land 992      
Buildings and Improvements 15,183      
Costs Capitalized Subsequent to acquisition 187      
Gross Amount at Which Carried As of Year End        
Land 992      
Buildings and Improvements 15,370      
Total 16,362      
Accum Deprec 1,435      
109 Weatherford, OK | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,669      
Costs Capitalized Subsequent to acquisition 592      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,261      
Total 2,361      
Accum Deprec 1,222      
309 West Chester, OH | ALF        
Initial Cost to Company        
Land 2,355      
Buildings and Improvements 13,553      
Gross Amount at Which Carried As of Year End        
Land 2,355      
Buildings and Improvements 13,553      
Total 15,908      
Accum Deprec 587      
276 Westminster, CO | ALF        
Initial Cost to Company        
Land 1,425      
Buildings and Improvements 9,575      
Gross Amount at Which Carried As of Year End        
Land 1,425      
Buildings and Improvements 9,575      
Total 11,000      
Accum Deprec 1,480      
110 Wheelersburg, OH | ALF        
Initial Cost to Company        
Land 29      
Buildings and Improvements 2,435      
Costs Capitalized Subsequent to acquisition 239      
Gross Amount at Which Carried As of Year End        
Land 29      
Buildings and Improvements 2,674      
Total 2,703      
Accum Deprec 1,344      
303 Wichita, KS | ALF        
Initial Cost to Company        
Land 1,422      
Buildings and Improvements 9,957      
Costs Capitalized Subsequent to acquisition 221      
Gross Amount at Which Carried As of Year End        
Land 1,422      
Buildings and Improvements 10,178      
Total 11,600      
Accum Deprec 828      
259 Wichita, KS | ALF        
Initial Cost to Company        
Land 730      
Costs Capitalized Subsequent to acquisition 9,682      
Gross Amount at Which Carried As of Year End        
Land 730      
Buildings and Improvements 9,682      
Total 10,412      
Accum Deprec 2,057      
283 Wichita, KS | ALF        
Initial Cost to Company        
Land 624      
Buildings and Improvements 13,846      
Gross Amount at Which Carried As of Year End        
Land 624      
Buildings and Improvements 13,846      
Total 14,470      
Accum Deprec 837      
076 Wichita Falls, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 1,850      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 1,850      
Total 1,950      
Accum Deprec 1,036      
120 Wichita Falls, TX | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,750      
Costs Capitalized Subsequent to acquisition 131      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,881      
Total 2,981      
Accum Deprec 1,526      
265 Williamstown, NJ | ALF        
Initial Cost to Company        
Land 711      
Buildings and Improvements 6,637      
Gross Amount at Which Carried As of Year End        
Land 711      
Buildings and Improvements 6,637      
Total 7,348      
Accum Deprec 1,287      
264 Williamstown, NJ | ALF        
Initial Cost to Company        
Land 711      
Buildings and Improvements 8,649      
Gross Amount at Which Carried As of Year End        
Land 711      
Buildings and Improvements 8,649      
Total 9,360      
Accum Deprec 1,516      
099 York, NE | ALF        
Initial Cost to Company        
Land 100      
Buildings and Improvements 2,318      
Costs Capitalized Subsequent to acquisition 78      
Gross Amount at Which Carried As of Year End        
Land 100      
Buildings and Improvements 2,396      
Total 2,496      
Accum Deprec 1,289      
297 Las Vegas, NV | School        
Initial Cost to Company        
Land 1,965      
Buildings and Improvements 7,308      
Costs Capitalized Subsequent to acquisition 849      
Gross Amount at Which Carried As of Year End        
Land 1,965      
Buildings and Improvements 8,157      
Total 10,122      
Accum Deprec 677      
271 Howell, MI | Land        
Initial Cost to Company        
Land 420      
Gross Amount at Which Carried As of Year End        
Land 420      
Total 420      
272 Milford, MI        
Initial Cost to Company        
Land 450      
Gross Amount at Which Carried As of Year End        
Land 450      
Total 450      
275 Yale, MI | Land        
Initial Cost to Company        
Land 73      
Gross Amount at Which Carried As of Year End        
Land 73      
Total 73      
305 Union, KY | Properties under Development        
Initial Cost to Company        
Land 858      
Buildings and Improvements 19,057      
Gross Amount at Which Carried As of Year End        
Land 858      
Buildings and Improvements 19,057      
Total 19,915      
311 Cedarburg, WI | Properties under Development        
Initial Cost to Company        
Land 924      
Buildings and Improvements 15,741      
Gross Amount at Which Carried As of Year End        
Land 924      
Buildings and Improvements 15,741      
Total 16,665      
306 Oaklawn, IL | ALF        
Initial Cost to Company        
Land 1,591      
Buildings and Improvements 13,772      
Gross Amount at Which Carried As of Year End        
Land 1,591      
Buildings and Improvements 13,772      
Total 15,363      
Accum Deprec 281      
313 Medford, OR | Properties under Development        
Initial Cost to Company        
Land 636      
Buildings and Improvements 3,970      
Gross Amount at Which Carried As of Year End        
Land 636      
Buildings and Improvements 3,970      
Total $ 4,606