EX-10.2 11 dex102.htm PLANT FACILITY SERVICE AGREEMENT DATED JULY 20, 2004 Plant Facility Service Agreement dated July 20, 2004

Exhibit 10.2

 

Plant Facility Service Agreement

[Translation]

 

This Agreement is made by and between Chi Mei Optoelectronics Corp. (hereinafter “Party A”) and Himax Display, Inc. (hereinafter “Party B”) on July 20, 2004. The parties agree to the following terms and conditions with respect to the use by Party B of a plant facility located in Tainan Science and Industrial Park and owned by Party A and the services to be provided by Party A to Party B.

 

Article 1

  Location of the Premises
    Party A agrees to provide a certain area of a plant facility located at 12 Nanke 8th Road, Tainan Science and Industrial Park, for Party B to research, develop, design, experiment, and establish a clean room for the production of Liquid Crystal on Silicon (L-COS).

Article 2

  Administrative Management

2.1

 

Personnel of Party B shall obey and act in compliance with all the administrative, management and operational regulations and processing directives of the plant.

2.2

 

Party B shall pay a management fee of NT$1,110,000 (tax excluded) to Party A, as prescribed in Appendix I.

2.3

 

Party B shall buy all necessary insurances, liability insurances, or arrange necessary risk management measures for the benefit of the properties located and personnel worked in the premises.

2.4

 

Party B represents and warrants that business operations and production activities engaged within the premises will not disturb Party A as a result of an argument and/or dispute between a third person and Party B or its personnel. In the event where Party A, its representative, or personnel suffers, including but not limited to mental, physical, reputation, property, and goodwill losses, Party B shall be liable for the damages. If the damage is substantial, Party is entitled to terminate this Agreement immediately.

 

1


2.5

 

With respect to payments of management fee, the following, without limitation, shall be taken into account:

   

1. cost of land used;

   

2. cost of plant construction;

   

3. cost of monthly water and electricity supply; and

   

4. cost of special gas and high-pressure electricity.

2.6

 

The management fee mentioned above may be adjusted reasonably and fairly upon the agreement of the parties based on the actual usage and costs of the premises.

2.7

 

When Party B moves to another office, it shall compensate Party A for the expenses in connection with remaining interior design, physical facilities and damages.

Article 3

  Clean Room

3.1

 

To facilitate Party B’s L-COS production within the premises, Party A agrees to establish one L-COS Clean Room (hereinafter, the “CR”) for Party B, while the equipment for production shall be provided by Party B.

3.2

 

Construction fees: The total costs of the CR to be established by Party A for Party B shall be NT$42,479,891 (taxes excluded, as prescribed in Appendix II). Party B shall pay the total amount to Party A in a lump-sum payment, and Party A shall issue the invoice in December 2003 to Party B for such payment.

3.3

 

Additional costs: Party B shall pay all the additional costs incurred thereafter in connection with the construction of CR and other additional construction. Party A will not pay such costs for Party B for reimbursement by Party B.

 

2


3.4

 

Ownership: Financed and established by Party A, the ownership of CR shall belong to Party A; however; a right of first refusal to purchase the CR may be granted to Party B upon the negotiation and agreement with Party A at the expiration of this Agreement.

3.5

 

Area to be used by Party B: Party A agrees to provide an area prescribed in Appendix III for Party B.

Article 4

  Supply and Management of Energy

4.1

 

Party A shall provide power and energy for Party B’s LCOS production. Party B shall collaborate with Party A, providing Party A necessary assistance (such as planning on water and power usage), so that Party A may provide Party B all the necessary power and utility.

4.2

 

Party B shall, depending on the actual volume of its usage, pay Party A every month a fee of energy supply and management. Computation of such fee is prescribed in Appendix IV.

Article 5

  Work Safety

5.1

 

Hazard Prevention Center and emergency response: Party B shall share the costs of supporting the Hazard Prevent Center in accordance with the area of its lease, which is prescribed in Appendix V. Party B shall establish an emergency response team, which shall collaborate with Party A in emergencies in accordance with the emergency response procedures of Party A.

5.2

 

Fire control examination: Party B shall conduct maintenance and repair of fire control facilities within the premises, and share the costs prescribed in Appendix V.

5.3

 

Public safety and hygiene management: Party B shall be responsible for providing safety and hygiene within the premises in accordance with the applicable laws and regulations, conduct public safety examinations in collaboration with Party A, and share relevant costs in proportion to the area it used.

   

 

3


5.4

  

Management of Party B’s contractors: Party B and its contractors shall comply with the contractors’ management rules promulgated by the Party A, as prescribed in Appendix VI.

5.5

  

Waste disposal: Party B shall, in accordance with applicable laws and regulations, dispose wastes generated in the course of producing LCOS.

5.6

  

Party B shall not store any illicit or illegal goods at Party A’s plant.

Article 6

   Changes of Fees

6.1

  

In the event where Party B increases its staff or expands its area usage, it shall pay Party A additional fees regarding the extra area, water and power supply.

6.2

  

In the event where extra fees are incurred due to Party B’s requirement regarding equipment (such as telephones) or its maintenance, such amounts shall become payable in the first month of the following year.

Article 7

   Payments
     Unless otherwise provided in Article 3, with respect to the fees payable (VAT excluded) by Party B to Party A under this Agreement, Party A shall provide the figure due and issue invoices to Party B within three business days after the 30th day of every month (or similar time). Party B shall, within five business days after receipt of Party A’s provision of figure notification and invoices, remit the amount payable to a designated bank account of Party A; such remittance shall be done no later than the 15th day of every month.

 

4


Article 8

  Maintenance
8.1  

With respect to the usage and entry of the premises specified in this Agreement, Party B shall exercise due care as a faithful manager to safekeep, maintain, and repair relevant facilities, and shall comply with the management rules promulgated by Party A. With respect to facilities out of Party B’s reach (such as air conditioning and fire control system), Party B may engage Party A to provide assistance.

8.2  

Party B shall not alter or add structures and exterior of the premises and the internal office facilities without Party A’ consent.

Article 9   Representations and Warranties
9.1  

The parties represent and warrant that this Agreement is executed by their duly authorized representatives.

9.2  

The parties represent and warrant that execution of this Agreement will not breach another contract, agreement, or obligation in any form having been made by either party with a third party.

9.3  

Party B represents and warrants that the decision to station in Party A’s plant has been approved by its board and in line with all company rules of its own.

9.4  

The Parties shall keep confidential this Agreement and information of the other party obtained under this Agreement.

Article 10   Breach
    Unless due to force majeure or government regulations, the party in breach of this Agreement shall compensate the other party all the losses and damages suffered by the other party as a result of the breach.
Article 11   Term and Termination
11.1  

This Agreement shall become effective on the effective date and expire on December 31, 2005.

11.2  

The Parties may extend this Agreement by one-year term with a 60-days’ notice sent prior to the date of expiration.

 

5


11.3  

This Agreement may be terminated if either party commits a breach or is financially exhausted, provided that the other party shall give such party a 60-days’ prior written notice.

11.4  

This Agreement may be terminated at any time upon the written consent of both parties.

11.5  

This Agreement shall terminate immediately in the event of liquidation, reorganization, or bankruptcy of either party.

Article 12   Restoration
    Upon the expiration or termination of this Agreement, Party B shall restore the premises at its own expense to its original condition.
    Fixtures and other property remaining on the premises shall be disposed of by Party A at Party B’s cost and expense.
Article 13   Amendment and Assignment
13.1  

Amendment of this Agreement shall be done by duly authorized representatives of the parties.

13.2  

Without prior written consent of the parties, this Agreement may not be assigned to any third person; provided, however, that in the event that Party B desires to terminate this Agreement as a result of a change in its business or an internal restructure, Party B shall notify Party A of such event immediately in writing.

    In the event of termination by the foregoing, Party B shall cause the new business affiliate to enter into an agreement with the same terms and conditions of this Agreement.
    Until the new business affiliate enters into the aforementioned agreement with Party A, the termination of this Agreement pursuant to this Article 13.2 shall not be effective.

 

6


13.3  

Party B shall not permit any third person to use the premises without consent of Party A.

Article 14   Entire Agreement
    The parties agree that this Agreement, together with the Appendixes attached thereto, replaces all prior written or verbal agreements or promises.
Article 15   Dispute Resolution
    Disputes arising out of this Agreement shall be resolved by the parties by amicable negotiation. Disputes which cannot be resolved by negotiation shall be settled by non-binding arbitration pursuant to the rules and procedures of the Arbitration Association of the Republic of China and the Arbitration Law of the Republic of China. Awards rendered by the arbiteurs may be litigated pursuant to Article 15 contained herein.
Article 16   Jurisdiction
    The Parties agree that any and all disputes arising out of this Agreement shall be brought to Tainan District Court, Taiwan, as the court of first impression.
Article 17   Counterparts
    This Agreement is executed in three counterparts, with Party A keeping one copy and Party B keeping two for records.

 

7


Entered into by

   

/Seals/

 

/Seals/

Chi Mei Optoelectronics Corporation

 

Himax Display, Inc.

Representative: He Zhao-yang

 

Representative: Wu Bing-sheng

Address: 1 Chiye Rd., STSP, Tainan

 

Address: 12 Nanke 8th Rd., Tainan

County

 

Science and Industrial Park, Tainan

   

County

 

Dated this 20th day of July, 2004

 

8


Appendix I - Management Fee for Himax Display, Inc.

 

Category


  

Item


   CHI MEI PLANT

    
      Cost

   Depreciation

   Unit Price
(Depreciated)


   Amount

   Unit

   Cost

   Interest
2.7%


   Maintenance
Cost


   Total
Cost


  

Remarks


Location

  

Office Area 55%

             151    1,092    m2    164,832              164,832     
    

Office Area Public Amenities 45%

             151    893    m2    134,843              134,843    $500 per ping
    

Clean Room 55%

             151    1,045    m2    157,795              157,795     
    

Clean Room Public Amenities 45%

             151    855    m2    129,105              129,105     

Interior Decoration

  

Office Desk/ Chair/ Partition

   —      6    —      1    Set    0    0    0    0    Already paid
    

Major Interior Decoration

   1,300,178    26    4,167    1    Month    4,167    2,925    0    7,093     
    

Light Partition

   1,950,000    26    6,250    1    Month    6,250    4,388    0    10,638     
    

Ceiling

   620,000    26    1,987    1    Month    1,987    1,395    0    3,382     
    

Seamless Flooring

   400,000    26    1,282    1    Month    1,282    900    0    2,182     
    

Conference room Whiteboard/ Notice Board

   —      6    —      0    Item    0    0    0    0    Already paid
    

Shoe Cabinet

   —      6    —      0    Item    0    0    0    0    Already paid

 

9


Facility

  

Network Equipment

   4,783,000   4    99,646    1    Month    99,646    10,762    56,830    167,238     
    

Telephone System

   1,086,197   6    15,086    1    Month    15,086    2,444    21,724    39,254     
    

Air Conditioning

   2,305,148   9    21,344    1    Month    21,344    5,187    46,106    72,634     
    

Electrical Equipment

   853,400   9    7,902    1    Month    7,902    1,920    17,068    26,890     
    

Firefighting Equipment

   500,000   9    4,630    1    Month    4,630    1,125    10,000    15,755     
    

Kitchen Equipment

   350,000   6    4,861    1    Month    4,861    788    7,000    12,649   

NT.7,000,000 per 1000 uses * 50 people

    

ID Card System

   234,250   6    3,253    1    Month    3,253    527    4,685    8,466   

NT.9,370,000 per 200 sets * 5 sets

    

Surveillance System

   409,655   6    5,690    1    Month    5,690    922    8,193    14,804   

NT.19,800,000 per 145 sets * 3 sets

    

Projector Screen

   —     6    —      1    Month    0    0    0    0   

Already paid

Electricity & Water

  

Water Cost

            30    65    Person    1,950    0    0    1,950     
    

Lighting/Operational Equipment Electricity Cost

            617    22    Day    13,574    0    0    13,574   

Excludes clean room

    

Air Conditioning Electricity Cost

   ($165/hr*
  10 hrs)
       1,650    22    Day    36,300    0    0    36,300   

Excludes clean room

 

10


Fees

  

MIS Service Fee

       60,000    1    Month    60,000    0    0    60,000     
    

Office Cleaning

       24,000    0.0    Man
hour
   0    0    0    0     
    

Garbage Cleaning and Disposal

   40Kg/
person
*
3.709
  148    65    Person    9,646    0    0    9,646   

May 2003 changed to NT.3709/ton

    

Security

       4    3,885    m2    15,540    0    0    15,540     
    

Medical

       50    65    Person    3,250    0    0    3,250     
    

Washroom Supplies (e.g. toilet paper)

       60    65    Person    3,900    0    0    3,900     
    

Parking Space (20 basic parking spots)

                           0    0    0   

For each space over 20, additional charge of NT.2300 per month

    

Fire Inspection

                           0    0    0     

 

11


Appendix II - Opto-Electronics Clean Room Construction for Himax Display Inc.

 

    

Construction
Form Code


  

PO Form Code


  

Explanation


  

Contractor


   Amount

   Remarks

1

  

59204666CM3

  

92509150CM3

  

Opto-Electronics clean room construction for HiamxDisplay

  

Han Tang

   32,500,000    Completed

2

  

59210216CM3

  

92513372CM3

  

Stickers and Labels

  

SHIN Tao-tsung

   1,600    Completed

3

  

59210211CM3

  

92515494CM3

  

Six separate power sources

  

Han Tang

   354,000    Completed
    

59210211CM3

  

92515492CM3

  

Additional low voltage electrical distribution engineering

  

Han Tang

   371,000    Completed
    

59210211CM3

  

92515493CM3

  

Ventilation

  

Han Tang

   422,000    Completed

4

  

59212334CM3

  

92515346CM3

  

Access swipe card system transplant

  

CHIN Chan-shing

   9,500    Completed

5

  

59212452CM3

  

92515185CM3

  

MAU room’s VFD and PLC tray transplant

  

Han Tang

   150,000    Completed

6

  

59211317CM3

  

92515184CM3

  

Three items of independent socket tray

  

Han Tang

   280,000    Completed

7

  

59210961CM3

  

92513664CM3

  

Display Sign

  

SHIN Tao-tsung

   6,000    Completed

8

  

59213355CM3

  

92516379CM3

  

Sewage pipe modification

  

Han Tang

   97,000    Completed

9

  

59213273CM3

  

92516170CM3

  

Additional sockets

  

Kao Hsin

   14,000    Completed
                         34,205,100     

 

* Additional shared liquid system cost:

 

1. The contractor for the PCW supply (for L-COS and LCD-USL) was CHIU HO Engineer Co.,Ltd. Cost was NT$5,480,000 + 725,536 = NT$6,205,536

 

12


L-COS: 8 m3/hr

 

LCD-USL: 75.3 m3/hr

 

The two feeds into LCOS and has to share 8/(75.3 + 8) = 0.096 of the cost, which is approximately 0.096 x 6205536 = 595,731.

 

2. The contractor for the DIW supply (for Sun-East International, L-COS, LCD-USL) was KINTECH.

 

Cost was NT$30 million + backup system NT$5.8 million (RO, EDI, UF chemical wash, 580,000) + (1 set of EDI, 2,600,000)

 

Sun-East International: 5 m3/hr

 

L-COS: 13 m3/hr

 

LCD-USL: 48 m3/hr

 

Total feed into LCOS shares 13/(5 + 13 + 48) ≈ 0.197 (300 million + 58 million + 2.6 million) = 7,679,060

 

13


Appendix III - Engineering schematic

 

[omitted]

 

14


Appendix IV

 

C.M.O.

LCM Plant Himax Display Opto-Electronics Project

Compressed Dry Air (CDA) Cost Calculation Table

    (1) Investment Cost    
   

Name


 

Total Investment
Amount


 

Monthly Cost
(amortized over 5 years)


 

Remarks


    Screw Air Compressor   NT.13345716   NT.185358    
    Air Dryer   NT.8555144   NT.118822    
    Pipeline   NT.39484094   NT.548390    
        Sub-Total   NT.61384954   NT.852570    

Fixed

  (2) Land and Infrastructure Investment Cost    

Cost

 

 

Amortized Monthly Total

(852570)/0.7*0.3

 

 

        NT.365387 per month

   
    (3) Equipment, Land and one-time Power Supply Work Total Investment Cost Monthly Interest    
    ((1) + (2)) * 0.5% (annual interest rate 6%)  

        NT.6090 per month

   
   

Sub-Total: (1) + (2) +(3) = 852570 + 365387 +6090

= NT.1224047 per month

   
   

Fixed Cost: 1224047/8752 CMH = NT.140/CMH–month) = NT.0.194 CMH-HR)

Note: 8752 CMH: (2188 CMH/SET * 4 SETS = 8752 CMH)

   

 

15


Operating

Cost

  (1) Electricity Cost
   

Equipment Name


 

Monthly Power
Consumption per Set


 

Number of Sets


 

Total Monthly Power
Consumption


 

Total Monthly
Electricity Cost


    Screw Air Compressor   246KWH*54*30   4   4*246*24*30   NT.1204416
    Air Dryer   51KWH*25*30   3   3*51*24*30   NT.187272
    Sub-total: NT.160/month-CMH
    (2) Maintenance Cost
   

Equipment Name


 

Monthly Cost per Set


 

Number of Sets


 

Total Monthly Cost


 

Remarks


    Screw Air Compressor   2043   4   8172    
    Air Dryer   19165   3   57495    
   

Sub-total: NT.7.5/month-CMH

Notes

 

1.      The screw air compressor costs NT.2043/month for replacement of air filter, oil filter and lubricant.

 

2.      The air dryer costs NT.19165/month for replacement of front filter, rear filter, final filter and activated carbon filter.

    Sub-total: (1) + (2) = NT.167,5/month-CMH
    Operating Cost: NT.167.5/month-CMH/30/24=NT.0.23 CMH-HR

Total

Cost

 

Fixed Cost + Operating Cost

= NT.0.194 CMH-HR + NT.0.23 CMH-HR

Remarks:

 

The total capacity of the four screw air compressors: 8752CMH

(Each compressor rated at 2188CMH)

 

16


C.M.O.

LCM Plant Himax Display Opto-Electronics Project

DCC System Cost Calculation Table

 

    (1) Investment Cost
   

Equipment Name


 

Total Investment Amount


 

Monthly Cost
(amortized over 5 years)


 

Remarks


    Pump (includes engineering)  

NT.19000000

 

NT.263889

   
    Pipeline work  

NT.39000000

 

NT.541667

   
    Sub-total  

NT.58000000

 

NT.805556

per month

   

Fixed

  (2) Land and Infrastructure Investment Cost    

Cost

 

 

Amortized Monthly Total

(805556)/0.7*0.3

 

 

        NT.345238 per month

    (3) Equipment, Land and one-time Power Supply Work Total Investment Cost Monthly Interest
    ((1) + (2)) * 0.5%      

        NT.5753/month

   

Sub-total: (1) + (2) + (3) = 805556 + 345238 + 5753

= NT.1156547 per month

   

Fixed Cost: 1156547/2410RT = NT.479/RT-month

Note:

2410RT: (heat exchanger 2430000Kcal/HR*3 SETS

= 7290000Kcal/HR/3024

= 2410RT)

Operating

Cost

  (1) Electricity Cost
   

Equipment Name


 

Monthly Power
Consumption per Set


 

Number of Sets


 

Total Monthly Power
Consumption


 

Total Monthly
Electricity Cost


    DCC refrigerated water pump  

75kwh*24*30

 

3

 

75kwh*24*30*3

 

NT.91800

    Sub-total:             NT.91800 per month
    (2) Maintenance Cost
   

Equipment Name


 

Monthly Cost per Set


 

Number of Sets


 

Total Monthly Cost


 

Remarks


    DCC refrigerated water pump  

1666

 

3

 

4998

   
   

Sub-total:             NT.4998 per month

Note: Pump maintenance (bearing lubrication, axel maintenance and calibration) is approximately NT.1666 per month.

    Sub-total: (1) + (2) = 91800 + 4998 = 96798 per month
    Operating Cost: 96798/2415RT/30/24 = NT.0.056/RT-HR

Total

Cost

  Fixed Cost + Operating Cost = NT.479/RT-month + NT.0.056/RT-HR

 

17


C.M.O.

LCM Plant Himax Display Opto-Electronics Project

Nitrogen Gas Cost Calculation Table

 

    (1) Investment Cost
   

Equipment Name


 

Total Investment Amount


 

Monthly Cost
(amortized over 5 years)


 

Remarks


    Pipeline   NT.3000000   NT.41667    
    Sub-total   NT.3000000   NT.41667 per month    

Fixed

  (2) Land and Infrastructure Investment Cost

Cost

 

 

Amortized Monthly Total

(41667)/0.7*0.3

 

 

NT.17857 per month

   
    (3) Equipment, Land and one-time Power Supply Work Total Investment Cost Monthly Interest
    ((1) + (2)) * 0.5% (Annual interest at 6%)   NT.298 per month    
   

Sub-total: (1) + (2) + (3) = 41667+ 17857 + 298

= NT.59822 per month

    Fixed Cost: NT.59822 per month
Operating
Cost
 

1KG LN2 = 0.8M3GN2

 

Expended Cost

= (Actual cumulative nitrogen gas usage / 0.8) * NT.3.1/KG-LN2

 

   

Operating Cost:

(Actual cumulative nitrogen gas usage) * NT.3.1/KG-LN2

Total

Cost

  Fixed Cost + Operating Cost = NT.59822/month + (actual cumulative nitrogen gas usage/0.8)*NT.3.1/KG-LN2

Remarks:

               

 

18


C.M.O.

LCM Plant Himax Display Opto-Electronics Project

Refrigerated Water System Cost Calculation Table

    (1) Investment Cost    
   

Equipment Name


 

Total Investment Amount


 

Monthly Cost
(amortized over 5 years)


 

Remarks


    Refrigeration unit including engineering   NT.64254860   NT.892429    
    Pump including engineering   NT.24270000   NT.337083    
    Water Cooling Tower including engineering   NT.28607105   NT.397321    
    Pipeline work   NT.67500000   NT.937500    
    Sub-total   NT.184631965  

NT.2564333

per month

   
Fixed   (2) Land and Infrastructure Investment Cost    
Cost  

 

Amortized Monthly Total

(2564333)/0.7*0.3

 

 

NT.1099000 per month

    (3) Equipment, Land and one-time Power Supply Work Total Investment Cost Monthly Interest    
    ((1) + (2)) * 0.5%  

NT. 18317 per month

   

Sub-total: (1) + (2) + (3) = 2564333 + 1099000 +18317

= NT.0.604/RT-HR

   
   

Fixed Cost: 3681650/8880RT = NT.434.8/RT-month

= NT. 0.604 RT-HR

Note: 8880RT: (Heat recovery 460RT * 3 SETS + 1250RT * 6 SETS

=8880RT)

   

 

19


Operating Cost   (1) Electricity Cost
   

Equipment Name


 

Monthly Power
Consumption
per Set


 

Number
of Sets


 

Total Monthly Power
Consumption


 

Total Monthly
Electricity Cost


    1250RT refrigeration unit   812KWH*24*30   6   812KWH*24*30*6   NT.3507840
    460RT refrigeration unit   360KWH*24*30   3   360KWH*24*30*3   NT.777600
    Secondary refrigerated water pump   150KWH*24*30   4   150KWH*24*30*4   NT.432000
    Cooling water pump   75KWH*24*30   6   75KWH*24*30*6   NT.324000
    Cooling water pump   5 KWH*24*30   3   5KWH*24*30*3   NT.120960
    Refrigerated water pump   30KWH*24*30   6   30KWH*24*30*6   NT.129600
    Refrigerated water pump   23KWH*24*30   3   23KWH*24*30*3   NT.49680
    Water cooling tower fan   45KWH*24*30   6   45KWH*24*30*6   NT.194400
    Sub-total: NT.5536080 per month
    (2) Maintenance Cost
   

Equipment Name


 

Monthly Cost
per Set


 

Number
of Sets


 

Total Monthly Cost


 

Remarks


    1250RT refrigeration unit   12500   6   7500    
    460RT refrigeration unit   1250   3   37500    
    Secondary refrigerated water pump   1666   4   6664    
    Cooling water pump   1666   6   9996    
    Cooling water pump   1666   3   4998    
    Refrigerated water pump   1666   6   9996    
    Refrigerated water pump   1666   3   4998    
    Water cooling tower fan   5000   6   30000    
    Sub-total: NT.179152 per month
   

Sub-total: (1) + (2) = 5536080 + 179152 = NT.5715232 per month.

 

Note:

 

1.      Maintenance for main refrigeration water unit (cleaning condenser, replace oil filter, clean distillation unit, replace refrigeration oil) costs approximately NT.150000 a year, or an average of NT.12500 per unit each month.

 

20


   

2.      Maintenance for the water cooling tower (cleaning basin, maintenance of speed reduction gear, replacement of speed reduction gear oil( costs approximately NT.60000 a year, or an average of NT.5000 per unit each month.

 

3.      Maintenance for pumps (bearing lubrication, maintenance of axels and calibration) costs approximately NT.20000 a year, or NT.1666 per unit each month.

    Operating Cost: 5715232/8880RT/30/24 = NT.0.893/RT-HR

Total

Cost

 

Fixed Cost + Operating Cost = NT.0.604/RT-HR + NT.0.893/RT-HR

= NT.1497/RT-HR

 

21


C.M.O.

 

LCM Plant Electricity System Cost Calculation

 

(1) A total of 26 high and low voltage distributors are related to Himax Display

 

1. Share in for one-fifth of the burden for the following distributors

 

3002-ESG-001~ 3002-ESG-005

 

3002-ESG-T01

 

3002-GT-001 ~ 005

 

3002-GR-001 ~ 3002-GR-005

 

Total: NT.3433800

 

One fifth is therefore NT.686760

 

2. Share in one half of the burden for the following distributors

 

2002-SB-250

 

2002-SB-T50

 

2002-SB-150

 

2002-SB-242F

 

2002-SB-131H”

 

2002-ESB-T81

 

2002-ESB-191D”

 

2002-ESB-291d”

 

2002-ESB-281D

 

2002-ESB-T91”

 

Total: NT.3898099

 

One half is therefore NT.1949050

 

3. Emergency Power Supply

 

Total construction cost is NT.50 million, with Himax Display

 

Opto-Electronics’s share being:

 

50000000/5*0.4 = NT.4000000

 

22


(2) From the above, if amortized over five years by LI-CHING Opto-Electronics, the fixed cost are:

 

4000000/6/12 = 5556

 

+

 

7457398.5/6/12 = 36609

 

NT. 92165

 

(3) The above are the fixed costs, while the variable cost is calculated using the following equation:

 

LI-CHING Opto-Electronics’ monthly power consumption

 

* Taipower’s listed hourly rate

 

* 1.2

 

23


C.M.O.

LCM Plant Himax Display Opto-Electronics Project

Hot Water System Cost Calculation Table

   

(1) Investment Cost

   
   

Equipment Name


 

Total Investment Amount


 

Monthly Cost
(amortized over 5 years)


 

Remarks


    Heater (1000KW, 217RT)  

NT.2593800

 

NT.36025

   
    Heater Pump  

NT.105090

 

NT.1460

   
    Primary Hot Water Pump  

NT.229163

 

NT.3182

   
    Secondary Hot Water Pump  

NT.394755

 

NT.5483

   

Fixed

  Pipeline  

NT.3312709

 

NT.46009

   

Cost

 

 

Sub-total

 

 

NT.6635517

 

 

NT.92159 per month

   
    (2) Land and Infrastructure Investment Cost    
   

Amortized Monthly Total

(92159)/0.7*0.3

 

        NT.39497 per month

    (3) Equipment, Land and one-time Power Supply Work Total Investment Cost Monthly Interest
    ((1) + (2)) * 0.5% (Annual interest at 6%)  

        NT.658 per month

   

Sub-total: (1) + (2) + (3) = 92159 + 39497 +658

= NT.132314 per month

   

Fixed Cost: 132314/434RT = NT.305/RT-month = NT.0.424/RT-HR

Note:

434RT: (one heater hot water RT index

= (290 gallon * 3.785 liter) * 10 temperature difference * 1 specific heat capacity * 60 minute / 3025 Calorie-hour = 217RT) * 2 SETS

= 434RT

 

24


Operating Cost

  (1) Electricity Cost
   

Equipment Name


 

Monthly Power
Consumption per Set


 

Number of Sets


 

Total Monthly Power
Consumption


 

Total Monthly
Electricity Cost


    Heater   1000KW*0.8*24*30   2  

2*1000KW

*0.8*24*30

  NT.1958400
    Heater Pump   2.2KW*0.8*24*30   2  

2*2.2KW

*0.8*24*30

  NT.18957
    Primary Hot Water Pump   5.5KW*0.8*24*30   3  

3*5.5KW*0.8

*24*30

  NT.16157
    Secondary Hot Water Pump   22KW*0.8*24*30   3  

3*22KW

*0.8*24*30

  NT.6463
    Sub-total: NT.1999977 per month
    (2) Maintenance Cost
   

Equipment Name


 

Monthly Cost per Set


 

Number of Sets


 

Total Monthly Cost


 

Remarks


    Heater   1000   2   2000    
    Heater Pump   1666   2   3332    
    Primary Hot Water Pump   1666   3   3332    
    Secondary Hot Water Pump   1666   3   3332    
   

Sub-total: NT.11996 per month

Note:

 

Maintenance for pumps (bearing lubrication, maintenance of axels and calibration) is approximately NT.1666 per set each month.

 

Maintenance for heater and cleaning of electric heater is approximately NT.12000 a year, or around NT.1000 per set each month.

    4. Sub-total: (1) + (2) = 1999977 + 11996 = NT. 2011973 per month
    Operating Cost: 2011973/434RT/30/24 = NT6.4RT-HR

Total

Cost

  Fixed Cost + Operating Cost = NT.0.424/RT-HR + NT6.4/RT-HR

Remarks

  The total for two heaters: 434RT (217RT per set)

 

25


Himax Display Opto-Eletronics Hyperpure Water Charges

 

    

Year 2003


  

Year 2004


Month


  

September


  

October


  

November


  

December


  

January


  

February


Hyperpure Water Usage (M3)

   100                         

Monthly Sewage Charge

   0                         

Cumulative Flow Rate at Start of Month

   100                         

Cumulative Flow Rate at End of Month

   200                         

Hyperpure Water Charge =

   Monthly Volume (M3) * unit price    Unit price    Monthly Sewage Charge * 1.3    Monthly Sewage Charge          
     100    40    1.3    5200          

 

26


C.M.O.

LCM Plant Himax Display Opto-Electronics Project

Sewage Treatment Charges Calculation Table

   

(1) Investment Cost

   

Equipment Name


 

Total Investment
Amount


 

Monthly Cost
(amortized over 5 years)


 

Remarks


   

Flow meter

 

NT.50000

 

NT.695

   
   

Sub-total

 

NT.50000

 

NT.695 per month

   
Fixed  

(2) Land and Infrastructure Investment Cost

       
Cost  

 

Amortized Monthly Total

NT.695/0.7*0.3 = 298

 

 

NT.298 per month

   
   

(3) Equipment, Land and one-time Power Supply Work Total Investment Cost Monthly Interest

   

((1) + (2)) * 0.5% (Annual interest at 6%)

 

NT.5 per month

   
   

Sub-total: (1) + (2) + (3) = 695 + 298 +5 = NT.998

       
   

Fixed Cost: NT.850 per month

       
   

(1) Electricity Cost

   

Equipment Name


 

Monthly Power
Consumption per Set


 

Number of Sets


 

Total Monthly Power
Consumption


 

Total Monthly
Electricity Cost


   

Sewage Pump

 

7.5KWH*24*30

 

2

 

10800kw.hr

 

NT.19440

Operating
Cost
 

Sub-total:            NT.91800 per month

       
   

(2) Maintenance Cost

   
   

Equipment Name


 

Monthly Cost per Set


 

Number of Sets


 

Total Monthly Cost


 

Remarks


   

Sewage 1 ton

 

NT.18/month

 

1

     

Calculated by volume

   

Operating Cost: NT.19440 per month

Total

Cost

 

Fixed Cost + Operating Cost + Pipeline Charge

= NT.998/month + NT.19440/month

= 20438 + Pipeline Charge * 1.3

Pipeline Charge is calculated using actual sewage volume.

Remarks:                    

 

27


Appendix V

 

I. Himax Display Opto-Electronics Fire and Maintenance Fees

 

Total Cost


 

Unit Price


 

Amount


 

Cost for 13
months


 

13 months
interest at 5%


 

Monthly Cost


 

Monthly
Interest


 

Monthly Charge


NT.2000000

  NT.18.41/M2   1,985M2   NT.36537   NT.1827   NT.2811   NT.141   NT.2952

 

II. Emergency Services Center

 

Cost for one person is approximately NT.585,579 per year.

 

NT.585579 * 4 people / 39,501 Ping / 12 month = NT.5/Ping

 

(Unit cost calculation based on area of Building A)

 

The above does not include share options or profit share.

 

28


Appendix VI

 

CHI MEI ELECTRONICS CORP.

 

Contractor Safety and Sanitation Penalty Clauses

 

Category


   Item

  

Violation


  

Penalty Amount

(NT)


     1-1    Did not apply for work permit or a permit for special operations. (such as use of naked flame, elevation, sealed space, suspension, fire protection )    3,000 each
     1-2    Work permit not displayed at work site.    3,000 each
Work Permit    1-3    Use of equipment not verified for use by this company. (Such as arc welders)    3,000 each
     1-4    Work not performed by qualified personnel or equipment. (Mobile cranes, suspended platforms, welding... etc.)    100,000 each
     2-1    Photographing or videotaping without permission will result in confiscation of film.    3,000 each
     2-2    Unauthorized removal or use of items such as the company’s electrical equipment and warning signs etc.    3,000 each

Plant Maintenance
and Security

   2-3    If damage done to equipment, the contractor is responsible for immediately arranging for its repair. (including other contractors’ equipment)    3,000 each
   2-4    Appropriate isolation measures not taken leading to alarm being set off by work.    5,000 each
     2-5    Unauthorized use of electrical (must use authorized electrical distribution board), water or gas sources.    10,000 each
     2-6    If negligence on part of the contractor results in severe loss to the company, the company will hold a meeting to decide the compensation. (The maximum penalty is the total loss suffered as calculated by the company.)    above 20,000
Command
and Control Operations
   3-1   

1. Did not plan and implement self-inspection measures.

2. Did not conduct the pre-work impact assessment meeting.

   2,000 each
     3-2    Personnel involved in work did not complete the safety and sanitation training course before starting work inside plant.    3,000 each
     3-3    Contractor’s site supervisor and safety/sanitation personnel did not attend safety and sanitation related meeting held by this company.    3,000 each
     3-4   

1. Supervisor not appointed for hazardous operations.

2. Safety/Sanitation supervision personnel not on site during operations that involve working above each other.

   3,000 each

 

29


     3-5   

1. Safety/Sanitation supervision personnel (Wearing identifying armband) not appointed at site.

2. Personnel involved in work not wearing identification vest.

   1,000 each
     3-6   

Personnel and Vehicle Management:

1. Personnel not wearing identification badge.

2. Working on site wearing a guest badge.

3. Personnel carrying or drinking alcoholic beverages. (including Whisbih type drinks)

4. Vehicle does not have identification badge, not parked as directed, or blocking traffic.

5. Personnel or vehicle entering or leaving the plant without the permission of the security staff.

   3,000 each
Work Safety    4-1    Work personnel not on ground when moving scaffolding.    3,000 each
     4-2    Did not apply to remove safety equipment, or did not restore safety equipment.    3,000 each
     4-3    Inadequate safety measures taken when working in enclosed space.    3,000 each
     4-4    Hazardous work sites that should regulate the movement of personnel not involved in the work (suspension, arc welding, cutting etc.) not displaying warning signs and area not properly closed off. (e.g. warning tape)    3,000 each
     4-5    Personnel not wearing and using properly safety equipment, (e.g. helmet, harness, mask etc.) or using inadequate safety equipment.    3,000 each
     4-6   

Elevated Operations

1. Not using safety harness or vertical safety lines.

2. Safety nets not installed or edge guard ropes not secured.

3. Use of non-approved personnel transportation equipment.

   3,000 each
     4-7   

Crane Operations

1. Crane or reel not fitted with safety latch.

2. Did not install/use reel over-speed device.

3. Wire rope broken, deformed or rope end not properly treated.

4. Improper transportation of personnel. (e.g. use the rope or hook to carry personnel directly)

5. When hoisting steel cylinders, did not use appropriate framework to secure them in place.

   3,000 each
     4-8   

1. Inadequate gate safety precautions.

2. Did not install warning signs.

3. Did not take appropriate safety measures for excavation work.

   3,000 each

 

30


     4-9   

1. Scaffolding has no guard rails, has overlapping steps, or does not have pins and struts.

2. Unsafe ladder installed. (Including dangerous slopes)

3. Scaffold not fixed securely during work.

   3,000 each
     4-10   

1. Inadequate lightning

2. Poor ventilation

3. Equipment such as cutting tools not fitted with protective measures.

   2,000 each
     5-1    Unauthorized use or damage of firefighting equipment outside of an emergency. (Such as using fire hose to hoist equipment, get water or displacement of firefighting equipment)    3,000 each
     5-2   

1. Failed to remove all flammable materials in work area or cover them fully with a fire blanket.

2. Safety/Sanitation supervision personnel not present during use of open flame.

3. Cutting and welding tools in poor condition, with inadequate protective measures.

   3,000 each
     5-3    Insufficient protective measures in flammable and combustible liquid work area. (including storage)    3,000 each
Fire
Prevention
   5-4   

1. During open flame operations at least two fire extinguishers must be supplied by contractor within a five meter radius. (each at least 10 pounds, with CO2 extinguishers to be used in clean room)

2. Fire extinguisher pressure indicator should be normal, and still within the expiry date.

   3,000 each
     5-5    No smoking in non-smoking areas.    3,000 each
     5-6   

1. Oxygen, acetylene and other steel cylinders not secured vertically or appropriately labeled.

2. Gas cylinders in use not placed on trolley.

3. Gas pipe lying across road.

   1,500 each
     5-7   

1. Electric arc welder casing not grounded.

2. Electric arc welder not fitted with an automatic electric shock prevention device.

   3,000 each
Safe
Electricity
Use
   6-1   

1. Electrical wiring placed on wet surface.

2. Use of electrical wiring with broken sheath or poor insulation.

3. Naked wires plugged into power socket.

4. Did not correctly install fuse or circuit breaker.

   2,000 each
     6-2    Electrical wiring not properly secured or placed in such a manner as to adversely affect personnel safety.    2,000 each
     6-3    Placing obstructions in passage ways that adversely affect the smooth operation emergency exit line.    3,000 each
Environment Protection    7-1   

1. Free blowing dust (did not spray water or take other effective dust suppression measures)

2. Build up of waste.

3. Other situations which cause environmental pollution.

   3,000 each

 

31


     7-2    Work site not cleaned up after completion of work.    3,000 each
     7-3    Did not follow the park management office’s directives for contractors’ and their staff.    5,000 each
     7-4   

Tools and materials

1. Not placed in the designated storage area

2. Physically exceeds the designated storage area or exceeds the allowed time.

3. Stored in a disorganized manner.

4. Interferes with passage way.

   3,000 each
Regulatory
Issues
   8-1    Penalized by oversight agency due to labor safety law violation.    10,000 each
     8-2    Penalized by environmental protection agency for environmental protection law violation.    10,000 each
     8-3    Did not report occupational injury that occurred at work site.    5,000 each
Audit of
Rectification
   9-1    After being notified of a minor flaw to rectify, but later found to not have resolved the issue on time.    1,000 each
     9-2    After being notified of a violation, but later found to not have resolved the issue on time.    5,000 each
     9-3    After being issued a financial penalty, did not pay the penalty or submit an appeal within 10 days.    Penalty amount
doubled.
     9-4    Obstructing or not cooperating with the company’s audit personnel’s audit operation.    10,000 each

 

Remarks:

 

1. These penalty clauses are applicable to all those who have a direct or indirect contractor relationship with this company.

 

2. Each incident of violation is in principle limited to one penalty per day, with the exception of special or severe violations upon notice.

 

3. The penalty for involved personnel or equipment is to be based upon the actual number of violations.

 

4. Unless otherwise specified, all rectification of faults should all be completed before the next work period. If faults are not rectified, work may not resume.

 

5. Depending on the severity of the situation, the labor safety department may call for a meeting to decide how repeat offenders (multiple occurrences of the same violation or having been repeatedly penalized) will be dealt with. Measures include doubling of penalties, dismissal of offending personnel, contractor’s signing of guarantee, offending personnel barred from working in the plant, termination of contractor status, and notification to relevant units that the contractor is prohibited from tendering.

 

NO: FM-U206-Ver.01

 

32