TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

1.1 Date

This Management Discussion and Analysis ("MD&A") should be read in conjunction with the unaudited financial statements of Taseko Mines Limited ("Taseko", or the "Company") for the nine months ended June 30, 2004.

This MD&A is prepared as of July 26, 2004. All dollar figures stated herein are expressed in Canadian dollars, unless otherwise specified.

This discussion includes certain statements that may be deemed "forward-looking statements". All statements in this discussion, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in the forward-looking statements.

Cautionary Note to U.S. Investors Concerning Estimates of Measured and Indicated Resources.

This management discussion and analysis uses the terms ‘measured resources’ and ‘indicated resources’. The Company advises U.S. investors that while these terms are recognized and required by Canadian regulations (under National Instrument 43-101 Standards of Disclosure for Mineral Projects), the U.S. Securities and Exchange Commission does not recognize them. U.S. investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into reserves.

1.2 Overview

Taseko Mines Limited ("Taseko" or the "Company") is a mineral exploration and mining company with three projects located in British Columbia, Canada. These are the Gibraltar copper mine and two advanced-stage exploration projects: the Prosperity gold-copper project and the Harmony gold project. The Company is currently focussing on re-start activities at the Gibraltar mine.

Gibraltar

The Gibraltar mine is a 35,000 tonnes per day mine and mill facility, which has had a successful 27-year operating history, and has been maintained on "care and maintenance" for the past five years awaiting higher copper prices. With the improvement in copper markets, the Company raised approximately $20 million in funding from investors to commence restart and commissioning of the Gibraltar mine. Such activities commenced at Gibraltar in June, and the Company plans to begin copper concentrate shipments in October 2004.


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

In June 2004, Taseko announced that it had signed a Framework Agreement to create a Joint Venture (the “JV”) with Ledcor CMI Ltd. (“Ledcor”), a private, British Columbia-based, construction and contract mining company. Under the proposed terms, Ledcor will be the mine operator, with primary responsibility for commissioning and operating the mine in addition to other aspects of mine operations, including drilling, blasting, loading and hauling of ore and waste as well as recruitment of personnel and maintenance of the equipment and facilities. Ledcor will contribute its own mine equipment to the JV and purchase or lease additional equipment, including a large new shovel and new trucks worth a total of $25 million, to supplement the existing site equipment. Taseko will contribute to the JV certain existing mine assets, including mineral rights and usage rights to the existing mill and equipment.

The Company and its former union, the Canadian Auto Workers (“CAW”), appeared before the British Columbia Labour Relations Board (“LRB”), which ruled that the Company is entitled to contract with Ledcor to commission and start up the mine. Further the LRB ruled that once the majority of workers on the Gibraltar site consist of the longer term mining and mill operating personnel, a vote would be held to determine who would represent those employees, CAW or Christian Labour Association of Canada, which represent Ledcor’s employees. The representation vote is to be held no later than 10 days after the first shipment of copper concentrate, planned to occur in October 2004. The JV is proceeding with the commissioning and start up of the mine.

A long-term copper concentrate sales contract has also been signed with Glencore Ltd. (“Glencore”), a major international metals buyer. Glencore is a diversified natural resources group based in Switzerland, with assets of US$15 billion. The sales contract is for 100% of the production from the mine for 40 months beginning in October 2004, and has fixed terms for treatment and refining charges at a discount to prevailing market prices. Arrangements have also been made with rail carriers and port facilities for the transportation, storage and shipment of Gibraltar’s copper concentrates to Glencore smelters overseas.

The current plan is to extract 148 million tonnes in sulphide material over 12 years, producing an average of 70 million pounds of copper and 980,000 pounds of molybdenum per year in concentrate. Oxide material, when accessed, will also be processed by the 10 million pound per year solvent extraction-electrowinning plant to produce copper cathode.

Personnel from Ledcor began work at site in late May 2004. Activities in June have included open pit pre-development work in the Pollyanna pit area, where some 7 million tonnes of waste rock needs to be removed to expose ore-grade material allowing for continuous mill feed. In addition, mine and mill equipment is being reconditioned in preparation for concentrate production.

Market Trends

Copper prices have been strong in 2004. Copper has increased from the average 2003 price of US$0.81/lb to US$1.25/lb in the year to date in 2004. The price of molybdenum oxide has increased substantially in 2004, and is currently trading at US$17.50/lb. Gold prices, although volatile in the past four to six months, have averaged US$399/oz in the calendar year to date, continuing the overall upward trend established in 2003.


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

1.3 Selected Annual Information

The consolidated financial statements have been prepared in accordance with Canadian generally accepted accounting principles, and are expressed in Canadian dollars except common shares outstanding.

    As at     As at     As at  
    September 30     September 30     September 30  
Balance Sheet   2003     2002     2001  
Current assets $ 6,110,155   $ 2,761,936   $ 2,740,911  
Mineral properties   28,813,296     28,813,296     602,001  
Other assets   26,311,460     28,735,049     28,727,482  
Total assets   61,234,911     60,310,281     32,070,394  
                   
Current liabilities   3,851,136     7,038,456     2,928,589  
Other liabilities   32,700,000     32,700,000     32,700,000  
Shareholders’ equity   24,683,775     20,571,825     (3,558,195 )
Total shareholders’ equity & liabilities   61,234,911     60,310,281     32,070,394  

    Year ended     Year ended     Year ended  
    September 30     September 30     September 30  
Operations   2003     2002     2001  
Conference and travel $ 43,398   $ 44,429   $ 72,981  
Consulting   178,104     133,672     1,750,662  
Corporation taxes   76,135     577,228     211,486  
Depreciation   711,170     714,065     714,857  
Exploration   2,029,529     2,071,885     3,860,176  
Interest and finance charges   201,942     507,790     73,058  
Legal, accounting and audit   169,356     334,492     483,653  
Office and administration   292,853     247,061     674,783  
Refinery project   500,000     1,698,826     3,571,942  
Shareholder communication   74,687     90,835     73,523  
Trust and filing   21,113     36,802     51,155  
Interest and other (income)   (721,480 )   (551,842 )   (1,110,431 )
Gain on sale of property, plant and equipment   (131,638 )   (1,314 )    
Write down of mineral property acquisition costs       600,000     44,224,214  
Write down of supplies inventory           3,509,465  
Stock-based compensation   65,344          
Loss for the period   3,510,513     6,503,929     58,161,524  
                   
Accretion expense   888,823          
                   
Basic and diluted loss per share $ (0.07 ) $ (0.21 ) $ (2.32 )
                   
Weighted average number of common shares outstanding   46,984,378     30,338,098     25,067,697  


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

1.4 Results of Operations

The Company’s loss for the period decreased in the third quarter of the year to $6.3 million from $7.0 million in the second quarter of the year due to the $5.1 million premium paid for the acquisition of the Gibraltar Reclamation Trust Limited Partnership (“GRT Partnership”) in the second quarter. The third quarter loss increased from $1.0 million in the same quarter in fiscal 2003 due to the possible restart of the Gibraltar mine and the cost of exercising its right to purchase the interest in the Gibraltar exploration lands earned by Northern Dynasty Minerals Ltd. and Rockwell Ventures Inc.

The main expense during the quarter was $3.9 million on exploration, an increase from $1.0 million spent in the previous quarter and $0.4 million spent in the same quarter in fiscal 2003.

Of the $3,939,477 in exploration expenditures, $3,923,883 was spent on Gibraltar, $8,336 was spent on Prosperity and $7,258 was spent on Harmony. The expenditures include the cost of care and maintenance, mine restart activities and exploratory drilling activities at Gibraltar, as well as routine ongoing costs for environmental monitoring, property assessment and claim fees, and mine planning studies for Prosperity and Harmony. The main exploration costs during the quarter were for site activities ($2,916,986) and drilling ($935,000) at Gibraltar. The drilling costs include the cost of exercising the Company’s right to purchase the interest in the Gibraltar exploration lands earned by Northern Dynasty Minerals Ltd. and Rockwell Ventures Inc.

Administrative costs are similar to the previous quarter with the exception of legal costs, which increased significantly due to legal issues related to the planned re-start of the Gibraltar mine.


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

1.5 Summary of Quarterly Results

The following summary is presented in Canadian dollars except common shares outstanding.

  Jun 30,   Mar 31,   Dec 31,   Sep 30,   Jun 30,   Mar 31,   Dec 31,   Sep 30,  
  2004   2004   2003   2003   2003   2003   2002   2002  
Current assets 22,503,985   31,197,299   12,393,240   6,110,155   6,931,542   4,590,814   5,817,311   2,761,936  
Mineral properties 28,813,296   28,813,296   28,813,296   28,813,296   28,813,296   28,813,296   28,813,296   28,813,296  
Other assets 37,453,575   29,025,131   26,258,435   26,311,460   26,232,419   26,069,484   26,355,556   28,735,049  
Total assets 88,770,856   89,035,726   67,464,971   61,234,911   61,977,257   59,473,594   60,986,163   60,310,281  
                                 
Current liabilities 4,082,614   1,411,538   3,786,070   3,851,136   3,490,173   3,571,875   4,053,587   7,038,456  
Other liabilities 32,700,000   32,700,000   32,700,000   32,700,000   32,700,000   32,700,000   32,700,000   32,700,000  
Shareholders’ equity 51,988,242   54,924,188   30,978,901   24,683,775   25,787,084   23,201,719   24,232,576   20,571,825  
Total shareholders’                                
equity and liabilities 88,770,856   89,035,726   67,464,971   61,234,911   61,977,257   59,473,594   60,986,163   60,310,281  
                                 
Expenses:                                
Conference and travel 19,062   22,051   40,269   4,449   12,492   6,962   19,495   24,149  
Consulting 94,875   (10,462 ) 110,927   30,118   40,309   58,011   49,666   (131,320 )
Corporation taxes 20,000   11,168     101,308   (44,911 ) 11,594   8,144   375,740  
Deprecation 181,434   180,407   179,978   179,559   176,617   176,617   178,377   179,719  
Exploration 3,939,477   975,538   2,130,546   607,301   449,458   687,681   285,089   739,340  
Interest and finance                                
charges 452,616   9,201   19,339   124,213   25,952   28,590   23,187   37,808  
Laboratory and other                                
services     (732,054 )          
Legal, accounting and                                
audit 92,940   22,913   16,818   40,526   53,960   18,272   56,598   36,230  
Office and administration 199,224   189,976   121,738   98,580   78,827   63,676   51,770   186,323  
Premium paid for GRTLP   5,095,249              
Property investigation     141,063   (47,805 ) 37,071   10,734      
Refinery project         500,000       (271,801 )
Salaries and benefits               (160,021 )
Shareholder                                
communications 18,694   530,704   73,802   7,833   4,223   39,104   23,527   8,164  
Trust and filing 13,842   17,241   4,395   1,250   8,421   10,698   744   (368 )
Interest and other                                
(income) (228,670 ) (325,399 ) (135,289 ) (129,811 ) (353,537 ) 64,623   (302,755 ) 11,382  
Gain on sale of property                                
plant and equipment           (131,638 )   (1,314 )
Stock-based                                
compensation 1,526,084   296,686   1,314,296   65,344          
Loss for the period 6,329,578   7,015,273   3,285,828   1,082,865   988,882   1,044,924   393,842   1,034,031  
                                 
Accretion expense on                                
convertible debenture 244,091   242,752   245,431   888,823          
                                 
Basic and diluted loss per                                
share (0.08 ) (0.10 ) (0.06 ) (0.04 ) (0.02 ) (0.02 ) (0.01 ) (0.01 )
                                 
Weighted average number                                
of common shares                                
outstanding (thousands) 71,384   65,005   57,481   46,984   44,660   40,173   34,057   30,338  


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

1.6 Liquidity

Historically Taseko’s sole source of funding was the sale of equity securities for cash primarily through private placements to sophisticated investors and institutions. As a consequence of the acquisition of the Gibraltar mine in 1999, Taseko received funding pursuant to a $17 million non-interest-bearing convertible debenture financing by Boliden Westmin (Canada) Ltd. As Taseko has the right and the intention to convert the debenture into common shares, the $17 million debenture is classified as equity rather than as a liability on the Company's balance sheet.

Reclamation deposits totaling approximately $17.5 million including interest, are to be used at a later date for reclamation purposes at Gibraltar, Prosperity and Harmony.

The reclamation liability of $32.7 million is secured by reclamation deposits and plant and equipment. The $26.6 million liability shown as tracking preferred shares of subsidiary, Gibraltar, is the net book value of 12,483,916 shares issued as part of the cost to acquire the Harmony gold project from Misty Mountain Gold Limited (subsequently renamed Continental Minerals Corporation). The tracking preferred shares are designed to track and capture the value of the Harmony gold property and will be convertible into common shares of the Company upon a realization event such as a sale to a third party or commercial production at the Harmony gold property. As Taseko has the right and the intention to settle these preferred shares with common shares of the Company, they have been included in shareholders’ equity on the balance sheet.

In December 2002, the Company renounced approximately $2.3 million in Canadian exploration expenditures (“CEE”) to flow-through investors. Accordingly, the Company was required to spend $2.3 million on qualified CEE by December 31, 2003. The Company completed the required expenditures by December 31, 2003.

At June 30, 2004, Taseko had working capital of $18.4 million, as compared to $29.8 million at the end of the previous quarter, and $3.4 million at the end of the same period in 2003. The decrease from the end of the previous quarter was a result of deposits made for the purchase of a mining shovel and for five mine haul trucks. The increase as compared to the end of the same period in 2003 was a result of several financings.

1.7 Capital Resources

In March 2004, the Company entered into an agreement to purchase a mining shovel for approximately US$10.1 million, of which US$6.4 million has been paid as an initial deposit. Subsequent to June 30, 2004, the Company paid an additional US$2.7 million towards this purchase.

In May 2004 the Company entered into an agreement to purchase 5 mining trucks for approximately US$8.2 million, of which US$1.64 million has been paid as an initial deposit.

The Company has a $2 million operating line of credit with a Canadian chartered bank at an interest rate of prime, with no fixed terms of repayment.


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

1.8 Off-Balance Sheet Arrangements

In October 2001, the Company’s subsidiary Gibraltar Mines Ltd. (“Gibraltar”) completed an arrangement agreement with Continental Minerals Corporation ("Continental"), which are British Columbia companies with certain management and directors in common with the Company. Under the terms of the arrangement agreement, among other things, Gibraltar paid $2.23 million cash and issued to Continental, 12,483,916 series A non-voting redeemable preferred shares in exchange for Continental’s interest in the Harmony Gold Project.

Gibraltar is obligated to redeem the series A preferred shares under certain conditions, notably the sale of all or substantially all (80%) of the Harmony Gold Property (excluding options or joint ventures which do not result in the certain or immediate transfer of 80% of Gibraltar’s interest in the Harmony Gold Property), or upon the commencement of commercial production at the Harmony Gold Property (an “HP Realization Event”). Upon the occurrence of an HP Realization event, Gibraltar must redeem Gibraltar preferred shares by distributing that number of Taseko common shares (“Taseko Shares”) equal to the paid-up amount (as adjusted) divided by a deemed price per Taseko Share, which will vary dependent on the timing of such HP Realization Event. At June 30, 2004, the conversion rate was $4.14 per Taseko Share.

In January 2002, Taseko announced that it would acquire GESL Partnership, and acquired a 38% initial position in these assets, comprising primarily of technology rights, during fiscal 2002. In the third quarter of fiscal 2003, the Company acquired the remaining business of the GESL Partnership under a plan of arrangement. This transaction resulted in a reduction of certain liabilities by $3 million and consolidated the Company’s 100% ownership of the copper refinery engineering business held by the GESL Partnership.

On December 31, 2003, the Company reached agreements with Gibraltar Reclamation Trust Limited Partnership (the “GRT Partnership”), a largely arm’s-length private Vancouver-based mining investment partnership which completed a financing to raise proceeds of $18.6 million to partially fund a planned restart of the Gibraltar copper mine owned by a subsidiary of the Company, Gibraltar Mines Ltd. As part of the financing the GRT Partnership entered into a Joint Venture arrangement with Gibraltar to proceed towards restarting the Gibraltar open pit copper mine. Gibraltar, as its contribution to the Joint Venture, agreed to contribute the use of its mine assets and fund the start-up expenses of the Gibraltar mine, and the GRT Partnership funded a qualifying environmental trust (“QET”), which has allowed Gibraltar to access other funds currently held by the Government of British Columbia as a security for the mine’s environmental reclamation obligations. Under the Joint Venture agreement, the GRT Partnership became entitled to certain revenues or production share from the Gibraltar mine following the resumption of production.

In related agreements, the Company obtained the exclusive right (the “Purchase Option”) to purchase the GRT Partnership for a fixed price of 130% of the total amount of the net financing proceeds, which were actually contributed by the GRT Partnership to the QET being an amount of $18.6 million. The Purchase Option was payable in common shares of the Company valued at the prevailing market price of the Company’s shares at the time the Company decides to trigger the purchase, or the price can be paid in cash by the Company. The investors in the GRT Partnership also acquired the right to sell the GRT Partnership to the Company for the appraised value of the GRT Partnership payable, at the Company’s election, in cash or in shares of the Company valued at the higher of the then-prevailing market (less a stated discount), and the undiscounted market price of the Company’s shares on December 31, 2003


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

(Cdn$2.15). To facilitate the start-up transactions, five directors and officers of the Company have personally guaranteed certain obligations (each as to one fifth) to third parties on behalf of the Company to the extent of $4.5 million, inclusive of a pledge of a cash deposit of $2 million. In consideration of the guarantee, they each received compensation equal to 10% of the amount guaranteed, calculated as 45,000 shares having a value of $2.00 each.

In March 2004 Taseko elected to exercise its call rights for the GRT Partnership and issued 7,967,742 shares valued at $2.79 each. Certain directors and officers participated as investors in the GRT Partnership in the aggregate amount of $1,300,000. These directors and officers received shares as a consequence of Taseko exercising the call right. The acquisition of the GRT Partnership provides Taseko with 100% control of those elements necessary for a mine restart decision and will eliminate the royalty entitlement held by the GRT Partnership.

1.9 Transactions with Related Parties

Hunter Dickinson Inc. (“HDI”) carries out investor relations, geological, corporate development, administrative and other management activities for, and incurs third party costs on behalf of the Company. Taseko reimburses HDI on a full cost-recovery basis.

Costs for services rendered by HDI to the Company decreased to $138,017 in the third quarter of fiscal 2004, as compared to $203,317 in the previous quarter and decreased as compared to $159,502 in the second quarter of 2003.

To facilitate the startup of the Gibraltar Mine, certain directors and officers of the Company have personally guaranteed certain obligations on behalf of the Company, for which they each received 45,000 shares of the Company (see item 1.8 above).

Certain directors and officers participated as investors in the GRT Partnership in the aggregate amount of $1,300,000 (see item 1.8 above).

1.10 Fourth Quarter

No applicable.

1.11 Proposed Transactions

There are no proposed asset or business acquisitions or dispositions, other than those in the ordinary course, before the board of directors for consideration.

1.12 Critical Accounting Estimates

Not applicable. The Company is a venture issuer.


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

1.13 Changes in Accounting Policies including Initial Adoption

None.

1.14 Financial Instruments and Other Instruments

None.

1.15 Other MD&A Requirements

1.15.1 Other MD&A Requirements

Additional information relating to the Company, including the Company's Annual Information Form, is available on SEDAR at www.sedar.com.

1.15.2 Additional Disclosure for Venture Issuers Without Significant Revenue

(a) capitalized or expensed exploration and development costs;

The required disclosure is presented in the Consolidated Schedule of Mineral Property Interests.

(b) expensed research and development costs;

Not applicable.

(c) deferred development costs;

Not applicable.

(d) general and administration expenses; and

The required disclosure is presented in the Consolidated Statements of Operations.

(e) any material costs, whether capitalized, deferred or expensed, not referred to in (a) through (d);

None.


TASEKO MINES LIMITED
NINE MONTHS ENDED JUNE 30, 2004

MANAGEMENT'S DISCUSSION AND ANALYSIS
 

1.15.3 Disclosure of Outstanding Share Data

The following details the share capital structure as at July 26, 2004, the date of this MD&A. These figures may be subject to minor accounting adjustments prior to presentation in future consolidated financial statements.

      Exercise        
  Expiry date   price   Number Number  
Common shares           84,896,953  
               
Share purchase options September 24, 2004   $0.50   1,762,000    
  December 20, 2004   0.40   22,500    
  March 31, 2005   0.30   100,000    
  May 9, 2005   0.38   20,000    
  July 29, 2005   0.25   50,000    
  September 29, 2006   0.55   2,390,000    
  September 20, 2005   0.65   17,000    
  September 20, 2005   0.81   45,000    
  September 20, 2005   1.40   100,000    
  September 20, 2005   1.65   70,000    
  September 29, 2006   1.36   2,240,000    
  September 29, 2006   1.50   10,000 6,826,500  
               
Warrants January 8, 2006   0.40   375,000    
  December 31, 2005   0.75   6,318,334    
  March 10, 2005   2.25   3,900,000 10,593,334  
               
Preferred shares redeemable into              
Taseko Mines Limited common              
shares           12,483,916  

This discussion includes certain statements that may be deemed "forward-looking statements". All statements in this discussion, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in the forward-looking statements.

The Company's auditors have not reviewed this MD&A or the unaudited quarterly financial statements to which this MD&A relates.