XML 69 R10.htm IDEA: XBRL DOCUMENT v3.20.4
Other Financial Statement Information
12 Months Ended
Dec. 31, 2020
Organization Consolidation And Presentation Of Financial Statements [Abstract]  
Other Financial Statement Information

Note B - Other Financial Statement Information

Inventories – net

 

 

 

December 31

 

 

 

2020

 

 

2019

 

Raw materials

 

$

53,947

 

 

$

49,729

 

Work-in-process

 

 

9,272

 

 

 

9,352

 

Finished products

 

 

38,801

 

 

 

45,760

 

 

 

 

102,020

 

 

 

104,841

 

Excess of current cost over LIFO cost

 

 

(4,483

)

 

 

(4,667

)

Noncurrent portion of inventory

 

 

0

 

 

 

(4,456

)

 

 

$

97,537

 

 

$

95,718

 

 

Costs for inventories of certain material are determined using the LIFO method and totaled approximately $32.0 million at each of the years ended December 31, 2020 and 2019.  The Company’s reserves for slow-moving and obsolete inventory at December 31, 2020 and 2019 were $9.9 million and $8.9 million, respectively.  

 

Noncurrent portion of inventory is included in Other assets on the Company’s Consolidated Balance Sheets.

Property and equipment – net

Major classes of property, plant and equipment are as follows:

 

 

 

December 31

 

 

 

2020

 

 

2019

 

Land and improvements

 

$

22,132

 

 

$

22,218

 

Buildings and improvements

 

 

97,909

 

 

 

82,811

 

Machinery, equipment and aircraft

 

 

176,377

 

 

 

180,221

 

Construction in progress

 

 

9,563

 

 

 

9,460

 

 

 

 

305,981

 

 

 

294,710

 

Less accumulated depreciation

 

 

(180,016

)

 

 

(170,692

)

 

 

$

125,965

 

 

$

124,018

 

 

Depreciation of property and equipment was $12.2 million in 2020, $12.3 million in 2019 and $12.1 million in 2018.  Machinery, equipment and aircraft includes $.3 million of financing leases at both years ended December 31, 2020 and 2019.

Legal proceedings

The Company can be party to a variety of pending legal proceedings and claims arising in the normal course of business, including, but not limited to, litigation relating to employment, workers’ compensation, product liability, environmental and intellectual property. The Company has liability insurance to cover many of these claims.  

Although the outcomes of these matters are not predictable with certainty, the Company records a liability when it is both probable that a liability has been incurred and the amount of the loss can be reasonably estimated. In the event the Company determines that a loss is not probable, but is reasonably possible, and the likelihood to develop what the Company believes to be a reasonable range of potential loss exists, the Company will include disclosure related to such matters.  To the extent that there is a reasonable possibility the losses could exceed amounts already accrued, the Company will adjust the accrual in the period in which the determination is made, disclose an estimate of the additional loss or range of loss and if the amount of such adjustment cannot be reasonably estimated, disclose that an estimate cannot be made.  During the year ended December 31, 2020, the Company accrued approximately $2.2 million representing its best estimate for losses to be incurred on a variety of global legal matters.

The Company and its subsidiaries Helix Uniformed Ltd. (“Helix”) and Preformed Line Products (Canada) Limited (“PLPC Canada”), were each named, jointly and severally, with each of SNC-Lavalin ATP, Inc. (“SNC ATP”), HD Supply Canada Inc., by its trade names HD Supply Power Solutions and HD Supply Utilities (“HD Supply”), and Anixter Power Solutions Canada Inc. (the corporate successor to HD Supply, “Anixter” and, together with the Company, PLPC Canada, Helix, SNC ATP and HD Supply, the (“Defendants”) in a complaint filed by Altalink, L.P. (the “Plaintiff”) in the Court of Queen’s Bench of Alberta in Alberta, Canada in November 2016 (the “Complaint”).

The Complaint states that Plaintiff engaged SNC ATP to design, engineer, procure and construct numerous power distribution and transmission facilities in Alberta (the “Projects”) and that through SNC ATP and HD Supply (now Anixter), spacer dampers manufactured by Helix were procured and installed in the Projects.  The Complaint alleges that the spacer dampers have and may continue to become loose, open and detach from the conductors, resulting in damage and potential injury and a failure to perform the intended function of providing spacing and damping to the Project.  The Plaintiffs are seeking an estimated $56.0 million Canadian dollars in damages jointly and severally from the Defendants, representing the costs of monitoring and replacing the spacer dampers and remediating property damage, due to alleged defects in the design and construction of, and supply of materials for, the Projects by SNC ATP and HD Supply/Anixter and in the design of the spacer dampers by Helix.  

The Company believes the claims against it are without merit and intends to vigorously defend against such claims. The Company is unable to predict the outcome of this case, however, it has recorded a reserve for the low end of the range for potential loss associated with this matter.  If this matter is concluded in a manner adverse to the Company, it could have a material effect on the Company’s financial results.