REGULATORY MATTERS
6 Months Ended
Jun. 30, 2018
REGULATORY MATTERS

NOTE 6 – REGULATORY MATTERS

UNITIL’S REGULATORY MATTERS ARE DESCRIBED IN NOTE 8 TO THE FINANCIAL STATEMENTS IN ITEM 8 OF PART II OF UNITIL CORPORATION’S FORM 10-K FOR DECEMBER 31, 2017 AS FILED WITH THE SECURITIES AND EXCHANGE COMMISSION ON FEBRUARY 1, 2018.

Tax Cuts and Jobs Act of 2017

On December 22, 2017, the Tax Cuts and Jobs Act of 2017 (TCJA) was signed into law. Among other things, the TCJA substantially reduced the corporate income tax rate to 21 percent, effective January 1, 2018. Each state public utility commission, with jurisdiction over the areas that are served by Unitil’s electric and gas subsidiary companies, has issued procedural orders directing how the tax law changes are to be reflected in rates, including requiring that the companies provide certain filings and calculations. Unitil has complied with these orders and has made the required changes to its rates as directed by the commissions. The FERC has also opened a rulemaking proceeding on this matter which has been addressed in a rate settlement filing by Granite State (described below). The Company believes that these matters are substantially resolved and will not have a material impact on its financial position, operating results, or cash flows.

In Maine, Northern Utilities’ Maine division recently completed a base rate case (described below). The MPUC’s final order in that docket incorporated the lower tax rates in the calculation of rates for the Company.

Similarly, in New Hampshire, Northern Utilities’ New Hampshire division recently completed a base rate case proceeding (described below). The NHPUC’s final order in that docket approved a comprehensive settlement agreement among the Company, the Staff of the Public Utilities Commission and the Office of Consumer Advocate which included the effect of the tax changes in the calculation of the revenue requirement. With respect to Unitil Energy, on April 30, 2018 the NHPUC approved the Company’s annual step increase pursuant to the provisions of its last base rate case, which included adjustments to account for the TCJA’s income tax changes.

In Massachusetts, the MDPU issued an order opening an investigation into the effect on rates of the decrease in the federal corporate income tax rate on the MDPU’s regulated utilities, and required each utility subject to its jurisdiction to submit proposals to address the effects of the TCJA and to reduce its rates as of January 1, 2018. The MDPU consolidated an earlier petition filed by the Attorney General requesting such an investigation into its order. On June 29, 2018, the MDPU issued an order accepting Fitchburg’s proposal to decrease the annual revenue requirement of both its gas and electric divisions by $0.8 million each. The MDPU will address the refund of excess accumulated deferred income taxes in phase two of its investigation.

 

On May 2, 2018, Granite State filed an uncontested rate settlement with FERC which accounted for the effects of the TCJA in its rates. The settlement was approved by FERC on June 27, 2018, and complies with and satisfies the FERC Notice of Proposed Rulemaking concerning the justness and reasonableness of rates in light of the corporate income tax reduction under the TCJA.

Base Rate Activity

Unitil Energy – Base Rates – On April 20, 2017 the NHPUC issued its final order approving a settlement between Unitil Energy, NHPUC Staff and the Office of Consumer Advocate providing for a permanent increase of $4.1 million in electric base rates, and a three year rate plan with an additional rate step adjustment, effective May 1, 2017, of $0.9 million, followed by two rate step adjustments in May of 2018 and 2019 to recover the revenue requirements associated with annual capital expenditures as defined under the rate plan. On April 30, 2018, the NHPUC approved Unitil Energy’s second step adjustment filing. The filing incorporated the revenue requirement of $3.3 million for 2017 plant additions, a reduction of $2.2 million for the effect of the federal tax decrease pursuant to the TCJA, along with the termination of the one-year $1.4 million reconciliation adjustment which had recouped the difference between temporary rates and final rates. The net effect of the three adjustments resulted in a revenue decrease of $0.3 million.

Fitchburg – Base Rates – Electric – On April 29, 2016 the MDPU issued an order approving a $2.1 million increase in Fitchburg’s electric base revenue decoupling target, effective May 1, 2016. As part of its order, the MDPU approved, with modifications, Fitchburg’s request for an annual capital cost recovery mechanism, which allows for increases to target revenues to recover the revenue requirement associated with capital additions as defined under the mechanism. In 2016, Fitchburg filed its first compliance report on capital investments for calendar year 2015. The MDPU approved the recovery of approximately $0.5 million, effective January 1, 2017, subject to further investigation and reconciliation. On December 18, 2017, the MDPU approved Fitchburg’s calendar year 2015 capital investments and associated revenue requirements for recovery. On June 29, 2017, Fitchburg filed its compliance report on capital investments for calendar year 2016. On December 20, 2017, the MDPU approved the recovery of approximately $0.4 million, effective January 1, 2018, subject to further investigation and reconciliation. On June 28, 2018, Fitchburg filed its compliance report of capital investments for calendar year 2017.

Fitchburg – Electric Grid Modernization – In December 2013, the MDPU opened an investigation into Modernization of the Electric Grid. The stated objective of the Grid Modernization proceeding is to ensure that the electric distribution companies “adopt grid modernization policies and practices.” In June 2014, the MDPU issued its first Grid Modernization order, setting forth a requirement that each electric distribution company submit a ten-year strategic Grid Modernization Plan (GMP). As part of the GMP, each company must include a five-year Short-Term Investment Plan (STIP), which must include an approach to achieving advanced metering functionality within five years of the Department’s approval of the GMP. The filing of a GMP is a recurring obligation and must be updated as part of subsequent base distribution rate cases, which by statute must occur no less often than every five years. Capital investments contained in the STIP are eligible for pre-authorization, meaning that the MDPU will not revisit in later filings whether the Company should have proceeded with these investments. Fitchburg and the Commonwealth’s three other electric distribution companies filed their initial GMPs on August 19, 2015. On May 10, 2018, the MDPU issued an order approving a three year plan for 2018 to 2020 with a spending cap of $4.4 million for Fitchburg. The order provides for a cost recovery mechanism for incremental capital investments and operation and maintenance (O&M) expenses. The electric distribution companies are to file compliance filings by August 8, 2018 which shall include 1) revised proposed performance metrics designed to address pre-authorized grid-facing investments, 2) a proposed evaluation plan for the three-year investment term, and 3) a model tariff for cost recovery including proposed protocol for identifying and tracking incremental O&M expenses. Cost recovery filings will be due February 15 for rates effect April 1. Annual reports will be due April 1 for the prior calendar year and the first term report will be due April 1, 2021. The next plan is due July 1, 2020 for the three year term 2021 to 2023, and shall include a five year strategic plan for 2021 – 2025.

Fitchburg – Solar Generation – On August 19, 2016, Fitchburg filed a petition with the MDPU seeking approval to develop a 1.3 MW solar generation facility located on Company property in Fitchburg, Massachusetts, including a cost recovery mechanism to share the costs and benefits of the project among all Fitchburg customers. On November 9, 2016, the MDPU approved a Settlement Agreement supporting the proposal, which was reached among the Company, the Attorney General of Massachusetts, and the Low-Income Weatherization and Fuel Assistance Program Network. Construction of the solar generating facility was completed and the facility began generating power on November 22, 2017. On April 2, 2018, Fitchburg submitted its first filing pursuant to its Solar Cost Adjustment tariff, by which the company recovers its annual revenue requirement related to its investment in the solar generation facility. The filing sought a net amount of approximately $0.3 million for recovery effective June 1, 2018. The recovery of this amount in rates was approved by the MDPU on May 31, 2018, subject to further investigation and reconciliation.

Fitchburg – Base Rates – Gas – Pursuant to the Company’s revenue decoupling adjustment clause tariff, as approved in its last base rate case providing for an annual increase in revenue of $1.6 million effective May 1, 2016, the Company is allowed to modify, on a semi-annual basis, its base distribution rates to an established revenue per customer target which promotes revenue stability and mitigates economic, weather and energy efficiency impacts to the Company’s revenues. The MDPU has consistently found that the Company’s filings are in accord with its approved tariffs, applicable law and precedent, and that they result in just and reasonable rates.

Fitchburg – Gas System Enhancement Program – On October 31, 2017, Fitchburg submitted its annual filing under its gas system enhancement program to recover the revenue requirements associated with its projected capital additions in 2018 as defined under the program. The filing sought approval to collect an additional $0.9 million of annual revenue requirements. As part of the filing, the Company requested to permanently change the revenue requirements cap to 3% as part of its tariff. On April 30, 2018, the MDPU approved recovery of the projected 2018 revenue requirements, subject to reconciliation and a cap of 1.5% on the change in revenue requirement to be billed in any given year. The cap resulted in approval of an additional $0.4 million of annual revenue requirements to be billed effective May 1, 2018 with the remaining $0.9 million of annual revenue requirements deferred for billing in future periods. In its May 1, 2018 annual reconciliation filing for 2017 revenue requirements, the Company requested that the MDPU waive the 1.5% revenue requirement cap and provide for full recovery of any under-collections. This matter remains pending.

Northern Utilities – Base Rates – Maine – On February 28, 2018, the MPUC issued its Final Order (Order) in Northern Utilities pending base rate case. The Order provided for an annual revenue increase of $2.1 million before a reduction of $2.2 million to incorporate the effect of the lower federal income tax rate under the TCJA. The MPUC Order approved a return on equity of 9.5 percent and a capital structure reflecting 50 percent equity and 50 percent long-term debt. The Order also provides for a reduction in annual depreciation expense, reducing the Company’s annual operating costs by approximately $0.5 million, and addressed a number of other issues, including a change to therm billing, increases in other delivery charges, and cost recovery under the Company’s TAB Program and TIRA mechanism. The new rates and other changes became effective on March 1, 2018. On March 16, 2018, the Company filed a Motion for Clarification requesting the MPUC clarify its Order in light of what the Company believes to be an inadvertent inconsistency with the Order regarding 2016 TIRA Eligible Facilities, rate base and related annual revenue adjustments. This matter remains pending.

 

Northern Utilities – Targeted Infrastructure Replacement Adjustment – Maine – The settlement in Northern Utilities’ Maine division’s 2013 rate case allowed the Company to implement a TIRA rate mechanism to adjust base distribution rates annually to recover the revenue requirements associated with targeted investments in gas distribution system infrastructure replacement and upgrade projects, including the Company’s Cast Iron Replacement Program (CIRP). The TIRA had an initial term of four years and covered targeted capital expenditures in 2013 through 2016. In its Order in the current base rate case (see above), the MPUC approved an extension of the TIRA mechanism for an additional eight-year period, which will allow for annual rate adjustments through the end of the CIRP program. On May 7, 2018, the MPUC approved the Company’s request to increase its annual base rates by 2.4%, or $1.1 million, to recover the revenue requirements for 2017 eligible facilities.

Northern Utilities – Targeted Area Build-out Program – Maine – In December 2015, the MPUC approved a Targeted Area Build-out (TAB) program and associated rate surcharge mechanism. This program is designed to allow the economic extension of natural gas mains to new, targeted service areas in Maine. It allows customers in the targeted area the ability to pay a rate surcharge, instead of a large upfront payment or capital contribution to connect to the natural gas delivery system. The initial pilot of the TAB program was approved for the City of Saco, and is being built out over a period of three years, with the potential to add 1,000 new customers and approximately $1 million in annual distribution revenue in the Saco area. A second TAB program was approved for the Town of Sanford, and has the potential to add 2,000 new customers and approximately $2 million in annual distribution revenue in the Sanford area. In its base rate case Order (above), the MPUC approved the inclusion of Saco TAB investments in rate base along with a cost recovery incentive mechanism for future TAB investments.

Northern Utilities – Base Rates – New Hampshire – On May 2, 2018, the NHPUC approved a settlement agreement among the Company, the NHPUC Staff and the Office of the Consumer Advocate in the Company’s pending rate case. The agreement provides for an annual revenue increase of $2.6 million, a reduction of annual revenue of $1.7 million to reflect the effect of the TCJA, and a step increase of $2.3 million to recover post-test year capital investments, all effective May 1, 2018 (with the revenue increase of $2.6 million reconciling to the date of temporary rates of August 1, 2017 and the revenue decrease for TCJA reconciling to January 1, 2018). Under the agreement, the Company may file for a second step increase for effect May 1, 2019 to recover eligible capital investments in 2018, up to a revenue requirement cap of $2.2 million. If the Company chooses the option to implement the second step increase, the next distribution base rate case shall be based on an historic test year of no earlier than twelve months ending December 31, 2020.

Granite State – Base Rates – On May 2, 2018, Granite State filed an uncontested rate settlement with FERC which provided for no change in rates, and accounted for the effects of a capital step adjustment offset by the effect of the TCJA. The settlement was approved by FERC on June 27, 2018, and complies with the FERC Notice of Proposed Rulemaking concerning the justness and reasonableness of rates in light of the corporate income tax reductions under the TCJA. The settlement also provides that Granite State may not file a general (Section 4) rate case prior to April 30, 2019.

 

Other Matters

NHPUC Energy Efficiency Resource Standard Proceeding – In May 2015, the NHPUC opened a proceeding to establish an Energy Efficiency Resource Standard (EERS), an energy efficiency policy with specific targets or goals for energy savings that New Hampshire electric and gas utilities must meet. On April 27, 2016, a comprehensive settlement agreement was filed by the parties, including Unitil Energy and Northern Utilities, which was approved by the NHPUC on August 2, 2016. The settlement provides for: extending the 2014-2016 Core program an additional year (through 2017); establishing an EERS; establishing a recovery mechanism to compensate the utilities for lost-revenue related to the EERS programs; and approving the performance incentives and processes for stakeholder involvement, evaluation, measurement and verification, and oversight of the EERS programs. In accordance with the Settlement, on September 1, 2017, the New Hampshire electric and gas utilities jointly filed a Statewide Energy Efficiency Plan for the period 2018-2020. The Settlement and the Statewide Energy Efficiency Plan for the period 2018-2020 were approved on January 2, 2018.

Unitil Energy – Electric Grid Modernization – In July 2015, the NHPUC opened an investigation into Grid Modernization to address a variety of issues related to Distribution System Planning, Customer Engagement with Distributed Energy Resources, and Utility Cost Recovery and Financial Incentives. The NHPUC engaged a consultant to direct a Working Group to investigate these issues and to prepare a final report with recommendations for the Commission. The final report was filed on March 20, 2017. This matter remains pending.

Unitil Energy – Net Metering – Pursuant to legislation that became effective in May 2016, the NHPUC opened a proceeding to consider alternatives to the net metering tariffs currently in place. The NHPUC issued an Order on June 23, 2017. The Order removes the cap on the total amount of generation capacity which may be owned or operated by customer-generators eligible for net metering. The order also adopts an alternative net metering tariff for small customer-generators (those with renewable energy systems of 100 kW or less) which will remain in effect for a period of years while further data is collected and analyzed, time-of-use and other pilot programs are implemented, and a distributed energy resource valuation study is conducted. Systems that are installed or queued during this period will have their net metering rate structure “grandfathered” until December 31, 2040. The Company does not believe that this proceeding will have a material adverse impact on the Company’s financial position, operating results or cash flows.

Fitchburg – Electric Restructuring – On November 1, 2017, Fitchburg submitted its 2017 annual reconciliation of costs and revenues for transition and transmission under its restructuring plan, including the reconciliation of costs and revenues for a number of other surcharges and cost factors, for review and approval by the MDPU. All of the rates were given final approval by the MDPU on December 28, 2017, effective January 1, 2018.

Fitchburg – Service Quality – On March 1, 2018, Fitchburg submitted its 2017 Service Quality Reports for both its gas and electric divisions in accordance with new Service Quality Guidelines issued by the MDPU in December 2015. Fitchburg reported that it met or exceeded its benchmarks for service quality performance in all metrics for both its gas and electric divisions. These filings are pending approval.

Fitchburg – Energy Diversity – Massachusetts Governor Baker signed into law H.4568 “An Act to Promote Energy Diversity” on August 8, 2016. Among many sections in the bill, the primary provision adds new sections 83c and 83d to the 2008 Green Communities Act. Section 83c requires every electric distribution company (EDC), including Fitchburg, to jointly and competitively solicit proposals for at least 400 MW’s of offshore wind energy generation by June 30, 2017, as part of a total of 1,600 MW of offshore wind the EDCs are directed to procure by June 30, 2027. The procurement requirement is subject to a determination by the MDPU that the proposed long-term contracts are cost-effective. Section 83d further requires the EDCs to jointly seek proposals for cost effective clean energy (hydro and other) long-term contracts via one or more staggered solicitations, the first of which shall be issued not later than April 1, 2017, for a total of 9,450,000 megawatt-hours by December 31, 2022. Emergency regulations implementing these new provisions, 220 C.M.R. § 23.00 et seq. and 220 C.M.R. § 24.00 et seq. were adopted by the MDPU on December 29, 2016, and adopted as final regulations on March 8, 2017. The EDCs issued the RFP for Long-Term Contracts for Clean Energy Projects, pursuant to Section 83d on March 31, 2017 and project proposals were received on July 27, 2017. Final selection of projects concluded in the first quarter of 2018, contracts were signed in June 2018 and preparation of the regulatory approval filing is underway. The EDCs issued the RFP for Long-Term Contracts for Offshore Wind Energy Projects pursuant to Section 83c on June 29, 2017 and project proposals were received on December 20, 2017. Final selection of projects was made in late May 2018 and contract negotiation is underway.

Fitchburg – Clean Energy RFP – Pursuant to Section 83a of the Green Communities Act in Massachusetts and similar clean energy directives established in Connecticut and Rhode Island, state agencies and the electric distribution companies in the three states, including Fitchburg, issued an RFP for clean energy resources (including Class I renewable generation and large hydroelectric generation) in November 2015. The RFP sought proposals for clean energy and transmission projects that can deliver new renewable energy to the three states. Project proposals were received in January 2016. Selection of contracts concluded during the fourth quarter of 2016 and contract negotiations concluded during the second quarter of 2017. On September 20, 2017, Fitchburg, along with the other three EDCs, filed for approval of the purchase power agreements which were negotiated as a result of the joint solicitation. A hearing on the merits was held in February 2018. The MDPU approved the agreements on June 15, 2018.

Fitchburg – Other – On August 25, 2017, the Massachusetts Department of Energy Resources (DOER) issued its final Solar Massachusetts Renewable Target (SMART) Program regulations. These regulations were promulgated pursuant to Chapter 75 of the Acts of 2016, which required the DOER to establish a new solar incentive program. The regulation is designed to support the continued development of an additional 1,600 MW of solar renewable energy generating sources via a declining block compensation mechanism. On September 12, 2017, the Massachusetts electric utilities jointly filed a model SMART tariff with the MDPU to implement the program and propose a cost recovery mechanism. Hearings on the merits were held in late March and early April 2018. This filing remains pending. In the interim, the current program for solar renewable energy credits, known as SREC-II, remains in effect for all eligible solar facilities.

On January 28, 2016 the MDPU approved Fitchburg’s Three-Year Energy Efficiency Plan for 2016-2018, subject to limited modifications and directives in the Order. The Department found that the savings goals included in each Three-Year Plan are reasonable and are consistent with the achievement of all available cost-effective energy efficiency; approved each Program Administrator’s program implementation cost budget for the Three-Year Plans; approved the performance incentive pool, mechanism, and payout rates; found that all proposed energy efficiency programs are cost-effective; found that funding sources are reasonable and that each Program Administrator may recover the funds to implement its energy efficiency plan through its Energy Efficiency Surcharge; and found that each Program Administrator’s Three-Year Plan is consistent with the Green Communities Act, the Guidelines, and Department precedent.

FERC Transmission Formula Rate Proceedings – Pursuant to Section 206 of the Federal Power Act, there are several pending proceedings before the FERC concerning the justness and reasonableness of the Return on Equity (ROE) component of the ISO-New England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates. On April 14, 2017, the U.S. Court of Appeals for the D.C. Circuit issued an opinion vacating a decision of the FERC with respect to these formula rates, and remanded it for further proceedings. The FERC had found that the Transmission Owners existing ROE was unlawful, and had set a new ROE. The Court found that the FERC had failed to articulate a satisfactory explanation for its orders. At this time, the ROE set in the vacated order will remain in place until further FERC action is taken. Separately, on March 15, 2018, the Transmission Owners filed a petition for review with the Court of certain orders of the FERC setting for hearing other complaints challenging the allowed return on equity component of the formula rates. Fitchburg and Unitil Energy are Participating Transmission Owners, although Unitil Energy does not own transmission plant. To the extent that these proceedings result in any changes to the rates being charged, a retroactive reconciliation may be required. The Company does not believe that these proceedings will have a material adverse impact on the Company’s financial condition or results of operations.

Legal Proceedings

The Company is involved in legal and administrative proceedings and claims of various types, which arise in the ordinary course of business. The Company believes, based upon information furnished by counsel and others, that the ultimate resolution of these claims will not have a material impact on its financial position, operating results or cash flows.

In early 2009, a putative class action complaint was filed against Unitil’s Massachusetts based utility, Fitchburg, in Massachusetts’ Worcester Superior Court, (captioned Bellermann et al v. Fitchburg Gas and Electric Light Company). The Complaint seeks an unspecified amount of damages, including the cost of temporary housing and alternative fuel sources, emotional and physical pain and suffering and property damages allegedly incurred by customers in connection with the loss of electric service during the ice storm in Fitchburg’s service territory in December 2008. The Massachusetts Supreme Judicial Court issued an order denying class certification status in July 2016, though the plaintiffs’ individual claims remain pending. The Company continues to believe these claims are without merit and will continue to defend itself vigorously.