XML 41 R15.htm IDEA: XBRL DOCUMENT v3.20.4
Commitments and Contingencies
12 Months Ended
Dec. 31, 2020
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Note 8: Commitments and Contingencies
Regulatory Matters
Overview
—Unitil’s distribution utilities deliver electricity and/or natural gas to customers in the Company’s service territories at rates established under traditional cost of service regulation. Under this
regulatory structure, Unitil Energy, Fitchburg, and Northern Utilities recover the cost of providing distribution service to their customers based on a representative test year, including a return on their capital investment in utility assets. Fitchburg’s electric and gas divisions also operate under revenue decoupling mechanisms.
Most of Unitil’s customers may elect to purchase their electric or natural gas supplies from third-party suppliers. For Northern Utilities, only business customers may purchase their natural gas supplies from third-party suppliers at this time. Most small and
medium-sized
customers continue to purchase such supplies through Unitil Energy, Fitchburg and Northern Utilities as the providers of basic or default service energy supply. Unitil Energy, Fitchburg and Northern Utilities purchase electricity or natural gas for basic or default service from unaffiliated wholesale suppliers and recover the actual costs of these supplies, without profit or markup, through reconciling, pass-through rate mechanisms that are periodically adjusted. The MDPU, the NHPUC and the MPUC each have continued to approve these reconciling rate mechanisms, which allow Fitchburg, Unitil Energy and Northern Utilities to recover their actual wholesale energy costs for electric power and natural gas.
In connection with the implementation of retail choice, Unitil Power and Fitchburg divested their long-term power supply contracts through the sale of the entitlements to the electricity sold under those contracts. Unitil Energy and Fitchburg recover in their rates all the costs associated with the divestiture of their power supply portfolios and have secured regulatory approval from the NHPUC and MDPU, respectively, for the recovery of power supply-related stranded costs and other restructuring-related regulatory assets. These assets have been principally recovered as of December 31, 2020. The remaining balance of these assets is $0.3 million, recorded in Current Assets as Accrued Revenue on the Company’s Consolidated Balance Sheet as of December 31, 2020 and projected to be recovered in the next year. Unitil’s distribution companies have a continuing obligation to submit filings in Massachusetts and New Hampshire demonstrating their compliance with regulatory mandates and provide for timely recovery of costs in accordance with their approved restructuring plans.
Tax Cuts and Jobs Act of 2017
On December 22, 2017, the Tax Cuts and Jobs Act of 2017 (TCJA) was signed into law. Among other things, the TCJA substantially reduced the corporate income tax rate to 21%, effective January 1, 2018. Each state public utility commission, with jurisdiction over the areas that are served by Unitil’s electric and gas subsidiary companies, issued orders directing how the tax law changes were to be reflected in rates. Unitil has complied with these orders and has made the required changes to its rates as directed by the commissions. The FERC issued a Notice of Proposed Rulemaking that would allow it to determine which pipelines under the Natural Gas Act may be collecting unjust and unreasonable rates in light of the corporate tax reduction. This matter was resolved for Granite State in its May 2, 2018 uncontested rate settlement filing, which accounted for the effect of the TCJA.
On November 21, 2019, the FERC issued Order No. 864, a final rule on Public Utility Transmission Rate Changes to Address Accumulated Deferred Income Taxes. The new rule requires public utilities with formula transmission rates to revise their formula rates to include a transparent methodology to address the TCJA and future tax law changes on customer rates by accounting for “excess” or “deficient” Accumulated Deferred Income Taxes (ADIT). FERC also required transmission providers with stated rates to account for TCJA’s effect on ADIT in their next rate case. The Company is complying with the new rule and there is no material effect on its financial position, operating results, or cash flows.
Rate Case Activity
Northern Utilities—Base Rates—Maine—
On March 26, 2020, the MPUC approved an increase to base revenue of $3.6 million, a 3.6% increase over the Company’s test year operating revenues, effective April 1, 2020. The order approved a return on equity of 9.48%, and a hypothetical capital structure of 50% equity and 50% debt. As part of the order and increase in base revenue, the MPUC provided for recovery of some but not all of the Company’s implementation costs associated with its customer information system pending the completion of an investigation. The Company believes that the customer information system costs were prudently incurred and that the investigation will not have a material impact on its financial position, operating results or cash flows.
Northern Utilities—Targeted Infrastructure Replacement Adjustment (TIRA)—Maine—
The settlement in Northern Utilities’ Maine division’s 2013 rate case authorized the Company to implement a TIRA rate mechanism to adjust base distribution rates annually to recover the revenue requirements associated with targeted investments in gas distribution system infrastructure replacement and upgrade projects, including the Company’s Cast Iron Replacement Program (CIRP). In its Final Order issued on February 28, 2018 for Northern Utilities’ 2017 base rate case, the MPUC approved an extension of the TIRA mechanism for an additional eight-year period, which will allow for annual rate adjustments through the end of the CIRP program. The Company’s most recent request under the TIRA mechanism, to increase annual base rates by $1.4 million for 2019 eligible facilities, was approved by the MPUC on April 29, 2020, effective May 1, 2020.
Northern Utilities—Base Rates—New Hampshire—
On May 2, 2018, the NHPUC approved a settlement agreement providing for a net annual revenue increase of $3.2 million, incorporating the effect of the TCJA, and an initial step increase to recover post-test year capital investments. The Company’s second annual revenue step increase of approximately $1.4 million to recover eligible capital investments in 2018 was approved by the NHPUC effective May 1, 2019. According to the terms of the settlement agreement, Northern Utilities’ next distribution base rate case shall be based on a historical test year no earlier than the twelve months ending December 31, 2020.
Unitil Energy—Base Rates—
On April 20, 2017 the NHPUC issued its final order effective May 1, 2017, providing for a permanent increase of $4.1 million followed by two annual rate step adjustments to recover the revenue requirements associated with certain capital expenditures. On April 30, 2018, the NHPUC approved Unitil Energy’s first step increase, effective May 1, 2018. On April 22, 2019, the NHPUC approved Unitil Energy’s second and final step adjustment, providing a revenue increase of approximately $340,000, effective May 1, 2019.
Fitchburg—Base Rates—Electric—
Fitchburg’s base rates are decoupled, and subject to an annual revenue decoupling adjustment mechanism, which includes a cap on the amount that rates may be increased in any year. In addition, Fitchburg has an annual capital cost recovery mechanism to recover the revenue requirement associated with certain capital additions. On November 1, 2018, Fitchburg filed its cumulative revenue requirement of $0.9 million associated with the Company’s 2015-2017 capital expenditures. On December 22, 2020,
 
final approval of
the filing was
 issued
. On October 29, 2019, Fitchburg filed its cumulative revenue requirement of $1.1 million associated with the Company’s 2015-2018 capital expenditures. On December 22, 2020,
 final approval of
the filing was
 issued
. On November 2, 2020, Fitchburg filed its cumulative revenue requirement of $1.4 million associated with the Company’s 2015-2019 capital expenditures. On December 17, 2020, the filing was approved, effective January 1, 2021, subject to further investigation and reconciliation.
 
On April 17, 2020, the MDPU approved a settlement agreement entered into by the Company and the Massachusetts Office of the Attorney General providing for a distribution increase of $1.1 million, effective November 1, 2020. The Company’s subsequent Compliance Filing reflected an adjusted distribution increase of $0.9 million, a decrease of $0.2 million from the original settlement amount. On May 21, 2020, the MDPU approved the Company’s Compliance Filing. The agreement provides for a return on equity of 9.7% and a capital structure reflecting 52.45% equity and 47.55% long-term debt. Under the agreement, the Company will not increase or redesign base distribution rates to become effective prior to November 1, 2023, though the Company may seek cost recovery for certain exogenous events that meet a revenue threshold of $0.1 million. The agreement also provides for the implementation of a major storm reserve fund, whereby the Company may recover the costs of restoration for qualifying storm events. In addition, the agreement provides for the extension of the annual capital cost recovery mechanism, modified to allow the recovery of property tax on the cumulative net capital expenditures.
Fitchburg—Base Rates—Gas—
Pursuant to the Company’s revenue decoupling adjustment clause tariff, as approved in its last base rate case, the Company is allowed to modify, on a semi-annual basis, its base distribution rates to an established revenue per customer target in order to mitigate economic, weather and energy efficiency impacts to the Company’s revenues. The MDPU has consistently found that the Company’s filings are in accord with its approved tariffs, applicable law and precedent, and that they result in just and reasonable rates.
On February 28, 2020, the MDPU approved a settlement agreement between the Company and the Massachusetts Office of the Attorney General. The agreement provides for an annual distribution revenue increase of $4.6 million to be
phased-in
over two years: (1) an increase of $3.7 million, which became effective on March 1, 2020; and (2) an increase of $0.9 million, effective on March 1, 2021. Under the agreement, the Company will not increase or redesign base distribution rates to become effective prior to March 1, 2023, though the Company may seek cost recovery for certain exogenous events that meet a revenue impact threshold of $40,000. The agreement provides for a return on equity of 9.7% and a capital structure reflecting 52.45% equity and 47.55% long-term debt.
Fitchburg—Gas System Enhancement Program—
Pursuant to statute and MDPU order, Fitchburg has an approved Gas System Enhancement Plan (GSEP) tariff through which it may recover certain gas infrastructure replacement and safety related investment costs, subject to an annual cap. Under the plan, the Company is required to make two annual filings with the MDPU: a forward-looking filing for the subsequent construction year, to be filed on or before October 31 (the GSEP Filing); and a filing, submitted on or before May 1, of final project documentation for projects completed during the prior year, demonstrating substantial compliance with its plan in effect for that year and showing that project costs were reasonably and prudently incurred (the GREC Filing). The Company considers these to be routine regulatory proceedings, and there are no material issues outstanding.
In an Order issued on April 30, 2019, the MDPU approved Fitchburg’s 2018 GSEP Filing and increased the annual cap on recovery. The Order resulted in a revenue increase of
$1.0 
million that went into effect on May 1, 2019, subject to reconciliation. The amount that exceeded the cap,
$0.6 
million, has been deferred to be recovered in a later proceeding. On May 1, 2019, the Company made its 2019 GREC Filing, seeking a waiver of the annual cap and a revenue increase of
$1.0 
million. The MDPU approved the Company’s request in its Order issued October 31, 2019. On October 31, 2019, the Company made its annual filing for an increase in revenues associated with 2020 GSEP investment for rates effective May 1, 2020. On March 12, 2020, the Company made a revised GSEP filing to incorporate the 2015 through 2018 GSEP investments in base rates effective March 1, 2020; on April 30, 2020, the MDPU approved the Company’s filing. On May 1, 2020, the Company made its 2020 GREC Filing. In accordance with the approved gas rate case settlement agreement, the Company decreased the Gas System Enhancement Reconciliation Adjustment Factors (GSERAF) and Gas System Enhancement Adjustment Factors to zero effective March 1, 2020, and will recover the February 29, 2020 GSEP deferral balance including interest over a 24 month period beginning March 1, 2021. As a result, the current year’s GSERAF will change on March 1, 2021, instead of November 1, 2020. The GSERAF recovery amount to be recovered over
24
months beginning March 1, 2021 is
$
2.2
 
million. This matter remains pending before the MDPU.
Granite State—Base Rates—
On November 30, 2020, the FERC approved Granite State’s filing of an uncontested rate settlement which provides for an increase in annual revenues of approximately $1.3 million, effective November 1, 2020. The Settlement Agreement permits the filing of limited Section 4 rate adjustments for capital cost projects eligible for cost recovery in 2021, 2022, and 2023, and sets forth an overall cap of approximately $14.6 million on the capital cost recoverable under such filings during the term of the Settlement. Under the Settlement Agreement, Granite may not file a new general rate case earlier than April 30, 2024 with rates to be effective no earlier than November 1, 2024 based on a test year ending no earlier than December 31, 2023.
Other Matters
Fitchburg—Independent Statewide Examination of the Safety of the Commonwealth’s Gas Distribution System—
The MDPU engaged a third-party evaluator to conduct an independent statewide examination of the safety of the gas distribution system to complement the investigation of the National Transportation Safety Board focused on the gas incident on September 13, 2018 in the Merrimack Valley and its potential causes. The evaluator examined: (1) the physical integrity and safety of the gas distribution system; and (2) the operation and maintenance policies and practices of the gas companies and municipal gas companies, with respect to the Commonwealth’s gas distribution system, including recommendations for improvements. The evaluator issued its final report on January 31, 2020, which contained a number of observations and recommendations for the improvement of gas distribution safety. On February 28, 2020, the Company filed a response and plan to implement the Unitil-specific recommendations, as well as general safety improvements.
Fitchburg—Investigation into the role of gas LDCs to achieve Commonwealth 2050 climate goals
 - The MDPU has opened an investigation to examine the role of Massachusetts gas local distribution companies (LDCs) in helping the Commonwealth to achieve its 2050 climate goal of
net-zero
greenhouse gas (GHG) emissions. In its Order opening the inquiry, the MDPU states that it is required to consider new policies and structures as the Commonwealth reduces reliance on fossil fuels, including natural gas, which may require LDCs to make significant changes to their planning processes and business models. The LDCs, including Fitchburg, have been directed to initiate a joint request for proposals (RFP) for an independent consultant(s) to conduct a study and prepare a report (Report), including a detailed study of each LDC that analyzes the feasibility of all identified pathways to help the Commonwealth achieve its
net-zero
GHG goal. The study is to include an examination of the potential pathways identified in the 2050 Decarbonization Roadmap developed by the MA Executive Office of Energy and Environmental Affairs, in consultation with the Massachusetts Department of Environmental Protection and the Massachusetts Department of Energy Resources. On or before March 1, 2022, each LDC is required to submit a proposal to the MDPU that includes the LDC’s recommendations and plans for helping the Commonwealth achieve its 2050 climate goals, supported by the Report. Prior to filing the Report and the LDCs’ proposals, the LDCs are directed to engage in a stakeholder process to solicit feedback and advice on both the Report and the proposals. Fitchburg is actively involved in the LDC’s joint effort to respond to the MDPU’s directives.
Financial Effects of
COVID-19
Pandemic—
The NHPUC and the MDPU have opened proceedings to consider the revenue and cost effects on the regulated gas and electric utilities within their respective jurisdictions of the requirement to continue the availability of gas, electric and water service to customers during the
COVID-19
pandemic. Among the effects under investigation are the revenue effects associated with service disconnection moratoriums, the waiver of fees and expanded customer payments arrangements; the increased cost of customer accounts that cannot be collected, including the cost of bad debt reserves and increased working capital costs; and increased operating and maintenance
costs incurred for employees to work safely and protect the public. Fitchburg, Unitil Energy and Northern Utilities are active participants in these proceedings, and are in full compliance with all regulatory orders governing service
shut-off
moratoriums and other customer service protection measures. These matters remain pending. On December 31, 2020, in docket DPU
20-58,
the MDPU issued an order which, among other provisions, allows the utility companies to defer for future recovery bad debt expense in excess of a baseline.
Northern Utilities / Granite State—Firm Capacity Contract
—Northern Utilities relies on the transport of gas supply over its affiliate Granite State pipeline to serve its customers in the Maine and New Hampshire service territories. Granite State facilitates critical upstream interconnections with interstate pipelines and third party suppliers essential to Northern Utilities’ service to its customers. Northern Utilities reserves firm capacity through a contract with Granite State, which is renewed annually. Pursuant to statutory requirements in Maine and orders of the MPUC, Northern Utilities submits an annual informational report requesting approval of a
one-year
extension of its
12-month
contract for firm pipeline capacity reservation, with an evergreen provision and three-month termination notification requirement. On May 13, 2020, the MPUC approved Northern Utilities’ request to extend its contract for firm transmission service on its affiliate Granite State pipeline for another year, extending the current contract for the period of November 1, 2020 through October 31, 2021.
Reconciliation Filings—
Fitchburg, Unitil Energy and Northern Utilities each have a number of regulatory reconciling accounts that require annual or semi-annual filings with the MDPU, NHPUC and MPUC, respectively, to reconcile costs and revenues, and to seek approval of any rate changes. These filings include: annual electric reconciliation filings by Fitchburg and Unitil Energy for a number of items, including default service, stranded cost changes and transmission charges; costs associated with energy efficiency programs in New Hampshire and Massachusetts, as directed by the NHPUC and MDPU; recovery of the ongoing costs of storm repairs incurred by Unitil Energy; and the actual wholesale energy costs for electric power and gas incurred by each of the three companies. Fitchburg, Unitil Energy and Northern Utilities have been, and remain in full compliance with all directives and orders regarding these filings. The Company considers these to be routine regulatory proceedings, and there are no material issues outstanding.
Fitchburg—Massachusetts RFPs—
Pursuant to a comprehensive energy law enacted in 2016, “An Act to Promote Energy Diversity,” (the Act) under Section 83C, the Massachusetts electric distribution
companies (EDCs), including Fitchburg, are required to jointly solicit
proposals for long-term contracts for at least 400 megawatts (MW) of offshore wind energy generation by June 30, 2017, as part of a total of
1,600 MW of offshore wind the EDCs are directed to procure by June 30, 2027. Under Section 83D of the Act, the EDCs are required to jointly
seek proposals for cost-effective clean energy (hydroelectric, solar and land-based wind) long-term contracts via one or more staggered
solicitations for a total of 9,450,000
megawatt-hours (MWh) by December 31, 2022. Unitil’s pro rata share of these contracts is approximately one percent. The EDCs issued the RFP for Section 83D Long-Term Contracts for Qualified Clean Energy Projects in March 2017, and after selection of final projects and negotiation, final contracts for
9,554,940 MWh of Qualified Clean Energy and associated Environmental Attributes from hydroelectric generation were filed in July 2018 for approval by the MDPU. On June 25, 2019, the MDPU approved the power purchase agreements, including the EDCs’ proposal to sell the energy procured under the contract into the
ISO-NE
wholesale market and to credit or charge the difference between the contract costs and the
ISO-NE
market costs to customers. The MDPU also determined that the EDCs’ request for remuneration equal to 2.75%
of the contract payments is reasonable and in the public interest and approved the EDCs’ proposal to amend their respective tariffs to include the recovery of costs associated with the contracts. The Massachusetts Supreme Judicial Court upheld the MDPU’s approval in an Order dated September 3, 2020. The Company believes the power purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.
 
The EDCs issued the RFP pursuant to Section 83C for Long-Term Contracts for Offshore Wind Energy Generation in June 2017. The EDCs selected an 800 MW project submitted by Vineyard Wind in May 2018, contracts were signed in July 2018 and on July 23, 2018, the EDCs, including Fitchburg, filed two long-term contracts, each for 400 MW of offshore wind energy generation with the MDPU for approval. On April 12, 2019, the MDPU approved the offshore wind energy generation power purchase agreements, including the EDCs’ proposal to sell the energy procured under the contract into the
ISO-NE
wholesale market and to credit or charge the difference between the contract costs and the
ISO-NE
market costs to customers. The MDPU also determined that the EDCs’ request for remuneration equal to 2.75% of the contract payments is reasonable and in the public interest and approved the EDCs’ proposal to amend their respective tariffs to include the recovery of costs associated with the contracts. The Company believes that the power purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.
The EDCs issued a second RFP pursuant to Section 83C for Long-Term Contracts for Offshore Wind Energy Generation on May 23, 2019. This solicitation sought to procure the remaining obligation under 83C to procure an additional 800 MW of offshore wind energy generation. The EDCs selected an 800 MW project submitted by Mayflower Wind and contracts were executed on January 10, 2020. A filing with the MDPU for approval of two long-term contracts, each for 400 MW of offshore wind energy generation, was made on February 10, 2020. On November 5, 2020, the MDPU approved the Offshore Wind Energy Generation power purchase agreements. The MDPU also determined that the EDCs’ request for remuneration equal to 2.75% is reasonable and in the public interest. On November 25, 2020 the Office of the Attorney General filed a Motion for Reconsideration regarding the MDPU’s order as it relates to remuneration. The matter is still pending at the MDPU. The Company believes that the power purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.
FERC Transmission Formula Rate Proceedings—
Pursuant to Section 206 of the Federal Power Act, there are several pending proceedings before the FERC concerning the justness and reasonableness of the Return on Equity (ROE) component of the
ISO-New
England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates. On April 14, 2017, the U.S. Court of Appeals for the D.C. Circuit (the “Court”) issued an opinion vacating a decision of the FERC with respect to the ROE, and remanded it for further proceedings. The FERC had found that the Transmission Owners existing ROE was unlawful, and had set a new ROE. The Court found that the FERC had failed to articulate a satisfactory explanation for its orders. At this time, the ROE set in the vacated order will remain in place until further FERC action is taken. Separately, on March 15, 2018, the Transmission Owners filed a petition for review with the Court of certain orders of the FERC setting for hearing other complaints challenging the allowed Return on Equity component of the formula rates. On November 21, 2019 the FERC issued an order in
EL14-12,
Midcontinent Independent System Operator ROE, in which FERC outlined a new
methodology for calculating the ROE. In response to the FERC order in EL
14-12,
the New England Transmission Owners (NETOs) filed a motion to reopen the record, which has been granted. This matter remains pending.
The FERC Section 206 proceeding concerning the justness and reasonableness of
ISO-New
England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates and to develop formula rate protocols for these rates has been resolved. On August 17, 2018 a joint settlement agreement among a number of the parties was filed with the FERC. FERC rejected the settlement agreement on May 22, 2019 and remanded the proceeding to the Chief Administrative Law Judge to resume hearing procedures. On May 24, 2019 the judge appointed a Dispute Resolution Facilitator to aid parties in settlement negotiations. The procedural schedule was suspended September 24, 2019 in order to allow participants to focus on settlement negotiations. On October 24, 2019, the NETO’s filed an unopposed motion to suspend the procedural schedule and waiver of answer period indicating that the NETO’s, Municipal Pool Transmission Facility Owners and the Commission Trial Staff have reached agreement in principle on the terms of a settlement to resolve all open issues in the proceeding. On June 15, 2020 a settlement was filed. The FERC approved the settlement agreement on December 28, 2020. Under the terms of the settlement agreement, the negotiated formula rates will take effect on January 1, 2022. Fitchburg and Unitil Energy are Participating Transmission Owners, although Unitil Energy does not own transmission plant. To the extent that these proceedings result in any changes to the rates being charged, a retroactive reconciliation may be required. The Company does not believe these proceedings will have a material adverse effect on its financial condition or results of operations.
Contractual Obligations
The following table lists the Company’s known specified gas and electric supply contractual obligations as of December 31, 2020.
 
           
Payments Due by Period
 
Gas and Electric Supply
Contractual Obligations (millions) as of December 31, 2020
  
Total
    
2021
    
2022
    
2023
    
2024
    
2025
    
2026 &
Beyond
 
Gas Supply Contracts
   $ 556.2      $ 55.9      $ 49.3      $ 46.5      $ 37.6      $ 36.2      $ 330.7  
Electric Supply Contracts
     15.6        1.3        1.3        1.4        1.4        1.4        8.8  
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
 
Total
   $ 571.8      $ 57.2      $ 50.6      $ 47.9      $ 39.0      $ 37.6      $ 339.5  
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
 
The Company and its subsidiaries have material energy supply commitments (see Note 7 (Energy Supply)). Cash outlays for the purchase of electricity and natural gas to serve customers are subject to reconciling recovery through periodic changes in rates, with carrying charges on deferred balances. From year to year, there are likely to be timing differences associated with the cash recovery of such costs, creating under- or over-recovery situations at any point in time. Rate recovery mechanisms are typically designed to collect the under-recovered cash or refund the over-collected cash over subsequent periods of less than a year.
Legal Proceedings
The Company is involved in legal and administrative proceedings and claims of various types, including those which arise in the ordinary course of business. The Company believes, based upon information furnished by counsel and others, that the ultimate resolution of these claims will not have a material effect on its financial position, operating results or cash flows.
Environmental Matters
The Company’s past and present operations include activities that are generally subject to extensive and complex federal and state environmental laws and regulations. The Company is in material compliance with applicable environmental and safety laws and regulations and, as of December 31, 2020, has not identified any material losses reasonably likely to be incurred in excess of recorded amounts. However, the Company cannot assure that significant costs and liabilities will not be incurred in the future. It is possible
that other developments, such as increasingly stringent federal, state or local environmental laws and regulations could result in increased environmental compliance costs. Based on the Company’s current assessment of its environmental responsibilities, existing legal requirements and regulatory policies, the Company does not believe that these environmental costs will have a material adverse effect on the Company’s consolidated financial position or results of operations.
Northern Utilities Manufactured Gas Plant Sites—
Northern Utilities has an extensive program to identify, investigate and remediate former manufactured gas plant (MGP) sites, which were operated from the
mid-1800s
through the
mid-1900s.
In New Hampshire, MGP sites were identified in Dover, Exeter, Portsmouth, Rochester and Somersworth. In Maine, Northern Utilities has documented the presence of MGP sites in Lewiston and Portland, and a former MGP disposal site in Scarborough.
Northern Utilities has worked with the Maine Department of Environmental Protection and New Hampshire Department of Environmental Services (NH DES) to address environmental concerns with these sites. Northern Utilities or others have completed remediation activities at all sites; however, on site monitoring continues at several sites which may result in future remedial actions as directed by the applicable regulatory agency. In July 2019, the NH DES requested that Northern Utilities review modeled expectations for groundwater contaminants against observed data at the Rochester site. In June 2020, the NH DES coupled the submittal of the review to a proposed extension of the gas distribution system by Northern Utilities; both the review and extension are expected to be completed by the end of the second quarter of 2021.    While any recommendation is subject to approval by the NH DES, the Company has accrued $0.8 million for estimated costs to complete the remediation at the Rochester site, which is included in the Environmental Obligations table below.
The NHPUC and MPUC have approved regulatory mechanisms for the recovery of MGP environmental costs. For Northern Utilities’ New Hampshire division, the NHPUC has approved the recovery of MGP environmental costs over succeeding seven-year periods. For Northern Utilities’ Maine division, the MPUC has authorized the recovery of environmental remediation costs over succeeding five-year periods.
The Environmental Obligations table shows the amounts accrued for Northern Utilities related to estimated future cleanup costs associated with Northern Utilities’ environmental remediation obligations for former MGP sites. Corresponding Regulatory Assets were recorded to reflect that the future recovery of these environmental remediation costs is expected based on regulatory precedent and established practices.
Fitchburg’s Manufactured Gas Plant Site—
Fitchburg has worked with the Massachusetts Department of Environmental Protection (Mass DEP) to address environmental concerns with the former MGP site at Sawyer Passway, and has substantially completed remediation activities, though on site monitoring continues. In April 2020, Fitchburg received notification from the Massachusetts Department of Transportation (Mass DOT) that a portion of the site may be incorporated into the proposed Twin City Rail Trail with an anticipated completion in 2022. Depending upon the final agreement between Fitchburg and Mass DOT, additional minor costs are expected prior to completion.
Additionally, in November 2020, the Mass DEP conducted an audit of the final remediation solution at Sawyer Passway. Site security improvements were required by the Mass DEP, which Fitchburg will complete in early 2021.
Fitchburg recovers the environmental response costs incurred at this former MGP site in gas rates pursuant to the terms of a cost recovery agreement approved by the MDPU. Pursuant to this agreement, Fitchburg is authorized to amortize and recover environmental response costs from gas customers over succeeding seven-year periods.
The following table sets forth a summary of changes in the Company’s liability for the current and long-term portions of the Company’s environmental obligations, which are included in Other Current Liabilities and Other Noncurrent Liabilities, respectively, on the Company’s Consolidated Balance Sheets as of December 31, 2020 and 2019.
Environmental Obligations
 
    
(millions)
 
    
Fitchburg
    
Northern
Utilities
    
Total
 
    
2020
    
2019
    
2020
    
2019
    
2020
    
2019
 
Total Balance at Beginning of Period
  
$
 
   $     
$
2.7
 
   $ 2.0     
$
2.7
 
   $ 2.0  
Additions
  
 
0.1
 
         
 
0.1
 
     0.9     
 
0.2
 
     0.9  
Less: Payments / Reductions
  
 
 
         
 
0.8
 
     0.2     
 
0.8
 
     0.2  
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
 
Total Balance at End of Period
  
$
0.1
 
   $     
$
2.0
 
   $ 2.7     
$
2.1
 
   $ 2.7  
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
 
Less: Current Portion
  
 
0.1
 
         
 
0.2
 
     0.6     
 
0.3
 
     0.6  
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
 
Noncurrent Balance at December 31,
  
$
 
   $     
$
1.8
 
   $ 2.1     
$
1.8
 
   $ 2.1