XML 25 R13.htm IDEA: XBRL DOCUMENT v3.22.2
REGULATORY MATTERS
6 Months Ended
Jun. 30, 2022
REGULATORY MATTERS
NOTE 6 - REGULATORY MATTERS
UNITIL’S REGULATORY MATTERS ARE DESCRIBED IN NOTE 8 TO THE FINANCIAL STATEMENTS IN ITEM 8 OF PART II OF UNITIL CORPORATION’S FORM 10-K FOR DECEMBER 31, 2021 AS FILED WITH THE SECURITIES AND EXCHANGE COMMISSION ON FEBRUARY 1, 2022.

Rate Case Activity
Northern Utilities - Base Rates - Maine
- On March 26, 2020, the MPUC approved an increase to base revenue of $3.6 million, a 3.6% increase over the Company’s test year operating revenues, effective April 1, 2020. The order approved a Return on Equity of 9.48%,
and a hypothetical capital structure
of 50% equity and 50% debt. As part of the order and increase in base revenue, the MPUC provided for recovery of some, but not all, of the Company’s implementation costs associated with its customer information system pending the completion of an investigation, including a third-party audit. On March 9, 2021, the MPUC opened a new docket to investigate the amount of customer information system costs that will be allowed in rates. On January 27, 2022, the Company and the Maine Office of the Public Advocate filed a stipulation in this docket. The stipulation includes no finding of imprudence or asset disallowance. The terms of the stipulation provide for recovery of the revenue requirement related to the Company’s customer information system in base rates starting November 1, 2022, which coincides with the timing of the Company’s winter cost of gas rate change. On February 9, 2022, the MPUC approved the stipulation.
Northern Utilities - Targeted Infrastructure Replacement Adjustment (TIRA) - Maine
-
The settlement in Northern Utilities’ Maine division’s
2013 rate case authorized the Company to implement a TIRA rate mechanism to adjust base distribution rates annually to recover the revenue requirements associated with targeted investments in gas distribution system infrastructure replacement and upgrade projects, including the Company’s Cast Iron Replacement Program (CIRP). In its Final Order issued on February 28, 2018 for Northern Utilities’ 2017 base rate case, the MPUC approved
an extension of the TIRA mechanism for an additional eight-year period, which will allow for annual rate adjustments through the end of the CIRP program. The Company’s most recent request under the TIRA mechanism, to increase annual base rates b
y $1.5 million for 2021 eligible facilities, was filed with the MPUC on February 28, 2022. On April 27, 2022, the MPUC issued an order approving the filing, for rates effective May 1, 2022.
Northern Utilities - Base Rates - New Hampshire
-
On July 20, 2022, the NHPUC issued an Order in the distribution base rate case filed with the
NHPUC on August 2, 2021 by Northern Utilities. The Order approves a comprehensive Settlement Agreement between the Company, the New
Hampshire DOE (DOE), and the Office of the Consumer Advocate (OCA). As provided in the Settlement Agreement, in addition to authorizing an
increase to permanent distribution rates o
f
$
6.1 
million, effective August 1, 2022, the Order
(1) approves a revenue decoupling mechanism and (2) allows for a step adjustment effective September 1, 2022 covering the additional revenue requirement resulting from changes in Net Plant in Service associated with
non-growth
investments for the period January 1, 2021, through December 31, 2021. On June 8, 2022, the Company filed for its first
step increase of approximately $1.6 million of annual revenue, for rates effective as of September 1, 2022, to recover eligible 2021 capital investments.
The NHPUC opened a separate docket to review the Company’s proposed step adjustment, and that matter remains pending. The increase in permanent rates will be reconciled back to October 1, 2021, the effective date of temporary rates previously approved in this docket. This distribution base rate case reflects the Company’s operating costs and investments in utility plant for a test year ended December 31, 2020 as adjusted for known and measurable changes. The Order provides for a return on equity of
 
9.3
%
 and a capital structure reflecting 52% equity and 48% long-term debt. In light of the Step Adjustment, the Company shall not file a distribution rate case with the Commission before January 1, 2024 (the “Stay-Out Period”). However, during
the term of the Stay-Out Period, the Company will be allowed to adjust distribution rates upward or downward resulting from a singular (not collective) exogenous event that exceeds $200,000.
Unitil Energy - Base Rates
- On May 3, 2022, the NHPUC issued an Order in the distribution base rate case filed with the NHPUC on April 2, 2021 by Unitil Energy. The Order approves, in part, a comprehensive Settlement Agreement between the Company, the New Hampshire DOE, the OCA, the New Hampshire Department of Environmental Services, Clean Energy New Hampshire, and ChargePoint, Inc. In addition to authorizing an increase to permanent distribution rates of $
6.3
million, effective June 1, 2022, the Order approves the following components of the Settlement Agreement: (1) a multi-year rate plan, (2) a revenue decoupling mechanism,
(3) time-of-use
rates, (4) resiliency programs to support the Company’s commitment to reliability, and (5) other rate design and tariff changes. On May 10, 2022, the Company filed a request for clarification with the NHPUC to clarify that the authorized revenue requirement should exclude expenses related to the Company’s proposed Arrearage Management Program (AMP), which was not approved in the Order. On May 12, 2022, the Commission issued an Order, which clarified that because the Company will not incur the expenses associated with the AMP, those costs should be removed from the revenue requirement, and that the adjusted increase of

$5.9 million will result in reasonable rates. The increase in permanent
rates
was
reconciled
back to June 1, 2021, the effective date of temporary rates previously approved in this docket. This distribution base rate case reflects the Company’s operating costs and investments in utility plant for a test year ended December 31, 2020 as adjusted for known and measurable changes. The Order provides for a return on equity of 9.2% and a capital structure reflecting 52% equity and 48% long-term debt. On July 28, 2022, the NHPUC approved, subject to reconciliation, the Company’s first step increase of approximately $1.3 million of annual revenue to recover eligible 2021 capital investments, effective August 1, 2022.
Fitchburg - Base Rates - Electric
- Fitchburg’s base rates are decoupled and subject to an annual revenue decoupling adjustment mechanism, which includes a cap on the amount that rates may be increased in any year. In addition, Fitchburg has an annual capital cost recovery mechanism to recover the revenue requirement associated with certain capital additions. On November 2, 2021, Fitchburg filed its cumulative revenue requirement of $1.6 million associated with its 2019 and 2020 capital expenditures. The Department allowed the associated rate increase to become effective on January 1, 2022, subject to further investigation and reconciliation. On June 24, 2022, the MDPU issued an Order approving the Company’s filing.
On April 17, 2020, the MDPU approved a settlement agreement entered into by the Company and the Massachusetts Office of the Attorney General providing for a distribution increase of $1.1 million, effective November 1, 2020. The Company’s subsequent Compliance Filing reflected an adjusted distribution increase of $0.9 million, a decrease of $0.2 million from the original settlement amount. On May 21, 2020, the MDPU approved the Company’s Compliance Filing. The agreement provides for a Return on Equity of 9.7% and a capital structure reflecting 52.45% equity and 47.55% long-term debt. Under the agreement, the Company will not increase or redesign base distribution rates to become effective prior to November 1, 2023, though the Company may seek cost recovery for certain exogenous events that meet a revenue threshold of $0.1 million. The agreement also provides for the implementation of a major storm reserve fund, whereby the Company may recover the costs of restoration for qualifying storm events. In addition, the agreement provides for the extension of the annual capital cost recovery mechanism, modified to allow the recovery of property tax on the cumulative net capital expenditures.
Fitchburg - Base Rates - Gas
- Pursuant to its revenue decoupling adjustment clause tariff, as approved in its last base rate case, the Company is allowed to modify, on a semi-annual basis, its base distribution rates to an established revenue per customer target in order to mitigate economic, weather and energy efficiency affect to the Company’s revenues. The MDPU consistently has found the Company’s filings are in accord with its approved tariffs, applicable law and precedent, and that they result in just and reasonable rates.
On February 28, 2020, the MDPU approved a settlement agreement between the Company and the Massachusetts Office of the Attorney General. The agreement provides for an annual distribution revenue increase of $4.6 million to be phased in over two years: (1) an increase of $3.7 million, which became effective on March 1, 2020; and (2) an increase of $0.9 million, which became effective on March 1, 2021. Under the agreement, the Company will not increase or redesign base distribution rates to become effective prior to March 1, 2023, though the Company may seek cost recovery for certain exogenous events that meet a revenue effect threshold of $40,000. The agreement provides for a Return on Equity of 9.7% and a capital structure reflecting 52.45% equity and 47.55% long-term debt.
Fitchburg - Gas System Enhancement Program
- Pursuant to statute and MDPU order, Fitchburg has an approved Gas System Enhancement Plan tariff through which it may recover certain gas infrastructure replacement and safety related investment costs, subject to an annual cap. Under the plan, the Company is required to make two annual filings with the MDPU: a forward-looking filing for the subsequent construction year, to be filed on or before October 31; and a filing, submitted on or before May 1, of final project documentation for projects completed during the prior year, demonstrating substantial compliance with its plan in effect for that year and showing that project costs were reasonably and prudently incurred. Fitchburg’s forward-looking filing submitted on October 30, 2020 requested recovery of approximately $2.2 million, and received final approval on April 29, 2021, effective May 1, 2021. The Company’s most recent forward-looking filing, filed on October 29, 2021, requested recovery of approximately $3.3 million.
On April 28, 2022, the MDPU issued an order approving this filing for rates effective May 1, 2022. The Company considers these to be routine regulatory proceedings, and there are no material issues outstanding.
Granite State - Base Rates
- On November 30, 2020, the FERC approved Granite State’s filing of an uncontested rate settlement which provides for an increase in annual revenues of approximately $1.3 million, effective November 1, 2020. The Settlement Agreement permits the filing of limited Section 4 rate adjustments for capital cost projects eligible for cost recovery in 2021, 2022, and 2023, and sets forth an overall cap of approximately $14.6 million on the capital cost recoverable under such filings during the term of the Settlement. Under the Settlement Agreement, Granite may not file a new general rate case earlier than April 30, 2024 with rates to be effective no earlier than November 1, 2024 based on a test year ending no earlier than December 31, 2023.
On August 24, 2021, the FERC accepted Granite State’s first limited Section 4 rate adjustment pursuant to the Settlement Agreement, for an annual revenue increase of $0.1
million, effective September 1, 2021. On July 28, 2022, Granite State filed its second
limited Section
 4 rate adjustment, for an annual revenue increase of $0.3 million, effective September 1, 2022. This matter remains pending.
Other Matters
Fitchburg - Grid Modernization
- On July 1, 2021, Fitchburg submitted its Grid Modernization Plan (GMP) to the MDPU. The GMP includes a five year strategic plan, including a plan for the full deployment of advanced metering functionality, and a four-year short-term investment plan, which focuses on foundational investments to facilitate the interconnection and integration of distributed energy resources, optimizing system performance through command and control and self-healing measures, and optimizing system demand by facilitating consumer price-responsiveness. The GMP is subject to review and approval by the MDPU. Briefing was concluded on July 1, 2022 and the GMP remains pending.
Fitchburg - Grid Modernization Cost Recovery Factor
- On April 15, 2022, Fitchburg filed its Grid Modernization Factor (GMF) rate adjustment and reconciliation filing pursuant to the Company’s proposed GMF Tariff, for recovery of the costs incurred as a result of implementing the Company’s 2018-2021 GMP, previously approved by the MDPU on February 7, 2019. The proposed GMF of $0.4 million was approved on May 27, 2022, effective June 1, 2022, subject to further investigation and reconciliation.
Fitchburg - Investigation into the role of gas LDCs to achieve Commonwealth 2050 climate goals -
The MDPU has opened an investigation to examine the role of Massachusetts gas local distribution companies (LDCs) in helping the Commonwealth achieve its 2050 climate goal of net-zero greenhouse gas (GHG) emissions. In its Order opening the inquiry, the MDPU stated it is required to consider new policies and structures as the Commonwealth reduces reliance on fossil fuels, including natural gas, which may require LDCs to make significant changes to their planning processes and business models. The LDCs, including Fitchburg, engaged an independent consultant to conduct a study and prepare a report (Consultant Report), including a detailed study of each LDC, that analyzes the feasibility of all identified pathways to help the Commonwealth achieve its net-zero GHG goal. The study includes an examination of the potential pathways identified in the 2050 Decarbonization Roadmap developed by the MA Executive Office of Energy and Environmental Affairs, in consultation with the Massachusetts Department of Environmental Protection and the Massachusetts Department of Energy Resources. Following an active stakeholder process, on March 18, 2022, Consultant Reports on decarbonization pathways, regulatory designs and stakeholder engagement were submitted to the MDPU. Also on March 18, 2022, the LDCs, including Fitchburg, submitted proposals to the MDPU that include the LDCs’ recommendations and plans for helping the Commonwealth achieve its 2050 climate goals, supported by the Consultant Reports. The MDPU held a technical session on the Consultant Report on March 30, 2022 and a technical session on the LDC proposals on April 15, 2022. Discovery by the MDPU is complete, and the MDPU has directed LDCs to respond to stakeholder comments by July 19, 2022.
Financial Effects of COVID-19 Pandemic
- The NHPUC and the MDPU have opened proceedings to consider the revenue and cost effects on the regulated electric and gas utilities within their respective
jurisdictions of the requirement to continue the availability of gas, electric and water service to customers during the
COVID-19
pandemic. Among the effects under investigation are the revenue effects associated with service disconnection moratoriums, the waiver of fees and expanded customer payments arrangements; the increased cost of customer accounts that cannot be collected, including the cost of bad debt reserves and increased working capital costs; and increased operating and maintenance costs incurred for employees to work safely and protect the public. Fitchburg, Unitil Energy and Northern Utilities are active participants in these proceedings, and are in full compliance with all regulatory orders governing service
shut-off
moratoriums and other customer service protection measures. On December 31, 2020, in docket DPU
20-58,
the MDPU issued an order which, among other provisions, allows the utility companies to defer for future recovery of bad debt expense in excess of a baseline. On July 7, 2021, the NHPUC issued an order which declined to authorize New Hampshire’s rate-regulated utilities’ establishment of a regulatory asset for incremental bad debt or waived late payment fees related to the
COVID-19
pandemic. The NHPUC stated that these costs will be addressed in each utility’s next rate case. On September 7, 2021, the NHPUC clarified its July 7 Order, determining that it has not foreclosed rate-regulated utilities from utilizing accounting mechanisms to defer costs in order to seek recovery in a future rate proceeding, and that Unitil Energy’s and Northern Utilities’ respective pending rate cases are the appropriate venue to address incremental bad debt and/or waived late payment fees resulting from the
COVID-19
public health emergency orders and directives. Consistent with the authorization provided in that Order, the Settling Parties agreed in Unitil Energy’s rate case that Unitil Energy be permitted to recover
 $386,957
in
COVID-19
related costs relating to expenses from calendar year 2020 by including those costs in its next Schedule EDC through the External Delivery Charge (EDC), a uniform rate per kWh, in the Company’s next scheduled EDC rate change effective August 1, 2022. This provision was approved by the NHPUC Order issued May 3, 2022 on the rate case Settlement Agreement. In Northern Utilities case, the Settling Parties agreed that Northern Utilities shall be permitted to recover
 $68,061
in
COVID-19
related costs relating to expenses from calendar year 2020 by including those costs in its Regulatory Assessment Adjustment Mechanism (RAAM), a uniform rate per therm, in the Company’s next scheduled RAAM rate change effective November 1, 2022. This provision was approved by the NHPUC Order, issued July 20, 2022, on the rate case Settlement Agreement.
Northern Utilities / Granite State - Firm Capacity Contract
- Northern Utilities relies on the transportation of gas supply over its affiliate Granite State pipeline to serve its customers in the Maine and New Hampshire service territories. Granite State facilitates critical upstream interconnections with interstate pipelines and third party suppliers essential to Northern Utilities’ service to its customers. Northern Utilities reserves firm capacity through a contract with Granite State, which is renewed annually. Pursuant to statutory requirements in Maine and orders of the MPUC, Northern Utilities submits an annual informational report requesting approval of a one-year extension of its 12-month contract for firm pipeline capacity reservation, with an evergreen provision and three-month termination notification requirement. On April 1, 2022, Northern Utilities submitted an annual informational report requesting approval on a one-year extension for the period of November 1, 2022 through October 31, 2023. The MPUC issued an Order on June 14, 2022 approving the one-year extension.
Reconciliation Filings
- Fitchburg, Unitil Energy and Northern Utilities each have a number of regulatory reconciling accounts that require annual or semi-annual filings with the MDPU, NHPUC and MPUC, respectively, to reconcile costs and revenues, and to seek approval of any rate changes. These filings include: annual electric reconciliation filings by Fitchburg and Unitil Energy for a number of items, including default service, stranded cost changes and transmission charges; costs associated with energy efficiency programs in New Hampshire and Massachusetts, as directed by the NHPUC and MDPU; recovery of the ongoing costs of storm repairs incurred by Unitil Energy; and the actual wholesale energy costs for electric power and gas incurred by each of the three companies. Fitchburg, Unitil Energy and Northern Utilities have been, and remain in full compliance with all directives and orders regarding these filings. The Company considers these to be routine regulatory proceedings, and there are no material issues outstanding.
Fitchburg - Massachusetts Request for Proposals (RFPs)
- Pursuant to a comprehensive energy law enacted in 2016, “An Act to Promote Energy Diversity,” (the Act) under Section 83C, the Massachusetts electric distribution companies (EDCs), including Fitchburg, are required to jointly solicit proposals for
long-term contracts for at least 400
MW
of offshore wind energy generation by June 30, 2017, as part of a total of 1,600 MW of offshore wind the EDCs are directed to procure by June 30, 2027. Under Section 83D of the Act, the EDCs are required to jointly seek proposals for cost-effective clean energy (hydroelectric, solar and land-based wind) long-term contracts via one or more staggered solicitations for a total of 9,450,000 megawatt-hours (MWh) by December 31, 2022. Unitil’s pro rata share of these contracts is approximately
1%
.
The EDCs issued the RFP for Section 83D Long-Term Contracts for Qualified Clean Energy Projects in March 2017, and after selection of final projects and negotiation, final contracts for 9,554,940 MWh of Qualified Clean Energy and associated Environmental Attributes from Hydro-Quebec Energy Services (U.S.), Inc. for hydroelectric generation were filed in July 2018 for approval by the MDPU. On June 25, 2019, the MDPU approved the power purchase agreements, including the EDCs’ proposal to sell the energy procured under the contract into the ISO-NE wholesale market and to credit or charge the difference between the contract costs and the ISO-NE market costs to customers. The MDPU also determined that the EDCs’ request for remuneration equal to 2.75% of the contract payments is reasonable and in the public interest and approved the EDCs’ proposal to amend their respective tariffs to include the recovery of costs associated with the contracts. The Massachusetts Supreme Judicial Court upheld the MDPU’s approval in an opinion dated September 3, 2020. The Company believes the power purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.
The EDCs issued the RFP pursuant to Section 83C for Long-Term Contracts for Offshore Wind Energy Generation in June 2017. The EDCs selected an 800 MW project submitted by Vineyard Wind in May 2018, contracts were signed in July 2018 and on July 23, 2018, the EDCs, including Fitchburg, filed two long-term contracts, each for 400 MW of offshore wind energy generation with the MDPU for approval. On April 12, 2019, the MDPU approved the offshore wind energy generation power purchase agreements, including the EDCs’ proposal to sell the energy procured under the contract into the ISO-NE wholesale market and to credit or charge the difference between the contract costs and the ISO-NE market costs to customers. The MDPU also determined that the EDCs’ request for remuneration equal to 2.75% of the contract payments is reasonable and in the public interest and approved the EDCs’ proposal to amend their respective tariffs to include the recovery of costs associated with the contracts. The Company believes the power purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.

The EDCs issued a second RFP pursuant to Section 83C for Long-Term Contracts for Offshore Wind Energy Generation on May 23, 2019. This solicitation sought to procure the obligation remaining under 83C at the time, an additional 800 MW of offshore wind energy generation. The EDCs selected an 800 MW project submitted by Mayflower Wind Energy LLC and contracts were executed on January 10, 2020. A filing with the MDPU for approval of two long-term contracts, each for 400 MW of offshore wind energy generation, was made on February 10, 2020. On November 5, 2020, the MDPU approved the Offshore Wind Energy Generation power purchase agreements. The MDPU also determined that the EDCs’ request for remuneration equal to 2.75% is reasonable and in the public interest. The Company believes the power purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.

In accordance with the requirement of Chapter 227 of the Acts of 2018, An Act to Advance Clean Energy, signed August 9, 2018, Massachusetts Department of Energy Resources (MDOER) prepared a report on the necessity, benefits and costs of requiring the EDCs to competitively conduct offshore wind generation RFPs for up to an additional 1,600 MW. The MDOER filed its report with the Legislature in May, 2019, recommending that, “the EDCs should proceed with additional offshore wind solicitations for up to 1,600 MW of offshore wind in 2022 and 2024 and only enter into contracts if found to be cost-effective.” On March 10, 2021, Fitchburg, along with the other EDCs, filed a petition with the MDPU for approval of a proposed timetable and method of solicitation and execution of long-term contracts for up to an additional 1,600 MW of off shore wind generation. On May 5, 2021, the DPU approved the proposed timetable and method for the solicitation, and the RFP was issued on May 7, 2021. On December 17, 2021, the EDCs selected a 1,600 MW portfolio of offshore wind generation that includes a 1,200 MW project submitted
by

Vineyard Wind and a 400 MW project submitted by Mayflower Wind. Contract negotiations were completed in early April 2022 and the contracts were submitted for approval to the MDPU on May 25, 2022. This matter remains pending.
Section 83C of Chapter 169 of the Acts of 2008 was recently amended by the Acts of 2021 to increase the aggregate amount of offshore wind capacity to be procured to 5,600 MW not later than June 30, 2027. After considering the two approved offshore wind contracts of 800 MW each and the most recent selection of 1,600 MW there is another 2,400 MW of offshore wind capacity to be procured in the future.
FERC Transmission Formula Rate Proceedings
- Pursuant to Section 206 of the Federal Power Act, there are several pending proceedings before the FERC concerning the justness and reasonableness of the Return on Equity (ROE) component of the ISO-New England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates. On April 14, 2017, the U.S. Court of Appeals for the D.C. Circuit (the Court) issued an opinion vacating a decision of the FERC with respect to the ROE, and remanded it for further proceedings. The FERC had found that the Transmission Owners existing ROE was unlawful, and set a new ROE. The Court found that the FERC had failed to articulate a satisfactory explanation for its orders. At this time, the ROE set in the vacated order will remain in place until further FERC action is taken. Separately, on March 15, 2018, the Transmission Owners filed a petition for review with the Court of certain orders of the FERC setting for hearing other complaints challenging the allowed Return on Equity component of the formula rates. On November 21, 2019 the FERC issued an order in EL14-12, Midcontinent Independent System Operator ROE, in which FERC outlined a new methodology for calculating the ROE. In response to the FERC order in EL 14-12, the New England Transmission Owners (NETOs) filed a motion to reopen the record, which has been granted. This matter remains pending. The Company does not believe these proceedings will have a material adverse effect on its financial condition or results of operations.
The FERC Section 206 proceeding concerning the justness and reasonableness of
ISO-New
England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates and to develop formula rate protocols for these rates has been resolved. On August 17, 2018 a joint settlement agreement among a number of the parties was filed with the FERC. FERC rejected the settlement agreement on May 22, 2019 and remanded the proceeding to the Chief Administrative Law Judge to resume hearing procedures. On May 24, 2019 the judge appointed a Dispute Resolution Facilitator to aid parties in settlement negotiations. The procedural schedule was suspended September 24, 2019 in order to allow participants to focus on settlement negotiations. On October 24, 2019, the NETOs filed an unopposed motion to suspend the procedural schedule and waiver of answer period indicating that the NETOs, Municipal Pool Transmission Facility Owners and the Commission Trial Staff have reached agreement in principle on the terms of a settlement to resolve all open issues in the proceeding. On June 15, 2020 a settlement was filed. The FERC approved the settlement agreement on December 28, 2020. Pursuant to the terms of the settlement agreement, the negotiated formula rates took effect on January 1, 2022. Fitchburg and Unitil Energy are Participating Transmission Owners, although Unitil Energy does not own transmission plant.
Legal Proceedings
The Company is involved in legal and administrative proceedings and claims of various types, including those which arise in the ordinary course of business. The Company believes, based upon information furnished by counsel and others, that the ultimate resolution of these claims will not have a material effect on its financial position, operating results or cash flows.