EX-99.1 2 exh_991.htm EXHIBIT 99.1

Exhibit 99.1

 

 

 

601 – 90 Eglinton Ave East, Toronto, Ontario, Canada M4P 2Y3 +1 416 362 5135 | www.micon - international.com NI 43 - 101 Technical Report, Initial Mineral Resource Estimate for the Trixie Deposit, Tintic Project, Utah, United States of America Effective Date: January 10, 2023 Report Date: January 27, 2023 Prepared By: William J. Lewis, P.Geo. Ing. Alan J. San Martin, MAusIMM (CP) Richard Gowans, P.Eng. OSISKO DEVELOPMENT CORP. 1100, av des Canadiens - de - Montreal Suite 300, P.O. Box 211 Montreal, QC H3B 2S2 Tel: 1.514.940.0685

 

 
 

 

 

Page

 

 

Table of Contents 

1.0   summary 1
1.1   General 1
1.2   Property Location, Description and Ownership 2
1.3   Accessibility, Climate, Physiography, Local Resources and Infrastructure 3
1.4   History 4
1.4.1   Tintic District – Early Mining History (1869 to 2002) 4
1.4.2   Trixie –Exploration Underground Development and Mining (1927 to 1995) 5
1.4.3   Trixie Exploration and Production (2000 to 2002) 7
1.4.4   Trixie Exploration and Production (2019 to 2021) 7
1.5   Geological Setting and Mineralization 8
1.5.1   Geological Setting 8
1.5.2   District Geology 9
1.5.3   District Mineralization and Structure 10
1.5.4   Geology, Structure and Mineralization at Trixie 10
1.6   Exploration Programs 12
1.6.1   Underground Exploration 12
1.6.2   Exploration Drilling Programs 12
1.7   Metallurgical Testwork 13
1.7.1   Sample Provenance 13
1.7.2   Metallurgical Testwork 14
1.7.3   Testwork Results 15
1.8   Initial Trixie Mineral Resource Estimate 15
1.8.1   Introduction 15
1.8.2   Methodology 15
1.8.3   Resource Database 15
1.8.4   Geological Model 16
1.8.5   Geostatistical Analysis 16
1.8.6   Block Model and Grade Interpretation 17
1.8.7   Model Validation 18
1.8.8   Mineral Resource Classification 18
1.8.9   Reasonable Prospects for Eventual Economic Extraction 18
1.8.10   Mined Void Depletion 19
1.8.11   Trixie Initial Mineral Resource Estimate Statement 20
1.8.12   Mineral Resource Grade Sensitivity Analysis 20
1.9   Conclusions 23
1.10   Exploration Budget and Further Recommendations 23
1.11   Exploration Budget and Other Expenditures 23
1.12   Further Recommendations 25
2.0   Introduction 27
2.1   Terms of Reference 27
2.2   Discussions, Meetings, Site Visits and Qualified Persons 28
2.3   Sources of Information 29
2.4   Units of Measurement and Abbreviations 30
2.5   Previous Technical Reports 33

 

Tintic Projecti January 27, 2023

 

 

 

Page

 

3.0   Reliance on other experts 34
4.0   Property Description and Location 35
4.1   General Description and Location 35
4.2   Land Tenure, Agreements, Mineral Rights and Ownership 36
4.2.1   Property Area 36
4.2.2   Acquisition of the Trixie Gold Project 36
4.2.3   Title, Mineral and Surface Rights Summary and Royalties 40
4.3   Encumbrances and Other Significant Factors or Risks 41
4.3.1   Encumbrances 41
4.3.2   Other Significant Factors and Risks 41
4.4   Permitting and Environmental Liabilities 42
4.4.1   Environment 42
4.4.2   Permits and Environmental Liabilities 42
4.5   QP Comments 43
5.0   Accessibility, climate, local resources, infrastructure and physiography 44
5.1   Accessibility 44
5.2   Infrastructure and Local Resources 44
5.3   Topography, Physiography, Vegetation and Climate 45
5.4   Site Facilities 45
6.0   History 48
6.1   Introduction 48
6.2   Tintic District – Early Mining History (1869 to 2002) 48
6.2.1   East Tintic District 48
6.3   Trixie –Exploration Underground Development and Mining (1927 to 1995) 50
6.3.1   Trixie Early Exploration (Pre-1957) 50
6.3.2   Trixie - Shaft Sinking and Underground Development and Mining (1968 to 1992) 51
6.3.3   Trixie Mine, Diluted Grade Production 54
6.4   Trixie Exploration and Production (2000 to 2002) 55
6.5   Trixie, Exploration and Production (2019 to 2021) 55
6.5.1   TCM – Trixie, Modern Target Generation (2019 to 2020) 55
6.5.2   TCM T2 Discovery (2020 to 2021) 58
6.5.3   TCM Underground Development and Mineral Processing (2020 to 2021) 61
7.0   geological setting and mineralization 62
7.1   Geological Setting 62
7.2   District Geology 62
7.3   District Mineralization and Structure 69
7.3.1   Geology, Structure and Mineralization at Trixie 70

 

Tintic Projectii January 27, 2023

 

 

 

Page

 

8.0   deposit types 74
8.1   Carbonate Replacement Deposits 75
8.2   High Sulphidation Epithermal Vein Systems 76
8.2.1   Mineralized Structures at Trixie 78
8.2.2   Trixie Gold-Tellurium Mineralization 81
8.2.3   Trixie T2 Structure: A Genetic Model for Mineralization 83
8.3   Porphyry Copper-Gold Potential 85
9.0   Exploration 87
9.1   General Information 87
9.2   Underground Mapping 87
9.3   Chip Sampling 87
9.3.1   Chip Sample Collection Procedures 89
9.3.2   Chip Sample Location Procedures 92
9.4   Trixie Underground 2022 Chip Samples and Assays 93
9.5   QP Comments 127
10.0   Drilling 129
10.1   Drilling Methodology 129
10.1.1   Surface RC Drilling 129
10.1.2   Underground Diamond Drilling 129
10.2   2022 Drilling Program 130
10.2.1   Surface RC Drilling 130
10.2.2   Underground Diamond Drilling 130
10.2.3   Drilling Highlights and Results 133
10.3   Additional Drilling Considerations 140
10.4   Drilling Program Recommendations 140
10.5   Micon QP Comments 141
11.0   Sample preparation, analyses and security 142
11.1   Introduction 142
11.2   Sample Handling and Security 142
11.2.1   Underground Chip Sampling 142
11.2.2   Drill Core Sampling 142
11.2.3   Reverse Circulation Drill Chip Sampling 143
11.3   Assay Laboratories Accreditation and Certification 143
11.3.1   ALS Laboratory 143
11.3.2   Tintic Laboratory 144
11.4   Sample Preparation and Assaying 144
11.4.1   ALS Sample Preparation 144
11.4.2   ALS Gold Assaying 145
11.4.3   ALS Multi-Element Assaying 145
11.4.4   Tintic Laboratory Sample Preparation 145
11.4.5   Tintic Laboratory Gold and Silver Assaying 146
11.5   Quality Assurance and Quality Control 146
11.5.1   Certified Reference Materials (Standards) 146
11.5.2   Blank Samples 149
11.5.3   Tintic Laboratory Sample Preparation Quality Assurance Measures 150
11.5.4   Tintic Laboratory Sample Analyses Quality Assurance Measures 150
11.6   QP Comments 151

 

Tintic Projectiii January 27, 2023

 

 

 

Page

 

12.0   data verification 152
12.1   General 152
12.2   Site Visit 152
12.2.1   QP Check Sampling 153
12.3   QP Comments 155
13.0   mineral processing and metallurgical testing 156
13.1   Mineral Processing and Metallurgical Testing 156
13.2   Sample Provenance 156
13.3   Metallurgical Testing 156
13.3.1   Metallurgical Sample Characterization 157
13.3.2   Minerology 159
13.3.3   Bottle Roll Leach Tests 161
13.3.4   Gravity Separation Tests 162
13.3.5   Comminution Tests 163
13.3.6   Additional Testwork 163
13.4   Notes Regarding Metallurgical Laboratory Certifications 163
13.5   Conclusions and Recommendations 163
14.0   Mineral Resource Estimates 165
14.1   Introduction 165
14.2   CIM Resource Definitions and Classifications 165
14.3   CIM Estimation of Mineral Resources Best Practices Guidelines 167
14.4   Methodology 167
14.5   Resource Database 168
14.6   Geological Model 169
14.7   Geostatistical Analysis 171
14.7.1   Compositing 171
14.7.2   High Grade Capping 171
14.7.3   Density 172
14.7.4   Variogram Analysis 174
14.7.5   Search Ellipse Parameters 174
14.8   Block Model and Grade Interpretation 177
14.9   Model Validation 178
14.9.1   Visual Inspection 178
14.9.2   Statistical Comparisons 178
14.9.3   Reconciliation 182
14.10   Mineral Resource Classification 182
14.11   Reasonable Prospects for Eventual Economic Extraction 183
14.12   Mined Void Depletion 184
14.13   Mineral Resource Estimate 185
14.14   Mineral Resource Grade Sensitivity Analysis 188
14.15   Factors That Could Affect the Mineral Resource Estimates 191
14.16   Responsibility for the Trixie Mineral Resource Estimate 192

 

Tintic Projectiv January 27, 2023

 

 

 

Page

 

15.0   Mineral Reserve Estimates 193
16.0   Mining Methods 193
17.0   Recovery Methods 193
18.0   Project Infrastructure 193
19.0   Market Studies and Contracts 193
20.0   environmental studies, permitting, and social or community impact 193
21.0   capital and operating costs 193
22.0   economic analysis 193
23.0   adjacent properties 194
23.1   Freeport McMoRan 195
23.1.1   1996 Historic Mineral Resources 195
23.2   Ivanhoe Electric 195
23.2.1   Property Description and Ownership 196
23.3   QP Comments 197
24.0   other relevant data and information 198
24.1   Trixie Test Mine 198
25.0   interpretations and conclusions 200
25.1   General Information 200
25.2   Trixie Initial Mineral Resource Estimate 200
25.2.1   Introduction 200
25.2.2   Methodology 200
25.2.3   Resource Database 200
25.2.4   Geological Model 201
25.2.5   Geostatistical Analysis 201
25.2.6   Block Model and Grade Interpretation 203
25.2.7   Model Validation 203
25.2.8   Mineral Resource Classification 203
25.2.9   Reasonable Prospects for Eventual Economic Extraction 204
25.2.10   Mined Void Depletion 204
25.2.11   Trixie Initial Mineral Resource Estimate Statement 205
25.2.12   Mineral Resource Grade Sensitivity Analysis 207
25.3   Conclusions 208

 

Tintic Projectv January 27, 2023

 

 

 

Page

 

26.0   recommendations 209
26.1   Exploration Budget and Other Expenditures 209
26.2   Further Recommendations 210
27.0   Date and signiture page 213
28.0   References 214
28.1   General Publication and Report References 214
28.2   Website References 216
29.0   Certificates 217

 

 

Appendices

 

APPENDIX 1: Glossary of Mining and Other Related Terms End of the report

 

APPENDIX 2: Tintic Project Properties and Mineral Rights End of the report

 

 

 

 

 

Tintic Projectvi January 27, 2023

 

 

 

Page

 

List of Tables

Table 1.1      Resource Cut-Off Grade Parameters 19
Table 1.2      Trixie Deposit Initial Mineral Resource Estimate (MRE) Statement 21
Table 1.3      Gold Grade Sensitivity Analysis at Different Cut-Off Grades 22
Table 1.4      Tintic Project, Recommended Budget for Further Work, Phase 1 (USD) 24
Table 1.5      Tintic Project, Recommended Budget for Further Work Phase, 2 (USD) 24
Table 2.1      Qualified Persons, Areas of Responsibility and Site Visits 29
Table 2.2      Conversion Factors for this Report 30
Table 2.3      List of Abbreviations 30
Table 4.1      Trixie Mineral Claims 40
Table 4.2      Burgin Mineral Claims 41
Table 6.1      Total Recovered Metal and Production Values from the Tintic District 52
Table 6.2      Trixie Mine Historic Production Summary 56
Table 9.1      2022 Trixie Underground Chip Sampling Summary by Development Area 93
Table 9.2      2022 Trixie Underground Chip Sequence Sample Assay Composites – Metric 108
Table 10.1    2022 Surface RC Drilling Assay Highlights in US Measurement Units 134
Table 10.2    2022 Underground Diamond Drilling Assay Highlights in US Measurement Units 134
Table 11.1    ALS Results of Standards used by TCM for the 2022 Drilling Programs 147
Table 11.2    Standards used by TCM for the 2022 Chip Sampling Program 148
Table 11.3    ALS Results of Blanks used by TCM for the 2022 Drilling Programs 149
Table 12.1    Underground Reject Face Chip Samples Selected for Secondary Assaying 154
Table 13.1    Metallurgical Composite Sample Average Head Gold and Silver Analyses 157
Table 13.2    Metallurgical Composite Selected Multi-Element Analyses 157
Table 13.3    Metallurgical Composite Whole Rock Analyses 158
Table 13.4    Summary of QEMSCAN Results 159

 

Tintic Projectvii January 27, 2023

 

 

 

Page

 

Table 13.5    Summary of Diagnostic Leach Test Results 160
Table 13.6    Summary of T2 Direct Bottle Roll Leach Test Results 161
Table 13.7    Summary of T4 Direct Bottle Roll Leach Test Results 162
Table 13.8    Summary of T2 Gravity and Gravity Tails Leach Test Results 162
Table 13.9    Summary of Comminution Test Results 163
Table 14.1    Top Capping Grades for Gold and Silver 171
Table 14.2    Sample Statistics for Gold and Silver for Raw Samples, Capped Composites and Uncapped Composites 172
Table 14.3    Bulk Density Values Used for the Mineralized Domains of the Trixie Deposit 173
Table 14.4    Variogram Models for Gold and Silver for each Mineralized Domain 175
Table 14.5    Estimation Parameters used for each Mineralized Domain 177
Table 14.6    Summary of the Block Model Characteristics 178
Table 14.7    Global Bias Analysis Between the Interpolation Methods 180
Table 14.8    Local Reconciliations of Underground Development Data with the Resource Model 182
Table 14.9    Resource Cut-Off Grade Parameters 184
Table 14.10  Trixie Deposit Initial Mineral Resource Estimate (MRE) Statement 187
Table 14.11  Gold Grade Sensitivity Analysis at Different Cut-Off Grades 188
Table 24.1    Trixie Test Mine Key Operating Details 198
Table 25.1    Resource Cut-Off Grade Parameters 204
Table 25.2    Trixie Deposit Initial Mineral Resource Estimate (MRE) Statement 206
Table 25.3    Gold Grade Sensitivity Analysis at Different Cut-Off Grades 207
Table 26.1    Tintic Project, Recommended Budget for Further Work, Phase 1 (USD) 209
Table 26.2    Tintic Project, Recommended Budget for Further Work, Phase 2 (US$) 209

 

Tintic Projectviii January 27, 2023

 

 

 

Page

 

List of Figures

Figure 4.1     Location Map for the Tintic Project 35
Figure 4.2     TCM Property Outline within the East Tintic District 37
Figure 4.3     Tintic Project Individual Claims Map 38
Figure 4.4     Tintic Project Surface Ownership 39
Figure 5.1     Overview of the Trixie Test Mine looking towards the Northeast 44
Figure 5.2     Burgin Site Infrastructure 46
Figure 6.1     Overview of the Major Historic Mineral Deposits of the Tintic District 49
Figure 6.2     Oblique 3D Model View of all Historic and Modern (T2) Development at Trixie 53
Figure 6.3     Trixie Headframe 57
Figure 6.4     Cross Section, Looking North, of the Surface RC Hole Intersections that Led to  Discovery of the T2 Structure 58
Figure 6.5     Plan Map of the 625 and 750 Levels and the T2 and T4 Mineralized Zones 59
Figure 6.6     An Early Mining Face on the T2 Structure Looking North 60
Figure 6.7     Overview Map of the Southern End of 625 ft Level 61
Figure 7.1     Map of the Tintic District Displaying Mineral Occurrences and Regional Tectonic Framework 63
Figure 7.2     Palaeozoic Stratigraphy of the Tintic District 64
Figure 7.3     Partial N-Facing 7.5’ Eureka Quadrangle Section A-A’ 66
Figure 7.4     Oligocene Volcano-Magmatic Stratigraphy of the Tintic District with  Select Reported Geochronologic Data 67
Figure 7.5     Simplified USGS Geologic Map of the East Tintic District 68
Figure 7.6     East-Facing Geological Long Section Displaying Underground Development at Trixie 73
Figure 8.1     Generalized Model of Deposit Styles in the East Tintic District 75
Figure 8.2     CRD-Style Base-Metal Mineralization, Massive Galena Typical of the Historic Burgin,  Tintic Standard and North Lily Mines 76

 

Tintic Projectix January 27, 2023

 

 

 

Page

 

Figure 8.3     Typical Sulphide Au-Ag-Rich Vein Mineralization found at Trixie and in the Historic Eureka Standard Mine, Hand Sample taken from the Eureka Standard Dump Pile 77
Figure 8.4     North Facing Geological Cross-Section displaying Mineralized Domains  and Controlling Structures at Trixie 79
Figure 8.5     East facing Geological Long-Section showing Mineralization and Development at Trixie 80
Figure 8.6     Left: Hand Sample from the T2 Structure; Right: Hand Sample from the T4 Stockwork Zone 82
Figure 8.7     Thin Sections from the T2 Structure 82
Figure 8.8     Schematic Section of Mineralization and Alteration Associated with the T2 Structure 84
Figure 8.9     Mapped Lithological Caps Relative to Known Deposits 86
Figure 9.1     Example of an Underground Map Sheet 88
Figure 9.2     Schematic illustrating the Three Classifications of Chip Sample Sequences Underground at Trixie 89
Figure 9.3     Example of a Chip Sampling Sketch and Data Sheet, CH1317 90
Figure 9.4     Post-Sampling Face Photo of Site CH1317 92
Figure 9.5     Trixie Long-Section Displaying New Development and Chip Sequence Sample Assay Map/Section Location Traces 94
Figure 9.6     Trixie Chip Sample Assay Map 1 of 11: 625 Level Development 95
Figure 9.7     Trixie Chip Sequence Assay Map 2 of 11: 665 Sublevel (Eileen Drift) Development 96
Figure 9.8     Trixie Chip Sequence Assay Map 3 of 11: 665 Sublevel (Eileen) Ramps and Historic Development 97
Figure 9.9     Trixie Chip Sequence Assay Map 4 of 11: Sill 2 Development Cut and Raise 4 Bench 98
Figure 9.10   Trixie Chip Sequence Assay Map 5 of 11: Sill 3 Development Cut 99
Figure 9.11   Trixie Chip Sequence Assay Map 6 of 11: Sill 4 Development and Exploration Cuts 100
Figure 9.12   Trixie Chip Sequence Assay Map 7 of 11: Sill 5 Development and Exploration Cuts 101
Figure 9.13   Trixie Chip Sequence Assay Map 8 of 11: Sill 6 Development Cut 102
Figure 9.14   Trixie Chip Sequence Assay Map 9 of 11: Sill 7 and 8 Development Cuts 103

 

Tintic Projectx January 27, 2023

 

 

 

Page

 

Figure 9.15   Trixie Chip Sequence Assay Map 10 of 11: Raise 1 Pillar Cut 1 104
Figure 9.16   Trixie Chip Sequence Assay Map 11 of 11: Raise 1 Pillar Cut 2 105
Figure 9.17   Trixie Chip Sequence Assay Section 1 of 2: Raises 4 and 5 106
Figure 9.18   Trixie Chip Sequence Assay Section 2 of 2: Raise 6 107
Figure 10.1   Surface RC Drill Rig 130
Figure 10.2   2022 Surface Reverse Circulation Drill Hole Collar Locations 132
Figure 10.3   2022 Underground Diamond Drill Hole Collar Locations 133
Figure 10.4   2022 Surface RC Drilling Locations for TRC040, TRC048 and TRC082. Looking 000 136
Figure 10.5   Underground Diamond Drilling Assay Locations for TUG-625-060, TUG-625-064, TUG-625-065, TUG-625-066, TUG-625-069. Looking 027 137
Figure 10.6   2022 Underground Diamond Drilling Assay Locations for TUG-625-27, TUG-625-28, TUG-625-29, TUG-625-30A, TUG-625-50, TUG-625-70.  Looking 000 138
Figure 10.7   2022 Underground Diamond Drilling Assay Locations for TUG-625-056, TUG-625-057, TUG-625-058. Looking 000. 139
Figure 11.1   Example of ALS Results for Standard OREAS 239 for the 2022 Drill Programs 148
Figure 11.2   ALS Results of Blanks for the 2022 Drilling Programs 150
Figure 12.1   Trixie Headframe showing the Cage to access Underground 153
Figure 14.1   Plan View (left) and Orthogonal View Looking Northwest (right) of the  Trixie Drill Hole and Chip Sample Database 169
Figure 14.2   Vertical Section View of the Trixie Geological and Resource Domain Wireframes Looking North 170
Figure 14.3   Example of Experimental and Modelled Variogram (Correlogram) for Gold in the T2 Domain 176
Figure 14.4   Visual Model Validation Comparison of Block Grades with Raw Sample Grades; Left: Plan View at 5,445 +/- 1.5 m;  Right: Vertical Section Looking North at Northing 23,755 +/- 1.5 m 179
Figure 14.5   Statistical Model Validation; Swath Plots in the Three Principal Orientations and the Gold Grade Histogram,  Comparing Declustered Sample Grades with the Estimated Model Grades (Example from the T2 Domain) 181

 

Tintic Projectxi January 27, 2023

 

 

 

Page

 

Figure 14.6   Vertical Long Section Looking East at the Current Development Voids and Historical Buffers,  Used to Deplete the Trixie Mineral Resources 186
Figure 14.7   Grade Tonnage Curves Indicating the Sensitivity of the Measured and  Indicated Mineral Resources at Different Cut-Off Grades 190
Figure 14.8   Grade Tonnage Curves Indicating the Sensitivity of the  Inferred Mineral Resources at Different Cut-Off Grades 191
Figure 23.1   Map of Adjacent Property Land Holders 194

 

 

 

 

Tintic Projectxii January 27, 2023

 

 

 

Osisko Development Corp.

 

1.0   summary

 

1.1General

 

Osisko Development Corp. (Osisko Development) has retained Micon International Limited (Micon) to independently review and verify its initial mineral resource estimate (MRE) for the Trixie deposit located within the boundaries of its Tintic Project (the Project) in the State of Utah, USA. and to compile a Canadian National Instrument (NI) 43-101 Technical Report disclosing the results of the MRE.

 

The geologic modelling for the Trixie deposit was completed by Osisko Development’s senior production geologist Courtney Kurtz, P.G. using Leapfrog Geo software. The MRE was completed by Osisko Development’s chief resource geologist, Daniel Downton, P.Geo., using Datamine Studio RM Pro 1.12 software. The MRE was then reviewed and validated by William Lewis, P.Geo. and Alan San Martin, AusIMM(CP), of Micon.

 

For the purpose of disclosure in this Technical Report, William Lewis, P.Geo., who is independent of Osisko Development and is a Qualified Person within the meaning of NI 43-101, is responsible for the initial mineral resource estimate by virtue of his independent review and validation of the work conducted by Osisko Development.

 

A site visit was conducted from September 12 to September 16, 2022, by Mr. Lewis to independently verify the geology, mineralogy, drilling programs and the Quality Assurance/Quality Control (QA/QC) programs at the Tintic Project.

 

When conducting, reviewing and validating the initial mineral resource estimate, Osisko Development and the Qualified Persons (QPs) used the following guidelines, published by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM):

 

1.The CIM Definitions and Standards for Mineral Resources and Reserves, adopted by the CIM council on May 10, 2014.

 

2.The CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines, adopted by the CIM Council on November 29, 2019.

 

This report discloses technical information, the presentation of which requires the QPs to derive sub-totals, totals and weighted averages that inherently involve a degree of rounding and, consequently, introduce a margin of error. Where these occur, the QPs do not consider them to be material.

 

The conclusions and recommendations of this report reflect the QPs best independent judgment in light of the information available to them at the time of writing. Micon and the QPs reserve the right, but will not be obliged, to revise this report and conclusions if additional information becomes known to them subsequent to the date of this report. Use of this report acknowledges acceptance of the foregoing conditions.

 

This report is intended to be used by Osisko Development subject to the terms and conditions of its agreement with Micon. That agreement permits Osisko Development to file this report as a Technical Report on SEDAR (www.sedar.com) pursuant to provincial securities legislation, or with the Securities and Exchange Commission (SEC) in the United States.

 

Tintic Project1January 27, 2023
 

 

 

Osisko Development Corp.

 

Neither Micon nor the QPs have, nor have they previously had, any material interest in Osisko Development or related entities. The relationship with Osisko Development is solely a professional association between the client and the independent consultants. This report is prepared in return for fees based upon agreed commercial rates and the payment of these fees is in no way contingent on the results of this report.

 

Micon and the QPs are pleased to acknowledge the helpful cooperation of Osisko Development management, personnel and consulting field staff, all of whom made any and all data requested available and responded openly and helpfully to all questions, queries and requests for material.

 

This report supersedes and replaces all prior Technical Reports written for the Tintic Project.

 

1.2Property Location, Description and Ownership

 

The Tintic Project is located in western Utah County, approximately 64 km south of Provo, Utah and 95 kilometres south of Salt Lake City. The property on which the Trixie test mine or Trixie deposit is located encompasses most of the East Tintic District, surrounding and immediately east of the incorporated town of Eureka. The township of Eureka is located approximately 6.4 km northwest of the Trixie test mine.

 

The coordinates of the centre of the Project are 407,700mE and 4,423,400mN, referenced in NAD83, Northern UTM Zone 12. The Project area is located on Eureka Quadrangle, US Topographic Map 1:24,000 scale, 7.5 Minute Series.

 

The nearest rail siding, in use, is located at Tintic Junction, approximately 10 km west of the Project.

 

The area of the Tintic Project owned or controlled by Osisko Development comprises 1,105 claims totalling 5,746 ha (14,200 acres) of patented mining claims and a further 107 unpatented mining claims of approximately 1,214 ha (3,000 acres). Osisko Development owns a small and varying percentage, interest or royalty in a number of other claims outside the main claim package.

 

Osisko Development verified the status of the mineral title to certain patented mining claims by engaging Utah legal counsel to conduct a review of Osisko Development’s chain of title for the select patented mining claims within the land package, covering approximately 243 ha (600 acres) surrounding the Trixie and Burgin mines. Utah legal counsel conducted their title review by examining the United States Bureau of Land Management records, including the patents issued by the United States, mineral survey and master title plans, and the official records of the Utah County Recorder’s Office, including the abstract (tract), mining claims, and grantor/grantee indices, among miscellaneous other records. This consolidated land position has been acquired over a hundred years of prior consolidation in the District. Osisko Development also engaged Wolcott LLC, an independent consultant, to conduct field checks and generate a geospatial database.

 

On May 30, 2022, Osisko Development announced the acquisition of 100% of Tintic Consolidated Metals LLC (TCM) (the “Acquisition”) from IG Tintic LLC (IG Tintic) and Chief Consolidated Mining Co. (CCMC) (the “Vendors”) for total consideration at closing of approximately USD 177 million in cash and shares of Osisko and:

 

i.USD 12.5 million in deferred payments

 

ii.a 2% NSR royalty, with a 50% buyback right in favour of Osisko Development exercisable within 5 years; and

 

iii.other contingent payments, rights and obligations.

 

Tintic Project2January 27, 2023
 

 

 

Osisko Development Corp.

 

1.3Accessibility, Climate, Physiography, Local Resources and Infrastructure

 

The closest major airport to the Tintic Project is in Salt Lake City, Utah (UT), located to the north-northwest of the city of Provo, UT via Interstate 15. Access to the Tintic Project from Provo, is via Interstate 15, a distance of 36 kilometres (km) south to exit 248 to US 6, then west on US 6, 27 km to Silver Pass Road, and then south 3.2 km to the Burgin project office site. The Trixie test mine is located 2.6 km southwest of the Burgin office on the paved Silver Pass Access Road. Provo and other smaller towns, including Payson, Santaquin and Eureka are also adjacent to the Project.

 

The towns of Goshen, Santaquin, Payson and Provo are the main sources for supplies and services. Tintic Project personnel and contractors also live in these areas.

 

The Project has sufficient power and water to support a mining operation.

 

Topographic relief in the East Tintic District ranges from 1,494 m in the Goshen Valley east of the District to 1,996 m at nearby Mineral Hill. The elevation at Trixie is 1,852 m.

 

The Tintic Mountains host the scanty vegetation typical of an arid region. Different species of cactus, forbs and shrubs grow on exposed rocky points. The more common trees of the higher slopes are pinyon pine, juniper and mountain mahogany. At lower elevations, maple thickets occur in the dry ravines, especially on the eastern slopes, while aspens are found in sheltered spots, more commonly those of northern exposure. In the valleys, sagebrush, rabbitbrush, Brigham’s tea and cheat grass constitute almost the entire vegetation. Range improvement projects in the area have had some effect on improving grazing.

 

The climate of the East Tintic District is semi-arid. The U.S. Climate data website noted that the mean monthly low temperatures at the nearby town of Elberta range from -10° Celsius (C) (15° Fahrenheit (F)) in January to 15°C (58°F) in July. The mean monthly high temperatures range from 2°C (37°F) in January to 33°C (93°F) in July. The Project has year-round access and operating season.

 

The Project’s main office, laboratory, workshops and onsite processing facilities are located at the Burgin site, immediately off Highway 6 and northeast of the Trixie test mine. The Burgin mine is a past-producing underground operation that was last mined in 1976. All references to Burgin in this report are with respect to the main office and surface facilities located at this site, and not to the Trixie test mine or deposit, unless otherwise specified.

 

A mill facility previously operational in 2002 is located at the Burgin site. In October, 2021, a pilot vat leaching circuit was established within the old Burgin mill facility for the recovery of gold and silver from of the mineralized material from the Trixie test mine. Osisko Development’s recent operations also included trucking mineralized material to an offsite facility for vat and heap leaching. This activity occurred from late 2020 up to May, 2022.

 

Tintic Project3January 27, 2023
 

 

 

Osisko Development Corp.

 

In 2022, a pilot tailings facility was constructed on site adjacent to the mill facility. The facility was double lined for potential future re-permitting and use as a heap leach facility.

 

The onsite laboratory at the Burgin site provides fire assay analysis for gold and silver for all underground grade control sampling from the Trixie test mine. Atomic Absorption Spectrometry (AAS) and bottle roll analysis to complement onsite VAT leaching and processing has also been established. Using an onsite laboratory to assay samples generated on site is common practice in the mining industry. Onsite laboratories usually participate in round robin exercises with government or independent laboratories as part of their Quality Assurance and Quality Control programs. In addition, onsite laboratories, such as the Burgin site usually send out check samples and engage laboratory auditing consultants to independently review their procedures.

 

The mineral property is sufficiently large that construction of further infrastructure at the Project will not be hindered by lack of space.

 

1.4History

 

1.4.1Tintic District – Early Mining History (1869 to 2002)

 

Economic mineralization in the Tintic District was first discovered in 1869 and, within a few years, most of the major outcropping ore bodies were being mined and many of the historic mining towns, including Diamond, Silver City, Mammoth, Eureka, Dividend and Knightsville had been established. By 1899, the Tintic District had become one of the richest mining districts in the USA. Active mining in the district continued through the 20th and the beginning of the 21st century.

 

1.4.1.1East Tintic District

 

Even though many claims in what is now identified as the East Tintic District had been staked before the turn of the 20th century, the only known occurrence of surface mineralization was in a small outcrop near the present Eureka Lilly shaft. All future discoveries of the blind ore bodies in the East Tintic District have been based on surface alteration and underground geological interpretation.

 

E.J. Raddatz became interested in the East Tintic District around 1906 and acquired a major holding in what is now the Tintic Standard area. Raddatz reasoned that, even though the surface rocks were inhospitable, there was a chance of discovery in the Ophir limestone at depth. It took a considerable amount of time, two shafts and thousands of feet (ft) of drift and winze workings but, in 1916, the Tintic Standard deposit was discovered and went on to become one of the major lead-silver mines in the world.

 

Mining geologists, attracted by the discovery of the Tintic Standard deposit, began to study the district. Based on these studies, a long drive on the 700 level of the Tintic Standard mine was commissioned. This exploration work intersected the mineral deposit that became the North Lily mine. Similar strategies led to the discovery of the Eureka Standard mine.

 

During World War II, the United States recognized that, in the event of a long war, new sources of raw material would be essential. As a result, the US Geological Survey undertook an exploration program seeking blind ore bodies in the East Tintic District. One of the blind targets identified by the USGS was the CCMC oxide area, a prominent outcrop of oxidized and pyritized volcanics which overlies the Burgin deposit. However, no major discovery was made from either the sinking of the 22.6 m (75 ft) deep CCMC shaft or the drift from the Apex Standard mine. It was later surface drilling that made the discovery of the Burgin ore body.

 

Tintic Project4January 27, 2023
 

 

 

Osisko Development Corp.

 

District production slowly increased through discovery of new mines and peaked between 1921 and 1930. From that peak, production decreased to a low between 1961 and 1970. Production from the Burgin mine led to a second peak of between 1971 and 1976.

 

1.4.2Trixie –Exploration Underground Development and Mining (1927 to 1995)

 

1.4.2.1Trixie Early Exploration (Pre-1957)

 

Following the discovery of the Tintic Standard deposit in 1917, the North Lily deposit in 1927 and the Eureka Standard deposit in 1928, interest was sparked over a poorly exposed structure overlying the current location of the Trixie test mine.

 

Intense hydrothermal alteration of volcanic rocks exposed at surface at the Trixie site attracted the attention of the U.S. Bureau of Mines, which, in 1946-1947 conducted a number of studies in the Trixie area.

 

Between 1954-1955 the USGS conducted sampling and mapping of the area immediately north of the current Trixie shaft location. This was followed up by the drilling that confirmed the presence of the Trixie fault and the validity of the surface anomalies when low-grade lead-zinc ore was intersected in the Trixie fault zone. After the conclusion of the USGS research program in 1956, Bear Creek Mining completed additional holes in the target area and several of these holes intersected strong lead-zinc replacement mineralization in the underlying limestone. Despite the apparent presence of ore-grade mineralization at depth, the disappointing core recoveries resulted in surface exploration work being terminated in 1957. Subsequently, the decision was made to conduct future exploration from underground.

 

1.4.2.2Trixie - Shaft Sinking and Underground Development and Mining (1968 to 1992)

 

The sinking of the Trixie shaft was initiated in 1968 and had reached the 750 ft level by 1969. Although the initial target of exploration at the Trixie historic mine was lead-zinc replacement mineralization in the hanging wall of the Trixie Fault, a gold-bearing structure was encountered during shaft sinking. This northerly-trending and steeply west-dipping structural zone became the primary source of ore, which was concentrated along three gold-silver mineralized shoots referred to as the 756 ore shoot, the 75-85 ore shoot, and the Survey zone.

 

The original carbonate replacement deposit (CRD) that was discovered at the Trixie historic mine in 1969 is located on the north end of the deposit within the downthrown carbonate sequence north of the Trixie fault. While limited in scale, the replacement mineralization consists of massive sulphide minerals and jasperoid between the 750 ft level and 900 ft level.

 

The 756 ore shoot represents the most productive of the three historically mined ore zones. This ore shoot plunges to the north, towards the Trixie and Eureka Standard faults and was mined continuously from approximately 75 ft above the 625 level to below the deepest 1350 level development. Based on limited historic drilling it remains open at depth.

 

Tintic Project5January 27, 2023
 

 

 

Osisko Development Corp.

 

In 1976, as mining and exploration continued within the 756 ore shoot, the 75-85 ore shoot was discovered approximately 1,600 ft (488 m) south of the Trixie shaft. The 75-85 ore shoot was mined from approximately 50 ft (15 m) above the 625 level down to the 1200 level.

 

In early 1980, Bear Creek Mining discovered the Survey zone while exploring for the Sioux-Ajax fault by drifting south on the 1050 ft level of the Trixie historic mine. The Survey vein segment was explored and extensively developed by Kennecott on the 750, 900, 1050 and 1200 levels during the pre-1995 silica flux mining periods. The southern end of the Survey Vein is extended for a distance of 3,400 ft south of the main shaft along the 1050 level and it remains open to the south and at depth.

 

In 1980, Sunshine Mining Corporation leased the Burgin unit from CCMC and by 1983 had also begun work at Trixie where it re-started mining operations and undertook additional underground development and diamond drilling. Much of the underground development and drilling from this time appears to have been focused on the 900, 1050, 1200 and 1350 levels. Perhaps the most notable exploration efforts at Trixie during this time were the southerly extensions of the 900, 1050 and 1200 ft level drifts, following the discovery of the Survey zone and the northeastward extension from the 1350 ft level to connect with the 1100 ft level of the Eureka Standard mine. This connection provided the underground access needed to evaluate the Eureka Standard fault along-strike and down-dip from the original Eureka Standard mine workings. Sunshine operated the Trixie historic mine until terminating their lease with CCMC at the end of 1992.

 

1.4.3Trixie Exploration and Production (2000 to 2002)

 

Between 2000 and 2002, CCMC (through its affiliate Tintic Utah Metals LLC) undertook an aggressive surface and underground drilling program at Trixie resulting in the discovery of a small-tonnage gold-silver resource associated with the earlier mined 75-85 mineralized zone. The 625 ft level was developed within the mine in 2001, but mining was suspended due to the decrease in the price of gold below $300/oz and CCMC’s financial and reported management problems.

 

1.4.4Trixie Exploration and Production (2019 to 2021)

 

1.4.4.1TCM – Trixie, Modern Target Generation (2019 to 2020)

 

TCM acquired the historical Trixie mine at the beginning of 2019, and initially focused its assessment on the base-metal resource opportunity at the Burgin mine. However, high-grade gold opportunities that had potential for near-term production and revenue at Trixie quickly became the focus of the company. Since most of the historic mining was focussed on the steep west-dipping structural corridor with very little development or exploration into either the footwall or hanging wall, there was high potential to define additional mineralized structures in close proximity to the existing underground infrastructure.

 

In August, 2019, TCM made the decision to commence rehabilitation of the historic mine and shaft, with the intention of beginning underground drilling and exploration of documented targets on the historic 625 ft and 750 ft development levels.

 

Tintic Project6January 27, 2023
 

 

 

Osisko Development Corp.

 

By December, 2019, TCM had compiled the historic Trixie datasets into a new 3D model of the deposit and identified a significant new target in the immediate footwall to the 610 stope. This new target, initially termed the North Survey Vein, was developed from reconsidering assays within historic surface RC holes which could not have originated from any of the historically mined areas. Further investigation of this target led to the discovery of the T2 and T4 structures.

 

The broad zones of mineralization encountered in the 2000-2001 surface RC drilling were originally interpreted to be caused by the smearing of mineralization within the holes. However, 2021 exploration work by TCM demonstrated that mineralization up to 60 ft in width is associated with the T4 stockwork. The broad zones of mineralization encountered in the 2000-2001 RC drilling were thus re-interpreted as intercepts of T2-T4 stockwork mineralization in the immediate footwall of the 75-85 structure.

 

1.4.4.2TCM T2 Discovery (2020 to 2021)

 

Between February and June, 2020, refurbishment of the 625 level was completed and this allowed for the commencement of underground diamond drilling. A total of five diamond drill holes were completed between June and August, 2020.

 

Despite extremely difficult drilling conditions, visible mineralization within the footwall of the 610 stope was confirmed in three of the five holes. With the visual confirmation of the mineralization and structure, a decision was made by TCM management to commence development of an exploration drift eastward towards the target zone.

 

The decision to develop into the target zone proved extremely fortuitous as only 13 m (44 ft) east of the historic 625 ft level development, TCM drifted directly into the T2 structure.

 

Abundant visible gold associated with the striking green colour of the mineralized zone aided the visual identification and test mining of the T2 structure. Initial test mining continued north and south on-strike of the steeply east dipping structure to determine potential strike lengths of the mineralized zone. At the same time, the original 609 exploration cross-cut was extended further eastward to test ground immediately east of the T2 structure for further mineralization. Together with additional diamond drilling and exploration cross-cuts a broad zone of mineralized stockwork veining up to 25 m (80 ft) in width was identified, and this is referred to as the T4 stockwork zone of mineralization.

 

1.4.4.3TCM Underground Development and Mineral Processing (2020 to 2021)

 

In November, 2020, the first shipment of mineralized material was shipped to an offsite processing facility and the first gold was poured by TCM. Continual underground development and drilling through 2021 helped define T2 mineralization over a 120 m (400 ft) strike length and led to the recognition of the scale of the T4 stockwork mineralization. Design work for a surface portal and internal decline ramp to access the Trixie underground development was commenced shortly thereafter. A geological model for T2-T4 mineralization identified the potential significance of the overlying Ophir Shale as a cap above the Tintic Quartzite host rock in influencing the T2-T4 mineralized zone. In the fall of 2021, the Burgin processing facility was equipped with an onsite vat leaching process. On May 30, 2022, Osisko Development announced the completion of its acquisition of TCM.

 

Tintic Project7January 27, 2023
 

 

 

Osisko Development Corp.

 

1.5Geological Setting and Mineralization

 

1.5.1Geological Setting

 

The Tintic Project is located within the historic Tintic mining district, a cluster of base and precious metal deposits covering more than 200 square kilometres (km2) (or approximately 80 square miles) within the East Tintic Mountains of north-central Utah. The district is centred approximately 90 km (56 miles) south-southwest of Salt Lake City and 65 km (40 miles) south of the Bingham Canyon porphyry Cu-Au-Mo deposit. The East Tintic Mountains occupy a position within the Late Cretaceous Sevier fold and thrust belt approximately 30 km (20 miles) from the eastern limit of the Basin and Range extensional province, as defined by the surface expression of the Wasatch fault. District mineralization is associated with a post-Sevier compression and pre-Basin and Range extension period of magmatism spanning ca. 27-35 Ma (latest Eocene to Oligocene). Commonly divided into Main, East, North and Southwest subdistricts, the greater Tintic is collectively the second largest metal producing district in Utah state, with Bingham first and Park City a close third. The core Tintic Project area covers more than 90% of known deposits within the East Tintic subdistrict. Additional coverage extends north, west, and south into the North, Main and Southwest districts, respectively.

 

1.5.2District Geology

 

The geology of the Tintic district can be summarized as the record of four major phases of geologic evolution. These are 1) development of a Palaeozoic platformal sequence atop previously deformed Precambrian basement, 2) folding, faulting and uplift accommodating east-west shortening during Late Cretaceous Sevier Orogeny, 3) latest Eocene to Oligocene calc-alkaline magmatism associated with district mineralization, and 4) Miocene to recent Basin and Range extension.

 

Accommodation of east-west shortening during Late Cretaceous Sevier Orogeny resulted in the development of the district scale Tintic syncline-East Tintic anticline fold pair, and several associated district-scale generally west-vergent thrusts. The geometry of the sub-horizontal roughly north-south trending fold pair is responsible for the general basement architecture of the Tintic district, wherein the youngest (Mississippian) rocks of the Palaeozoic sequence are preserved along the trough of the Tintic syncline in the Main district and the Tintic Quartzite is present at its highest structural levels along the crest of the East Tintic anticline in the East district. High-angle structures developed in relation to the Sevier orogeny include a system of predominantly northeast trending faults, with strike-slip offset interpreted as accommodating differential displacement syn-compression, and a system of variably oriented normal faults developed in accommodation of late to post-orogenic gravitational collapse.

 

Extensive erosion following Sevier uplift resulted in the development of a rugged paleo-topography by the onset of district magmatism ca. 35 Ma. The latest Eocene to Oligocene magmatic record consists of a quartz latite flow and tuff dominant sequence of irregular thickness up to 1,500 m (5,000 ft) with cross cutting to coeval locally porphyritic monzonite to quartz monzonite intrusions of varying geometries. District mineralization, dated in the East Tintic at around 31 Ma, is contemporaneous and associated. In the East Tintic district, known fissure-vein and replacement deposits are nearly exclusively buried beneath the irregular volcanic cover. While the basal (pre-mineral) volcanic cover hosts no significant mineralization, it is commonly characterized by significant hydrothermal alteration. Several sub-km-scale lithocaps point to potential porphyry targets at depth, where more localized alteration along predominantly north to northeast-trending fissures with associated pebble dikes were used in successful targeting of many of the known historic deposits.

 

Tintic Project8January 27, 2023
 

 

 

Osisko Development Corp.

 

The Palaeozoic sequence and its irregular volcanic cover are disrupted by Basin and Range extensional faulting. Miocene-age volcanics likely mark the onset of extension in the district ca. 16-18 Ma. While any pre-existing fault structures are likely primed for some degree of Basin and Range extensional reactivation, the most significant normal offsets occur along roughly north-south trending structures, e.g., the district-scale Eureka Lilly fault. The variably north-south striking and west-dipping Eureka Lilly fault forms a major aquitard through the East Tintic district, dividing a fresh, cool-water-table in its hanging-wall to the west from a hot and saline water table in its footwall to the east. Post-lava offset on the Eureka Lilly fault is apparently variable along strike and may account for only one-half to a third of the total offset across the structure, believed to have initiated during Late Sevier orogeny.

 

1.5.3District Mineralization and Structure

 

The four subdistricts of the Tintic are in part distinguishable in terms of their known mineral occurrences, hosted within the deformed Palaeozoic sequence and, to a more limited extent, Oligocene monzonitic intrusions. The Main district is the most historically productive district by far, with characteristic carbonate-hosted lead-zinc-silver replacement deposits that form predominantly north to northeast-trending sub-horizontal zones rooted into subvertical chimney-like mineralized bodies rich in copper, gold and silver. Carbonate-replacement deposits with economic zinc ± lead ± silver are likewise present in the East district and the historically least-productive North district. The East district is unique in terms of the relative structural complexity of its deposits, and by the added presence of gold and silver-rich high-sulphidation fissure vein systems hosted within the brittle and unreactive Tintic Quartzite, such as at Trixie. The Southwest district is characterised by a relative dominance of igneous rocks, containing fissure systems hosted within the Silver City stock and smaller associated monzonitic porphyry intrusions. The Southwest district is also host to the Southwest Tintic porphyry copper system, viewed as subeconomic but with minor historical production from peripheral high-sulphidation, copper-silver-lead veins. Several key observations suggest the presence of additional and potentially economic porphyry centres within the district. This includes indicator clay assemblages and elevated molybdenum and/or copper-lead ratios at the Big Hill, Silver Pass, and Government Canyon lithocaps, all contained within the Tintic Project claims area.

 

1.5.4Geology, Structure and Mineralization at Trixie

 

Mineralization at the Trixie test mine is structurally controlled within a north-south-trending fissure-vein and breccia system developed within the brittle Tintic Quartzite. Gold and silver-rich mineralization within the so-called Trixie vein system is best classified as high-sulfidation epithermal (see discussion in Section 8). Current development at Trixie is focused within the footwall to the historically productive steep-to-the-west-dipping 75-85 structure, targeting the subvertical-to-the-east-dipping T2 fissure vein, its hanging -wall T4 breccia zone, and a network of smaller-scale likewise north-south-trending mineralized fissures contained within it.

 

Sub-horizontal Palaeozoic strata exposed in underground at Trixie are believed to occupy a position within or proximal to the hinge zone of the East Tintic anticline, the nature of which may exert primary influence on the geometry, frequency, and distribution of grade controlling structures within the Trixie vein system. The stratigraphic contact between the Tintic Quartzite and overlying and impermeable lower shale member of the Ophir Formation appears to have a major controlling influence on the development and distribution grade and mineralization at Trixie. While controlling structures within the Trixie vein system do penetrate the younger overlying sequences, mineralization typically displays strong rheologic control and is restricted to the older and underlying brittlely fractured Tintic Quartzite host.

 

Tintic Project9January 27, 2023
 

 

 

Osisko Development Corp.

 

The main shaft of the historic Trixie mine was collared at approximately 1,852 m (6,075 ft) elevation into an outcropping window of Middle Cambrian Teutonic Limestone. The shaft passes through the full thickness of the Ophir Formation to reach the Tintic Quartzite at a depth of approximately 125 m (410 ft). All current development stems off the historic 625-foot mine level, deeper historic workings include 750, 900, 1050, 1200 and 1350-foot levels. The full extent of both modern and historic development at Trixie resides within the hanging-wall to the district-scale Eureka Lilly fault. The fresh groundwater table of the Eureka Lilly hanging-wall at Trixie sits below the ca. 1,437 m (4,716 ft) elevation of the 1350-foot level, around 425 m below surface. The Late Eocene to Oligocene Packard Quartz Latite unconformably overlies the Palaeozoic Tintic-Ophir-Teutonic sequence in nearly every direction surrounding the Trixie main shaft. The Packard Quartz Latite is in local unconformable contact with both the Ophir Formation and Tintic Quartzite, reaching thicknesses up to 380 m (1,250 ft) directly south of the ventilation shaft.

 

The core of the Trixie vein system occupies a high-seated position within an east-west oriented horst, the bounding structures of which may have served as critical pathways for mineralizing fluids. North of the Trixie main shaft, the Tintic Quartzite is down-dropped an estimated 198 m (650 ft) across the east-west-trending sub-vertically north-dipping Trixie fault zone. At the very northern limits of development, the sequence is again offset relatively down to the north across the Eureka Standard fault zone, which appears to consist locally of at least two major east-northeast trending splays. Though not fully constrained, relative stratigraphic offset across the Eureka Standard fault zone is of similar or greater magnitude to that observed across the Trixie Fault zone. Approaching the southern end of development, the Tintic Quartzite and mineralized structures of the Trixie vein system appear to be offset across the presumably steep to the south-dipping Sioux-Ajax fault zone. The Sioux-Ajax fault zone has not been intersected by any modern-day development. Constraining its displacement and orientation is complicated by several intersecting west-dipping splays of the Eureka Lilly fault that appear to further offset the mineralization.

 

The Sioux-Ajax fault system is well-known within the Main District as a major ore controlling structure, with associated breccias hosting large replacement bodies in both the Mammoth and Iron Blossom mines. The Sioux-Ajax fault system of the Main district consists locally of two or more splays, generally striking east-southeast and dipping steeply to the north. The fault system is buried beneath volcanic cover projecting along strike into the East Tintic district, wherein its correlation and relationships with known structures have long been a topic of high interest and debate. Recent interpretations based on the integration of historical mapping with high-resolution magnetic data acquired in 2019 suggest that the Trixie, Eureka Standard, and south-dipping Sioux Ajax fault zones, as defined within the Trixie development area, are structurally linked with the Sioux Ajax zone of the Main district and may have collectively provided the deep-seated plumbing necessary for mineralization at Trixie.

 

The historic 756 ore shoot at the north end of Trixie development displays a steep northerly plunge in the footwall to the Trixie fault zone. At the southern end of Trixie development, higher grade ore shoots within the historically mined 75-85 zone exhibit a steep southerly plunge for which the presumed south-dipping Sioux Ajax fault zone is the interpreted structural control. These historical observations suggest that mineralization and grade within the T2 fissure vein and T4 zone currently in development in the immediate footwall to the 75-85 structure may be characterized by a similar geometry.

 

Tintic Project10January 27, 2023
 

 

 

Osisko Development Corp.

 

1.6Exploration Programs

 

1.6.1Underground Exploration

 

Exploration work undertaken at the Tintic Project in 2022 consisted of coordinated underground mapping and sampling programs covering both new exploration drifts and development along and across the mineralization underground at Trixie. Post-advancement face, rib and back chip-sampling, and post-survey three-dimensional underground back and rib geologic mapping were conducted by the geological team.

 

No surface regional-scale mapping or sampling programs were conducted in 2022.

 

1.6.2Exploration Drilling Programs

 

1.6.2.1Surface RC Drilling

 

Surface reverse circulation (RC) drilling of the Trixie Deposit (T1, T2, T3, T4, and 75-85 mineralized zones) commenced in July, 2022 and a total of 6,937.25 m (22,760 ft) of RC drilling in 21 drill holes were completed by early December, 2022 when the program terminated.

 

At the time of writing, assay results from 8 RC drill holes from the 2022 RC surface drilling program have been received and incorporated into the MRE.

 

1.6.2.2Underground Diamond Drilling

 

The 2022 underground diamond drilling program on the Trixie Deposit (T1, T2, T3, T4, and 75-85 mineralized zones) recommenced on April 1, 2022 and by December 19, 2022, 1,966.57 m (6,452 ft) of drilling was completed on the Trixie Deposit in 46 drill holes.

 

At the time of writing, assay results from 14 diamond drill holes were received and incorporated into the MRE.

 

1.6.2.3Drilling and Assay Problems

 

Difficult drilling conditions addressed in previous reports have continued to be a hallmark of the RC and diamond drilling programs at Trixie. Although recovery in the diamond drilling program averages a reasonable 90.1%, the core suffers significant destruction during the drilling process resulting in difficult interpretations of significant mineralized structures, and increased uncertainty in the rock quality designation and recovery data. Broken ground, significant faulting, and hard abrasive lithologies have resulted in slow sample production and further compromised the structural interpretation. Average RC production of 27.4 m (90 ft) per day and diamond drill production of 9.4 m (31 ft) per day were typical of the 2022 program. In addition, the lack of structural data made true-width relationships difficult to determine from the drilling.

 

Tintic Project11January 27, 2023
 

 

 

Osisko Development Corp.

 

Due to the issues with the drilling, the historical and current underground development have been the primary sources of information regarding the nature, orientation and extent of the mineralization at Trixie for the initial mineral resource estimate.

 

Slow turn-around times of 60 to 90 days at the assay laboratories have resulted in a significant lack of assay data and have prevented the inclusion of many diamond drill and RC holes in the initial mineral resource estimate.

 

1.7Metallurgical Testwork

 

1.7.1Sample Provenance

 

Two bulk metallurgical composite samples were prepared by Osisko Development from mineralization obtained during the exploration test mining performed during 2021 and early 2022.

 

The first bulk composite (T2 Soil Sample) was prepared from laboratory high grade coarse reject samples, over an 8-month period from April to December, 2021. This 477.5 kg sample was selected to be representative of a T2/T4 high grade run of mine (ROM) material leached in the TCM pilot vat leach facility (VLF) during 2021 and 2022.

 

The second composite sample (T4 Soil Sample) was prepared using four sample increments at various mine accessible points of the T4 structure. This 171 kg sample was selected to be representative of the bulk T4 structure at the 625 level.

 

1.7.2Metallurgical Testwork

 

Metallurgical testing was undertaken by Kappes, Cassiday & Associates (KCA), Reno, Nevada and included the following primary testwork:

 

·Multi-element analysis of the samples.

 

·Diagnostic leaching.

 

·Gold deportment mineralogy (AMTEL).

 

·Bulk mineralogy (FLSmidth).

 

·Bottle roll leach testing at various particle sizes.

 

·Gravity separations tests.

 

·Comminution testwork (Hazen Research).

 

1.7.2.1Sample Characterization

 

The head grades of the two samples were 64.1 g/t Au and 102 g/t Ag for T2, and 8.8 g/t Au and 14.5 g/t Ag T4.

 

Tintic Project12January 27, 2023
 

 

 

Osisko Development Corp.

 

Both samples are characterized by high silica content (92% to 96%) and low sulphide sulphur content, typically less than 0.2% S2-. Copper in the T2 sample measured about 750 g/t but only about half of this was readily cyanide soluble.

 

Diagnostic leach tests using samples of the two composites ground to 80% passing 74 microns indicated that approximately 99% of the gold in sample T2 and 88% in sample T4, is directly soluble. Mineralogical gold deportment studies showed that 99% of the gold in sample T2 was exposed and potentially cyanide soluble while T4 material showed that 81% of the gold was free gold with hessite and telluride associations of 7% and 10% respectively. The gold grains identified in sample T2 tended to be larger than those in T4.

 

Comminution tests showed that both samples were relatively hard and abrasive. Bond ball mill work indices of 18.2 kWh/t and 19.0 kWh/t were calculated for T2 and T4, respectively.

 

Deleterious elements often encountered in gold mineral resources are present in low concentrations in both these samples. Mercury is <3 ppm, selenium was analyzed at or below 5 ppm, and arsenic was 176 g/t on average for T2 and 29 g/t for the T4 sample. The T2 high grade structure sample did show relatively higher concentrations of these deleterious elements than the T4 material. The sulphide sulphur content was relatively low for both samples and therefore, it is unlikely that the mineralization will be acid generating.

 

1.7.3Testwork Results

 

Bottle roll cyanide leach tests gave results of up to 99% Au and 88% Ag extraction after 72 hours for sample T2. The corresponding best T4 tests achieved 98% Au and 84% Ag extraction.

 

Gravity separation tests using sample T2 suggested that approximately about 40% gold can be recovered by gravity separation.

 

1.8Initial Trixie Mineral Resource Estimate

 

1.8.1Introduction

 

The initial Mineral Resource Estimate for the Trixie test mine (the “initial MRE”), was conducted between December, 2022 and January, 2023.

 

1.8.2Methodology

 

The mineral resource area for the Trixie deposit covers a strike length of approximately 445 m down to a vertical depth of approximately 295 m below surface.

 

The wireframe models for the Trixie deposit were prepared using LeapFrog GEO v.2022.1 (LeapFrog). Wireframe modelling included the construction of five mineralized domains constrained to the extents of the regional-scale Tintic Quartzite lithologic unit and capped by shale belonging to the overlying lower member of the Ophir Formation. Geostatistical analyses were carried out using Datamine Snowden Supervisor v.8.15.0.1 (“Supervisor”). The estimation, block model and grade interpolation, were prepared using Datamine StudioTM RM Pro v.1.12.113.0 (Datamine). Resource-level potentially mineable underground shapes were created using the Deswik CAD v.2021.2.748 Shape Optimizer module (DSO).

 

Tintic Project13January 27, 2023
 

 

 

Osisko Development Corp.

 

1.8.3Resource Database

 

The close-out date for the Trixie deposit initial MRE database is December 12, 2022. It consists of 42 validated diamond drill holes, totalling 2,358.45 m of core and comprised of 1,802 sample intervals. The database also includes 8 validated RC drill holes, totalling 2,421.64 m of RC drilling and comprises 987 sample intervals, and 1,019 underground chip sample strings comprised of 4,467 sample intervals assayed for gold and silver.

 

The database includes validated location, survey, and assay results. It also includes lithological descriptions taken from drill core logs.

 

The database covers the strike length of each mineralized domain at variable drill hole and chip sample spacings, ranging between 1.5 and 50 m.

 

In addition to the tables of raw data, each database includes several tables of calculated drill hole composites and wireframe solid intersections, which are required for the statistical evaluation and mineral resource block modelling.

 

1.8.4Geological Model

 

The geological model of the Trixie deposit was prepared in LeapFrog, using underground mapping, chip samples, RC drill holes, and validated diamond drill holes, all completed by December 12, 2022.

 

A total of five mineralized domains, were modelled with each domain restricted up dip by its contact with the lower shale member of the Ophir Formation, as this contact acts as an impermeable cap to mineralizing fluids.

 

The domains modelled were the T1, T2, T3, T4 and the 75-85. In addition, a north-south trending sub-vertically dipping fault structure has been mapped across multiple underground development headings near the 625 level and has been intercepted in multiple drill holes. Though the full extent of the structure is at present unknown, it is currently inferred to project through the entirety of the model. As underground mapping indicates a minor offset of the T2 structure across this fault, it is used as a hard boundary for geological modelling and grade interpolation. The model is thus split into east and west fault blocks, with each mineralized domain subdivided into respective east and west subdomains.

 

1.8.5Geostatistical Analysis

 

1.8.5.1Compositing

 

Most of the analytical samples were collected with lengths between 0.31 and 1.52 m. A modal composite length of approximately 0.61 m was applied to domains T2 and T3, generating composites as close to 0.61 m as possible, while creating residual intervals with a minimum length of 0.06 m. A modal composite length of 0.91 m was applied to all other domains. In all cases, composite files were derived from raw values within the modelled resource domains.

 

Tintic Project14January 27, 2023
 

 

 

Osisko Development Corp.

 

1.8.5.2High grade Capping

 

Multiple capping (different capping at different ranges in each domain) was selected as the capping methodology for high grade outlier gold and silver assays at the Trixie deposit. After considering reconciliation results and geological continuity, the T2 domain uses a single capping level for gold. The top capping thresholds were selected based on the probability plots and vary from 20.0 g/t to 1,350.0 g/t Au and 200.0 g/t to 2,500.0 g/t Ag.

 

The maximum range for high-grade continuity was established using the indicator variograms, which suggests a loss of continuity after 4.5 m to 9.0 m, depending on the mineralized domain. A range of 7.6 m was selected and applied to all zones as a general average search range for the first pass grade top cut interpolation.

 

1.8.5.3Density

 

The density databases contain 512 measurements taken on samples across multiple geologic domains.

 

Average bulk density values in the mineralized domains were assigned to the T1 (2.616 t/m3), T2 (2.955 t/m3), T3 (2.638 t/m3), T4 (2.621 t/m3), and 75-85 (2.617 t/m3) domains.

 

A density of 0.00 t/m3 was assigned to the underground development from all past mining activities.

 

Bulk densities were used to calculate tonnages from the volume estimates in the block model.

 

1.8.5.4Variogram Analysis

 

The spatial distribution of gold and silver was evaluated through variogram analysis and spherical variograms were modelled for each of the mineralized domains.

 

All variogram analyses and modelling were performed in “Supervisor”. Primary directions and orientations of the variograms were observed in the data and visually in 3D space. These orientations were then examined statistically within the software package to ensure that they represented the best possible fit of the geology and grade continuity.

 

1.8.5.5Search Parameters

 

For the T2, T3 and 75-85 domains, the 3D directional-specific search ellipses were guided by the local structural orientation of the domain for an anisotropic search. For the T1 and T4 domains 3D directional-specific search ellipses were guided by the Au and Ag grade variograms. The search radii were influenced and determined by both the grade and indicator variograms.

 

Grade distributions and kriging neighbourhood analyses (KNA) were used to help guide the number of composites to use for the grade interpolations.

 

Search neighbourhoods used different capping levels, as determined through the threshold analyses.

 

Tintic Project15January 27, 2023
 

 

 

Osisko Development Corp.

 

1.8.6Block Model and Grade Interpretation

 

The criteria used in the selection of block size include drill hole spacing, composite length, the geometry of the modelled zone, and the anticipated mining methods. A block size of 1.22 m x 1.22 m x 1.83 m was used. Sub-cells were used, allowing a resolution of 0.30 m x 0.30 m x 0.30 m to better reflect the shape of the mineralization domains. Sub-cells were assigned the same values as their parent cell. No rotation was applied to the block model.

 

Four search passes were used for the grade interpolation and each one utilized a capped grade from the multiple capping levels determined through threshold analyses. A series of sensitivity runs were performed to examine the impact of various parameters on the estimation. Parameters were selected, and gold and silver were estimated using inverse distance squared (ID2). Each subsequent estimation pass used increasing search neighbourhood sizes, determined from grade and indicator variogram results. Samples from a minimum of two drill holes or chip strings were required to estimate all blocks.

 

1.8.7Model Validation

 

Mineralized domain models were validated using a variety of methods including visual inspection of the model grades, grade distributions compared to the informing raw samples, statistical comparisons of informing composites to the model for local and global bias, and reconciliation comparing the model to observed grades from underground development.

 

All analyses indicate that the model follows the grade distribution of the informing composites and that the accuracy of the model has been demonstrated. The total global comparison for each resource classification is within a 20% tolerance for bias and reconciliation. The Micon QPs consider that the model is valid and is a reasonable representation of the Trixie mineralization, based on the current level of sampling and geological information.

 

1.8.8Mineral Resource Classification

 

Mineral Resource Classification was determined through geometric criteria deemed reasonable for the deposit.

 

Due to the lack of sample data that fully crosscut the T1 and 75-85 domains, no material has been classified as measured for these domains, and the characteristics used to classify indicated material have tighter constraints.

 

Due to the geological nature of the stockwork structures in the T4 domain, there is a degree of uncertainty in the ranges of the high-grade mineralization. Therefore, no material has been classified as measured in that domain.

 

Blocks estimated within the mineralized domains not meeting the criteria to classify them as either measured, indicated or inferred were not classified and are not part of the mineral resource estimate.

 

Tintic Project16January 27, 2023
 

 

 

Osisko Development Corp.

 

1.8.9Reasonable Prospects for Eventual Economic Extraction

 

A reasonable economic cut-off grade for resource evaluation at the Trixie deposit was determined using the parameters presented in Table 1.1. The QPs consider the selected cut-off grade of 4.85 g/t Au to be appropriate based on the current knowledge of the Project.

 

Table 1.1
Resource Cut-Off Grade Parameters

 

Parameters Values (USD)
Mining Cost ($/ST*)  $60.00
G&A ($/ST)  $64.97
Haulage ($/ST)  $10.00
Milling ($/ST)  $89.00
Total Refining Cost ($/oz)  $2.65
Gold Price ($/oz)  $1,750
Royalty (Combination) 4.50%
Mill Recovery 95.0%
COG - Round up to (0.05 g/t) 4.85

Table supplied by Osisko Development.

*ST represents short ton.

 

The Deswik Stope Optimizer (DSO) was used to demonstrate spatial continuity of the mineralized zones within “potentially mineable shapes”. The DSO parameters used a minimum mining shape of 6.1 m along the strike of the deposit, a height of 6.1 m and a minimum width of 1.5 m. The maximum shape measures 6.1 m x 6.1 m x 12.2 m in width. Only those blocks of the model constrained by the resulting conceptual mineable shapes are reported as resources.

 

In the opinion of the QPs, the use of the conceptual mining shapes as constraints to report Mineral Resource Estimates demonstrate that the reported resources meet the criteria defined in the CIM Definition Standards (2014), and the MRMR Best Practice Guidelines (2019) for reasonable prospects of eventual economic extraction.

 

The economics of the resources were evaluated solely on the gold content within the mineralized domains. By product silver resources reported are contained in those resource blocks that have potential economic viability based only on the contained gold.

 

1.8.10Mined Void Depletion

 

All current underground development at the Trixie deposit has been conducted by TCM and the void solids for this development have been surveyed, modelled, and kept up to date by TCM. The historically mined development at Trixie has been modelled by TCM but to reduce the associated risk of uncertainty in void locations, a buffer solid of 6.1 m (20 ft) was developed around the historical shapes. The historical buffers and the current development voids are used to deplete the final mineral resource of the Trixie deposit. As underground diamond drilling continues to intersect historically mined voids, the void shapes will be refined, reducing the uncertainty, and the depletion buffers may be reduced.

 

Tintic Project17January 27, 2023
 

 

 

Osisko Development Corp.

 

1.8.11Trixie Initial Mineral Resource Estimate Statement

 

The QPs have classified the initial MRE as Measured, Indicated, and Inferred Mineral Resources based on data density, search ellipse criteria, and interpolation parameters. The initial MRE is considered a reasonable representation of the mineral resources of the Trixie deposit based on the current quality data and geological knowledge. The Mineral Resource Estimate follows the 2014 CIM Definition Standards on Mineral Resources and Reserves.

 

Table 1.2 displays the results of the initial MRE at the official 4.85 g/t Au cut-off grade for the Trixie deposit.

 

1.8.12Mineral Resource Grade Sensitivity Analysis

 

Table 1.3 shows the cut-off grade sensitivity analysis of gold and silver for the initial MRE. The reader should be cautioned that the figures provided in Table 1.3 should not be interpreted as a mineral resource statement. The reported quantities and grade estimates at different cut-off grades are presented for the sole purpose of demonstrating the sensitivity of the mineral resource model for gold to the selection of a reporting cut-off grade. Micon’s QP has reviewed the MRE cut-off grades used in the sensitivity analysis, and it is the opinion of the QP that they meet the test for reasonable prospects of eventual economic extraction at varying prices of gold or other underlying parameters used to calculate the cut-off grade.

 

 

 

 

 

Tintic Project18January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 1.2
Trixie Deposit Initial Mineral Resource Estimate (MRE) Statement

 

Classification Cut-off Grade Quantity Grade Gold Contained Metal Grade Silver Contained Metal
Gold (g/t) ('000 t) (g/t) Gold ('000 oz) (g/t) Silver ('000 oz)
Measured 4.85 11 190.61 67 195.53 69
Indicated 4.85 225 20.17 146 43.73 316
Total Measured + Indicated 4.85 236 28.08 213 50.77 385
Inferred 4.85 385 19.64 243 42.82 530

Notes:

1.Effective date of the Mineral Resource Estimate (MRE) is 10 January, 2023.
2.William Lewis P.Geo, of Micon International Limited and Alan S J San Martin, AusIMM(CP), of Micon International Limited have reviewed and validated the MRE for Trixie and are independent “Qualified Persons”, as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). They are responsible for the initial MRE.
3.The mineral resources disclosed in this report were estimated using the CIM standards on mineral resources and reserves definitions, and guidelines prepared by the CIM standing committee on reserve definitions and adopted by the CIM council.
4.Mineral Resources are reported when they are within potentially mineable shapes derived from a stope optimizer algorithm, assuming an underground longhole stoping mining method with stopes of 6.1 m x 6.1 m x minimum 1.5 m dimensions.
5.Mineral Resources are not mineral reserves and do not have demonstrated economic viability.
6.Geologic modelling was completed by Osisko Development’s senior production geologist Courtney Kurtz, P.G. of Utah, USA using Leapfrog Geo software. The MRE was completed by Osisko Development’s chief resource geologist, Daniel Downton, P.Geo using Datamine Studio RM Pro 1.12 software. The MRE was reviewed and verified by William Lewis and Alan San Martin of Micon.
7.The estimate is reported for an underground mining scenario and with reasonable assumptions. The cut-off grade of 4.85 g/t Au was calculated using a gold price of USD 1,750/oz, a CAD: USD exchange rate of 1.3; total mining, processing and G&A costs of USD 226.62/short ton a combined royalty of 4.5% and an average metallurgical recovery of 95%.
8.Average bulk density values in the mineralized domains were assigned to the T1 (2.616 t/m3), T2 (2.955 t/m3), T3 (2.638 t/m3), T4 (2.621 t/m3), and 75-85 (2.617 t/m3) domains.
9.The Inverse Distance Squared interpolation method was used with a parent block size of 1.2 m x 1.2 m x 1.8 m.
10.The Mineral Resource results are presented in-situ. Estimations used metric units (metres, tonnes, g/t). The number of tonnes is rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects.
11.Neither Osisko Development nor Micon International Limited is aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the mineral resource estimate other than disclosed in this report.

 

Tintic Project19January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 1.3
Gold Grade Sensitivity Analysis at Different Cut-Off Grades

 

Classification Tonnes COG Au (g/t) Au (oz) Ag (g/t) Ag (oz)
Measured + Indicated 334,672 2.50 20.83 224,173 42.82 460,779
319,822 2.75 21.68 222,896 43.86 450,953
307,608 3.00 22.42 221,774 44.89 443,994
294,982 3.25 23.24 220,417 45.69 433,314
282,778 3.50 24.10 219,084 46.57 423,392
271,397 3.75 24.95 217,747 47.52 414,665
262,447 4.00 25.68 216,661 48.36 408,078
254,538 4.25 26.33 215,513 48.89 400,102
246,598 4.50 27.05 214,455 49.84 395,124
238,470 4.75 27.82 213,323 50.58 387,785
235,808 4.85 28.08 212,878 50.77 384,932
233,051 5.00 28.35 212,436 51.15 383,279
225,992 5.25 29.08 211,256 51.93 377,298
219,345 5.50 29.79 210,054 52.66 371,399
214,337 5.75 30.34 209,096 53.33 367,482
209,391 6.00 30.92 208,184 53.92 363,007
203,529 6.25 31.63 206,977 54.79 358,517
198,274 6.50 32.30 205,914 55.54 354,071
193,801 6.75 32.88 204,845 56.11 349,585
189,341 7.00 33.50 203,919 56.92 346,468
185,742 7.25 34.00 203,058 57.34 342,437
181,989 7.50 34.55 202,159 57.85 338,499
Inferred 553,279 2.50 14.75 262,371 38.22 679,912
521,606 2.75 15.48 259,572 39.13 656,177
493,696 3.00 16.19 256,945 39.98 634,610
470,812 3.25 16.82 254,650 40.72 616,359
450,545 3.50 17.42 252,276 41.35 598,941
432,016 3.75 17.99 249,918 42.10 584,763
420,273 4.00 18.37 248,242 42.24 570,717
408,442 4.25 18.78 246,679 42.51 558,235
397,456 4.50 19.18 245,047 42.52 543,387
387,852 4.75 19.53 243,523 42.65 531,832
384,845 4.85 19.64 243,053 42.82 529,766
379,046 5.00 19.87 242,188 43.02 524,210
371,936 5.25 20.15 240,983 43.37 518,566
361,726 5.50 20.56 239,154 43.98 511,444
354,923 5.75 20.85 237,895 44.41 506,746
347,256 6.00 21.18 236,435 44.95 501,843
338,905 6.25 21.54 234,672 45.49 495,696
329,274 6.50 21.97 232,593 46.19 488,985
321,519 6.75 22.33 230,836 46.81 483,828
313,378 7.00 22.74 229,161 47.45 478,092
302,759 7.25 23.27 226,557 48.28 469,947
296,008 7.50 23.63 224,925 48.87 465,129

Table supplied by Osisko Development.

 

Tintic Project20January 27, 2023
 

 

 

Osisko Development Corp.

 

1.9Conclusions

 

With its purchase of TCM in May, 2022, Osisko Development has acquired a major portion of the historical East Tintic Mining District in Utah. The east Tintic district has been a prolific mining area throughout most of its history with several past producers located within the boundaries of Osisko Development’s Tintic Project.

 

The exploration, compilation and development work on the Trixie deposit conducted by Osisko Development since its acquisition have resulted in a better understanding of the geology and mineralization. Based upon the work, Osisko Development has been able to undertake an initial MRE for the Trixie deposit, which remains open at depth and along strike.

 

Micon QPs have reviewed and validated the programs conducted by Osisko Development which form the basis for the initial mineral resource estimate, as well as the mineral resource itself. It is Micon’s QPs’ opinion that the underlying exploration programs have been conducted according to industry best practices as outlined by CIM. Therefore, Micon’s QPs believe that the initial mineral resource estimate can be used as the basis for further exploration and development work to expand the mineral resources and to begin to conduct work leading to the undertaking of a Preliminary Economic Assessment (PEA) for the Trixie deposit.

 

1.10Exploration Budget and Further Recommendations

 

1.11Exploration Budget and Other Expenditures

 

The budgets presented in Table 1.4 and Table 1.5 summarize the estimated costs for completing the recommended drilling and exploration program described below. The budget is a cost estimate and guideline to complete the work. The budget is divided into a two-phase approach, with the second phase contingent on the successful completion of the first.

 

It is the opinion of the Micon QPs that all of the recommended work is warranted and that only the amount of exploration drilling on new targets needs to be finalized. Micon and its QPs appreciate that the nature of the programs and expenditures may change as the further studies are undertaken, and that the final expenditures and results may not be the same as originally proposed.

 

The Micon QPs are of the opinion that Osisko Development’s recommended work program and proposed expenditures are appropriate, warranted and well thought out. The Micon QPs believe that the proposed budget reasonably reflects the type and amount of the activities required to advance the Trixie deposit.

 

Tintic Project21January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 1.4
Tintic Project, Recommended Budget for Further Work, Phase 1 (USD)

 

Type of Activity Cost/ft (approx.) All included Quantity Total (USD)
Infill and Exploration Drilling on Existing Resource $260/ft. 20,000 ft. $5,200,000
Regional Drilling $260/ft 20,000 ft. $5,200,000
Surface geochemical Surveys, Surface and Underground Sampling and Mapping, GIS Compilation     $1,500,000
LiDAR Survey     $55,000
Operational Permits     $1,000,000
Environmental Studies     $1,000,000
Update MRE     $200,000
Metallurgical Test Work     $150,000
Property Wide Activities Subtotal     $14,305,000
Contingency (~10%)     $1,430,500
Total Phase 1 (USD)     $15,735,500

Table provided by Osisko Development.

 

Table 1.5
Tintic Project, Recommended Budget for Further Work Phase, 2 (USD)

 

Type of Activity Cost/ft (approx.) All included Quantity Total (USD)
Additional Infill and Exploration Drilling on Existing Resource $260/ft. 20,000 ft. $5,200,000
Additional Regional Drilling $260/ft 20,000 ft. $5,200,000
Completion of a PEA     $2,000,000
Underground development for exploration ramp $2,500/ft 10,000 ft.  $25,000,000
Contingency (~10%)     $3,740,000
Total Phase 2     $41,140,000
Total Phase 1 and 2     $56,875,500

Table provided by Osisko Development.

 

1.12Further Recommendations

 

Based on the results of the initial MRE, Micon’s QPs recommend further exploration and development of Trixie deposit. It is recommended that Osisko Development continues with underground exploration drilling at Trixie 625 L, together with continued face sampling and mapping along strike and down dip of the mineral resource and to infill areas currently defined as containing inferred resources. It is also recommended that, since the continued underground face sampling has been beneficial to the development of the Project, exploration development continue in order to improve underground access from surface to the deeper levels of the mine. In addition to exploration at Trixie, it is recommended that Osisko Development continue its exploration program on the other mineral targets on the Tintic Property with continued surface mapping and sampling, data compilation and surface drilling of regional high sulphidation, CRD and porphyry targets.

 

Tintic Project22January 27, 2023
 

 

 

Osisko Development Corp.

 

It is recommended that Osisko Development move to a Preliminary Economic Assessment (PEA) at Trixie, by conducting additional metallurgical work, along with further engineering studies on mining and reconciliation, continuing with environmental, permitting and community engagement and conducting a detailed economic analysis.

 

In summary, the following work program is recommended.

 

1.Exploration Work:
a)Conduct an additional approximately 6,000 m (20,000 ft.) of underground diamond drilling for exploration and delineation at Trixie, with primary focus on the T2 and T4 deposits.
b)Continue to develop a structural model with underground face and back mapping at Trixie.
c)Incorporate the remaining 2022 drill results and 2023 drill results into an updated MRE.
d)Continue generative work within the greater Tintic Project, including geophysical interpretation, historic data compilation, and geologic modelling of high sulphidation targets at North Lily and Eureka Standard, CRD targets at Tintic Standard and Burgin, and porphyry targets at Big Hill and Silver Pass areas.
e)Commence surface drilling of regional targets to potentially add further mineral resources in secondary deposits.
f)Perform a LiDAR survey on the property for collection of surface imagery and for aiding in structural interpretation.
g)Investigate the acquisition of a Bazooka drill to conduct short < 25 m (<82 ft) drill holes in conjunction with development underground. This is separate from drilling longer underground exploration holes from a set drilling station.
h)Investigate the use of conducting sludge sampling to provide data on the lateral extent of the grade up to approximately 3.5 m in each wall of the drift as development progresses.
i)Conduct further density sampling for each of the geological domains.
j)Continue construction of the Trixie ramp to make exploration more accessible and continue to improve access to deeper levels for continuous face sampling.

 

2.Burgin Onsite Assay Laboratory:
a)Continue to undertake bi-annual independent inspections of the onsite assay laboratory.
b)Have the onsite laboratory participate in independent assay round robins, as part of its QA/QC practices.
c)Conduct regular screen metallic assays for all gold samples above a pre-determined grade, possibly 1 ounce of gold per short ton.

 

3.Metallurgical Testwork:

It is recommended that the following program of metallurgical testing be undertaken during the next stage of project development:

a)Leaching tests to optimize conditions in terms of precious metal recovery, capital costs and operating costs.
b)Comparative testwork and techno-economic study to compare heap, VAT and agitation leaching technologies.
c)Geochemical characterization testwork on representative feed and residue samples.
d)Appropriate additional comminution testing, depending on the most likely process flowsheet.
e)Variability testwork.

 

Tintic Project23January 27, 2023
 

 

 

Osisko Development Corp.

 

4.PEA:
a)Complete independent metallurgical testwork at the Trixie test mine. Conduct variability testwork and separate recoverability testwork for each zone. If the zones exhibit notable or significant differences in recoveries, incorporate those into an updated resource model.
b)Complete further geotechnical work.
c)Identify further permitting considerations and potential environmental studies for the Project
d)Continue with further community engagement and social license management.
e)Undertake further detailed economic analysis, based upon engineering and metallurgical trade-off studies.

 

 

 

 

 

Tintic Project24January 27, 2023
 

 

 

Osisko Development Corp.

 

2.0   Introduction

 

2.1Terms of Reference

 

Osisko Development Corp. (Osisko Development) has retained Micon International Limited (Micon) to independently review and verify its initial mineral resource estimate (MRE) for the Trixie deposit located within the boundaries of its Tintic Project (the Project) in the State of Utah, USA., and to compile a Canadian National Instrument (NI) 43-101 Technical Report disclosing the results of the MRE.

 

The geologic modelling for the Trixie deposit was completed by Osisko Development’s senior production geologist Courtney Kurtz, P.G., using Leapfrog Geo software. The MRE was completed by Osisko Development’s chief resource geologist, Daniel Downton, P.Geo., using Datamine Studio RM Pro 1.12 software. The MRE was then reviewed and validated by William Lewis, P.Geo. and Alan San Martin, AusIMM(CP), of Micon.

 

For the purposes of disclosure in this Technical Report. William Lewis, P.Geo., who is independent of Osisko Development and is a Qualified Person (QP) within the meaning of NI 43-101, is responsible for the initial mineral resource estimate, by virtue of his independent review and validation of the work conducted by Osisko Development.

 

When conducting, reviewing and validating the initial mineral resource estimate, Osisko Development, Micon’s QPs used the following guidelines, as issued by the Canadian Institute of Mining, Metallurgy and Peroleum (CIM):

 

1.The CIM Definitions and Standards for Mineral Resources and Reserves, adopted by the CIM council on May 10, 2014.

 

2.The CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines, adopted by the CIM Council on November 29, 2019.

 

This report discloses technical information, the presentation of which requires the QPs to derive sub-totals, totals and weighted averages that inherently involve a degree of rounding and, consequently, introduce a margin of error. Where these occur, the QPs do not consider them to be material.

 

The conclusions and recommendations of this report reflect the QPs best independent judgment in light of the information available to them at the time of writing. Micon and the QPs reserve the right, but will not be obliged, to revise this report and conclusions if additional information becomes known to them subsequent to the date of this report. Use of this report acknowledges acceptance of the foregoing conditions.

 

This report is intended to be used by Osisko Development subject to the terms and conditions of its agreement with Micon. That agreement permits Osisko Development to file this report as a Technical Report on SEDAR (www.sedar.com) pursuant to provincial securities legislation, or with the Securities Exchange Commission (SEC) in the United States.

 

Neither Micon nor the QPs have, nor have they previously had, any material interest in Osisko Development or related entities. The relationship with Osisko Development is solely a professional association between the client and the independent consultants. This report is prepared in return for fees based upon agreed commercial rates and the payment of these fees is in no way contingent on the results of this report.

 

Tintic Project25January 27, 2023
 

 

 

Osisko Development Corp.

 

Micon and the QPs are pleased to acknowledge the helpful cooperation of Osisko Development management, personnel and consulting field staff, all of whom made any and all data requested available and responded openly and helpfully to all questions, queries and requests for material.

 

This report supersedes and replaces all prior Technical Reports written for the Tintic Project.

 

2.2Discussions, Meetings, Site Visits and Qualified Persons

 

In order to undertake the review and validation of the initial mineral resource estimate for the Trixie deposit, the QPs of this Technical Report held a number of discussions and meetings with Osisko Development’s personnel and contractors to discuss details relevant to the exploration programs, Quality Assurance/Quality Control (QA/QC) programs, parameters used for the mineral resource estimate and the mineral resource estimate itself. The discussions were held via email chains and phone calls, as well as Microsoft Teams and Zoom meetings. The discussions were open, frank and at no time was information withheld or not available to the QPs.

 

A site visit was conducted from September 12 to September 16, 2022. The site visit was undertaken by Mr. Lewis to independently verify the geology, mineralogy, drilling programs and the QA/QC programs. A number of samples were collected during the 2022 site visit and the verification program on those samples is discussed in Section 12 of this report.

 

Prior to the site visit, the objectives of that visit were discussed between Osisko Development’s Vice President of Exploration, Maggie Layman, P.Geo. and William Lewis. Mr. Lewis visited the different areas of the property, with an emphasis on verifying the exploration/evaluation works completed to date, as well as obtaining a general overview of the current work at the Trixie test mine. An inspection was made of the underground workings at the Trixie deposit, along with a visit to the surface drilling site. During the visit, Mr. Lewis was accompanied by Ms. Layman and had the opportunity to meet the personnel responsible for the various areas of technical services (mining, metallurgy and process), exploration and underground geology as well as a number of contractors. A number of open and frank discussions were held regarding the exploration programs, sampling QA/QC procedures, mineral resource modelling and the parameters and procedures used for the mineral resource estimate.

 

Open and frank discussions continued throughout the mineral resource process on all aspects of the process, culminating in completion of the initial mineral resource estimate in January, 2023.

 

The QPs responsible for the preparation of this report and their areas of responsibility and sites visits are summarized in Table 2.1.

 

Tintic Project26January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 2.1
Qualified Persons, Areas of Responsibility and Site Visits

 

Qualified Person Title and Company Area of Responsibility Site Visit
William J. Lewis, P.Geo. Senior Geologist, Micon Sections 1 (except 1.7), 2 to 12, 14.1 to14.4, 14.10 to 14.16 (except 14.12) and 23 to 28 September 12 to September 16, 2022
Ing. Alan San Martin, MAusIMM(CP) Mineral Resource Specialist, Micon Sections 14.5 to 14.9 and 14.12 None
Richard Gowans, P.Eng. Principal Metallurgist Sections 1.7 and 13 None
NI 43-101 Sections not applicable to this report 15,16,17,18,19,20,21 and 22  

 

2.3Sources of Information

 

Micon’s review of the Tintic Project, and the Trixie deposit in particular, was based on published material researched by the QPs, as well as data, professional opinions and unpublished material submitted by the professional staff of Osisko Development or its consultants. Much of these data came from reports prepared and provided by Osisko Development. The information and reference sources for this report are identified in Section 28.0.

 

The descriptions of geology, mineralization and exploration used in this report are taken from reports prepared by various organizations and companies or their contracted consultants, as well as from various government and academic publications. The conclusions of this report use, in part, data available in published and unpublished reports supplied by the companies which have conducted exploration on the property, and information supplied by Osisko Development. The information provided to Osisko Development was supplied by reputable companies and the QPs have no reason to doubt its validity. Micon has used the information where it has been verified through its own review and discussions.

 

Some of the figures and tables for this report were reproduced or derived from reports on the property written by various individuals and/or supplied to the QPs by Osisko Development. A number of the photographs were taken by Mr. Lewis during his September, 2022 site visit. In cases where photographs, figures or tables were supplied by other individuals or Osisko Development, the source is referenced below that item. Figures or tables generated by Micon are unreferenced.

 

2.4Units of Measurement and Abbreviations

 

All currency amounts are stated in United States of America dollars (USD), unless otherwise stated. Quantities are generally stated in metric units, the standard Canadian and international practice, including metric tonnes (t) and kilograms (kg) for mass, kilometres (km) or metres (m) for distance, hectares (ha) for area, grams (g) and grams per metric tonne (g/t) for gold and silver grades (g/t Au, g/t Ag). Wherever applicable, US units of measure have been converted to Système International d’Unités (SI) units for reporting consistency, but the US units may be stated in brackets after the metric units. Precious and base metal grades may be expressed in parts per million (ppm) or parts per billion (ppb) and their quantities may also be reported in troy ounces (ounces, oz) for precious metals and in pounds (lbs) for base metals, a common practice in the mining industry.

 

Tintic Project27January 27, 2023
 

 

 

Osisko Development Corp.

 

The original work on the initial resource estimate for the Trixie deposit was performed by Osisko Development personnel in the United States and used US units of measurement. For reporting in a Technical Report under Canadian NI 43-101 requirements, the US units have been converted to metric units.

 

Table 2.2 summarizes the conversion factors from US measurement units to international metric units. Table 2.3 provides a list of abbreviations that are used in this report. Appendix 1 contains a glossary of mining and other related terms that are used in this report.

 

Table 2.2
Conversion Factors for this Report

 

US Measurements Metric Measurement
1 acre 0.404686 hectare
1 foot 0.3048 metre
1 ton 0.90718 tonnes
1 troy ounce 31.1035 grams
32 degrees Fahrenheit* 0 degrees Celsius

*Formula to Convert Fahrenheit to Celsius is (°F − 32) × 5/9 = °C

 

Table 2.3
List of Abbreviations

 

Name Abbreviation
Atomic Absorption Spectrometry AAS
Adsorption/desorption/reactivation ADR
ALS Minerals or ALS Geochemistry ALS
American Association of Laboratory Accreditation AALA
American Drilling Corp, LLC. American Drilling
American Society of Testing Material ASTM
Australasian Institute of Mining and Metallurgy AusIMM
Australian Geostats Pty Ltd Australian Geostats
Australian Ore Research & Exploration P/L OREAS
Brunton® Standard Transit compass Brunton® compass
Canadian Centre for Mineral and Energy Technology CANMET
Canadian Institute of Mining, Metallurgy and Petroleum CIM
Canadian National Instrument 43-101 NI 43-101
Canadian Securities Administrators CSA
Carbonate replacement deposit CRD
CDN Resource Laboratories Ltd. CDN Resource
Centimetre(s) cm
Chartered Professional(s) CP(s)
Chief Consolidated Mining Co. CCMC
Committee for Mineral Reserve International Reporting Standards CRIRSCO
Cubic feet per second cfs
Degree(s), Degrees Celsius, Degrees Fahrenheit o ,oC, oF
Deswik Stope Optimizer DSO
Digital elevation model DEM

 

Tintic Project28January 27, 2023
 

 

 

Osisko Development Corp.

 

Name Abbreviation
Dissolved oxygen DO
Electronic Data Gathering, Analysis and Retrieval EDGAR
Emerald Hollow LLC Emerald Hollow
Florin Analytical Services LLC Florin or FAS
Freeport McMoRan Inc. Freeport McMoRan
Freeport-McMoran Mineral Properties Inc. FMMP
Grams per metric tonne g/t
Hectare(s) ha
Hour h
Identification(s) ID(s)
IG Tintic LLC IG Tintic
Inch(es) in
Inductively Coupled Plasma – Emission Spectrometry ICP-ES
Internal rate of return IRR
International Electrotechnical Commission IEC
International Organization for Standardization ISO
Ivanhoe Electric Inc. Ivanhoe Electric or IVNE
Inverse Distance Squared ID2
Joint Ore Reserve Committee JORC
Kappes, Cassiday & Associates KCA
Kennecott Copper Corp. Kennecott
Kilogram(s) kg
Kilometre(s) km
Kriging neighbourhood analyses KNA
Layne Christensen Company Layne
Large Mine Operations LMO
Litre(s) L
London Metal Exchange) LME
Matrix matched standard MMS
Metre(s) m
Micon International Limited Micon
Million (eg million tonnes, million ounces, million years) M (Mt, Moz, Ma)
Milligram(s) mg
Millimetre(s) mm
Mineral resource estimate MRE
Mountain States R & D International Mountain States
Nasco Industrial Services and Supply LLC. NISS
National Institute of Standards and Technology NIST
Nearest Neighbour NN
Net present value, at discount rate of 8%/y NPV, NPV8
Net smelter return NSR
North American Datum NAD
Not available/applicable n.a.
Notice of Intent NOI
Ordinary kriging OK
Ore Research and Exploration Pty Ltd. OREAS
Osisko Development Corp. Osisko Development or ODV

 

Tintic Project29January 27, 2023
 

 

 

Osisko Development Corp.

 

Name Abbreviation
Osisko Gold Royalties Ltd. Osisko Gold Royalties
Ounces (troy)/ounces per year oz, oz/y
Parts per billion, part per million ppb, ppm
Percent(age) %
Qualified Person QP
Quality Assurance/Quality Control QA/QC
Qualitica Consulting Inc. Qualitica Consulting
Reverse Circulation RC
Short tons (US) ST
Specific gravity SG
Square kilometre(s) km2
Standard Reference Material(s) SRM(s)
Sunshine Mining Corporation Sunshine Mining
System for Electronic Document Analysis and Retrieval SEDAR
Talisker Exploration Services Inc. Talisker
Three-dimensional 3D
Tintic Consolidated Metals LLC. TCM
Tintic Utah Metals LLC. Tintic Utah Metals or TUM
Tonne (metric), tonnes per day, tonnes per hour t, t/d, t/h
Tonne-kilometre t-km
Two-dimensional 2D
United States Dollar(s) USD
US Environmental Protection Agency EPA
US Geological Survey USGS
US Securities and Exchange Commission SEC
Universal Transverse Mercator UTM
Utah UT
Utah Department of Water Quality DWQ
Utah Division of Oil, Gas and Mining DOGM
Year y

 

2.5Previous Technical Reports

 

One previous Technical Report has been published on the Tintic Project:

 

·Technical Report on the Tintic Project, East Tintic Mining District, Utah County, Utah, USA, for Osisko Development Corp. by Dr. Thomas A. Henricksen, dated June 7, 2022, and filed on SEDAR June 10, 2022.

 

Tintic Project30January 27, 2023
 

 

 

Osisko Development Corp.

 

3.0   Reliance on other experts

 

In this Technical Report, discussions in Sections 1.0 and 4.0 regarding royalties, permitting, taxation and environmental matters are based on material provided by Osisko Development. The QPs and Micon are not qualified to comment on such matters and have relied on the representations and documentation provided by Osisko Development for such discussions.

 

All data used in this report were originally provided by Osisko Development. The QPs have reviewed and analyzed these data and have drawn their own conclusions therefrom.

 

The QPs and Micon offer no legal opinion as to the validity of the title to the mineral concessions claimed by Osisko Development and have relied on information provided by Osisko Development.

 

Osisko Development has confirmed to Micon that it verified the status of the mineral title to certain patented mining claims by engaging Utah legal counsel, Holland and Hart LLP, to conduct a review of Osisko Development’s chain of title for the select patented mining claims within the land package covering approximately 243 ha (600 acres) surrounding the Trixie and Burgin mines. Holland and Hart LLP conducted its title review by examining the United States Bureau of Land Management records, including the patents issued by the United States, mineral survey and master title plans, and the official records of the Utah County Recorder’s Office, including the abstract (tract), mining claims, and grantor/grantee indices, among miscellaneous other records. This consolidated land position has been acquired over a hundred years of prior consolidation in the district. Osisko Development also engaged with Wolcott LLC, an independent consultant to conduct field checks and generate a geospatial database for the mineral claims.

 

Information related to royalties, permitting, taxation and environmental matters have been updated by Osisko Development through personal communication with the QPs. Previous NI 43-101 Technical Reports, as well as other references, which were used in the compilation of this report are listed in Section 28.0.

 

Tintic Project31January 27, 2023
 

 

 

Osisko Development Corp.

 

4.0   Property Description and Location

 

4.1General Description and Location

 

The Tintic Project is located in western Utah County, approximately 64 kilometres (km) south of Provo, Utah and 95 km south of Salt Lake City. The property in which the Trixie test mine or Trixie deposit is located encompasses most of the East Tintic District, surrounding and immediately east of the incorporated town of Eureka. The town of Eureka is located approximately 6.4 km northwest of the Trixie test mine. Figure 4.1 shows the Project location within the state of Utah.

 

The coordinates of the centre of the Project are 407,700mE and 4,423,400mN, referenced in NAD83, Northern UTM Zone 12. The Project area is located on Eureka Quadrangle, US Topographic Map 1:24,000 scale, 7.5 Minute Series.

 

The nearest rail siding, in use, is located at Tintic Junction, approximately 10 km west of the Project.

 

Figure 4.1
Location Map for the Tintic Project

 

  

Figure provided by Osisko Development.

 

 

Tintic Project32January 27, 2023
 

 

 

Osisko Development Corp.

 

4.2Land Tenure, Agreements, Mineral Rights and Ownership

 

4.2.1Property Area

 

The area of the Tintic Project owned or controlled by Osisko Development comprises 1,105 claims totalling 5,746 ha (14,200 acres) of patented mining claims (Figure 4.2), and a further 107 unpatented mining claims of approximately 1,214 ha (3,000 acres) (Figure 4.3). Figure 4.2 displays the Tintic Consolidated Metals LLC (TCM) property outline within the East Tintic District. Osisko Development owns a small and varying percentage interest or royalty in a number of other claims outside the main claim package and these are shown as leased on the map in Figure 4.3. Figure 4.4 displays the individual patented surface (and mineral rights) owned by Osisko Development.

 

4.2.2Acquisition of the Trixie Gold Project

 

On May 30, 2022, Osisko Development announced the acquisition of 100% of Tintic Consolidated Metals LLC (TCM) (the “Acquisition”) from IG Tintic LLC (IG Tintic) and Chief Consolidated Mining Co. (CCMC) (the “Vendors”) for total consideration at closing of approximately USD 177 million in cash and shares of Osisko and:

 

i.USD 12.5 million in deferred payments

 

ii.a 2% NSR royalty, with a 50% buyback right in favour of Osisko Development exercisable within 5 years; and

 

iii.other contingent payments, rights and obligations.

 

Osisko Development entered a binding metals stream (“Stream”) term sheet with Osisko Gold Royalties Ltd. (Osisko Gold Royalties) for total cash consideration of USD 20 million. Under the Stream, Osisko Development will deliver to Osisko Bermuda Ltd., a wholly owned subsidiary of Osisko Gold Royalties, 2.5% of all metals produced from Tintic at a purchase price of 25% of the relevant spot metal price. Once 27,150 ounces of refined gold have been delivered, the Stream rate will decrease to 2.0% of all metals produced. The proceeds from the Stream will be used to advance the development of the Tintic Project.

 

Tintic Project33January 27, 2023
 

 

 

Osisko Development Corp.

 

 

Figure 4.2
TCM Property Outline within the East Tintic District

 

 

Figure provided by Osisko Development.

 

Tintic Project34January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 4.3
Tintic Project Individual Claims Map

 

 

Figure provided by Osisko Development.

 

Tintic Project35January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 4.4
Tintic Project Surface Ownership

 

 

Figure provided by Osisko Development.

 

Tintic Project36January 27, 2023
 

 

 

Osisko Development Corp.

 

4.2.3Title, Mineral and Surface Rights Summary and Royalties

 

Effective upon the closing of the acquisition, Osisko Development acquired 5,746.53 ha (14,200 acres) of patented mineral claims in the East Tintic District (Appendix 2) as well as rights to acquire an additional 1,214.06 ha (3,000 acres) of patented mineral claims within the East and Main Tintic Districts. Osisko Development also acquired surface rights over approximately 243 ha (600 acres) surrounding the Trixie and Burgin mines (Table 4.1 and Table 4.2), with an option to acquire additional surface rights as needed for construction of additional mining infrastructure. Osisko Development has agreed all necessary easements with the surface rights owner for water, transportation and infrastructure access to the mine site.

 

As part of the Acquisition, two 1% net smelter return royalties (NSRs) were granted, each with a 50% buyback right in favour of Osisko Development, each for USD 7.5 million within 5 years. The NSRs were granted to IG Tintic and Emerald Hollow LLC.

 

The state of Utah is entitled to a 0.78% mining severance tax.

 

There are no further underlying royalty or other property payments owed to any third party on the TCM property, other than those described above.

 

Table 4.1
Trixie Mineral Claims

 

Name* Survey No. Patent No. Township Range A Portion of Sections
Cameo #27 6766 1006490 T10S R2W 28: NE¼
Cedar 6574 959091 T10S R2W 28: NE¼
Cedar No. 1 6574 959091 T10S R2W 28: NE¼
Cedar No. 4 6737 993922 T10S R2W

27: NW¼

28: NE¼

East Point #5 6091 397059 T10S R2W

21: SE¼

28: NE¼

Rose 7138 1108693 T10S R2W

21: SE¼

28: NE¼

Trixy 6073 214588 T10S R2W

27: NW¼

28: NE¼

TRUMP 6073 214588 T10S R2W 28: NW¼
Vern No. 2 6456 925953 T10S R2W

21: SE¼

28: NE¼

White Rose No. Four 6766 1006490 T10S R2W

27: NW¼

28: NE¼

White Rose No. 5 Amended 6766 1006490 T10S R2W 21: SE¼
White Rose No. Six 6766 1006490 T10S R2W

21: SE¼

28: NE¼

White Rose No. Seven 6766 1006490 T10S R2W 21: SE¼

*Owns all right, title, and interest (100%) interest in the surface and mineral estates.

Table provided by Osisko Development.

 

Tintic Project37January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 4.2
Burgin Mineral Claims

 

Name Survey No. Patent No. Township Range A Portion of Sections
Christmas 6560 915159 T10S R2W

15: SE¼

22: NE¼

Christmas No. 1 6560 915159 T10S R2W

15: SE¼

22: NE¼

Detective No. 5 6560 915159 T10S R2W 15: SE¼
Detective No. 7 6560 915159 T10S R2W 15: SE¼
Sunny Side No. 1 6560 915159 T10S R2W

15: SE¼

22: NE¼

Climax #1 6784 1038307 T10S R2W

15: SE¼

22: NE¼

Climax #2 6784 1038307 T10S R2W 15: SE¼
Eastern No. 2 6784 1038307 T10S R2W

11: SW¼

14: NW¼

15: SE¼

*Owns all right, title, and interest (100%) interest in the surface and mineral estates.

Table provided by Osisko Development.

 

4.3Encumbrances and Other Significant Factors or Risks

 

4.3.1Encumbrances

 

Permitting of the Trixie test mine is well advanced, with many project components already permitted and bonded by the Utah Division of Oil, Gas and Mining (DOGM). These include the Trixie shaft and surface facilities. Full development of the Trixie test mine will require a number of additional Agency approvals, none of which is anticipated to be problematic to obtain. Pursuant to the Stream Agreement, Osisko Bermuda has a first ranking security interest over all of the present and future assets of TCM. TCM is a division of Osisko Development.

 

4.3.2Other Significant Factors and Risks

 

Effective upon the closing of the Acquisition, Osisko Development’s rights to use and access all surface and water rights conveyed to Emerald Hollow LLC (Emerald Hollow) are governed by a Framework Agreement executed at closing and dated effective May 27, 2022 (the “Framework Agreement”). Under the Framework Agreement, Osisko Development has the right to conduct exploration activities and has agreed easements to use the surface rights owned by Emerald Hollow. Osisko Development also has the right to purchase surface rights from Emerald Hollow at market rates if it has reasonably determined that actual use and occupation of such lands for facilities for more than eighteen (18) months are necessary for economic exploitation of proven or probable reserves or measured, indicated, or inferred resources.

 

Osisko Development has also retained a right of first offer in the event that Emerald Hollow desires to sell, assign, or otherwise transfer to a third party all or a portion of its interest in the surface rights it owns, as well as a first priority right to purchase from Emerald Hollow, at a price based on prevailing market rates, a maximum annual water flow rate of 2.45 cubic feet per second (cfs) and a maximum annual volume of 1,776.64 acre-feet of water from Emerald Hollow for its mining activities.

 

Tintic Project38January 27, 2023
 

 

 

Osisko Development Corp.

 

There are no other known significant factors and risks that may affect access, title, or the right or ability to perform work on the property.

 

4.4Permitting and Environmental Liabilities

 

4.4.1Environment

 

TCM maintains adequate financial surety of USD 1,473,167 with the Utah DOGM. This financial surety was last updated in August, 2021 with the addition of a pilot process operation. TCM is currently in the process of updating its large mine permit with Utah DOGM and expects the surety to be updated as part of this process.

 

TCM maintains all necessary environmental permits to operate within the Tintic operations area, including the current large mine permit update. As part of this update, environmental resources within the Tintic Test Mine were reviewed. As of the date of this report, all water rights and other water sources have been secured and agreed upon. Furthermore, the US Fish and Wildlife Service has deemed that this area does not contain areas of critical wildlife concern.

 

There are no other known significant factors and risks that may affect access, title, or the right or ability to perform work on the property.

 

4.4.2Permits and Environmental Liabilities

 

TCM is working under the Notice of Intent (NOI) Large Mine Operations (LMO) plan permit approved by the Utah DOGM in 2017. An updated LMO was submitted in February, 2022 and is currently going through the review/approval process. TCM has exploration permits in place (i.e., surety bonding) to support surface diamond drilling and the excavation of the Trixie Portal (Brandy Lee Decline). Once approved, the exploration for the decline will fall within the updated LMO. Under agreement with the Utah DOGM and the Utah Department of Water Quality (DWQ), TCM is permitted to operate a pilot processing facility and a tails holding pad. TCM does not discharge any water or effluents from current operations.

 

4.5QP Comments

 

Micon and the QPs are not aware of any significant factors or risks, other than those discussed in this Technical Report, that may affect access, title, or the right or ability to perform work on the property by Osisko Development. It is Micon’s and the QP’s understanding that further permitting and environmental studies will be required, if further exploration, test mining and economic studies demonstrate that the mineralization is sufficient to host a mining operation.

 

The area of the Tintic Project is large enough to be able to locate and accommodate the infrastructure necessary to host any future mining operations, if Osisko Development advances the Trixie test mine towards a production decision.

 

Tintic Project39January 27, 2023
 

 

 

Osisko Development Corp.

 

5.0   Accessibility, climate, local resources, infrastructure and physiography

 

5.1Accessibility

 

The closest major airport to the Tintic Project is in Salt Lake City, Utah, located to the north-northwest of the city of Provo, via Interstate 15. Access to the Tintic Project from Provo, is via Interstate 15, a distance of 36 km south to exit 248 to US 6, then west on US 6 for 27 km to Silver Pass Road, and then south 3.2 km to the Burgin administration office site. The Trixie test mine is located 2.6 km southwest of the Burgin office on the paved Silver Pass Access Road (Figure 5.1). Provo is the fourth largest city in Utah, and other smaller towns, including Payson, Santaquin and Eureka are also adjacent to the Project.

 

Figure 5.1
Overview of the Trixie Test Mine looking towards the Northeast

 

  

Figure provided by Osisko Development.

 

5.2Infrastructure and Local Resources

 

The towns of Goshen, Santaquin, Payson and Provo are the main sources for supplies and services. Tintic Project personnel and contractors also live in these areas.

 

The Project has sufficient power and water to support a mining operation.

 

The nearest perennial surface water body is Utah Lake, which is located approximately 14 km northeast of the Project area.

 

Tintic Project40January 27, 2023
 

 

 

Osisko Development Corp.

 

Three small perennial springs discharge from perched ground water in the upper portion of the volcanic cap rocks at an elevation of 1,950 m on the western slope of the upper Silver Spring Pass Canyon drainage. Perennial flow is limited to short reaches below these springs. The company anticipates that additional water will be available for the Project from various surface and underground water sources pursuant to written agreements with the owners of water rights in the vicinity.

 

A 46 kVA high tension power line owned by Rocky Mountain Power crosses the property near the Burgin administrative complex. The installation of new transformers and electrical infrastructure to service both the Trixie test mine and the Burgin administrative complex was completed by TCM in December, 2021, with peak load usage up to 4.5 MW. Estimated peak load power requirement for Trixie is 3 MW.

 

5.3Topography, Physiography, Vegetation and Climate

 

Topographic relief in the East Tintic District ranges from 1,494 m in the Goshen Valley east of the District to 1,996 m at nearby Mineral Hill. The elevation at Trixie is 1,852 m.

 

The Tintic Mountains host the scanty vegetation typical of an arid region. Different species of cactus, forbs and shrubs grow on exposed rocky points. The more common trees of the higher slopes are pinyon pine, juniper and mountain mahogany. At lower elevations, maple thickets occur in the dry ravines, especially on the eastern slopes, while aspens are found in sheltered spots, more commonly those of northern exposure. In the valleys, sagebrush, rabbitbrush, Brigham’s tea and cheat grass constitute almost the entire vegetation. Range improvement projects in the area have had some effect on improving grazing.

 

The climate of the East Tintic District is semi-arid. The U.S. Climate data website (https://www.usclimatedata.com/climate/elberta/utah/united-states/usut0068) noted that the mean monthly low temperatures at the nearby town of Elberta range from -10 degrees (°) Celsius (C) or 15° Fahrenheit (F) in January to 15° C (58° F) in July. The mean monthly high temperatures range from 2° C (37° F) in January to 33° C (93° F) in July. The Project has year-round access and operating season.

 

5.4Site Facilities

 

The Project’s main office, laboratory, workshops and onsite processing facilities are located at the Burgin site, immediately off Highway 6 and northeast of the Trixie test mine (Figure 5.2). The Burgin mine is a past-producing underground operation containing lead-zinc-silver ores that was last mined by Kennecott in 1976. All references to Burgin in this report are with respect to the main office and surface facilities located at this site, and not to the Trixie test mine or deposit, unless otherwise specified.

 

A mill facility previously operational in 2002 is located at the Burgin site. In October, 2021, a pilot vat leaching circuit was established within the old Burgin mill facility for cyanide vat leaching of the mineralized material from the Trixie test mine. Osisko Development’s recent operations also included trucking mineralized material to an offsite facility for vat and heap leaching from late 2020 to May, 2022.

 

In 2022, a pilot tailings facility was constructed on site adjacent to the mill facility. The facility was double lined for future re-permitting and operation as a heap leach facility.

 

Tintic Project41January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 5.2
Burgin Site Infrastructure

 

  

Figure provided by Osisko Development. 

 

There is a current effort to design and construct a test milling facility in the Burgin mill building to further demonstrate the leach recovery results from the pilot vat leach facility in operation through late 2022. There is a tailings facility north of the processing facilities which will be redesigned and reconstructed to support tailings storage for the currently in-development Burgin Test Mill. Additional to the milling facilities, a permanent crusher installation is in development to prepare feed for the test mill or as part of future milling/processing facilities.

 

The onsite laboratory at the Burgin site provides fire assay analysis for gold and silver for all underground grade control sampling from the Trixie test mine. Atomic Absorption Spectrometry (AAS) and bottle roll analysis to complement onsite VAT leaching and processing have also been established. Using an onsite laboratory to assay samples generated on site is common practice in the mining industry. Onsite laboratories usually participate in round robin exercises with government or independent laboratories as part of their QA/QC programs. In addition, onsite laboratories, such as the Burgin site, usually send out check samples and engage laboratory auditing consultants to independently review their procedures.

 

The mineral property is sufficiently large that construction of further infrastructure at the Project will not be hindered by lack of space.

 

Tintic Project42January 27, 2023
 

 

 

Osisko Development Corp.

 

6.0   History

 

6.1Introduction

 

Much of the material in this section is taken from the Chief Consolidated Mining Retrospect and Prospect 2005 Report. The mines, resources and reserves quoted in this section are historical in nature and should not be relied upon. It is unlikely that any of the resources or reserve estimates would comply with current NI 43-101 criteria or CIM Standards and Definitions. Historical resource and reserve estimates included in this section are for illustrative purposes only and should not be disclosed out of context. The QP did not review the database, key assumptions, parameters, or methods used for the historic mining on the East Tintic District as they are no longer available or were never recorded.

 

6.2Tintic District – Early Mining History (1869 to 2002)

 

Economic mineralization in the Tintic District was first discovered in 1869 and within a few years, most of the major outcropping ore bodies were being mined and many of the historic mining towns, including Diamond, Silver City, Mammoth, Eureka, Dividend and Knightsville had been established (Krahulec and Briggs, 2006). By 1899, the Tintic District had become one of the richest mining districts in the USA. Active mining in the district continued through the 20th and beginning of the 21st century. Major replacement type ore bodies were discovered along three main structures known as the Gemini, Mammoth-Chief and Godiva ore runs. In 1905, a fourth ore run which was not outcropping, the Iron Blossom, was discovered by Jesse Knight. This “blind” discovery by Knight, some distance east of the outcropping ore runs, opened the possibility of further deposits to the east (Figure 6.1).

 

6.2.1East Tintic District

 

Even though many claims in what is now identified as the East Tintic District had been staked before the turn of the 20th century, the only known occurrence of surface mineralization was in a small outcrop near the present Eureka Lilly shaft. All future discoveries of the blind ore bodies in the East Tintic District would be based on surface alteration and underground geological interpretation.

 

E.J. Raddatz became interested in the East Tintic District around 1906 and acquired a major holding in what is now the Tintic Standard area. Raddatz reasoned that, even though the surface rocks were inhospitable, there was a chance of discovery in the Ophir limestone at depth. It took two shafts and thousands of feet of drift and winze workings but in 1916 the Tintic Standard deposit was discovered and went on to become one of the major lead-silver mines in the world.

 

Mining geologists, attracted by the discovery of the Tintic Standard deposit, began to study the district. Among these was Paul Billingsley, who observed that the volcanic cover in the east was pre-mineral and was altered by various stages of mineralizing fluids contemporaneous with ore deposition. Mr. Billingsley also recognized that the dikes and fissures cutting the volcanics continued at depth into the underlying sediments. Based on these ideas, a long drive on the 700 level of the Tintic Standard mine was commissioned. The target was projected from a surface exposure of a strong alteration zone, along with persistent dikes mapped within the volcanics. This exploration work intersected the mineral deposit that became the North Lily mine. Similar strategies led to the discovery of the Eureka Standard mine.

 

Tintic Project43January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 6.1
Overview of the Major Historic Mineral Deposits of the Tintic District

 

  

Figure provided by Osisko Development.

 

During World War II, the United States recognized that, in the event of a long war, new sources of raw material would be essential. As a result, the US Geological Survey undertook an exploration program seeking blind ore bodies in the East Tintic District. One of the blind targets identified by the USGS was the CCMC oxide area, a prominent outcrop of oxidized and pyritized volcanics which overlies the Burgin deposit. However, no major discovery was made from either the sinking of the 22.6 m (75 ft) deep CCMC shaft or the drift from the Apex Standard mine. It was later surface drilling that made the discovery of the Burgin ore body.

 

Tintic Project44January 27, 2023
 

 

 

Osisko Development Corp.

 

District production slowly increased through discovery of new mines and peaked between 1921 and 1930, when according to data from the U.S. Bureau of Mines, production for that decade from the combination of the Main Tintic and East Tintic mining districts reached 4,250,000 tons. From that peak, production decreased to a low of 662,000 tons between 1961 and 1970. Production from the Burgin mine led to a second peak of 1,200,000 tons between 1971 and 1976. Total recovered metal from the greater Tintic District is summarized in Table 6.1.

 

6.3Trixie –Exploration Underground Development and Mining (1927 to 1995)

 

6.3.1Trixie Early Exploration (Pre-1957)

 

Following the discovery of the Tintic Standard deposit in 1917, the North Lily deposit in 1927 and the Eureka Standard deposit in 1928, interest was sparked over a poorly exposed structure overlying the current location of the Trixie test mine. Two shallow prospecting shafts known as the Trump shaft (94 ft or 28.5 m deep) and South Standard shaft (102 ft or 31 m deep) were sunk, but due to their shallow depth, failed to intersect mineralization.

 

Intense hydrothermal alteration of volcanic rocks exposed at surface at the Trixie site attracted the attention of the U.S. Bureau of Mines, which, in 1946-1947, conducted gravimetric and spectrographic surveys as well as geological studies of the Trixie area.

 

Between 1954-1955 the USGS conducted geochemical sampling and geological mapping of the area immediately north of the current Trixie shaft location. This was followed up by the drilling of nine holes that confirmed the presence of the Trixie fault and the validity of the surface geochemical anomalies when low-grade lead-zinc ore was intersected in the Trixie fault zone. After the conclusion of the USGS research program in 1956, Bear Creek Mining (an exploration subsidiary of Kennecott Copper Corp. (Kennecott)) completed eight additional core holes in the target area and several of these holes intersected strong lead-zinc replacement mineralization in the underlying limestone. Despite the apparent presence of ore-grade mineralization at depth, the disappointing core recoveries resulted in surface exploration work being terminated in 1957. Subsequently, the decision was made to conduct future exploration from underground.

 

6.3.2Trixie - Shaft Sinking and Underground Development and Mining (1968 to 1992)

 

The sinking of the Trixie shaft was initiated in 1968 and had reached the 750 ft level by 1969. Although the initial target of exploration at the Trixie historic mine was lead-zinc replacement mineralization in the hanging wall of the Trixie Fault, a gold-bearing structure was encountered during shaft sinking at a depth of 584 ft. This northerly-trending and steeply west-dipping structural zone became the primary source of ore, which was concentrated along three gold-silver mineralized segments. From north to south these ore shoots were referred to as the 756 ore shoot, the 75-85 ore shoot, and the Survey zone (Figure 6.2).

 

Tintic Project45January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 6.1
Total Recovered Metal and Production Values from the Tintic District

 

Sub-District Ore Treated (Short Tons) Gold
(Troy Ounces)
Silver
(Troy Ounces)
Copper (Short Tons) Lead
(Short Tons)
Zinc
(Short Tons)
Main Tintic 1869-1993 13,813,942 2,166,841 207,687,897 109,866 644,750 69,258
East Tintic 1899-2002 5,982,827 658,224 75,871,239 17,759 507,981 178,545
SW Tintic 1869-1919 122,000 12,025 1,440,370 585 4,160 115
North Tintic 1902-1955 63,939 8 40,412 - 6,081 10,654
Total 19,982,708 2,837,098 285,039,918 128,210 1,162,972 258,572
Average Grade   0.142 oz/t 14.26 oz/t 0.64 % 5.82 % 1.29 %
Metal Prices as of October, 2022   $1,662 per Ounce $20 per Ouncer $7,746 per Short Ton $1,870 per Short Ton $3,124 per Short Ton
Production value at current price   $4,715,256,876 $5,558,278,401 $993,114,660 $2,174,757,640 $807,778,928
Total Production $14,249,186,505          

Table from Krahulec and Briggs, 2006.

 

 

 

Tintic Project46January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 6.2
Oblique 3D Model View of all Historic and Modern (T2) Development at Trixie

 

Figure provided by Osisko Development.

 

 

 

Tintic Project47January 27, 2023
 

 

 

Osisko Development Corp.

 

The original carbonate replacement deposit (CRD) that was discovered at the Trixie historic mine in 1969 is located on the north end of the deposit within the downthrown carbonate sequence north of the Trixie fault. While limited in scale, the replacement mineralization consists of massive sulphide minerals and jasperoid that locally enclose irregular blocks of argillized shale and limestone between the 750 ft level and 900 ft level. Metal zonation within the deposit was documented at the time of mining with the upper levels displaying higher grade zinc and gold values, which diminish down-plunge, while copper and silver values increase at depth and lead concentrations remain consistent throughout (Morris et al., 1979).

 

The 756 ore shoot represents the most productive of the three historically mined ore zones. This ore shoot was developed up to nine feet in width and over 900 ft in strike length and was mined for over 1,000 vertical feet. The shoot plunges to the north towards the Trixie and Eureka Standard faults and was mined continuously from approximately 75 ft above the 625 level to below the deepest 1350 level development. Based on limited historic drilling, the 756 ore shoot continues for at least 300 ft below the 1350 level and remains open at depth.

 

In 1976, as mining and exploration continued within the 756 mineralized shoot, the 75-85 ore shoot was discovered approximately 1,600 ft (488 m) south of the Trixie shaft. The 75-85 ore shoot was mined from approximately 50 ft (15 m) above the 625 level down to the 1200 level.

 

In early 1980 Bear Creek Mining discovered the Survey zone while exploring for the Sioux-Ajax fault by drifting south on the 1050 ft level of the Trixie historic mine. The Survey vein segment was explored and extensively developed by Kennecott on the 750, 900, 1050 and 1200 levels during the pre-1995 silica flux mining periods. The southern end of the Survey Vein is extended for a distance of 3,400 ft south of the main shaft, along the 1050 level and remains open to the south and at depth.

 

In 1980, Sunshine Mining Corporation (Sunshine Mining) leased the Burgin unit from CCMC and by 1983 had also begun work at Trixie where it re-started mining operations and undertook additional underground development and diamond drilling. Much of the underground development and drilling from this time appears to have been focused on the 900, 1050, 1200 and 1350 levels. Perhaps the most notable exploration efforts at Trixie during this time were the southerly extensions of the 900, 1050 and 1200 ft level drifts following the discovery of the Survey zone and the northeastward extension from the 1350 ft level to connect with the 1100 ft level of the Eureka Standard mine. This connection provided the underground access needed to evaluate the Eureka Standard fault along-strike and down-dip from the original Eureka Standard mine workings. Sunshine Mining operated the Trixie historic mine until terminating its lease with CCMC at the end of 1992.

 

6.3.3Trixie Mine, Diluted Grade Production

 

Between 1969 and 1995, the historic Trixie mine was operated as a source of silica flux ore for direct shipment to Kennecott’s Bingham Canyon smelter. Payments were received for gold, silver and variably for copper. Production from 1969 through to 1992 totaled 808,240 tons, containing 159,289 oz of gold and 4.75 million oz of silver. Ore mined during this period was heavily diluted (as much as 3:1) with footwall and hanging wall Tintic Quartzite. Open stope mining methods and poor ground control practices appeared to be only partially responsible for the dilution of ore. Production of 100 tons per day was required from the historic Trixie mine to provide a precious metal-rich silica flux ore to Kennecott’s Bingham Canyon smelter. Since the Tintic Quartzite was as good a source of silica flux as the mineralized quartz veins themselves, dilution of the Trixie ore with Tintic Quartzite was a deliberate practice to obtain the daily tonnage requirements. A diluted mining grade of 0.15 to 0.3 oz/t Au during this time was an optimal grade to obtain the required tonnage for the Bingham Canyon smelter, covering the cost of extraction and shipping of the silica flux.

 

Tintic Project48January 27, 2023
 

 

 

Osisko Development Corp.

 

As a result of a settlement of litigation between the then-operator Sunshine Mining and CCMC, underground mining at the Trixie operation ceased in 1992. CCMC mined and shipped some low-grade surface stockpile material for smelter flux between 1993 and 1995, but with changes to Kennecott’s smelting process in 1995, its Garfield smelter no longer required Trixie flux ore. There were other western smelters with requirements for high-silica metals-bearing flux, but the costs of transportation to these smelters, coupled with low ore prices reduced the overall profit potential of mining the Trixie and other known silica-hosted precious metal deposits in the East Tintic District.

 

6.4Trixie Exploration and Production (2000 to 2002)

 

Between 2000 and 2002, CCMC (through its affiliate Tintic Utah Metals LLC (Tintic Utah Metals)) undertook an aggressive surface and underground drilling program at Trixie, resulting in the discovery of a small-tonnage gold-silver resource associated with the earlier mined 75-85 mineralized zone. In the case of the gold-silver resource, a new level (the 625 ft level) was developed within the mine in 2001, and approximately 11,120 tons of gold-silver ore, averaging 0.66 oz/t Au, were produced before mining was suspended due to the decrease in the price of gold below $300/oz and CCMC’s financial and reported management problems.

 

Table 6.2 summarizes the production from the Trixie mine from before 1883 to 2002.

 

6.5Trixie, Exploration and Production (2019 to 2021)

 

6.5.1TCM – Trixie, Modern Target Generation (2019 to 2020)

 

TCM acquired the historic Trixie mine at the beginning of 2019, and initially focused its assessment on the base-metal resource opportunity at the Burgin mine. However, high-grade gold opportunities that had potential for near-term production and revenue Trixie mine quickly became the focus of the company. A preliminary economic report dated 2010 indicated the presence of known and documented resource opportunities at the Trixie mine, though these required in-depth evaluation and additional work to quantify. Since most of the historic mining was focussed on the steep west-dipping structural corridor with very little development or exploration into either the footwall or hanging wall, there was high potential to define additional mineralized structures in close proximity to the existing underground infrastructure.

 

Tintic Project49January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 6.2
Trixie Mine Historic Production Summary

 

Year Operating Company Short Tons Sold Average Gold Grade (Oz/ST*) Average Silver Grade (Oz/ST*) Gold Total (Troy Ounces) Silver Total (Troy Ounces)
Pre 1983 Bear Creek Mining Co. 508,482 0.2 6.95 102,713 3,533,950
1983 Sunshine Mining Co. 1,736 0.3 4.8 516 8,333
1984 Sunshine Mining Co. 11,397 0.15 6 1,710 68,382
1985 Sunshine Mining Co. 25,538 0.25 3.49 6,487 89,128
1986 Sunshine Mining Co. 0 - - - -
1987 Sunshine Mining Co. 2,527 0.25 4.69 627 11,852
1988 Sunshine Mining Co. 22,611 0.3 7.08 6,716 160,086
1989 Sunshine Mining Co. 28,343 0.32 7.13 9,070 230,429
1990 Sunshine Mining Co. 31,115 0.27 6.68 8,159 207,706
1991 Sunshine Mining Co. 40,608 0.18 4.96 7,486 201,418
1992 Sunshine Mining Co. 50,002 0.13 3.35 6,488 167,531
1993-1995 South Standard Mining Co. 74,761 0.026 0.66 1,944 49,342
1995-2001 Chief Consolidated Mining 0 - - - -
2002 Chief Consolidated Mining 11,120 0.663 2.39 7,373 26,577
Total   808,240 0.196 5.85 159,289 4,754,734

Table supplied by Osisko Development but originally prepared by Tom Gast for CCMC, October 2010.

*ST = US Short Tons

 

 

 

Tintic Project50January 27, 2023
 

 

 

Osisko Development Corp.

 

The historic Trixie mine together with the entire East Tintic property had been in a state of care and maintenance followed by near abandonment, since 2014, and this resulted in wide-spread vandalism and damage to the property and physical assets. This included destruction of the primary hoist, hoist foundation and building at Trixie that was used to operate the conveyance and provide access to the underground development. In August, 2019, TCM made the decision to commence rehabilitation of the historic mine and shaft (Figure 6.3), with the intention of beginning underground drilling and exploration of documented targets on the historic 625 ft and 750 ft development levels.

 

By December, 2019, TCM had compiled the historic Trixie datasets into a new 3D model of the deposit and identified a significant new target in the immediate footwall to the 610 stope. This new target, initially termed the North Survey Vein, was developed from reconsidering assays within historic surface RC holes which could not have originated from any of the historically mined areas (Figure 6.4). Further investigation of this target lead to the discovery of the T2 and T4 structures.

 

Figure 6.3
Trixie Headframe

 

 

Micon site visit photograph.

 

Tintic Project51January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 6.4
Cross Section, Looking North, of the Surface RC Hole Intersections that Led to
Discovery of the T2 Structure

 

  

Figure provided by Osisko Development.

 

The broad zones of mineralization encountered in the 2000-2001 surface RC drilling were originally interpreted to be caused by the smearing of mineralization within the holes, given that the known mineralized structures were typically no more than six to eight feet in width. However, exploration work by TCM in 2021 demonstrated that mineralization up to 60 ft in width is associated with the T4 stockwork. The broad zones of mineralization encountered in the 2000-2001 RC drilling were thus re-interpreted as intercepts of T2-T4 stockwork mineralization in the immediate footwall of the 75-85 structure.

 

6.5.2TCM T2 Discovery (2020 to 2021)

 

Between February and June, 2020, refurbishment of the 625 level was completed by TCM with new services installed to commence underground diamond drilling. A total of five diamond drill holes were completed between June and August, 2020, all collared from the only suitable drilling position, just north of the ventilation shaft (Figure 6.5).

 

Tintic Project52January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 6.5
Plan Map of the 625 and 750 Levels and the T2 and T4 Mineralized Zones

 

  

Figure provided by Osisko Development.

 

Despite extremely difficult drilling conditions, visible mineralization within the footwall of the 610 stope was confirmed in three of the five holes. With the visual confirmation of the mineralization and structure a decision was made by TCM management to commence development of an exploration drift eastward towards the target zone. This exploration drift would open-up the target structure for sampling and visual examination, as well as opening up more favourable positions from which to drill on the east side of the 610 stope.

 

Tintic Project53January 27, 2023
 

 

 

Osisko Development Corp.

 

The decision to develop into the target zone by TCM management proved extremely fortuitous. Only 13 m (44 ft) east of the historic 625 ft level development, TCM drifted directly into the T2 structure. The first three grab samples taken returned 1,234 g/t Au (36 oz/t Au), 1,947 g/t Au (56.8 oz/t Au) and 5,417 g/t Au (158 oz/t Au). Figure 6.6 shows one of the earliest underground mining faces on the T2 structure, with composite chip sampling across the face returning 2.4 m of 3,497 g/t Au and 6,583 g/t Ag (8 ft of 102.0 oz/t Au and 192 oz/t Ag).

 

Figure 6.6
An Early Mining Face on the T2 Structure Looking North

 

  

Figure provided by Osisko Development.

 

Abundant visible gold associated with the striking green colour of the mineralized zone aided the visual identification and mining of the T2 structure. Initial mining continued north and south on-strike of the steeply east-dipping structure to determine potential strike lengths of the mineralized zone. At the same time the original 609 exploration cross-cut was extended further eastward to test ground immediately east of the T2 structure for further mineralization. Together with additional diamond drilling and exploration cross-cuts, a broad zone of mineralized stockwork veining up to 25 metres (80 ft) in width has now been identified, and is referred to as the T4 stockwork zone of mineralization.

 

Figure 6.7 displays an overview of the historic mine development and new mining completed by TCM between 2020-2021, with the T2 and T4 development located only 13 m (44 ft) east of the historic mine infrastructure on the 625 level.

 

Tintic Project54January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 6.7
Overview Map of the Southern End of 625 ft Level

 

  

Figure provided by Osisko Development.

 

6.5.3TCM Underground Development and Mineral Processing (2020 to 2021)

 

In November, 2020 the first shipment of mineralized material was made to an offsite processing facility and the first gold was poured by TCM. Continual underground development and drilling through 2021 helped define T2 mineralization over a 400 ft strike length and led to the recognition of the scale of the T4 stockwork mineralization. Design work for a surface portal and internal decline ramp to access the Trixie underground development was commenced shortly thereafter. A geological model for T2-T4 mineralization identified the potential significance of the overlying Ophir Shale, as a cap above the Tintic Quartzite host rock, in influencing the T2-T4 mineralized zone. In the fall of 2021, the Burgin Processing Facility was equipped with an onsite vat leaching process. On May 30, 2022, Osisko Development announced the completion of its acquisition of TCM.

 

Tintic Project55January 27, 2023
 

 

 

Osisko Development Corp.

 

7.0   geological setting and mineralization

 

7.1Geological Setting

 

The Tintic Project is located within the historic Tintic mining district, a cluster of base and precious metal deposits covering more than 200 square kilometres (or approximately 80 square miles) within the East Tintic Mountains of north-central Utah (Figure 7.1). The district is centred approximately 90 km (56 miles) south-southwest of Salt Lake City and 65 km (40 miles) south of the Bingham Canyon porphyry Cu-Au-Mo deposit. The East Tintic Mountains occupy a position within the Late Cretaceous Sevier fold and thrust belt (e.g., Allmendinger & Jordan, 1982; Yonkee & Weil, 2015) approximately 30 km (20 miles) from the eastern limit of the Basin and Range extensional province as defined by the surface expression of the Wasatch fault. District mineralization is associated with a post-Sevier compression and pre-Basin and Range extension period of magmatism, spanning ca. 27-35 Ma (latest Eocene to Oligocene) (e.g., Moore et al., 2007). Commonly divided into Main, East, North and Southwest subdistricts, the greater Tintic is collectively the second largest metal producing district in Utah state, with Bingham first and Park City a close third (Krahulec and Briggs, 2006). The core Tintic project area covers more than 90% of known deposits within the East Tintic subdistrict. Additional coverage extends north, west and south into the North, Main, and Southwest districts, respectively.

 

7.2District Geology

 

The geology of the Tintic district can be summarized as the record of four major phases of geologic evolution. These are 1) development of a Palaeozoic platformal sequence atop previously deformed Precambrian basement, 2) folding, faulting, and uplift accommodating east-west shortening during the Late Cretaceous Sevier Orogeny, 3) latest Eocene to Oligocene calc-alkaline magmatism associated with district mineralization, and 4) Miocene to recent Basin and Range extension.

 

Precambrian basement in the Tintic district consists of phyllitic shales and coarse-grained quartzite of the Big Cottonwood Formation, exposed on the western limits of the East Tintic mountains but encountered only as xenoliths within the Eureka quadrangle at the district core. Deposited unconformably above the Big Cottonwood Formation, the Palaeozoic platformal sequence consists of a 701 to 975 m (2,300 to 3,000 ft) basal quartzite (the Lower Cambrian Tintic Quartzite) that grades through a relatively thin sequence of calcareous shales and lesser limestone facies (the Middle Cambrian Ophir Formation) into an extensive carbonate sequence that spans into the Late Mississippian. Total stratigraphic thickness of the Palaeozoic sequence exceeds 2,743 m (9,000 ft) (e.g., Morris, 1964: Geology of the Eureka Quadrangle; Morris, 1964: Geology of the Tintic Junction Quadrangle; Morris et al., 1979) (Figure 7.2).

 

Tintic Project56January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 7.1
Map of the Tintic District Displaying Mineral Occurrences and Regional Tectonic Framework

 

 

Figure provided by Osisko Development.

 

Tintic Project57January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 7.2
Palaeozoic Stratigraphy of the Tintic District

 

 

Figure provided by Osisko Development.

 

Tintic Project58January 27, 2023
 

 

 

Osisko Development Corp.

 

Accommodation of east-west shortening during the Late Cretaceous Sevier Orogeny resulted in the development of the district scale Tintic syncline-East Tintic anticline fold pair, and several associated district-scale, generally west-vergent thrusts (Morris, 1964: Geology of the Eureka Quadrangle; Morris et al., 1979). The geometry of the sub-horizontal roughly north-south trending fold pair is responsible for the general basement architecture of the Tintic district, wherein the youngest (Mississippian) rocks of the Palaeozoic sequence are preserved along the trough of the Tintic syncline in the Main district and the Tintic Quartzite is present at its highest structural levels along the crest of the East Tintic anticline in the East district (Figure 7.3). High-angle structures developed in relation to the Sevier orogeny include a system of predominantly northeast trending faults with strike-slip offset interpreted as accommodating differential displacement syn-compression, and a system of variably oriented normal faults developed in accommodation of late to post-orogenic gravitational collapse. (e.g., Morris, 1964: Geology of the Eureka Quadrangle; Morris et al., 1979).

 

Extensive erosion following Sevier uplift resulted in the development of a rugged paleotopography by the onset of district magmatism ca. 35 Ma (Figure 7.4). The latest Eocene to Oligocene magmatic record consists of a quartz latite flow and tuff dominant sequence of irregular thickness up to 1,500 m (5,000 ft) with cross-cutting to coeval locally porphyritic monzonite to quartz monzonite intrusions of varying geometries (e.g., Morris, 1964: Geology of the Eureka Quadrangle; Morris, 1964: Geology of the Tintic Junction Quadrangle; Morris et al., 1979; Keith and Kim, 1990) (Figure 7.4). District mineralization, dated in the East Tintic at around 31 Ma (Laughlin et al., 1969) is contemporaneous and associated. In the East Tintic district, known fissure-vein and replacement deposits are nearly exclusively buried beneath the irregular volcanic cover (Figure 7.5). While the basal (pre-mineral) volcanic cover hosts no significant mineralization, it is commonly characterized by significant hydrothermal alteration. Several sub-km-scale lithocaps point to potential porphyry targets at depth, where more localized alteration along predominantly N to NE-trending fissures with associated pebble dikes were used in successful targeting of many of the known historic deposits (e.g., Morris et al., 1979).

 

The Palaeozoic sequence and its irregular volcanic cover are disrupted by Basin and range extensional faulting. Miocene-age volcanics likely mark the onset of extension in the district ca. 16-18 Ma (Figure 7.4). While any pre-existing fault structures are likely primed for some degree of Basin and Range extensional reactivation, the most significant normal offsets occur along roughly north-south trending structures, e.g., the district-scale Eureka Lilly fault. The variably north-south striking and west-dipping Eureka Lilly fault forms a major aquitard through the East Tintic district, dividing a fresh, cool-water-table in its hanging-wall to the west from a hot and saline water table in its footwall to the east. Post-lava offset on the Eureka Lilly fault is apparently variable along strike and may account for only one-half to a third of the total offset across the structure, believed to have initiated during Late Sevier orogeny (Morris et al., 1979).

 

Tintic Project59January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 7.3
Partial N-Facing 7.5’ Eureka Quadrangle Section A-A’

 

 

Figure provided by Osisko Development but originally digitized from Morris (1964) Geology of the Eureka Quadrangle.

 

 

 

Tintic Project60January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 7.4
Oligocene Volcano-Magmatic Stratigraphy of the Tintic District with
Select Reported Geochronologic Data

 

Figure provided by Osisko Development.

 

Tintic Project61January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 7.5
Simplified USGS Geologic Map of the East Tintic District

 

 

Figure provided by Osisko Development.

 

Tintic Project62January 27, 2023
 

 

 

Osisko Development Corp.

 

7.3District Mineralization and Structure

 

The four subdistricts of the Tintic are in part distinguishable in terms of their known mineral occurrences, hosted within the deformed Palaeozoic sequence and, to a more limited extent, Oligocene monzonitic intrusions. The Main district is the most historically productive district by far (Section 6.0), with characteristic carbonate-hosted lead-zinc-silver replacement deposits that form predominantly north to northeast-trending sub-horizontal zones rooted into subvertical chimney-like mineralized bodies rich in copper, gold and silver (e.g., Krahulec and Briggs, 2006 [after Morris, 1969]) (Figure 7.1). Carbonate-replacement deposits with economic zinc ± lead ± silver are likewise present in the East district and the historically least-productive North district. The East district is unique in terms of the relative structural complexity of the deposits, and by the added presence of gold and silver-rich high-sulphidation fissure vein systems hosted within the brittle and unreactive Tintic Quartzite, such as at Trixie. The Southwest district is characterised by a relative dominance of igneous rocks, containing fissure systems hosted within the Silver City stock and smaller associated monzonitic porphyry intrusions (e.g., Krahulec and Briggs, 2996). The Southwest district is also host to the Southwest Tintic porphyry copper system, viewed as subeconomic but with minor historical production from peripheral high-sulphidation, copper-silver-lead veins (Krahulec and Briggs, 2006). Several key observations suggest the presence of additional and potentially economic porphyry centres within the district. This includes indicator clay assemblages and elevated molybdenum and/or copper-lead ratios at the Big Hill, Silver Pass, and Government Canyon lithocaps, all contained within the Tintic Project claims area (e.g., Sillitoe, 2006; 2022; Leveille, 2021) (Figure 7.1) (Discussion in Section 8).

 

In addition to an association with both the low- and high-angle faults developed regionally through the Late Cretaceous Sevier Orogeny, mineralization within the East Tintic is often linked with a more localized network of high-angle structures, apparently developed pre to syn-mineral in association with latest Eocene to Oligocene magmatism (e.g., Morris et al., 1979). These structures formed conduits for the emplacement of pebble dikes, monzonitic intrusions, and their associated hydrothermal fluids. They range in orientation from north-south to more prevalent north-easterly trends and are particularly well-developed as faults and fissures within the brittle Tintic Quartzite. The Tintic Quartzite is brought to its highest structural levels within the East district, along the crest of the East Tintic anticline in the hanging-wall to the East Tintic thrust, which is itself complexly folded through progressive deformation. The geometry and nature of the East Tintic anticline are largely interpreted from underground mapping and the exact location of its axial trace at the base of the younger volcanic cover is unknown. Sub-horizontal Palaeozoic strata of the Trixie area are believed to occupy a position within or proximal to the hinge zone of the anticline (Morris et al., 1979). North of Trixie, the fold axis is interpreted to have been offset significantly eastward and fold geometry is described as asymmetric, with a shallow to the west dipping western limb, and steep to locally overturned eastern limb, intensely deformed along the East Tintic thrust.

 

A little more than half of the historical production within the East Tintic district has been sourced from massive lead-zinc-silver replacement deposits formed at a variety of locations where faults that juxtapose younger carbonates directly against the Tintic Quartzite are cross-cut by, or intersect with, high-angle northeast-trending structures (Krahulec and Briggs, 2006). Replacement ore bodies of the Burgin deposit are largely localized within a fault-bound wedge of deformed Ophir Formation and Teutonic carbonate facies rocks overthrust by the Tintic Quartzite, in the hanging-wall of the main East Tintic thrust (Morris et al., 1979). Several interpreted syn-Sevier strike-slip structures, including the Eureka Standard and Apex faults are the presumed conduits for mineralizing fluids, despite observations that they root into and do not crosscut the East Tintic Thrust (Morris et al., 1979). Replacement bodies at the historic North Lilly mine are found at its higher structural levels where northeast-trending fissures locally exploited by monzonitic porphyry dikes, intersect carbonates of the Middle Ophir Formation down-dropped into direct contact with the Tintic Quartzite, along the dip-slip normal reactivated Tintic Standard Thrust.

 

Tintic Project63January 27, 2023
 

 

 

Osisko Development Corp.

 

High-sulphidation gold – silver ± copper deposits hosted within fissure vein systems in the Tintic Quartzite account for the remaining historic production and all mineralized zones currently under development within the East Tintic district (Krahulec and Briggs, 2006). Structural trend at the Trixie, as dictated by the subvertical-to-the-east-dipping T2 structure and smaller scale fissures within its hanging wall T4 breccia zone, is north south. At the historic Eureka Standard mine, about 1.6 km (1 mi) to the north-northeast, deposit-scale geometry is largely controlled by the northeast-southwest striking and moderately northwest dipping Eureka Standard fault zone, however, individually mapped mineralized fissures within the zone, range from fault-parallel to subvertical and predominantly northeast trending. At the historic North Lily mine, approximately 2 km (1.2 mi) farther north, high-sulphidation mineralization is intimately associated with a series of sub-vertical northeast-trending fissures and parallel monzonitic dikes.

 

7.3.1Geology, Structure and Mineralization at Trixie

 

Mineralization at the Trixie test mine is structurally controlled within a north-south-trending fissure-vein and breccia system, developed within the brittle Tintic Quartzite. Gold and silver-rich mineralization within the so-called Trixie vein system is best classified as high-sulphidation epithermal (see discussion in Section 8). Current development at Trixie is focused within the footwall to the historically productive steep-to-the-west-dipping 75-85 structure, targeting the subvertical-to-the-east-dipping T2 fissure vein, its hanging -wall T4 breccia zone, and a network of smaller-scale likewise north-south-trending mineralized fissures contained within it.

 

Sub-horizontal Palaeozoic strata exposed in underground workings at Trixie are believed to occupy a position within or proximal to the hinge zone of the East Tintic anticline (Morris et al., 1979), the nature of which may exert primary influence on the geometry, frequency, and distribution of grade controlling structures within the Trixie vein system. The stratigraphic contact between the Tintic Quartzite and overlying and impermeable lower shale member of the Ophir Formation appears to have a major controlling influence on the development and grade distribution of mineralization at Trixie. While controlling structures within the Trixie vein system do penetrate the younger overlying sequences, mineralization typically displays strong rheologic control and is restricted to the older and underlying brittlely fractured Tintic Quartzite host.

 

The main shaft of the historic Trixie mine was collared at approximately the 1,852 m (6,075 ft) elevation into an outcropping window of Middle Cambrian Teutonic Limestone. The shaft passes through the full thickness of the Ophir Formation to reach the Tintic Quartzite at a depth of approximately 125 m (410 ft). All current development stems off the historic 625-foot mine level, while deeper historic workings include 750, 900, 1050, 1200, and 1350-foot levels. The full extent of both modern and historical development at Trixie resides within the hanging-wall to the district-scale Eureka Lilly fault. The fresh groundwater table of the Eureka Lilly hanging-wall at Trixie sits below the ca. 1,437 m (4,716 ft) elevation of the 1350-foot level, around 425 m below surface. The Late Eocene to Oligocene Packard Quartz Latite unconformably overlies the Palaeozoic Tintic-Ophir-Teutonic sequence in nearly every direction surrounding the Trixie main shaft. The Packard Quartz Latite is in local unconformable contact with both the Ophir Formation and Tintic Quartzite, reaching thicknesses up to 380 m (1,250 ft) directly south of the vent shaft (Figure 7.6).

 

Tintic Project64January 27, 2023
 

 

 

Osisko Development Corp.

 

The core of the Trixie vein system occupies a high-seated position within an east-west oriented horst, the bounding structures of which may have served as critical pathways for mineralizing fluids (Figure 7.6). North of the Trixie main shaft, the Tintic Quartzite is down-dropped an estimated 198 m (650 ft) across the east-west-trending sub-vertically north-dipping Trixie fault zone (Morris et al., 1979). At the very northern limits of development, the sequence is again offset relative down to the north across the Eureka Standard fault zone, which appears to consist locally of at least two major east-northeast trending splays. Though not fully constrained, relative stratigraphic offset across the Eureka Standard fault zone is of similar or greater magnitude to that observed across the Trixie Fault zone. Approaching the southern end of development, the Tintic Quartzite and mineralized structures of the Trixie vein system appear to be offset across the presumably steep to the south-dipping Sioux-Ajax fault zone. The Sioux-Ajax fault zone has not been intersected by any modern-day development. Constraining its displacement and orientation is complicated by several intersecting west-dipping splays of the Eureka Lilly fault that appear to further offset mineralization.

 

The Sioux-Ajax fault system is well-known within the Main District as a major ore controlling structure, with associated breccias hosting large replacement bodies in both the Mammoth and Iron Blossom mines (Morris et al., 1979). The Sioux-Ajax fault system of the Main district consists locally of two or more splays generally striking east-southeast and dipping steeply to the north. The fault system is buried beneath volcanic cover projecting along strike into the East Tintic district, wherein its correlation and relationships with known structures have long been a topic of high interest and debate (e.g., Morris et al., 1979). Recent interpretations based on the integration of historical mapping with high-resolution magnetic data acquired in 2019 suggest that the Trixie, Eureka Standard, and south-dipping Sioux Ajax fault zones as defined within the Trixie development area, are structurally linked with the Sioux Ajax zone of the Main district and may have collectively provided the deep-seated plumbing necessary for mineralization at Trixie.

 

The historic 756 ore shoot at the north end of Trixie development displays a steep northerly plunge in the footwall to the Trixie fault zone. At the southern end of Trixie development, higher grade ore shoots within the historically mined 75-85 zone exhibit a steep southerly plunge, for which the presumed south-dipping Sioux Ajax fault zone is the interpreted structural control. These historical observations suggest that mineralization and grade within the T2 fissure vein and T4 zone currently in development in the immediate footwall to the 75-85 structure may be characterized by a similar geometry.

 

Tintic Project65January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 7.6
East-Facing Geological Long Section Displaying Underground Development at Trixie

 

 

Figure provided by Osisko Development.

 

 

 

Tintic Project66January 27, 2023
 

 

 

Osisko Development Corp.

 

8.0   deposit types

 

There are three interrelated deposit types of particular interest within the East Tintic district:

 

1.Carbonate Replacement Deposits (CRDs), with lead-zinc replacement of reactive carbonate sedimentary sequences, found at the historic Burgin, Tintic Standard and North Lily mines.

 

2.High-Sulphidation epithermal veins: gold and silver rich epithermal vein systems hosted primarily within the basal Tintic Quartzite host rock, found at the Trixie, Eureka Standard and the deeper levels of the historic North Lily mine.

 

3.Porphyry Copper-Gold: copper and gold rich mineralization hosted in porphyritic intrusive rocks. Although not yet identified in East Tintic, a porphyry centre is thought to be the hydrothermal source for both the deposit styles listed above.

 

The distribution of both CRDs and high-sulphidation epithermal vein systems in the East Tintic district is strongly lithologically controlled, with known high-sulphidation epithermal veins restricted to the Tintic Quartzite, and CRD type base-metal deposits hosted in the overlying carbonate sequence. This is in part reflecting a rheological control, due to the brittle nature of the quartzite which makes it more prone to the development of breccia hosted epithermal veins, and in part a geochemical control, due to the more reactive nature of the carbonates to acidic fluids. The same strongly acidic hydrothermal fluid, sourced from a potential deep-seated porphyry centre, may be responsible for both the precipitation of high-sulphidation mineral assemblages within the quartzite and, once buffered during interaction with overlying carbonate facies rocks, the precipitation of CRD deposits. A generalized model for each of the deposit types and their idealized location relative to depth of emplacement and stratigraphic control is presented in Figure 8.1.

 

Figure 8.1
Generalized Model of Deposit Styles in the East Tintic District

 

 

Source: Modified from TCM 2021.

 

Tintic Project67January 27, 2023
 

 

 

Osisko Development Corp.

 

8.1Carbonate Replacement Deposits

 

CRDs account for more than 90 percent of all ore produced in the East Tintic district (Morris & Lovering, 1979). Silver rich lead-zinc CRDs of the historic Burgin, Tintic Standard and North Lily mines, are characterized by the replacement of limestone by massive sulphide adjacent to intersections between steeply dipping northeast-trending faults and shallow to moderately west or southwest dipping faults. The complex geometry of the more shallowly dipping fault zones demonstrates an imbricate nature, with repeated fault bound slivers of mineralized stratigraphy, as well as localized folding of thrust sheets forming pockets or “pot-hole” structures that provided favourable focal points for mineralization. The mineralogy of the replacement deposits typically consists of massive galena ± sphalerite, with lesser silver sulphides and sulphosalts (Figure 8.2). In general, there is a zonation observed within the replacement bodies with a core which is richer in lead and silver and an increase in zinc and manganese toward the peripheries (Morris & Lovering 1979).

 

Steeply dipping northeast trending fissures transect the CRD deposits and localize silver and gold-silver rich mineralization along structurally controlled planes, such as the Silver Fissure at the historic Burgin mine.

 

Figure 8.2
CRD-Style Base-Metal Mineralization, Massive Galena Typical of the Historic Burgin,
Tintic Standard and North Lily Mines

 

  

Figure provided by Osisko Development.

 

Tintic Project68January 27, 2023
 

 

 

Osisko Development Corp.

 

8.2High Sulphidation Epithermal Vein Systems

 

High-sulphidation epithermal vein systems containing enargite-gold-silver ores (Figure 8.3) are structurally controlled and limited in known occurrence to the basal Tintic Quartzite unit. The brittle and relatively geochemically inert nature of the Tintic Quartzite make it particularly well-suited to focus ascending mineralizing fluids along permeable faults and breccia zones developed within the otherwise relatively impermeable rock, allowing for the deposition of precious metal-rich gold-silver mineralization, as seen at Trixie, the historic Eureka Standard mine and in the deeper levels of the historic North Lily mine, associated hydrothermal fluids which tend to be strongly acidic, with elevated sulphur fugacity (John et al., 2018). The conditions of the hydrothermal fluids can be deduced from the stability of the assemblage of ore and gangue minerals that precipitate from them, as well as from fluid inclusions within individual minerals. The assemblage enargite ± pyrophyllite ± alunite which is common in the known vein systems hosted in the Tintic Quartzite is indicative of high-sulphidation conditions (John et al., 2018). Precipitation of minerals from a hydrothermal fluid may be related to changes in temperature, pressure, pH, sulphur fugacity or a number of other controlling factors. Rapid releases in fluid pressure are of particular importance as they can trigger flash boiling, a process which simultaneously cools the fluid while partitioning volatile phases such as H2S and CO2 into the exsolved vapour leading to changes in pH and sulphur fugacity, all of which can contribute to the formation of high concentrations of gold (Hedenquist, 1985).

 

Figure 8.3
Typical Sulphide Au-Ag-Rich Vein Mineralization found at Trixie and in the Historic Eureka Standard Mine, Hand Sample taken from the Eureka Standard Dump Pile

 

 

Figure provided by Osisko Development.

 

Tintic Project69January 27, 2023
 

 

 

Osisko Development Corp.

 

Apparent controlling structures within the East Tintic high-sulphidation epithermal vein systems are typically narrow (approximately 0.1-3 m or approximately 0.3-10 ft wide) polymetallic quartz-barite fissure veins, such as are observed at the core of the gold and silver-rich telluride-bearing T2 structure at Trixie. High-sulphidation epithermal mineralization also occurs within silica ledges and silica-sulphide-sulphosalt flooded breccia zones adjacent to primary controlling structures, such as in the T4 breccia zone at the Trixie mine. High-sulphidation ores are oxidized above the water table, locally characterized by the in-situ replacement of copper bearing tellurides and sulphides by bright green and blue supergene copper tellurates and copper carbonates. Oxidation and leaching of sulphides above the water table have the added benefit of releasing any refractory gold that may have otherwise been bound in the crystal structure of the sulphides. The water table at Trixie is 425 m (1,394 ft) below surface, at an elevation of 1,425 m (4,765 ft) and is reported at a similar elevation in the other historic mines west of the Eureka Lilly fault (Morris and Lovering, 1979). East of the Eureka Lilly fault the water table is hot and saline and is approximately 50 m lower in elevation than on the west side.

 

8.2.1Mineralized Structures at Trixie

 

Five unique interrelated and/or cross cutting structurally controlled domains of mineralization with varying gold grades are recognized at Trixie: 75-85, T1, T2, T3, and T4 (Figure 8.4). Though controlling structures may penetrate younger stratigraphic horizons, mineralization is limited to the Tintic Quartzite, as overlying shales belonging to the lower member of the Ophir Formation formed an impermeable cap to mineralizing fluids.

 

8.2.1.175-85 Structure

 

The 75-85 domain consists of a discrete north-south striking moderate to steeply west-dipping polymetallic silica-sulphide cemented breccia zone. The domain connects two historically developed tabular mineralized bodies, the 756 at the north end of Trixie development, and the 75-85 mineralized shoot to the south (Morris et al., 1979) (Figure 8.5). Historically documented primary economic minerals include a wide range of silver, copper, lead and/or zinc bearing sulphides and sulphosalts (e.g., argentite, proustite, polybasite, silver-bearing tennantite-tetrahedrite, enargite, chalcopyrite, bornite, galena, sphalerite and pyrite) as well as native gold (Morris et al., 1979). Gangue minerals are chiefly crystalline quartz and barite.

 

Combined modern modelling and historic documentation define the structure along a strike length of approximately 700 m (2,300 ft), from northern termination in a series of horsetail fractures about 30 m (100 ft) south of the Trixie fault (Morris et al., 1979) to its southerly abutment against the Sioux Ajax Fault, across which it is unconstrained but likely offset. Historic development on the 756 ore shoot extends approximately 23 m (75 ft) below the 1350-foot development level (approximately 1,416 m; 4,645 ft elevation). The mineral potential for this zone is open at depth.

 

Current modelled dips for the structure are slightly less than the historically documented average of 75°, ranging from approximately 60° down to approximately 40° where the structure appears to shallow locally through the 750 ft development level. The strike of the structure is historically documented to range locally from 005° through 340° (Morris et al., 1979). Similar-scale deflections from an average strike of approximately 350° are apparent at the scale of the current model as well. The breccia zone ranges in width from less than 1 m (3 ft) to upwards of 12 m (40 ft).

 

Current data suggest that the 75-85 structure truncates both the T2 structure and T4 stockwork zone, implying that it is the youngest of the mineralization and grade controlling structures at Trixie.

 

Tintic Project70January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 8.4
North Facing Geological Cross-Section displaying Mineralized Domains
and Controlling Structures at Trixie

 

 

Figure provided by Osisko Development but modified from TCM June, 2022.

 

Tintic Project71January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 8.5
East facing Geological Long-Section showing Mineralization and Development at Trixie

 

 

Figure provided by Osisko Development modified from TCM June, 2022.

 

 

 

Tintic Project72January 27, 2023
 

 

 

Osisko Development Corp.

 

8.2.1.2T1 Structure

 

The T1 domain consists of Tintic Quartzite-hosted disseminated mineralization constrained within a footwall wedge between the intersecting discrete T2 and 75-85 structural domains. The mineralization appears to extend no further than around 15 m (approximately 50 ft) into the footwall of either bounding structure and, therefore, is interpreted to have developed as a lower-grade halo to them.

 

8.2.1.3T2 Structure

 

The structurally controlled T2 domain is a discrete subvertical to the east-dipping fissure vein and breccia zone characterized by polymetallic gold and silver-rich telluride-bearing mineralization, with quartz-barite gangue. While some evidence for historic exploitation of the structure around the 675-foot sublevel is indicated by the presence of minor stoping dating from the 1970s, the continuity and full potential of the structure was not recognized until its ‘discovery’ by TCM in 2021.

 

8.2.1.4T3 Structure

 

The T3 domain consists of a discrete and narrow (approximately 1 m; 2-3 ft-wide) fissure fault zone, characterized by base and precious metal mineralization with quartz-barite gangue in breccia fill and lenses. The structure strikes north-south and dips steeply (approximately 77°) to the east. As currently constrained, the structure is of limited measurable length along strike and down-dip, maximum 150 m (490 ft) and 35 m (115 ft), respectively, but is open for potential in either dimension. The structure as currently constrained is completely contained within the 75-85 hangingwall, thus its potential interactions with the other mineral and grade-controlling structures are unknown.

 

8.2.2Trixie Gold-Tellurium Mineralization

 

The gold and silver-rich T2 structure at the Trixie is located in the immediate footwall of the historically mined west-dipping 75-85 structure. The T2 structure is a discrete 0.2 to 0.8 m wide central fissure vein developed within the Tintic Quartzite, characterized by a prominent striking green-blue mosaic framework breccia consisting of angular Tintic Quartzite clasts within a highly mineralized fracture fill cement matrix (Figure 8.6). The matrix consists of mosaic to drusy quartz intergrown with coarse-crystalline bladed barite, sulphosalts, native gold and gold-silver bearing tellurides, which have been variably oxidized to form copper-tellurates (Figure 8.7). Gold values in the thousands of ppm are associated with significant visible free gold and Ag ± Au-tellurides.

 

Mineralization on the T2 structure is capped by the contact with the lower shale member of the Ophir Formation, approximately 25 to 40 m (80 to 130 ft) above the 625 level of mining. The relatively impermeable shale is thought to play a critical role in confining the gold mineralization to structures within the Tintic Quartzite. At depth, the T2 breccia resolves itself into a discrete 1-3-metre-wide structure where it has been encountered in drilling. The anomalous gold grades and exotic telluride and copper-tellurate mineralogy associated with the T2 structure are markedly different to the historically mined polymetallic mineralization found in the 75-85 and associated structures. However, evidence of earlier polymetallic mineralization within the T2 structure is provided by the presence of spotty base-metal and sulphide-rich mineralization within historic drill hole intercepts both at depth and along strike to the north.

 

Tintic Project73January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 8.6
Left: Hand Sample from the T2 Structure; Right: Hand Sample from the T4 Stockwork Zone

 

Figure provided by Osisko Development.

 

Figure 8.7
Thin Sections from the T2 Structure

 

 

Figure provided by Osisko Development modified from APSAR 2020.

 

A broad zone of quartz-stockwork veining and gold mineralization identified as the T4 stockwork zone is located east, and in the immediate hanging wall of the T2 structure. The stockwork mineralization has been traced from above the 625 level down to at least the 750 level. Although lower in grade than the T2 structure, the stockwork mineralization averages approximately 9 ppm Au and can be up to 25 m in width.

 

Tintic Project74January 27, 2023
 

 

 

Osisko Development Corp.

 

The T4 stockwork zone is characterized by a broad zone of quartz-barite stockwork veining, with prominent drusy quartz filling open spaces. Stockwork veining is often accompanied by dark sulphosalt inclusions that are less than 0.5% of vein mass, but typically relate to elevated gold grades between 7 and 100 ppm Au.

 

Intensity of stockwork veining is typically greatest within an 2.5-3.5 m envelope of the T2 structure, where the stockwork is also accompanied by intense silica-alunite alteration of the Tintic Quartzite host. Within the broader 25 m wide stockwork envelope, discrete structurally controlled zones do display locally greater percentages of veining and alunite alteration, where the stockwork may take on a more planar sheeted vein character, typically with a flatter 40 to 65-degree dip towards the east, sympathetic to the steeper easterly dip of the T2 fissure vein.

 

A geological cross-section of the T2 structure and T4 stockwork zone was presented previously in Figure 8.4.

 

8.2.3Trixie T2 Structure: A Genetic Model for Mineralization

 

The steeply east dipping T2 structure is part of a larger extensional fault system that pre-dates mineralization. Localized polymetallic mineralization within the T2 structure indicates that it was genetically linked to the 75-85 mineralizing event but that it remained or became permeable to a later, more evolved, gold-telluride rich hydrothermal fluid phase, with accompanying Au-tellurium deposition.

 

Two key geological elements are interpreted to be critical in facilitating the emplacement and localization of gold mineralization along the T2 structure, as identified above the 625 level. First, the overlying lower shale member of the Ophir Formation acts as an impermeable cap to mineralizing fluids along the T2 structure. Second is the intersection of the east-west trending Sioux Ajax structural corridor with the Trixie vein system, at a location immediately south of the ventilation shaft, as displayed on the geological long section, Figure 8.5. The intersection of these two structures aligns with the south-plunging mineralized shoots historically mined in the 75-85 mining panels.

 

The intersection of the Sioux Ajax fault zone with the T2 structure is interpreted to have provided the deep-seated plumbing that facilitated the upward migration of later and overprinting Au-telluride hydrothermal fluids along it. In this scenario, gold rich fluids that ascended through the Sioux Ajax-T2 intersection zone encountered the impermeable overlying lower shale member of the Ophir Formation and flowed along a gently northerly raking up-dip shale-quartzite contact northwards, facilitated by localized dilation along the centre of the T2 structure. At a point in time, the hydrothermal fluids are interpreted to have over-pressurized the T2 structure, with hydrostatic fluid pressure exceeding the confining lithostatic pressure resulting in sudden release of pressure and flash boiling of the hydrothermal fluids. Flash boiling can cause the rapid deposition of free gold (Hedenquist and Henley, 1985) and is evidenced by abundant gas-rich fluid inclusions found in thin sections from areas surrounding gold-bearing mineralization within T2 (Figure 8.7). The deposition of significant native free gold, electrum and Au-Ag-tellurides within a quartz-barite rich matrix which cements angular silica-alunite altered quartzite breccia clasts within the T2 structure also supports a brecciation-boiling model (Figure 8.8). However, some degree of brecciation likely predates mineralization, associated with the initial formation of the T2 structure itself.

 

Tintic Project75January 27, 2023
 

 

 

Osisko Development Corp.

 

Hydrothermal fluids have also migrated into the adjacent brecciated hanging wall of the T2 structure, with mineralizing fluids again pooling beneath the shale sediment cap, leading to development of the broad T4 stockwork zone of mineralization.

 

Figure 8.8
Schematic Section of Mineralization and Alteration Associated with the T2 Structure

 

 

Figure provided by Osisko Development.

 

Geological and mineralogical observations, together with overall grade-distributions on the T2 and T4 mineralized zones, led to the development of the genetic model proposed above, where gold-bearing mineralization developed as a sub-horizontal blanket underlying the Tintic Quartzite-Ophir Formation contact. The potential for a steeply dipping, south-plunging mineralized shoot on the southern end of the T2 structure associated with the intersection of the Sioux Ajax fault, still needs to be properly drill tested.

 

8.3Porphyry Copper-Gold Potential

 

The Tintic district has long been recognized for its porphyry mineralization potential, located 65 km south of the Bingham Canyon mine and in a mineral district displaying many similar characteristics. The Bingham Canyon porphyry copper-gold-molybdenum deposit is associated with a halo of carbonate replacement zinc-lead-silver deposits, like those of the Tintic district. Known low-grade porphyries are located immediately to the south of TCM’s land holding at the Southwest Tintic Porphyry deposit and the Treasure Hill area. Several potential porphyry centres are interpreted beneath the East Tintic district itself, likely responsible for driving the hydrothermal fluid flows that are reflected in the carbonate replacement and high-sulphidation deposits throughout the district (Figure 8.9).

 

Tintic Project76January 27, 2023
 

 

 

Osisko Development Corp.

 

Several alteration lithological caps have been identified on surface, indicative of the upward (or lateral) flow of hot acidic hydrothermal fluid from depth, and have been the focus of limited exploration drilling by Anglo American and Rio Tinto between 2008 and 2014. Of particular interest is the area surrounding Big Hill, where a coincident gold and molybdenum in soil anomaly coincides with an area where B-type quartz veinlets have been mapped on surface. The potential for the discovery of a large copper porphyry centre or centres beneath the East Tintic district will depend on well designed greenfields exploration and drilling programs.

 

Figure 8.9
Mapped Lithological Caps Relative to Known Deposits

 

 

Figure provided by Osisko Development modified from Morris, 1964.

 

Tintic Project77January 27, 2023
 

 

 

Osisko Development Corp.

 

9.0   Exploration

 

9.1General Information

 

Exploration work undertaken at the Tintic Project in 2022 consisted of coordinated underground mapping and sampling programs covering both new exploration drifts and development along the mineralization underground at Trixie. Post-advancement face, rib, and back chip-sampling, and post-survey three-dimensional underground back and rib geologic mapping were conducted by the geological team. The effective cut-off date for work description and assays reported herein is December 12, 2022. No regional-scale mapping or sampling programs were conducted in 2022.

 

9.2Underground Mapping

 

Geologists conduct underground mapping for all new development headings. Mapping consists of analog data collection on letter page size base maps prepared in the Maptek™ 3D modelling program Vulcan™. Once a newly developed area has been line-surveyed and updated in Vulcan, the geologist can begin map preparation. The geologist will load two survey files, one containing the rib outline, the other the back and sill lines. The rib survey is extruded outward by the average difference between the sill and back elevations to match the height of the heading. Following these steps, the geologist can generate base maps containing spatially accurate 2D areas for the ribs, face, and back, which are then printed off at a 1:20 scale (Figure 9.1).

 

Prior to data collection underground, the geologist will wash down the area to be mapped to obtain a clearer exposure of the geological units. Map data collected include lithology, structure, alteration and mineralization. Direct measurements of structures including bedding, fractures and veins, are collected using a Brunton® Standard Transit compass (Brunton® compass) and directly plotted onto maps.

 

Completed maps are transferred to mylar compilation level maps. When the levels are complete, they are scanned and saved onto the network. Geologists register the maps in the Maptek™ 3D modelling program Vulcan™ and digitize the back mapping. Finally, the mapping data and structural data are used in conjunction with sample data to aid 3D computer modelling.

 

9.3Chip Sampling

 

Trixie underground chip samples are classified as one of three types: face, rib, or back. Face chip samples are collected along structure-parallel cuts at all development faces, following each round of advancement (Figure 9.2). Rib chip samples are collected parallel to development along headings designed to cross perpendicular to structures of interest, e.g., exploration drifts. Back chip samples are collected to decrease data spacing in areas of overbreak or, in instances where face sampling was not completed prior to further advancement, they may run either perpendicular or parallel to development. Face chip widths are limited by the width of development, averaging approximately 1.75 m (5.75 ft) in 2022. Rib chips, by nature of being parallel to development, are typically much longer, ranging from a minimum of 1.2 m (4 ft) to greater than 24 m (80 ft) during 2022. While face chips are the most commonly collected chip type, accounting for more than 75% of individual chips reported herein, they account for only 51% of the total length of development sampled in 2022. Back chips account for less than 5% of the total length of sampling in 2022.

 

Tintic Project78January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.1
Example of an Underground Map Sheet

 

 

Figure provided by Osisko Development.

 

Figure 9.2
Schematic illustrating the Three Classifications of Chip Sample Sequences Underground at Trixie

 

 

Figure provided by Osisko Development.

 

Tintic Project79January 27, 2023
 

 

 

Osisko Development Corp.

 

9.3.1Chip Sample Collection Procedures

 

Prior to chip sampling, a geologist will inspect the development face to be sampled and fill out a digital data form referred to as a face sheet (Figure 9.3). Basic data captured on each face sheet include a parent face identification (ID), indicating the development name, chip/site ID, the distance and bearing from the nearest survey point, the face azimuth and sampling width, the name of the sampling geologist and the date.

 

Figure 9.3
Example of a Chip Sampling Sketch and Data Sheet, CH1317

 

 

Figure provided by Osisko Development.

 

Chip/site IDs are a three to four-digit number assigned in sequence, e.g., 738 and 1355 for the first and last chips reported herein. A prefix of CH is added in the database to distinguish from underground diamond and surface RC drill holes, e.g., CH1208. Distance from the nearest surveyed reference point is measured to the face along either the left or right rib, depending on the survey point location. Face azimuth is calculated by adding 90° to a bearing shot perpendicular to the face, using a Brunton® compass. All distance measurements are recorded in feet.

 

Tintic Project80January 27, 2023
 

 

 

Osisko Development Corp.

 

While advancing along mineralized structures, each face chip consists ideally of a minimum of three samples to ensure separate coverage of the footwall, hanging wall and the target structure, i.e., vein. The first sample in sequence will typically begin at the left-rib-face intersection and extend to the margin of the vein. The second sample will typically cover the full width of the vein, and the third sample will extend from the right vein margin to the right-rib-face intersection. The geologist may collect fewer than three samples if the overall width of the face or location of the vein within it does not allow for separate footwall, hanging wall, and vein samples greater than or equal to a minimum sampling width of 0.5 ft. For rib chips and any face chips that cut multiple veins or otherwise complex geology, the geologist will collect as many samples as are necessary for adequate representation and coverage from the minimum 0.5 to a maximum sample width of 5 ft.

 

For every chip, a full colour schematic sketch is made at a 1:60 (1 in. = 5 ft.) scale within a pre-labeled grid contained within the face sheet; 3x3 in. for face sketches and 2x3 in. for back sketches. Sketches are carried across multiple face sheet forms for chip sample sequences longer than 15 ft. Typical quartzite host rock is sketched in yellow, shale in brown and veins in red. Any zones of brecciation are indicated with an ‘X’ pattern hatching. For all chips crossing veining, the sampling geologist will take a minimum of one direct vein measurement using the Brunton® compass, label the measurement at its point of collection on the sketch, and record its orientation in strike and dip (000°/00°), using the North American right-hand rule convention. Multiple structural measurements will be taken and recorded in instances of multiple veins and/or notable differences between hanging wall and footwall orientation.

 

Samples are recorded and collected from left to right, with intervals indicated on the face sketch and the corresponding sample IDs recorded in a table at the bottom of the face sheet. Sample IDs are derived from the chip/site ID. A prefix of F, B, or R is assigned to distinguish face, back and rib chips, respectively. A two-digit numerical suffix counting in sequence from 01, is then added to distinguish individual chip samples within a sequence, e.g., the resulting ID F131701 indicates the first sample in sequence along face chip site 1317. The sample table at the bottom of the face sheet includes additional observational fields to be filled out row-by-row for each individual sample, including width, lithology and lithologic unit (i.e., USGS map unit code), as well as abundances of visible gold, identifiable tellurium-bearing minerals, tetrahedrite, barite, copper oxides, and sulphides.

 

Individual samples are collected into 10” by 17” CGS protexo cloth bags labelled with the sample ID as recorded on the corresponding face sheet. Beginning with the leftmost sample 01, each labelled bag is placed in a container and held at a height of approximately 1.5 m (5 ft) from the sill floor while material is chipped into it, moving across the face from left to right. At the end of one sample interval, the geologist will tie the bag, remove it from the container and continue with the next sample.

 

Once all samples are collected, the geologist will mark the vein/sample margins on the face with spray paint and take a photograph (Figure 9.4). All samples are brought to the Burgin mine laboratory for assaying at the end of a shift. Back at the office, the geologist will hand-enter the day’s data into the Datamine software DH Logger, where the sample IDs can be connected with assay values once the assays certificates are complete. The geologist will then scan all face sheets for registration/georeferencing in Vulcan™.

 

Tintic Project81January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.4
Post-Sampling Face Photo of Site CH1317

 

 

Figure provided by Osisko Development.

 

9.3.2Chip Sample Location Procedures

 

Chip sample sequences are effectively captured in the database as drill holes, moving “downhole” left to right, from a zero-depth collar referenced from the start of sampling back to the nearest surveyed reference point. As all face chips are collected horizontally, each is assigned dip of 0, input with the calculated face azimuth representing trend into a single data row within the DH Logger downhole survey table. Rib chips may be assigned a positive or negative dip value to appropriately represent sampling along ramps and declines.

 

Point survey updates are conducted by an in-house surveyor two to three times per week. Following an update, geologists will load the surveys in Vulcan™ and measure the recorded distance from the nearest surveyed reference point along the trend of the heading, to acquire XYZ collar coordinates for all recent chips. These coordinates are recorded on the chip’s face sheet and entered into DH Logger.

 

Chips are loaded in Vulcan™ weekly to ensure that the strings are located properly. Face chips strings should run perpendicular to the development heading and be centred on the rib survey, to account for equal overbreak on either rib during advancement. Rib chips should parallel either the left or right rib survey, referenceable within the parent Face ID.

 

Tintic Project82January 27, 2023
 

 

 

Osisko Development Corp.

 

9.4Trixie Underground 2022 Chip Samples and Assays

 

From January through December 12, 2022, (which is the cut-off for data presented herein), a total of 2,115 samples from 547 individual sample sequences were collected across a number of different test mining and exploration development areas underground at Trixie (Table 9.1, Figure 9.5). All samples were assayed for gold and silver at the on-site Tintic laboratory. Assays are presented herein within a series of maps and sections by development area (Figure 9.6 to Figure 9.18), and as composites with selected individual sample highlights within Table 9.2, which uses metric lengths and grades.

 

Table 9.1
2022 Trixie Underground Chip Sampling Summary by Development Area

 

Development Area Chip Sample Sequence Count Total Chip Samples Total Length of Sampling
Metres Feet
625 Level Sill 38 203 175.84 576.90
665 (Eileen) Sublevel 91 313 206.65 678.00
665 (Eileen) Ramp 18 60 44.23 145.10
665 (Eileen) Historic 6 18 17.77 58.30
Sill 2 Development Cut 19 59 27.31 89.60
Sill 3 Development Cut 47 138 70.13 230.10
Sill 4 Development Cut 84 246 122.44 401.70
Sill 4 Exploration Cuts 10 66 43.13 141.50
Sill 5 Development Cut 62 161 83.85 275.10
Sill 5 Exploration Cuts 23 194 151.18 496.00
Sill 6 Development Cut 25 48 28.01 91.90
Sill 7 Development Cut 6 15 8.53 28.00
Sill 8 Development Cut 2 4 1.83 6.00
Raise 1 Pillar Cut 1 30 98 69.04 226.50
Raise 1 Pillar Cut 2 23 70 44.71 146.70
Raise 4 Exploration Cuts 13 76 58.52 192.00
Raise 4 Bench 4 22 12.95 42.50
Raise 5 20 50 36.88 121.00
Raise 5 Exploration Cuts 12 111 84.58 277.50
Raise 6 1 3 1.83 6.00
Raise 6 Exploration Cuts 13 160 159.62 523.70
Totals 547 2,115 1,449.05 4,754.10

Table provided by Osisko Development.

 

Tintic Project83January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.5
Trixie Long-Section Displaying New Development and Chip Sequence Sample Assay Map/Section Location Traces

 

 

Figure provided by Osisko Development.

 

Tintic Project84January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.6
Trixie Chip Sample Assay Map 1 of 11: 625 Level Development

 

 

Figure provided by Osisko Development.

 

Tintic Project85January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.7
Trixie Chip Sequence Assay Map 2 of 11: 665 Sublevel (Eileen Drift) Development

 

 

Figure provided by Osisko Development.

 

Tintic Project86January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.8
Trixie Chip Sequence Assay Map 3 of 11: 665 Sublevel (Eileen) Ramps and Historic Development

 

  

Figure provided by Osisko Development.

 

Tintic Project87January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.9
Trixie Chip Sequence Assay Map 4 of 11: Sill 2 Development Cut and Raise 4 Bench

 

 

Figure provided by Osisko Development.

 

Tintic Project88January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.10
Trixie Chip Sequence Assay Map 5 of 11: Sill 3 Development Cut

 

Figure provided by Osisko Development.

 

Tintic Project89January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.11
Trixie Chip Sequence Assay Map 6 of 11: Sill 4 Development and Exploration Cuts

 

Figure provided by Osisko Development.

 

Tintic Project90January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.12
Trixie Chip Sequence Assay Map 7 of 11: Sill 5 Development and Exploration Cuts

 

Figure provided by Osisko Development.

 

Tintic Project91January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.13
Trixie Chip Sequence Assay Map 8 of 11: Sill 6 Development Cut

 

Figure provided by Osisko Development.

 

Tintic Project92January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.14
Trixie Chip Sequence Assay Map 9 of 11: Sill 7 and 8 Development Cuts

 

Figure provided by Osisko Development.

 

Tintic Project93January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.15
Trixie Chip Sequence Assay Map 10 of 11: Raise 1 Pillar Cut 1

 

Figure provided by Osisko Development.

 

Tintic Project94January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.16
Trixie Chip Sequence Assay Map 11 of 11: Raise 1 Pillar Cut 2

 

Figure provided by Osisko Development.

 

Tintic Project95January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.17
Trixie Chip Sequence Assay Section 1 of 2: Raises 4 and 5

 

Figure provided by Osisko Development.

 

Tintic Project96January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 9.18
Trixie Chip Sequence Assay Section 2 of 2: Raise 6

 

Figure provided by Osisko Development.

 

Tintic Project97January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 9.2
2022 Trixie Underground Chip Sequence Sample Assay Composites – Metric

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH738   0.00 1.46 1.46  1,089.83  310.93  Sill 2 Development
CH738 including 0.46 1.07 0.61  2,609.65  746.22  Sill 2 Development
CH739   0.00 2.53 2.53  33.29  78.47  Sill 3 Development
CH739 including 1.74 2.10 0.37  85.92  157.86  Sill 3 Development
CH740   0.00 1.22 1.22  162.22  194.22  Sill 2 Development
CH740 including 0.70 1.22 0.52  381.60  456.97  Sill 2 Development
CH741   0.00 0.82 0.82  14.78  0.01  Sill 2 Development
CH742   0.00 2.74 2.74  208.20  377.87  Sill 3 Development
CH742 including 2.23 2.74 0.52  890.97 1,573.11  Sill 3 Development
CH743   0.00 1.13 1.13  156.97  70.03  Sill 2 Development
CH743 including 0.00 0.46 0.46  343.03  172.73  Sill 2 Development
CH744   0.00 2.01 2.01  171.39  84.05  Sill 2 Development
CH744 including 0.46 1.16 0.70  475.69  179.60  Sill 2 Development
CH745   0.00 2.35 2.35  45.12  72.86  Sill 2 Development
CH745 including 1.28 2.04 0.76  119.33  188.62  Sill 2 Development
CH746   0.00 2.01 2.01  352.56  294.87  Sill 2 Development
CH746 including 0.70 1.46 0.76  901.03  720.25  Sill 2 Development
CH747   0.00 2.04 2.04  309.48  333.35  Sill 2 Development
CH747 including 0.00 0.37 0.37  1,047.03  737.97  Sill 2 Development
CH747 and 0.37 0.70 0.34  568.84 1,024.73  Sill 2 Development
CH747 and 0.70 1.01 0.30  35.14  97.67  Sill 2 Development
CH747 and 1.68 2.04 0.37  110.78  64.02  Sill 2 Development
CH748   0.00 1.65 1.65  22.12  40.93  Sill 3 Development
CH748 including 0.58 0.91 0.34  107.19  177.21  Sill 3 Development
CH749   0.00 1.65 1.65  43.25  64.78  Sill 2 Development
CH749 including 0.70 1.34 0.64  101.61  155.54  Sill 2 Development
CH750   0.00 1.52 1.52  38.90  99.93  Sill 3 Development
CH750 including 0.73 1.04 0.30  188.41  499.62  Sill 3 Development
CH751   0.00 1.83 1.83  4.29  8.91  Sill 2 Development
CH752   0.00 1.52 1.52  4.51  15.96  Sill 2 Development
CH753   0.00 3.47 3.47  103.67  230.61  Sill 3 Development
CH753 including 1.07 1.65 0.58  277.65  655.33  Sill 3 Development
CH753 and 1.65 2.26 0.61  77.24  227.91  Sill 3 Development
CH753 and 2.80 3.17 0.37  354.13  570.24  Sill 3 Development
CH754   0.00 1.28 1.28  2.73  7.68  Sill 2 Development
CH755   0.00 0.91 0.91  6.85  31.50  Sill 2 Development
CH755 including 0.70 0.91 0.21  24.90  72.40  Sill 2 Development
CH756   0.00 1.07 1.07  3.33  4.91  Sill 2 Development
CH757 No significant assays  625 Level Sill
CH758 No significant assays  625 Level Sill
CH759 No significant assays  625 Level Sill
CH760 No significant assays  625 Level Sill
CH761   0.00 1.13 1.13  2.02  10.99  Sill 2 Development

 

Tintic Project98January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH761 including 0.52 0.61 0.09  14.63  34.65  Sill 2 Development
CH762 No significant assays  Sill 2 Development
CH763 No significant assays  625 Level Sill
CH764   27.74 33.83 6.10  1.91  8.04  625 Level Sill
CH769 No significant assays  625 Level Sill
CH770 No significant assays  625 Level Sill
CH771 No significant assays  625 Level Sill
CH772   0.00 1.52 1.52  3.24  8.08  Sill 2 Development
CH773   0.00 3.17 3.17  1.23  60.33  625 Level Sill
CH774   0.00 2.59 2.59  0.51  20.07  625 Level Sill
CH775 No significant assays  625 Level Sill
CH776 No significant assays  625 Level Sill
CH777   0.00 2.44 2.44  2.50  8.00  625 Level Sill
CH778   0.00 2.13 2.13  10.65  20.22  Sill 3 Development
CH779 No significant assays  625 Level Sill
CH780   0.00 1.31 1.31  111.90  87.77  Sill 2 Development
CH780 including 0.00 0.61 0.61  239.49  188.69  Sill 2 Development
CH781   0.00 2.44 2.44  18.82  35.96  625 Level Sill
CH781 including 0.91 1.22 0.30  147.65  269.39  625 Level Sill
CH782   0.00 0.91 0.91  44.11  63.25  Sill 2 Development
CH783   0.00 2.29 2.29  1.08  8.20  625 Level Sill
CH784   0.00 1.10 1.10  9.22  112.27  Sill 3 Development
CH785   0.00 2.47 2.47  2.50  19.14  625 Level Sill
CH786   0.00 0.98 0.98  46.74  180.17  Sill 3 Development
CH786 including 0.73 0.98 0.24  143.56  214.94  Sill 3 Development
CH787   0.00 1.46 1.46  525.02 1,694.76  Sill 3 Development
CH787 including 0.00 0.24 0.24  288.38 1,102.30  Sill 3 Development
CH787 and 0.24 0.85 0.61  1,143.35 3,596.74  Sill 3 Development
CH788 No significant assays  625 Level Sill
CH790   0.00 0.76 0.76  140.11  916.14  Sill 3 Development
CH790 including 0.00 0.46 0.46  210.11 1,380.78  Sill 3 Development
CH791   0.00 4.27 4.27  20.89  14.99  Raise 4 Bench
CH791 including 0.61 1.22 0.61  129.04  65.86 Raise 4 Bench
CH792   0.00 4.88 4.88  306.97  262.91 Raise 4 Bench
CH792 including 1.22 1.83 0.61  634.42  799.42  Raise 4 Bench
CH792 and 1.83 2.44 0.61  593.69  555.85 Raise 4 Bench
CH792 and 3.05 3.66 0.61  151.73  101.06 Raise 4 Bench
CH792 and 3.66 4.27 0.61  120.84  22.49 Raise 4 Bench
CH792 and 4.27 4.88 0.61  798.05  378.23  Raise 4 Bench
CH793   0.00 1.52 1.52  15.25  101.41  Sill 3 Development
CH794 No significant assays  Sill 3 Development
CH795 No significant assays  Sill 3 Development
CH796 No significant assays  Sill 3 Development
CH797 No significant assays  Sill 3 Development
CH798 No significant assays  Sill 3 Development
CH799 No significant assays  Sill 3 Development

 

Tintic Project99January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH800 No significant assays  Sill 3 Development
CH801   0.00 1.83 1.83  6.55  20.55  Raise 4 Bench
CH801 including 1.62 1.83 0.21  27.83  126.97 Raise 4 Bench
CH802   0.00 1.49 1.49  12.29  58.84  Sill 3 Development
CH803   0.00 1.55 1.55  5.81  104.89  Sill 3 Development
CH805   0.00 1.98 1.98  57.66  32.04  Raise 4 Bench
CH805 including 1.07 1.68 0.61  139.59  71.05 Raise 4 Bench
CH805 and 1.68 1.98 0.30  55.06  20.21 Raise 4 Bench
CH806   0.00 1.83 1.83  0.54  14.91  Sill 3 Development
CH807 No significant assays  Sill 3 Development
CH810 No significant assays  625 Level Sill
CH811 No significant assays  625 Level Sill
CH812 No significant assays  625 Level Sill
CH813 No significant assays  Raise 4 Exploration
CH814 No significant assays    Raise 4 Exploration
CH815   0.00 1.98 1.98  46.77  79.13  Sill 4 Development
CH815 including 1.37 1.98 0.61  135.31  208.23  Sill 4 Development
CH816   0.00 1.80 1.80  5.76  37.17  Sill 4 Development
CH817 No significant assays  Raise 4 Exploration
CH818 No significant assays  Raise 4 Exploration
CH819 No significant assays  625 Level Sill
CH820 No significant assays  625 Level Sill
CH821   0.00 1.22 1.22  29.89  94.81  Sill 4 Development
CH822   0.00 1.43 1.43  7.92  17.37  Sill 4 Development
CH822 including 0.00 0.30 0.30  36.24  77.12  Sill 4 Development
CH823 No significant assays  Raise 4 Exploration
CH824 No significant assays Raise 4 Exploration
CH825   0.00 1.34 1.34  2.69  35.23  Sill 4 Development
CH826   0.00 1.74 1.74  2.84  20.52  Sill 4 Development
CH827   0.00 1.49 1.49  1.28  20.40  Sill 4 Development
CH828   0.00 2.44 2.44  2.12  22.08  Raise 4 Exploration
CH829 No significant assays  Raise 4 Exploration
CH830 No significant assays  Sill 4 Development
CH831 No significant assays  Sill 4 Development
CH832   0.00 4.27 4.27  44.67  114.18  Raise 4 Exploration
CH832 including 2.44 3.05 0.61  224.19  353.74  Raise 4 Exploration
CH833   0.00 4.27 4.27  11.29  24.13  Raise 4 Exploration
CH834 No significant assays  Raise 4 Exploration
CH835 No significant assays  Sill 4 Development
CH836   0.00 1.19 1.19  0.95  60.88  Sill 4 Development
CH837 No significant assays    Raise 4 Exploration
CH838   0.00 5.49 5.49  11.33  53.96  Raise 4 Exploration
CH840 No significant assays  Sill 4 Development
CH841 No significant assays  Sill 4 Development
CH842 No significant assays  Sill 4 Development
CH843   0.00 1.89 1.89  1.54  37.82  Sill 4 Development

 

Tintic Project100January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH845   0.00 1.37 1.37  3.08  13.50  Sill 4 Development
CH846   0.00 2.13 2.13  6.58  26.17  Sill 4 Development
CH847   0.00 2.13 2.13  32.45  88.39  Sill 4 Development
CH847 including 1.68 2.13 0.46  144.74  390.30  Sill 4 Development
CH848   0.00 1.83 1.65  132.68  147.32  Sill 4 Development
CH848 including 0.00 0.79 0.79  118.10  215.46  Sill 4 Development
CH848 and 0.79 1.52 0.73  170.41  98.05  Sill 4 Development
CH849   0.00 1.95 1.95  24.96  107.31  Sill 4 Development
CH849 including 0.91 1.52 0.61  68.22  231.13  Sill 4 Development
CH850   0.00 1.46 1.46  146.80  108.93  Sill 4 Development
CH850 including 0.52 0.73 0.21  960.82  568.50  Sill 4 Development
CH851   0.00 0.91 0.91  5.84  29.48  Sill 4 Development
CH852   0.00 1.74 1.74  5.78  56.70  Sill 4 Development
CH853   0.00 1.22 1.22  13.75  56.29  Sill 4 Development
CH854   0.00 1.74 1.74  28.12  66.67  Sill 4 Development
CH854 including 0.00 0.21 0.21  139.05  233.94  Sill 4 Development
CH855   0.00 1.43 1.43  9.42  108.95  Sill 4 Development
CH856   0.00 1.43 1.43  51.26  32.85  Sill 4 Development
CH856 including 0.91 1.43 0.52  138.10  0.01  Sill 4 Development
CH857   0.00 1.40 1.40  14.65  187.93  Sill 4 Development
CH858   0.00 1.01 1.01  2.42  42.33  Sill 4 Development
CH859   0.00 0.98 0.98  1.17  36.35  Sill 4 Development
CH860   0.00 2.44 2.44  21.13  197.56  Raise 5
CH861   0.00 2.44 2.44  8.23  11.39  Raise 5
CH862 No significant assays  Sill 4 Development
CH863   0.00 0.70 0.70  186.58  108.93  Sill 4 Development
CH863 including 0.00 0.21 0.21  606.14  334.95  Sill 4 Development
CH864   0.00 1.92 1.92  4.22  74.49  Sill 4 Development
CH865 No significant assays  Raise 5
CH866 No significant assays  Raise 5
CH867   0.00 1.83 1.83  8.89  25.63  Raise 5
CH868 No significant assays  Raise 5
CH869   0.00 1.22 1.22  128.78  372.67  Sill 4 Development
CH869 including 0.46 1.22 0.76  205.62  563.01  Sill 4 Development
CH870   0.00 1.52 1.52  42.22  151.53  Sill 4 Development
CH870 including 0.00 0.61 0.61  105.03  376.40  Sill 4 Development
CH871   0.00 1.07 1.07  13.21  42.81  Sill 4 Development
CH872   0.00 2.44 2.44  12.97  32.82  Raise 5
CH873   0.00 1.86 1.86  35.33  170.36  Sill 4 Development
CH873 including 0.43 0.64 0.21  198.80  572.20  Sill 4 Development
CH874   0.00 1.13 1.13  128.11 3,094.36  Sill 4 Development
CH874 including 0.00 0.56 0.56  223.23 1,729.77  Sill 4 Development
CH875   0.00 1.83 1.83  4.18  9.65  Raise 5
CH876   0.00 1.83 1.83  10.83  33.51  Raise 5
CH877   0.00 0.91 0.91  175.74 1,202.83  Sill 4 Development
CH877 including 0.00 0.61 0.61  247.93 1,669.10  Sill 4 Development

 

Tintic Project101January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH878   0.00 1.22 1.22  432.04  771.44  Sill 4 Development
CH878 including 0.00 0.18 0.18  535.28 1,011.18  Sill 4 Development
CH878 and 0.18 0.49 0.30  567.26 2,471.51  Sill 4 Development
CH878 and 0.49 0.91 0.43  591.50  0.01  Sill 4 Development
CH879   0.00 1.34 1.34  182.61  90.14  Sill 4 Development
CH879 including 0.00 0.49 0.49  494.63  204.62  Sill 4 Development
CH880 No significant assays  Sill 4 Development
CH881   0.00 1.46 1.46  1.72  9.34  Sill 4 Development
CH882   0.00 2.44 2.44  8.39  21.76  Raise 5
CH883 No significant assays  Raise 5
CH884   0.00 1.83 1.83  12.64  81.22  Sill 4 Development
CH885   0.00 1.22 1.22  8.77  124.11  Sill 4 Development
CH886 No significant assays  Raise 5
CH887   0.00 2.04 2.04  145.78  649.80  Sill 4 Development
CH887 including 0.85 1.22 0.37  610.55 1,581.85  Sill 4 Development
CH888   0.00 1.52 1.52 0.45 0.01  Raise 5
CH889   0.00 3.66 3.66  158.23  238.30  Sill 4 Development
CH889 including 0.00 0.61 0.61  90.81  62.70  Sill 4 Development
CH889 and 1.22 1.83 0.61  464.83  525.95  Sill 4 Development
CH889 and 1.83 2.44 0.61  327.84  702.40  Sill 4 Development
CH890 No significant assays  Raise 5
CH891 No significant assays  Raise 5
CH892 No significant assays  Raise 5
CH893   0.00 1.95 1.95  694.50  540.37  Sill 4 Development
CH893 including 1.07 1.40 0.34  3,722.31 2,454.88  Sill 4 Development
CH894 No significant assays  Raise 5
CH895   0.00 3.05 3.05  1.67  8.40  625 Level Sill
CH896   0.00 1.37 1.37  2,771.97 2,269.69  Sill 3 Development
CH896 including 0.30 1.01 0.70  5,390.78 4,394.48  Sill 3 Development
CH898   0.00 1.68 1.68  410.31  589.75  Sill 3 Development
CH898 including 0.91 1.37 0.46  1,430.44 2,047.51  Sill 3 Development
CH898 and 1.37 1.68 0.30  101.17  171.13  Sill 3 Development
CH899   0.00 0.55 0.55  73.96  48.00  Sill 3 Development
CH899 including 0.40 0.55 0.15  261.43  163.01  Sill 3 Development
CH900   0.00 0.43 0.43  22.42  208.16  625 Level Sill
CH901   0.00 0.61 0.61  42.96  150.09  Sill 5 Development
CH902 No significant assays  Sill 3 Development
CH903 No significant assays  625 Level Sill
CH904 No significant assays  625 Level Sill
CH905   0.00 3.66 3.66  7.24  24.37  Sill 5 Exploration
CH906   0.00 3.66 3.66  45.58  106.23  Sill 5 Exploration
CH907 No significant assays  Sill 5 Exploration
CH908 No significant assays  Raise 5
CH909   0.00 1.52 1.52  18.73  28.27  Sill 3 Development
CH910   0.00 1.52 1.52  606.75  243.87  Sill 3 Development
CH910 including 0.00 0.61 0.61  430.14  227.71  Sill 3 Development

 

Tintic Project102January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH910 and 0.61 0.91 0.30  1,749.76  457.69  Sill 3 Development
CH910 and 0.91 1.52 0.61  211.86  153.12  Sill 3 Development
CH911   0.00 1.22 1.22  1,152.40  214.18  Sill 3 Development
CH911 including 0.30 0.61 0.30  4,150.15  425.99  Sill 3 Development
CH911 and 0.61 1.22 0.61  225.55  205.14  Sill 3 Development
CH912   0.00 2.44 2.44  3.41  17.12  Sill 5 Exploration
CH913   0.00 1.68 1.68  2,724.03  215.12  Sill 3 Development
CH913 including 0.55 0.85 0.30 14,883.20 1,153.72  Sill 3 Development
CH914   0.00 1.52 1.52  570.32  85.46  Sill 3 Development
CH914 including 0.00 0.61 0.61  907.44  132.26  Sill 3 Development
CH914 and 0.61 0.91 0.30  846.79  81.52  Sill 3 Development
CH914 and 0.91 1.52 0.61  94.96  40.62  Sill 3 Development
CH915 No significant assays  Raise 5
CH916   0.00 6.10 6.10  5.66 1,121.28  Sill 5 Exploration
CH917   0.00 1.37 1.37  116.71  172.46  Sill 3 Development
CH917 including 0.00 0.40 0.40  98.93  53.44  Sill 3 Development
CH917 and 0.40 0.79 0.40  290.57  495.25  Sill 3 Development
CH918   0.00 6.10 6.10  7.78  53.15  Sill 5 Exploration
CH919   0.00 3.66 3.66  5.65  151.22  Sill 5 Exploration
CH920   0.00 3.66 3.66  2.16  41.67  Sill 5 Exploration
CH921   0.00 1.22 1.22  19.49  63.96  Sill 3 Development
CH922   0.00 1.49 1.49  11.45  13.23  Sill 3 Development
CH923 No significant assays  Raise 5
CH924   0.00 1.16 1.16  10.61  19.64  Sill 3 Development
CH924 including 0.43 0.67 0.24  49.55  91.54  Sill 3 Development
CH925   0.00 4.88 4.88  4.53  93.08  Sill 5 Exploration
CH926   0.00 4.88 4.88  7.04  74.45  Sill 5 Exploration
CH927   0.00 1.62 1.62  97.18  48.12  Sill 3 Development
CH927 including 0.24 0.55 0.30  499.55  254.97  Sill 3 Development
CH928 No significant assays  Sill 3 Development
CH929   0.00 1.22 1.22  8.01  17.07  Sill 3 Development
CH930   0.00 27.43 27.43  2.17  24.53  Sill 5 Exploration
CH931 No significant assays  Sill 3 Development
CH932 No significant assays  Sill 3 Development
CH933 No significant assays  Sill 3 Development
CH934   0.00 1.83 1.83  0.75  10.58  Sill 3 Development
CH935   0.00 17.07 17.07  0.19  17.74  Sill 5 Exploration
CH936   0.00 17.07 17.07  1.11  6.17  Sill 5 Exploration
CH937   0.00 2.07 2.07  0.05  3.19  Sill 3 Development
CH938   0.00 12.19 12.19  0.52  1.29  Sill 5 Exploration
CH939   0.00 1.37 1.37  139.65  227.05  Sill 3 Development
CH939 including 1.07 1.37 0.30  620.15  980.67  Sill 3 Development
CH940   0.00 0.91 0.91  10.13  11.14  Sill 3 Development
CH942   0.00 1.37 1.37  25.52  271.13  Sill 3 Development
CH942 including 0.40 0.55 0.15  227.59 1,323.29  Sill 3 Development
CH943   0.00 1.22 1.22  111.45  359.02  Sill 3 Development

 

Tintic Project103January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH943 including 0.00 0.30 0.30  443.34 1,419.18  Sill 3 Development
CH944   0.00 5.49 5.49  0.24  0.01  Sill 5 Exploration
CH946   0.00 1.01 1.01  404.02  171.48  Sill 5 Development
CH946 including 0.61 0.79 0.18  2,053.60  773.47  Sill 5 Development
CH947   0.00 8.23 8.23  0.03  2.53  Sill 5 Exploration
CH948   0.00 1.10 1.10  16.95  147.21  Sill 5 Development
CH949   0.00 1.52 1.52  1.72  25.46  Sill 5 Development
CH950   0.00 6.10 6.10  0.40  19.93  625 Level Sill
CH951   0.00 1.83 1.83  2.95  20.49  Sill 5 Development
CH952   0.00 1.98 1.98  4.20  58.05  Sill 5 Development
CH953   0.00 3.05 3.05  0.62  20.64  625 Level Sill
CH954   0.00 1.49 1.49  6.70  43.83  Sill 5 Development
CH955   0.00 0.88 0.88  1.28  80.54  Sill 5 Development
CH956   0.00 6.10 6.10  0.12  2.57  625 Level Sill
CH957   0.00 6.10 6.10  0.18  35.28  625 Level Sill
CH966   0.00 0.46 0.46  1,367.96  479.47  Sill 4 Development
CH967   0.00 0.61 0.61  75.38  32.24  Sill 4 Development
CH967 including 0.30 0.46 0.15  292.12  106.72  Sill 4 Development
CH968   0.00 1.22 1.22  261.78  106.94  Sill 4 Development
CH968 including 0.15 0.61 0.46  658.36  199.49  Sill 4 Development
CH969   0.00 0.91 0.91  287.54  61.65  Sill 4 Development
CH969 including 0.21 0.52 0.30  787.01  165.50  Sill 4 Development
CH969 and 0.52 0.91 0.40  47.80  14.96  Sill 4 Development
CH970   0.00 1.98 1.98  17.65  4.01  Sill 4 Development
CH970 including 0.70 0.94 0.24  96.58  19.66  Sill 4 Development
CH971   0.00 2.13 2.13  264.36  30.78  Sill 4 Development
CH971 including 0.76 1.16 0.40  760.36  47.15  Sill 4 Development
CH971 and 1.16 1.71 0.55  465.21  85.65  Sill 4 Development
CH972   0.00 1.34 1.34  79.59  59.04  Sill 4 Development
CH972 including 0.67 0.85 0.18  401.06  153.18  Sill 4 Development
CH973   0.00 1.22 1.22  1,523.54  126.38  Sill 4 Development
CH973 including 0.00 0.30 0.30  262.10  233.04  Sill 4 Development
CH973 and 0.30 0.61 0.30  5,753.47  191.28  Sill 4 Development
CH974   0.00 1.98 1.98  372.56  294.68  Sill 4 Development
CH974 including 0.00 0.49 0.49  496.58  423.66  Sill 4 Development
CH974 and 0.49 1.28 0.79  624.26  475.98  Sill 4 Development
CH975   0.00 1.65 1.65  657.83  319.59  Sill 4 Development
CH975 including 0.00 0.61 0.61  92.49  22.14  Sill 4 Development
CH975 and 0.61 1.04 0.43  2,389.35 1,183.93  Sill 4 Development
CH976   0.00 1.40 1.40  7.07  48.88  Sill 4 Development
CH976 including 0.00 0.15 0.15  23.02  186.01  Sill 4 Development
CH976 and 0.52 0.67 0.15  33.12  231.78  Sill 4 Development
CH977   0.00 21.34 21.34  5.02  27.87  625 Level Sill
CH978   0.00 24.38 24.38  0.89  1.18  625 Level Sill
CH979   0.00 1.55 1.55  32.75  7.68  Sill 4 Development
CH979 including 0.00 0.15 0.15  60.70  48.20  Sill 4 Development

 

Tintic Project104January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH980   0.00 1.80 1.80  3.60  18.79  Sill 4 Development
CH981   0.00 1.37 1.37  1.47  28.89  Sill 4 Development
CH983   0.00 6.10 6.10  0.09  0.25  625 Level Sill
CH984   0.00 6.10 6.10  1.13  0.01  625 Level Sill
CH985   0.00 0.98 0.98  0.36  9.24  Sill 4 Development
CH986   0.00 1.52 1.52  0.52  3.20  Sill 4 Development
CH987   0.00 2.04 2.04  0.63  2.86  665 Sublevel (Eileen)
CH988   0.00 2.13 2.13  0.10  0.68  665 Sublevel (Eileen)
CH989   0.00 1.37 1.37  2.64  0.01  Sill 4 Development
CH990   0.00 1.22 1.22  21.97  26.13  Sill 4 Development
CH991   0.00 1.43 1.43  1.63  6.56  Sill 4 Development
CH992   0.00 2.04 2.04  2.17  4.48  665 Sublevel (Eileen)
CH993   0.00 1.07 1.07  1.85  5.21  665 Sublevel (Eileen)
CH994   0.00 1.49 1.49  2.13  4.22  Sill 4 Development
CH995   0.00 1.83 1.83  0.57  3.91  665 Sublevel (Eileen)
CH996   0.00 1.58 1.58  0.03  2.35  Sill 4 Development
CH997   0.00 1.52 1.52  17.96  10.85  Sill 4 Development
CH998   0.00 1.19 1.19  22.79  31.35  Sill 4 Development
CH998 including 0.00 0.43 0.43  62.02  79.21  Sill 4 Development
CH999   0.00 1.65 1.65  0.19  1.18  665 Sublevel (Eileen)
CH1000   0.00 1.37 1.37  32.10  45.11  Sill 4 Development
CH1000 including 0.52 0.76 0.24  49.06  50.22  Sill 4 Development
CH1001   0.00 1.83 1.83  1.12  9.09  665 Sublevel (Eileen)
CH1002   0.00 1.68 1.68  1.73  1.82  665 Sublevel (Eileen)
CH1003   0.00 0.91 0.91  6.45  6.96  Sill 4 Development
CH1004   0.00 0.91 0.91  7.84  29.72  Sill 4 Development
CH1004 including 0.30 0.43 0.12  37.61  138.43  Sill 4 Development
CH1005   0.00 1.98 1.98  22.57  18.93  665 Sublevel (Eileen)
CH1005 including 1.37 1.98 0.61  73.19  55.64  665 Sublevel (Eileen)
CH1006   0.00 1.37 1.37  386.04  747.10  Sill 4 Development
CH1006 including 0.76 1.37 0.61  848.82 1,665.65  Sill 4 Development
CH1007   0.00 2.56 2.56  543.03 1,005.97  665 Sublevel (Eileen)
CH1007 including 1.55 2.56 1.01  1,381.60 2,546.06  665 Sublevel (Eileen)
CH1008   0.00 0.91 0.91  0.59  5.12  Sill 4 Development
CH1009   0.00 2.74 2.74  57.47  107.82  665 Sublevel (Eileen)
CH1009 including 2.29 2.74 0.46  340.76  625.85  665 Sublevel (Eileen)
CH1010   0.00 1.22 1.22  0.02  13.76  Sill 4 Development
CH1011   0.00 3.54 3.54  367.54  141.38  665 Sublevel (Eileen)
CH1011 including 1.77 2.32 0.55  2,352.18  911.10  665 Sublevel (Eileen)
CH1012   0.00 1.28 1.28  0.49  16.35  Sill 4 Development
CH1013   0.00 1.46 1.46  69.57  155.41  Sill 4 Development
CH1013 including 0.70 0.85 0.15  649.74 1,491.10  Sill 4 Development
CH1014   0.00 1.16 1.16  26.01  215.62  Sill 4 Development
CH1014 including 0.67 0.94 0.27  106.96  900.34  Sill 4 Development
CH1015   0.00 1.83 1.83  13.86  33.24  Sill 4 Development
CH1015 including 1.01 1.31 0.30  57.35  156.02  Sill 4 Development

 

Tintic Project105January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1016   0.00 1.52 1.52  5.18  15.64  665 Sublevel (Eileen)  
CH1017   0.00 1.52 1.52  63.28  106.11  665 Sublevel (Eileen)  
CH1017 including 0.00 0.40 0.40  240.49  391.64  665 Sublevel (Eileen)  
CH1018   0.00 1.89 1.89  2.22  15.17  Sill 4 Development
CH1019   0.00 1.55 1.55  0.61  3.16  Sill 4 Development
CH1020   0.00 1.22 1.22  6.05  4.44  Sill 4 Development
CH1021   0.00 1.89 1.89  6.43  15.38  665 Sublevel (Eileen)  
CH1022   0.00 1.83 1.83  6.10  5.07  665 Sublevel (Eileen)  
CH1023   0.00 1.83 1.83  25.38  40.99  665 Sublevel (Eileen)  
CH1025   0.00 2.13 2.13 0.01 0.93 665 Sublevel (Eileen)
CH1026   0.00 2.26 2.26  2.84  12.21  665 Sublevel (Eileen)  
CH1027   0.00 3.05 3.05  8.88  48.20  Sill 4 Exploration
CH1028   0.00 3.05 3.05  0.78  22.15  Sill 4 Exploration
CH1029   0.00 3.05 3.05  0.01  6.13  Sill 4 Exploration
CH1030   0.00 3.05 3.05  0.13  2.68  Sill 4 Exploration
CH1031   0.00 2.47 2.47  1.17  3.27  665 Sublevel (Eileen)  
CH1032   0.00 1.83 1.83 0.62 0.00 Raise 6
CH1033   0.00 2.77 2.77  0.32  0.01  665 Sublevel (Eileen)  
CH1034   0.00 1.68 1.68  0.48  3.79  665 Sublevel (Eileen)  
CH1035   0.00 2.44 2.44  7.43  32.98  665 Sublevel (Eileen)  
CH1037   0.00 2.13 2.13  0.10  5.06  665 Sublevel (Eileen)  
CH1038   0.00 2.13 2.13  4.34  17.28  665 Sublevel (Eileen)  
CH1049   0.00 1.83 1.83  3.99  16.57  Sill 5 Development
CH1050   0.00 3.66 3.66  0.17  1.30  Sill 4 Exploration
CH1051   0.00 1.83 1.83  1.57  5.33  665 Sublevel (Eileen)  
CH1052   0.00 4.88 4.88  0.66  6.07  Sill 4 Exploration
CH1053   0.00 1.89 1.89  0.14  3.07  665 Sublevel (Eileen)  
CH1055   0.00 1.98 1.98  1.25  1.23  665 Sublevel (Eileen)  
CH1056   0.00 2.29 2.29  3.37  4.93  665 Sublevel (Eileen)  
CH1056 including 1.65 1.83 0.18  38.45  53.84  665 Sublevel (Eileen)  
CH1057   0.00 2.32 2.32  1.70  1.29  665 Sublevel (Eileen)  
CH1057 including 1.55 1.71 0.15  18.75  18.14  665 Sublevel (Eileen)  
CH1058   0.00 2.16 2.16  9.84  46.03  Sill 5 Development
CH1059   0.00 3.96 3.96  7.52  5.96  Sill 4 Exploration
CH1060   0.00 2.19 2.19  143.28  122.94  665 Sublevel (Eileen)  
CH1060 including 0.91 1.16 0.24  1,277.05 1,086.13  665 Sublevel (Eileen)  
CH1061   0.00 1.65 1.65  3.38  35.42  Sill 5 Development
CH1062   0.00 1.71 1.71  0.50  0.39  Sill 5 Development
CH1063   0.00 2.29 2.29  1.02  16.49  Sill 5 Development
CH1064   0.00 2.74 2.74  0.36  4.06  Sill 4 Exploration
CH1065   0.00 2.80 2.80  0.08  2.86  Sill 5 Development
CH1066   0.00 2.74 2.74  193.24  140.79  665 Sublevel (Eileen)  
CH1066 including 0.00 0.30 0.30  1,075.52  389.75  665 Sublevel (Eileen)  
CH1066 and 0.30 1.22 0.91  123.17  226.98  665 Sublevel (Eileen)  
CH1066 and 1.22 1.83 0.61  146.18  98.22  665 Sublevel (Eileen)  
CH1068   0.00 2.74 2.74  51.44  55.27  665 Sublevel (Eileen)  

 

Tintic Project106January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1068 including 0.61 0.91 0.30  318.19  254.34  665 Sublevel (Eileen)  
CH1069   0.00 2.50 2.50  226.00  83.40  665 Sublevel (Eileen)  
CH1069 including 1.37 1.98 0.61  903.57  323.83  665 Sublevel (Eileen)  
CH1070   0.00 2.19 2.19  1.51  3.81  Sill 5 Development
CH1071   0.00 7.62 7.62  1.43  15.30  Sill 4 Exploration
CH1072   0.00 2.10 2.10  221.27  17.90  665 Sublevel (Eileen)  
CH1072 including 1.43 2.10 0.67  693.59  56.12  665 Sublevel (Eileen)  
CH1073   0.00 2.04 2.04  3.78  7.58  665 Sublevel (Eileen)  
CH1074   0.00 1.58 1.58  1.94  5.09  Sill 5 Development
CH1075   0.00 8.08 8.08  16.99  109.40  Sill 4 Exploration
CH1075 including 1.68 2.44 0.76  116.46  800.93  Sill 4 Exploration
CH1076   0.00 2.59 2.59  482.30  409.81  665 Sublevel (Eileen)  
CH1076 including 0.91 1.89 0.98  1,277.05 1,086.13  665 Sublevel (Eileen)  
CH1077   0.00 2.56 2.56  2.47  37.70  665 Sublevel (Eileen)  
CH1078   0.00 2.07 2.07  0.34  14.69  665 Sublevel (Eileen)  
CH1079   0.00 2.16 2.16  1.51  3.33  665 Sublevel (Eileen)  
CH1080   0.00 2.29 2.29  29.58  36.73  665 Sublevel (Eileen)  
CH1080 including 1.07 1.37 0.30  215.60  275.45  665 Sublevel (Eileen)  
CH1081   0.00 2.38 2.38  17.76  32.77  665 Sublevel (Eileen)  
CH1081 including 1.01 1.46 0.46  92.32  168.98  665 Sublevel (Eileen)  
CH1082   0.00 1.22 1.22  9.91  84.97  Sill 5 Development
CH1083   0.00 1.62 1.62  45.82  343.99  Sill 5 Development
CH1084   0.00 3.66 3.66  0.01  0.35  Raise 5 Exploration
CH1085   0.00 3.66 3.66  0.01  0.89  Raise 5 Exploration
CH1086   0.00 1.74 1.74  18.45  84.66  Sill 5 Development
CH1086 including 1.52 1.74 0.21  36.61  28.04  Sill 5 Development
CH1087   0.00 11.98 11.98  20.87  106.92  Raise 5 Exploration
CH1087 including 4.27 4.88 0.61  164.62  436.58  Raise 5 Exploration
CH1088   0.00 11.06 11.06  16.63  74.01  Raise 5 Exploration
CH1089   0.00 2.10 2.10  25.27  36.38  Sill 5 Development
CH1090 No significant assays  Sill 5 Development
CH1091   0.00 2.44 2.44  4.89  0.24  625 Level Sill
CH1092   0.00 1.52 1.52  4.70  96.19  Sill 5 Development
CH1093   0.00 13.81 13.81  2.34  10.48  Raise 5 Exploration
CH1094   0.00 14.02 14.02  10.13  12.82  Raise 5 Exploration
CH1094 including 1.80 2.19 0.40  254.89  59.86  Raise 5 Exploration
CH1095   0.00 3.66 3.66  0.01  13.20  Raise 5 Exploration
CH1096   0.00 3.66 3.66  0.01  2.34  Raise 5 Exploration
CH1097   0.00 5.58 5.58  0.49  6.99  Raise 5 Exploration
CH1098   0.00 4.60 4.60  0.01  4.97  Raise 5 Exploration
CH1099   0.00 4.39 4.39  0.26  31.56  Raise 5 Exploration
CH1100   0.00 4.51 4.51  2.06  2.88  Raise 5 Exploration
CH1101   0.00 1.86 1.86  9.14  21.77  665 Sublevel (Eileen)  
CH1102   0.00 0.94 0.94  856.54  608.09  Sill 5 Development
CH1102 including 0.40 0.76 0.37  2,202.85 1,559.99  Sill 5 Development
CH1103   0.00 2.04 2.04  5.49  25.06  665 Sublevel (Eileen)  

 

Tintic Project107January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1104   0.00 0.98 0.98  10.11  3.67  Sill 5 Development
CH1104 including 0.43 0.55 0.12  16.13  4.76  Sill 5 Development
CH1105   0.00 1.04 1.04  683.53  42.51  Sill 5 Development
CH1105 including 0.24 0.64 0.40  1,769.33  102.40  Sill 5 Development
CH1106   0.00 2.16 2.16  36.68  36.18  665 Sublevel (Eileen)  
CH1106 including 0.52 0.70 0.18  35.87  32.37  665 Sublevel (Eileen)  
CH1106 and 1.04 1.31 0.27  262.63  207.06  665 Sublevel (Eileen)  
CH1107   0.00 2.04 2.04  6.97  22.52  665 Sublevel (Eileen)  
CH1108   0.00 0.91 0.91  49.18  39.95  Sill 5 Development
CH1108 including 0.40 0.55 0.15  193.43  149.21  Sill 5 Development
CH1109   0.00 0.94 0.94  65.69  58.62  Sill 5 Development
CH1109 including 0.00 0.58 0.58  107.17  95.64  Sill 5 Development
CH1110   0.00 2.07 2.07  2,800.11  315.99  Sill 5 Development
CH1110 including 0.00 1.22 1.22  4,757.42  528.90  Sill 5 Development
CH1111   0.00 1.13 1.13  19.65  13.67  Sill 5 Development
CH1111 including 0.76 1.13 0.37  54.49  35.36  Sill 5 Development
CH1112   0.00 1.25 1.25  0.76  6.00  Sill 5 Development
CH1113   0.00 1.37 1.37  2.18  16.69  Sill 5 Development
CH1114   0.00 1.52 1.52  1,553.07 1,224.91  Sill 5 Development
CH1114 including 0.00 0.82 0.82  2,873.05 2,263.41  Sill 5 Development
CH1115   0.00 1.34 1.34  229.62  226.01  Sill 5 Development
CH1115 including 0.40 0.82 0.43  712.31  686.29  Sill 5 Development
CH1116   0.00 1.25 1.25  358.06  219.60  Sill 5 Development
CH1116 including 0.00 0.34 0.34  1,324.67  810.38  Sill 5 Development
CH1117   0.00 1.52 1.52  13.31  4.79  Sill 5 Development
CH1117 including 0.30 0.61 0.30  41.19  16.77  Sill 5 Development
CH1118   0.00 1.40 1.40  13.20  21.92  Sill 5 Development
CH1118 including 0.91 1.07 0.15  105.38  144.88  Sill 5 Development
CH1119   0.00 1.22 1.22  4.56  42.47  Sill 5 Development
CH1120   0.00 10.42 10.42  1.48  5.80 Raise 6 Exploration
CH1121   0.00 10.30 10.30 2.42 22.05 Raise 6 Exploration
CH1122 No significant assays Raise 6 Exploration
Ch1123   0.00 16.25 16.25 0.00 0.34 Raise 6 Exploration
CH1124   0.00 1.71 1.71  4.98  19.11  Sill 5 Development
CH1125   0.00 1.07 1.07  1.35  5.10  Sill 5 Development
CH1126   0.00 1.25 1.25  0.80  7.87  Sill 5 Development
CH1127   0.00 1.07 1.07  3.88  32.21  Sill 5 Development
CH1128   0.00 0.91 0.91  1.04  5.51  Sill 5 Development
CH1129   0.00 0.82 0.82  0.03  11.72  Sill 5 Development
CH1130   0.00 1.04 1.04  0.19  3.10  Sill 5 Development
CH1132   0.00 2.23 2.23  10.93  36.45  665 Sublevel (Eileen)  
CH1134   0.00 2.74 2.74  22.49  57.63  665 Sublevel (Eileen)  
CH1134 including 0.00 0.21 0.21  111.82  178.46  665 Sublevel (Eileen)  
CH1135   0.00 0.91 0.91  0.01  1.53  Sill 5 Development
CH1136   0.00 9.75 9.75 0.41 2.09 Raise 6 Exploration
CH1137   0.00 7.32 7.32 0.65 7.73 Raise 6 Exploration

 

Tintic Project108January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1138   1.83 18.29 16.46  7.76  16.81 Raise 6 Exploration
CH1139   2.13 18.29 16.15  0.06  2.89 Raise 6 Exploration
CH1140   0.00 1.28 1.28  0.02  1.81  Sill 5 Development
CH1141   0.00 2.23 2.23  0.01  3.86  665 Sublevel (Eileen)  
CH1142   0.00 2.44 2.44  0.01  5.16  665 Sublevel (Eileen)  
CH1143   0.00 1.34 1.34  0.01  0.01  Sill 5 Development
CH1144   0.00 1.34 1.34  0.01  2.26  Sill 5 Development
CH1145   0.00 2.44 2.44  0.01  7.56  665 Sublevel (Eileen)  
CH1146   0.00 0.91 0.91  0.01  1.54  Sill 5 Development
CH1147   0.00 0.91 0.91  0.21  1.41  Sill 5 Development
CH1148   0.00 1.98 1.98  37.51  41.03  665 Sublevel (Eileen)  
CH1149   0.00 1.16 1.16  3.07  24.27  Sill 5 Development
CH1150   0.00 2.90 2.90  39.15  81.93  665 Sublevel (Eileen)  
CH1150 including 1.68 2.29 0.61  183.65  254.25  665 Sublevel (Eileen)  
CH1151   0.00 1.07 1.07  0.01  4.84  Sill 5 Development
CH1152   0.00 2.35 2.35  22.48  40.81  665 Sublevel (Eileen)  
CH1152 including 1.22 1.77 0.55  94.58  174.56  665 Sublevel (Eileen)  
CH1153   0.00 1.52 1.52  1.17  3.04  Sill 5 Development
CH1154   0.00 15.73 15.73 0.00 1.21 Raise 6 Exploration
CH1155   0.00 15.91 15.91 2.36 37.77 Raise 6 Exploration
CH1156   0.00 0.91 0.91  0.38  9.36  Sill 5 Development
CH1157   0.00 3.29 3.29  0.09  3.02  665 Sublevel (Eileen)  
CH1158   0.00 2.47 2.47  0.62  4.63  665 Sublevel (Eileen)  
CH1159   0.00 2.44 2.44  0.69  2.90  665 Sublevel (Eileen)  
CH1160   0.00 1.89 1.89  7.54  19.23  665 Sublevel (Eileen)  
CH1161   0.00 2.56 2.56  2.93  26.74  665 Sublevel (Eileen)  
CH1162   0.00 0.91 0.91  90.75  217.64  Sill 5 Development
CH1162 including 0.00 0.30 0.30  265.96  650.81  Sill 5 Development
CH1163   0.00 0.61 0.61  5,197.77 6,698.97  Sill 5 Development
CH1164   0.00 1.37 1.37  4.74  26.14  Sill 5 Development
CH1165   0.00 1.89 1.89  0.42  2.55  665 Sublevel (Eileen)  
CH1166   0.00 7.74 7.74 0.01 0.00 Raise 6 Exploration
CH1167   0.00 7.59 7.59 0.00 1.17 Raise 6 Exploration
CH1168   0.00 1.22 1.22  0.23  6.03  Sill 5 Development
CH1169   0.00 3.08 3.08  0.71  13.23  665 Sublevel (Eileen)  
CH1170   0.00 3.35 3.35  4.20  3.39  665 Sublevel (Eileen)  
CH1170 including 0.91 1.22 0.30  39.13  37.21  665 Sublevel (Eileen)  
CH1171   0.00 1.25 1.25  0.45  4.12  Sill 5 Development
CH1172   0.00 2.99 2.99  12.62  3.21  665 Sublevel (Eileen)  
CH1172 including 0.00 0.24 0.24  154.47  35.00  665 Sublevel (Eileen)  
CH1173   0.00 1.10 1.10  0.03  2.33  Sill 5 Development
CH1174   0.00 3.14 3.14  14.04  22.83  665 Sublevel (Eileen)  
CH1175   0.00 1.07 1.07  0.11  2.07  Sill 5 Development
CH1176   0.00 2.29 2.29  145.85  30.04  665 Sublevel (Eileen)  
CH1176 including 0.37 0.85 0.49  681.89  51.72  665 Sublevel (Eileen)  
CH1180   0.00 2.53 2.53  912.28  5.17  665 Sublevel (Eileen)  

 

Tintic Project109January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1180 including 0.94 1.49 0.55  4,186.46  0.01  665 Sublevel (Eileen)  
CH1181   0.00 1.40 1.40  1.65  18.34  Sill 5 Development
CH1182   0.00 2.47 2.47  26.05  26.20  665 Sublevel (Eileen)  
CH1182 including 1.10 1.34 0.24  216.26  155.38  665 Sublevel (Eileen)  
CH1183   0.00 2.01 2.01  11.62  10.43  665 Sublevel (Eileen)  
CH1184   0.00 2.23 2.23  12.81  11.89  665 Sublevel (Eileen)  
CH1184 including 1.46 1.92 0.46  54.34  57.87  665 Sublevel (Eileen)  
CH1185   0.00 2.04 2.04  19.47  22.31  665 Sublevel (Eileen)  
CH1186   0.00 2.44 2.44  25.21  13.30  665 Sublevel (Eileen)  
CH1187   0.00 2.19 2.19  340.36  69.94  665 Sublevel (Eileen)  
CH1187 including 0.30 1.04 0.73  1,017.01  209.81  665 Sublevel (Eileen)  
CH1188   0.00 1.98 1.98  16.75  12.41  665 Sublevel (Eileen)  
CH1189   0.00 2.01 2.01  20.14  19.63  665 Sublevel (Eileen)  
CH1190   0.00 2.29 2.29  50.20  13.88  665 Sublevel (Eileen)  
CH1190 including 0.61 1.07 0.46  87.28  23.35  665 Sublevel (Eileen)  
CH1191   0.00 2.77 2.77  1.23  39.60  665 Sublevel (Eileen)  
CH1192   0.00 3.78 3.78  0.21  25.26  Sill 5 Exploration
CH1193   0.00 3.99 3.99  3.83  10.85  Sill 5 Exploration
CH1193 including 2.16 2.47 0.30  40.42  74.12  Sill 5 Exploration
CH1194   0.00 2.04 2.04  87.23  67.27  665 Sublevel (Eileen)  
CH1194 including 0.00 0.61 0.61  147.84  97.22  665 Sublevel (Eileen)  
CH1195   0.00 2.07 2.07  0.37  55.17  665 Sublevel (Eileen)  
CH1196   0.00 4.42 4.42  1.42  10.20  Sill 5 Exploration
CH1197   0.00 4.24 4.24  0.33  15.04  Sill 5 Exploration
CH1198   0.00 2.68 2.68  24.28  40.32  665 Sublevel (Eileen)  
CH1199   0.00 2.38 2.38  14.50  31.68  665 Sublevel (Eileen)  
CH1200   0.00 2.59 2.59  10.15  4.66  665 Sublevel (Eileen)  
CH1201   0.00 1.83 1.83  6.61  5.62  665 Sublevel (Eileen)  
CH1202   0.00 1.83 1.83  88.88  119.20  665 Sublevel (Eileen)  
CH1202 including 0.91 1.83 0.91  176.69  38.88  665 Sublevel (Eileen)  
CH1203   0.00 0.91 0.91  90.69  219.46  Sill 5 Exploration
CH1203 including 0.46 0.91 0.46  175.80  420.47  Sill 5 Exploration
CH1204   0.00 3.08 3.08  21.21  91.58  Sill 5 Exploration
CH1204 including 2.41 3.08 0.67  305.45  554.44  Sill 5 Exploration
CH1205   0.00 2.59 2.59  160.08  111.16  665 Sublevel (Eileen)  
CH1205 including 0.91 1.46 0.55  672.03  0.01  665 Sublevel (Eileen)  
CH1205 and 1.46 1.83 0.37  91.09  444.60  665 Sublevel (Eileen)  
CH1206   0.00 1.83 1.83  226.53  155.96  Sill 5 Exploration
CH1206 including 0.91 1.46 0.55  672.03  0.01  Sill 5 Exploration
CH1206 and 1.46 1.83 0.37  91.09  444.60  Sill 5 Exploration
CH1208   0.00 2.26 2.26  44.20  6.18  665 Sublevel (Eileen)  
CH1208 including 0.67 1.34 0.67  148.58  20.78  665 Sublevel (Eileen)  
CH1209   0.00 1.95 1.95  55.91  7.79 665 Sublevel (Eileen)
CH1209 including 1.22 1.95 0.73  148.58  20.77 665 Sublevel (Eileen)
CH1210   0.00 2.68 2.68 0.94 0.00 665 Sublevel (Eileen)
CH1212   0.00 2.77 2.77  104.26  33.05 665 Sublevel (Eileen)

 

Tintic Project110January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1212 including 0.49 1.25 0.76  378.61  88.79 665 Sublevel (Eileen)
CH1213   0.00 2.23 2.23  9.04  71.94 Sill 6 Development
CH1214   0.00 2.29 2.29  36.04  7.11 665 Sublevel (Eileen)
CH1214 including 1.52 1.83 0.30  194.79  -    665 Sublevel (Eileen)
CH1215   0.00 2.13 2.13  71.62  31.17 665 Sublevel (Eileen)
CH1215 including 1.22 1.83 0.61  150.29  74.56 665 Sublevel (Eileen)
CH1217   0.00 1.07 1.07  2.89  119.58 Sill 6 Development
CH1220   0.00 2.44 2.44  49.86  32.88 665 Sublevel (Eileen)
CH1220 including 0.76 1.68 0.91  132.19  87.69 665 Sublevel (Eileen)
CH1221   0.00 0.91 0.91  4.53  -    Sill 6 Development
CH1222   0.00 0.76 0.76  1.20  -    Sill 6 Development
CH1223   0.00 0.76 0.76  0.07  14.80 Sill 6 Development
CH1224   0.00 0.91 0.91  2.78  33.70 Sill 6 Development
CH1225   0.00 0.88 0.88  2.02  41.89 Sill 6 Development
CH1226   0.00 0.91 0.91  0.99  8.71 Sill 6 Development
CH1227   0.00 0.91 0.91  0.72  -    Sill 6 Development
CH1228   0.00 3.35 3.35  503.78 2,586.22 Raise 1 Pillar Cut 1
CH1228 including 1.52 2.74 1.22  1,375.03 6,994.86 Raise 1 Pillar Cut 1
CH1229   0.00 2.56 2.56  0.92  20.60 Raise 1 Pillar Cut 1
CH1230   0.00 3.35 3.35  84.31  440.85 Raise 1 Pillar Cut 1
CH1230 including 0.00 0.61 0.61  422.03 2,129.12 Raise 1 Pillar Cut 1
CH1231   0.00 1.77 1.77  38.17  98.27 Raise 1 Pillar Cut 1
CH1231 including 0.40 0.85 0.46  118.81  168.78 Raise 1 Pillar Cut 1
CH1233   0.00 1.83 1.83  25.86  93.82 Raise 1 Pillar Cut 1
CH1234   0.00 1.74 1.74  81.11  124.01 Raise 1 Pillar Cut 1
CH1234 including 0.00 0.34 0.34  311.07  357.52 Raise 1 Pillar Cut 1
CH1235   0.00 2.19 2.19  6.77  1.50 Raise 1 Pillar Cut 1
CH1235 including 0.91 1.16 0.24  44.53  9.36 Raise 1 Pillar Cut 1
CH1236   0.00 1.77 1.77  56.12  192.29 Raise 1 Pillar Cut 1
CH1236 including 0.91 1.16 0.24  372.27 1,329.79 Raise 1 Pillar Cut 1
CH1237   0.00 1.68 1.68  234.46  186.92 Raise 1 Pillar Cut 1
CH1237 including 0.61 0.91 0.30  1,272.44 1,003.57 Raise 1 Pillar Cut 1
CH1238   0.00 1.49 1.49  368.37  742.56 Raise 1 Pillar Cut 1
CH1238 including 0.27 1.19 0.91  598.32 1,212.00 Raise 1 Pillar Cut 1
CH1239   0.00 1.52 1.52  4.91  19.46 Raise 1 Pillar Cut 1
CH1240   0.00 1.62 1.62  11.71  48.50 Raise 1 Pillar Cut 1
CH1240 including 0.00 0.24 0.24  46.31  131.78 Raise 1 Pillar Cut 1
CH1241   0.00 2.83 2.83  3.74  21.18 Raise 1 Pillar Cut 1
CH1242   0.00 1.95 1.95  3.12  0.72 665 (Eileen) Ramp
CH1243   0.00 2.29 2.29  28.85  28.69 665 (Eileen) Ramp
CH1243 including 1.52 2.29 0.76  85.09  75.39 665 (Eileen) Ramp
CH1245   0.00 2.16 2.16  63.97  15.54 665 (Eileen) Ramp
CH1246   0.00 1.22 1.22  4.48  -    Raise 1 Pillar Cut 1
CH1247   0.00 1.37 1.37  468.80 1,113.03 Raise 1 Pillar Cut 1
CH1247 including 0.46 1.37 0.91  656.15 1,582.72 Raise 1 Pillar Cut 1
CH1248   0.00 2.29 2.29  14.94  56.36 Raise 1 Pillar Cut 1

 

Tintic Project111January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1249   0.00 2.13 2.13  47.78  32.05 665 (Eileen) Ramp
CH1250   0.00 2.19 2.19  29.53  22.96 665 (Eileen) Ramp
CH1251   0.00 3.17 3.17  23.70  20.73 665 (Eileen) Ramp
CH1252   0.00 0.76 0.76  1,091.44  79.14 Sill 6 Development
CH1252 including 0.00 0.34 0.34  2,455.35  158.95 Sill 6 Development
CH1253   0.00 1.83 1.83  50.10  30.89 665 (Eileen) Ramp
CH1254   0.00 0.98 0.98  1,237.85  95.44 Sill 6 Development
CH1254 including 0.00 0.46 0.46  2,637.71  185.16 Sill 6 Development
CH1255   0.00 0.76 0.76  1,700.62  131.19 Sill 6 Development
CH1255 including 0.00 0.37 0.37  3,539.06  265.43 Sill 6 Development
CH1256   0.00 0.91 0.91  3,901.32  78.71 Sill 6 Development
CH1256 including 0.00 0.46 0.46  7,765.62  124.89 Sill 6 Development
CH1257   0.00 1.34 1.34  642.74  47.40 Sill 6 Development
CH1257 including 0.91 1.34 0.43  1,549.64  106.48 Sill 6 Development
CH1258   0.00 0.91 0.91  637.91  113.70 Sill 6 Development
CH1258 including 0.00 0.30 0.30  1,833.74  231.04 Sill 6 Development
CH1259   0.00 2.32 2.32  12.25  8.56 665 (Eileen) Ramp
CH1260   0.00 1.77 1.77  186.40  22.54 Sill 6 Development
CH1260 including 1.55 1.77 0.21  1,477.34  116.01 Sill 6 Development
CH1261   0.00 1.37 1.37  9.12  7.45 665 (Eileen) Ramp
CH1262   0.00 0.91 0.91  15.70  39.36 Sill 6 Development
CH1263   0.00 1.52 1.52  1.40  21.97 Sill 6 Development
CH1264   0.00 2.74 2.74  90.07  31.49 665 (Eileen) Ramp
CH1264 including 1.34 1.95 0.61  399.25  128.42 665 (Eileen) Ramp
CH1265   0.00 3.51 3.51  1.01  16.15 665 (Eileen) Ramp
CH1266   0.00 1.22 1.22  2.83  14.19 Sill 6 Development
CH1267   0.00 3.05 3.05  295.26  56.23 665 (Eileen) Ramp
CH1267 including 2.13 2.74 0.61  1,468.70  280.94 665 (Eileen) Ramp
CH1268   0.00 2.50 2.50  10.91  124.74 Raise 1 Pillar Cut 2
CH1268 including 0.61 0.85 0.24  77.79  879.67 Raise 1 Pillar Cut 2
CH1269   0.00 2.59 2.59  110.04  48.01 665 (Eileen) Ramp
CH1269 Including 1.95 2.59 0.64  397.29  146.11 665 (Eileen) Ramp
CH1270   0.00 2.96 2.96  6.89  6.05 665 (Eileen) Ramp
CH1271   0.00 1.22 1.22  642.30  655.67 Sill 6 Development
CH1271 including 0.30 0.61 0.30  2,464.66 2,473.95 Sill 6 Development
CH1272   0.00 1.19 1.19  33.92  95.07 Sill 6 Development
CH1272 including 0.91 1.19 0.27  93.86  306.96 Sill 6 Development
CH1273   0.00 2.29 2.29  53.66  50.21 665 (Eileen) Ramp
CH1273 including 0.98 1.55 0.58  204.39  157.66 665 (Eileen) Ramp
CH1274   0.00 2.50 2.50  47.41  35.41 665 (Eileen) Ramp
CH1274 including 0.91 1.52 0.61  173.64  145.18 665 (Eileen) Ramp
CH1275   0.00 1.37 1.37  32.15  82.81 Raise 1 Pillar Cut 2
CH1275 including 0.76 0.91 0.15  278.03  745.29 Raise 1 Pillar Cut 2
CH1276   0.00 2.80 2.80  85.56  30.73 665 (Eileen) Ramp
CH1276 including 0.18 0.91 0.73  223.79  60.06 665 (Eileen) Ramp
CH1277   0.00 1.10 1.10  0.38  2.73 Raise 1 Pillar Cut 2

 

Tintic Project112January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1278   0.00 1.22 1.22  3.53  13.82 Sill 6 Development
CH1279   0.00 1.07 1.07  27.14  29.97 Sill 6 Development
CH1281   0.00 1.34 1.34  11.71  29.09 Sill 6 Development
CH1282   0.00 1.52 1.52  4.75  -    Sill 6 Development
CH1283   0.00 1.28 1.28  0.22  2.06 Raise 1 Pillar Cut 2
CH1286   0.00 2.38 2.38  43.87  59.86 665 (Eileen) Ramp
CH1286 including 0.73 1.46 0.73  133.94  173.47 665 (Eileen) Ramp
CH1287   0.00 1.16 1.16  287.29  488.60 Raise 1 Pillar Cut 2
CH1287 including 0.21 0.52 0.30  974.15  608.50 Raise 1 Pillar Cut 2
CH1287 and 0.82 0.98 0.15  167.84 2,278.57 Raise 1 Pillar Cut 2
CH1287 and 0.98 1.16 0.18  51.29  137.02 Raise 1 Pillar Cut 2
CH1288   0.00 1.34 1.34  23.13  38.83 Raise 1 Pillar Cut 2
CH1288 including 0.30 0.58 0.27  107.92  148.17 Raise 1 Pillar Cut 2
CH1290   0.00 1.19 1.19 0.53 10.07 Raise 1 Pillar Cut 2
CH1291   0.00 1.31 1.31  171.16  410.98  Raise 1 Pillar Cut 2
CH1291 including 0.46 0.79 0.34  661.95 1,557.18  Raise 1 Pillar Cut 2
CH1292   0.00 1.83 1.83  7.64  82.53 Raise 1 Pillar Cut 2
CH1293   0.00 1.52 1.52  8.82  56.64 Sill 7 Development
CH1294   0.00 2.13 2.13  3.97  30.04 Raise 1 Pillar Cut 2
CH1295   0.00 1.52 1.52  42.96  164.95 Raise 1 Pillar Cut 2
CH1298   0.00 1.07 1.07  220.33  61.32 Sill 7 Development
CH1298 including 0.61 0.76 0.15  1,227.49  244.77 Sill 7 Development
CH1299   0.00 0.91 0.91  184.26  371.38 Sill 7 Development
CH1300   0.00 1.71 1.71  83.57  53.82 Sill 7 Development
CH1300 including 0.70 1.10 0.40  262.70  109.63 Sill 7 Development
CH1302   0.00 2.13 2.13  484.51  248.55 625 Level Sill
CH1302 including 0.91 1.46 0.55  1,296.40  108.88 625 Level Sill
CH1302 and 1.46 2.13 0.67  421.38  672.31 625 Level Sill
CH1303   0.00 2.10 2.10  25.98  50.18 Sill 7 Development
CH1304   0.00 1.22 1.22  122.23  194.72 Sill 7 Development
CH1304 including 0.00 0.91 0.91  149.57  246.35 Sill 7 Development
CH1312   0.00 2.44 2.44  99.17  112.82 665 (Eileen) Historic
CH1313   0.00 2.59 2.59  1.50  36.82 665 (Eileen) Historic
CH1314   0.00 1.68 1.68  15.66  56.52 665 (Eileen) Historic
CH1314 including 0.00 0.37 0.37  44.02  79.88 665 (Eileen) Historic
CH1315   0.00 2.56 2.56  124.03  170.03 Raise 1 Pillar Cut 1
CH1315 including 0.00 0.85 0.85  182.28  224.75 Raise 1 Pillar Cut 1
CH1315 and 0.85 1.28 0.43  353.72  512.55 Raise 1 Pillar Cut 1
CH1316   0.00 2.65 2.65  167.92  382.17 Raise 1 Pillar Cut 1
CH1316 including 0.00 0.43 0.43  171.36  248.20 Raise 1 Pillar Cut 1
CH1316 and 0.43 0.76 0.34  1,013.55 2,125.38 Raise 1 Pillar Cut 1
CH1317   0.00 2.44 2.44  310.45 1,399.20 Raise 1 Pillar Cut 1
CH1317  ncluding 0.49 0.91 0.43  1,058.14 6,294.04 Raise 1 Pillar Cut 1
CH1317 and 1.52 2.01 0.49  489.61  957.56 Raise 1 Pillar Cut 1
CH1318   0.00 2.01 2.01  502.85  778.59 Raise 1 Pillar Cut 1
CH1318 including 0.24 0.88 0.64  683.61 1,799.52 Raise 1 Pillar Cut 1

 

Tintic Project113January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1318 and 0.88 1.52 0.64  883.89  632.05 Raise 1 Pillar Cut 1
CH1319   0.00 2.38 2.38  138.75  474.86 Raise 1 Pillar Cut 1
CH1319 including 1.16 2.38 1.22  216.01  733.90 Raise 1 Pillar Cut 1
CH1320   0.00 1.74 1.74 453.34 1,299.79 Raise 1 Pillar Cut 1
CH1320 including 0.30 1.25 0.94  844.67 2,428.18 Raise 1 Pillar Cut 1
CH1321   0.00 2.07 2.07 270.90 273.11 Raise 1 Pillar Cut 1
CH1321 including 0.61 1.58 0.98  188.14  164.24 Raise 1 Pillar Cut 1
CH1321 and 1.58 2.07 0.49  721.53  611.48 Raise 1 Pillar Cut 1
CH1322   0.00 1.98 1.98  405.91  641.26 Raise 1 Pillar Cut 1
CH1322 including 1.37 1.98 0.61  1,297.91 2,034.66 Raise 1 Pillar Cut 1
CH1323   0.00 2.62 2.62  331.03  215.94 Raise 1 Pillar Cut 1
CH1323 including 0.37 0.73 0.37  1,101.03  217.00 Raise 1 Pillar Cut 1
CH1323 and 1.65 2.62 0.98  376.38  408.78 Raise 1 Pillar Cut 1
CH1324   0.00 4.57 4.57  352.65  446.22 Raise 1 Pillar Cut 1
CH1324 including 1.52 3.05 1.52  220.64  310.56 Raise 1 Pillar Cut 1
CH1324 and 3.05 3.96 0.91  1,198.70 1,358.69 Raise 1 Pillar Cut 1
CH1325   0.00 3.66 3.66  335.08  333.77 Raise 1 Pillar Cut 1
CH1325 including 1.52 2.13 0.61  155.50  134.59 Raise 1 Pillar Cut 1
CH1325 and 2.13 3.05 0.91  1,182.79 1,146.31 Raise 1 Pillar Cut 1
CH1326   0.00 2.87 2.87  1,042.03  498.82 Raise 1 Pillar Cut 1
CH1326 including 1.22 1.43 0.21  462.40  339.59 Raise 1 Pillar Cut 1
CH1326 and 2.04 2.87 0.82  3,419.93 1,587.57 Raise 1 Pillar Cut 1
CH1328   0.00 2.59 2.59  531.46  648.34 Raise 1 Pillar Cut 1
CH1328 including 2.13 2.59 0.46  1,888.17 2,942.92 Raise 1 Pillar Cut 1
CH1329   0.00 2.32 2.32  210.91  394.45 Raise 1 Pillar Cut 1
CH1329 including 1.22 1.31 0.09  96.78  81.04 Raise 1 Pillar Cut 1
CH1329 and 1.92 2.32 0.40  1,180.43 2,262.29 Raise 1 Pillar Cut 1
CH1332   0.00 1.22 1.22  200.91  134.52 Sill 8 Development
CH1332 including 0.00 0.30 0.30  311.21  156.36 Sill 8 Development
CH1332 and 0.30 0.76 0.46  239.05  -    Sill 8 Development
CH1333   0.00 0.61 0.61  41.34  -    Sill 8 Development
CH1335   0.00 2.23 2.23  20.29  81.28 665 (Eileen) Historic
CH1336   0.00 2.74 2.74  95.79  124.53 665 (Eileen) Historic
CH1336 including 1.22 2.07 0.85  118.17  195.72 665 (Eileen) Historic
CH1337   0.00 2.74 2.74  96.96  118.82 Raise 1 Pillar Cut 2
CH1337 including 0.00 0.91 0.91  287.97  323.96 Raise 1 Pillar Cut 2
CH1338   0.00 2.07 2.07  24.95  65.18 Raise 1 Pillar Cut 2
CH1339   0.00 1.83 1.83  67.92  141.35 Raise 1 Pillar Cut 2
CH1339 including 0.55 1.28 0.73  123.76  261.16 Raise 1 Pillar Cut 2
CH1340   0.00 1.83 1.83  470.19  821.04 Raise 1 Pillar Cut 2
CH1340 including 0.00 0.61 0.61  1,323.93 2,143.81 Raise 1 Pillar Cut 2
CH1341   0.00 1.83 1.83  106.86  340.34 Raise 1 Pillar Cut 2
CH1341 including 0.00 0.21 0.21  622.70 1,960.99 Raise 1 Pillar Cut 2
CH1346   0.00 2.90 2.90  473.14 1,371.28 Raise 1 Pillar Cut 2
CH1346 including 1.22 1.98 0.76  1,753.17 5,095.23 Raise 1 Pillar Cut 2
CH1347   0.00 6.10 6.10  288.82  249.84 665 (Eileen) Historic

 

Tintic Project114January 27, 2023
 

 

 

Osisko Development Corp.

 

Site ID Depth from
(m)
Depth to
(m)
Length
(m)

Au

(g/t)

Ag

(g/t)

Development Area
CH1347 including 1.22 2.44 1.22  880.36  263.25 665 (Eileen) Historic
CH1348   0.00 2.50 2.50  364.44  312.88 Raise 1 Pillar Cut 2
CH1348 including 1.43 2.04 0.61  1,470.35 1,222.90 Raise 1 Pillar Cut 2
CH1349   0.00 2.74 2.74  697.81  731.43 Raise 1 Pillar Cut 2
CH1349 including 0.91 1.83 0.91  1,721.84 1,816.49 Raise 1 Pillar Cut 2
CH1350   0.00 2.44 2.44  144.94  134.50 Raise 1 Pillar Cut 2
CH1350 including 1.52 2.44 0.91  245.15  222.63 Raise 1 Pillar Cut 2
CH1351   0.00 2.29 2.29  2,311.18 1,146.46 Raise 1 Pillar Cut 2
CH1351 including 1.37 2.29 0.91  5,524.28 2,673.83 Raise 1 Pillar Cut 2
CH1352   0.00 2.68 2.68  557.17  370.45 Raise 1 Pillar Cut 2
CH1352 including 1.77 2.38 0.61  1,865.07 1,366.68 Raise 1 Pillar Cut 2
CH1355   0.00 2.13 2.13  1,633.69 1,615.74 Raise 1 Pillar Cut 2
CH1355 including 1.52 2.13 0.61  5,012.31 3,441.76 Raise 1 Pillar Cut 2

Table provided by Osisko Development.

 

9.5QP Comments

 

Micon’s QP discussed the Trixie sampling practices and procedures with Project personnel, as well as observing the underground face chip sampling during the September, 2022 site visit. Micon’s QP believes that the Trixie sampling practices and procedures are managed according to the Exploration Best Practice Guidelines established by the CIM. Micon’s QP also believes that the samples derived from the underground chip sampling practices are appropriately taken, recorded and located, and are suitable for use in the estimation of mineral resources.

 

Tintic Project115January 27, 2023
 

 

 

Osisko Development Corp.

 

10.0   Drilling

 

10.1Drilling Methodology

 

10.1.1Surface RC Drilling

 

Schramm 480 and Schramm 625 truck, track and buggy mounted RC drill rigs were used to complete the surface drilling.

 

All surface holes were cased through overburden. Both centre-feed and regular-feed, 4 ½” RC hammers were used during penetration, as well as tri-cone bits, as warranted by the ground conditions. A lobed interchange was used or removed as needed to control drillhole deviation.

 

All drill holes were drilled wet, using water and drilling muds to reduce dust and stabilize the drill holes. Intervals with little to no return or sample material were recorded as “NS” for “No Sample”.

 

Chip samples were collected continuously in every 5-foot run from a drill-mounted cyclone, using a 30/70 splitter. Thirty percent of the continuous sample was collected in cloth filter bags for assay, while seventy percent was collected in 20”x30” clear plastic poly bags, as a reject to be retained on site. A small fraction of chips was caught by a metal mesh sieve and saved in plastic chip sample trays for logging on site.

 

Samples were sent to ALS Geochemistry’s (ALS) Reno and Elko, Nevada, laboratories, for independent third-party sample preparation, with analysis by fire assay, multi-element four-acid digest, and screen metallics. All assay batches include full QA/QC standard and blank inserts. ALS laboratories are independent assaying facilities which have ISO/IEC 17025:2017 accredited methods in North America.

 

10.1.2Underground Diamond Drilling

 

Both U6 and Versa diamond drill rigs were used to complete the underground drilling.

 

All underground holes were collared using a HQ core size, with the expectation of obtaining HQ core across the targeted mineralized zones. Some holes were reduced a NQ core size across targeted zones, where ground conditions necessitated this reduction.

 

Geological logging and sampling were completed onsite, with all samples comprised of half core dispatched to ALS’s Reno and Elko laboratories for third party sample preparation and analysis by fire assay, multi-element four-acid digest, and screen metallics. All assay batches include full QA/QC standard and blank inserts.

 

10.22022 Drilling Program

 

10.2.1Surface RC Drilling

 

Surface RC drilling of the Trixie Deposit (T1, T2, T3, T4, and 75-85 mineralized zones) commenced in July, 2022. Layne Christensen Company (Layne) was the drilling contractor for this program and drilled until December, 2022. Layne completed 6,937.25 m (22,760 ft) of RC drilling in 21 drill holes by early December, 2022 when the program terminated. Figure 10.1 is a photograph of the RC drill rig. Drilling locations are presented in Figure 10.2.

 

Tintic Project116January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 10.1
Surface RC Drill Rig

 

Micon site visit photograph.

 

10.2.2Underground Diamond Drilling

 

The 2022 underground diamond drilling program on the Trixie Deposit (T1, T2, T3, T4, and 75-85 mineralized zones) recommenced on April 1, 2022, with the arrival of American Drilling Corp, LLC. (American Drilling) on site. At the time of its August 14, 2022, departure from site, American Drilling had completed 975.97 m (3,202 ft) of underground diamond drilling in 18 drill holes.

 

On October 3, 2022, Nasco Industrial Services and Supply LLC. (NISS) commenced drilling the Trixie deposit and, by December 19, 2022, had completed 990.6 m (3,250 ft) of underground diamond drilling in 28 drill holes.

 

Underground holes were drilled in vertical fans oriented semi-orthogonally to the strike of the T2 and T4 mineralized zones. Multiple fans were drilled from each underground drill bay with both up and down holes ranging from dips of +70° to -70° and depths from 9.3 m to 152 m (30.5 to 499 ft), averaging 43 m (140 ft) per hole.

Tintic Project117January 27, 2023
 

 

 

Osisko Development Corp.

 

During the 2022 underground diamond drilling program, 1,966.57 m (6,452 ft) of drilling were completed on the Trixie Deposit, across 46 drill holes. Drilling locations are presented in Figure 10.3.

 

Figure 10.2
2022 Surface Reverse Circulation Drill Hole Collar Locations

 

Figure provided by Osisko Development.

 

Tintic Project118January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 10.3
2022 Underground Diamond Drill Hole Collar Locations

 

Figure provided by Osisko Development.

 

10.2.3Drilling Highlights and Results

 

At the time of writing, assay results from 8 RC drill holes from the 2022 surface drilling program have been received and are summarized in Table 10.1. A total of four of the surface RC drill holes had no significant assays and one-hole, TRC053, was abandoned. A total of 14 underground diamond drill hole mineralized intersections were returned at the time of report writing. Assay highlights from the underground diamond drilling program are summarized in Table 10.2. Cross-section locations for surface and underground drilling are presented in Figure 10.4 to Figure 10.7.

 

Tintic Project119January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 10.1
2022 Surface RC Drilling Assay Highlights in US Measurement Units

 

Hole_Number Depth_From (ft) Depth_To (ft) Length (ft) Au (ppm) Ag (ppm)
TRC040 605.00 615.00 10.00 0.07 103.85
TRC048 1,095.00 1,100.00 5.00 0.32 88.00
1,305.00 1,310.00 5.00 0.23 74.60
TRC052 515.00 530.00 15.00 0.66 29.33

Table provided by Osisko Development.

 

Table 10.2
2022 Underground Diamond Drilling Assay Highlights in US Measurement Units

 

Hole_Number Depth_From (ft) Depth_To (ft) Length (ft) Au (ppm) Ag (ppm)
TUG-625-027   223.00 226.00 3.00 1.45 23.60
TUG-625-028   32.70 35.70 3.00 1.35 20.70
  126.00 126.70 0.70 1.28 78.60
  134.20 135.40 1.20 10.70 155.00
  135.40 137.30 1.90 1.43 18.65
TUG-625-029   4.00 7.50 3.50 2.50 21.93
  121.50 134.00 12.50 25.95 21.48
including 124.00 129.00 5.00 43.00 41.80
TUG-625-030A 22.00 30.50 8.50 3.07 12.93
TUG-625-050   97.90 106.00 8.10 14.97 113.85
including 102.50 106.00 3.50 25.50 90.00
TUG-625-056   40.50 42.00 1.50 0.12 21.70
TUG-625-057   39.00 40.00 1.00 0.12 25.50
  79.00 88.00 9.00 0.09 44.30
TUG-625-058   33.70 37.00 3.30 0.11 30.30
  103.00 117.00 14.00 0.24 114.80
including 103.00 107.60 4.60 0.57 305.00
TUG-625-060   105.00 122.50 17.50 12.58 439.26
TUG-625-064   150.60 154.20 3.60 3.09 9.99
TUG-625-065   177.70 181.70 4.00 264.00 511.00
TUG-625-066   13.50 17.50 4.00 1.48 28.90
  58.00 63.00 5.00 3.55 8.48
  83.00 91.50 8.50 2.29 16.06
TUG-625-069   84.00 88.00 4.00 65.50 84.30
including 86.00 87.00 1.00 231.00 246.00
TUG-625-070   108.70 111.30 2.60 2.17 66.50

Table provided by Osisko Development.

 

Tintic Project120January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 10.4
2022 Surface RC Drilling Locations for TRC040, TRC048 and TRC082. Looking 000

 

 

Figure provided by Osisko Development.

 

Tintic Project121January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 10.5
Underground Diamond Drilling Assay Locations for TUG-625-060, TUG-625-064, TUG-625-065, TUG-625-066, TUG-625-069. Looking 027

 

Figure provided by Osisko Development.

 

Tintic Project122January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 10.6
2022 Underground Diamond Drilling Assay Locations for TUG-625-27, TUG-625-28, TUG-625-29, TUG-625-30A, TUG-625-50, TUG-625-70.
Looking 000

 

Figure provided by Osisko Development.

 

Tintic Project123January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 10.7
2022 Underground Diamond Drilling Assay Locations for TUG-625-056, TUG-625-057, TUG-625-058. Looking 000.

 

 

Figure provided by Osisko Development.

 

Tintic Project124January 27, 2023
 

 

 

Osisko Development Corp.

 

10.3Additional Drilling Considerations

 

Difficult drilling conditions addressed in previous reports have continued to be a hallmark of the RC and diamond drilling programs at Trixie. Although recovery in the diamond drilling program averages a reasonable 90.1%, the core suffers significant destruction during the drilling process, resulting in difficult interpretations of significant mineralized structures, and increased uncertainty in the rock quality designation and recovery data. Broken ground, significant faulting and hard abrasive lithologies have resulted in slow sample production and further compromised the structural interpretation. Average RC production of 27.4 m (90 ft) per day and diamond drill production of 9.4 m (31 ft) per day were typical of the 2022 program. This led to all-in drilling costs around $200/ft. In addition, the lack of structural data made true-width relationships difficult to determine from the drilling.

 

Slow turn-around times of 60 to 90 days at the assay laboratories have resulted in a significant lack of assay data at the time of writing and have prevented the inclusion of many diamond drill and RC holes in the resource estimate presented in Section 14.0.

 

A significant difference in assay grade is seen between the drilling results and results taken from underground face sampling. RC and diamond drilling samples, highlighted in Table 10.1 and Table 10.2 showed maximum assay result of 264 g/t gold (7.7 oz/t gold), whereas underground samples typically show grades in 100’s to 1,000’s of grams per tonne (10’s to 100’s troy ounces per ton). These differences are in the process of being investigated and assessed. It is to be noted, however, that continuous chip sampling along the faces of the T2 and cross-cuts is possible through underground development, whereas the underground diamond drilling presents challenging conditions but is able to accurately identify the T2 structure. The expression, “Drill for structure, mine for grade” can be applied at Trixie.

 

10.4Drilling Program Recommendations

 

Further underground diamond drilling is recommended at Trixie for 2023. A focus on step-outs to the south along the 625 level, approaching the Sioux-Ajax fault, will provide significant opportunity to extend the strike of the Trixie mineralized zone. Additional exploration drifting in this direction will be necessary, in order to continue the exploration program. Furthermore, rehabilitating access to the 750 level will expand the drilling capabilities, allowing for deeper, down-dip targeting. Rehabilitation should be prioritized early in 2023. It is recommended that two diamond drill rigs are secured, in order to start the 2023 program, with a third diamond drill rig to be brought online once access to the 750 level is established.

 

Once underground exploration drilling to the south is advanced, additional follow-up drilling of targets to the north of Trixie is also recommended. Exploration drilling to the east, to identify any parallel mineralized structures that lie between the Trixie and the Eureka Lilly fault, is also recommended.

 

Further RC drilling is not recommended at this time at Trixie. Difficult ground conditions and a thick non-prospective overlying layer of quartz-latite have resulted in prohibitively high drilling costs, slow production, and poor data recovery. RC drilling may be useful for broader step-out drilling around Trixie and should be reconsidered following the analysis of the results from the 2023 underground diamond drilling program.

 

Tintic Project125January 27, 2023
 

 

 

Osisko Development Corp.

 

10.5Micon QP Comments

 

Micon’s QP reviewed the drilling and sampling procedures at Trixie during the site visit and in further discussions with Osisko Development personnel. Micon’s QP believes, that despite the challenges encountered during the Trixie drilling programs, the drilling and sampling procedures have been and are being conducted with industry best practices in mind, such as those outlined by CIM. Therefore, the drilling can be appropriately included as part of the database which serves as the basis for the current and future mineral resource estimates.

 

 

 

 

 

Tintic Project126January 27, 2023
 

 

 

Osisko Development Corp.

 

11.0   Sample preparation, analyses and security

 

11.1Introduction

 

The following section describes the preparation, analysis and security procedures used for all underground face chip and drill core samples collected during 2022 at the Trixie test mine which are used in the current resource estimate. Samples collected prior to 2022 and which are included in the current resource estimate were validated by Dr. Thomas A. Henricksen QP, C.P.G. and are considered to meet generally accepted industry standards for sample preparation, analysis, QA/QC and security protocols. Micon’s QP has reviewed the material related to the samples validated by Dr. Henricksen and believes that they meet generally accepted industry standards, as outlined by CIM, and are therefore suitable to be used as the basis for a mineral resource estimate.

 

11.2Sample Handling and Security

 

Sample handling and security procedures are managed by TCM personnel. These procedures are described below.

 

11.2.1Underground Chip Sampling

 

All underground chip samples are collected by TCM mine geologists from each of the active faces during each shift, as required. Chip samples are collected and do not exceed 0.91 m (3 ft) in length. The face is washed for safety, and for better identification of mineralization, alteration and structures. The hangingwall and footwall of the structures are marked on the face and back. Sample intervals are marked up and follow lithological contacts. Samples are transported by the geologist from the Trixie test mine to the onsite Tintic laboratory at the Burgin administrative complex.

 

11.2.2Drill Core Sampling

 

Following extraction from the core tube, underground diamond drill core is placed in wax-impregnated core boxes with depths marked by wooden marking blocks. The boxes are labelled with the drill hole number, the box number, and the depth interval, then lidded and taped shut. Boxes are brought to surface daily by miners and picked up by TCM logging geologists and geotechnicians and delivered to the TCM logging facility.

 

At the core logging facility, drill core is marked with footage depths and recovery and rock quality are measured and recorded. Geologic and geotechnical information is logged and input into Datamine’s DHLogger software and synchronized to a central database. Sample intervals are marked with aluminum tags and unique sample identification numbers, and input into DHLogger, as well. Drill core is then photographed and sent to the core cutting facility.

 

TCM core cutters half-cut the drill core using an Almonte Automated Core Saw. Half the core is placed back in the core box and the other half is placed in a calico or plastic sample bag, labelled with the corresponding sample identification number. Boxes of half-cut core are palleted and moved to core storage. Sample bags are moved to a staging area for dispatch to an analytical laboratory.

 

Tintic Project127January 27, 2023
 

 

 

Osisko Development Corp.

 

During staging for dispatch, standard and blank samples are inserted into the sample sequence for QA/QC. Bagged samples are then placed in rice bags in groups of five to ten samples, depending on weight. Rice bags are labelled with a unique shipment ID and sequential numbering (eg: Bag 1, Bag 2) A sample list and sample submittal form are inserted into the first bag for each shipment, then bags are sealed with metal ties, loaded on pallets, and secured using clear shrink wrap. All samples are shipped to ALS Analytical Laboratories via Old Dominion Shipping. Copies of a manifest and chain of custody form are given to TCM and Old Dominion.

 

11.2.3Reverse Circulation Drill Chip Sampling

 

During the RC drilling process, rock chips are lifted to surface with air and water pressure. Chips are run through a cyclone attachment on the drill tower, fitted with splitters which cause a 1:2 split of the chips. At five-foot intervals, a third of the chips is separated into cloth filter bags for sampling, while two thirds are separated in polyethylene bags for storage as reject material. Once per five-foot interval, a coarse mesh sieve is inserted into the reject outflow from the cyclone to collect a small, representative chip sample. This sample is placed in chip sample trays for logging. Once per fifty-foot interval, an additional splitter is added to the cyclone to divide the sampled chips into a sample and a duplicate for QA/QC purposes. Any water overflow from the cyclone outflow is caught with a -80-mesh sieve to prevent the loss of fine material. Bags are sealed and laid out to dry on the drill pad.

 

Sample bags and chip trays are collected from the drill pad by TCM logging geologists and geotechnicians and delivered to the TCM logging facility. Geologic information is logged into Datamine’s DHLogger software and synchronized to a central database. Chip trays are then photographed.

 

During staging for dispatch, standard and blank samples are inserted into the sample sequence for QA/QC. Samples are then placed in rice bags in groups of five to ten samples, depending on weight. The bags then follow the numbering and shipping procedure described above for the core samples.

 

11.3Assay Laboratories Accreditation and Certification

 

11.3.1ALS Laboratory

 

The International Organization for Standardization (ISO) and the International Electrotechnical Commission (IEC) form the specialized system for worldwide standardization. ISO/IEC 17025, General Requirements for the Competence of Testing and Calibration Laboratories, sets out the criteria for laboratories wishing to demonstrate that they are technically competent, operating an effective quality system, and able to generate technically valid calibration and test results. The standard forms the basis for the accreditation of competence of laboratories by accreditation bodies. ISO 9001 applies to management support, procedures, internal audits and corrective actions. It provides a framework for existing quality functions and procedures.

 

All drill core and RC chip samples were submitted to the ALS laboratory in either Twin Falls, Idaho or Elko, Nevada. Analysis of the drill core and RC chip samples was completed in the ALS laboratory in either Reno, Nevada or North Vancouver, British Columbia. These ALS laboratories are ISO 9001 certified and accredited (ISO/IEC 17025) for the analytical methods used routinely on the samples from Trixie. The ALS facilities are commercial laboratories, independent of Osisko Development Corp. and have no interest in the Project.

 

Tintic Project128January 27, 2023
 

 

 

Osisko Development Corp.

 

11.3.2Tintic Laboratory

 

Underground chip samples are submitted to the onsite Tintic laboratory at the Burgin administrative complex. The Tintic laboratory is not a certified analytical laboratory, but the facility is managed by a qualified laboratory manager, with annual auditing by independent technical staff. Inter-laboratory check assays using ALS Laboratory as a third-party independent analysis of samples are routinely carried out as part of ongoing QA/QC work.

 

An independent audit/inspection of the Tintic laboratory facilities was conducted in May, 2022 by Qualitica Consulting Inc. (Qualitica Consulting). A report of recommendations was provided to Osisko Development and implemented. A new preparation laboratory was constructed in 2022 and a full-time laboratory manager is on site to monitor ongoing QA/QC and troubleshoot any issues that arise in the laboratory.

 

11.4Sample Preparation and Assaying

 

11.4.1ALS Sample Preparation

 

The following outlines ALS laboratories sample preparation procedures:

 

·Samples are sorted and logged into the ALS LIMS program.

 

·Samples are dried and weighed.

 

·Samples are crushed to +70% passing 2 mm (CRU-31).

 

·A crushed sample split of up to 500 g is pulverized to +85% passing 75 μm screen (PUL 32m).

 

·Once analysis is complete pulp material is returned to TCM for storage and coarse rejects are disposed of after 90 days.

 

11.4.2ALS Gold Assaying

 

The following outlines ALS laboratories assay procedures used on the Trixie mineralization:

 

·A 50-g pulp aliquot is analyzed by Au-AA26: fire assay followed by aqua regia digestion (HNO3-HCl) with an atomic absorption spectroscopy finish (AAS).

 

·When assay results are higher than 100 g/t Au, a second 50-g pulp aliquot is analyzed by Au-GRA22: fire assay, parting with nitric acid (HNO3) with a gravimetric finish.

 

·Selected samples are analyzed by metallic screen. The +100 μm fraction (Au+) is analyzed in its entirety by fire assay with gravimetric finish. The 100 μm fraction (minus) is homogenized and two subsamples are analyzed by fire assay with AAS (Au-AA25) or gravimetric finish (Au-GRA21). The average of the two minus fraction subsamples is taken and reported as the Au- fraction result. The gold content is then determined by the weighted average of the Au+ and Au- fractions.

 

Tintic Project129January 27, 2023
 

 

 

Osisko Development Corp.

 

11.4.3ALS Multi-Element Assaying

 

The following outlines ALS Laboratories assay procedures used for multi-element assaying:

 

·Some samples are analyzed by trace-level multi-element method ME-MS61: a 0.25-g aliquot is digested by four-acid digestion (HNO3-HClO4-HF-HCl) and HCl leach (method GEO-4A01) and analyzed by ICP-AES.

 

·Following this analysis, the results are reviewed for high concentrations of bismuth, mercury, molybdenum, silver and tungsten and diluted accordingly. Samples meeting these criteria are then analyzed by ICP-MS. Results are corrected for spectral interelement interferences.

 

11.4.4Tintic Laboratory Sample Preparation

 

The Tintic laboratory sample preparation procedures are outlined as follows:

 

·The samples are loaded into a drying oven to remove any moisture.

 

·After drying, the sample order is confirmed on the submittal form. Any discrepancies are brought to the geology group’s attention and resolved.

 

·Each sample is prepared using a belt elevator feeding into a jaw crusher, then directly into a gyratory crusher reducing sample particle size to approximately 3.5 mm.

 

·The sample is then introduced to a rotary splitter to reduce volume and maintain representation of the entire sample. The rotary table has 12 paired pans which are selected randomly until an approximate 2,000-gram split is available for pulverizing.

 

·Pulverizing is achieved by feeding the selected sample split into a vibratory feeder that feeds a disc pulverizer.

 

·The finely ground sample is then introduced to a small Jones splitter and further reduced to approximately 250-grams and inserted into a sample packet, ready for assaying.

 

11.4.5Tintic Laboratory Gold and Silver Assaying

 

The following outlines Tintic Laboratory assay procedures:

 

·Each prepared sample packet is forwarded to the fire assay laboratory, where a routine 1 assay ton assay is performed. This assay uses lead as a collector for any precious metals in the fusion step and then oxidizes the lead using a cupel (magnesia cup) to separate the precious metals from the lead.

 

·The remaining “bead” of precious metals is referred to as a doré bead. The Assayer will tap each Doré with a hammer to remove any residual cupel and then place the bead in a ceramic cup.

 

·The doré beads are then forwarded to the Balance room where each doré is weighed, using a micro-balance and recording the weight.

 

·A 25% concentrate volume of nitric acid is added to each ceramic cup containing a doré bead and placed on a hotplate. The nitric acid dissolves silver leaving only the gold as a solid.

 

·The solution is decanted from the cup, the cup and gold are rinsed with deionized water, and then returned to the hotplate to dry. The dry cup and gold are annealed, and after cooling, the gold is weighed on the micro-balance and weight recorded.

 

Tintic Project130January 27, 2023
 

 

 

Osisko Development Corp.

 

11.5Quality Assurance and Quality Control

 

This section summarizes the 2022 TCM QA/QC program, including the QA/QC procedures used internally at the Tintic laboratory.

 

A total of 2,030 drill core and RC chip samples (including QA/QC samples) were assayed in 2022 at ALS. The 2022 QA/QC program included a routine insertion of standards and blanks. TCM included one standard in every 20 samples and one blank in every 30 samples.

 

A total of 2,851 chip samples (including QA/QC samples) were assayed in 2022 at the Tintic laboratory. The 2022 QA/QC program included a routine insertion of standards and blanks. TCM included one standard in every 10 samples and one blank in every 20 samples.

 

11.5.1Certified Reference Materials (Standards)

 

Accuracy is monitored by adding standards at the rate of one Certified Reference Material (CRM) or Standard for every 20 samples. Standards are used to detect assay problems with specific sample batches and any possible long-term biases in the overall dataset. TCM’s definition of a quality control failure is when:

 

·Assays for a CRM are outside ± three standard deviations (±3SD) or ±10%.

 

·Assays for two consecutive CRMs are outside ±2SD, if one of them is outside ±3SD.

 

11.5.1.1Certified Reference Materials (Standards) at ALS

 

A total of 98 standards were analyzed at ALS during the 2022 drilling programs, for an insertion rate of 4.8%. Fifteen different CRMs from Ore Research and Exploration Pty Ltd. (OREAS) were used. OREAS is an independent Australian based supplier of certified reference materials for the global mining industry since 1988. OREAS is ISO 17034 accredited.

 

In 2022, a total of 8 QC failures were recognized as having insufficient material for analysis. Reruns were not requested as per TCM’s protocol, because the surrounding samples assayed at or below the lower detection limit (0.01 g/t Au).

 

The 2022 average CRM results are all within ±1.5% of the expected values (Table 11.1), except for two CRMs with a limited sample size. All assays were within ±3SD of the accepted value (Figure 10.1).

 

Tintic Project131January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 11.1
ALS Results of Standards used by TCM for the 2022 Drilling Programs

 

CRM Count Expected Au (g/t) Observed Au (g/t) Percent of Expected (%)
Average SD Average SD
OREAS 217 15 0.338 0.010 0.344 0.011 101.8%
OREAS 223 1 1.78 0.045 1.790 N/A 100.6%
OREAS 234 11 1.2 0.030 1.182 0.037 98.5%
OREAS 236 9 1.85 0.059 1.832 0.043 99.0%
OREAS 239 14 3.55 0.086 3.553 0.099 100.1%
OREAS 242 3 8.67 0.215 8.780 0.078 101.3%
OREAS 243 2 12.39 0.306 12.775 0.106 103.1%
OREAS 245 2 25.73 0.546 26.150 1.202 101.6%
OREAS 256 2 7.66 0.238 7.650 0.325 99.9%
OREAS 296 15 2.19 0.057 2.202 0.058 100.5%
OREAS 297 2 17.83 0.396 18.100 0.919 101.5%
OREAS 298 7 34.99 0.832 34.943 1.034 99.9%
OREAS 298 1 89.97 2.232 85.700 N/A 95.3%
OREAS 609b 5 4.97 0.260 5.146 0.138 103.5%
OREAS 610 1 9.83 0.254 9.330 N/A 94.9%
Total 90 Weighted Average 100.38%

Table provided by Osisko Development.

 

Figure 11.1
Example of ALS Results for Standard OREAS 239 for the 2022 Drill Programs

 

 

Figure provided by Osisko Development.

 

11.5.1.2Certified Reference Materials (Standards) at the Tintic Laboratory

 

A total of 326 standards were analyzed at the Tintic laboratory for the 2022 chip sampling program, for an insertion rate of 11.4%. Ten different CRMs from OREAS were used as shown in Table 11.2.

 

Tintic Project132January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 11.2
Standards used by TCM for the 2022 Chip Sampling Program

 

CRM Count
OREAS 217 4
OREAS 223 1
OREAS 240 2
OREAS 245 23
OREAS 256 32
OREAS 296 39
OREAS 297 89
OREAS 298 102
OREAS 299 18
OREAS 610 16
Total 326

Table provided by Osisko Development.

 

A representative portion of the data from the 2022 average CRM results for the Tintic laboratory were reviewed by the QPs during the site visit and were deemed adequate.

 

11.5.2Blank Samples

 

Contamination during preparation is monitored by the routine insertion of coarse barren material (a “blank”), that goes through the same sample preparation and analytical procedures as the core samples. Elevated values for blanks may indicate sources of contamination in the fire assay procedure (contaminated reagents or crucibles) or sample solution carry-over during instrumental finish. The blank sample has been purchased from OREAS in bulk and consists of course silica blank material from the Cassidy Lake occurrence of nearly pure silica sand in New Brunswick, Canada.

 

11.5.2.1Blank Samples Performance at ALS

 

In 2022, 66 blanks were submitted to ALS with the drilling samples, for an insertion rate of 3.3%. All of the blanks analyzed at ALS, assayed less than or equal to 0.1 g/t Au, which is 10 times the detection limit of 0.01 g/t Au. These results are thus considered acceptable. Table 11.3 summarizes the performance of the blanks. Figure 11.2 shows the results graphically.

 

Table 11.3
ALS Results of Blanks used by TCM for the 2022 Drilling Programs

 

Total blanks 66
Minimum Au g/t <0.01
Maximum Au g/t 0.1
Below detection limit (# and %) 48 (72.7%)
QC Failures (# and %) 0 (0.00%)

Table provided by Osisko Development.

 

Tintic Project133January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 11.2
ALS Results of Blanks for the 2022 Drilling Programs

 

 

Figure provided by Osisko Development.

 

11.5.2.2Blank Samples Performance at the Tintic Laboratory

 

In 2022, 146 blanks were submitted to the Tintic laboratory with the chip samples, for an insertion rate of 5.1%. A representative portion of the blanks data was reviewed by the QP during the site visit and results were satisfactory.

 

11.5.3Tintic Laboratory Sample Preparation Quality Assurance Measures

 

Tintic laboratory sample preparation quality assurance measures include dust collection, compressed air blowdown of each piece of equipment and quartz rock “wash” between each sample. Also, daily a random selection (approximately 10%) of pulverized samples are sieve tested to evaluate grinding performance, expecting them to achieve 70% passing through a 0.074 mm screen.

 

11.5.4Tintic Laboratory Sample Analyses Quality Assurance Measures

 

Equipment used for measurements in the Tintic laboratory is monitored daily for accuracy. Each batch of samples that passes through fire assay contains the certified standard/blank submitted from the geologist and will also include an internal standard and blank. The standard used at the Tintic laboratory is identified as a matrix matched standard (MMS). The matrix matched standard is a randomly selected sample mixed with an aliquot of a known certified standard. This standard value is calculated by comparing the unmixed sample data with the MMS standard data. If the MMS standard fails, the sample batch is rejected and the assay procedure is repeated from the pulverized sample packets.

 

The completed assay is evaluated against internal quality control of the MMS passing and the blank being below the Tintic laboratory lower detection limit of 0.17 g/t (0.005 opt) for gold. If either standard fails, the analysis is performed again from the sample packets. Once data are reported to the geology department, they will evaluate the submitted standard/blank for compliance.

 

Tintic Project134January 27, 2023
 

 

 

Osisko Development Corp.

 

The standard operating procedures applied at the Tintic laboratory for sample preparation, fire assay, fusion and cupellation, parting, weigh back, sample submission, sample reporting, and quality control are in line with industry standards at other production laboratories. These procedures are regularly checked for accuracy by client departments including geology and metallurgy.

 

11.6QP Comments

 

Micon’s QP has reviewed and had extensive discussions with Osisko Development personnel regarding the QA/QC program at the Tintic Project and has reviewed the results of the Tintic laboratory audit by Qualitica Consulting. Micon’s QP also toured the Tintic laboratory during the September, 2022 site visit. During the discussions all aspects of the QA/QC program, results and recommendations of the Tintic laboratory audit as well as potential additions to the QA/QC programs were discussed.

 

Based on the QA/QC results from ALS, and the favourable audit of the Tintic laboratory, it is the opinion of Micon’s QP that the assay database for the Trixie deposit is of suitable quality to be used in the estimate of resources and as the basis for further work.

 

Tintic Project135January 27, 2023
 

 

 

Osisko Development Corp.

 

12.0   data verification

 

12.1General

 

In order to undertake the review and validation of the initial mineral resource estimate for the Trixie deposit, the QPs of this Technical Report held a number of discussions and meetings with Osisko Development’s personnel and contractors to discuss details relevant to the exploration programs, QA/QC programs, parameters used for the mineral resource estimate and the mineral resource estimate itself. The discussions were held via email chains and phone calls, and Microsoft Teams and Zoom meetings, as well as during the site visit. At all times the discussions were open, frank and at no time was information withheld or not available to the QPs. Open and frank discussions continued throughout mineral resource validation in December, 2022 and January, 2023 on all aspects of the process, and this culminated in the completion of the initial mineral resource estimate.

 

The geologic modelling for the Trixie deposit was completed by Osisko Development’s senior production geologist Courtney Kurtz, P.G. using Leapfrog Geo software. The MRE was completed by Osisko Development’s chief resource geologist, Daniel Downton, P.Geo., using Datamine Studio RM Pro 1.12 software. The MRE was then reviewed and validated by William Lewis, P.Geo. and Alan San Martin, AusIMM(CP) of Micon.

 

For the purpose of disclosure in this Technical Report, William Lewis, P.Geo., who is independent of Osisko Development and is a Qualified Person within the meaning of NI 43-101, is responsible for the initial mineral resource estimate by virtue of his independent review and validation of the work conducted by Osisko Development.

 

The QPs responsible for the preparation of this report and their areas of responsibility and sites visits have been documented previously in Table 2.1.

 

12.2Site Visit

 

A site visit was conducted from September 12 to September 16, 2022. The site visit was undertaken by Mr. Lewis, in order to independently verify the geology, mineralogy, drilling programs and the QA/QC programs. A number of underground reject face samples were selected by the QP during the site visit as check samples for independent assaying.

 

Prior to the site visit, the objectives of that site visit were discussed between Osisko Development’s Vice President of Exploration, Maggie Layman, P.Geo. and William Lewis. Mr. Lewis visited the different areas of the property, with an emphasis on verifying the exploration/evaluation works completed to date, as well as obtaining a general overview of the current work at the Trixie test mine and conducting an inspection of the underground workings at the Trixie deposit, along with a visit to the surface drilling site. During the site visit, Mr. Lewis was accompanied by Ms. Layman and had the opportunity to meet the personnel responsible for the various areas of technical services (mining, metallurgy and process), exploration and underground geology as well as a number of contractors. A number of open and frank discussions were held regarding the exploration programs, sampling QA/QC procedures, mineral resource modelling and the parameters and procedures for the mineral resource estimate. Figure 12.1 is a picture of the Trixie headframe showing the cage to access underground via the shaft.

 

Tintic Project136January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 12.1
Trixie Headframe showing the Cage to access Underground

 

 

Micon Site Visit Photograph.

 

12.2.1QP Check Sampling

 

A total of 29 underground reject face chip samples were selected for secondary assaying, the results of which are summarized in Table 12.1. As expected, where nuggety gold is involved, some of the lower grade and the higher-grade samples tend to show a poor reproducibility of assays. Of the 29 face chip samples selected by the QP for re-assay, 25 samples returned a similar or a higher gold grade than the original gold assay. Of the 4 samples that returned a lower gold assay, only one was significantly lower. While total reproducibility of the gold assays is not achievable at the Trixie deposit, the check assays clearly demonstrated the presence of potentially economic gold mineralization within the deposit.

 

The silver assays of the 29 check samples showed generally similar results to the gold assays. In the case of silver, there were 8 samples (1 significantly) in which the check assay was lower than the original assay. For the other 21 samples the check sample assayed higher for silver. Thus, there is limited reproducibility of both gold and silver assays and this needs to be carefully considered when conducting a mineral resource estimate.

 

Tintic Project137January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 12.1
Underground Reject Face Chip Samples Selected for Secondary Assaying  

 

Sample Site ID Sample ID Sample Date Sample Length Original Mine Face Chip Sample Results Secondary Check Mine Face Chip Sample Results Comparison Original Versus Check Samples
Depth_From (ft) Depth_To (ft) Length (ft)

Au

(ppm/grams per ton)

Ag

(ppm/grams per ton)

Au

(ounces/ton)

Ag

(ounces/ton)

Au

(ppm/grams per ton)

Ag

(ppm/grams per ton)

Au

(ounces/ton)

Ag

(ounces/ton)

Au (%) Ag (%)
738 F73802 2022-01-01 1.5 3.5 2.0 2,609.65 746.22 75.94 21.71 2,200 788 64.02 22.93 118.62 94.70
750 F75001 2022-01-10 0.0 2.4 2.4 1.72 0.01 0.05 0.00 14.95 25 0.44 0.73 11.50 0.02
753 B75309 2022-01-13 9.2 10.4 1.2 354.13 570.24 10.30 16.59 330 618 9.60 17.98 107.31 92.27
763 R76303 2022-01-18 95.0 97.0 2.0 0.01 0.01 0.00 0.00 4.92 8 0.14 0.23 0.10 0.06
764 R76404 2022-01-18 97.0 99.0 2.0 17.86 0.01 0.52 0.00 3.11 10 0.09 0.29 574.30 0.05
773 F77306 2022-01-23 7.9 9.4 1.5 8.26 343.34 0.24 9.99 9.41 291 0.27 8.47 87.74 117.99
782 F78201 2022-01-30 0.0 1.5 1.5 40.49 50.43 1.18 1.47 44.3 52 1.29 1.51 91.39 96.98
787 F78702 2022-02-07 0.8 2.8 2.0 1,143.35 3,596.74 33.27 104.66 1,900 3,970 55.29 115.52 60.18 90.60
792 R79203 2022-02-09 4.0 6.0 2.0 634.42 799.42 18.46 23.26 727 934 21.15 27.18 87.27 85.59
794 F79402 2022-02-12 2.5 4.7 2.2 1.99 74.82 0.06 2.18 5.41 71 0.16 2.07 36.73 105.38
807 F80701 2022-02-23 0.0 2.5 2.5 0.41 2.64 0.01 0.08 2.63 10 0.08 0.29 15.64 26.40
878 F87802 2022-04-22 0.6 1.6 1.0 567.26 2,471.51 16.51 71.92 744 3080 21.65 89.62 76.24 80.24
896 F89602 2022-05-05 1.0 3.3 2.3 5,390.78 4,394.48 156.86 127.87 4,620 4,490 134.44 130.65 116.68 97.87
913 F91302 2022-05-14 1.8 2.8 1.0 14,883.20 1,153.72 433.08 33.57 >10000 1,170 290.99 34.05 148.83 98.61
915 R91501 2022-05-15 0.0 2.0 2.0 2.57 1.85 0.07 0.05 45.9 13 1.34 0.38 5.59 14.22
916 R91609 2022-05-15 16.0 18.0 2.0 7.01 11,053.15 0.20 321.63 25.3 59 0.74 1.72 27.71 18,734.15
948 F94802 2022-05-29 1.0 2.6 1.6 35.63 278.09 1.04 8.09 171.5 192 4.99 5.59 20.78 144.84
1014 F101402 2022-07-02 2.2 3.1 0.9 113.90 824.38 3.31 23.99 122 811 3.55 23.60 93.36 101.65
1017 F101703 2022-07-04 1.3 2.7 1.4 1.58 7.47 0.05 0.22 5.99 8 0.17 0.23 26.33 93.42
1038 F103805 2022-07-16 5.2 7.0 1.8 0.07 3.36 0.00 0.10 7.74 5 0.23 0.15 0.89 67.19
1066 F106601 2022-07-23 0.0 1.0 1.0 1,075.52 389.75 31.30 11.34 1,080 436 31.43 12.69 99.59 89.39
1068 F106802 2022-07-24 2.0 3.0 1.0 318.19 254.34 9.26 7.40 498 285 14.49 8.29 63.89 89.24
1110 F111001 2022-08-16 0.0 4.0 4.0 4,757.42 528.90 138.43 15.39 5,170 653 150.44 19.00 92.02 81.00
1114 F111401 2022-08-17 0.0 2.7 2.7 2,873.05 2,263.41 83.60 65.86 2,510 2,040 73.04 59.36 114.46 110.95
1120 R112003 2022-08-20 6.0 7.5 1.5 1.44 5.69 0.04 0.17 16.25 12 0.47 0.35 8.85 47.39
1145 F114502 2022-08-28 4.0 5.2 1.2 0.01 46.68 0.00 1.36 41.9 40 1.22 1.16 0.01 116.69
1160 F116003 2022-09-03 2.8 4.4 1.6 0.75 20.19 0.02 0.59 31.2 15 0.91 0.44 2.42 134.61
1163 G116301 2022-09-03 0.0 2.0 2.0 5,197.77 6,698.97 151.25 194.93 5,170 5,970 150.44 173.72 100.54 112.21
1176 F117602 2022-09-07 1.2 2.8 1.6 681.89 51.71 19.84 1.50 763 67 22.20 1.95 89.37 77.19
    Average     1.8                    

Reject Face Chip Samples selected for secondary sampling.

No UG drilling samples available.

1 ppm = 1 gram/ton.

Troy ounces = ppm/34.366.

 

Tintic Project138January 27, 2023
 

 

 

Osisko Development Corp.

 

The variability in the gold and silver grades is due to the presence of native gold and silver or to the mineralogy of the samples. Both historical work and recent work indicate that care must be taken when reporting and relying on specific assay grades. Further work is needed to identify the specific minerals, mineral combinations or geological conditions that affect the reproducibility of the sample grades. Further investigation of high-grade assays also needs to be undertaken, by conducting screen metallic assays to determine the percentage of fine to course grained gold and silver contained in the higher-grade samples.

 

12.3QP Comments

 

The presence of grade variability is not a hindrance to producing a reliable resource estimate for a mineral deposit. The first step is to recognize the variability and then to apply appropriate procedures and methodologies to minimize any over estimation of the resource grade. Micon’s QP believes that despite the demonstrated grade variability within the Trixie deposit, Osisko Development has used appropriate procedures within its estimation methodology to limit over estimation of the grade and, consequently skewing the metal content within the deposit.

 

While the reproducibility of assays clearly indicates the variability of the grade within the mineral zones that comprise the Trixie deposit, Micon’s QPs believe that the database generated for the Trixie deposit is adequite for use as the basis of a mineral resource estimate. The database is also sufficiently reliable to be used as the basis for further work and upon which to conduct further economic studies.

 

 

 

 

 

Tintic Project139January 27, 2023
 

 

 

Osisko Development Corp.

 

13.0   mineral processing and metallurgical testing

 

13.1Mineral Processing and Metallurgical Testing

 

This section summarizes metallurgical bench and pilot scale testing on samples obtained from the Trixie test mine. Estimates of precious metal recoveries and reagent consumptions are included.

 

The metallurgical testing was undertaken by Kappes, Cassiday & Associates (KCA), Reno, Nevada for TCM.

 

The Qualified Person (QP) for this section of the report is Richard Gowans P.Eng., Principal Metallurgist of Micon International Limited. The QP was not involved with the selection of the metallurgical samples or the management of work completed by KCA. In preparing this section of the report, the QP has reviewed the following metallurgical test reports:

 

·Kappes, Cassiday & Associates, Trixie Project, T2 Soil Sample, Report of Metallurgical Test Work Prepared for Tintic Consolidated Metals LLC, July 2022.

 

·Kappes, Cassiday & Associates, Trixie Project, T4 Soil Sample, Report of Metallurgical Test Work Prepared for Tintic Consolidated Metals LLC, October 2022.

 

13.2Sample Provenance

 

Two bulk metallurgical composite samples were selected and prepared by Osisko Development from mineralization obtained during the exploratory test mining performed during 2021 and early 2022.

 

The first bulk composite was prepared using laboratory high grade coarse reject samples over an 8-month period from April to December 2021. This sample was titled “T2 Soil Sample” although it contained both T2 and T4 type mineralization. This 477.5 kg sample was reported by Osisko Development to be representative of a T2/T4 high grade run of mine (ROM) material leached in the TCM pilot vat leach facility (VLF) during 2021 and 2022.

 

The second composite sample was prepared using four sample increments at various mine accessible points of the T4 structure. This 171 kg sample was labelled “T4 Soil Sample” and is roughly representative of the bulk T4 structure at the 625 level.

 

The QP considers that the composite samples are reasonably representative of the T2 and T4 structure mineralization that occurs in the area on interest.

 

13.3Metallurgical Testing

 

The metallurgical testing program using the two composite samples included the following primary testwork:

 

·Multi-element analysis of the samples.

 

·Diagnostic leaching.

 

·Gold deportment mineralogy (AMTEL).

 

·Bulk mineralogy (FLSmidth).

 

Tintic Project140January 27, 2023
 

 

 

Osisko Development Corp.

 

·Bottle roll leach testing at various particle sizes.

 

·Gravity separations tests.

 

·Comminution testwork (Hazen Research).

 

The gravity separation amenability tests were not performed for the T4 sample.

 

13.3.1Metallurgical Sample Characterization

 

Average gold and silver analyses for the two composite samples are included in Table 13.1. There was very little variation between the duplicate gold fire assays for the T2 sample (63.3 g/t and 64.8-g/t). The T4 samples, on the other hand showed more variation between the duplicate gold head assays (6.2 g/t and 11.3 g/t).

 

Table 13.1
Metallurgical Composite Sample Average Head Gold and Silver Analyses

 

Sample Description Average Head Assays
Au (g/t) Ag (g/t)
88643 A - T2 Soil Sample 64.06 101.52
88665 A - T4 Soil Sample 8.75 14.49

 

Multi-element analyses of the two composite head samples are presented in Table 13.2 and the whole rock analysis in Table 13.3. These tables present the results for two replicate samples of T2, but only a single sample of T4.

 

Table 13.2
Metallurgical Composite Selected Multi-Element Analyses

 

Element/Compound Units T2 Sample A T2 Sample B T4 Sample
As mg/kg 173 179 29
Bi mg/kg 164 165 54
C(total) % 0.1 0.08 0.19
C(organic) % 0.09 0.07 0.16
C(inorganic) % 0.01 0.01 0.04
Cd mg/kg 2 3 <1
Co mg/kg 3 4 2
Cr mg/kg 116 173 214
Cu(total) mg/kg 745 731 74
Cu(cyanide soluble)1 mg/kg 390 341 45
Fe % 0.64 0.62 0.4
Hg mg/kg 2.88 2.86 2.25
Mo mg/kg 6 6 7.5
Ni mg/kg 6 12 12
Pb mg/kg 535 538 120
S(total) % 0.53 0.52 0.24
S(sulphide) % 0.17 0.14 0.03
S(sulphate) % 0.36 0.38 0.21
Sb mg/kg 132 141 38
Se mg/kg 5 5 <5
Sr mg/kg 228 220 143
Te mg/kg 179 187 24
V mg/kg 8 8 6
W mg/kg <10 <10 18
Zn mg/kg 92 104 12

1 Average assay from cyanide shake tests.

 

Tintic Project141January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 13.3
Metallurgical Composite Whole Rock Analyses

 

Compound

T2 Sample A

(%)

T2 Sample B

(%)

T4 Sample

(%)

SiO2 95.07 92.07 96.35
Al2O3 1.57 1.54 0.77
Fe2O3 0.85 0.92 0.65
CaO 0.46 0.43 0.37
MgO 0.07 0.05 0.08
Na2O 0.05 0.04 0.11
K2O 0.27 0.27 0.20
TiO2 0.16 0.15 0.13
MnO 0.03 0.03 0.01
SrO 0.03 0.03 0.02
BaO 1.27 1.32 0.79
Cr2O3 0.03 0.04 0.05
P2O5 0.01 0.01 0.02
LOI1090°C 1.83 1.86 1.25
SUM 101.70 98.76 100.76

 

Both samples are characterized by high silica content (92% to 96%) and low sulphide sulphur content, typically less than 0.2%. Copper in the T2 sample measured about 750 g/t but only about half of this is readily cyanide soluble.

 

Deleterious elements often encountered in gold mineral resources are present in low concentrations in both samples. Mercury is <3 ppm, selenium was analyzed at or below 5 ppm, and arsenic, on average, was 176 g/t for T2 and 29 g/t for the T4 sample. The T2, high grade structure sample did show relatively higher concentrations of these deleterious elements than the T4 material. As noted above, the sulphide sulphur content was relatively low and, therefore, it is unlikely that either sample will be acid generating.

 

Tintic Project142January 27, 2023
 

 

 

Osisko Development Corp.

 

13.3.2Minerology

 

13.3.2.1Sample Mineralogy

 

Samples of pulverized T2 and T4 composites were submitted to FLSmidth Inc. in Midvale, Utah for QEMSCAN analyses, which show the global mineralogy of the samples. A summary of these results, showing the 12 most abundant mineral phases, is presented in Table 13.4.

 

Table 13.4
Summary of QEMSCAN Results

 

Composite T2   Composite T4
Mineral Relative Abundance (%)   Mineral Relative Abundance (%)
Quartz 93.611   Quartz 94.968
Barite 2.025   Pyrophyllite 1.693
Smectite/Kaolinite 1.147   Barite 1.403
Pyrophyllite 1.013   Smectite/Kaolinite 0.723
Carbonates 0.538   Carbonates 0.562
Pyrite 0.431   Other 0.219
Tramp iron 0.401   Svanbergite 0.086
Other 0.188   Tramp iron 0.076
Svanbergite 0.169   Iron oxide 0.069
Diaspore 0.134   Pyrite 0.064
Rutile/Ilmenite 0.056   Rutile/Ilmenite 0.055
Zircon 0.055   Zircon 0.036

 

The main component of the two samples is quartz (94-96%) and both contain minor barite, pyrophyllite, smectite/kaolinite clays, and carbonates. The T2 sample contains a little more pyrite than the T4 sample (0.4% vs 0.06%).

 

13.3.2.2Precious Metals Deportment

 

KCA completed a diagnostic leach test for gold and silver deportment of the samples. This procedure identifies the mineral associations via wet-chemical analytical methods for gold and silver, and provides an indication of potential methods for their extraction.

 

The T2 sample contained almost entirely (98.8%) directly cyanide soluble gold with minor constituents associated with other minerals. Silver was 83.3% cyanide soluble with more significant associations with other minerals. For the T4 sample, 87.5% of gold was directly cyanide soluble with significant gold associated (about 11%) with copper-zinc sulphides and labile pyrite. Silver was 83.8% cyanide soluble in the T4 sample. The results for the two composite samples ground to 80% passing 74 microns are shown in Table 13.5.

 

Tintic Project143January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 13.5
Summary of Diagnostic Leach Test Results

 

Mineral Associations T2 Sample T4 Sample
Au Extraction (%) Ag Extraction (%) Au Extraction (%) Ag Extraction (%)
Direct cyanide soluble 98.8 83.3 87.5 83.8
Calcite, dolomite, galena, pyrrhotite, hematite 0.6 9.1 1.1 2.8
Cu-Zn sulphides, labile pyrite 0.1 2.6 11.1 2.3
Sphalerite, galena, labile sulphide, tetrahedrite 0.4 0.8 0.3 1.0
Pyrite, marcasite, arsenopyrite 0.0 0.6 0.0 2.5
Locked in gangue 0.1 3.6 0.1 7.6
Total 100.0 100.0 100.0 100.0

 

The diagnostic leach test results are supported by the mineralogical gold deportment studies conducted by AMTEL, London, Ontario, Canada. The AMTEL study using the T2 sample at a grind size of 80% passing 150 microns showed that 99% of gold was exposed and potentially cyanide soluble, with 21% existing as free gold, 31% associated with hessite (Ag2Te), 36% associated with other tellurates and 12% associated with other minerals. The study showed that 41% of the gold grains present in the sample were >38µm and potentially amenable to gravity separation.

 

A similar study for the T4 material showed that 81% of the gold was free gold with hessite and telluride associations of 7% and 10%, respectively. Compared to T2, the T4 gold was finer with 100% of T4 gold passing 75µ (compared to 76% for the T2 sample) and 25%% of the gold was >38µm.

 

13.3.3Bottle Roll Leach Tests

 

Bottle roll leach tests were conducted to determine the potential for gold recovery from the two composite samples by direct cyanidation under a range of conditions. The kinetic 72-hour leach tests investigated grind size, sodium cyanide concentration and dissolved oxygen (DO).

 

The bottle roll leach test results for sample T2 are summarized in Table 13.6. These tests explored a range of grind sizes from 80% passing 1 mm to 75 µm, cyanide concentration range from 0.5-1.5 g/L, and the effect of pre-aeration.

 

Gold and silver extractions increased with finer grind size with 99% Au and 82% Ag extraction after 72 hours at a grind of 80% passing 75 µm and using 1 g/L NaCN concentration. The Au extraction did not improve with pre-aeration or higher cyanide solution concentration levels above 1 g/L, although silver extraction kinetics tended to improve with higher DO and cyanide concentration.

 

Tintic Project144January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 13.6
Summary of T2 Direct Bottle Roll Leach Test Results

 

KCA

Test

Number

Target

P80 Size,

mm

Target

NaCN,

g/L

Pre-aeration

Target DO

mg/L

Calculated Head Extraction

NaCN

Consumption

Au g/t Ag g/t Au-72h Ag-72h kg/t
88644A 1.0 1.0 - 79.7 159 89% 58% 0.70
88644B 0.5 1.0 - 75.8 159 94% 62% 0.80
88644C 0.15 1.0 - 72.0 146 98% 78% 0.91
88644D 0.075 1.0 - 73.7 153 99% 82% 0.96
88650A 0.075 0.5 - 73.4 149 98% 62% 0.78
88650B 0.075 1.5 - 63.9 142 99% 87% 1.01
88663A 0.075 1.0 8 72.6 123 99% 86% 1.19
88663B 0.075 1.0 >14 80.7 156 99% 88% 1.07

 

Bottle roll leach test results for sample T4 are summarized in Table 13.7. These tests explored a range of grind sizes from 80% passing 1 mm to 75 µm, cyanide concentration range from 0.5-4.0 g/L, and the effect of pre-aeration.

 

Gold and silver extractions increased with finer grind size although there was no improvement with grinding below 150 µm. Extractions after 72 hours at this grind size were 98% for Au and 80% for Ag when using 1 g/L NaCN concentration. The Au extraction tended not to improve with pre-aeration or higher cyanide solution concentration levels above 1 g/L, although silver extraction kinetics tended to improve with higher cyanide concentration but with no increase in DO.

 

Table 13.7
Summary of T4 Direct Bottle Roll Leach Test Results

 

KCA

Test

Number

Target

P80 Size,

mm

Target

NaCN,

g/L

Pre-aeration

Target DO

mg/L

Calculated Head Extraction

NaCN

Consumption

Au g/t Ag g/t Au-72h Ag-72h kg/t
88672A 1.0 1.0 - 8.02 20.3 95% 71% 0.13
88672B 0.5 1.0 - 8.43 20.2 97% 75% 0.15
88672C 0.15 1.0 - 8.07 20.7 98% 80% 0.20
88673A 0.075 1.0 - 8.06 20.5 96% 73% 0.42
88672D 0.075 0.5 - 7.99 20.9 97% 78% 0.88
88673B 0.075 1.5 - 8.59 21.9 98% 82% 0.58
88677A 0.075 3.0 - 7.43 21.0 97% 84% 1.34
88677B 0.075 4.0 - 6.95 18.1 98% 82% 1.30
88674A 0.075 1.5 8 7.69 16.6 98% 80% 0.31
88674B 0.075 1.5 >14 7.70 17.1 98% 81% 0.29

 

13.3.4Gravity Separation Tests

 

Gravity separation tests were completed using sample T2 at four grind sizes, 80% passing 1 mm, 0.5 mm, 0.15 mm and 0.075 mm. The primary gravity concentration step used a Knelson centrifugal gravity concentrator, the concentrate from which was cleaned using a shaking table. A sample of each test gravity tailings was cyanide leach for 72 hours. A summary of the gravity and gravity tailings leach test results is presented in Table 13.8.

 

Tintic Project145January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 13.8
Summary of T2 Gravity and Gravity Tails Leach Test Results

 

Target

P80 Size,

mm

Gravity

Conc.

Wt%

Gravity Conc. Grade Gravity Recovery Gravity Tails Total Recovery
Leach Extraction
Au g/t Ag g/t Au% Ag% Au% Ag% Au% Ag%
1.0 0.4 5,574 5,576 35.5% 22.2% 92% 67% 95% 74%
0.5 0.4 6,313 2,075 39.9% 8.6% 97% 73% 98% 75%
0.15 0.6 3,808 3,160 38.6% 19.2% 98% 82% 99% 85%
0.075 0.4 4,892 2,762 33.9% 11.5% 98% 83% 99% 85%

 

Gravity separation testing showed, as expected by the minerology, approximately 40% gravity gold recoverable and 20% or less recovery of silver. The combined gravity plus gravity tailings leach recoveries were similar to the direct leach results.

 

13.3.5Comminution Tests

 

A portion of as-received head material for the two composite samples, along with a portion of previously screened head material of T2 only (-19 mm +12.5 mm) was submitted to Hazen Research for comminution testing. Testwork was completed to provide a Bond Ball Mill Work index for both samples and an abrasion index for T2 (Table 13.9).

 

Table 13.9
Summary of Comminution Test Results

 

Test Description T2 Composite T2 (-19 mm +12.5 mm) T4 Composite
Bond Ball Mill Work Index (kWh/t) 18.2   19.0
Abrasion Index (g)   0.6753  

 

The comminution test results suggest that the T2 and T4 composite samples are relatively hard and that the T2 composite is very abrasive.

 

13.3.6Additional Testwork

 

In addition to the metallurgical/mineralogical work outlined above, Osisko Development reports that testwork was completed by Patterson Cooke to determine the dewatering behaviour of leach tailings samples. This program of work included, thickener settling rates, filtration rates, and Proctor compaction tests.

 

Osisko Development also reported that testwork to support engineering of a cyanide destruction system was completed by KCA.

 

Tintic Project146January 27, 2023
 

 

 

Osisko Development Corp.

 

13.4Notes Regarding Metallurgical Laboratory Certifications

 

All the metallurgical testwork reported in this section was conducted and organized by KCA with some aspects subcontracted to FL Smidth and Amtel. KCA is not ISO accredited.

 

Assays for the testwork undertaken by KCA were carried out by Florin Analytical Services (FAS), part of the KCA group, which operates as an independent commercial analytical laboratory. FAS participates in round robin analyses within several professional organizations, including:

 

·American Society of Testing Material (ASTM) bullion by cupellation Round Robin Program.

 

·Society of Mineral Analysts Proficiency Studies.

 

·Geostats Survey of International Laboratories.

 

13.5Conclusions and Recommendations

 

The composite samples selected by Osisko to represent typical T2 and T4 structure mineralization were amenable to agitation cyanide leaching. Scoping level bottle roll leaching tests suggested that very high gold extractions (98-99%) could be achieved under typical design conditions. Corresponding silver extractions of around 80% to 88% would be expected.

 

It is recommended that the following program of testing be undertaken during the next stage of project development:

 

·Leaching tests to optimize conditions in terms of precious metal recovery, capital costs and operating costs.

 

·Comparative testwork and techno-economic study to compare heap, VAT and agitation leaching technologies.

 

·Geochemical characterization testwork on representative feed and residue samples.

 

·Appropriate additional comminution testing depending on the most likely process flowsheet.

 

·Variability testwork.

 

Tintic Project147January 27, 2023
 

 

 

Osisko Development Corp.

 

14.0   Mineral Resource Estimates

 

14.1Introduction

 

The Initial Mineral Resource Estimate for the Trixie test mine (the “initial MRE”), was conducted in December, 2022 and January, 2023 and comprises initial resources for the Trixie deposit in the East Tintic district. The estimate was prepared, using all available information, by Daniel Downton, P.Geo., of Osisko Development, and reviewed and validated by William Lewis, P.Geo., and Alan S J San Martin, AusIMM(CP) of Micon who are independent QPs as this term is defined in NI 43-101.

 

This section describes the technical aspects of the resource estimate including methods used and key assumptions considered during the estimation process.

 

14.2CIM Resource Definitions and Classifications

 

All resources and reserves presented in a Technical Report must follow the current CIM Definitions and Standards for mineral resources and reserves or a similar standard, such as the Australasian JORC Code. The latest edition of the CIM Definitions and Standards was adopted by the CIM council on May 10, 2014, and includes the following resource definitions:

 

“Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories. An Inferred Mineral Resource has a lower level of confidence than that applied to an Indicated Mineral Resource. An Indicated Mineral Resource has a higher level of confidence than an Inferred Mineral Resource but has a lower level of confidence than a Measured Mineral Resource.”

 

“A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction.”

 

“The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.”

 

“Material of economic interest refers to diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial minerals.”

 

“The term Mineral Resource covers mineralization and natural material of intrinsic economic interest which has been identified and estimated through exploration and sampling and within which Mineral Reserves may subsequently be defined by the consideration and application of Modifying Factors.”

 

“Inferred Mineral Resource”

 

“An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity.”

 

Tintic Project148January 27, 2023
 

 

 

Osisko Development Corp.

 

“An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.”

 

“An Inferred Mineral Resource is based on limited information and sampling gathered through appropriate sampling techniques from locations such as outcrops, trenches, pits, workings and drill holes. Inferred Mineral Resources must not be included in the economic analysis, production schedules, or estimated mine life in publicly disclosed Pre-Feasibility or Feasibility Studies, or in the Life-of-mine plans and cash flow models of developed mines. Inferred Mineral Resources can only be used in economic studies as provided under NI 43-101.”

 

“Indicated Mineral Resource”

 

“An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit.”

 

“Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation.”

 

“An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.”

 

“Mineralization may be classified as an Indicated Mineral Resource by the Qualified Person when the nature, quality, quantity and distribution of data are such as to allow confident interpretation of the geological framework and to reasonably assume the continuity of mineralization. The Qualified Person must recognize the importance of the Indicated Mineral Resource category to the advancement of the feasibility of the project. An Indicated Mineral Resource estimate is of sufficient quality to support a Pre-Feasibility Study which can serve as the basis for major development decisions.”

 

“Measured Mineral Resource”

 

“A Measured Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit.”

 

“Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation.

 

A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.”

 

“Mineralization or other natural material of economic interest may be classified as a Measured Mineral Resource by the Qualified Person when the nature, quality, quantity and distribution of data are such that the tonnage and grade or quality of the mineralization can be estimated to within close limits and that variation from the estimate would not significantly affect potential economic viability of the deposit. This category requires a high level of confidence in, and understanding of, the geology and controls of the mineral deposit.”

 

Tintic Project149January 27, 2023
 

 

 

Osisko Development Corp.

 

14.3CIM Estimation of Mineral Resources Best Practices Guidelines

 

When reviewing and validating Osisko Development’s mineral resource estimate for the Trixie deposit, Micon’s QPs have used the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines which were adopted by the CIM Council on November 29, 2019.

 

14.4Methodology

 

The initial MRE discussed herein covers the Trixie deposit. The mineral resource area for the deposit covers a strike length of approximately 445 m down to a vertical depth of approximately 295 m below surface.

 

The wireframe models for the Trixie deposit were prepared using LeapFrog GEO v.2022.1 (LeapFrog). Wireframe modelling included the construction of five mineralized domains constrained to the extents of the regional-scale Tintic Quartzite lithologic unit and capped by shale belonging to the overlying lower member of the Ophir Formation (see Section 7.0). Geostatistical analyses were carried out using Datamine Snowden Supervisor v.8.15.0.1 (Supervisor). The estimation, block model and grade interpolation, were prepared using Datamine StudioTM RM Pro v.1.12.113.0 (Datamine). Resource-level potentially mineable underground shapes were created using the Deswik CAD v.2021.2.748 Shape Optimizer module (DSO).

The main steps in the methodology were as follows:

 

·Compile and validate the diamond drill hole, RC drill hole, and chip sample databases used for mineral resource estimation.

 

·Validate the geological model and interpretation of the mineralized domains based on lithological and structural information, underground mapping, and metal content.

 

·Validate the drill hole and chip sample databases, compositing database, and capping values, for the purpose of geostatistical analysis, and perform variography.

 

·Validate the block model and grade interpolation.

 

·Decide on and validate the classification criteria for mineral resource classification.

 

·Assess the mineral resources with “reasonable prospects for eventual economic extraction” by selecting appropriate cut-off grades and producing reasonable “resource-level” optimized underground potentially mineable shapes.

 

·Generate a Mineral Resource Estimate statement.

 

·Assess the factors that could affect the mineral resource estimate.

 

Since the block model is presented in units of measurement used in the USA, short tons needed to be converted to metric tonnes during the evaluation of the model. The conversion used is 1.0 tonne is equal to 1.10231 tons or 1.0 ton is equal to 0.90718 tonnes.

 

Tintic Project150January 27, 2023
 

 

 

Osisko Development Corp.

 

14.5Resource Database

 

The close-out date for the Trixie deposit initial MRE database is December 12, 2022. The database consists of 42 validated diamond drill holes, totalling 2,358.45 m of core and including 1,802 sample intervals. The database also includes 8 validated RC drill holes, totalling 2,421.64 m of RC drilling and including 987 sample intervals, and 1,019 underground chip sample strings comprising 4,467 sample intervals assayed for gold (Au) and silver (Ag), (Figure 14.1).

 

The database includes validated location, survey, and assay results. It also includes lithological descriptions taken from drill core logs.

 

The database covers the strike length of each mineralized domain at variable drill hole and chip sample spacings, ranging from 1.5 to 50 m.

 

In addition to the tables of raw data, each database includes several tables of calculated drill hole composites and wireframe solid intersections, which are required for the statistical evaluation and mineral resource block modelling.

 

Figure 14.1
Plan View (left) and Orthogonal View Looking Northwest (right) of the
Trixie Drill Hole and Chip Sample Database 

 

Figure supplied by Osisko Development.

 

Tintic Project151January 27, 2023
 

 

 

Osisko Development Corp.

 

14.6Geological Model

 

The TCM geological team prepared the geological model of the Trixie deposit in LeapFrog, using underground mapping, chip samples, RC drill holes, and validated diamond drill holes, all completed by December 12, 2022.

 

A total of five mineralized domains were modelled (Figure 14.2). Each domain was restricted up dip by its contact with the lower shale member of the Ophir Formation, as this contact acts as an impermeable cap to mineralizing fluids.

 

The T1 domain consists of Tintic Quartzite-hosted disseminated mineralization constrained within a footwall wedge between the intersecting discrete T2 and 75-85 structural domains. Mineralization within the T1 domain is interpreted to have formed as a halo to its bounding structures and has been modelled as extending roughly 10 m from the T2 and 75-85 footwall margins.

 

Figure 14.2
Vertical Section View of the Trixie Geological and Resource Domain Wireframes Looking North

 

 

Figure supplied by Osisko Development.

 

The structurally controlled T2 domain is a discrete subvertical vein and breccia zone, dipping to the east and characterized by polymetallic gold and silver-rich telluride-bearing mineralization with quartz-barite gangue.

 

The T3 domain consists of mineralization localized in a discrete steeply east-dipping fissure vein breccia with measurable but limited down-dip and along strike extents, constrained within the hanging wall of the 75-85 domain and characterized by polymetallic gold and silver rich mineralization with quartz-barite and sulphide gangue.

 

Tintic Project152January 27, 2023
 

 

 

Osisko Development Corp.

 

The T4 domain consists of a broad zone of quartz-barite stockwork veining developed predominantly in the hanging wall of the discrete T2 structure and associated with an envelope of lower grade mineralization. Stockwork veining is often accompanied by tellurides and dark sulphosalt inclusions comprising less than 0.5% of vein mass but typically related to elevated gold grades. Localized elevated gold grades within the T4 domain may also be associated with semi-continuous, smaller-scale T2-like fissure veins that are difficult to trace.

 

The structurally controlled and historically exploited 75-85 domain consists of a discrete steeply west-dipping polymetallic silica-sulphide cemented breccia zone developed within a historically described fissure fault. Current data suggest that the 75-85 structure crosscuts and truncates both the T2 structural and T4 stockwork domains.

 

A north-south trending sub-vertically dipping fault structure has been mapped across multiple underground development headings near the 625 level and has been intercepted in multiple drill holes. Though the full extent of the structure is as yet unknown, it is currently inferred to project through the entirety of the model. As underground mapping indicates minor offset of the T2 structure across this fault, it is used as a hard boundary for geological modelling and grade interpolation. The model is thus split into east and west fault blocks, with each mineralized domain subdivided into respective east and west subdomains.

 

14.7Geostatistical Analysis

 

14.7.1Compositing

 

For each domain, the assay data were flagged and analyzed to determine an appropriate composite length to minimize any bias introduced by variable sample lengths. Most of the analytical samples were collected at lengths of between 0.31 and 1.52 m. A modal composite length of approximately 0.61 m was applied to domains T2 and T3, generating composites as close to 0.61 m as possible, while creating residual intervals with a minimum of 0.06 m in length. A modal composite length of 0.91 m was applied to all other domains. In all cases, composite files were derived from raw values within the modelled resource domains.

 

14.7.2High Grade Capping

 

The impact of high-grade outliers on composite data was examined using log histograms and log probability plots. Cumulative metal and mean and variance plots were analyzed for the impact of high-grade capping. Threshold indicator grades were coded and analyzed to determine spatial continuity of the high grades. The indicator variograms suggest that high-grade continuity decreases with increasing grade thresholds. Upon statistical and spatial review of the composite data, the QPs are of the opinion that capping is required in order to restrict the influence of high grade outlier assays at varying ranges.

 

Multiple capping (different capping at different ranges in each domain) was selected as the capping methodology for the gold and silver grades at the Trixie deposit. After considering reconciliation results and geological continuity, the T2 domain uses a single capping level for gold.

 

Tintic Project153January 27, 2023
 

 

 

Osisko Development Corp.

 

The top capping thresholds were selected based on the probability plots and vary from 20.0 g/t to 1,350.0 g/t Au and 200.0 g/t to 2,500.0 g/t Ag. These top capping grades are summarized in Table 14.1.

 

Table 14.1
Top Capping Grades for Gold and Silver

 

Domain Au Top Capping (g/t) Ag Top Capping (g/t)
T1 100.0 300.0
T2 1,350.0 2,500.0
T3 20.0 2,000.0
T4 200.0 600.0
75-85 45.0 200.0

 Table supplied by Osisko Development.

 

The maximum range for high-grade continuity was established using the indicator variograms, which suggest a loss of continuity after 4.5 m to 9.0 m, depending on the mineralized domain. A range of 7.6 m was selected and applied to all zones, as a general average search range for the first top capping level.

 

Gold and silver statistics for the raw assay data, composites, and capped composites are presented in Table 14.2.

 

14.7.3Density

 

TCM’s density databases contain 512 measurements taken on samples across multiple geologic domains. Table 14.3 provides a breakdown of bulk density measurements of the mineralized domains.

 

Average bulk density values in the mineralized domains were assigned to the T1 (2.616 t/m3), T2 (2.955 t/m3), T3 (2.638 t/m3), T4 (2.621 t/m3), and 75-85 (2.617 t/m3) domains.

 

A density of 0.00 t/m3 was assigned to the underground development from all past mining activities.

 

Bulk densities were used to calculate tonnages from the volume estimates in the block model.

 

Table 14.2
Sample Statistics for Gold and Silver for Raw Samples, Capped Composites and Uncapped Composites

 

Gold
  Domain Number of Samples Minimum Maximum Average Au g/t Variance CoV
Raw Sample Data T1 789 0.003 6,932.19 37.58 89,409.19 7.96
T2 1,034 0.003 16,381.81 353.16 1,410,557.97 3.36
T3 74 0.005 4,080.00 82.72 228,442.40 5.78
T4 2,821 0.000 1,709.08 11.07 4,896.19 6.32
75-85 258 0.003 5,197.77 42.75 122,648.16 8.19
Uncapped Composites T1 718 0.003 6,932.19 32.80 83,182.80 8.79
T2 953 0.003 16,381.81 357.37 1,261,264.68 3.14
T3 62 0.005 4,080.00 94.98 271,284.45 5.48
T4 2,442 0.000 1,709.08 9.92 3,261.26 5.76
75-85 214 0.005 5,197.77 40.70 128,374.48 8.80
Capped Composites T1 718 0.003 100.00 9.09 570.44 2.63
T2 953 0.003 1,350.00 214.50 154,551.45 1.83
T3 62 0.005 20.00 6.16 49.66 1.14
T4 2,442 0.000 200.00 7.58 701.88 3.49
75-85 214 0.005 45.00 8.04 186.12 1.70

 

Tintic Project154January 27, 2023
 

 

 

Osisko Development Corp.

 

Silver
  Domain Number of samples Minimum Maximum Average Ag g/t Variance CoV
Raw Sample Data T1 789 0.003 2,862.16 32.04 19,159.56 4.32
T2 1,034 0.003 23,200.00 345.95 1,310,930.49 3.31
T3 74 0.005 6,273.17 339.39 706,718.10 2.48
T4 2,821 0.000 11,053.15 36.78 55,848.17 6.43
75-85 258 0.005 6,698.97 85.17 191,664.64 5.14
Uncapped Composites T1 718 0.003 2,862.16 28.12 17,544.33 4.71
T2 953 0.003 8,324.45 332.96 758,061.02 2.62
T3 62 0.005 6,273.17 351.94 789,187.54 2.52
T4 2,442 0.000 4,421.26 33.98 21,630.30 4.33
75-85 214 0.005 6,698.97 86.15 223,216.61 5.48
Capped Composites T1 718 0.003 300.00 20.93 2,995.67 2.62
T2 953 0.003 2,500.00 277.37 312,873.04 2.02
T3 62 0.005 2,000.00 281.57 257,629.47 1.80
T4 2,442 0.000 600.00 29.23 6,017.98 2.65
75-85 214 0.005 200.00 40.81 3,030.37 1.35

Table supplied by Osisko Development.

 

Table 14.3
Bulk Density Values Used for the Mineralized Domains of the Trixie Deposit

 

Domain Number of samples Density (t/m3)
T1 174 2.616
T2 164 2.955
T3* 10 2.638
T4 156 2.621
75-85** 184 2.617

Table Notes:

* T3 has no direct measurements. Unmineralized host rock and 75-85 measurements were used as these are the surrounding rocks of the T3 structure.

** The 75-85 domain only has two direct SG measurements. These two and the measurements from the surrounding unmineralized quartzite host rocks and the T1 domain were used.

Table supplied by Osisko Development.

 

14.7.4Variogram Analysis

 

The spatial distribution of gold and silver was evaluated through variogram analysis for each mineralized domain. Spherical variograms were modelled for each domain.

 

Tintic Project155January 27, 2023
 

 

 

Osisko Development Corp.

 

All variogram analyses and modelling were performed in “Supervisor”. Primary directions and orientations of the variograms were observed in the data and visually in 3D space. These orientations were then examined statistically within the software package to ensure that they represented the best possible fit of the geology and grade continuity.

 

Table 14.4 summarizes the modelled variograms and Figure 14.3 provides an example of the variogram models used in the mineral resource estimation for the T2 domain.

 

14.7.5Search Ellipse Parameters

 

For the T2, T3 and 75-85 domains, the 3D directional-specific search ellipses were guided by the local structural orientation of the domain for an anisotropic search. For the T1 and T4 domains 3D directional-specific search ellipses were guided by the Au and Ag grade variograms. The search radii were influenced and determined by both the grade and indicator variograms.

 

Grade distributions and kriging neighbourhood analyses (KNA) were used to help guide the number of composites to use for the grade interpolations.

 

Search neighbourhoods used different capping levels, as determined through the threshold analyses from Section 14.7.2.

 

Search ellipse and estimation parameters are presented in Table 14.5.

 

Tintic Project156January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 14.4
Variogram Models for Gold and Silver for each Mineralized Domain

 

Au Variograms Rotation Angles   Structure 1 Range (m) Structure 2 Range (m)
Domain Nugget Dip Direction (Z) Dip (X) Plunge (Y) Type Sil Strike Dip Vertical Sil Strike Dip Vertical
T1 0.30 80 90 90 Spherical 0.45 3.05 5.49 1.22 0.25 18.29 22.86 4.57
T2 0.30 80 90 170 Spherical 0.37 3.05 8.53 1.83 0.33 16.76 10.67 2.44
T3 0.10 0 0 0 Spherical 0.44 2.74 2.74 2.74 0.46 4.57 4.57 4.57
T4 0.35 100 100 90 Spherical 0.33 6.40 0.91 4.88 0.32 22.86 18.29 12.19
75-85 0.10 80 125 180 Spherical 0.61 6.71 12.19 8.84 0.29 15.24 13.72 9.14

 

Ag Variograms Rotation Angles   Structure 1 Range (m) Structure 2 Range (m)
Domain Nugget Dip Direction (Z) Dip (X) Plunge (Y) Type Sil Strike Dip Vertical Sil Strike Dip Vertical
T1 0.02 80 90 90 Spherical 0.69 1.52 4.88 2.44 0.29 7.62 18.29 4.57
T2 0.30 80 90 170 Spherical 0.38 4.27 4.57 2.44 0.32 18.29 9.14 3.05
T3 0.40 0 0 0 Spherical 0.18 1.52 1.52 1.52 0.42 7.62 7.62 7.62
T4 0.50 100 100 90 Spherical 0.36 8.84 6.10 3.35 0.14 30.48 30.48 30.48
75-85 0.10 80 125 180 Spherical 0.54 1.52 21.03 2.74 0.36 7.62 24.38 4.57

Table supplied by Osisko Development.

 

Tintic Project157January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 14.3
Example of Experimental and Modelled Variogram (Correlogram) for Gold in the T2 Domain

 

  

Figure supplied by Osisko Development.

Ranges on variograms are measured in feet and converted to metres for reporting purposes.

 

Tintic Project158January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 14.5
Estimation Parameters used for each Mineralized Domain

 

  Orientation Ranges (m) Multi Capping
Domain Pass Min Cmp Max Cmp Min DDH Azi (Z) Dip (X) Plunge (Z) X (m) Y (m) Z (m) Au g/t Cap Ag g/t Cap
T1 1 3 6 2 80 90 90 7.62 7.62 3.05 100 300
2 3 6 2 80 90 90 15.24 15.24 6.10 50 90
3 3 6 2 80 90 90 30.48 30.48 12.19 50 90
4 3 6 2 80 90 90 152.40 152.40 60.96 50 90
T2 1 3 6 2 ANISOTROPIC 7.62 4.57 3.05 1350 2500
2 3 6 2 ANISOTROPIC 15.24 9.14 6.10 1350 900
3 3 6 2 ANISOTROPIC 30.48 18.29 12.19 1350 550
4 3 6 2 ANISOTROPIC 152.40 91.44 60.96 1350 550
T3 1 3 6 2 ANISOTROPIC 0 7.62 7.62 3.05 20 2000
2 3 6 2 ANISOTROPIC 0 15.24 15.24 6.10 12 800
3 3 6 2 ANISOTROPIC 0 30.48 30.48 12.19 8 350
4 3 6 2 ANISOTROPIC 0 152.40 152.40 60.96 8 350
T4 1 3 6 2 100 100 90 7.62 7.62 3.05 200 600
2 3 6 2 100 100 90 15.24 15.24 6.10 100 350
3 3 6 2 100 100 90 30.48 30.48 12.19 40 150
4 3 6 2 100 100 90 152.40 152.40 60.96 40 150
75-85 1 3 6 2 ANISOTROPIC 180 7.62 7.62 3.05 45 200
2 3 6 2 ANISOTROPIC 180 15.24 15.24 6.10 30 70
3 3 6 2 ANISOTROPIC 180 30.48 30.48 12.19 30 70
4 3 6 2 ANISOTROPIC 180 152.40 152.40 60.96 30 70

Table supplied by Osisko Development.

 

14.8Block Model and Grade Interpretation

 

The criteria used in the selection of block size include drill hole spacing, composite length, the geometry of the modelled zone, and the anticipated mining methods. A block size of 1.22 x 1.22 x 1.83 m was used. Sub-cells were used, allowing a resolution of 0.30 x 0.30 x 0.30 m to better reflect the shape of the mineralization domains. Sub-cells were assigned the same values as their parent cell. No rotation was applied to the block model. The characteristics of the block model are summarized in Table 14.6. The sub-celling is efficient in filling the wireframe volumes.

 

Four search passes were used for interpolating grades into the block model, applying the appropriate grade caps. A series of sensitivity runs were performed to examine the impact of various parameters on the estimation. Parameters were selected, and gold and silver grades were interpolated using inverse distance squared (ID2) methodology. Each subsequent estimation pass used increasing search neighbourhood sizes determined from grade and indicator variogram results and industry best practices. Samples from a minimum of two drill holes or chip strings were required to estimate all blocks.

 

Tintic Project159January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 14.6
Summary of the Block Model Characteristics

 

Block Model Parameters
Axis Origin Block Size (ft) No. of Blocks Min Sub Cell (ft)
X 21,275 4.0 350 1.0
Y 22,500 4.0 545 1.0
Z 5,025 6.0 180 1.0

The local grid system uses US measurements, so block sizes were originally designated in feet and were converted to metres for reporting purposes. Table supplied by Osisko Development.

 

14.9Model Validation

 

Mineralized domain models were validated using a variety of methods including visual inspection of the model grades and grade distributions compared to the informing raw samples, statistical comparisons of informing composites to the model for local and global bias, and reconciliation comparing the model to observed grades from underground development.

 

All analyses indicate that the model follows the grade distribution of the informing composites and the accuracy of the model is considered to have been demonstrated. The total global comparison for each resource classification is within a 20% tolerance for bias and reconciliation. The QP considers the model to be a reasonable representation of the Trixie mineralization, based on the current level of sampling.

 

14.9.1Visual Inspection

 

Figure 14.4 represents section views of the model compared with the raw informing sample data. The visual validation confirms that the block model honours the drill hole and chip sample data and justifies the multiple capping grades.

 

14.9.2Statistical Comparisons

 

Ordinary kriging (OK) and Nearest Neighbour (NN) interpolations were performed to check for local and global bias in the models. The OK interpolations matched well with the ID2 interpolations, and a global bias analysis (Table 14.7) comparing the “representative declustered” NN mean estimate grade to the ID2 mean estimate grade at zero cut-off indicates a variance of less than 20%, with the material classified as measured being within the 5% tolerance.

 

The trend and local variation of the estimated ID2 models were compared with the declustered composite data, using swath plots in three directions (North, East, and Elevation). The ID2 models show similar trends in grades, with the expected smoothing for the method when compared to the composite data. Figure 14.5 shows the swath plot in the three principal directions of the T2 domain, as an example.

 

Tintic Project160January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 14.4
Visual Model Validation Comparison of Block Grades with Raw Sample Grades; Left: Plan View at 5,445 +/- 1.5 m;
Right: Vertical Section Looking North at Northing 23,755 +/- 1.5 m

 

 

Figure supplied by Osisko Development.

 

Tintic Project161January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 14.7
Global Bias Analysis Between the Interpolation Methods

 

Global Bias Check (Gold Mineralization) VER 1222
Classification Domain Tons (ST)* OK** (g/t) NN** (g/t) ID2** (g/t) OK vs NN ID vs NN OK vs ID
Measured T1          -  -  -
T2 23,444 179.10 197.80 188.41 -9.5% -4.7% 5.2%
T3 2,003 5.04 4.96 5.02 1.7% 1.3% -0.4%
T4          -  -  -
75-85          -  -  -
TOTAL 346,428 20.42 21.92 20.92 -6.9% -4.7% 2.5%
Indicated T1 87,207 10.11 11.82 9.93 -14.5% -16.0% -1.8%
T2 27,612 29.47 51.87 38.72 -43.2% -25.4% 31.4%
T3 2,808 2.68 3.52 2.59 -24.0% -26.6% -3.5%
T4 869,368 4.89 4.96 4.76 -1.4% -4.0% -2.6%
75-85 10,945 9.44 12.40 8.85 -23.9% -28.6% -6.2%
TOTAL 676,959 4.71 5.87 4.96 -19.7% -15.5% 5.2%
Inferred T1 1,328,896 2.35 4.60 2.50 -48.9% -45.5% 6.5%
T2 73,952 30.86 57.66 41.32 -46.5% -28.4% 33.9%
T3 3,161 1.76 2.81 1.74 -37.3% -38.3% -1.7%
T4 1,515,629 1.62 1.18 1.50 37.1% 26.9% -7.4%
75-85 386,830 5.76 6.83 5.69 -15.6% -16.7% -1.3%
TOTAL 3,308,469 3.05 4.48 3.28 -31.9% -26.7% 7.6%
Total Classified Trixie 4,331,856 4.70 6.09 4.95 -22.8% -18.6% 5.4%

Table supplied by Osisko Development.

*The tonnage is reported in Short Tons (ST) using the US measurement system.

**The OK, NN and ID2 interpolations use metric measurements of grams per metric tonne.

 

Tintic Project162January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 14.5
Statistical Model Validation; Swath Plots in the Three Principal Orientations and the Gold Grade Histogram,
Comparing Declustered Sample Grades with the Estimated Model Grades (Example from the T2 Domain)

 

 

Figure supplied by Osisko Development.

 

Tintic Project163January 27, 2023
 

 

 

Osisko Development Corp.

 

14.9.3Reconciliation

 

Underground development grades have been measured and tracked during the exploratory mining throughout the 2022 campaign. Model grade interpolations were reconciled with the tracked grades over various development areas and time frames. Table 14.8 shows the comparisons and the reconciliation factors from the analysis.

 

Table 14.8
Local Reconciliations of Underground Development Data with the Resource Model

 

Heading Month Tonnes Claimed Au g/t Model Au g/t (AuID) Reconciliation Factor
625-607.5 Aug-22 431 32.19 16.76 -48%
625-S1C5 Aug-22 641 48.34 61.72 28%
R5C2 Aug-22 130 48.34 8.00 -83%
R5C3 Aug-22 68 48.34 0.65 -99%
TOTAL   1,271 41.77 37.69 -10%
625-607.5 Sep-22 1,209 33.06 43.99 33%
625-S1C5 Sep-22 384 57.55 37.77 -34%
625-S1C6 Sep-22 255 57.55 28.34 -51%
R6 Sep-22 593 39.64 2.40 -94%
TOTAL   2,442 40.62 31.27 -23%
625-607.5 Oct-22 1,385 82.63 51.75 -37%
625-R1SPC1 Oct-22 545 70.76 83.78 18%
625-R1SPC2 Oct-22 669 69.54 73.44 6%
625-S1C6 Oct-22 332 99.64 133.66 34%
625-S1C7 Oct-22 310 99.64 99.39 0%
TOTAL   3,241 85.71 74.56 -13%
R1NPC1 Nov-22 477 246.66 281.61 14%
R1NPC2 Nov-22 163 258.30 118.30 -54%
TOTAL   640 249.62 240.06 -4%
MAY-OCT   11,498 44.19 54.33 23%
Weighted Average 4-month Reconciliation Factor     -15%

Table supplied by Osisko Development.

 

14.10Mineral Resource Classification

 

Mineral Resource Classification was determined through geometric criteria deemed reasonable for the deposit by the QP.

 

Due to the lack of sample data that fully crosscuts the T1 and 75-85 domains, no material has been classified as measured for these domains, and the characteristics used to classify indicated material has tighter constraints.

 

Due to the geological nature of the stockwork structures in the T4 domain, there is a degree of uncertainty in the ranges of the high-grade mineralization. Therefore, no material has been classified as measured.

 

Tintic Project164January 27, 2023
 

 

 

Osisko Development Corp.

 

For the T1 and 75-85 domains:

 

The Indicated classification was assigned to those continuous blocks within the mineralized domains that were informed by composites from at least two drill holes or chip strings, and which were less than 6.1 m from the nearest composite, with an average composite spacing less than 10.67 m.

 

For the T4 domain:

 

The Indicated classification was assigned to those continuous blocks within the mineralized domains that were informed by composites from at least two drill holes or chip strings, and which were less than 15.24 m from the nearest composite, with an average composite spacing less than 25.9 m.

 

For the T2, T3 domains:

 

The Measured classification was assigned to those continuous blocks within the mineralized domains that were informed by composites from at least two drill holes or chip strings, and which were less than 6.1 m from the nearest composite, with an average composite spacing less than 10.67 m.

 

The Indicated classification was assigned to those continuous blocks within the mineralized domains that were informed by composites from at least two drill holes or chip strings, and which were less than 15.24 m to the nearest composite, with an average composite spacing less than 25.9 m.

 

For all Domains:

 

The Inferred classification was assigned to those continuous blocks within the mineralized domains that were informed by composites from at least two drill holes or chip strings, and which were less than 50.3 m from the nearest composite, with an average composite spacing less than 100.6 m.

 

Blocks estimated within the mineralized domains not meeting the above criteria were not classified and are excluded from the resource estimate.

 

14.11Reasonable Prospects for Eventual Economic Extraction

 

A reasonable economic cut-off grade for resource evaluation at the Trixie deposit is 4.85 g/t Au. This was determined using the parameters presented in Table 14.9. The QP considers the selected cut-off grade of 4.85 g/t Au to be adequate based on the current knowledge of the project.

 

The DSO was used to demonstrate spatial continuity of the mineralized zones within “potentially mineable shapes”. The DSO parameters used a minimum mining shape of 6.1 m along the strike of the deposit, a height of 6.1 m and a minimum width of 1.5 m. The maximum shape measures 6.1 m x 6.1 m x 12.2 m in width. Only those blocks of the model constrained by the resulting conceptual mineable shapes are reported as resources.

 

The use of the conceptual mining shapes as constraints to report Mineral Resource Estimates demonstrates that the resource estimate meets the criteria defined in the CIM Definition Standards (2014), and the MRMR Best Practice Guidelines (2019) for “reasonable prospects for eventual economic extraction”.

 

Tintic Project165January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 14.9
Resource Cut-Off Grade Parameters

 

Parameters Values (USD)
Mining Cost ($/ST)  $60.00
G&A ($/ST)  $64.97
Haulage ($/ST)  $10.00
Milling ($/ST)  $89.00
Total Refining Cost ($/oz)  $2.65
Gold Price ($/oz)  $1,750
Royalty (Combination) 4.50%
Mill Recovery 95.0%
   
COG - Round up to (0.05 g/t) 4.85

Table supplied by Osisko Development.

ST = Short Ton.

 

Economics of the resources were based solely on the gold content within the mineralized domains. Silver resources reported are contained in those resource blocks that have potentially economic contained gold.

 

14.12Mined Void Depletion

 

All current underground development at the Trixie deposit has been performed by TCM. The void solids for this development are surveyed, modelled, and kept up to date by the TCM technical team. The historically mined development at Trixie has been modelled by TCM but to reduce the associated risk of the uncertainty in void locations, a buffer solid of 6.1 m was developed around the historical shapes. The buffers and the current development voids are used to deplete the final mineral resource estimate of the Trixie deposit. As underground diamond drilling continues to intersect historically mined voids, the void shapes will be refined, reducing the uncertainty, and the depletion buffers may be reduced.

 

Figure 14.6 identifies the voids used to deplete the current MRE.

 

14.13Mineral Resource Estimate

 

The QPs have classified the initial MRE as Measured, Indicated, and Inferred mineral resources based on data density, search ellipse criteria, and interpolation parameters. The initial MRE is considered to be a reasonable representation of the mineral resources of the Trixie deposit, based on the currently available data and geological knowledge. The Mineral Resource Estimate follows the 2014 CIM Definition Standards on Mineral Resources and Reserves. The effective date of the Initial Mineral Resource Estimate is January 10, 2023.

 

Table 14.10 displays the results of the initial MRE at the official 4.85 g/t Au cut-off grade for the Trixie deposit.

 

Tintic Project166January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 14.6
Vertical Long Section Looking East at the Current Development Voids and Historical Buffers,
Used to Deplete the Trixie Mineral Resources

 

 

Figure supplied by Osisko Development.

 

Tintic Project167January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 14.10
Trixie Deposit Initial Mineral Resource Estimate (MRE) Statement

 

Classification Cut-off Grade Quantity Grade Gold Contained Metal Grade Silver Contained Metal
Gold (g/t) ('000 t) (g/t) Gold ('000 oz) (g/t) Silver ('000 oz)
Measured 4.85 11 190.61 67 195.53 69
Indicated 4.85 225 20.17 146 43.73 316
Total Measured + Indicated 4.85 236 28.08 213 50.77 385
Inferred 4.85 385 19.64 243 42.82 530

Notes:

1.Effective date of the Mineral Resource Estimate (MRE) is 10 January, 2023.
2.William Lewis P.Geo, of Micon International Limited and Alan S J San Martin, AusIMM(CP), of Micon International Limited have reviewed and validated the MRE for Trixie and are independent “Qualified Persons” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). They are responsible for the initial MRE.
3.The mineral resources disclosed in this report were estimated using the CIM standards on mineral resources and reserves definitions, and guidelines prepared by the CIM standing committee on reserve definitions and adopted by the CIM council.
4.Mineral Resources are reported when they are within potentially mineable shapes derived from a stope optimizer algorithm, assuming an underground longhole stoping mining method with stopes of 6.1 m x 6.1 m x minimum 1.5 m dimensions.
5.Mineral Resources are not mineral reserves and do not have demonstrated economic viability.
6.Geologic modelling was completed by Osisko Development’s senior production geologist Courtney Kurtz, P.G. of Utah, USA using Leapfrog Geo software. The MRE was completed by Osisko Development’s chief resource geologist, Daniel Downton, P.Geo using Datamine Studio RM Pro 1.12 software. The MRE was reviewed and verified by of William Lewis and Alan San Martin of Micon.
7.The estimate is reported for an underground mining scenario and with reasonable assumptions. The cut-off grade of 4.85 g/t Au was calculated using a gold price of USD1,750/oz, a CAD: USD exchange rate of 1.3; total mining, processing and G&A costs of USD226.62/US ton a combined royalty of 4.5% and an average metallurgical recovery of 95%.
8.Average bulk density values in the mineralized domains were assigned to the T1 (2.616 t/m3), T2 (2.955 t/m3), T3 (2.638 t/m3), T4 (2.621 t/m3), and 75-85 (2.617 t/m3) domains.
9.Inverse Distance Squared interpolation method was used with a parent block size of 1.2 m x 1.2 m x 1.8 m.
10.The Mineral Resource results are presented in-situ. Estimations used metric units (metres, tonnes, g/t). The number of tonnes is rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects.
11.Neither Osisko Development nor Micon International Limited is aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the mineral resource estimate other than disclosed in this report.

 

Tintic Project168January 27, 2023
 

 

 

Osisko Development Corp.

 

14.14Mineral Resource Grade Sensitivity Analysis

 

Table 14.11 shows the cut-off grade sensitivity analysis of gold and silver for the initial MRE. The reader should be cautioned that the figures provided in Table 14.11 should not be interpreted as a mineral resource statement. The reported quantities and grade estimates at different cut-off grades are presented for the sole purpose of demonstrating the sensitivity of the mineral resource model for gold to the selection of a reporting cut-off grade. Figure 14.7 and Figure 14.8 presents the grade tonnage curves built on the cut-off grade sensitivity data presented in Table 14.11. Micon’s QP has reviewed the MRE cut-off grades used in the sensitivity analysis, and it is the opinion of the QP that they meet the test for reasonable prospects of eventual economic extraction at varying prices of gold or other underlying parameters used to calculate the cut-off grade.

 

Table 14.11
Gold Grade Sensitivity Analysis at Different Cut-Off Grades

 

Classification Tonnes COG Au (g/t) Au (oz) Ag (g/t) Ag (oz)
Measured + Indicated 334,672 2.50 20.83 224,173 42.82 460,779
319,822 2.75 21.68 222,896 43.86 450,953
307,608 3.00 22.42 221,774 44.89 443,994
294,982 3.25 23.24 220,417 45.69 433,314
282,778 3.50 24.10 219,084 46.57 423,392
271,397 3.75 24.95 217,747 47.52 414,665
262,447 4.00 25.68 216,661 48.36 408,078
254,538 4.25 26.33 215,513 48.89 400,102
246,598 4.50 27.05 214,455 49.84 395,124
238,470 4.75 27.82 213,323 50.58 387,785
235,808 4.85 28.08 212,878 50.77 384,932
233,051 5.00 28.35 212,436 51.15 383,279
225,992 5.25 29.08 211,256 51.93 377,298
219,345 5.50 29.79 210,054 52.66 371,399
214,337 5.75 30.34 209,096 53.33 367,482
209,391 6.00 30.92 208,184 53.92 363,007
203,529 6.25 31.63 206,977 54.79 358,517
198,274 6.50 32.30 205,914 55.54 354,071
193,801 6.75 32.88 204,845 56.11 349,585
189,341 7.00 33.50 203,919 56.92 346,468
185,742 7.25 34.00 203,058 57.34 342,437
181,989 7.50 34.55 202,159 57.85 338,499
Inferred 553,279 2.50 14.75 262,371 38.22 679,912
521,606 2.75 15.48 259,572 39.13 656,177
493,696 3.00 16.19 256,945 39.98 634,610
470,812 3.25 16.82 254,650 40.72 616,359
450,545 3.50 17.42 252,276 41.35 598,941
432,016 3.75 17.99 249,918 42.10 584,763
420,273 4.00 18.37 248,242 42.24 570,717
408,442 4.25 18.78 246,679 42.51 558,235
397,456 4.50 19.18 245,047 42.52 543,387
387,852 4.75 19.53 243,523 42.65 531,832
384,845 4.85 19.64 243,053 42.82 529,766
379,046 5.00 19.87 242,188 43.02 524,210
371,936 5.25 20.15 240,983 43.37 518,566
361,726 5.50 20.56 239,154 43.98 511,444
354,923 5.75 20.85 237,895 44.41 506,746
347,256 6.00 21.18 236,435 44.95 501,843
338,905 6.25 21.54 234,672 45.49 495,696
329,274 6.50 21.97 232,593 46.19 488,985
321,519 6.75 22.33 230,836 46.81 483,828
313,378 7.00 22.74 229,161 47.45 478,092
302,759 7.25 23.27 226,557 48.28 469,947
296,008 7.50 23.63 224,925 48.87 465,129

Table supplied by Osisko Development.

 

Tintic Project169January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 14.7
Grade Tonnage Curves Indicating the Sensitivity of the Measured and
Indicated Mineral Resources at Different Cut-Off Grades

 

 

Figure supplied by Osisko Development.

 

Tintic Project170January 27, 2023
 

 

 

Osisko Development Corp.

 

Figure 14.8
Grade Tonnage Curves Indicating the Sensitivity of the
Inferred Mineral Resources at Different Cut-Off Grades

 

 

Figure supplied by Osisko Development.

 

14.15Factors That Could Affect the Mineral Resource Estimates

 

It is the QP’s opinion that the factors set out below could affect the mineral resource estimate.

 

·The geological interpretations and assumptions used to generate the estimation domains.

 

·Mineralization and geologic geometry and continuity of mineralized zones.

 

·Estimates of mineralization and grade continuity.

 

·The treatment of high-grade gold and silver values.

 

·The grade interpolation methods and estimation parameter assumptions.

 

·The confidence assumptions and methods used in the mineral resource classification.

 

·The density and the methods used in the estimation of density.

 

·Metal price and other economic assumptions used in the cut-off grade determination.

 

·Input and design parameter assumptions that pertain to the underground mining constraints.

 

Tintic Project171January 27, 2023
 

 

 

Osisko Development Corp.

 

·Assumptions as to the continued ability to access the test mine site, retain mineral and surface rights titles, maintain the operation within environmental and other regulatory permits, and maintain the social license to operate.

 

No environmental, permitting, legal, title, taxation, socio-economic, marketing, political or other relevant factors are known to the QP that would materially affect the estimation of Mineral Resources that are not discussed in this report.

 

14.16Responsibility for the Trixie Mineral Resource Estimate

 

The geologic modelling for the Trixie deposit was completed by Osisko Development’s senior production geologist Courtney Kurtz, P.G. using Leapfrog Geo software. The MRE was completed by Osisko Development’s chief resource geologist, Daniel Downton, P.Geo., using Datamine Studio RM Pro 1.12 software. The MRE was then reviewed and validated by William Lewis, P.Geo. and Alan San Martin, AusIMM(CP), of Micon.

 

For the purpose of disclosure in this Technical Report, William Lewis, P.Geo., who is independent of Osisko Development and is a Qualified Person within the meaning of NI 43-101, is responsible for the initial mineral resource estimate by virtue of his review and validation of the work conducted by Osisko Development.

 

Tintic Project172January 27, 2023
 

 

 

Osisko Development Corp.

 

TECHNICAL REPORT SECTIONS NOT REQUIRED

 

The following sections which form part of the NI 43-101 reporting requirements for advanced projects or properties are not relevant to the current Technical Report.

 

15.0   Mineral Reserve Estimates

 

 

16.0   Mining Methods

 

 

17.0   Recovery Methods

 

 

18.0   Project Infrastructure

 

 

19.0   Market Studies and Contracts

 

 

20.0   environmental studies, permitting, and social or community impact

 

 

21.0   capital and operating costs

 

 

22.0   economic analysis

 

 

23.0   adjacent properties

 

 

Tintic Project173January 27, 2023
 

 

 

Osisko Development Corp.

 

Ivanhoe Electric Inc. (Ivanhoe Electric) and Freeport McMoRan Inc. (Freeport McMoRan), along with various other private landowners hold the adjacent property to the Osisko Development Tintic Project (Figure 23.1). Much of this land has been used historically for various mining related purposes, including the processing and transportation of ore material, in addition to ranching and farming.

 

Figure 23.1
Map of Adjacent Property Land Holders

 

 

Figure provided by Osisko Development.

 

Tintic Project174January 27, 2023
 

 

 

Osisko Development Corp.

 

23.1Freeport McMoRan

 

Freeport-McMoran Mineral Properties Inc. (FMMP) holds approximately 13 km2 of mineral claims to the southwest of the Tintic Project, including the Southwest Tintic Porphyry target and the Treasure Hill lithocap. FMMP acquired the claims from Quaterra Resources Inc. (Quaterra Resources) in the late 2000’s (source: Quaterra Resources website). A non-NI 43-101 compliant resource estimate of 600 million tons of 0.28% copper and 0.1% molybdenum was based on six drill holes which intercepted mineralization at a depth greater than 360 m (1,180 ft) (Krahulec, 1996). Treasure Hill hosts north-northeast trending pyrite-enargite veins. The top of the hill is characterized by strongly silicified shingle breccia, with several other breccia pipes having been mapped in the surrounding area (Krahulec and Briggs, 2006).

 

There is little publicly available data on the current status of exploration on the Freeport-McMoRan held claims. The following has been extracted from a 2011 press release by Quaterra Resources:

 

FMMP completed a total of seven reverse circulation and three diamond core holes, for a total of 4,323 m, to depths ranging from 122 m to 1,265 m. Widespread propylitic and quartz-sericite-pyrite, and lesser biotite alteration were intersected, containing generally narrow intervals of low-grade copper mineralization. Drill hole STFM-3 (TD 378 m) intersected 34 m of 0.20% Cu starting at 52 m depth in the Diamond Gulch area. That intersection was underlain by a zone of weak associated biotite alteration prior to going back into sericite-chlorite-pyrite alteration in the lower part of the hole. Elsewhere, hole STFM-1 intersected 15 m of 0.22% Cu starting at 107 m, within pyritic, advanced-argillic altered volcanic rocks, followed by quartz-sericite and biotite alteration with isolated short intervals containing 0.1 to 0.3% Cu.

 

23.1.11996 Historic Mineral Resources

 

The historical 1996 mineral resource estimate was compiled prior to the introduction of CIM reporting standards for resources and reserves. While the resources were conducted according to the standards of the time, none of the information regarding the key assumptions, parameters and methodology used to define the historical mineral resources are reported. The historical resource is reported here only as part of the public information regarding the mineral district within which the Trixie deposit is located.

 

23.2Ivanhoe Electric

 

Ivanhoe Electric Inc. (Ivanhoe Electric) holds approximately 65 km2 of patented and unpatented mineral claims with an additional approximately 75 km2 of leases and prospecting permits, all of which are located to the west and south of Osisko Development’s Tintic Project. Ivanhoe Electric initiated an exploration drill program in 2022 after more than five years of digitization of old mine records and geologic mapping. (Press release 11/22/2022).

 

The following summary has been extracted from the Ivanhoe Electric Inc. 2021 NI 43-101 Technical Report.

 

Tintic Project175January 27, 2023
 

 

 

Osisko Development Corp.

 

23.2.1Property Description and Ownership

 

Ivanhoe Electric’s holdings include a gold, silver, and base metal Carbonate Replacement Deposit (CRD), skarn, fissure vein, and copper-gold porphyry exploration project located in the historical Tintic Mining District (the District) of central Utah. The district is the site of significant historical production and over 125 years of exploration activity. The Project is located near the City of Eureka, approximately 95 km south of Salt Lake City, and can be accessed from U.S. Highway 6, approximately 30 km west of the Interstate 15 junction. It is crossed by many historical mine roads and defunct railroad paths, which provide access to most of the property. The exploration area covers approximately 65 km2 of private patented claims, unpatented claims, state leases and prospecting permits consolidated by Ivanhoe Electric into a cohesive package.

 

There is currently no mining taking place on the Project.

 

In 2019, Nordmin Resource & Industrial Engineering USA was commissioned by Ivanhoe Electric to investigate and prepare an underground rehabilitation work plan and cost estimate for the Sioux-Ajax Tunnel, Grand Central Shaft, Holden Tunnel, Mammoth Shaft and Lower Mammoth Tunnel to make these areas accessible for mapping, sampling and, in some cases, drilling. The Sioux-Ajax Tunnel and Grand Central Shaft are of highest priority for accessing the current and potential future drill targets and geologic mapping and sampling programs.

 

Between November 2017 and May 2021, Ivanhoe Electric completed comprehensive work programs including:

 

·Surface geological mapping at 1:2,500 scale across 15 km2, in conjunction with sampling and analyzing 576 rock samples.

 

·Petrography and age dating of selected surface and underground rock samples.

 

·Completion of two geophysics surveys: a 2,850 km2 airborne magnetic survey and a 72 km2 deep penetrating (>1,500 m depth), three-dimensional ground induced polarization survey.

 

·Compilation and digitization of over 500 historical maps and mine plans and sections.

 

·Geological mapping and rock chip sampling in the Sioux-Ajax Tunnel.

 

The significant work undertaken by Ivanhoe Electric has resulted in over 14 well described, geologically and geophysically supported exploration areas being recognized, four of which have been prioritized for an initial drilling program.

 

23.3QP Comments

 

Micon has not verified the information regarding the mineral deposits and showings described above that are outside the immediate area of the Trixie deposit or the property held by Osisko Development. The information contained in this section of the report, which was provided by Osisko Development, is not necessarily indicative of the mineralization at the Trixie deposit.

 

Tintic Project176January 27, 2023
 

 

 

Osisko Development Corp.

 

24.0   other relevant data and information

 

This section includes additional information intended to further the understanding of the reader regarding the Tintic Project and Trixie test mine.

 

24.1Trixie Test Mine

 

Since acquisition by Osisko Development in May, 2022, the Trixie test mine has been subject to development, rehabilitation and exploration. The material excavated during these activities has been processed at the pilot scale vat leach facility located at the old Burgin concentrator site. Details of processing activities up to the date of this Technical Report are summarized in Table 24.1.

 

Table 24.1
Trixie Test Mine Key Operating Details

 

Description  June 2022 Q3 2022
Mineralized Material Milled in short tons (tonnes) 840 (762) 2,880 (2,613)
Mill Throughput in short tons/day (tonnes/day) 28 (25.4) 31.3 (28.4)
Blended T2 & T4 Diluted Head Grade in troy oz/ton Au (grams/tonne Au) 1.2 (41.1) 0.83 (28.5)
Gold recovery (%) 78% 78%
Gold produced and sold (troy oz) 1,753 3,600
Trixie portal development feet (metres) - 1,007 (307)

Table provided by Osisko Development.

 

Development has been conducted on the 625 Level as well as a portal and decline toward the 750 L from surface, plus drill station construction. At the time of compiling this Technical Report, the decline is approximately 50% completed with 700 m driven and is expected to intersect the existing 625 Level in the second quarter of 2023.

 

The Tintic team has been rehabilitating the shaft between the 625 and 750 Levels as well as the 750 Level station and existing workings. Rehabilitation is ongoing.

 

The primary activity at the Trixie test mine has been exploration. These activities have included drilling, drifting along strike of the mineralization and driving raises along the mineralization to access upper levels.

 

Since acquisition, Osisko Development has driven 864 m of drift. This drifting has been along the T2 zone, across and within the T4 zone, across the 75-85 zone, and across the T1 zone from the 665 sublevel to the Ophir shale contact.

 

A total of 7 raises (2 post acquisition) have been excavated to explore up dip from the 625 Level and to test the contact with the overlying Ophir shale. At the time of writing this report, 166 m of raises have been driven.

 

The exploration drifting, together with the drilling at the Trixie test mine are allowing Osisko Development to further define the extent of the mineralization identified to date. This work will also provide the base for further exploration at Trixie.

 

Tintic Project177January 27, 2023
 

 

 

Osisko Development Corp.

 

25.0   interpretations and conclusions

 

25.1General Information

 

With the acquisition of the Tintic Project in May, 2022, Osisko Development has acquired the majority of the East Tintic Mining District in Utah. The East Tintic Mining District is part of the larger Tintic Mining District, where economic mineralization was first discovered in 1869, and which, by 1899, had become one of the richest mining districts in the United States. Active mining in the district continued through the 20th and beginning of the 21st century.

 

The results of the 2022 surface and underground exploration and development programs, along with the compilation of historic information for the mineral deposit at the Trixie test mine has allowed Osisko Development to disclose an Initial Mineral Resource Estimate for the Trixie deposit.

 

25.2Trixie Initial Mineral Resource Estimate

 

25.2.1Introduction

 

The Initial Mineral Resource Estimate for the Trixie deposit (the “initial MRE”), was conducted in December, 2022 and January, 2023.

 

25.2.2Methodology

 

The mineral resource area for the Trixie deposit covers a strike length of approximately 445 m down to a vertical depth of approximately 295 m below surface.

 

The wireframe models for the Trixie deposit were prepared using LeapFrog GEO v.2022.1 (LeapFrog). Wireframe modelling included the construction of five mineralized domains constrained to the extents of the regional-scale Tintic Quartzite lithologic unit and capped by shale belonging to the overlying lower member of the Ophir Formation. Geostatistical analyses were carried out using Datamine Snowden Supervisor v.8.15.0.1 (Supervisor). The estimation, block model and grade interpolation, were prepared using Datamine StudioTM RM Pro v.1.12.113.0 (Datamine). Resource-level potentially mineable underground shapes were created using the Deswik CAD v.2021.2.748 Shape Optimizer module (DSO).

 

25.2.3Resource Database

 

The close-out date for the Trixie deposit initial MRE database is December 12, 2022. The database consists of 42 validated diamond drill holes, totalling 2,358.45 m of core, including 1,802 sample intervals. The database also includes 8 validated RC drill holes, totalling 2,421.64 m of RC drilling and including 987 sample intervals, and 1,019 underground chip sample strings comprised of 4,467 sample intervals assayed for gold and silver.

 

The database includes validated location, survey, and assay results. It also includes lithological descriptions taken from drill core logs.

 

Tintic Project178January 27, 2023
 

 

 

Osisko Development Corp.

 

The database covers the strike length of each mineralized domain at variable drill hole and chip sample spacings, ranging from 1.5 to 50 m.

 

In addition to the tables of raw data, each database includes several tables of calculated drill hole composites and wireframe solid intersections, which are required for the statistical evaluation and mineral resource block modelling.

 

25.2.4Geological Model

 

The geological model of the Trixie deposit was prepared in LeapFrog, using underground mapping, chip samples, RC drill holes, and validated diamond drill holes, all completed by December 12, 2022.

 

A total of five mineralized domains were modelled with each domain restricted up dip by its contact with the lower shale member of the Ophir Formation, as this contact acts as an impermeable cap to mineralizing fluids.

 

The domains modelled were the T1, T2, T3, T4 and the 75-85. In addition, a north-south trending sub-vertically dipping fault structure has been mapped across multiple underground development headings near the 625 level and has been intercepted in multiple drill holes. Though the full extent of the structure is at present unknown, it is currently inferred to project through the entirety of the model. As underground mapping indicates minor offset of the T2 structure across this fault, it is used as a hard modelling boundary for geological modelling and grade interpolation. The model is thus split into east and west fault blocks with each mineralized domain subdivided into respective east and west subdomains.

 

25.2.5Geostatistical Analysis

 

25.2.5.1Compositing

 

Most of the analytical samples collected were between 0.31 and 1.52 m in length. A modal composite length of approximately 0.61 m was applied to domains T2 and T3, generating composites as close to 0.61 m as possible, while creating residual intervals with a minimum of 0.06 m in length. A modal composite length of 0.91 m was applied to all other domains. In all cases, composite files were derived from raw values within the modelled resource domains.

 

25.2.5.2High grade Capping

 

Multiple capping (different capping at different ranges in each domain) was selected as the capping methodology for outlying gold and silver grades at the Trixie deposit. After considering reconciliation results and geological continuity, the T2 domain uses a single capping grade for gold. The top capping thresholds were selected based on the probability plots and vary from 20.0 g/t to 1,350.0 g/t Au and 200.0 g/t to 2,500.0 g/t Ag.

 

The maximum range for high-grade continuity was established using the indicator variograms, which suggests a loss of continuity after 4.5 m to 9.0 m, depending on the mineralized domain. A range of 7.6 m was selected and applied to all zones as a general average search range for the first top grade capping level.

 

Tintic Project179January 27, 2023
 

 

 

Osisko Development Corp.

 

25.2.5.3Density

 

The density databases contain 512 measurements taken on samples across multiple geologic domains.

 

Average bulk density values in the mineralized domains were assigned to the T1 (2.616 t/m3), T2 (2.955 t/m3), T3 (2.638 t/m3), T4 (2.621 t/m3), and 75-85 (2.617 t/m3) domains.

 

A density of 0.00 t/m3 was assigned to the underground development from all past mining activities.

 

Bulk densities were used to calculate tonnages from the volume estimates in the block model.

 

25.2.5.4Variogram Analysis

 

The spatial distribution of gold and silver was evaluated through variographic analysis for each mineralized domain using spherical variograms.

 

All variogram analyses and modelling were performed in “Supervisor”. Primary directions and orientations of the variograms were observed in the data and visually in 3D space. These orientations were then examined statistically within the software package, to ensure that they represented the best possible fit of the geology and grade continuity.

 

25.2.5.5Search Parameters

 

For the T2, T3, and 75-85 domains, the 3D directional-specific search ellipses were guided by the local structural orientation of the domain for an anisotropic search. For the T1 and T4 domains 3D directional-specific search ellipses were guided by the Au and Ag grade variograms. The search radii were influenced and determined by both the grade and indicator variograms.

 

Grade distributions and kriging neighbourhood analysis were used to help guide the number of composites to use for the grade interpolations.

 

Search neighbourhoods used different capping levels as determined through the threshold analyses

 

25.2.6Block Model and Grade Interpretation

 

The criteria used in the selection of block size include drill hole spacing, composite length, the geometry of the modelled zone and the anticipated mining methods. A block size of 1.22 m x 1.22 m x 1.83 m was adopted. Sub-cells were used, allowing a resolution of 0.30 m x 0.30 m x 0.30 m to better reflect the shape of the mineralization domains. Sub-cells were assigned the same values as their parent cell. No rotation was applied to the block model.

 

Four search passes were used for the grade estimation and each one utilized a capped grade from the multiple capping levels determined through threshold analyses. A series of sensitivity runs were performed to examine the impact of various parameters on the estimation. Parameters were selected, and gold and silver were estimated, using ID2. Each subsequent estimation pass used increasing search neighbourhood sizes, determined from grade and indicator variogram results. Samples from a minimum of two drill holes or chip strings were required to estimate grade for all blocks.

 

Tintic Project180January 27, 2023
 

 

 

Osisko Development Corp.

 

25.2.7Model Validation

 

Mineralized domain models were validated using a variety of methods including visual inspection of the model grades and grade distributions compared to the informing raw samples, statistical comparisons of informing composites to the modelled grade for local and global bias, and reconciliation comparing the model to observed grades from underground development.

 

All analyses indicated that the model follows the grade distribution of the informing composites, thus confirming the accuracy of the model. The total global comparison for each resource classification is within a 20% tolerance for bias and reconciliation. The QP considers that the model is valid and is a reasonable representation of the Trixie mineralization based on the current level of sampling and geological information.

 

25.2.8Mineral Resource Classification

 

Mineral Resource Classification was determined through geometric criteria deemed reasonable for the deposit.

 

Due to the lack of sample data that fully crosscuts the T1 and 75-85 domains, no material has been classified as measured for these domains, and the characteristics used to classify indicated material have tighter constraints.

 

Due to the geological nature of the stockwork structures in the T4 domain, there is a degree of uncertainty in the ranges of the high-grade mineralization. Therefore, no material has been classified as measured.

 

Blocks estimated within the mineralized domains not meeting the criteria to classify them as either measured indicated or inferred were not classified and are not part of the mineral resource estimate.

 

25.2.9Reasonable Prospects for Eventual Economic Extraction

 

A reasonable economic cut-off grade for resource evaluation at the Trixie deposit is 4.85 g/t Au. This was determined using the parameters presented in Table 25.1. The QP considers the selected cut-off grade of 4.85 g/t Au to be adequate based on the current knowledge of the deposit.

 

The Deswik Stope Optimizer (DSO) was used to demonstrate spatial continuity of the mineralized zones within “potentially mineable shapes”. The DSO parameters used a minimum mining shape of 6.1 m along the strike of the deposit, a height of 6.1 m and a minimum width of 1.5 m. The maximum shape measures 6.1 m x 6.1 m x 12.2 m in width. Only those blocks of the model constrained by the resulting conceptual mineable shapes are reported as resources.

 

The use of the conceptual mining shapes as constraints to report the Mineral Resource Estimate demonstrates that the criteria defined in the CIM Definition Standards (2014), and the MRMR Best Practice Guidelines (2019) for “reasonable prospects for eventual economic extraction” have been met.

 

Tintic Project181January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 25.1
Resource Cut-Off Grade Parameters

 

Parameters Values (USD)
Mining Cost ($/ST)  $60.00
G&A ($/ST)  $64.97
Haulage ($/ST)  $10.00
Milling ($/ST)  $89.00
Total Refining Cost ($/oz)  $2.65
Gold Price ($/oz)  $1,750
Royalty (Combination) 4.50%
Mill Recovery 95.0%
   
COG - Round up to (0.05 g/T) 4.85

Table supplied by Osisko Development.

 

The economics of the resources were based solely on the gold content within the mineralized domains. Silver resources reported are contained within those resource blocks determined to be potentially economically viable on the basis of their contained gold.

 

25.2.10Mined Void Depletion

 

All current underground development at the Trixie deposit is by TCM and the void solids for this development are surveyed, modelled, and kept up to date by TCM. The historically mined development at Trixie has been modelled by TCM but to reduce the associated risk of the uncertainty in void locations, a buffer solid of 6.1 m was developed around the historical shapes. The historical buffers and the current development voids are used to deplete the final mineral resource of the Trixie deposit.

 

25.2.11Trixie Initial Mineral Resource Estimate Statement

 

The QPs have classified the initial MRE as Measured, Indicated, and Inferred mineral resources based on data density, search ellipse criteria, and interpolation parameters. The initial MRE is considered a reasonable representation of the mineral resources of the Trixie deposit, based on the current quality data and geological knowledge. The Mineral Resource Estimate follows the 2014 CIM Definition Standards on Mineral Resources and Reserves.

 

Table 25.2 summarizes the results of the initial MRE for the Trixie deposit, at the 4.85 g/t Au cut-off grade.

 

Tintic Project182January 27, 2023
 

 

 

Osisko Development Corp.

 

Table 25.2
Trixie Deposit Initial Mineral Resource Estimate (MRE) Statement

 

Classification Cut-off Grade Quantity Grade Gold Contained Metal Grade Silver Contained Metal
Gold (g/t) ('000 t) (g/t) Gold ('000 oz) (g/t) Silver ('000 oz)
Measured 4.85 11 190.61 67 195.53 69
Indicated 4.85 225 20.17 146 43.73 316
Total Measured + Indicated 4.85 236 28.08 213 50.77 385
Inferred 4.85 385 19.64 243 42.82 530

Notes:

1.Effective date of the Mineral Resource Estimate (MRE) is 10 January, 2023.
2.William Lewis P.Geo, of Micon International Limited and Alan S J San Martin, AusIMM(CP), of Micon International Limited have reviewed and validated the MRE for Trixie and are independent “Qualified Persons” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). They are responsible for the initial MRE.
3.The mineral resources disclosed in this report were estimated using the CIM standards on mineral resources and reserves definitions, and guidelines prepared by the CIM standing committee on reserve definitions and adopted by the CIM council.
4.Mineral Resources are reported when they are within potentially mineable shapes derived from a stope optimizer algorithm, assuming an underground longhole stoping mining method with stopes of 6.1 m x 6.1 m x minimum 1.5 m dimensions.
5.Mineral Resources are not mineral reserves and do not have demonstrated economic viability.
6.Geologic modelling was completed by Osisko Development’s senior production geologist Courtney Kurtz, P.G. of Utah, USA using Leapfrog Geo software. The MRE was completed by Osisko Development’s chief resource geologist, Daniel Downton, P.Geo using Datamine Studio RM Pro 1.12 software. The MRE was reviewed and validated by William Lewis and Alan San Martin of Micon.
7.The estimate is reported for an underground mining scenario and with reasonable assumptions. The cut-off grade of 4.85 g/t Au was calculated using a gold price of USD1,750/oz, a CAD: USD exchange rate of 1.3; total mining, processing and G&A costs of USD 226.62/short ton a combined royalty of 4.5% and an average metallurgical recovery of 95%.
8.Average bulk density values in the mineralized domains were assigned to the T1 (2.616 t/m3), T2 (2.955 t/m3), T3 (2.638 t/m3), T4 (2.621 t/m3), and 75-85 (2.617 t/m3) domains.
9.Inverse Distance Squared interpolation method was used with a parent block size of 1.2 m x 1.2 m x 1.8 m.
10.The Mineral Resource results are presented in-situ. Estimations used metric units (metres, tonnes, g/t). The number of tonnes is rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects.
11.Neither Osisko Development nor Micon International Limited is aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the mineral resource estimate other than disclosed in this report.

 

Tintic Project183January 27, 2023
 

 

 

Osisko Development Corp.

 

25.2.12Mineral Resource Grade Sensitivity Analysis

 

Table 25.3 shows the cut-off grade sensitivity analysis of gold and silver for the initial MRE. The reader should be cautioned that the figures provided in Table 25.3 should not be interpreted as a mineral resource statement. The reported quantities and grade estimates at different cut-off grades are presented for the sole purpose of demonstrating the sensitivity of the mineral resource model for gold to the selection of a reporting cut-off grade. Micon’s QP has reviewed the MRE cut-off grades used in the sensitivity analysis, and it is the opinion of the QP that they meet the test for reasonable prospects of eventual economic extraction at varying prices of gold or other underlying parameters used to calculate the cut-off grade.

 

Table 25.3
Gold Grade Sensitivity Analysis at Different Cut-Off Grades

 

Classification Tonnes COG Au (g/t) Au (oz) Ag (g/t) Ag (oz)
Measured + Indicated 334,672 2.50 20.83 224,173 42.82 460,779
319,822 2.75 21.68 222,896 43.86 450,953
307,608 3.00 22.42 221,774 44.89 443,994
294,982 3.25 23.24 220,417 45.69 433,314
282,778 3.50 24.10 219,084 46.57 423,392
271,397 3.75 24.95 217,747 47.52 414,665
262,447 4.00 25.68 216,661 48.36 408,078
254,538 4.25 26.33 215,513 48.89 400,102
246,598 4.50 27.05 214,455 49.84 395,124
238,470 4.75 27.82 213,323 50.58 387,785
235,808 4.85 28.08 212,878 50.77 384,932
233,051 5.00 28.35 212,436 51.15 383,279
225,992 5.25 29.08 211,256 51.93 377,298
219,345 5.50 29.79 210,054 52.66 371,399
214,337 5.75 30.34 209,096 53.33 367,482
209,391 6.00 30.92 208,184 53.92 363,007
203,529 6.25 31.63 206,977 54.79 358,517
198,274 6.50 32.30 205,914 55.54 354,071
193,801 6.75 32.88 204,845 56.11 349,585
189,341 7.00 33.50 203,919 56.92 346,468
185,742 7.25 34.00 203,058 57.34 342,437
181,989 7.50 34.55 202,159 57.85 338,499
Inferred 553,279 2.50 14.75 262,371 38.22 679,912
521,606 2.75 15.48 259,572 39.13 656,177
493,696 3.00 16.19 256,945 39.98 634,610
470,812 3.25 16.82 254,650 40.72 616,359
450,545 3.50 17.42 252,276 41.35 598,941
432,016 3.75 17.99 249,918 42.10 584,763
420,273 4.00 18.37 248,242 42.24 570,717
408,442 4.25 18.78 246,679 42.51 558,235
397,456 4.50 19.18 245,047 42.52 543,387
387,852 4.75 19.53 243,523 42.65 531,832
384,845 4.85 19.64 243,053 42.82 529,766
379,046 5.00 19.87 242,188 43.02 524,210
371,936 5.25 20.15 240,983 43.37 518,566
361,726 5.50 20.56 239,154 43.98 511,444
354,923 5.75 20.85 237,895 44.41 506,746
347,256 6.00 21.18 236,435 44.95 501,843
338,905 6.25 21.54 234,672 45.49 495,696
329,274 6.50 21.97 232,593 46.19 488,985
321,519 6.75 22.33 230,836 46.81 483,828
313,378 7.00 22.74 229,161 47.45 478,092
302,759 7.25 23.27 226,557 48.28 469,947
296,008 7.50 23.63 224,925 48.87 465,129

Table supplied by Osisko Development.

 

Tintic Project184January 27, 2023
 

 

 

Osisko Development Corp.

 

25.3Conclusions

 

With its purchase of TCM in May, 2022, Osisko Development has acquired a major portion of the historical East Tintic Mining District in Utah. The east Tintic district has been a prolific mining district throughout most of its history with several past producers located within the boundaries of Osisko Development’s Tintic Project.

 

The exploration, compilation and development work on the Trixie deposit conducted by Osisko Development since its acquisition has resulted in a better understanding of the geology and mineralization. Based upon the work, Osisko Development has been able to undertake an initial mineral resource estimate for the Trixie deposit, which remains open at depth and along strike.

 

Micon QPs have reviewed and validated the programs conducted by Osisko Development which are the basis for the initial mineral recourse estimate, as well as validating the mineral resource itself. It is Micon’s QPs opinion that the exploration programs which are basis of the mineral resource estimate and the mineral resource estimate itself have both been conducted according to industry best practices as outlined by the CIM. Therefore, Micon’s QPs believe that the initial mineral resource estimate can be used as the basis for further exploration and development work, to expand the mineral resources and begin to conduct work leading to the undertaking of a Preliminary Economic Assessment (PEA) for the Trixie deposit.

 

Tintic Project185January 27, 2023
 

 

 

Osisko Development Corp.

 

26.0   recommendations

 

26.1Exploration Budget and Other Expenditures

 

The budgets presented in Table 26.1 and Table 26.2 summarize the estimated costs for completing the recommended drilling and exploration program described below. The budget is a cost estimate and guideline to complete the work. The budget is divided into a two-phase approach, with the second phase contingent on the successful completion of the first.

 

Table 26.1
Tintic Project, Recommended Budget for Further Work, Phase 1 (USD)

 

Type of Activity Cost/ft (approx.) All included Quantity Total (USD)
Infill and Exploration Drilling on Existing Resource $260/ft. 20,000 ft. $5,200,000
Regional Drilling $260/ft 20,000 ft. $5,200,000
Surface geochemical Surveys, Surface and Underground Sampling and Mapping, GIS Compilation     $1,500,000
LiDAR Survey     $55,000
Operational Permits     $1,000,000
Environmental Studies     $1,000,000
Update MRE     $200,000
Metallurgical Test Work     $150,000
Property Wide Activities Subtotal     $14,305,000
Contingency (~10%)     $1,430,500
Total Phase 1     $15,735,500

Table provided by Osisko Development.

 

Table 26.2
Tintic Project, Recommended Budget for Further Work, Phase 2 (US$)

 

Type of Activity Cost/ft (approx.) All included Quantity Total (USD)
Additional Infill and Exploration Drilling on Existing Resource $260/ft. 20,000 ft. $5,200,000
 Additional Regional Drilling $260/ft 20,000 ft. $5,200,000
Completion of a PEA     $2,000,000
Underground development for exploration ramp $2500/ft 10,000 ft.  $25,000,000
Contingency (~10%)     $3,740,000
Total Phase 2     $41,140,000
Total Phase 1 and 2     $56,875,500

Table provided by Osisko Development.

 

It is the opinion of the Micon QPs that all of the recommended work is warranted and that only the amount of exploration drilling on new targets needs to be finalized. Micon and its QPs appreciate that the nature of the programs and expenditures may change as the further studies are undertaken, and that the final expenditures and results may not be the same as originally proposed.

 

Tintic Project186January 27, 2023
 

 

 

Osisko Development Corp.

 

The Micon QPs are of the opinion that Osisko Development’s recommended work program and proposed expenditures are appropriate and well thought out. The Micon QPs believe that the proposed budget reasonably reflects the type and amount of the activities required to advance the Trixie deposit.

 

26.2Further Recommendations

 

Based on the results of the initial MRE, Micon’s QPs recommend further exploration and development of Trixie deposit. It is recommended that Osisko Development continues with underground exploration drilling at Trixie 625 L, together with continued face sampling and mapping along strike and down dip of the mineral resource and to infill areas currently defined as being in the inferred category. It is also recommended that, since the continued underground face sampling has been beneficial to the development of the Project, exploration development continue, in order to improve underground access from surface to the deeper levels of the mine. In addition to exploration at Trixie, it is recommended that Osisko Development continue its exploration program on the other mineral targets on the Tintic Property, with continued surface mapping and sampling, data compilation and surface drilling of regional high sulphidation, CRD and porphyry targets.

 

It is recommended that Osisko Development move to a PEA at Trixie by conducting additional metallurgical work, along with further engineering studies on mining and reconciliation, continuing with environmental, permitting and community engagement and conducting a detailed economic analysis.

 

In summary, the following work program is recommended:

 

1.Exploration Work:

 

a)Conduct an additional approximately 6,000 m (20,000 ft.) of underground diamond drilling for exploration and delineation at Trixie, with primary focus on the T2 and T4 deposits.

 

b)Continue to develop a structural model with underground face and back mapping at Trixie.

 

c)Incorporate the remaining 2022 drill results and 2023 drill results into an updated MRE.

 

d)Continue generative work within the greater Tintic Project, including geophysical interpretation, historic data compilation, and geologic modelling of high sulphidation targets at North Lily and Eureka Standard, CRD targets at Tintic Standard and Burgin, and porphyry targets at Big Hill and Silver Pass areas.

 

e)Commence surface drilling of regional targets to potentially add further mineral resources in secondary deposits.

 

f)Perform a LiDAR survey on the property for collection of surface imagery and for aiding in structural interpretation.

 

g)Investigate the acquisition of a Bazooka drill to conduct short < 25 m (<82 ft) drill holes in conjunction with development underground. This is separate from drilling longer underground exploration holes from a set drilling station.

 

h)Investigate the use of conducting sludge sampling to provide data on the lateral extent of the grade up to approximately 3.5 m in each wall of the drift as development progresses.

 

Tintic Project187January 27, 2023
 

 

 

Osisko Development Corp.

 

i)Conduct further density sampling for each of the geological domains.

 

j)Continue construction of the Trixie ramp to make exploration more accessible and continue to improve access to deeper levels for continuous face sampling.

 

2.Burgin Onsite Assay Laboratory:

 

a)Continue to undertake bi-annual independent inspections of the onsite assay laboratory.

 

b)Have the onsite laboratory participate in independent assay round robins as part of its QA/QC practices.

 

c)Conduct regular screen metallic assays for all gold samples above a pre-determined grade, possibly 1 ounce of gold per short ton.

 

3.Metallurgical Testwork:

 

It is recommended that the following program of metallurgical testing be undertaken during the next stage of project development:

 

a)Leaching tests to optimize conditions in terms of precious metal recovery, capital costs and operating costs.

 

b)Comparative testwork and techno-economic study to compare heap, VAT and agitation leaching technologies.

 

c)Geochemical characterization testwork on representative feed and residue samples.

 

d)Appropriate additional comminution testing, depending on the most likely process flowsheet.

 

e)Variability testwork.

 

4.PEA:

 

a)Complete independent metallurgical testwork at the Trixie test mine. Conduct variability testwork and separate recoverability testwork for each zone. If the zones exhibit notable or significant differences in recoveries, incorporate those into an updated resource model.

 

b)Complete further geotechnical work.

 

c)Identify further permitting considerations and potential environmental studies for the Project

 

d)Continue with further community engagement and social license management.

 

e)Undertake further detailed economic analysis, based upon engineering and metallurgical trade-off studies.

 

Tintic Project188January 27, 2023
 

 

 

Osisko Development Corp.

 

27.0   Date and signiture page

 

The independent Qualified Persons for this report are as follows:

 

MICON INTERNATIONAL LIMITED

 

 

“William J. Lewis” {signed and sealed as of the report date}
   
William J. Lewis, P.Geo. Report Date: January 27, 2023.
Senior Geologist Effective Date: January 10, 2023.

 

 

“Alan J. San Martin” {signed as of the report date}  
   
Ing. Alan J. San Martin, MAusIMM (CP) Report Date: January 27, 2023.
Mineral Resource Specialist Effective Date: January 10, 2023.

 

 

“Richard Gowans” {signed and sealed as of the report date}  
   
Richard M. Gowans, P.Eng. Report Date: January 27, 2023.
Principal Metallurgist Effective Date: January 10, 2023.

 

 

 

Tintic Project189January 27, 2023
 

 

 

Osisko Development Corp.

 

28.0   References

 

28.1General Publication and Report References

 

Allen, T.L., (2012), “Mafic Alkaline Magmatism in the East Tintic Mountains, West-Central Utah: Implications for a Late Oligocene Transition from Subduction to Extension.” Provo, UT, Brigham Young University, M.S. thesis, 55 p., https://scholarsarchive.byu.edu/etd/2938/.

 

Allmendinger, R.W., and Jordan, T.E., (1981), “Mesozoic evolution, hinterland of the Sevier orogenic belt”. Geology, vol. 9, no. 7, pp. 308–313. https://doi.org/10.1130/0091-7613(1981)9<308:MEHOTS>2.0.CO;2.

 

Applied Petrologic Services and Research, (2020), “Petrologic Studies of Drill Core & Subsurface Rock Chip from the Trixie Precious Metal Mine, Utah USA.” Report APSAR123001 prepared for Tintic Consolidated Metals, 36 p.

 

Banks, Paul, (2015), An Update on harmonization of 2014 CIM Definition Standards, CIM Magazine, Vol. 10, No. 3, May,2015, pp 44 to 46. 41p.

 

Banks, Paul, (2015), Implementation of 2014 CIM Definition Standards, CIM Magazine, Vol. 10, No. 5, August,2015, pp 32 to 34.

 

Jolette, C., (2022) Laboratory Audit – Burgin Mine, internal report conducted for Osisko Development Corp. by Qualitica Consulting Inc., 41 p.

 

John, D.A., Vikre, P.G., du Bray, E.A., Blakely, R.J., Fey, D.L., Rockwell, B.W., Mauk, J.L., Anderson, E.D., and Graybeal, F.T., (2018), “Descriptive models for epithermal gold-silver deposits.” U.S. Geological Survey Scientific Investigations Report 2010–5070–Q, 247 p., https://doi.org/10.3133/sir20105070Q.

 

Kappes, Cassiday & Associates, (July, 2022), Trixie Project, T2 Soil Sample, Report of Metallurgical Test Work Prepared for Tintic Consolidated Metals LLC, 127 p.

 

Kappes, Cassiday & Associates, (October, 2022), Trixie Project, T4 Soil Sample, Report of Metallurgical Test Work Prepared for Tintic Consolidated Metals LLC, 98 p.

 

Krahulec, K., and Briggs, D.F., (2006), “History, Geology, and Production of the Tintic Mining District, Juab, Utah, and Tooele Counties, Utah.” in Bon., R.L., Gloyn, R.W., and Park, G.M., eds. Mining Districts of Utah, Geological Association of Utah Publication, no. 32, pp. 121–50.

 

Krahulec, K., (1996), “Geology and Geochemistry of the SWT Copper System, Tintic Mining District, Juab County, Utah.” Geology and Ore Deposits of the American Cordillera: Field Trip Guidebook Compendium: April 10-13, 1995 Reno/Sparks, Nevada: pp 62 to 78.

 

Keith, J.D., Dallmeyer, R.D., Kim., C-S., and Kowallis, B.J., (1989), “A Re-evaluation of the volcanic history and mineral potential of the central East Tintic Mountains, Utah.” Utah Geological and Mineral Survey Open File Report 166, 86 p.

 

Tintic Project190January 27, 2023
 

 

 

Osisko Development Corp.

 

Hedenquist, J. W. and Henley, R. W., (1985), “Hydrothermal eruptions in the Waiotapu geothermal system, New Zealand: their origin, associated breccias, and relation to precious metal mineralization” Economic Geology, vol. 80, pp. 1640–1668.

 

Laughlin, A. W., Lovering, T.S., and Mauger, R.L., (1969), “Age of Some Tertiary Igneous Rocks from the East Tintic District, Utah.” Economic Geology, vol. 64, no. 8, pp. 915 to 918, https://doi.org/10.2113/gsecongeo.64.8.915.

 

Leveille, R.A., (2021), “Volcanic Stratigraphy, Instructions, and Targets, Tintic District, Utah.” Report prepared for Tintic Consolidated Metals. 8 p.

 

McKean, A.P., (2011), “Volcanic stratigraphy and a kinematic analysis of NE-trending faults of Allens Ranch 7.5' quadrangle, Utah County, Utah.” Provo, UT, Brigham Young University, M.S. thesis, 95 p., https://scholarsarchive.byu.edu/etd/2410/.

 

Moore, D.K., (1993), “Oligocene East Tintic volcanic Field, Utah – geology and petrogenesis.” Provo, UT, Brigham Young University, M.S. thesis, 64 p.

 

Moore, D. K., Keith, J. D., Christiansen, E. H., Kim, C. S., Tingey, D. G., Nelson, S. T., and Flamm, D. S., (2007), “Petrogenesis of the Oligocene East Tintic volcanic field, Utah.” in Willis, G.C., Hylland, M.D., Clark, D.L., and Chidsey, T.C., Jr., eds. Central Utah – Diverse geology of a Dynamic Landscape, Geological Association of Utah Publication, no. 36, pp. 163-180.

 

Morris, H. T., (1956), United States Geological Survey. Geologic Map and Section of the Tintic Junction Quadrangle, Juab, Tooele and Utah Counties, Utah. Map. 1:24 000. Bulletin 1142-L, Plate I. Reston, VA: U.S. Department of the Interior.

 

Morris, H., T. (1964), “Geology of the Eureka Quadrangle Utah and Juab Counties, Utah.” Contributions to Economic Geology, Geological Survey Bulletin 1142-K. U.S. Department of the Interior.

 

Morris, H., T. (1964), “Geology of the Tintic Junction Quadrangle Tooele, Juab, and Utah Counties, Utah.” Contributions to Economic Geology, Geological Survey Bulletin 1142-L. Department of the Interior.

 

Morris, H. T., (1964), United States Geological Survey. Geologic Map and Section of the Eureka Quadrangle, Juab and Utah Counties, Utah. Map. 1:24 000. Bulletin 1142-K, Plate I. Reston, VA: U.S. Department of the Interior.

 

Morris, H.T., Lovering, T.S., Mogensen, A.P., Shepard, W.M., Perry, L.I., and Smith, S.M., (1979), “General Geology and Mines of the East-Tintic Mining District, Utah and Juab Counties, Utah.” U.S. Geological Survey Professional Paper, vol. 1024.

 

Morris, H.T., Lovering, T.S., Mogensen, A.P., Shepard, W.M., Perry, L.I., and Smith, S.M., (1979), United States Geological Survey. Geologic map of the East Tintic mining district, Utah and Juab Counties, Utah. Map. 1:9 600. Professional Paper 1024, Plate I. Reston, VA: U.S. Department of the Interior.

 

Tintic Project191January 27, 2023
 

 

 

Osisko Development Corp.

 

Morris, H.T., Lovering, T.S., Mogensen, A.P., Shepard, W.M., Perry, L.I., and Smith, S.M., (1979), United States Geological Survey. Geologic sections of the East Tintic mining district, Utah and Juab Counties, Utah. Map. 1:9 600. Professional Paper 1024, Plate II. Reston, VA: U.S. Department of the Interior.

 

SRK Consulting (U.S.)., (2021) “NI 43-101 Technical Report: Mineral Project Exploration Information, Tintic Project, Utah, U.S.A.” Prepared for Ivanhoe Electric, A.M. Deiss, QP, 158 p.

 

Sillitoe, R.H., (2006), “Exploration Potential of the Tintic District.” Report prepared for Chief Consolidated Mining Company, 12 p.

 

Tintic Consolidated Metals., (2022), Technical Report on the Tintic Project: East Tintic Mining District: Utah County, Utah, USA. Draft NI-43-101 prepared for Osisko Development Corporation, T.A. Henricksen, QP. 197 p.

 

Utah Geological Survey and New Mexico Geochronology Research Laboratory., (2007), “40Ar/39Ar Geochronology Results for the Furner Ridge and Tintic Mountain Quadrangles, Utah.” Utah Geological Survey Open File Report 505, 26 p. http://geology.utah.gov/online/ofr/ofr-505.pdf.

 

Utah Geological Survey and Nevada Isotope Geochronology Laboratory., (2009), “40Ar/39Ar Geochronology Results for Tintic Mountain and Champlin Peak Quadrangles, Utah.” Utah Geological Survey Open Field Report 558, 17 p. http://geology.utah.gov/online/ofr/ofr-558.pdf.

 

Yonkee, W. A., and Weil, A.B., (2015), "Tectonic evolution of the Sevier and Laramide belts within the North American Cordillera orogenic system." Earth-Science Reviews, vol. 150, pp. 531-593.

 

28.2Website References

 

Osisko Development Corporation website, (2023), https://osiskodev.com/news/

 

Tintic Project192January 27, 2023
 

 

 

Osisko Development Corp.

 

29.0   Certificates

 

 

 

 

 

 

 

 

 

 

Tintic Project193January 27, 2023
 

 

 

Osisko Development Corp.

 

CERTIFICATE OF AUTHOR

William J. Lewis, P.Geo.

 

As the co-author of this report for Osisko Development Corp. entitled “NI 43-101 Technical Report, Initial Mineral Resource Estimate for the Trixie Deposit, Tintic Project, Utah, USA” dated January 27, 2023, with an effective date of January 10, 2023, I, William J. Lewis do hereby certify that:

 

1.I am employed as a Senior Geologist by, and carried out this assignment for, Micon International Limited, Suite 601, 90 Eglinton Avenue East, Toronto, Ontario M4P 2Y3, tel. (416) 362-5135, e-mail wlewis@micon-international.com.

 

2.This certificate applies to the Technical Report titled “NI 43-101 Technical Report, Initial Mineral Resource Estimate for the Trixie Deposit, Tintic Project, Utah, USA” dated January 27, 2023, with an effective date of January 10, 2023

 

3.I hold the following academic qualifications:

 

B.Sc. (Geology) University of British Columbia 1985.

 

4.I am a registered Professional Geoscientist with the Association of Professional Engineers and Geoscientists of Manitoba (membership # 20480); as well, I am a member in good standing of several other technical associations and societies, including:
·Association of Professional Engineers and Geoscientists of British Columbia (Membership # 20333).
·Association of Professional Engineers, Geologists and Geophysicists of the Northwest Territories (Membership # 1450).
·Professional Association of Geoscientists of Ontario (Membership # 1522).
·The Canadian Institute of Mining, Metallurgy and Petroleum (Member # 94758).

 

5.I have worked as a geologist in the minerals industry for over 35 years.

 

6.I am familiar with NI 43-101 and, by reason of education, experience and professional registration, I fulfill the requirements of a Qualified Person as defined in NI 43-101. My work experience includes 4 years as an exploration geologist looking for gold and base metal deposits, more than 11 years as a mine geologist in underground mines and 20 years as a surficial geologist and consulting geologist on precious and base metals and industrial minerals.

 

7.I have read NI 43-101 and this Technical Report has been prepared in compliance with the instrument.

 

8.I have visited the Tintic Project and the Trixie Deposit for three days between September 12 to September 16, 2022.

 

9.This is the first Technical Report I have written or co-authored for the mineral property that is the subject of this Technical Report.

 

10.I am independent Osisko Development Corp. and its subsidiaries according to the definition described in NI 43-101 and the Companion Policy 43-101 CP.

 

11.I am responsible for Section 1 (except for 1.7), 2 to 12, 14.1 to 14.4, 14.10 to 14.16 (except for 14.12) and 23 to 28 of this Technical Report with Sections 15 through 22 not applicable to this Technical Report.

 

12.As of the date of this certificate, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make this technical report not misleading.

 

Report Dated this 27 day of January, 2023 with an effective date of January 10, 2023.

 

 

“William J. Lewis” {signed and sealed as of the report date}

 

William J. Lewis, B.Sc., P.Geo.

Senior Geologist, Micon International Limited

 

Tintic Project194January 27, 2023
 

 

 

Osisko Development Corp.

 

CERTIFICATE OF AUTHOR

Ing. Alan J. San Martin, MAusIMM (CP)

 

As the co-author of this report for Osisko Development Corp. entitled “NI 43-101 Technical Report, Initial Mineral Resource Estimate for the Trixie Deposit, Tintic Project, Utah, USA” dated January 27, 2023, with an effective date of January 10, 2023, I, Alan J. San Martin do hereby certify that:

 

1.I am employed as a Mineral Resource Specialist by Micon International Limited, Suite 601, 90 Eglinton Avenue East, Toronto, Ontario M4P 2Y3, tel. (416) 362-5135, e-mail asanmartin@micon-international.com.

 

2.I hold a bachelor’s degree in mining engineering (equivalent to B.Sc.) from the National University of Piura, Peru, 1999.

 

3.I am a member in good standing of the following professional entities:

 

·The Australasian Institute of Mining and Metallurgy accredited Chartered Professional in Geology, Membership #301778.
·Canadian Institute of Mining, Metallurgy and Petroleum, Member ID 151724.
·Colegio de Ingenieros del Perú (CIP), Membership # 79184.

 

4.I have continuously worked in my profession since 1999. My experience includes mining exploration, mineral deposit modelling, mineral resource estimation and consulting services for the mineral industry.

 

5.I am familiar with NI 43-101 and form 43-101F1 and by reason of education, experience and professional registration with AusIMM(CP), I fulfill the requirements of a Qualified Person as defined in NI 43-101.

 

6.I have not visited the Tintic Project.

 

7.This is the first Technical Report I have written or co-authored for the mineral property that is the subject of this Technical Report.

 

8.As of the date of this certificate to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make this report not misleading.

 

9.I have read NI 43-101 and this Technical Report has been prepared in compliance with the instrument.

 

10.I am independent Osisko Development Corp. and its subsidiaries according to the definition described in NI 43-101 and the Companion Policy 43-101 CP.

 

11.I am responsible for the preparation of Sections 14.5 to 14.9 and 14.12 of this Technical Report with Sections 15 through 22 not applicable to this Technical Report..

 

Report Dated this 27 day of January, 2023 with an effective date of January 10, 2023.

 

 

“Alan J. San Martin” {signed as of the report date}

 

Ing. Alan J. San Martin, MAusIMM (CP)

Mineral Resource Specialist, Micon International Limited

 

Tintic Project195January 27, 2023
 

 

 

Osisko Development Corp.

 

CERTIFICATE OF AUTHOR

Richard M. Gowans, P.Eng.

 

As the co-author of this report for Osisko Development Corp. entitled “NI 43-101 Technical Report, Initial Mineral Resource Estimate for the Trixie Deposit, Tintic Project, Utah, USA” dated January 27, 2023, with an effective date of January 10, 2023, I, Richard Gowans do hereby certify that:

 

1.I am employed as Principal Metallurgist by, and carried out this assignment for, Micon International Limited, Suite 601, 90 Eglinton Avenue East, Toronto, Ontario M4P 2Y3, tel. (416) 362-5135, e-mail rgowans@micon-international.com.

 

2.I hold the following academic qualifications:

 

B.Sc. (Hons) Minerals Engineering The University of Birmingham, U.K. 1980.

 

3.I am a registered Professional Engineer of Ontario (membership number 90529389); as well, I am a member in good standing of the Canadian Institute of Mining, Metallurgy and Petroleum.

 

4.I am familiar with NI 43-101 and by reason of education, experience and professional registration, fulfill the requirements of a Qualified Person as defined in NI 43-101. My work experience includes over 30 years of the management of technical studies and design of numerous metallurgical testwork programs and metallurgical processing plants.

 

5.I have read NI 43-101 and this Technical Report has been prepared in compliance with the instrument.

 

6.I have not visited the Tintic Project.

 

7.I have not participated in the preparation of a prior Technical Reports on the Tintic Project.

 

8.I am independent of Osisko Development Corp. and its related entities, as defined in Section 1.5 of NI 43-101.

 

9.I am responsible for Section 1.7 and 13 of this Technical Report with Sections 15 through 22 not applicable to this Technical Report.

 

10.As of the date of this certificate, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make this technical report not misleading.

 

Report Dated this 27 day of January, 2023 with an effective date of January 10, 2023.

 

 

“Richard Gowans” {signed and sealed as of the report date}

 

Richard Gowans P.Eng.

Principal Metallurgist

 

Tintic Project196January 27, 2023
 

 

 

 

Osisko Development Corp.

 

 

 

 

Appendix 1

 

Glossary of Mining and Other Related Terms

 

 

 

 

 

 

 

 

 

 

Tintic Project197

January 27, 2023

 

 

 

Osisko Development Corp.

 

The following is a glossary of general mining terms that may be used in this Technical Report.

 

A    
     
Ag   Symbol for the element silver.
     
Assay   A chemical test performed on a sample of ores or minerals to determine the amount of valuable metals contained.
     
Au    Symbol for the element gold.
     
B    
     
Base metal   Any non-precious metal (e.g. copper, lead, zinc, nickel, etc.).
     
Bulk mining   Any large-scale, mechanized method of mining involving many thousands of tonnes of ore being brought to surface per day.
     
Bulk sample   A large sample of mineralized rock, frequently hundreds of tonnes, selected in such a manner as to be representative of the potential orebody being sampled.  The sample is usually used to determine metallurgical characteristics.
     
Bullion   Precious metal formed into bars or ingots.
     
By-product   A secondary metal or mineral product recovered in the milling process.
     
C    
     
Channel sample   A sample composed of pieces of vein or mineral deposit that have been cut out of a small trench or channel, usually about 10 cm wide and 2 cm deep.
     
Chip sample   A method of sampling a rock exposure whereby a regular series of small chips of rock is broken off along a line across the face.
     
CIM Standards   The CIM Definition Standards on Mineral Resources and Mineral Reserves adopted by CIM Council from time to time.  The most recent update adopted by the CIM Council is effective as of November 27, 2010.
     
CIM   The Canadian Institute of Mining, Metallurgy and Petroleum.
     
Concentrate   A fine, powdery product of the milling process containing a high percentage of valuable metal.
     
Contact   A geological term used to describe the line or plane along which two different rock formations or rock types meet.
     
Core   The long cylindrical piece of rock, about an inch in diameter, brought to surface by diamond drilling.
     
Core sample   One or several pieces of whole or split parts of core selected as a sample for analysis or assay.

 

Tintic Project198

January 27, 2023

 

 

 

Osisko Development Corp.

 

Cross-cut   A horizontal opening driven from a shaft and (or near) right angles to the strike of a vein or other orebody. The term is also used to signify that a drill hole is crossing the mineralization at or near right angles to it.
     
Cu    Symbol for the element copper.
     
Cut-off grade    The lowest grade of mineralized rock that qualifies as ore grade in a given deposit, and is also used as the lowest grade below which the mineralized rock currently cannot be profitably exploited.  Cut-off grades vary between deposits depending upon the amenability of ore to gold extraction and upon costs of production.
     
D    
     
Deposit    An informal term for an accumulation of mineralization or other valuable earth material of any origin.
     
Development drilling   Drilling to establish accurate estimates of mineral resources or reserves usually in an operating mine or advanced project.
     
Dilution   Rock that is, by necessity, removed along with the ore in the mining process, subsequently lowering the grade of the ore.
     
Dip    The angle at which a vein, structure or rock bed is inclined from the horizontal as measured at right angles to the strike.
     
Doré   A semi refined alloy containing sufficient precious metal to make recovery profitable. Crude precious metal bars, ingots or comparable masses produced at a mine which are then sold or shipped to a refinery for further processing.
     
E    
     
Epithermal   Hydrothermal mineral deposit formed within one kilometre of the earth’s surface, in the temperature range of 50 to 200°C.
     
Epithermal deposit   A mineral deposit consisting of veins and replacement bodies, usually in volcanic or sedimentary rocks, containing precious metals or, more rarely, base metals.
     
Exploration   Prospecting, sampling, mapping, diamond drilling and other work involved in searching for ore.
     
F    
     
Face   The end of a drift, cross-cut or stope in which work is taking place.
     
Fault   A break in the Earth's crust caused by tectonic forces which have moved the rock on one side with respect to the other.
     
Fold   Any bending or wrinkling of rock strata.
     
Footwall   The rock on the underside of a vein or mineralized structure or deposit.

 

Tintic Project199

January 27, 2023

 

 

 

Osisko Development Corp.

 

Fracture    A break in the rock, the opening of which allows mineral-bearing solutions to enter.  A "cross-fracture" is a minor break extending at more-or-less right angles to the direction of the principal fractures.
     
G    
     
g/t   Abbreviation for gram(s) per metric tonne.
     
     
g/t    Abbreviation for gram(s) per tonne.
     
Grade    Term used to indicate the concentration of an economically desirable mineral or element in its host rock as a function of its relative mass. With gold, this term may be expressed as grams per tonne (g/t) or ounces per tonne (opt).
     
Gram   One gram is equal to 0.0321507 troy ounces.
     
H    
     
Hanging wall   The rock on the upper side of a vein or mineral deposit.
     
High grade   Rich mineralization or ore. As a verb, it refers to selective mining of the best ore in a deposit.
     
Host rock   The rock surrounding an ore deposit.
     
Hydrothermal   Processes associated with heated or superheated water, especially mineralization or alteration.
     
I    
     
Indicated Mineral Resource 
    An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit.  Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation.  An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.
     
Inferred Mineral Resource 
    An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity.  An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.”

 

Tintic Project200

January 27, 2023

 

 

 

Osisko Development Corp.

 

Intrusive   A body of igneous rock formed by the consolidation of magma intruded into other 
     
K    
     
km    Abbreviation for kilometre(s). One kilometre is equal to 0.62 miles.
     
L    
     
Leaching   The separation, selective removal or dissolving-out of soluble constituents from a rock or ore body by the natural actions of percolating solutions.
     
Level   The horizontal openings on a working horizon in a mine; it is customary to work mines from a shaft, establishing levels at regular intervals, generally about 50 m or more apart.
     
M    
     
  Abbreviation for metre(s). One metre is equal to 3.28 feet.
     
Measured Mineral Resource 
    A Measured Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource.  It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.
     
Metallurgy   The science and art of separating metals and metallic minerals from their ores by mechanical and chemical processes.
     
Metamorphic    Affected by physical, chemical, and structural processes imposed by depth in the earth’s crust.
     
Mill   A plant in which ore is treated and metals are recovered or prepared for smelting; also a revolving drum used for the grinding of ores in preparation for treatment.
     
Mine    An excavation beneath the surface of the ground from which mineral matter of value is extracted.
     
Mineral   A naturally occurring homogeneous substance having definite physical properties and chemical composition and, if formed under favourable conditions, a definite crystal form.
     
Mineral Concession    
    That portion of public mineral lands which a party has staked or marked out in accordance with federal or state mining laws to acquire the right to explore for and exploit the minerals under the surface.

 

Tintic Project201

January 27, 2023

 

 

 

Osisko Development Corp.

 

Mineralization   The process or processes by which mineral or minerals are introduced into a rock, resulting in a valuable or potentially valuable deposit.
     
Mineral Resource
    A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction.  The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.  Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories.  An Inferred Mineral Resource has a lower level of confidence than that applied to an Indicated Mineral Resource.  An Indicated Mineral Resource has a higher level of confidence than an Inferred Mineral Resource but has a lower level of confidence than a Measured Mineral Resource.  The term mineral resource used in this report is a Canadian mining term as defined in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the CIM), Standards on Mineral Resource and Mineral Reserves Definitions and guidelines adopted by the CIM Council on December 11, 2005, updated as of November 27, 2010 and more recently updated as of May 10, 2014(the CIM Standards).
     
N    
     
Net Smelter Return
    A payment made by a producer of metals based on the value of the gross metal production from the property, less deduction of certain limited costs including smelting, refining, transportation and insurance costs.
     
NI 43-101
    National Instrument 43-101 is a national instrument for the Standards of Disclosure for Mineral Projects within Canada.  The Instrument is a codified set of rules and guidelines for reporting and displaying information related to mineral properties owned by, or explored by, companies which report these results on stock exchanges within Canada.  This includes foreign-owned mining entities who trade on stock exchanges overseen by the Canadian Securities Administrators (CSA), even if they only trade on Over the Counter (OTC) derivatives or other instrumented securities.  The NI 43-101 rules and guidelines were updated as of June 30, 2011.
     
     

 

Tintic Project202

January 27, 2023

 

 

 

Osisko Development Corp.

 

O    
     
Open Pit/Cut   A form of mining operation designed to extract minerals that lie near the surface.  Waste or overburden is first removed, and the mineral is broken and loaded for processing.  The mining of metalliferous ores by surface-mining methods is commonly designated as open-pit mining as distinguished from strip mining of coal and the quarrying of other non-metallic materials, such as limestone and building stone.
     
Osisko Development
    Osisko Development Corp., including, unless the context otherwise requires, the Company's subsidiaries.
     
Outcrop   An exposure of rock or mineral deposit that can be seen on surface that is, not covered by soil or water.
     
Oxidation   A chemical reaction caused by exposure to oxygen that result in a change in the chemical composition of a mineral.
     
Ounce   A measure of weight in gold and other precious metals, correctly troy ounces, which weigh 31.2 grams as distinct from an imperial ounce which weigh 28.4 grams.
     
oz   Abbreviation for ounce.
     
P    
     
Plant   A building or group of buildings in which a process or function is carried out; at a mine site it will include warehouses, hoisting equipment, compressors, maintenance shops, offices and the mill or concentrator.
     
Pyrite   A common, pale-bronze or brass-yellow, mineral composed of iron and sulphur.  Pyrite has a brilliant metallic luster and has been mistaken for gold.  Pyrite is the most wide-spread and abundant of the sulphide minerals and occurs in all kinds of rocks.
     
Q    
     
Qualified Person   Conforms to that definition under NI 43-101 for an individual: (a) to be an engineer or geoscientist with a university degree, or equivalent accreditation, in an area of geoscience, or engineering, related to mineral exploration or mining; (b) has at least five years' experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these, that is relevant to his or her professional degree or area of practice; (c) to have experience relevant to the subject matter of the mineral project and the technical report; (d) is in good standing with a professional association; and (e) in the case of a professional association in a foreign jurisdiction, has a membership designation that (i) requires attainment of a position of responsibility in their profession that requires the exercise of independent judgement; and (ii) requires (A.) a favourable confidential peer evaluation of the individual’s character, professional judgement, experience, and ethical fitness; or (B.) a recommendation for membership by at least two peers, and demonstrated prominence or expertise in the field of mineral exploration or mining.

 

Tintic Project203

January 27, 2023

 

 

 

Osisko Development Corp.

 

R    
     
Reclamation    The restoration of a site after mining or exploration activity is completed.
     
S    
     
Shoot   A concentration of mineral values; that part of a vein or zone carrying values of ore grade.
     
Strike   The direction, or bearing from true north, of a vein or rock formation measure on a horizontal surface.
     
Stringer   A narrow vein or irregular filament of a mineral or minerals traversing a rock mass.
     
Sulphides   A group of minerals which contains sulphur and other metallic elements such as copper and zinc.  Gold and silver are usually associated with sulphide enrichment in mineral deposits.
     
T    
     
Tonne    A metric ton of 1,000 kilograms (2,205 pounds).
     
V    
     
Vein   A fissure, fault or crack in a rock filled by minerals that have travelled upwards from some deep source.
     
W    
     
Wall rocks   Rock units on either side of an orebody.  The hanging wall and footwall rocks of a mineral deposit or orebody.
     
Waste   Unmineralized, or sometimes mineralized, rock that is not minable at a profit.
     
Working(s)   May be a shaft, quarry, level, open-cut, open pit, or stope etc.  Usually noted in the plural.
     
Z    
     
Zone   An area of distinct mineralization.

 

 

 

Tintic Project204

January 27, 2023

 

 

 

Osisko Development Corp.

 

 

 

 

Appendix 2

 

Tintic Project PROPERTIES AND MINERAL RIGHTS

 

 

 

 

 

 

 

 

 

Tintic Project205

January 27, 2023

 

 

 

Osisko Development Corp.

 

Properties and Mineral Rights

 

Osisko Development’s Owned Property

 

Fee Property:

 

Owns all right, title, and interest (100%) interest in the surface and mineral estates in the following:

 

TRIXIE CLAIMS

 

Name Survey No. Patent No. Township Range A Portion of Sections
Cameo #27 6766 1006490 T10S R2W 28: NE¼
Cedar 6574 959091 T10S R2W 28: NE¼
Cedar No. 1 6574 959091 T10S R2W 28: NE¼
Cedar No. 4 6737 993922 T10S R2W

27: NW¼

28: NE¼

East Point #5 6091 397059 T10S R2W

21: SE¼

28: NE¼

Rose 7138 1108693 T10S R2W

21: SE¼

28: NE¼

Trixy 6073 214588 T10S R2W

27: NW¼

28: NE¼

TRUMP 6073 214588 T10S R2W 28: NW¼
Vern No. 2 6456 925953 T10S R2W

21: SE¼

28: NE¼

White Rose No. Four 6766 1006490 T10S R2W

27: NW¼

28: NE¼

White Rose No. 5 Amended 6766 1006490 T10S R2W 21: SE¼
White Rose No. Six 6766 1006490 T10S R2W

21: SE¼

28: NE¼

White Rose No. Seven 6766 1006490 T10S R2W 21: SE¼

 

BURGIN CLAIMS

 

Name Survey No. Patent No. Township Range A Portion of Sections
Christmas 6560 915159 T10S R2W

15: SE¼

22: NE¼

Christmas No. 1 6560 915159 T10S R2W

15: SE¼

22: NE¼

Detective No. 5 6560 915159 T10S R2W 15: SE¼
Detective No. 7 6560 915159 T10S R2W 15: SE¼
Sunny Side No. 1 6560 915159 T10S R2W

15: SE¼

22: NE¼

Climax #1 6784 1038307 T10S R2W

15: SE¼

22: NE¼

Climax #2 6784 1038307 T10S R2W 15: SE¼
Eastern No. 2 6784 1038307 T10S R2W

11: SW¼

14: NW¼

15: SE¼

 

Tintic Project206

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name Survey No. Patent No. Township Range A Portion of Sections
Eastern No. 3 6784 1038307 T10S R2W

14: NW¼

15: SE¼

22: NE¼

Eastern No. 4 6784 1038307 T10S R2W 14: NW¼, SW¼
Eastern #7 6784 1038307 T10S R2W 14: NW¼, SW¼
Eastern #8 6784 1038307 T10S R2W 14: NW¼
Eastern #9 6784 1038307 T10S R2W

11: SW¼

14: NW¼

Eastern #10 6784 1038307 T10S R2W 14: NW¼
Eastern #11 6784 1038307 T10S R2W

11: SW¼

14: NW¼

Eastern #12 6785 1039439 T10S R2W 14: NW¼
Eastern #13 6785 1039439 T10S R2W

11: SW¼

14: NW¼

Eastern #14 6785 1039439 T10S R2W

11: SW¼

14: NW¼

Eastern #15 6785 1039439 T10S R2W 14: NW¼
Eastern #17 6785 1039439 T10S R2W 14: NW¼
Inez No. 3 6801 1042410 T10S R2W 14: NW¼, SW¼
Wonderer Amended 6466 971242 T10S R2W

11: SW¼

15: SE¼

Wonderer 5-X Amended 6466 971242 T10S R2W 15: SE¼
Wonderer 6-X Amended 6466 971242 T10S R2W 15: SE¼
Zenith 1 6752 945099 T10S R2W

14: NW¼, SW¼

22: NE¼

Zenith 19 6752 945099 T10S R2W

14: NW¼

22: NE¼

 

Owns all right, title, and interest (100%) interest in the mineral estate in the following:

 

Name State Of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
ANNIE HURLEY 40406 4628 UTAH 10S 2W 17,20
ARGENTUM 40408 4623 UTAH 10S 2W 17
AUGUST #1 40399 5736 UTAH 10S 2W 16,17
AUGUST BESTELMEYER 40398 5736 UTAH 10S 2W 17
AUGUST GULCH 4390 5795 UTAH 10S 2W 16
BALTIMORE NO. 3 21844 6000 UTAH 10S 2W 9

 

Tintic Project207

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
BANK NOTE #12 LODE 21792 6757 UTAH 10S 2W 27
BANK NOTE #13 LODE 60563 6757 UTAH 10S 2W 27
BANK NOTE #14 LODE 60564 6757 UTAH 10S 2W 27
BANK NOTE #15 LODE 60565 6757 UTAH 10S 2W 27
BANK NOTE #16 60566 6757 UTAH 10S 2W 27
BAVARIA GIRL 4394 5734 UTAH 10S 2W 16,17
BELVA 40334 6975 UTAH 10S 2W 17
BERTHA LODE 60696 6402 UTAH 10S 2W 8,9
BLAK EAGEL 21752 6848 UTAH 10S 2W 15,22
BLAK EAGEL #1 60366 6848 UTAH 10S 2W 15
BULLION FRACTION 4345 6935 UTAH 10S 2W 16
BURGLER (Card-113) 63111 4141 JUAB 10S 2W 32
CALDWELL 40428 6438 UTAH 10S 2W 9
CAMEO  #34 19269 6757 UTAH 10S 2W 27
CAMEO #33 62680 6766 UTAH 10S 2W 27
CATHARINA BESTELMEYER 64974 5734 UTAH 10S 2W 16,17
CEDAR FRACTION 4348 6882 UTAH 10S 2W 9
CEDAR NO. 10 4378 6436 UTAH 10S 2W 9
CEDAR NO. 2 60714 6000 UTAH 10S 2W 9
CEDAR NO. 4 60713 6000 UTAH 10S 2W 9
CEDAR NO. 5 AMENDED 21795 6737 UTAH 10S 2W 27,28
CLARA LODE 66457 5795 UTAH 10S 2W 16
CLARA NO. 2 66459 5795 UTAH 10S 2W 16
CLARA NO. 2 EXTENSION 4373 6553 UTAH 10S 2W 16
CLARK 40429 6438 UTAH 10S 2W 9,16
CONTACT 21840 6204 UTAH 10S 2W 15,16
CONTACT 40414 3826 UTAH 10S 2W 17,20
COPPER QUEEN 60704 6204 UTAH 10S 2W 15,16
COPPER QUEEN NO. 2 60705 6204 UTAH 10S 2W 15
COPPER QUEEN NO. 3 60706 6204 UTAH 10S 2W 15
COPPER QUEEN NO. 4 60707 6204 UTAH 10S 2W 15
COYOTE NO. 7 66454 6402 UTAH 10S 2W 16,17
COYOTE NO. 8 66455 6402 UTAH 10S 2W 16
COYOTE NO. 9 66456 6402 UTAH 10S 2W 16,17
CROWN POINT EXT #5 62838 5774 UTAH 10S 2W 20,21,28,29
DESERT 4379 6402 UTAH 10S 2W 9,16
DESERT FRACTION 66449 6402 UTAH 10S 2W 16

 

Tintic Project208

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
DESERT NO. 2 4376 6448 UTAH 10S 2W 9
DESERT NO. 3 64728 6448 UTAH 10S 2W 9,16
DESERT NO. 4 64027 6448 UTAH 10S 2W 9,16
DESERT NO. 5 66450 6402 UTAH 10S 2W 9,16
DESERT NO. 6 66451 6402 UTAH 10S 2W 17
DESERT NO. 7 66452 6402 UTAH 10S 2W 17
DESERT NO. 8 64018 6448 UTAH 10S 2W 9,16
DESERT NO. 9 66453 6402 UTAH 10S 2W 16
DETECTIVE NO. 2 60618 6560 UTAH 10S 2W 15
DEWEY 40430 6438 UTAH 10S 2W 9
DOVE 40405 4758 UTAH 10S 2W 17
EAST CONTACT NO. 37 21766 6793 UTAH 10S 2W 14
EAST CONTACT NO. 53 60462 6790 UTAH 10S 2W 14
EAST CONTACT NO. 54 60463 6790 UTAH 10S 2W 14
EAST CONTACT NO. 55 60464 6790 UTAH 10S 2W 14
EAST CONTACT NO. 66 60453 6793 UTAH 10S 2W 14
EAST CONTACT NO. 67 60456 6790 UTAH 10S 2W 14
EASTERN #16 LODE 60519 6785 UTAH 10S 2W 11,14
EASTERN #18 LODE 60513 6785 UTAH 10S 2W 11,14
EASTERN #19 LODE 60514 6785 UTAH 10S 2W 14
EASTERN #20 LODE 60515 6785 UTAH 10S 2W 14
EASTERN #5 LODE 60520 6784 UTAH 10S 2W 14,22
EASTERN #6 LODE 60521 6784 UTAH 10S 2W 14,22,23
ELEANOR 60597 6585 UTAH 10S 2W 21,28
ELEANOR NO. 1 60598 6585 UTAH 10S 2W 21
FRACTION GOLD HILL 19311 4668 UTAH 10S 2W 16,21
FRACTION HEDWIG 62735 4668 UTAH 10S 2W 16
FRACTION OF GRUTLI NUMBER 3 19308 4984 UTAH 10S 2W 16
FRACTION VICTORY #1 LODE 21852 5550 UTAH 10S 2W 16
FRANCELIA 40396 5823 UTAH 10S 2W 17
GATLEY LODE MINING CLAIM 60367 6848 UTAH 10S 2W 15
GOLD BOND NO. 12 21789 6759 UTAH 10S 2W 27,34
GOLD BOND NO. 13 60538 6759 UTAH 10S 2W 27,34
GOLD BOND NO. 14 60539 6759 UTAH 10S 2W 27,34
GOLD BOND NO. 15 60540 6759 UTAH 10S 2W 27,34
GOLD BOND NO. 16 60541 6759 UTAH 10S 2W 27
GOLDEN HORSE SHOE 21846 5878 UTAH 10S 2W 16

 

Tintic Project209

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
GOLDEN TREASURE 40407 4628 UTAH 10S 2W 17
GOOD WILL 60699 6402 UTAH 10S 2W 8,9
GRANT NO. 1 40382 6061 UTAH 10S 2W 17
GRANT NO. 2 40383 6061 UTAH 10S 2W 8,17
GRANT NO. 3 40384 6061 UTAH 10S 2W 8,17
GRANT NO. 4 40385 6061 UTAH 10S 2W 17
GRANT NO. 5 40386 6061 UTAH 10S 2W 17
GREAT EASTERN #4 65618 5740 UTAH 10S 2W 16,21
GREYHOUND 21838 6393 UTAH 10S 2W 15
GREYHOUND NO. 2 60701 6393 UTAH 10S 2W 15
GREYHOUND NO. 3 60702 6393 UTAH 10S 2W 15
GREYHOUND NO. 4 60703 6393 UTAH 10S 2W 15
GRUTLI 66458 5795 UTAH 10S 2W 16
GRUTLI EXTENSION LODE 66460 5795 UTAH 10S 2W 16
HANIBAL 60718 5736 UTAH 10S 2W 8,9,16
HICKS FRACTION 4351 6754 UTAH 10S 2W 16
HIDDEN TREASURE 21824 6466 UTAH 10S 2W 9,10,15,16
HIDDEN TREASURE # 2 21814 6527 UTAH 10S 2W 9,10,15,16
HIDDEN TREASURE NO. 3 60655 6466 UTAH 10S 2W 10
HIDDEN TREASURE NO. 4 60656 6466 UTAH 10S 2W 9,10
HILL TOP 60559 6757 UTAH 10S 2W 27
HILL TOP NO. 1 21765 6800 UTAH 10S 2W 22,23,27
HILL TOP NO. 2 60444 6800 UTAH 10S 2W 23,27
HILL TOP NO. 3 60445 6800 UTAH 10S 2W 27
HILL TOP NO. 4 60446 6800 UTAH 10S 2W 27
HILL TOP NO. 5 60447 6800 UTAH 10S 2W 27
HILL TOP NO. 6 60448 6800 UTAH 10S 2W 23,27
HILL TOP NO. 7 60449 6800 UTAH 10S 2W 27
HILL TOP NUMBER 1 21788 6759 UTAH 10S 2W 34
HILL TOP NUMBER 2 60551 6759 UTAH 10S 2W 34
HILL TOP NUMBER 3 60544 6759 UTAH 10S 2W 27,34
HILL TOP NUMBER 4 60543 6759 UTAH 10S 2W 27,33,34
HILL TOP NUMBER 5 60546 6759 UTAH 10S 2W 27,28,33,34
HILL TOP NUMBER 6 60545 6759 UTAH 10S 2W 27
HILL TOP NUMBER 7 60547 6759 UTAH 10S 2W 34
ICE KING 21839 6392 UTAH 10S 2W 15,16
INEZ NO. 1 21764 6801 UTAH 10S 2W 14

 

Tintic Project210

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
INEZ NO. 2 60436 6801 UTAH 10S 2W 14
INEZ NO. 4 60438 6801 UTAH 10S 2W 14
INEZ NO. 5 60439 6801 UTAH 10S 2W 14,23
INEZ NO. 6 60440 6801 UTAH 10S 2W 14,23
INEZ NO. 7 60441 6801 UTAH 10S 2W 23
IRMA FRACTION 4347 6916 UTAH 10S 2W 16,17
JAMISON HILL 60657 6466 UTAH 10S 2W 15
JOHNY AND CLARA 40400 5736 UTAH 10S 2W 16,17
JUANITA 40409 4623 UTAH 10S 2W 17
JUDGE 21779 6786 UTAH 10S 2W 15
KARREN 21811 6563 UTAH 10S 2W 22
KARREN NO. 1 65661 6563 UTAH 10S 2W 22
KARREN NO. 2 65662 6563 UTAH 10S 2W 22
KARREN NO. 3 65663 6563 UTAH 10S 2W 22
LAMB NO. 10 21761 6803 UTAH 10S 2W 23
LAMB NO. 11 60422 6803 UTAH 10S 2W 23
LAMB NO. 12 60423 6803 UTAH 10S 2W 23
LAMB NO. 13 60425 6803 UTAH 10S 2W 23
LAMB NO. 14 60426 6803 UTAH 10S 2W 23
LAMB NO. 15 21760 6803 UTAH 10S 2W 23
LAMB NO. 16 60418 6803 UTAH 10S 2W 23
LAMB NO. 17 60419 6803 UTAH 10S 2W 23
LAMB NO. 19 60420 6803 UTAH 10S 2W 23
LAMB NO. 20 21763 6802 UTAH 10S 2W 14,23
LAMB NO. 21 60431 6802 UTAH 10S 2W 14,23
LAMB NO. 3 60421 6803 UTAH 10S 2W 14,23
LAMB NO. 4 60442 6801 UTAH 10S 2W 14
LAMB NO. 5 21759 6803 UTAH 10S 2W 14,23
LAMB NO. 6 60434 6802 UTAH 10S 2W 14,23
LAMB NO. 7 60414 6803 UTAH 10S 2W 23
LAMB NO. 8 60435 6802 UTAH 10S 2W 14,23
LAST CHANCE 60623 6527 UTAH 10S 2W 9,16
LAST CHANCE 65671 6527 UTAH 10S 2W 9,16
LAST HOPE 21856 4178 UTAH 10S 2W 16
LETTA 40403 4759 UTAH 10S 2W 17
LITTLE FRED 40395 5850 UTAH 10S 2W 20
LUCILE LODE (Card-704) 21855 5471 JUAB, UTAH 10S 2W 29

 

Tintic Project211

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
MAPLE 18768 4099 UTAH 10S 2W 17,20
MATILDA 21820 6467 UTAH 10S 2W 9
MILLER 40431 6438 UTAH 10S 2W 9
MINNIE 40410 4623 UTAH 10S 2W 17
MINNIE MOORE (Card-163)   3835 JUAB  10S 2W 20
MY CATHERINE B LODE 66461 5795 UTAH 10S 2W 16
MYRTLE LODE 40397 5822 UTAH 10S 2W 20
NATRONA 40427 6438 UTAH 10S 2W 9,16
NEVADA #4 21784 6767 UTAH 10S 2W 15,22
NO. 1 IRON PLACER 65312 XX UTAH 10S 2W 20
NO. 2 IRON PLACER 65313 XX UTAH 10S 2W 21
OVERSIGHT (Card-735) 60743 6885 JUAB 10S 2W 19
OXEN LODE 21845 5974 UTAH 10S 2W 9
PINE LODE 4350 6771 UTAH 10S 2W 9
RATTLESNAKE NO. 1 21762 6802 UTAH 10S 2W 14
RATTLESNAKE NO. 10 21758 6804 UTAH 10S 2W 23
RATTLESNAKE NO. 11 60411 6804 UTAH 10S 2W 23
RATTLESNAKE NO. 12 60412 6804 UTAH 10S 2W 23
RATTLESNAKE NO. 13 60413 6804 UTAH 10S 2W 23
RATTLESNAKE NO. 2 60427 6802 UTAH 10S 2W 14
RATTLESNAKE NO. 3 60428 6802 UTAH 10S 2W 14
RATTLESNAKE NO. 9 60394 6804 UTAH 10S 2W 23,14
ROBERT 21754 6806 UTAH 10S 2W 27,34
ROBERT # 1 60374 6806 UTAH 10S 2W 27
ROBERT # 2 60379 6806 UTAH 10S 2W 23,26,27
ROBERT # 3 21753 6806 UTAH 10S 2W 26,27,34
ROBERT # 4 60368 6806 UTAH 10S 2W 23,26
ROBERT # 5 60369 6806 UTAH 10S 2W 26,27,34
ROBERT # 6 60370 6806 UTAH 10S 2W 23,26
ROBERT # 7 60371 6806 UTAH 10S 2W 26
ROBERT # 8 60372 6806 UTAH 10S 2W 23,26
ROBERT # 9 60373 6806 UTAH 10S 2W 26
SOUTH STANDARD NO. 1 60560 6757 UTAH 10S 2W 27
SOUTH STANDARD NO. 10 60561 6757 UTAH 10S 2W 22,27
SOUTH STANDARD NO. 11 60562 6757 UTAH 10S 2W 27
SOUTH STANDARD NO. 3 21790 6757 UTAH 10S 2W 27
SOUTH STANDARD NO. 5 60542 6757 UTAH 10S 2W 27

 

Tintic Project212

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
SOUTH STANDARD NO. 7 60548 6757 UTAH 10S 2W 22,27
SOUTH STANDARD NO. 8 60549 6757 UTAH 10S 2W 22,27
SOUTH STANDARD NO. 9 65436 6757 UTAH 10S 2W 22,27
SPARROW 40404 4759 UTAH 10S 2W 17
SUNBEAM NO. 1 63143 5740 UTAH 10S 2W 20
SUNBEAM NO. 2 63144 5740 UTAH 10S 2W 20
SUNBEAM NO. 3 63145 5740 UTAH 10S 2W 21
SUNBEAM NO. 4 63146 5740 UTAH 10S 2W 16,21
SUNDOWN 65463 6563 UTAH 10S 2W 22
SUNNY SIDE FRACTION 60619   UTAH 10S 2W 15,22
SUNNY SIDE NO. 2 60621 6560 UTAH 10S 2W 15,22
SUNNY SIDE NO. 3 60622 6560 UTAH 10S 2W 15,22
SUNNY SIDE NO. 5 60611 6563 UTAH 10S 2W 22
SUNNY SIDE NO. 6 60612 6563 UTAH 10S 2W 22
SUNNY SIDE NO. 7 60613 6563 UTAH 10S 2W 22
SUNNY SIDE NO. 8 60614 6563 UTAH 10S 2W 22
SUNRISE (Card-657) 65466 6052 JUAB 11S 2W 5
SURPRISE 4374 6466 UTAH 10S 2W 9,16
SURPRISE FRACTION 21746 7171 UTAH 10S 2W 9
SURPRISE NO. 2 60658 6466 UTAH 10S 2W 9
THE LAMB NO. 1 60415 6803 UTAH 10S 2W 14,23
THE LAMB NO. 2 60443 6801 UTAH 10S 2W 14
THE LAMB NO. 9 60416 6803 UTAH 10S 2W 23
TINTIC STANDARD #10 21802 6612 UTAH 10S 2W 10,15
TINTIC STANDARD #31 60607 6612 UTAH 10S 2W 10,15
TINTIC STANDARD #32 60608 6612 UTAH 10S 2W 10,15
TINTIC STANDARD #33 60609 6612 UTAH 10S 2W 10,15
TINTIC STANDARD #34 21801 6612 UTAH 10S 2W 10,15
TINTIC STANDARD #35 60604 6612 UTAH 10S 2W 10,11,15
TIP TOP NO. 2 60716 5974 UTAH 10S 2W 9
UNCLE ANDREAS 64975 5734 UTAH 10S 2W 16
UNCLE ANDREAS NO. 2 66462 5795 UTAH 10S 2W 16
UNION B. 21851 5559 UTAH 10S 2W 15,16
UNION NO. 2 60708 6204 UTAH 10S 2W 16
VEGA LODE 21853 5480 UTAH 10S 2W 16
VENIUS (SA00-004) 60717 5974 UTAH 10S 2W 9
VICTORY NO. 1 FRACTION 21852 5550 UTAH 10S 2W 16

 

Tintic Project213

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
WANDERER NUMBER 9 AMENDED LODE 21778 6787 UTAH 10S 2W 15
WATER GULCH 60719 5736 UTAH 10S 2W 8,9,16,17
WEBER 40432 6438 UTAH 10S 2W 9,16
WEDGE 21747 7156 UTAH 10S 2W 16
WHITE ROSE NO. 10 AMENDED 62676 6766 UTAH 10S 2W 27,28
WHITE STALLION NO. 2 21796 4654 UTAH 10S 2W 16
WHITE WING NO. 2 60624 6527 UTAH 10S 2W 16
WHITE WING NO. 6 60651 6466 UTAH 10S 2W 10,15
WHITE WING NO. 7 60652 6466 UTAH 10S 2W 10
WHITE WING NO. 8 60653 6466 UTAH 10S 2W 10,15
WHITE WING NO. 9 60654 6466 UTAH 10S 2W 10,15
WONDERER #1 60646 6466 UTAH 10S 2W 15
WONDERER #2 60647 6466 UTAH 10S 2W 15
WONDERER #3 60648 6466 UTAH 10S 2W 15
WONDERER #4 60649 6466 UTAH 10S 2W 15
WONDERER NO. 7 60650 6466 UTAH 10S 2W 15,22
WONDERER NO. 8 21821 6466 UTAH 10S 2W 15
ZENITH #11 60572 6752 UTAH 10S 2W 22
ZENITH #13 60573 6752 UTAH 10S 2W 22
ZENITH #15 60574 6752 UTAH 10S 2W 22,27
ZENITH #16 60575 6752 UTAH 10S 2W 22
ZENITH #17 60576 6752 UTAH 10S 2W 22,27
ZENITH #18 60577 6752 UTAH 10S 2W 22,27
ZENITH #2 60567 6752 UTAH 10S 2W 22
ZENITH #7 60568 6752 UTAH 10S 2W 14,22
ZENITH #9 60569 6752 UTAH 10S 2W 14,22
ZENITH FRACTION 60615 6563 UTAH 10S 2W 22
ZENITH NO. 3 60570 6752 UTAH 10S 2W 14,22
ZENITH NO. 5 60571 6752 UTAH 10S 2W 14,22
ZUMA FRACTION #1 21847 5774 UTAH 10S 2W 21,28
ZUMA FRACTION #1 62839 5774 UTAH 10S 2W 28,29
ZUMA NO. 1 21849 5735 UTAH 10S 2W 21,28,29
ZUMA NO. 2 60720 5735 UTAH 10S 2W 21
ZUMA NO. 3 60721 5735 UTAH 10S 2W 20,21,28,29
ZUMA NO. 4 63060 5735 UTAH 10S 2W 21

 

Tintic Project214

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
61 128 0001 SE 1/4 OF NE 1/4 OF SEC. 15, T10S, R2W, SLB&M. AREA 40.679 AC. ALSO LOT 15, 16, 17, IN SEC. 15, T10S, R2W, SLB&M. AREA 111.449 AC. TOTAL AREA 152.128 AC.

 

Name State Of Utah Tax
Property No.
Patent Survey
No.
County Township Range Section
ACORN AMENDED 62661 6847 UTAH, JUAB 10S 2W 33
ALFALFA 19300 5685 UTAH 10S 2W 20
ALMA (Card-657) 63074 6052 JUAB 10S 2W 32
AMERICA (Card-657) 63076 6052 JUAB 10S 2W 32
AMERICAN 19298 5698 UTAH 10S 2W 20
ANDY AMENDED 19284 6433 UTAH 10S 2W 16
ANGLE 19291 5854 UTAH 10S 2W 20
ARROW 19295 5714 UTAH 10S 2W 20
ATAIR 19283 6439 UTAH 10S 2W 21
AURORIA 19316 4282 UTAH 10S 2W 16
BIG EASTERN MINE 19336 3149 UTAH 10S 2W 20
BIG SPRING 19281 6462 UTAH 10S 2W 28,33
BILL SHULER 19342 219 UTAH 10S 2W 20,29
BLUE RIBBON AMENDED 62662 6847 UTAH 10S 2W 28
BLUE RIBBON AMENDED #1 62663 6847 UTAH 10S 2W 28
BLUE RIBBON NO. 2 AMENDED 19260 6847 UTAH 10S 2W 28
BLUE RIBBON NO. 3 AMENDED 62657 6847 UTAH 10S 2W 28
BURGLAR EXTENSION (Card-657) 76395 6052 JUAB 10S 2W 32
BURGLER (Card-113) 63111 4141 JUAB 11S 2W 5
BUTTE 19314 4420 UTAH 10S 2W 20
BUZZARD 62658 6847 UTAH 10S 2W 28,29
CARL (Card-731) 63115 6847 JUAB 10S 2W 29,32
CAROLINE 19329 37 UTAH 10S 2W 16
CASTLE 62729 5714 UTAH 10S 2W 20
CEDAR NO. 2 62697 6574 UTAH 10S 2W 28
CEDAR NO. 3 62698 6574 UTAH 10S 2W 28
CEDAR NO. 6 19255 7140 UTAH 10S 2W 27,28
CLIMAX 62706 6439 UTAH 10S 2W 21
CLINTON 62730 5714 UTAH 10S 2W 20
CLIPPER 62731 5714 UTAH 10S 2W 20
COLORADO 19321 4120 UTAH 10S 2W 20,29
COMET AMENDED 62707 6433 UTAH 10S 2W 16
EAGEL 62666 6767 UTAH 10S 2W 21,22

 

Tintic Project215

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah Tax
Property No.
Patent Survey
No.
County Township Range Section
EAST BOY MINE 19337 3148 UTAH 10S 2W 20
EAST FRACTION 19293 5740 UTAH 10S 2W 16
EAST POINT #1 19287 6091 UTAH 10S 2W 21
EAST POINT #2 62710 6091 UTAH 10S 2W 21
EAST POINT #3 19286 6091 UTAH 10S 2W 21
EAST POINT #4 62708 6091 UTAH 10S 2W 21
ED STOKES 19343 218 UTAH 10S 2W 19,20,29
ELEANOR #2 19273 6595 UTAH 10S 2W 21,28
EMMA 19299 5687 UTAH 10S 2W 20
EVELYNE (Card-657) 65571 6052 JUAB 10S 2W 32
FINLEY 19296 5709 UTAH 10S 2W 20
FLAGSTAFF 19333 324 UTAH 10S 2W 19,20
FLOWER (Card-657) 19344 6052 UTAH, JUAB 10S 2W 32,33
FRACTION (Card-657) 65584 6052 JUAB 10S 2W 32
FRACTION HEDWIG 62735 4668 UTAH 10S 2W 16
FRACTION OF GRUTLI NUMBER 3 19308 4984 UTAH 10S 2W 16
GILES (Card-731) 63139 6847 JUAB 10S 2W 32
GOLD BOND NO. 17 61056 6574 UTAH, JUAB 10S 2W 33
GOLD BOND NO. 18 19275 6574 UTAH, JUAB 10S 2W 33
GOLD BOND NO. 19 62693 6574 UTAH 10S 2W 28,33
GOLD BOND NO. 20 61057 6574 UTAH 10S 2W 27,28
GOLD BOND NO. 21 62694 6574 UTAH 10S 2W 28,33
GOLD BOND NO. 22 19270 6739 UTAH 10S 2W 28,33
GOLD HILLFRACTION 19311 4668 UTAH 10S 2W 16,21
GOLDEN CHARIOT MINE NO. 1 19307 5466 UTAH 10S 2W 20
GOLDEN CHARIOT NO. 2 62732 5466 UTAH 10S 2W 20
GOLDEN CHARIOT NO. 3 62733 5466 UTAH 10S 2W 20
GOLDEN CHARIOT NO. 4 LODE 19306 5533 UTAH 10S 2W 20,21
GOLDEN FISSURE 62711 6091 UTAH 10S 2W 21
GOSHEN NO. 4 19297 5708 UTAH 10S 2W 20
GRACE 19272 6606 UTAH 10S 2W 28
GREAT CARBONATE QUEEN A 19285 6204 UTAH 10S 2W 15,16,21,22
GREAT EASTERN #1 19292 5740 UTAH 10S 2W 17
GREAT EASTERN #2 65617 5740 UTAH 10S 2W 16,17
GREAT EASTERN #3 62717 5740 UTAH 10S 2W 16,17,20,21
GREAT EASTERN #5 19294 5740 UTAH 10S 2W 16,21

 

Tintic Project216

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah Tax
Property No.
Patent Survey
No.
County Township Range Section
GREAT EASTERN #6 62725 5740 UTAH 10S 2W 17,20,21
GREAT EASTERN #7 62726 5740 UTAH 10S 2W 20
GREAT EASTERN #8 62727 5740 UTAH 10S 2W 16
GREAT IRISH CHANCE 62728 5740 UTAH 10S 2W 20
GREYHOUND NO. 5 19280 6465 UTAH 10S 2W 15,21,22
GRUTLI NO. 3 62734 4984 UTAH 10S 2W 16
HAWK 40402 4759 UTAH 10S 2W 17,20
HEDWIG 62736 4668 UTAH 10S 2W 16,21
HIGHLAND MARY 19327 38 UTAH 10S 2W 16
HORSESHOE 62712 6091 UTAH 10S 2W 21
HORSESHOE A 62713 6091 UTAH 10S 2W 21
HORSESHOE NO. 1 62714 6091 UTAH 10S 2W 21
HOUSE (Card-731) 62659 6847 UTAH, JUAB 10S 2W 28,29
IDAHO FRACTION 19265 6767 UTAH 10S 2W 22
INDEPENDENCE 19332 325 UTAH 10S 2W 20
IRON KING AMENDED 19262 6808 UTAH 10S 2W 21
IRON KING NO. 1 AMENDED 19263 6807 UTAH 10S 2W 21
JUNE BUG 19312 4440 UTAH 10S 2W 20
JUSTICE 19339 314 UTAH 10S 2W 20
KARREN NO. 4 65664 6563 UTAH 10S 2W 22,27
KIDNAPPING 62720 5740 UTAH 10S 2W 16,21
KLENZO 62685 6595 UTAH 10S 2W 21,28
KLENZO NO. 2 62686 6595 UTAH 10S 2W 21,28
LAST CHANCE 19320 4140 UTAH   10S 2W 20
LEDGE (Card-731) 62660 6847 UTAH, JUAB 10S 2W 28,29,32,33
LEONA 19290 5983 UTAH 10S 2W 20
LILLEY OF THE WEST 62738 4282 UTAH 10S 2W 16
LILLY FRACTION 19257 6933 UTAH 10S 2W 16
LILY SILVER 19258 6931 UTAH 10S 2W 16
LITTLE SILVER KING 19323 4104 UTAH 10S 2W 16
LOVE WANDERER 19315 4323 UTAH 10S 2W 16
MACK 19304 5584 UTAH 10S 2W 20
MAHOGANY 19325 3970 UTAH 10S 2W 19,20
MIDDLE MAN 19345 220 UTAH 10S 2W 19,20
MONTANA 19319 4143 UTAH 10S 2W 20
MONTANA 62669 6767 UTAH 10S 2W 21,22
MONTANA NO. 2 62670 6767 UTAH 10S 2W 21,22

 

Tintic Project217

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah Tax
Property No.
Patent Survey
No.
County Township Range Section
MORNING STAR 62741 4120 UTAH 10S 2W 20,29
MOUNTAIN VIEW 19331 3326 UTAH 10S 2W 17,19,20
NARROW GAUGE 19334 323 UTAH 10S 2W 19,20
NELLIE 19303 5585 UTAH 10S 2W 20
NEVADA 62671 6767 UTAH 10S 2W 22
NEVADA NO. 1 62672 6767 UTAH 10S 2W 22
NEVADA NO. 2 19264 6767 UTAH 10S 2W 21,22
NEVADA NO3 62681 6766 UTAH 10S 2W 21,22
NEVADA NO6 62682 6766 UTAH 10S 2W 21,22
NEVADA TUNNEL  EXTENSION 19259 6847 UTAH 10S 2W 28,29
NEVADA TUNNEL EXT. NO. 2 62684 6606 UTAH 10S 2W 28,29
NEVADA TUNNEL NO. 2 AMENDED (Card-731) 19261 6847 UTAH, JUAB 10S 2W 29
NEVADA TUNNEL NO. 3 62664 6847 UTAH 10S 2W 32,33
NEVADA TUNNEL NO 4 (Card-657) 65306 6052 JUAB 10S 2W 32
NEVADA TUNNEL NO 5 (Card-657) 65307 6052 JUAB 10S 2W 32
OLD ROSE AMENDED 62654 6847 UTAH, JUAB 10S 2W 33
OLD ROSE NO. 1 AMENDED 62655 6847 UTAH 10S 2W 28,33
OLIVER (CYRUS) LODE 19330 3327 UTAH 10S 2W 19,20
PAUL 62695 6574 UTAH 10S 2W 28
PAUL NO. 1 19274 6574 UTAH 10S 2W 28
PAUL NO. 2 62689 6574 UTAH 10S 2W 28,33
PAUL NO. 3 62690 6574 UTAH 10S 2W 28
PAUL NO. 4 62691 6574 UTAH 10S 2W 28,33
PAUL NO. 5 62692 6574 UTAH 10S 2W 28
PHEBE S. 19328 3700 UTAH 10S 2W 20,29
PROTECTION 19338 3147 UTAH 10S 2W 20
RALPH 19324 4100 UTAH 10S 2W 16
RED BIRD 19313 4422 UTAH 10S 2W 20
REXALL 62687 6595 UTAH 10S 2W 28
REXALL NO. 2 62688 6595 UTAH 10S 2W 28
RHOMBUS 19253 7157 UTAH 10S 2W 21
SAGE BRUSH (Card-657) 62716 6052 UTAH, JUAB 10S 2W 32,33
SAGE BRUSH (Card-657) 65409 6052 UTAH, JUAB 10S 2W 32,33
SALLY 19254 7141 UTAH 10S 2W 27,28
SAMPSON 62739 4282 UTAH 10S 2W 16

 

Tintic Project218

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah Tax
Property No.
Patent Survey
No.
County Township Range Section
SARAH 19326 39 UTAH 10S 2W 16
SEPTEMBER 62721 5740 UTAH 10S 2W 17,20
SEPTEMBER FRACTION 19305 5883 UTAH 10S 2W 20
SHAFT (Card-657) 65416 6052 JUAB 10S 2W 32,33
SHAWNEE 62665 6808 UTAH 10S 2W 21
SIDE EXTENSION OF SILVER KING 19322 4105 UTAH 10S 2W 16
SIDE EXTENSION OF SUNRISE AMENDED 62667 6767 UTAH 10S 2W 21,22
SILVER ROCK #1 19279 6559 UTAH 10S 2W 27,28
SILVER ROCK #2 62699 6559 UTAH 10S 2W 27,28
SILVER ROCK #3 62700 6559 UTAH 10S 2W 27,28
SIOUX 19341 221 UTAH 10S 2W 20,29
SLIM (Card-731) 63140 6847 JUAB 10S 2W 32
SNOW BIRD 4392 5740 UTAH 10S 2W 16,21
SPY MINE NO. 4 62740 4140 UTAH 10S 2W 20
SPY NO. 2 19318 4149 UTAH 10S 2W 20
SPY NO. 3 19317 4166 UTAH 10S 2W 20
SUCCESS 19340 260 UTAH 10S 2W 20
SUMMIT (Card-731) 62656 6847 UTAH, JUAB 10S 2W 29,32,33
SUNBEAM #1 62723 5740 UTAH 10S 2W 20,21
SUNBEAM #2 62724 5740 UTAH 10S 2W 21
SUNBEAM #3 62718 5740 UTAH 10S 2W 21
SUNBEAM #4 62719 5740 UTAH 10S 2W 21
SUNDOWN NO. 2 63138 6563 UTAH 10S 2W 22
SUNNY SIDE FRACTION 60619 6560 UTAH 10S 2W 15,22
SUNRISE (Card-657) 65466 6052 JUAB 10S 2W 32
SUNRISE FRACTION 62668 6767 UTAH 10S 2W 21,22
VERMONT 19301 5588 UTAH 10S 2W 20,29
VERN NO. 1 19282 6456 UTAH 10S 2W 21,28
VERN NO. 3 62702 6456 UTAH 10S 2W 28
VERN NO. 4 62703 6456 UTAH 10S 2W 28
VERN NO. 5 62704 6456 UTAH 10S 2W 28
VERN NO. 6 62705 6456 UTAH 10S 2W 28
WELLER FRACTION 62737 4668 UTAH 10S 2W 16
WITHE ROSE 62683 6766 UTAH 10S 2W 21,22
WITHE ROSE #1 62677 6766 UTAH 10S 2W 21,22
WITHE ROSE #2 62678 6766 UTAH 10S 2W 22,27
WITHE ROSE #3 62679 6766 UTAH 10S 2W 21,22,27,28

 

Tintic Project219

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State Of Utah Tax
Property No.
Patent Survey
No.
County Township Range Section
WITHE ROSE FRACTION 19267 6766 UTAH 10S 2W 21,22
WYMA 19302 5586 UTAH 10S 2W 20

 

Name State Of
Utah Tax
Property No.
Patent Survey
No.
County Township Range Section
CALDWELL 40428 6438 UTAH, 10S 2W 9
CLARK  40429 6438 UTAH 10S 2W 9,16
DESERT NO. 4 64027 6448 UTAH 10S 2W 9
DESERT NO. 8 64018 6448 UTAH 10S 2W 16
DEWEY 40430 6438 UTAH 10S 2W 9
GREAT EASTERN NO. 4 65618 5740 UTAH 10S 2W 16, 21
MILLER 40431 6438 UTAH 10S 2W 9
NATRONA 40427 6438 UTAH 10S 2W 9,16
WEBER 40432 6438 UTAH 10S 2W 9,16

 

Owns all right, title, and interest (100%) in the mineral estate in the following:

 

Tax Account Tax Legal Description
XE-- THE MINERAL RIGHTS ONLY BENEATH THE SURFACE OF EUREKA TOWNSITE, AS MORE PARTICULARLY DESCRIBED BY THE DEED OF CONVEYANCE FROM EUREKA CITY MINING COMPANY TO CHIEF CONSOLIDATED MINING COMPANY DATED MAY 15, 1916, AND RECORDED AT THE OFFICE OF THE JUAB COUNTY RECORDER ON MAY 25, 1916, AS ENTRY NO.  21207, IN BOOK 78 AT PAGE 219, TOGETHER WITH ALL OTHER INTERESTS CONVEYED BY SAID DEED
XE00-4635 BEGINNING AT THE NW CORNER OF LOT 44, BLK 1, PLAT "A" OF THE EUREKA CITY SURVEY, THENCE N 52˚52' E 11.32 FT, THENCE S 29˚23' E 132.27 FT, THENCE S 42˚48' W 16.21 FT, THENCE N 62˚21' W 8.64 FT, THENCE N 29˚23' W 108.42 FT, THENCE N 5˚26' W 21.72 FT TO BEGINNING. CONT 0.06 ACRES
XE00-4723  BEGINNING AT THE NW CORNER OF LOT 18, BLK 3, PLAT "A", EUREKA CITY SURVEY, THENCE N 58˚39' E 26.85 FT, THENCE S 30˚ E 37 FT, THENCE S 58˚39' W 30.17 FT M/L TO W'LY LINE OF SAID LOT, THENCE N 24˚52' W 37 FT TO BEGINNING. CONT 0.02A
XE00-4758 ALL OF LOT 22, BLK 4, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.01 ACRES
XE00-4771 ALL OF LOT 1, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.01 ACRES
XE00-4790 ALL OF LOT 20, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.14 ACRES
XE00-4791 ALL OF LOT 21, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.07 ACRES
XE00-4793 ALL OF LOT 25, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.03 ACRES
XE00-4794 ALL OF LOT 26, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.08 ACRES
XE00-4795 ALL OF LOT 27, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.05 ACRES

 

Tintic Project220

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-4796 ALL OF LOT 28, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.07 ACRES
XE00-4799 ALL OF LOTS 31, 32 & 35, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.08 ACRE
XE00-4801 ALL OF LOT 34, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.10 ACRE
XE00-4802 ALL OF LOT 36, BLK 5, PLAT "A" OF THE EUREKA CITYSURVEY. CONT 0.12 ACRE
XE00-4803 ALL OF LOTS 37, 38 & 50, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT 0.27 ACRE
XE00-4804 BEGINNING AT THE NE CORNER OF LOT 39, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY, THENCE S 46˚2' E 110.46 FT TO CORNER OF LOT 39, THENCE S 41˚31' W 3.7 FT TO CORNER OF LOT 39, THENCE S 44˚28' E 57.09 FT TO A PT, THENCE S 44˚35' W 32 FT TO A PT ON SW BOUNDARY LINE OF LOT 39,THENCE N 49˚24' W 121.29 FT TO CORNER OF LOT 39, THENCE N 47˚15' W 22.28 FT TO NW CORNER OF LOT 39, THENCE N 39˚7' E 45.47 FT TO BEGINNING. 0.15 AC
XE00-4805 BEGINNING AT THE NW CORNER OF LOT 40, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY, THENCE N 39˚7' E 34.25 FT, THENCE S 51˚15' E 111.67 FT, M/L, TO A PT ON THE S BOUNDARY OF SAID LOT, THENCE S 41˚31' W 44.3 FT TO THE SW CORNER OF SAID LOT, THENCE N 46˚02' W 110.46 FT TO BEGINNING. CONT 0.10 ACRE
XE00-4806 BEGINNING AT THE NE'LY CORNER OF LOT 40, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY, THENCE RUNNING S 51˚15' E 112.26 FT, THENCE S 41˚31' W 14 FT, THENCE N 51˚15' W 111.67 FT, M/L, TO PT ON N'LY END LINE OF SAID LOT, THENCE N 39˚07' E 14 FT, M/L, TO PT OF BEGINNING. CONT .04 ACRES
XE00-4807 BEGINNING AT THE NE CORNER OF LOT 41, BLK 5, PLAT "A" EUREKA CITY SURVEY, THENCE S 46˚43' E 41.17 FT, THENCE S 39˚20' W 11.35 FT, THENCE S 47˚8' E 86.87 FT, THENCE S 40˚10 W 41.61 FT, THENCE N 46˚50' W 137.4 FT, THENCE N 50˚17' E 53.11 FT TO BEGINNING. CONT .14 ACRE
XE00-4808 BEGINNING 53.11 FT S 50˚17' W OF NE CORNER OF LOT 41, BLK 5, PLAT "A", EUREKA CITY SURVEY, THENCE S 46˚50' E 137.4 FT, M/L TO S BOUNDARY LINE OF SAID LOT, THENCE FOLLOWING S BOUNDARY LINE TO THE SW CORNER OF SAID LOT, THENCE N 51˚15' W 146.49 FT, THENCE N 50˚17' E 53.11 FT TO BEGINNING. CONT .15 ACRES
XE00-4809 ALL OF LOT 42, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT .15 ACRES
XE00-4811 ALL OF LOT 45, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT .20 ACRES
XE00-4812 ALL OF LOTS 46, 48 AND 49, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY. CONT .42 ACRES
XE00-4815 ALL OF LOT 54, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY & THAT PART OF LOTS 6, 19, 52, & 53, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY DESCRIBED AS FOLLOWS: BEGINNING AT THE NW CORNER OF SAID LOT 19, THENCE ABOUT N 54˚34' E 165 FT, M/L, TO PT ON THE E LINE BOUNDARY OF LOT 52, THENCE ABOUT S 30˚W 107 FT, M/L, ON W LINE OF LOT 52, THENCE S 48˚50' E 135 FT TO PT ON THE N BOUNDARY LINE OF LOT 38, THENCE S 39˚07' W 23 FT, M/L, TO SW CORNER OF LOT 54, THENCE N 53˚26' W 28.86 FT TO CORNER OF LOT 54, THENCE S 42˚38' W 13.55 FT TO CORNER OF LOT 54,THENCE N 54˚34' W 159.78 FT TO BEGINNING. 0.23 AC
XE00-4817 BEGINNING AT THE E'RLY CORNER OF LOT 45, BLK 5, PLAT "A" OF THE EUREKA CITY SURVEY, THENCE S 16˚45' W 90.81 FT, THENCE S 22˚50' W 97.95 FT TO THE S BOUNDARY LINE OF THE EUREKA CITY SURVEY, THENCE N 89˚38' E ALONG SAID BOUNDARY 250 FT, THENCE N 47˚38' W 240 FT, M/L, TO BEGINNING HANIFIN TRACT CONT 0.49 ACS

 

Tintic Project221

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-4818 BEGINNING AT THE SW CORNER OF LOT 17, BLK 6, PLAT "A", EUREKA CITY SURVEY, THENCE N 50' W 249.20 FT, THENCE N 18˚41' E 21.10 FT, THENCE S 29˚9' W 49.03 FT, THENCE S 49˚26' W 120.07 FT, THENCE S 49˚32' W 124.80 FT, THENCE S 47˚38' E 85 FT M/L TO S BOUNDARY LINE OF EUREKA CITY SURVEY, THENCE N 89˚38' E ALONG THE S BOUNDARY LINE 150 FT, M/L, TO BEGINNING. HANIFIN TRACT CONT 0.68 ACS
XE00-4836 ALL OF LOT 9, BLK 6, PLAT A, EUREKA CITY SURVEY. CONT 0.77 ACRES

 

 

Tax Account Tax Legal Description
XE00-4837 BEGINNING AT THE SE CORNER OF LOT 10, BLK 6, PLAT "A" OF THE EUREKA CITY SURVEY, THENCE S 29˚09' W 49.03 FT, THENCE S 49˚26' W 120.07 FT, THENCE N 46˚45' W 173 FT M/L TO THE NW CORNER OF OLD BARN YARD, THENCE N 55˚47' E 85 FT, M/L, TO THE SW CORNER OF LOT 11 OF SAID BLK, THENCE N 57˚34' E 117.86 FT, THENCE S 36˚12' E 15.85 FT, THENCE S 34˚47' E 110.81 FT TO BEGINNING. CONT 0.65 ACRES
XE00-4844-1 BEGINNING AT THE NW CORNER OF LOT 14, BLK 6, PLAT "A", EUREKA CITY SURVEY, THENCE N 57˚01' E 60.11 FT, THENCE S 26˚40' E 54 FT, M/L TO A PT ON THE S'RLY BOUNDARY OF SAID LOT 14, WHICH IS 52.38 FT FROM THE SW CORNER OF SAID LOT 14, THENCE S 57˚37' W 52.38 FT TO THE SW CORNER OF SAID LOT 14, THENCE N 34˚47' W 52.88 FT, M/L, TO BEGINNING. CONT 0.07 ACRES
XE00-4845 BEGINNING AT THE NW CORNER OF LOT 15, BLK 6, PLAT "A", EUREKA CITY SURVEY, THENCE N 57˚37' E 106 FT, M/L, TO POINT ON THE N BOUNDARY 20 FT DIST NW'RLY FROM THE CENTER LINE OFTHE MAIN SPUR TRACK OF THE D&RG R/R, THENCE PARALLEL AND 20 FT DISTANT FROM SAID CENTER LINE ON AN 8˚ CURVE SW'RLY ABOUT 56 FT, THENCE S 31˚08' W ABOUT 58 FT TO W BOUNDARY OF SAID LOT, THENCE N 34˚47' W 50 FT, M/L, TO BEGINNING. CONT 0.06 ACS
XE00-4846 BEGINNING AT A PT ON THE S BOUNDAY LINE OF LOT 16, BLK 6, PLAT "A" OF THE EUREKA CITY SURVEY, WHICH PT BEARS S 89˚16' W 25.5 FT FROM THE SW CORNER OF SAID LOT, THENCE N 31˚08' E TO A PT ON THE N BOUNDARY LINE OF SAID LOT, THENCE N 57˚44' E TO THE NE CORNER OF SAID LOT, THENCE S 26˚40' E 109.81 FT TO THE SE CORNER OF SAID LOT, THENCE S 89˚16' W 150.62 FT, M/L, TO BEGINNING. CONT 0.20 ACRES
XE00-4852 ALL OF THE E 1/2 OF LOT 4, BLK 7, PLAT A, EUREKA CITY SURVEY. CONTAINS 0.24 ACRES.
XE00-4856-1  LOTS 6 & 22, BLK 7, PLAT A, EUREKA TOWNSITE SURVEY. ALSO BEGINNING 174.52 FT N OF SW CORNER OF LOT 30, BLK 7, PLAT A, EUREKA TOWNSITE SURVEY, RUNNING THENCE N 30˚32' ALONG ITS WESTERN BOUNDARY 128.67 FT TO NW CORNER OF SAID LOT 30, THENCE N 61˚05' E 228.40 FT, THENCE S 28˚52' E 269.88 FT TO A POINT N 28˚51'29" W 21.94 FT FROM THE SE CORNER OF SAID LOT 30, THENCE S 51˚39'12" E 30.92 FT, THENCE N 30˚32' W 156.09 FT, THENCE N 58˚07' W 190 FT TO BEGINNING. EXCEPT R-O-W OF D.&R.G.R.R. CO. SPUR LESS DEED TO RONALD G BRAY - SURFACE AREA 150 FT SQ LEAVING A BALANCE OF 1.78 AC.
XE00-4858 ALL OF LOT 7, BLK 7, PLAT A, EUREKA CITY SURVEY. CONTAINS 0.39 ACRES. EXCEPT PORTION DEEDED TO "AITKEN" IN B 331, P 761, LEAVING A BALANCE OF 0.02 AC. M/L
XE00-4871 BEGINNING AT THE SW CORNER OF LOT 15, BLK 7, PLAT A, EUREKA CITY SURVEY, THENCE N 57˚27' E 135 FT, THENCE S 35˚01' E 2.97 FT, THENCE S 61˚05' W 135.89 FT TO BEGINNING. CONTAINS 0.01 ACRES.
XE00-4875 BEGINNING AT THE NW CORNER OF LOT 18, BLK 7, PLAT A, EUREKA CITY SURVEY, THENCE N 74˚47' E 132.37 FT, THENCE S 16˚44' E 20 FT M/L TO PT ON E BOUNDARY OF SAID LOT 25 FT DIST NW'LY FROM CENTER LINE OF MAIN SPUR TRACK OF D.& R.G.RR., THENCE PARALLEL TO SAID CENTER LINE S 59˚20' W 130 FT M/L TO W BOUNDARY OF SAID LOT, THENCE N 22˚52' W 55 FT M/L TO BEGINNING. CONT 0.11 AC

 

Tintic Project222

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-4876 PART OF LOT 19, BLK 7, PLAT A, EUREKA CITY SURVEY, DESCRIBED AS BEGINNING AT A PT ON E BOUNDARY AND 20 FT S 20˚31' E FROM NE CORNER OF LOT 18, BLK 7, PLAT A, EUREKA CITY SURVEY, THENCE S 20˚31' E ABOUT 20 FT TO A PT 25 FT DIST NW'LY FROM CENTER LINE OF MAIN SPUR TRACK OF THE D.&R.G.RR., S 59˚20' W ABOUT 2 FT THENCE N 16˚44' W ABOUT 20 FT TO BEGINNING. 0.01AC
XE00-4878 BEGINNING AT THE SW CORNER OF LOT 20, BLK 7, PLAT A, EUREKA CITY SURVEY, THENCE N 61˚05' E 128.5 FT TO SE CORNER OF SAID LOT, N 20˚31' W 12 FT S 59˚20' W 128.5 FT TO A PT ON W LINE OF SAID LOT, S 22˚52' W TO BEGINNING. CONTAINS 0.02 AC
XE00-4880 ALL OF LOT 23, BLK 7, PLAT A, EUREKA CITY SURVEY. CONTAINS 0.17 ACRES.
XE00-4886  BEGINNING AT THE SE CORNER OF LOT 28, BLK 7, PLAT A, EUREKA CITY SURVEY, THENCE N 35˚01'W ABOUT 72 FT TO PT ON THE E BOUNDARY OF SAID LOT 25 FT DISTANT SE'LY FROM CENTER LINE OF MAIN SPUR TRACK OF D.&R.G. RR, THENCE PARALLEL TO SAID CENTER LINE SW'LY, ON A 14˚CURVE ABOUT166 FT TO S BOUNDARY OF LOT, THENCE N 58˚47' E 152 FT M/L TO SE COR, THE PLACE OF BEGINNING. 0.15AC
XE00-4888 BEGINNING AT THE SE CORNER OF LOT 29, BLK 7, PLAT A, EUREKA CITY SURVEY, THENCE N 30˚32' W ABOUT 108 FT TO A PT ON THE E BOUNDARY OF SAID LOT 25 FT DIST SE'LY FROM CENTER LINE OF MAIN SPUR TRACK OF D.&R.G.RR., THENCE PARLLEL TO SAID CENTER LINE S 51˚10' W ABOUT 144 FT, THENCE ON A 14˚ CURVE TO THE LEFT ABOUT 42 FT TO THE W BOUNDARY OF LOT, THENCE S 35˚01' E ABOUT 72 FT TO SW COR, THENCE N 61˚19' E 178.54 FT TO BEGINNING. CONTAINS 0.37 ACRES.
XE00-4890-1 ALL OF LOT 32, BLK 7, PLAT A, EUREKA CITYSURVEY. EXCEPTING THAT PORTION DEEDED TO WILLIE & JENNIE M. LUJAN BY A DEED RECORDED SEPT 15,1971 & FOUND IN BOOK 230, PAGE 593. CONTAINS 0.32 ACRES.
XE00-4894-1 ALL OF LOT 34, BLOCK 7, PLAT "A" OF THE EUREKA CITY SURVEY EXCEPT PORTION DEEDED TO CAMMIE SORENSEN IN BOOK 378, PAGE 363. LEAVING A BALANCE OF 0.11 AC. MORE OR LESS.
XE00-4898 BEGINNING AT THE SE CORNER OF LOT 35, BLK 7, PLAT "A", EUREKA CITY SURVEY, THENCE N 32˚17' W ABOUT 92 FT TO PT ON E BOUNDARY OF SAID LOT, 25 FT DIST SE'LY FROM CENTER LINE OF MAIN SPUR TRACK OF D & R G RR SW'LY ON A 14˚ CURVE PAR'LL TO SAID CENTER LINE ABOUT 80 FT S 6˚25' W ABOUT 44 FT TO S BOUNDARY OF SAID LOT N 60˚35' E 84 FT M/L TO SE CORNER THE POB. 0.10 AC, LESS THAT PORTION OF PARCEL XE 4903-2122 DEEDED TO "WRIGHT" IN B 453, P 170. LEAVING A BALANCE OF 0.09 AC. M/L.
XE00-4899-111  PART OF THE J C MCCHRYSTAL TRACTDESCRIBED AS COM AT THE SE CORNER OF LOT 32, BLK 7, PLAT "A" EUREKA CITY SURVEY THENCE S 700 FT THENCE S 89˚38' W 117.52 FT TO TRUE PT OF BEGINNING, THENCE N 13˚58' E 230.4 FT THENCE W 592 THENCE S 18' E 227 FT THENCE N 89˚38' E 535.2 FT TO BEGINNING. EXCEPT THOSE CERTAIN SURFACE RIGHTS CONVEYED AS DESCRIBED IN B 325 P 350 SERIAL NO. XE-5652-K & B 344 P 201 SERIAL NO. XE-5652-D & B 373 P 765 SERIAL NO. XE-5652-O & B 368 P 272 SERIAL NO. XE-5652-C & B 306 P 613 SERIAL NO. XE-5652-J & B 379 P 807 SERIAL NO. XE-4899-12 & B 386 P 225 SERIAL NO. XE-5652-N & WRIGHT SERIAL NO. XE-6119-O & CARLSON XE-4903-212 B 392 P 656 BALANCE 1.54 AC. ALSO LESS XE4899-112 B 438 P 86. ALSO LESS THAT PORTION OF XE4903-2112 DEEDED TO "WRIGHT" IN B 453 P 170, LEAVING A BALANCE OF 0.75 AC M/L.
XE00-4900 PART OF THE JACKSON C MCCHRYSTAL TRACT DESCRIBED AS COM AT SE CORNER OF LOT 32, BLK 7, PLAT "A ECS THENCE S 73˚50' W 119.57 FT THENCE N 22˚52' W 132.37 FT THENCE S 87˚29' W" 120.72 FT THENCE S 28˚52' E 278.94 FT THENCE N 58˚7' E 179.46 FT THENCE N 10' W 66.1 FT TO BEGINNING. CONT ABOUT 0.740 AC EXCEPT FOR PART DEEDED TO WILLIE & JENNIE LUJAN IN BOOK 230 PAGE 593 AND "AUSTIN IN BOOK 382 PAGE 591 AND "CUNNINGHAM" IN B 386 P 370 LEAVING A BALANCE OF 0.31 AC. M/L

 

Tintic Project223

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-4901 PART OF J C MC CHRYSTAL TRACT DESCRIBEDAS BEGINNING AT SW CORNER OF LOT 35, BLK 7, PLAT "A" EUREKA CITY SURVEY THENCE S 27˚34' E 265 FT M/L TO PT ON S BDY LINE OF TOWNSITE THENCE N 89˚38' E 47.85 FT TO PT ON S BDY LINE OF TOWNSITE THENCE N 18' W 248.43 FT TO PT 89˚52' W 149.75 FT M OR L TO PT ON S BDY LINE OF LOT 35 THENCE S 60˚35' W 22.84 FT TO BEGINNING. CONT. 0.64 AC EXCEPT SURFACE RIGHTS OF PARCELS AS DESCRIBED IN BOOK 344 PAGE 201 AND BOOK 373 PAGE 765. ALSO LESS THAT PORITON OF XE4903-2122 DEEDED TO "WRIGHT" IN B 453 P 170. LEAVING A BALANCE OF 0.25 AC. M/L.
XE00-4902 PART OF J C MC CHRYSTAL TRACT DESCRIBED AS BEGINNING AT SE CORNER OF LOT 32, BLK 7, PLAT "A" EUREKA CITY SURVEY THENCE S 10' E 699.72 FT TO PT ON S BDY LINE OF TOWNSHIP THENCE N 89˚38' E 22.39 FT TO PT THENCE N 2˚W 700 FT TO BEGINNING. CONT 0.18 ACRES EXCEPT SURFACE RIGHTS CONVEYED TO U.P.& L. CO. ON PORTION THEREOF AND "RILEY" IN BOOK 236 PAGE 357 AND "AUSTIN" IN BOOK 382 PAGE 591 LEAVING A BALANCE OF 0.09 AC.
XE00-4903-2121  PART OF J C MC CHRYSTAL TRACT DESCRIBED AS BEGINNING AT A PT 66.1 FT S 10' E FROM SE CORNER OF LOT 32 BLK 7 PLAT A EUREKA CITY SURVEY FROM SD PT OF BEGINNING S 58˚07' W 179.46 FT TO SE CORNER OF LOT 30 SD BLK, PLAT & SURVEY S 58˚07' W 220 FT TO SE CORNER OF LOT 33 SD BLK, PLAT & SURVEY S 59˚04' W 199.18 FT TO SE CORNER OF LOT 34 SD BLK PLAT & SURVEY THENCE S 60˚26' W 134.64 FT TO SW CORNER OF LOT 34 SD BLK PLAT & SURVEY THENCE N 32˚17' W 77.82 FT TO SE CORNER OF SD LOT 35 THENCE S 60˚35' W 153.34 FT N 89˚52' E 149.75 FT S 18˚ E 21.43 FT E 592 FT S 13˚58' W 230.4 FT N 89˚38' E 117.52 FT N 0˚10' W 633.9 FT TO BEGINNING. EXCEPT THE SURFACE RIGHTS TO THE FOLLOWING AS DESCRIBED IN BOOK 348 PAGE 254 SERIALNO.XE5652-E BOOK 232 PAGE 361 SERIAL NO. XE4903-1 BOOK 344 PAGE 201 SERIAL NO. XE5652-D BOOK 325 PAGE 350 SERIAL NO. XE5652-K BOOK 379 PAGE 807 SERIAL NO. XE4899-12 BOOK 382 PAGE 591 SERIAL NO. XE5388-2 BOOK 386 PAGE 370 SERIAL NO. XE4903-2 BOOK 392 PAGE 656 SERIAL NO. XE4903-212 BOOK 396 PAGE 96 SERIAL NO. XE5388-3 LEAVING A BALANCE OF 1.25 AC. LESS XE4899-112 B 438 P 860. ALSO LESS THAT PORTION OF XE4903-2122 DEEDED TO "WRIGHT" IN B 453 P 170, LEAVING ABALANCE OF 0.50 AC M/L.
XE00-4909 ALL OF LOT 5, BLK 1, PLAT "B" OF THE EUREKA CITY SURVEY. CONT 0.06 ACRES
XE00-4916 BEGINNING 50 FT N 58˚25' W OF THE NE CORNER OF LOT 10, BLK 1, PLAT "B", EUREKA CITY SURVEY, THENCE S ABOUT 21-1/2˚ E TO A POINT ON THE S BOUNDARY LINE OF SAID LOT, THENCE N 61˚39' W 18.37 FT, THENCE N 28˚28' E TO BEGINNING. CONT 0.03 ACRES
XE00-4970 ALL OF LOT 21, BLK 3, PLAT B, EUREKA CITY SURVEY. CONTAINS 0.01 ACRES.
XE00-4990 ALL OF LOT 21, BLK 4, PLAT "B", EUREKA CITY SURVEY. CONTAINS 0.03 AC
XE00-4992 ALL OF LOT 23, BLK 4, PLAT "B", EUREKA CITY SURVEY. CONTAINS 0.03 AC
XE00-5059 BEGINNING AT THE NE CORNER OF LOT 8, BLK 5, PLAT "B", EUREKA CITY SURVEY, THENCE S 10˚48' E 23.01 FT, S 64˚14' W 65 FT M/L, THENCE N 17˚57' W 48 FT, M/L, TO N'LY BOUNDARY LINE, THENCE N 73˚36' E 65 FT TO BEGINNING. NOTE: BOUNDARY LINES DO NOT CONFORM TO OFFICIAL SURVEY BUT DESCRIPTION SAME AS IN DEED TO CHIEF. CONT 0.04 AC
XE00-5069 ALL OF LOT 12, BLK 5, PLAT 'B', EUREKA CITY SURVEY. CONTAINS 0.01 ACRES.
XE00-5072 ALL OF LOT 18, BLK 5, PLAT B, EUREKA CITY SURVEY. CONTAINS 0.01 ACRES.
XE00-5080 LOT 11, OF SUB OF LOT 19, BLK 5, PLAT "B", EUREKA CITY SURVEY. CONTAINS 0.11 ACRES.
XE00-5150 ALL OF LOT 13, BLK 6, PLAT "B", EUREKA CITYSURVEY. CONT 0.01 ACRES
XE00-5224  ALL OF LOT 16, BLK 8, PLAT "B", EUREKA CITY SURVEY & A PART OF LOT 21, BLK 8, PLAT "B", EUREKA CITY SURVEY DESCRIBED AS FOLLOWS: BEGINNING AT THE SE CORNER OF SAID LOT 16, THENCE N 20˚58' W 61.82 FT, THENCE S 73˚21' W 43 FT, THENCE S 20˚58' E 67 FT, M/L, TO S'LY LINE OF SAID LOT 21, THENCE N 66˚27' E 43 FT, M/L, TO BEGINNING. CONT 0.18 AC.
XE00-5227 ALL OF LOT 19, BLK 8, PLAT "B", EUREKA CITY SURVEY. CONT 0.045 AC.
XE00-5229 THAT PART OF LOTS 21 & 25, BLK 8, PLAT "B", EUREKA CITY SURVEY, DESCRIBED AS BEGINNING AT A PT N 66˚27' E 30.83 FT FROM SW CORNER SAID LOT 21, THENCE N 66˚27' E 30.83 FT, THENCE N 20˚58' W 67 FT, THENCE N 73˚21' E 11.1 FT, THENCE N 17˚33' W 53.89 FT, THENCE S 63˚22' W 50.19 FT S 23˚21' E ALONG CENTER OF DIVIDING WALL 116.51 FT TO BEGINNING. CONT 0.10 AC.

 

Tintic Project224

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-5230 THAT PART OF LOTS 21 & 25, BLK 8, PLAT "B", EUREKA CITY SURVEY DESCRIBED AS BEGINNING AT THE SW CORNER OF SAID LOT 21, THENCE N 66˚27' E 30.83 FT N 23˚21' W ALONG CENTER DIVIDING WALL 116.51 FT TO N SAID OF LOT 25, THENCE S 62˚22' W 14.46 FT TO NW CORNER OF LOT 25, THENCE S 18˚ E 42.73 FT TO SW CORNER OF LOT 25, THENCE S 73˚21' W 12.69 FT TO NW CORNER OF LOT 21 S 5˚26' E 5.11 FT THENCE S 24˚41' E 69.99 FT TO BEGINNING. CONT 0.07AC.
XE00-5232 ALL OF LOT 24, BLK 8, PLAT "B", EUREKA CITY SURVEY. CONT .01 AC.
XE00-5373-111 ALL OF LOTS 13,19 & 22 BLK 3 PLAT CEUREKA CITY SURVEY. CONT 3.8 ACRES M/L EXCEPT PORTION DEEDED IN BOOK 365 PAGE 228 OF THE RECORDS OF JUAB COUNTY ALSO N EXCEPTING THAT PORTION DEEDED TO"WALL" IN BOOK 367 PAGE 918 ALSO EXCEPTING THAT PORITON DEEDED TO "JUDGES" IN BOOK 387 PAGE 187 CONT. 0.16 AC M/L. ALSO LES PORTION DEEDED TO "SMITHS" IN BOOK 400 PAGE 499 (XE-5386-2) LEAVING A BALANCE OF 1.34 AC. LESS PORTION DEEDED TO CUNNINGHAM IN BOOK 405 PAGE 445 (XE -5373-112) LEAVING A BALANCE OF 0.85 AC.
XE00-5374-2111 LOT 23 BLK 3 PLAT C ECS. SURFACE RIGHTSONLY EXCEPTING THAT PORTION DEEDED TO WILLIE & JENNIE M LUJAN BY A DEED RECORDED SEPT 15,1971 FOUND IN BOOK 230 PAGE 593. ALSO EXCEPTING PORTION DEEDEDTO "WALL" IN BOOK 367 PAGE 918 ALSO EXCEPTING PORTION DEEDED TO "JUDGES" IN BOOK 387 PAGE 187 CONT. 0.06 AC. M/L LEAVING A BALANCE OF 0.32 AC.
XE00-5375 ALL OF LOT 20 BLK 3 PLAT C EUREKA CITYSURVEY. CONT 1.07 ACRE
XE00-5378-1 PART OF LOT 24 BLK 3 PLT C ECS DESCRIBEDAS; BEGINNING AT SE CORNER OF LOT 22 SD BLK, PLAT & SURVEY THENCE S 15˚21' E 33 FT THENCE ABOUT N 78˚31' E 53.75 FT TO CENTER OF A WELL THENCE ABOUT 66˚30' E 88.75 FT TO CORNER OF SD LOT 24, NE CORNER OF S'RLY PORTION THEREOF THENCE N 68˚E 188.26 FT THENCE N 36˚14' W 166.56 FT THENCE S 69˚2' W TO NW CORNER OF SD LOT 24 THENCE S15˚21' E 125.77 FT TO BEGINNING. CONT 1.13 AC. LESS ANY PORTION DEEDED IN BOOK 365 PAGE 228 CONT. 0.01 AC. M/L LEAVING A BALANCEOF 1.13 AC. LESS PORTION DEEDED TO SCHOW IN B 411 P 264 (XE -5379-2) LEAVING A BALANCE OF 1.13 AC. ALSO LESS PORTION DEEDED TO "WAHLBERG" IN B 439 P 647, LEAVING A BALANCE OF 0.58 AC.
XE00-5379-11 PART OF LOT 24 BLK 3 PLT C ECS DESCRIBED AS; BEGINNING AT SE CORNER OF LOT 22 SD BLK, PLAT & SURVEY THENCE S 76˚44' W 33.72 FT THENCE S 20˚49' E 387.14 FT THENCE N 48˚11' E 190.35 FT THENCE N 22˚31' W 174.95 FT THENCE S 66˚30' W 50 FT THENCE N 23˚31' W 100 FT THENCE S 66˚30' W38.75 FT TO THE CTR OF A WELL THENCE S 78˚31' W 53.75 FT THENCE N 15˚21' W 33 FT TO BEGINNING. CONT 1.14 ACRES. LESS ANY PORTIONIF ANY DEEDED TO "SILVER TREASURE, INC." IN BOOK 413 P 261 (XE-5386-3) ALSO LESS PORTION DEEDED TO "SCHOW" IN B411 P 264, LEAVING A BALANCE OF 0.51 AC, M/L.
XE00-5380  COM AT A PT 274.9 FT N 22˚31' W OF SE CORNER OF LOT 24 BLK 3 PLAT C ECS THENCE S 66˚30' W 50 FT THENCE S 22˚31' E 100 FT THENCE N 66˚30' E 50 FT THENCE N 23˚31' W 100 FT TO BEGINNING. CONT 0.11 AC. LESS PORTION DEEDEDTO SCHOW IN B 411 P 264 (XE 5379-2) ALSO LESS PORITON DEEDED TO "SCHOW" IN B 442 P 346 (XE 5379-12) LEAVING A BALANCE OF 0.02 AC, M/L.
XE00-5382 BEGINNING AT SW CORNER OF LOT 25, BLK 3, PLAT C, ECS, THENCE N 61˚23' E 156.84 FT THENCE N 26˚10' W 26.64 FT THENCE N 61˚04' E 20 FT THENCE N 29˚ W16.5 FT TO N BDRY LN OF LOT 25 THENCE S 69˚23' W 159 FT M/L TO NW CORNER OF SD LOT 25 THENCE S 14˚29' E 67.73 FT TO BEGINNING. EXCEPT R/R OF W. CONT 0.22 
XE00-5386-1 TRACT C, BLK 3, PLAT "C" OF THE EUREKA CITY SURVEY; BEGINNING AT A POINT N 89˚45' W 1334.9 FT FROM SE CORNER OF SAID CITY SURVEY, THENCE N 49˚51' W 126.96 FT, THENCE S 69˚10' W 153 FT, THENCE S 25˚21' E 197.19 FT, THENCE S 69˚2' W 291.15 FT, THENCE S 36˚14' E166.56 FT, THENCE S 68˚W 188.26 FT, THENCE S 22˚31' E 274.95 FT, THENCE S 48˚11' W 190.35 FT, THENCE N 20˚40' W 386.14 FT, THENCE S 76˚44' W 413.78 FT, THENCE S 2˚ E 727.14 FT, THENCE N 89˚38' E 1056.75 FT, THENCE N 8' W 1295.15 FT TO BEGINNING. CONT 22.06 ACRES EXCEPT THOSE CERTAIN SURFACE RIGHTS CONVEYED IN BOOK 367, PAGE 918, LOCATED IN NW'LY CORNER OF PROPERTY HEREIN AND THAT PORTION DEEDED TO UTAH POWER & LIGHT CO. LOCATED IN SW'LY PORTION OF PROPERTY HEREIN. LEAVING A BALANCE OF 20.06 AC. MORE OR LESS. ALSO LESS PORTION DEEDED TO "AUSTIN" AS DESCRIBED IN BOOK 382, PAGE 591, ALSO LESS PORTION DEEDED TO "SMITHS" IN BOOK 400, PAGE 499 (XE-5386-2) LEAVING A BALANCE OF 19.56 AC. ALSO LESS PORTION DEEDED TO SCHOW IN B 411, P 264 (XE 5379-2) LEAVING A BALANCE OF 19.56 AC. LESS PORTION DEEDED TO "SILVER TREASURE INC." IN B 413, P 261, (XE-5386-3) LEAVING A BALANCE OF 19.06 AC. M/L. ALSO LESS ANY PORTION DEEDED TO " EUREKA CITY" IN B 563 P 1269" LEAVING A BALANCE OF 18.97 AC. M/L

 

Tintic Project225

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-5388 ALL OF LOTS 1 & 2 BLK 4 PLAT C EUREKACITY SURVEY. CONT 1.01 AC. EXCEPT SURFACE RIGHTS DEEDED TO U.P.& L. CO.AND PORTION DEEDED TO "LUJAN" IN B 230 P 593 AND PORITON DEEDED TO "WALL" IN B367 P 918. AND LESS PORTION DEEDED TO "AUSTIN" IN BOOK 382 PAGE 591 LEAVING A BALANCE OF 0.88 AC. LESS PORTION DEEDED TO "BROCK" IN BOOK396 PAGE 94 PARCEL XE-5388-3 LEAVING A BALANCE OF 0.37 AC.
XE00-5441 THAT PART OF UNNUMBERED TRACT ADJOINING LOTS 12 & 21, BLK 1, PLAT "D". EUREKA CITY SURVEY DESCRIBED AS BEGINNING AT A POINT S 71˚W 35 FT FROM SW CORNER OF SD LOT 12, THENCE N 18˚12' W 125 FT S 58˚17' W 44 FT S 18˚12' E 115 FT, THENCE N 71˚ E TO BEGINNING. CONT 0.12 ACRES JOHN HUGHS TRACT
XE00-5471 THAT PARCEL OF LAND ADJOINING LOT 5, BLK 2, PLAT D, EUREKA CITY SURVEY, DESCRIBED AS FOLLOWS. BEGINNING AT SE CORNER OF EUREKA TOWNSITE, THENCE ALONG S LINE OF SAID TOWNSITE N 89˚45' W 673.36 FT, N 70˚54' E 711.17 FT, S 13' E 235.96 FT TO BEGINNING. CONTAINS 1.82 ACRES.
XE00-5481  LOT 10, BLK 1, PLAT E, EUREKA CITY SURVEY. CONTAINS 0.08 ACRES.
XE00-5529  LOT 26, BLK 2, PLAT E, EUREKA CITY SURVEY. CONTAINS 0.10 ACRES.
XE00-5530 LOT 27, BLK 2, PLAT E, EUREKA CITYSURVEY. CONTAINS 0.10 ACRES.
XE00-5534 LOT 31, BLK 2, PLAT E, EUREKA CITY SURVEY. CONTAINS 0.03 ACRES
XE00-5538 LOT 4, BLK 3, PLAT E, EUREKA CITY SURVEY. CONTAINS 0.01 ACRES.
XE00-5560 LOT 23, BLK 3, PLAT E, EUREKA CITY SURVEY. FORMER OWNER NATIONAL HOUSING & FINANCE SYNDICATE.CONT 0.05 AC.
XE00-5572-A LOT 35, BLK 3, PLAT E, EUREKA CITY SURVEY. CONTAINS 0.09 ACRES.
XE00-5580  LOT 2, BLK 4, PLAT E, EUREKA CITY SURVEY. CONTAINS 0.02 ACRES.
XE00-5588-A LOT 11, BLK 4, PLAT E, EUREKA CITY SURVEY. CONTAINS 0.04 ACRES.
XE00-5596-A LOT 19, BLK 4, PLAT E, EUREKA CITY SURVEY. CONTAINS 0.01 ACRES.
XE00-5602-A SURFACE GROUND OF THE NORTHENCE EXTENSION ZULU, VALLEY & RIDGE MNG. CLAIM, U.S. LOT 231 KNOWN AS TRACT A, BLK 4, PLAT EEUREKA CITY SURVEY. CONT 1.79 ACRES.
XE00-5632 BEGINNING AT THE SE CORNER OF LOT 18, BLK 1, PLAT F, EUREKA CITY SURVEY, FROM WHICH CORNER # 4, LAST CHANCE MNG CLAIM U.S. LOT 261, BEARS S 10˚58' E 460.3 FT, THENCE N 81˚10' W 221.0 FT, N 8˚20' E 8 FT, S 81˚10' E 101 FT, THENCE S 7˚25' W 5 FT S 81˚10' E 120 FT, S 4˚18' W 3 FT TO BEGINNING. CONTAINS 0.03 ACRES.
XE00-5637-A LOT 23, BLK 1, PLAT F, EUREKA CITY SURVEY, CONTAINS 0.02 ACRES.
XE00-5643-A LOT 30, BLK 1, PLAT F, EUREKA CITY SURVEY. CONTAINS 0.03 ACRES.
XE00-5643-B LOTS 31 & 32, BLK 1, PLAT F, EUREKA CITY SURVEY. CONTAINS 0.04 ACRES.
XE00-5650-B  LOT 41, BLK 1, PLAT F, EUREKA CITY SURVEY. CONTAINS 0.01 ACRES.
XE00-6111 BEGINNING 120 FT N OF SE CORNER OF SW 1/4 OF NE 1/4 SEC 18 T 10S R 2W SLM THENCE N 200 FT E 80 FT S 18˚ E 72 FT W 25 FT S 18˚ E 44 FT E 25 FT S 18˚ E 55 FT S 74˚ W 138 FT TO BEGINNING. CONT. 0.43 AC.

 

Tintic Project226

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-6113-211 LOT 8 OF SEC 18 T 10S R 2W SLM ALSO ALLOF LOT 7 OF SEC 18 T 10S R 2W SLM EXCEPT ALL OF THE FOLLOWING DESCRIBED PARCELS:
PARCEL XE-5652-P: THAT PORTION OF THE FOLLOWING DESCRIBED PROPERTY LYING E OF THE E 1/16 LINE OF SEC 18, T 10S, R 2W, SLM. BEGINNING AT A POINT ON THE E BNDRY LINE OF EUREKA CITY WHICH IS S 0˚13' E 1355 FTFROM THE NE CORNER OF THE NW QTR OF THE NE 1/4 OF SEC 18, T10S,R 2W, SLB&M, THENCE S 47˚58' W 398.84 FT,THENCE N 0˚13' W 871.20 FT, THENCE N 47˚58' E 56.40 FT, THENCE N 0˚13' W 632 FT,THENCE N 89˚47' E 700.50 FT, THENCE S 0˚13' E 871.20 FT, THENCE S 47˚58' W 601.16 FT TOP.O.B. CONTAINING A BALANCE OF 10.99 AC. PARCEL XE-6118-A: A TRIANGLE TRACT OR PARCEL OF LAND WITHIN THE E 1/2 OF THE NE 1/4 OF SEC 18, T 10S, R 2W, SLM. DESCRIBED AS FOLLOWS; COM AT THE NE CORNER OF SAID SEC 18, THENCE S 38˚52' W 1155.4 FT, THENCE S 50˚08' W 183.52 FT TO THE TRUE POINT OF BEGINNING OF THE LAND DESCRIBED HEREIN, SAID POINT OF BEGINNING. BEING LOCATED AT THE INTERSECTION OF THEE LINE OF D&RG WESTERN R.R. CO'S STATION GROUNDS OF ITS TINTIC BRANCH AT KNIGHTVILLE, JUAB COUNTY WITHENCE THE SE'LY R-O-W LINE OF U.S. HWY # 6, THENCE S 0˚22' E 610 FT, THENCE N 39˚52' W 456.01 FT TO A POINT IN SAID SE'LY R-O-W LINE OF US HWY # 6, THENCE N 47˚58' E ALONG SAID R-O-W LINE 388.29 FT TO TRUE POINT OF BEGINNING. CONT 2 ACRES M/L.

PARCEL XE-6113-22: SURFACE RIGHTS ONLY; BEGINNING AT THE NE CORNER OF LEASED PREMISES, IDENTICAL WITHENCE THE NW CORNER OF UTAH STATE ROAD COMMISSION'S PROPERTY, WHENCE THE CORNER TO SECS 7,8,17,&18, T 10S, R 2W, SLM.BEARS N 40˚20-1/2' E, 1327.5 FT & RUNNING THENCE S 39˚52' E (FOLLOWING THE DIRECTION OF THE W'LY SIDE LINE OF THE UTAH STATE ROAD COMMISSION'S PROPERTY) 225 FT, THENCE S 50˚08' W 190 FT M/L TO A POINT ON E'LY BNDY OF THE D.&R.G.W.R.R. CO.STATION SITE; THENCE N 0˚22' W ALONG SD BNDY OF THE D.&R.G.W.R.R. CO. STATION SITETO ITS INTERSECTION WITHENCE THE PROJECTION, SW'LY OF THE N'LY BOUNDARY OF THE UTAH STATE ROAD COMMISSION'S PROPERTY; THENCE N 50˚08' E 8 FT M/L TO THE PLACE OF BEGINNING. CONT.0.49 AC

PARCEL XF-6113-1: SURFACE ONLY OF A PORTION OF LOT 7 OF SEC 18, T 10S, R 2W, SLM DESCRIBED AS FOLLOWS BEGINNING AT A POINT WHICH IS S 40˚31' W 1155.4 FT FROM THE NE CORNER OF SAID SEC 18, THENCE S 38˚13' E 175 FT S 51˚47' W 175 FT N 38˚13' W 175 FT N 51˚47' E 175 FT TO BEGINNING. CONT 0.6 AC. STATE ROAD EQUIPMENT SHED #73 EUREKA. PARCEL XF-6113-3: BEGINNING AT A POINT INDENTICAL WITHENCE THE N'LY CORNER WHICH POINT IS S 40˚31' W 1155.4 FT FROM THE NE CORNER OF SEC 18, T 10S, R 2W, SLM & RUNNING THENCE N 40˚28' E 25.5 FT, THENCE S 38˚13' E 405 FT, THENCE S 51˚47' W 200 FT, THENCE N 38˚13' W 225 FT TO THE S'LY CORNER OF SAID AREA HERETOFORE QUITCLAIMED BY GRANTOR TO GRANTEE HEREIN ,THENCE FOLLOWING THE BOUNDARY OF SAID AREA N 51˚47' E 175 FT, THENCE N 38˚13' W 175 FT TO BEGINNING. CONT 1.03 AC.
PARCEL XF-6111: BEGINNING 120 FT N OF SE CORNER OF SW 1/4 OF THE NE 1/4 SEC 18, T 10S, R 2W, SLM, THENCE N 200 FT E 80 FT S 18˚ E 72 FT W 25 FT S 18˚ E 44 FT E 25 FT S 18˚ E 55 FT S 74˚W 138 FT TO BEGINNING. CONT. 0.43 AC. PARCEL XF-6114: COM ON S SIDE LINE OF LOT 8 SEC 18 T 10S R 2W SLM WHERE E SIDELINE OF SMUGGLER LODE SURVEY #3347 CROSSES SAID S SIDE LINE THENCE N 29˚35' E 200 FT S 88˚27' E ABOUT 30 FT TO W SIDE LINE VALCAN LODE LOT # 4196 THENCE S 32˚ W ABOUT 220 FT ALONG W SIDE SD VULCAN LODE TO S LINE OF DS LOT 8, THENCE W ABOUT 30 FT TO BEGINNING. CONT 0.115 AC
PARCEL XF-6115: UNDERGROUND RIGHTS ONLYTO FOLLOWING COM AT SW CORNER OF LOT 8 SEC 18 T 10S R 2W SLM THENCE N 12˚ W 32.61 FT N28˚24' E 675.45 FT S 1˚02' E 168.7 FT S 29˚35' W 527.09 FT N 89˚46' W 63.07 FTTO BEGINNING. ALSO COM AT CORNER #1 SMUGGLER LODESURVEY #3347 THENCE S 29˚35' W ALONG E SIDESAID SMUGGLER LODE 318.8 FT S 88˚27' E 30 FT TO W SIDE LINE VULCAN LODE LOT#4196 THENCE N 31˚21' E 306.4 FT N 88˚27' W 55.9 FT TO BEGINNING. CONT 1.36 AC. CONTAINING IN ALL 37.53 ACRES MORE OR LESS. ALSO LESS PROPERTY DEEDED IN BOOK 534 PAGE 332 TO JUAB SPECIAL SERVICE FIRE DISTRICT DESCRIBED AS: BEGINNINGINNING AT THE NORTHWEST CORNER OF THE EUREKA POSTAL ENTERPRISES PARCEL ON RECORD IN THE JUAB COUNTY RECORDERS OFFICE IN BOOK 381, PAGE 283, WHICH IS NORTHENCE 01°14'30" EAST ALONG THE SECTION LINE 1368.21 FEET AND WEST 1145.78 FEET FROM THE SOUTHEAST CORNER OF THE NORTHEAST QUARTER OF SECTION 18, TOWNSHIP 10 SOUTH, RANGE 2 WEST, SALT LAKE BASE AND MERIDIAN, THENCE SOUTHENCE 37.27'27" EAST 242.78 FEET ALONG THE WEST LINE OF SAID EUREKA POSTAL ENTERPRISES PARCEL AND THE CLEO JUDGE PARCEL ON RECORD IN THE JUAB COUNTY RECORDERS OFFICE IN BOOK 518, PAGE 877, THENCE SOUTHENCE 50.22'37" WEST 352.95 FEET, THENCE NORTHENCE 02O30'39" EAST 178.51 FEET TO A 125.00 FOOT RADIUS CURVE TO THE LEFT, THENCE ALONG SAID CURVE 91.92 FEET, WITHENCE A CHORD OF NORTHENCE 18°33'22" WEST 89.86 FEET, THENCE NORTHENCE 39°37'23" WEST 26.36 FEET TO THE SOUTHENCE LINE OF U.S. HIGHWAY 6, THENCE NORTHENCE 50°22'37" EAST ALONG SAID SOUTHENCE LINE 210 FEET TO THE POINT OF BEGINNINGINNING LEAVING A BALANCE OF 35.53 AC. M/L.

 

Tintic Project227

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
  ALSO EXCEPTING, QUARTER: NE S 18 T 10S R 2W A PARCEL OF LAND FOR SURFACE RIGHTS, BEING PART OF AN ENTIRE TRACT OF PROPERTY, SITUATE IN PATENTED MINING CLAIM ANACONDA, SURVEY NO. 3519 AND IN LOT 7 OF SECTION 18, T 10S, R 2W, S.L.B. & M. THE BOUNDARIES OF SAID PARCEL OF LAND ARC DESCRIBED AS FOLLOWS:

BEGINNINGINNING ON THE SOUTHEASTERLY RIGHT OF WAY LINE OF AN EXISTING HIGHWAY KNOWN AS U.S. HIGHWAY 6, AND AT THE NORTHEASTERLY CORNER OF THAT PROPERTY QUIT CLAIIMED BY THE GRANTOR IN THAT DEED RECORDED AS ENTRY NO. 13496, IN BOOK 1828 AT PAGE 25 IN THE OFFICE OF THE UTAH COUNTY RECORDER, AT A POINT 1129.90 FT., S 40˚31'00" W 50.57 FT. S 38˚13'00" E AND 123.08 FT. N 49˚46'00" E FROM THE NORTHEAST CORNER OF SAID SECTION 18 AND RUNNING THENCE N 49˚46'00" E 150.09 FT ALONG SAID SOUTHEASTERLY RIGHT OR WAY LINE; THENCE S 38˚13'00" E 479.71 FT; THENCE S 51˚47'00" W 473.00 FT; THENCE N 38˚13'00" W 115.67 FT; THENCE N 51˚47'00" E 323.00 FT; THENCE N 38˚13'00" W, 358.76 FT TO THE POINT OF BEGINNINGINNING. THE ABOVE DESCRIBED PARCEL OF LAND CONTAINS 108.896 SQARE FEET OR AREA OR 2.50 ACRES. LEAVING A BALANCE OF 33.03 AC M/L
XE00-6113-211 (Continued) PARCEL XF-6113-1: SURFACE ONLY OF A PORTION OF LOT 7 OF SEC 18, T 10S, R 2W, SLM DESCRIBED AS FOLLOWS BEGINNING AT A POINT WHICH IS S 40˚31' W 1155.4 FT FROM THE NE CORNER OF SAID SEC 18, THENCE S 38˚13' E 175 FT S 51˚47' W 175 FT N 38˚13' W 175 FT N 51˚47' E 175 FT TO BEGINNING. CONT 0.6 AC. STATE ROAD EQUIPMENT SHED #73 EUREKA. PARCEL XF-6113-3: BEGINNING AT A POINT INDENTICAL WITHENCE THE N'LY CORNER WHICH POINT IS S 40˚31' W 1155.4 FT FROM THE NE CORNER OF SEC 18, T 10S, R 2W, SLM & RUNNING THENCE N 40˚28' E 25.5 FT, THENCE S 38˚13' E 405 FT, THENCE S 51˚47' W 200 FT, THENCE N 38˚13' W 225 FT TO THE S'LY CORNER OF SAID AREA HERETOFORE QUITCLAIMED BY GRANTOR TO GRANTEE HEREIN ,THENCE FOLLOWING THE BOUNDARY OF SAID AREA N 51˚47' E 175 FT, THENCE N 38˚13' W 175 FT TO BEGINNING. CONT 1.03 AC.
PARCEL XF-6111: BEGINNING 120 FT N OF SE CORNER OF SW 1/4 OF THE NE 1/4 SEC 18, T 10S, R 2W, SLM, THENCE N 200 FT E 80 FT S 18˚ E 72 FT W 25 FT S 18˚ E 44 FT E 25 FT S 18˚ E 55 FT S 74˚W 138 FT TO BEGINNING. CONT. 0.43 AC. PARCEL XF-6114: COM ON S SIDE LINE OF LOT 8 SEC 18 T 10S R 2W SLM WHERE E SIDELINE OF SMUGGLER LODE SURVEY #3347 CROSSES SAID S SIDE LINE THENCE N 29˚35' E 200 FT S 88˚27' E ABOUT 30 FT TO W SIDE LINE VALCAN LODE LOT # 4196 THENCE S 32˚ W ABOUT 220 FT ALONG W SIDE SD VULCAN LODE TO S LINE OF DS LOT 8, THENCE W ABOUT 30 FT TO BEGINNING. CONT 0.115 AC

 

Tintic Project228

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-6113-211 (Continued) PARCEL XF-6115: UNDERGROUND RIGHTS ONLY TO FOLLOWING COM AT SW CORNER OF LOT 8 SEC 18 T 10S R 2W SLM THENCE N 12˚ W 32.61 FT N28˚24' E 675.45 FT S 1˚02' E 168.7 FT S 29˚35' W 527.09 FT N 89˚46' W 63.07 FTTO BEGINNING. ALSO COM AT CORNER #1 SMUGGLER LODESURVEY #3347 THENCE S 29˚35' W ALONG E SIDESAID SMUGGLER LODE 318.8 FT S 88˚27' E 30 FT TO W SIDE LINE VULCAN LODE LOT#4196 THENCE N 31˚21' E 306.4 FT N 88˚27' W 55.9 FT TO BEGINNING. CONT 1.36 AC. CONTAINING IN ALL 37.53 ACRES MORE OR LESS. ALSO LESS PROPERTY DEEDED IN BOOK 534 PAGE 332 TO JUAB SPECIAL SERVICE FIRE DISTRICT DESCRIBED AS: BEGINNINGINNING AT THE NORTHWEST CORNER OF THE EUREKA POSTAL ENTERPRISES PARCEL ON RECORD IN THE JUAB COUNTY RECORDERS OFFICE IN BOOK 381, PAGE 283, WHICH IS NORTHENCE 01°14'30" EAST ALONG THE SECTION LINE 1368.21 FEET AND WEST 1145.78 FEET FROM THE SOUTHEAST CORNER OF THE NORTHEAST QUARTER OF SECTION 18, TOWNSHIP 10 SOUTH, RANGE 2 WEST, SALT LAKE BASE AND MERIDIAN, THENCE SOUTHENCE 37.27'27" EAST 242.78 FEET ALONG THE WEST LINE OF SAID EUREKA POSTAL ENTERPRISES PARCEL AND THE CLEO JUDGE PARCEL ON RECORD IN THE JUAB COUNTY RECORDERS OFFICE IN BOOK 518, PAGE 877, THENCE SOUTHENCE 50.22'37" WEST 352.95 FEET, THENCE NORTHENCE 02O30'39" EAST 178.51 FEET TO A 125.00 FOOT RADIUS CURVE TO THE LEFT, THENCE ALONG SAID CURVE 91.92 FEET, WITHENCE A CHORD OF NORTHENCE 18°33'22" WEST 89.86 FEET, THENCE NORTHENCE 39°37'23" WEST 26.36 FEET TO THE SOUTHENCE LINE OF U.S. HIGHWAY 6, THENCE NORTHENCE 50°22'37" EAST ALONG SAID SOUTHENCE LINE 210 FEET TO THE POINT OF BEGINNINGINNING LEAVING A BALANCE OF 35.53 AC. M/L.ALSO EXCEPTING, QUARTER: NE S 18 T 10S R 2W A PARCEL OF LAND FOR SURFACE RIGHTS, BEING PART OF AN ENTIRE TRACT OF PROPERTY, SITUATE IN PATENTED MINING CLAIM ANACONDA, SURVEY NO. 3519 AND IN LOT 7 OF SECTION 18, T 10S, R 2W, S.L.B. & M. THE BOUNDARIES OF SAID PARCEL OF LAND ARC DESCRIBED AS FOLLOWS:
XE00-6113-211 (Continued)

BEGINNING ON THE SOUTHEASTERLY RIGHT OF WAY LINE OF AN EXISTING HIGHWAY KNOWN AS U.S. HIGHWAY 6, AND AT THE NORTHEASTERLY CORNER OF THAT PROPERTY QUIT CLAIIMED BY THE GRANTOR IN THAT DEED RECORDED AS ENTRY NO. 13496, IN BOOK 1828 AT PAGE 25 IN THE OFFICE OF THE UTAH COUNTY RECORDER, AT A POINT 1129.90 FT., S 40˚31'00" W 50.57 FT. S 38˚13'00" E AND 123.08 FT. N 49˚46'00" E FROM THE NORTHEAST CORNER OF SAID SECTION 18 AND RUNNING THENCE N 49˚46'00" E 150.09 FT ALONG SAID SOUTHEASTERLY RIGHT OR WAY LINE; THENCE S 38˚13'00" E 479.71 FT; THENCE S 51˚47'00" W 473.00 FT; THENCE N 38˚13'00" W 115.67 FT; THENCE N 51˚47'00" E 323.00 FT; THENCE N 38˚13'00" W, 358.76 FT TO THE POINT OF BEGINNINGINNING. THE ABOVE DESCRIBED PARCEL OF LAND CONTAINS 108.896 SQARE FEET OR AREA OR 2.50 ACRES. LEAVING A BALANCE OF 33.03 AC M/L

PARCEL XF-6113-1: SURFACE ONLY OF A PORTION OF LOT 7 OF SEC 18, T 10S, R 2W, SLM DESCRIBED AS FOLLOWS BEGINNING AT A POINT WHICH IS S 40˚31' W 1155.4 FT FROM THE NE CORNER OF SAID SEC 18, THENCE S 38˚13' E 175 FT S 51˚47' W 175 FT N 38˚13' W 175 FT N 51˚47' E 175 FT TO BEGINNING. CONT 0.6 AC. STATE ROAD EQUIPMENT SHED #73 EUREKA. PARCEL XF-6113-3: BEGINNING AT A POINT INDENTICAL WITHENCE THE N'LY CORNER WHICH POINT IS S 40˚31' W 1155.4 FT FROM THE NE CORNER OF SEC 18, T 10S, R 2W, SLM & RUNNING THENCE N 40˚28' E 25.5 FT, THENCE S 38˚13' E 405 FT, THENCE S 51˚47' W 200 FT, THENCE N 38˚13' W 225 FT TO THE S'LY CORNER OF SAID AREA HERETOFORE QUITCLAIMED BY GRANTOR TO GRANTEE HEREIN ,THENCE FOLLOWING THE BOUNDARY OF SAID AREA N 51˚47' E 175 FT, THENCE N 38˚13' W 175 FT TO BEGINNING. CONT 1.03 AC.
[See tax description for more details]

XE00-6113-211 (Continued) PARCEL XF-6111: BEG 120 FT N OF SE COR OF SW 1/4 OF THE NE 1/4 SEC 18, T 10S, R 2W, SLM, TH N 200 FT E 80 FT S 18` E 72 FT W 25 FT S 18` E 44 FT E 25 FT S 18` E 55 FT S 74`W 138 FT TO BEGINNING. CONT. 0.43 AC. PARCEL XF-6114: COM ON S SIDE LINE OF LOT 8 SEC 18 T 10S R 2W SLM WHERE E SIDELINE OF SMUGGLER LODE SURVEY #3347 CROSSES SAID S SIDE LINE TH N 29`35' E 200 FT S 88`27' E ABOUT 30 FT TO W SIDE LINE VALCAN LODE LOT # 4196 TH S 32` W ABOUT 220 FT ALONG W SIDE SD VULCAN LODE TO S LINE OF DS LOT 8, TH W ABOUT 30 FT TO BEGINNING. CONT 0.115 AC

 

Tintic Project229

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XE00-6113-211 (Continued) PARCEL XF-6115: UNDERGROUND RIGHTS ONLYTO FOLLOWING COM AT SW COR OF LOT 8 SEC 18 T 10S R 2W SLM TH N 12` W 32.61 FT N28`24' E 675.45 FT S 1`02' E 168.7 FT S 29`35' W 527.09 FT N 89`46' W 63.07 FTTO BEGINNING. ALSO COM AT COR #1 SMUGGLER LODESURVEY #3347 TH S 29`35' W ALONG E SIDESAID SMUGGLER LODE 318.8 FT S 88`27' E 30 FT TO W SIDE LINE VULCAN LODE LOT#4196 TH N 31`21' E 306.4 FT N 88`27' W 55.9 FT TO BEGINNING. CONT 1.36 AC. CONTAINING IN ALL 37.53 ACRES MORE OR LESS. ALSO LESS PROPERTY DEEDED IN BOOK 534 PAGE 332 TO JUAB SPECIAL SERVICE FIRE DISTRICT DESCRIBED AS: BEGINNING AT THE NORTHWEST CORNER OF THE EUREKA POSTAL ENTERPRISES PARCEL ON RECORD IN THE JUAB COUNTY RECORDERS OFFICE IN BOOK 381, PAGE 283, WHICH IS NORTH 01°14'30" EAST ALONG THE SECTION LINE 1368.21 FEET AND WEST 1145.78 FEET FROM THE SOUTHEAST CORNER OF THE NORTHEAST QUARTER OF SECTION 18, TOWNSHIP 10 SOUTH, RANGE 2 WEST, SALT LAKE BASE AND MERIDIAN, THENCE SOUTH 37.27'27" EAST 242.78 FEET ALONG THE WEST LINE OF SAID EUREKA POSTAL ENTERPRISES PARCEL AND THE CLEO JUDGE PARCEL ON RECORD IN THE JUAB COUNTY RECORDERS OFFICE IN BOOK 518, PAGE 877,
XE00-6113-211 (Continued)

 THENCE SOUTH 50.22'37" WEST 352.95 FEET, THENCE NORTH 02O30'39" EAST 178.51 FEET TO A 125.00 FOOT RADIUS CURVE TO THE LEFT, THENCE ALONG SAID CURVE 91.92 FEET, WITH A CHORD OF NORTH 18°33'22" WEST 89.86 FEET, THENCE NORTH 39°37'23" WEST 26.36 FEET TO THE SOUTH LINE OF U.S. HIGHWAY 6, THENCE NORTH 50°22'37" EAST ALONG SAID SOUTH LINE 210 FEET TO THE POINT OF BEGINNING LEAVING A BALANCE OF 35.53 AC. M/L.

ALSO EXCEPTING, QUARTER: NE S 18 T 10S R 2W A PARCEL OF LAND FOR SURFACE RIGHTS, BEING PART OF AN ENTIRE TRACT OF PROPERTY, SITUATE IN PATENTED MINING CLAIM ANACONDA, SURVEY NO. 3519 AND IN LOT 7 OF SECTION 18, T 10S, R 2W, S.L.B. & M. THE BOUNDARIES OF SAID PARCEL OF LAND ARC DESCRIBED AS FOLLOWS:

XE00-6113-211 (Continued) BEGINNING ON THE SOUTHEASTERLY RIGHT OF WAY LINE OF AN EXISTING HIGHWAY KNOWN AS U.S. HIGHWAY 6, AND AT THE NORTHEASTERLY CORNER OF THAT PROPERTY QUIT CLAIIMED BY THE GRANTOR IN THAT DEED RECORDED AS ENTRY NO. 13496, IN BOOK 1828 AT PAGE 25 IN THE OFFICE OF THE UTAH COUNTY RECORDER, AT A POINT 1129.90 FT., S 40`31'00" W 50.57 FT. S 38`13'00" E AND 123.08 FT. N 49`46'00" E FROM THE NORTHEAST CORNER OF SAID SECTION 18 AND RUNNING THENCE N 49`46'00" E 150.09 FT ALONG SAID SOUTHEASTERLY RIGHT OR WAY LINE; THENCE S 38`13'00" E 479.71 FT; THENCE S 51`47'00" W 473.00 FT; THENCE N 38`13'00" W 115.67 FT; THENCE N 51`47'00" E 323.00 FT; THENCE N 38`13'00" W, 358.76 FT TO THE POINT OF BEGINNING. THE ABOVE DESCRIBED PARCEL OF LAND CONTAINS 108.896 SQARE FEET OR AREA OR 2.50 ACRES. LEAVING A BALANCE OF 33.03 AC M/L
XE00-6114 COM ON S SIDE LINE OF LOT 8, SEC 18, T 10S, R 2W, SLM, WHERE E SIDE LINE OF SMUGGLER LODE SURVEY # 3347 CROSSES SAID S SIDELINE, THENCE N 29˚35' E 200 FT S 88˚27' E ABOUT 30 FT TO W SIDE LINE VALCAN LODELOT # 4196 THENCE S 32˚ W ABOUT 22O FT ALONG W SIDE SD VULCAN LODE TO S LINE OF SAID LOT 8, THENCE W ABOUT 30 FT TO BEGINNING. CONT 0.115 A
XE00-6115 UNDERGROUND RIGHTS ONLY TO FOLLOWING: COM AT SW CORNER OF LOT 8, SEC 18, T 10S, R 2W, SLM, THENCE N 12' W 32.61 FT N 28˚24' E 675.45 FT S 1˚02' E 168.7 FT S 29˚35' W 527.09 FT N 89˚46' W 63.07 FT TO BEGINNING. ALSO COM AT CORNER # 1 SMUGGLER LODE SURVEY # 3347 THENCE S 29˚35' W ALONG E SIDE SAID SMUGGLER LODE 318.8 FT S 88˚27' E 30 FT TO W SIDE LINE VULCAN LODE LOT # 4196 THENCE N 31˚21' E 306.4 FT N 88˚27' W 55.9 FT TO BEGINNING. CONT 1.36 AC.
XF00-6115-A LOTS 26, 27 OF SEC 18, T 10S, R 2W, SLM. CONT 3.18 AC.
XF00-5690 ALL OF LOTS 1 & 2 BLOCK C, O.S.L. PLAT & ROBINSON TOWNSITE MAMMOTH CITY SURVEY. CONT. 0.23 AC.

 

Tintic Project230

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
XF00-5740 ALL OF LOT 12, BLK H, ROBINSON TOWNSITE MAMMOTH CITY SURVEY AND ALL OF LOT 13, BLK H, OSL PLAT & ROBINSON TOWNSITE MAMMOTH CITY SURVEY CONT 0.30 ACS
XF00-5741 ALL OF LOTS 14 & 15 AND THE S 20 FT OFLOT 17, BLOCK H, OSL PLAT & ROBINSON TOWNSITE MAMMOTH CITY SURVEY CONT 0.33 ACS
XF00-5744 ALL OF LOTS 18 & 19 BLK H, ROBINSON TOWNSITE MAMMOTH CITY SURVEY CONT 0.25 ACS
XF00-5745 ALL OF LOTS 20 & 21 BLK H, ROBINSON TOWNSITE MAMMOTH CITY SURVEY AND ALL OF LOTS 22 & 23, BLK H, OSL PLAT & ROBINSON TOWNSITE MAMMOTH CITY SURVEY CONT 0.43 A
XF00-5963-MINERAL ALL MINERALS, INCLUDING OIL AND GAS, WITHTHE RIGHT TO ENTER UPON SAID SURFACE AT ANY TIME FOR THE PURPOSE OF DRILLING, SINKING SHAFTS, ERECTING MINE BUILDINGS, ERECTING DUMPS, BUILDING ROADS AND UTILIZING THE SURFACE AREA FOR SHAFTS AND MINE BUILDINGS, NOT TO EXCEED FIVE HUNDRED FEET IN DIAMETER FOR ANY SINGLE SURFACE OPENING. ON THE FOLLOWING DESCRIBEDPROPERTY: LOTS 2,4, 5, 6,7,8 & 9, SEC 25, T10S, R3W, SLM, MAMMOTH CITY, CONT 133.10 ACS
XF00-5965-MINERAL ALL MINERALS, INLUDING OIL & GAS, WITH THE RIGHT TO ENTER UPON SAID SURFACE AT ANY TIME FOR THE PURPOSE OF DRILLING, SINKING SHAFTS, ERECTING MINE BUILDINGS, ERECTING DUMPS, BUILDING ROADS AND UTILIZING THE SURFACE AREA FOR SHAFTS AND MINE BUILDINGS, NOT TO EXCEED FIVE HUNDRED FEET IN DIAMETER FOR ANY SINGLE SURFACE OPENING. ON THE FOLLOWING DESCRIBED PROPERTY: THE N 1/2 OF SE 1/4, THE SE 1/4 OF NE 1/4, THE W 1/2 OF NE 1/4, & LOT 1 SEC 26, T10S, R3W, SLM, CONT 234 AC. IN MAMMOTHCITY ALSO: ALL OF THE NW 1/4, THE NE 1/4 OF THE SW 1/4 AND ALL OF LOT 2 OF SEC 26, T10S, R3W, SLM, CONT 235.59 ACS LESS 1.05 AC FOR ST RD & LESS 26.21 AC FOR PROJECTS-173 TOTAL ACS 442.33
XF00-5995-12 LOT 7 BLOCK 5 SILVER CITY SURVEY. CONT.0.057 AC.
XF00-6126-F  LOT 14 OF SEC 13, T10S, R3W, SLM CONT 2.17
XF00-6150-MINERAL ALL MINERALS, INCLUDING OIL & GAS, WITH THE RIGHT TO ENTER UPON SAID SURFACE AT ANY TIME FOR THE PURPOSE OF DRILLING, SINKING SHAFTS, ERECTING MINE BUILDINGS, ERECTING DUMPS, BUILDING ROADS AND UTILIZING THE SURFACE AREA FOR SHAFTS AND MINE BUILDINGS, NOT TO EXCEED FIVE HUNDRED FEET IN DIAMETER FOR ANY SINGLE SURFACE OPENING AFFECTING THE FOLLOWING DESCRIBED PROPERTY: THE E 1/2 OF NE 1/4 OF SEC 22, T10S, R3W, SLM. CONT. 80 AC.
XF00-6152-1 MINERAL ALL OF THE SURFACE RIGHTS GRANTED IN B 325 P 317 AFFECTING THE FOLLOWING DESCRIBED PROPERTY: SW 1/4, W 1/2 OF SE 1/4, SW 1/4 OF NE 1/4, NE 1/4 OF SE 1/4 & LOT 3 OF SEC 23, T 10S, R 3W, SLM. EXCEPT A CIRCULAR PLOT OF GROUND, 700 FT IN DIAMETER THE CENTER OF WHICH BEARS FROM THE W 1/4 OF SAID SEC 23 S 45˚04' E 1587.3 FT. LEAVING A BALANCE OF 334.34 AC.
XF00-6291  BEGINNING 1320 FT S OF NE CORNER OF SEC 28, T 11S, R 3W, SLM, THENCE W 750 FT, S 1320 FT, E 750 FT, N 1320 FT TO BEGINNING. CONTAINS 22.50 ACRES.

 

Tax Account Tax Legal Description
35 104 0007 COMMENCING S 83 FT & E 33 FT FROM NW 1/4 COR. SEC. 13, T10S, R2W, SLB&M.; S 637 FT; E 68.78 FT; N 0 DEG 20' 7" W 564.91 FT; E 330 FT; E 4619.69 FT; E 330 FT; N 88 DEG 54' 27" E 330 FT; S 1 DEG 5' 34" E 50 FT; S 88 DEG 54' 27" W 298.12 FT; S 0 DEG 11' 55" W 515.53 FT; E 2510.8 FT; N 660 FT; W 7590 FT; S 23 FT; W 297 FT TO BEGINNING. AREA 50.140 AC. ALSO PART LOT 1, PLAT A, BRONSON SUB DESCRIBED AS FOLLOWS; COMMENCING N 4640.84 FT & W 8053.74 FT FROM S 1/4 COR. SEC. 18, T10S, R1W, SLB&M.; W 33 FT; N 0 DEG 20' 7" W 564.919 FT; E 330 FT; S 50 FT; W 296.71 FT; S 0 DEG 20' 7" E 514.91 FT TO BEGINNING. AREA 0.770 AC. ALSO PART LOT 2, PLAT A, BRONSON SUB DESCRIBED AS FOLLOWS: COMMENCING N 4640.84 FT & W 2845.31 FT FROM S 1/4 COR. SEC. 18, T10S, R1W, SLB&M.; W 5208.43 FT; N 0 DEG 20' 7" W 514.91 FT; E 296.71 FT; N 50 FT; E 4619.69 FT; S 50 FT; E 296.83 FT; S 0 DEG 11' 55" W 514.91 FT TO BEGINNING. AREA 66.900 AC. ALSO PART LOT 3, PLAT A, BRONSON SUB DESCRIBED AS FOLLOWS: COMMENCING N 4640.84 FT & W 2812.32 FT FROM S 1/4 COR. SEC. 18, T10S, R1W, SLB&M.; W 33 FT; N 0 DEG 11' 55" E 514.91 FT; W 296.83 FT; N 50 FT; E 330 FT; S 0 DEG 11' 55" W 564.91 FT TO BEGINNING. AREA 0.770 AC. TOTAL AREA 118.58 AC.

 

Tintic Project231

January 27, 2023

 

 

 

Osisko Development Corp.

 

Tax Account Tax Legal Description
61 046 0001 ALL OF SEC. 32, T9S, R2W, SLB&M. AREA 345.063 AC
61 094 0019 NW 1/4 OF NW 1/4 SEC. 17 LESS: PARCEL 18, DEED 10578-70 DESCRIBED AS FOLLOWS; COM S 49.15 FT & E 1.16 FT FR NW COR. SEC. 17, T10S R1W SLB&M.; N 89 DEG 6' 0" E 836.95 FT; S 8 DEG 6' 0" E 1299.33 FT; S 89 DEG 15' 39" W 989.73 FT; N 1 DEG 20' 54" W 1286.34 FT TO BEG. AREA 26.997 AC. ALSO COM S 1 DEG 33' 0" E 1330 FT FR NW COR. SEC. 17, T10S R1W SLB&M.; S 1 DEG 33' 0" E 584.7 FT; S 85 DEG 15' 0" E 1069.3 FT; N 8 DEG 6' 0" W 695.4 FT; S 89 DEG 6' 0" W 983.6 FT TO BEG. AREA 14.922 AC. TOTAL AREA 41.919 AC.
61 095 0003 COM S 49.99 FT & E 1.18 FT FR NE COR. SEC. 18 T10S R1W SLB&M.; S 1 DEG 20' 54" E 2621.02 FT; N 89 DEG 41' 9" W 2659.18 FT; N 1 DEG 33' 18" W 2583.85 FT; N 89 DEG 30' 36" E 1986.5 FT; S 95.83 FT; N 89 DEG 3' 30" E 100 FT; S 0 DEG 28' 15" E 1.64 FT; N 89 DEG 3' 30" E 100 FT; N 95.9 FT; N 89 DEG 30' 36" E 481.19 FT TO BEG. AREA 158.634 AC.
61 119 0001 SW 1/4 OF SE 1/4 SEC 5, T10S, R2W, SLM; SE 1/4 OF SE 1/4 OF SD SEC. AREA 80 ACRES.
61 120 0001 LOT 5 (UTAH COUNTY PORTION) SEC. 7, T10S, R2W, SLB&M. AREA 26.122 AC. ALSO N 1/2 OF SE 1/4 (UTAH COUNTY PORTION) SEC. 7, T10S, R2W, SLB&M. AREA 55.200 AC. TOTAL AREA 81.322 AC.
61 120 0002  COMMENCING W 300 FT FROM SE 1/4 COR. SEC. 7, T10S, R2W, SLB&M.; N 440 FT; W 297 FT; S 440 FT; E 297 FT TO BEGINNING. AREA 3.006 AC.
61 120 0003  COMMENCING AT SE 1/4 COR. SEC. 7, T10S, R2W, SLB&M.; N 440 FT; W 297 FT; S 440 FT; E 297 FT TO BEGINNING. AREA 3.011 AC.
61 121 0001 COMMENCING AT NW COR OFSEC 8, T10S, R2W, SLM; S ALONG SEC LINE 5280 FT; E ALONG SEC LINE 3168 FT; N 22 59' E 5 CHS; N62 W 2088.6 FT; N 25 46' E 3020 FT; E 1740 FT;N 45 E 350 FT; S 50 E 350 FT; E 500 FT TO SE COR OF LOT 1; N ALONG SEC LINE TO NE COR OF SEC; W ALONG SEC LINE 5280 FT TO BEGINNING. LESS STATE ROAD & MILL SITES. AREA 306.44 ACRES.
61 129 0001 NE 1/4 OF NW 1/4 AND LOT 2, SEC 17, T10S, R2W, SLM. AREA 75.15 ACRES.
61 130 0008 COMMENCING AT NE COR. SEC. 18, T10S, R2W, SLB&M.; S 0 DEG 54' 42" W 1599.13 FT; N 60 DEG 58' 16" W 38.83 FT; N 71 DEG 3' 55" W 95.18 FT; N 68 DEG 42' 20" W 34.09 FT; N 47 DEG 25' 51" W 164.69 FT; N 54 DEG 42' 43" W 63.42 FT; N 75 DEG 3' 47" W 88.78 FT; N 61 DEG 29' 31" W 64.79 FT; N 51 DEG 47' 0" E 381.18 FT; N 38 DEG 13' 0" W 479.71 FT; S 49 DEG 46' 0" W 273.16 FT; N 38 DEG 13' 0" W 50.61 FT; S 40 DEG 28' 0" W 25.5 FT; S 51 DEG 47' 0" W 82.45 FT; N 6 DEG 7' 32" W 62.96 FT; N 15 DEG 47' 57" W 121.24 FT; N 5 DEG 12' 58" W 60.52 FT; N 0 DEG 33' 35" W 102.41 FT; N 11 DEG 0' 21" E 87.77 FT; N 2 DEG 6' 42" E 142.51 FT; N 3 DEG 26' 32" E 116.62 FT; N 3 DEG 28' 44" E 78.29 FT; N 0 DEG 31' 42" E 54.27 FT; N 17 DEG 48' 33" W 76.04 FT; N 21 DEG 52' 26" W 49.43 FT; S 89 DEG 27' 27" E 869.08 FT TO BEGINNING. AREA 21.000 AC.
98 125 0042 THE PATENTED MINING CLAIMS DESCRIBED ON EXHIBIT B-1

 

Tintic Project232

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
8TH OF AUGUST (Card-0554-A) 60979 265 JUAB 9S 3W 35
ALABAMA (Card-0257-A and Card-0257-B) 21897 312 JUAB 10S 2W 18
ALOHA LODE (Card-0279) 43515 4536 JUAB 10S

3W

2W

13

7

ALOHA LODE (Card-0279) 43514 4536 JUAB 10S 2W 7
ALPHA MILL SITE (Card-0267-A) 43512 105B JUAB 10S 3W 12
ALPHA MILL SITE (Card-0267-A) 43512 105B JUAB 10S 2W 7
AMERICAN STAR(AMD)LODE (Card-0256) 21942 240 JUAB 10S 2W 18,19
ANA MARGARET 21889 264 UTAH 10S 3W 1,2
ANA MARGARET 21889 264 UTAH 9S 3W 35,36
ANACONDA LODE (Card-0252) 21858 3519

JUAB/

UTAH

10S 2W 17,18
ANNA NO. 2 (Card-247) 60745 4320 JUAB 10S 3W 24
AURORA LODE (Card-0279) 43540 4536 JUAB 10S 3W 13
AURORA LODE (Card-0279) 43540 4536 JUAB 10S 2W 18
AURORA LODE #1 (Card-0279) 43539 4536 JUAB 10S 3W 13
AURORA LODE #1 (Card-0279) 43539 4536 JUAB 10S 2W 18
BALTIC 21886 6024 UTAH 10S 3W 1,2
BALTIC 21886 6024 UTAH 10S 2W 6,7
BAPTA LODE (Card-0287 and SA00-004) 21953 4026 JUAB 10S 3W 13
BATTERY B LODE (Card-0279) 43525 4536 JUAB 10S 2W 7
BEECHER (Card-0233) 24821 196A JUAB 10S 2W 18,19
BEND LODE #2 21834 6430 UTAH 10S 2W 5
BEND LODE #3 60397 6430 UTAH 10S 2W 5
BILL MCKINLEY (Card-685) 21901 5081 JUAB 10S 3W 24
BLACKBIRD AMENDED (Card-0256) 60746 240 JUAB 10S 2W 18
BLUE BELL (Card-0236) 62827 124 JUAB 10S 2W 18,19
BLUE BELL NORTH EXTENSION (Card-0236) 62825 212 JUAB 10S 2W 18
BLUE BELL NORTH EXTENSION (Card-0236) 65317 212 JUAB 10S 2W 18
BLUE TRACT (Card-583) 13209 6024 JUAB 10S 2W 7
BLUFF 21809 6582 UTAH 10S 3W 2
BLUFF 21809 6582 UTAH 9S 2W 34
BOOM MILL SITE (Card-0037-A and SA00-0004) 21957 247-B JUAB 10S 2W 18
BUDDER LODE 60818 5905 JUAB 10S 2W 29,30
BULLION LODE (Card-0238 and SA00-0004) 21954 76 JUAB 10S 3W 13
C. S. D. 21888 265 UTAH 9S 3W 35
CAFFER EXTENSION 25527 187 JUAB 10S 3W 24
CAFFER EXTENSION 25527 187 JUAB 10S 2W 19
CASCARA LODE (Card-0279) 43510 4536 JUAB 10S 2W 7
CASCARA LODE (Card-0279) 43511 4536 JUAB 10S 3W 12
CHIEF FRACTION LODE (Card-605) 60756 6289 JUAB 10S 2W 18
CHIEF NO. 10 21876 6484 UTAH 9S 2W 29
CHIEF NO. 4 60260 6484 UTAH 9S 2W 29

 

Tintic Project233

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
CHIEF NO. 5 60264 6484 UTAH 9S 2W 29
CHIEF NO. 6 60265 6484 UTAH 9S 2W 29
CHIEF NO. 7 60266 6484 UTAH 9S 2W 29
CHIEF NO. 8 60267 6484 UTAH 9S 2W 29
CHIEF NO. 9 21875 6484 UTAH 9S 2W 29
CHRISTMAS LODE NO. 1 21866 6633 UTAH 9S 2W 33
CHRISTMAS LODE NO. 2 60217 6633 UTAH 9S 2W 33
CHRISTMAS LODE NO. 3 60218 6633 UTAH 9S 2W 33
CHRISTMAS LODE NO. 4 60220 6633 UTAH 9S 2W 27,33,34
CHRISTMAS LODE NO. 5 21798 6633 UTAH 9S 2W 33
CHRISTMAS LODE NO. 6 60580 6633 UTAH 9S 2W 33,34
CHRISTMAS LODE NO. 7 60581 6633 UTAH 9S 2W 34
CHURCH STREET LODE (Card-0305) 43551 3871 JUAB 10S 3W 12,13
CINCH (Card-0554-A&B) 60761 264 JUAB 10S 3W 2
CINCH (Card-0554-A&B) 60761 264 JUAB 9S 3W 35
CLIMAX PLACER (Card-0303) 43541 4800 JUAB 10S 2W 18
COFFER (Card-0207) 63160 186 JUAB 10S 3W 13,24
COFFER (Card-0207) 63160 186 JUAB 10S 2W 18,19
COLD CANYON LODE (Card-0279) 43522 4536 JUAB 10S 3W 12
COLD CANYON LODE (Card-0279) 43522 4536 JUAB 10S 2W 7
COLORADO CHIEF LODE (Card-210 and SA00-0004) 60747 139 JUAB 10S 3W 13
COMSTOCK LODE 21841 6114 JUAB, UTAH 10S 2W 17
CONTACT LODE 21817 6516 UTAH 10S 2W 3
CONTACT LODE 21817 6516 UTAH 9S 2W 34
CONTACT LODE #1 60638 6516 UTAH 10S 2W 3
CONTACT LODE #1 60638 6516 UTAH 9S 2W 34
CONTACT LODE #2 60639 6516 UTAH 9S 2W 27,34
CONTACT LODE #3 60640 6516 UTAH 9S 2W 27,34
CONTACT LODE #5 64948 6516 UTAH 9S 2W 27,34
COPPER GLANCE #1 60599 6583 UTAH 10S 2W 2
COPPER GLANCE EXT. NO. 1 60600 6583 UTAH 10S 2W 2
COPPER GLANCE EXT. NO. 2 60601 6583 UTAH 10S 2W 2
CORNUCOPIA LODE (Card-211 and SA00-0004) 21952 97 JUAB 10S 3W 13
CORPORAL LODE (Card-0279) 43528 4536 JUAB 10S 2W 7,18
COSOPOLITE NO. 2 (Card-209) 21934 140 JUAB 10S 3W 12
COSSACK LODE 21869 6537 UTAH 10S 2W 6,7
CRESCENT #6 60602 6583 UTAH 10S 2W 2
CROESUS LODE 60319 6024 UTAH 10S 3W 1,12
CROWN POINT EXT #4 62837 5774 UTAH 10S 2W 20,29
CURACOA LODE (Card-0279) 43538 4536 JUAB 10S 2W 7,18
DAN PATCH LODE (Card-0583) 60750 6024 JUAB 10S 3W 12

 

Tintic Project234

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
DIVIDE 65546 6430 UTAH 10S 2W 5
DIVIDE #1 LODE 60398 6430 UTAH 10S 2W 5
DIVIDE #10 LODE 21878 6432 UTAH 10S 2W 6
DIVIDE #11 LODE 60685 6432 UTAH 10S 2W 5,6,7,8
DIVIDE #12 LODE 60691 6432 UTAH 10S 2W 6,7
DIVIDE #13 LODE 60268 6432 UTAH 10S 2W 6,7
DIVIDE #14 LODE 60269 6432 UTAH 10S 2W 6,7
DIVIDE #15 LODE 60270 6432 UTAH 10S 2W 6,7
DIVIDE #2 LODE 60307 6430 UTAH 10S 2W 5
DIVIDE #22 LODE (Card-068) 43520 6432 JUAB, UTAH 10S 2W 7
DIVIDE #22 LODE (Card-068) 43521 6432 JUAB, UTAH 10S 2W 7
DIVIDE #23 LODE 60693 6432 UTAH 10S 2W 7,8
DIVIDE #3 LODE 60271 6432 UTAH 10S 2W 5
DIVIDE #4 LODE 21877 6432 UTAH 10S 2W 5,6
DIVIDE #6 LODE 60695 6432 UTAH 10S 2W 5,8
DIVIDE #7 LODE 60399 6430 UTAH 10S 2W 5
DIVIDE #8 LODE 60400 6430 UTAH 10S 2W 5,8
DIVIDE #9 LODE 60272 6432 UTAH 10S 2W 5,6
DIVIDE FRACTION 60306 6430 UTAH 10S 2W 5
DONNELLY BOY LODE (Card-0183) 60752 311 JUAB 10S 3W 24
DORA (Card-0576) 62828 5663 JUAB 10S 2W 18,19
DORIC (Card-583) 60320 6024 JUAB, UTAH 10S 3W 12
DROP (Card-0554-A&B) 21903 264 JUAB, UTAH 10S 3W 2
DROP ((Card-0554-A&B) 21903 264 JUAB, UTAH 9S 3W 35
E. PINYON LODE 60847 6516 UTAH 10S 2W 4
E. PINYON LODE 60847 6516 UTAH 9S 2W 33
E. PINYON LODE #10 60642 6516 UTAH 10S 2W 3
E. PINYON LODE #10 60642 6516 UTAH 9S 2W 34
E. PINYON LODE #11 21816 6516 UTAH 9S 2W 27,34
E. PINYON LODE #12 60632 6516 UTAH 10S 2W 3
E. PINYON LODE #12 60632 6516 UTAH 9S 2W 34
E. PINYON LODE #14 60633 6516 UTAH 10S 2W 3
E. PINYON LODE #14 60633 6516 UTAH 9S 2W 34
E. PINYON LODE #15 60634 6516 UTAH 9S 2W 27,34
E. PINYON LODE #2 60635 6516 UTAH 10S 2W 4
E. PINYON LODE #2 60635 6516 UTAH 9S 2W 33
E. PINYON LODE #3 21871 6516 UTAH 9S 2W 33
E. PINYON LODE #4 60636 6516 UTAH 10S 2W 3,4
E. PINYON LODE #4 60636 6516 UTAH 9S 2W 33,34

 

Tintic Project235

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
E. PINYON LODE #5 21815 6516 UTAH 9S 2W 33,34,27
E. PINYON LODE #6 60625 6516 UTAH 10S 2W 3
E. PINYON LODE #6 60625 6516 UTAH 9S 2W 34
E. PINYON LODE #8 60626 6516 UTAH 10S 2W 3
E. PINYON LODE #8 60626 6516 UTAH 9S 2W 34
E. PINYON LODE #9 65792 6516 UTAH 9S 2W 27,34
EAGLE (Card-0174) 62829 123 JUAB 10S 2W 18
EAGLE NORTH EXTENSION 24820 213 JUAB 10S 2W 18
EAGLE SOUTH EXTENSION 62821 214 JUAB 10S 2W 19
EAST CONTACT NO. 1 21774 6789 UTAH 10S 2W 11
EAST CONTACT NO. 10 60493 6789 UTAH 10S 2W 2,11
EAST CONTACT NO. 11 60494 6789 UTAH 10S 2W 11
EAST CONTACT NO. 12 60495 6789 UTAH 10S 2W 11
EAST CONTACT NO. 13 60496 6789 UTAH 10S 2W 2,11
EAST CONTACT NO. 14 21773 6789 UTAH 10S 2W 11
EAST CONTACT NO. 15 60492 6789 UTAH 10S 2W 11
EAST CONTACT NO. 16 60489 6789 UTAH 10S 2W 2,11
EAST CONTACT NO. 17 60490 6789 UTAH 10S 2W 11
EAST CONTACT NO. 18 60491 6789 UTAH 10S 2W 11
EAST CONTACT NO. 19 21777 6788 UTAH 10S 2W 11
EAST CONTACT NO. 2 21772 6789 UTAH 10S 2W 11
EAST CONTACT NO. 20 60509 6788 UTAH 10S 2W 11
EAST CONTACT NO. 21 60510 6788 UTAH 10S 2W 11
EAST CONTACT NO. 22 60511 6788 UTAH 10S 2W 11
EAST CONTACT NO. 23 65554 6788 UTAH 10S 2W 11
EAST CONTACT NO. 24 60512 6788 UTAH 10S 2W 11
EAST CONTACT NO. 25 21770 6790 UTAH 10S 2W 11
EAST CONTACT NO. 26 21776 6788 UTAH 10S 2W 11
EAST CONTACT NO. 27 60504 6788 UTAH 10S 2W 11
EAST CONTACT NO. 28 60470 6790 UTAH 10S 2W 11
EAST CONTACT NO. 29 60505 6788 UTAH 10S 2W 11
EAST CONTACT NO. 3 60483 6789 UTAH 10S 2W 11
EAST CONTACT NO. 30 60506 6788 UTAH 10S 2W 11
EAST CONTACT NO. 31 60471 6790 UTAH 10S 2W 11
EAST CONTACT NO. 32 60507 6788 UTAH 10S 2W 11
EAST CONTACT NO. 33 60508 6788 UTAH 10S 2W 11
EAST CONTACT NO. 34 60472 6790 UTAH 10S 2W 11,12
EAST CONTACT NO. 35 21775 6788 UTAH 10S 2W 11,12
EAST CONTACT NO. 36 60497 6788 UTAH 10S 2W 11,12
EAST CONTACT NO. 4 60484 6789 UTAH 10S 2W 2,11
EAST CONTACT NO. 40 60450 6793 UTAH 10S 2W 11,14
EAST CONTACT NO. 41 60451 6793 UTAH 10S 2W 11,14
EAST CONTACT NO. 42 60452 6793 UTAH 10S 2W 11,14
EAST CONTACT NO. 43 60474 6790 UTAH 10S 2W 11,14

 

Tintic Project236

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
EAST CONTACT NO. 44 60476 6790 UTAH 10S 2W 11,14
EAST CONTACT NO. 45 21769 6790 UTAH 10S 2W 11
EAST CONTACT NO. 46 60465 6790 UTAH 10S 2W 11
EAST CONTACT NO. 47 60466 6790 UTAH 10S 2W 11,14
EAST CONTACT NO. 48 60467 6790 UTAH 10S 2W 11,14
EAST CONTACT NO. 49 60468 6790 UTAH 10S 2W 11,14
EAST CONTACT NO. 5 60486 6789 UTAH 10S 2W 11
EAST CONTACT NO. 50 21768 6790 UTAH 10S 2W 11,14
EAST CONTACT NO. 51 60460 6790 UTAH 10S 2W 11,14
EAST CONTACT NO. 52 60461 6790 UTAH 10S 2W 11,12,13,14
EAST CONTACT NO. 56 21767 6790 UTAH 10S 2W 14
EAST CONTACT NO. 57 60454 6790 UTAH 10S 2W 14
EAST CONTACT NO. 58 60455 6790 UTAH 10S 2W 14
EAST CONTACT NO. 59 60487 6789 UTAH 10S 2W 2,11
EAST CONTACT NO. 6 21771 6789 UTAH 10S 2W 11
EAST CONTACT NO. 60 60498 6788 UTAH 10S 2W 2,11
EAST CONTACT NO. 61 60499 6788 UTAH 10S 2W 2,11
EAST CONTACT NO. 62 60500 6788 UTAH 10S 2W 2,11
EAST CONTACT NO. 63 60501 6788 UTAH 10S 2W 2,11
EAST CONTACT NO. 68 60457 6790 UTAH 10S 2W 14
EAST CONTACT NO. 69 60458 6790 UTAH 10S 2W 14
EAST CONTACT NO. 7 60479 6789 UTAH 10S 2W 2,11
EAST CONTACT NO. 70 60459 6790 UTAH 10S 2W 13,14
EAST CONTACT NO. 8 60481 6789 UTAH 10S 2W 11
EAST CONTACT NO. 9 60482 6789 UTAH 10S 2W 11
EAST HUMBUG LODE 60709 6114 UTAH 10S 2W 17
ECLIPSE (Card-0537) 64831 107 JUAB 10S 3W 24
ELECTRIC 12129 6534 UTAH 10S 2W 6
ELLA (Card-554-A&B)) 60336 264 JUAB, UTAH 10S 3W 1
ELLA (Card-554-A&B)) 60336 264 JUAB, UTAH 9S 3W 36
ELLA (Card-680) 43552 6455 JUAB, UTAH 10S 2W 17,18
ELLA (Card-680) 43554 6455 JUAB, UTAH 10S 2W 17,18
ELLA (Card-680) 43553 6455 JUAB 10S 2W 17,18
ENDY 21843 6059 UTAH 10S 2W 17
EUREKA 62793 6895 UTAH 10S 3W 1
EUREKA LODE (Card-175 and SA00-0004) 60748 39 JUAB 10S 3W 24
EUREKA LODE #6 (Card-743) 65570 6895 JUAB 10S 3W 12
EUREKA LODE NO. 1 60214 6895 UTAH 10S 3W 1
EUREKA LODE NO. 2 60216 6895 UTAH 10S 3W 1

 

Tintic Project237

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
EVANS LODE (Card-732) 60763 6897 JUAB 10S 3W 24
FIELD LODE (Card-577) 43546 6043 JUAB 10S 2W 7
FIELD LODE (Card-577) 43546 6043 JUAB 10S 3W 12
FIELD LODE (Card-577) 21931 6043 JUAB 10S 3W 12
FLORENCE 21868 6569 UTAH 10S 2W 6
FLORENCE 21868 6569 UTAH 10S 3W 1
FOURTH OF JULY LODE (Card-0164) 21930 3373 JUAB 10S 3W 12,13
GEMINI #2 LODE (Card-0147 and SA00-0004) 60769 4379 JUAB 10S 3W 13
GEMINI EXTENSION LODE (Card-0153 and SA00-0004) 60722 111A JUAB 10S 3W 13
GEMINI EXTENSION MILLSITE (Card-0267-A) 43523 111-B JUAB 10S 3W 12
GEMINI EXTENSION MILLSITE (Card-0267-A) 43523 111-B JUAB 10S 2W 7
GEMINI LODE (Card-0158 and SA00-0004) 60749 69 JUAB 10S 3W 13
GENERAL SLOCUM 64002 6569 UTAH 10S 3W 1
GEORGE A. WILSON (Card-352) 21925 296 JUAB 10S 3W 24
GET THERE ELI 60329 265 UTAH 9S 3W 35,36
GETUP 12125 6513 UTAH 10S 2W 4
GETUP 12125 6513 UTAH 9S 2W 33
GIANT LODE (Card-583-B) 60321 6024 JUAB, UTAH 10S 2W 7
GIANT LODE(Card-583-B) 21926 6024 JUAB, UTAH 10S 3W 12
GOLDEN RAY LODE (Card-0183) 21927 311 JUAB 10S 3W 24
GOOD ENOUGH (Card-0149) 62830 3742 JUAB 10S 2W 18
GOOD ENOUGH #2 LODE (Card-0183) 60793 311 JUAB 10S 3W 24
GRANITE LODE (Card-0152) 21928 234 JUAB 10S 2W 18
GRANITE MOUNTAIN 60712 6059 UTAH 10S 2W 17
HADES LODE (Card-597) 60773 346 JUAB 10S 3W 24
HARDING 21865 6884 UTAH 10S 2W 6
HELEN LODE 21799 6631 UTAH 10S 2W 4,9
HEMITITE 21854 5472 UTAH 10S 2W 29
HIATUS LODE (Card-0353) 60775 3626 JUAB 10S 3W 24
HILL SIDE NO. 1 60671 6463 UTAH 10S 2W 4
HILLSIDE NO. 1 21829 6463 UTAH 10S 2W 4
HOBBS (Card-554-A) 60330 265 JUAB, UTAH 9S 3W 35
HORNSILVER LODE (Card-143) 60774 203A JUAB 10S 3W 24
HOUGHTON (Card-0141) 62831 197 JUAB 10S 2W 18,19
HY MICKY MUCK (Card-0554-A&B) 60760 264 JUAB 10S 3W 2
HY MICKY MUCK (Card-0554-A&B) 60760 264 JUAB 9S 3W 35
JACK FRACT 60710 6114 JUAB, UTAH 10S 2W 17
JAMES G BLAINE (Card-0368) 21899 227 JUAB 10S 2W 19
JAY LODE (Card-733) 21924 6896 JUAB 10S 3W 24

 

Tintic Project238

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
JOE DANDY 60223 6569 UTAH 10S 2W 6
JUMBO 60337 264 UTAH 10S 3W 2
JUMBO 60322 6024 JUAB, UTAH 10S 3W 1,12
JUMBO 60337 264 UTAH 9S 3W 35
KEYSTONE LODE (Card-0112 and SA00-0004) 60768 112A JUAB 10S 3W 13
KEYSTONE MILL SITE (Card-0267-A) 43536 112B JUAB 10S 2W 7,18
KID 60331 265 UTAH 9S 3W 35,36
KINGSTON LODE (Card-0110) 21893 4378 JUAB 10S 3W 13
KNIGHT 60711 6114 JUAB, UTAH 10S 2W 17
KO KO 60332 265 UTAH 9S 3W 35
LA BONTA 21863 122 UTAH 10S 2W 29
LAMB NO. 22 60432 6802 UTAH 10S 2W 14,23
LAP 21882 6431 UTAH 10S 2W 6
LAP 21882 6431 UTAH 9S 2W 31
LAP #1 60302 6431 UTAH 9S 2W 31
LAST CHANCE LODE (Card-553 and SA00-0004) 21950 261 JUAB 10S 3W 13, 9
LEADVILLE LODE (Card-0584-B) 21904 6081 JUAB 10S 3W 13
LEADVILLE LODE (Card-0584-B) 49127 6081 JUAB 10S 3W 13
LEGAL LODE (Card-388 and SA00-0004) 21923 132 JUAB 10S 3W 13,24
LEO LODE 60817 6475 JUAB 10S 3W 24
LIABILITY LODE 21921 3622 JUAB 10S 3W 13
LIMIT #10 60303 6431 UTAH 9S 2W 31
LIMIT #11 60304 6431 UTAH 9S 2W 31
LIMIT #9 60305 6431 UTAH 9S 2W 31,32
LIMIT LODE 21885 6402 UTAH 9S 2W 32,33
LITTLE CHIEF 65685   JUAB 10S 3W 13
LITTLE GEM (Card-583) 60815 60241 JUAB 10S 2W 7
LOUISE (Card-0554) 21902 264 JUAB, UTAH 10S 3W 1,2
LOUISE (Card-0554) 21902 264 JUAB, UTAH 9S 3W 35
LUCKY BOY 21800 6629 UTAH 10S 2W 3,4
LUCKY BOY 21800 6629 UTAH 9S 2W 33,34
LUCKY BOY JR. (Card-659 and SA00-0004) 60766 6565 JUAB 10S 3W 13,24
LUCKY BOY JR. (Card-659 and SA00-0004) 60766 6565 JUAB 10S 2W 18,19
LUCKY BOY NO. 2 60603 6629 UTAH 10S 2W 4
LUCKY BOY NO. 2 60603 6629 UTAH 9S 2W 33
LUPUS 65708 6432 UTAH 10S 2W 6
LUPUS #9 60277 6431 UTAH 10S 2W 6
LUPUS NO. 1 60273 6432 UTAH 10S 2W 6
LUPUS NO. 2 60274 6432 UTAH 10S 2W 6

 

Tintic Project239

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
LUPUS NO. 3 60276 6432 UTAH 10S 2W 6
MABEL 60338 264 UTAH 9S 3W 35,36
MAE E.A. (Card-0554-A&B) 60978 265 JUAB, UTAH 9S 3W 35
MAGPIE 21867 6630 UTAH 10S 2W 5
MARCUS AURELIUS LODE (Card-685) 21922 5081 JUAB 10S 3W 24
MARINDA NO. 1 21806 6598 UTAH 10S 2W 3
MARINDA NO. 1 21806 6598 UTAH 9S 2W 34
MARINDA NO. 2 60596 6598 UTAH 10S 2W 3
MARINDA NO. 2 60596 6598 UTAH 9S 2W 34
MARY ALICE LODE (Card-0183) 60984 311 JUAB 10S 3W 24
MARY BELL LODE (Card-0183) 60986 311 JUAB 10S 3W 24
MATILDA LODE (Card-0095) 21920 315 JUAB 10S 2W 18,19
MAUD S. 60324 6024 UTAH 10S 2W 6,7
MAY DAY ANNEXATION 40413 4283 UTAH 10S 2W 17
MAY FLOWER NO2 48737 6534 UTAH 10S 2W 6,7
MEG MERILESS 60255 6484 UTAH 9S 2W 29,32
MIDNIGHT EXTENSION 21842 6017 UTAH 9S 2W 34
MODELA LODE (Card-604) 60985 6290 JUAB 10S 2W 18
MONO LODE 60781 70 JUAB 10S 3W 13,24
MONTE CARLO 65259 6569 UTAH 10S 2W 6
MORNING STAR LODE (Card-594) 60779 5108 JUAB 10S 3W 24
N E (Card-0554-A&B) 60758 38 JUAB 10S 3W 2
N. A. R. (Card-0554-A&B) 30982 265 JUAB, UTAH 9S 3W 35
N. END 60256 6484 UTAH 9S 2W 28
N. END LODE NO. 2 21873 6484 UTAH 9S 2W 28
N. END LODE NO. 3 60241 6484 UTAH 9S 2W 28
N. END LODE NO. 6 21874 6484 UTAH 9S 2W 29
N. END NO. 1 60251 6484 UTAH 9S 2W 28
N. END NO. 10 60257 6484 UTAH 9S 2W 28
N. END NO. 4 60258 6484 UTAH 9S 2W 28,29
N. END NO. 5 60259 6484 UTAH 9S 2W 29
N. END NO. 7 60247 6484 UTAH 9S 2W 28,29
N. END NO. 8 60252 6484 UTAH 9S 2W 28
N. END NO. 9 60253 6484 UTAH 9S 2W 28
N. TUNNEL 60677 6463 UTAH 10S 2W 3
N. TUNNEL NO. 1 60678 6463 UTAH 10S 2W 3
N. TUNNEL NO. 2 60679 6463 UTAH 10S 2W 3
N. TUNNEL NO. 3 21828 6463 UTAH 10S 2W 3
N. TUNNEL NO. 4 60672 6463 UTAH 10S 2W 3
N. TUNNEL NO. 5 60673 6463 UTAH 10S 2W 3
N.S. NO. 1 60286 6431 UTAH 10S 2W 5
N.S. NO. 10 60287 6431 UTAH 9S 2W 32

 

Tintic Project240

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
N.S. NO. 10 60287 6431 UTAH 10S 2W 5,6
N.S. NO. 11 60288 6431 UTAH 10S 2W 5
N.S. NO. 11 60288 6431 UTAH 9S 2W 32
N.S. NO. 12 60290 6431 UTAH 10S 2W 5
N.S. NO. 12 60290 6431 UTAH 9S 2W 32
N.S. NO. 16 60308 6430 UTAH 10S 2W 5
N.S. NO. 16 60308 6430 UTAH 9S 2W 32
N.S. NO. 17 60309 6430 UTAH 10S 2W 5
N.S. NO. 17 60309 6430 UTAH 9S 2W 32
N.S. NO. 18 60315 6402 UTAH 10S 2W 4,5
N.S. NO. 18 60315 6402 UTAH 9S 2W 32,33
N.S. NO. 19 60316 6402 UTAH 10S 2W 4,5
N.S. NO. 19 60316 6402 UTAH 9S 2W 33
N.S. NO. 2 21880 6431 UTAH 10S 2W 5
N.S. NO. 3 60282 6431 UTAH 10S 2W 5,6
N.S. NO. 4 60283 6431 UTAH 10S 2W 6
N.S. NO. 5 60284 6431 UTAH 10S 2W 6
N.S. NO. 6 60285 6431 UTAH 10S 2W 6
N.S. NO. 7 21879 6431 UTAH 10S 2W 6
N.S. NO. 7 21879 6431 UTAH 9S 2W 31
N.S. NO. 8 60280 6431 UTAH 10S 2W 6
N.S. NO. 8 60280 6431 UTAH 9S 2W 31
N.S. NO. 9 60281 6431 UTAH 10S 2W 6
N.S. NO. 9 60281 6431 UTAH 9S 2W 31,32
N.W. (Card-0554-A&B) 60759 38 JUAB 10S 3W 2
NOAH (Card-0076) 63428 239 JUAB 10S 2W 18,19
NOAH FRACTION (Card-0682) 62824 6550 JUAB 10S 2W 19
NORTH EXT. BLUE BELL (Card-0082) 62825 212 JUAB 10S 2W 18
NORTH EXT. RIDGE LODE (Card-0672-C) 25528 231 JUAB 10S 3W 13
NORTH EXT. VALLEY LODE (Card-0672-B) 25531 231 JUAB 10S 3W 13
NORTH EXTENSION EAGLE (Card-0083) 24820 213 JUAB 10S 2W 18
NORTH EXTENSION ZULU LODE (Card-0672-A and SA00-0004) 25530 231 JUAB 10S 3W 13
NORTH OF IRELAND NO. 1 21872 6491 UTAH 10S 2W 6
NORTH OF IRELAND NO. 2 60236 6491 UTAH 10S 2W 6
NORTH OF IRELAND NO. 3 60237 6491 UTAH 10S 2W 6
NORTH OF IRELAND NO. 4 60239 6491 UTAH 10S 2W 6
NORWAY FRACTION (Card-658) 43548 6539 JUAB 10S 3W 13
NORWAY FRACTION (Card-658) 43547 6539 JUAB 10S 3W 13
NORWAY LODE (Card-422 and SA00-0004) 21948 276 JUAB 10S 3W 13
NORWAY LODE (Card-422 and SA00-0004) 43549 276 JUAB 10S 3W 13
OCKONOOK (Card-244) 60811 4548 JUAB 10S 2W 29,32
OHIO MINING CLAIM 21887 4827 UTAH 10S 2W 5
OLE BOLE LODE (Card-432 and SA00-0004) 21947 275 JUAB 10S 3W 13

 

Tintic Project241

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
ONNIE GAGAN 60333 265 UTAH 9S 3W 35,36
PALERMO (Card-583) 21917 6024 JUAB, UTAH 10S 3W 12
PALERMO (Card-583) 65348 6024J JUAB 10S 3W 12
PARROT 43508 6024 JUAB, UTAH 10S 2W 7
PARROT (Card-583) 43507 6024 JUAB 10S 2W 7
PAXMAN MILLSITE 21859 3286 UTAH 10S 2W 7,8
PAXMAN MILLSITE NO. 2 21860 3518 UTAH 10S 2W 7,8
PEACE 21797 6730 UTAH 10S 2W 4
PEACE FRACTION 60579 6730 UTAH 10S 2W 4
PEAK 60628 6516 UTAH 9S 2W 33
PINYON 60629 6516 UTAH 10S 2W 4
PINYON 60629 6516 UTAH 9S 2W 33
R. R. FRACTION 21818 6515 UTAH 10S 2W 4
RABBIT 60222 6630 UTAH 10S 2W 5
RABBIT 60222 6630 UTAH 9S 2W 32
RAILROAD NO. 10 21827 6463 UTAH 10S 2W 3
RAILROAD NO. 12 60667 6463 UTAH 10S 2W 3
RAILROAD NO. 13 60668 6463 UTAH 10S 2W 3
RAILROAD NO. 14 60669 6463 UTAH 10S 2W 3
RAILROAD NO. 4 21826 6463 UTAH 10S 2W 3
RAILROAD NO. 5 60662 6463 UTAH 10S 2W 3
RATTLESNAKE NO. 4 60429 6802 UTAH 10S 2W 14
RATTLESNAKE NO. 5 60410 6804 UTAH 10S 2W 14
RATTLESNAKE NO. 6 62789 6804 UTAH 10S 2W 14
RATTLESNAKE NO. 7 60392 6804 UTAH 10S 2W 14
RATTLESNAKE NO. 8 60393 6804 UTAH 10S 2W 14
RED BIRD LODE (Card-564 and SA00-0004) 60981 96 JUAB 10S 3W 13
RICHARD LODE (Card-734) 21916 6898 JUAB 10S 3W 24
RIDGE 25529 5708 JUAB 10S 2W 29
RIDGE (Card-0456) 25529 106 JUAB 10S 3W 13,24
RIDGE NORTH EXTENSION (Card-672) 25528 231 JUAB 10S 3W 13
RIO TINTO LODE (Card-0279) 43529 4536 JUAB 10S 2W 7,18
RIO TINTO LODE (Card-0279) 43530 4536 JUAB 10S 3W 12,13
ROBBINS EUREKA LODE (Card-0268) 21918 71 JUAB 10S 3W 13,24
ROBERT # 10 60375 6806 UTAH 10S 2W 23,26
ROBERT # 11 60376 6806 UTAH 10S 2W 26
ROBERT # 12 60377 6806 UTAH 10S 2W 23,26
ROBERT #14 21756 6805 UTAH 10S 2W 23,26
ROBERT #15 60387 6805 UTAH 10S 2W 26
ROBERT #16 60388 6805 UTAH 10S 2W 26
ROBERT #17 60389 6805 UTAH 10S 2W 26
ROBERT #18 60390 6805 UTAH 10S 2W 26

 

Tintic Project242

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
ROBERT #19 60391 6805 UTAH 10S 2W 26
ROBERT #20 21755 6805 UTAH 10S 2W 26
ROBERT #21 60380 6805 UTAH 10S 2W 26
ROBERT #22 60381 6805 UTAH 10S 2W 26
ROBERT #23 60382 6805 UTAH 10S 2W 26
ROBERT #24 60383 6805 UTAH 10S 2W 26
ROBERT #25 60384 6805 UTAH 10S 2W 26
ROBERT #26 60385 6805 UTAH 10S 2W 23,26
ROBERT #27 60386 6805 UTAH 10S 2W 23,26
ROBERT 13 60378 6806 UTAH 10S 2W 26
RYAN MILLSITE (Card-0267-A) 43542 3060B JUAB, UTAH 10S 2W 18
S. S. NO. 1 65405 6463 UTAH 10S 2W 4
S. S. NO. 2 65406 6463 UTAH 10S 2W 4
S. S. NO. 3 65407 6463 UTAH 10S 2W 4
S. S. NO. 5 60643 6515 UTAH 10S 2W 4
S. S. NO. 6 60630 6516 UTAH 10S 2W 3,4
SAN JUAN (Card-583) 60989 6024 JUAB, UTAH 10S 3W 12
SAN JUAN (Card-583) 65412 6024J JUAB 10S 3W 12
SAN JUAN (Card-583) 60990 6024 JUAB 10S 3W 12
SAVAGE LODE (Card-583) 21913 6024 JUAB 10S 3W 12
SHAITAN 60242 6484 UTAH 9S 2W 28,29,32,33
SHERMAN 60334 265 UTAH 9S 3W 35
SHIELD LODE NO. 12 63151 7024 UTAH 10S 2W 2,11
SHIELD NO. 1 60360 7021 UTAH 10S 2W 2
SHIELD NO. 10 63149 7024 UTAH 10S 2W 2,11
SHIELD NO. 11 63150 7024 UTAH 10S 2W 2,11
SHIELD NO. 2 63152 7021 UTAH 10S 2W 2
SHIELD NO. 26 63157 7021 UTAH 10S 2W 2
SHIELD NO. 27 63158 7021 UTAH 10S 2W 2
SHIELD NO. 28 63159 7021 UTAH 10S 2W 2
SHIELD NO. 29 21749 7025 UTAH 10S 2W 2,3,10
SHIELD NO. 3 63153 7021 UTAH 10S 2W 2,11
SHIELD NO. 30 60352 7025 UTAH 10S 2W 2
SHIELD NO. 31 60353 7025 UTAH 10S 2W 2
SHIELD NO. 32 60354 7025 UTAH 10S 2W 2
SHIELD NO. 4 63154 7021 UTAH 10S 2W 2,11
SHIELD NO. 5 63155 7021 UTAH 10S 2W 2,11
SHIELD NO. 52 60355 7025 UTAH 10S 2W 2
SHIELD NO. 52 60355 7025 UTAH 9S 2W 34
SHIELD NO. 53 21748 7025 UTAH 10S 2W 2
SHIELD NO. 53 21748 7025 UTAH 9S 2W 34

 

Tintic Project243

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
SHIELD NO. 54 60346 7025 UTAH 10S 2W 2
SHIELD NO. 54 60346 7025 UTAH 9S 2W 34
SHIELD NO. 55 60348 7025 UTAH 10S 2W 2
SHIELD NO. 55 60348 7025 UTAH 9S 2W 34
SHIELD NO. 56 60349 7025 UTAH 10S 2W 2,3
SHIELD NO. 56 60349 7025 UTAH 9S 2W 34
SHIELD NO. 6 63156 7021 UTAH 10S 2W 2,11
SHIELD NO. 7 60358 7024 UTAH 10S 2W 2,11
SHIELD NO. 8 63147 7024 UTAH 10S 2W 2,11
SHIELD NO. 9 63148 7024 UTAH 10S 2W 2,11
SI TAM (Card-0554-A&B) 60971 264 JUAB 10S 3W 2
SILVER BILL 60335 265 UTAH 9S 3W 35
SILVER GEM LODE (Card-486) 21912 128 JUAB 10S 3W 24
SILVERS LODE (Card-679) 60992 6401 JUAB 10S 2W 18
SMUGGLER #4 LODE (Card-548) 21914 6503 JUAB 10S 2W 18
SO. EXT. OF WEST MAMMOTH (Card-596) 60987 5348 JUAB 10S 3W 24
SOLID MULTOON LODE (Card-477) 21911 283A JUAB 10S 2W 18
SOUTH EXT. BLUE BELL (Card-0044) 24819 215 JUAB 10S 2W 19
SOUTH EXTENSION BEECHER (Card-0042) 62820 216 JUAB 10S 2W 19
SOUTH EXTENSION EAGLE (Card-0043) 62821 214 JUAB 10S 2W 19
SOUTH SIDE 21832 6432 UTAH 10S 2W 7
SOUTH SIDE NO. 1 60686 6432 JUAB, UTAH 10S 2W 7
SOUTH SIDE NO. 2 (Card-0053) 60687 6432 JUAB, UTAH 10S 2W 7
SOUTH SIDE NO. 2 (Card-0053) 21910 6432 JUAB 10S 2W 7
SOUTH SIDE NO. 3 60688 6432 UTAH 10S 2W 7,8
SOUTH SIDE NO. 4 60689 6432 UTAH 10S 2W 7,8
SOUTH SIDE NO. 5 60690 6432 UTAH 10S 2W 7,8
STELLA FRACTION 60243 6484 UTAH 9S 2W 29,32
STONEWALL JACKSON (Card-0084-A1) 60808 210 JUAB 10S 2W 18,19
STYX LODE (Card-597) 60991 346 JUAB 10S 3W 24
SULLIVAN (Card-0038-A) 86593 254 JUAB 10S 2W 19
SUMMIT #10 LODE 60209 6516 UTAH 10S 2W 4
SUMMIT #10 LODE 60210 6516 UTAH 9S 2W 33
SUMMIT NO. 1 60401 6430 UTAH 10S 2W 5
SUMMIT NO. 2 60402 6430 UTAH 10S 2W 5
SUMMIT NO. 3 60310 6430 UTAH 10S 2W 5
SUMMIT NO. 7 21884 6402 UTAH 10S 2W 4
SUMMIT NO. 7 21884 6402 UTAH 9S 2W 33
SUMMIT NO. 8 60198 6402 UTAH 9S 2W 33
SUMMIT NO. 8 60199 6402 UTAH 9S 2W 33
SUMMIT NO. 9 PART 1 60192 6402 UTAH 10S 2W 33
SUMMIT NO. 9 PART 2 60193 6402 UTAH 10S 2W 4

 

Tintic Project244

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
SUMMIT NO. 9 PART 2 60193 6402 UTAH 9S 2W 33
SUNDOWN NO. 2 21810 3835 UTAH 10S 2W 20,29
SUNSET 60328 6024 UTAH 10S 3W 1,12
TALISMAN FRACTION LODE (Card-660 and SA00-0004) 21945 6545 JUAB 10S 3W 13
TALISMAN LODE (Card-0001-A1 and SA00-0004) 60983 104 JUAB 10S 3W 13
TAMARACK LODE (Card-0279) 43537 4536 JUAB 10S 2W 7,18
TETRO (Card-0257) 21909 312 JUAB 10S 2W 7
TETRO (Card-0257) 21898 312 JUAB 10S 2W 18
THREE PLY (Card-550 and SA00-0004) 60204 95 JUAB 10S 3W 13
THUMB TACK 60631 6516 UTAH 9S 2W 27,34
TINTIC 60339 264 UTAH 9S 3W 36
TINTIC STANDARD #36 60605 6612 UTAH 10S 2W 11
TINTIC STANDARD #44 60606 6612 UTAH 10S 2W 11
TINTIC STANDARD NO. 2 60659 6466 UTAH 10S 2W 9,10
TINTIC STANDARD NO11 21805 6611 UTAH 10S 2W 10
TINTIC STANDARD NO12 60591 6611 UTAH 10S 2W 10
TINTIC STANDARD NO13 60592 6611 UTAH 10S 2W 10
TINTIC STANDARD NO15 60593 6611 UTAH 10S 2W 10
TINTIC STANDARD NO16 60594 6611 UTAH 10S 2W 10
TINTIC STANDARD NO17 21787 6763 UTAH 10S 2W 3,10
TINTIC STANDARD NO18 60531 6763 UTAH 10S 2W 10
TINTIC STANDARD NO19 60532 6763 UTAH 10S 2W 2,10
TINTIC STANDARD NO22 60533 6763 UTAH 10S 2W 2,10
TINTIC STANDARD NO24 60534 6763 UTAH 10S 2W 2,3,10
TINTIC STANDARD NO28 60535 6763 UTAH 10S 2W 3
TINTIC STANDARD NO28 60535 6763 UTAH 9S 2W 34
TINTIC STANDARD NO29 21786 6763 UTAH 10S 2W 3
TINTIC STANDARD NO29 21786 6763 UTAH 9S 2W 34
TINTIC STANDARD NO30 60530 6763 UTAH 10S 2W 3
TINTIC STANDARD NO30 60530 6763 UTAH 9S 2W 34
TINTIC STANDARD NO37 21804 6611 UTAH 10S 2W 2,10,11
TINTIC STANDARD NO38 60585 6611 UTAH 10S 2W 2,10,11,15
TINTIC STANDARD NO39 60586 6611 UTAH 10S 2W 2,11
TINTIC STANDARD NO40 65481 6763 UTAH 10S 2W 2,10
TINTIC STANDARD NO45 60537 6763 UTAH 10S 2W 3,10
TINTIC STANDARD NO46 60536 6763 UTAH 10S 2W 3
TINTIC STANDARD NO47 30983 6763 UTAH 10S 2W 3,10
TINTIC STANDARD NO48 60727 6763 UTAH 10S 2W 3
TINTIC STANDARD NO49 60728 6763 UTAH 10S 2W 3,10
TINTIC STANDARD NO5 60588 6611 UTAH 10S 2W 10
TINTIC STANDARD NO50 60729 6763 UTAH 10S 2W 3
TINTIC STANDARD NO50 60729 6763 UTAH 9S 2W 34

 

Tintic Project245

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
TINTIC STANDARD NO51 60730 6763 UTAH 10S 2W 3
TINTIC STANDARD NO51 60730 6763 UTAH 9S 2W 34
TINTIC STANDARD NO52 60731 6763 UTAH 10S 2W 3,10
TINTIC STANDARD NO6 60589 6611 UTAH 10S 2W 10
TINTIC STANDARD NO7 21803 6611 UTAH 10S 2W 10
TINTIC STANDARD NO8 60583 6611 UTAH 10S 2W 10
TINTIC STANDARD NO9 60584 6611 UTAH 10S 2W 10
TOLTEC LODE (Card-0508) 60794 3625 JUAB 10S 3W 24
TOLTEC LODE (Card-279) 43524 4536 JUAB 10S 2W 7
TOWN VIEW (Card-702) 63162 4307 JUAB 10S 2W 18
TOWN VIEW FRACTION (Card-703) 25949 6672 JUAB 10S 2W 18
TRESTLE 60660 6463 UTAH 10S 2W 3
TRIANGULAR LODE (Card-0021) 60993 4600 JUAB 10S 2W 18
TUNNEL NO. 3 LODE 63431   UTAH 10S 2W 4,9
TUNNEL NO. 4 LODE 63388 6463 UTAH 10S 2W 3,4,9,10
UNION (Card-510) 65491 188 JUAB 10S 3W 24
VALLEY LODE  (Card-567 and SA00-0004) 60970 100 JUAB 10S 3W 13,24
VALLEY NORTH EXTENSION (Card-672) 25531 231 JUAB 10S 3W 13
VOLTAIRE MILL SITE (Card-267-A and SA00-0004) 21906 103B JUAB 10S 3W 12
W. PINYON 60231 6516 UTAH 9S 2W 33
W. PINYON NO. 2 60207 6402 UTAH 9S 2W 33
W. PINYON NO. 2 60208 6402 UTAH 9S 2W 33
W. PINYON NO. 3 60311 6402 UTAH 9S 2W 33
W. PINYON NO. 4 60313 6402 UTAH 9S 2W 33
W. PINYON NO. 5 60312 6402 UTAH 9S 2W 28,33
W. PINYON NO. 6 60314 6402 UTAH 9S 2W 28,33
W. PINYON NO. 7 60244 6484 UTAH 9S 2W 28,33
W. PINYON NO. 8 60205 6516 UTAH 9S 2W 33
W. PINYON NO. 8 65501 6516 UTAH 9S 2W 33
W. PINYON NO. 9 60233 6516 UTAH 9S 2W 33
W. W. C. MILL SITE (Card-521 and SA00-0004) 21943 163B JUAB 10S 2W 18
WATER LILLIE LODE 21831 6457 UTAH 10S 2W 3
WATSON (Card-0010) 62822 3722 JUAB 10S 2W 18,19
WATSON EXTENSION (Card-0009) 62823 3723 JUAB 10S 2W 19
WEST BULLION LODE (Card-523 and SA00-0004) 21944 90 JUAB 10S 3W 13,24
WEST EMMA (Card-580) 65515 6082 JUAB 10S 3W 13
WEST MAMMOTH S EXTENSION (Card-596) 65516 5348 JUAB 10S 3W 24
WHISPERING WILLIE (Card-659) 60806 6566 JUAB 10S 2W 18,19
WONDER #1 (Card-609) 60972 6001 JUAB, UTAH 10S 2W 7

 

Tintic Project246

January 27, 2023

 

 

 

Osisko Development Corp.

 

Name State of Utah
Property Tax
No.
Patent
Survey
No.
County Township Range Section
WONDER #1 (Card-609) 76573 6001 JUAB, UTAH 10S 2W 7
WONDER #2 (Card-609) 48712 6001 JUAB, UTAH 10S 2W 6,7
WONDER #2 (Card-609) 76574 6001 JUAB, UTAH 10S 2W 6,7
WONDER #3 (Card-609) 48713 6001 JUAB, UTAH 10S 2W 7
WONDER #3 (Card-609) 76575 6001 JUAB, UTAH 10S 2W 7
WYOMING SILVER MINING CO. 21861 52 UTAH 10S 2W 8
ZULU LODE (Card-11 and SA00-0004) 21955 99 JUAB 10S 3W 13,24
ZULU NORTH EXTENSION (Card-672) 25530 231 JUAB 10S 3W 13
ZULU NORTH EXTENSION (Card-672) 30980 231 JUAB 10S 3W 13

 

Name State Of Utah Tax
Property No.
Patent Survey
No.
County Township Range Section
NEVADA 19309 4767 UTAH 10S 2W 19
SALVATOR 19335 3219 UTAH 10S 2W 19

 

Owns all right, title, and interest (100%) interest in the metallic minerals only in the following:

 

Name Survey Number Township Range A Portion of
Section(S)
Mining
District
Good Luck 6402 T10S R2W 4,5,8,9 Tintic
Limestone 6402 T10S R2W 4,9 Tintic
Bend 6402 T10S R2W 4,5 Tintic
Fraction 6402 T10S R2W 4 Tintic
Fraction No. 1 6402 T10S R2W 4 Tintic
Hill Side 6402 T10S R2W 4 Tintic
Summit No. 4 6402 T10S R2W 4,5 Tintic
Summit No. 5 6402 T10S R2W 4 Tintic
Summit No. 6 6402 T10S R2W 4 Tintic
S.S. 6402 T10S R2W 4 Tintic
Rosie 4126 T10S R2W 4,9 Tintic
Golden Eagle 4126 T10S R2W 4,9 Tintic
Eagle Lode Mining Claim No. 1 4126 T10S R2W 4,9 Tintic
Bend No. 1 6430 T10S R2W 5 Tintic
Tunnel Site 4126 T10S R2W 4 Tintic

 

Tintic Project247

January 27, 2023

 

 

 

Osisko Development Corp.

 

Unpatented Mining Claims:

 

Owns 100% of the following unpatented mining claims:

 

Serial
Number
Lead File
Number
Legacy
Serial
Number
Legacy
Lead File
Number
Claim Name County Claim
Type
Township
Range
Section
Quadrant
UT101363382 UT101363382 UMC399886 UMC399883 CCM 4 JUAB, UTAH LODE CLAIM 10S 2W 29 NW
UT101363383 UT101363383 UMC399887 UMC399883 CCM 5 JUAB, UTAH LODE CLAIM 10S 2W 29 NW
UTAH LODE CLAIM 10S 2W 20 SW
UT101363384 UT101363384 UMC399888 UMC399883 CCM 6 JUAB, UTAH LODE CLAIM 10S 2W 29 NW
UTAH LODE CLAIM 10S 2W 20 SW
UT101363385 UT101363385 UMC399889 UMC399883 CCM 7 UTAH LODE CLAIM 10S 2W 20 SW
UT101363386 UT101363386 UMC399890 UMC399883 CCM 8 JUAB, UTAH LODE CLAIM 10S 2W 19 NE
SE
UT101364242 UT101364242 UMC399891 UMC399883 CCM 9 UTAH LODE CLAIM 10S 2W 20 SE
SW
UT101364243 UT101364243 UMC399892 UMC399883 CCM 10 UTAH LODE CLAIM 10S 2W 20 SW
UT101364244 UT101364244 UMC399893 UMC399883 CCM 11 UTAH LODE CLAIM 10S 2W 20 NW
UT101364245 UT101364245 UMC399894 UMC399883 CCM 12 UTAH LODE CLAIM 10S 2W 20 NW
UT101364246 UT101364246 UMC399895 UMC399883 CCM 13 UTAH LODE CLAIM 10S 2W 21 SW
UT101364247 UT101364247 UMC399896 UMC399883 CCM 14 UTAH LODE CLAIM 10S 2W 22 NW
UT101364248 UT101364248 UMC399897 UMC399883 CCM 15 UTAH LODE CLAIM 10S 2W 15 SE
UT101364249 UT101364249 UMC399898 UMC399883 CCM 16 UTAH LODE CLAIM 10S 2W 10 NW
UT101364250 UT101364250 UMC399899 UMC399883 CCM 17 UTAH LODE CLAIM 10S 2W 3 SW
10S 2W 10 NW
UT101364251 UT101364251 UMC399900 UMC399883 CCM 18 UTAH LODE CLAIM 10S 2W 3 SE
UT101364252 UT101364252 UMC399901 UMC399883 CCM 19 UTAH LODE CLAIM 10S 2W 3 NE
SE
UT101364253 UT101364253 UMC399902 UMC399883 CCM 20 UTAH LODE CLAIM 10S 2W 3 NE
UT101364254 UT101364254 UMC399903 UMC399883 CCM 21 UTAH LODE CLAIM 9S 2W 34 SE
SW
10S 2W 3 NE
UT101650658 UT101650658 UMC403434 UMC403414 CCM 43 UTAH LODE CLAIM 10S 2W 17 SE
UT101650659 UT101650659 UMC403435 UMC403414 CCM 44 JUAB, UTAH LODE CLAIM 10S 2W 17 SE
SW
UT101650660 UT101650660 UMC403436 UMC403414 CCM 45 JUAB, UTAH LODE CLAIM 10S 2W 17 SE
SW

 

Tintic Project248

January 27, 2023

 

 

 

Osisko Development Corp.

 

Serial
Number
Lead File
Number
Legacy
Serial
Number
Legacy
Lead File
Number
Claim Name County Claim
Type
Township
Range
Section
Quadrant
UT101651635 UT101651635 UMC403437 UMC403414 CCM 46 UTAH LODE CLAIM 10S 2W 17 SE
UT101678678 UT101678678 UMC403515 UMC403515 DAN SULLIVAN JUAB, UTAH LODE CLAIM 10S 2W 17 SE
SW
UT101678679 UT101678679 UMC403516 UMC403515 DAN SULLIVAN # 1 JUAB, UTAH LODE CLAIM 10S 2W 17 SW
UT101718478 UT101718478 UMC446346 UMC446346 TRACY KT NO 1 UTAH LODE CLAIM 11S 2W 11 SW
UT101718479 UT101718479 UMC446347 UMC446346 TRACY KT NO 2 UTAH LODE CLAIM 11S 2W 11 SW
UT101718480 UT101718480 UMC446348 UMC446346 TRACY KT NO 3 UTAH LODE CLAIM 11S 2W 11 SW
UT101718481 UT101718481 UMC446349 UMC446346 TRACY KT NO 4 UTAH LODE CLAIM 11S 2W 11 SW
UT101718482 UT101718482 UMC446350 UMC446346 TRACY KT NO 5 UTAH LODE CLAIM 11S 2W 11 SW
UT101718483 UT101718483 UMC446351 UMC446346 TRACY KT NO 6 UTAH LODE CLAIM 11S 2W 11 SW
UT101718484 UT101718484 UMC446352 UMC446346 TRACY KT NO 7 UTAH LODE CLAIM 11S 2W 11 SW
UT101718485 UT101718485 UMC446353 UMC446346 TRACY KT NO 8 UTAH LODE CLAIM 11S 2W 11 SW
UT101719330 UT101719330 UMC446354 UMC446346 TRACY KT NO 9 UTAH LODE CLAIM 11S 2W 11 SW
UT101719331 UT101719331 UMC446355 UMC446346 TRACY KT NO 10 UTAH LODE CLAIM 11S 2W 11 SW
UT101857326 UT101857326 UMC445639 UMC445639 SANDY B NO 10 UTAH LODE CLAIM 11S 2W 22 NE
NW
UT101857327 UT101857327 UMC445640 UMC445639 SANDY B NO 11 UTAH LODE CLAIM 11S 2W 22 NE
NW
UT101857328 UT101857328 UMC445641 UMC445639 SANDY B NO 12 UTAH LODE CLAIM 11S 2W 22 NE
NW
UT101857329 UT101857329 UMC445642 UMC445639 SANDY B NO 13 UTAH LODE CLAIM 11S 2W 22 NE
NW
UT101857330 UT101857330 UMC445643 UMC445639 SANDY B NO 14 UTAH LODE CLAIM 11S 2W 22 NE
NW
SE
SW
UT101857331 UT101857331 UMC445644 UMC445639 SANDY B NO 19 UTAH LODE CLAIM 11S 2W 22 NE
UT101857332 UT101857332 UMC445645 UMC445639 SANDY B NO 20 UTAH LODE CLAIM 11S 2W 22 NE
UT101857333 UT101857333 UMC445646 UMC445639 SANDY B NO 21 UTAH LODE CLAIM 11S 2W 22 NE
UT101857334 UT101857334 UMC445647 UMC445639 SANDY B NO 22 UTAH LODE CLAIM 11S 2W 22 NE
UT101857335 UT101857335 UMC445648 UMC445639 SANDY B NO 23 UTAH LODE CLAIM 11S 2W 22 NE
SE

 

Tintic Project249

January 27, 2023

 

 

 

Osisko Development Corp.

 

Serial
Number
Lead File
Number
Legacy
Serial
Number
Legacy
Lead File
Number
Claim Name County Claim
Type
Township
Range
Section
Quadrant
UT101858489 UT101858489 UMC445649 UMC445649 SANDY B NO 6 UTAH LODE CLAIM 11S 2W 22 SW
UT101858490 UT101858490 UMC445650 UMC445649 SANDY B NO 7 UTAH LODE CLAIM 11S 2W 22 SW
UT101858491 UT101858491 UMC445651 UMC445649 SANDY B NO 8 UTAH LODE CLAIM 11S 2W 22 SW
UT101858492 UT101858492 UMC445652 UMC445649 SANDY B NO 9 UTAH LODE CLAIM 11S 2W 22 SW
UT101858493 UT101858493 UMC445653 UMC445649 SANDY B NO 15 UTAH LODE CLAIM 11S 2W 22 SE
SW
UT101858494 UT101858494 UMC445654 UMC445649 SANDY B NO 16 UTAH LODE CLAIM 11S 2W 22 SE
SW
UT101858495 UT101858495 UMC445655 UMC445649 SANDY B NO 17 UTAH LODE CLAIM 11S 2W 22 SE
SW
UT101858496 UT101858496 UMC445656 UMC445649 SANDY B NO 18 UTAH LODE CLAIM 11S 2W 22 SE
SW
UT101858497 UT101858497 UMC445657 UMC445649 SANDY B NO 24 UTAH LODE CLAIM 11S 2W 22 SE
UT101858498 UT101858498 UMC445658 UMC445649 SANDY B NO 25 UTAH LODE CLAIM 11S 2W 022 SE
UT101858499 UT101858499 UMC445659 UMC445649 SANDY B NO 26 UTAH LODE CLAIM 11S 2W 22 SE
UT101858500 UT101858500 UMC445660 UMC445649 SANDY B NO 27 UTAH LODE CLAIM 11S 2W 22 SE
UT101858501 UT101858501 UMC445661 UMC445649 CLOE NO 6 UTAH LODE CLAIM 11S 2W 22 SW
UT101858502 UT101858502 UMC445662 UMC445649 CLOE NO 7 UTAH LODE CLAIM 11S 2W 22 SW
UT101858503 UT101858503 UMC445663 UMC445649 CLOE NO 8 UTAH LODE CLAIM 11S 2W 22 SW
UT101858504 UT101858504 UMC445664 UMC445649 CLOE NO 9 UTAH LODE CLAIM 11S 2W 22 SW

 

 

250