EX-99.1 2 ex99_1.htm EXHIBIT 99.1 Exhibit 99.1
Avino Silver & Gold Mines Ltd.
Suite 400 - 455 Granville Street
Vancouver, BC V6C 1T1
Ph: (604) 682-3701
Fax: (604) 682-3600
 www.avino.com, shares@avino.com



December 18, 2006
TSX-V Trading symbol: ASM
 U.S. OTC BB symbol: ASGMF
Berlin & Frankfurt GV6

AVINO ANNOUNCES RESULTS OF 2006 DRILLING ON MINTO PROPERTY

Avino Silver and Gold Mines Ltd. is pleased to announce results of the 2006 drilling program at its Minto Property in Bridge River Gold Mining area approximately 100 km north of Vancouver B.C.

The four diamond core holes were drilled to explore down dip extensions of gold bearing structures originally discovered in trench 827 on the Minto North Zone.


Holes MO-06-01 and 02 were drilled from a site approximately 10 m west of trench 827. Hole MO-06-03 was drilled from a site approximately 2 m north and 7 m east of MO-06-01, 02. Hole MO-06-04 was drilled from the same set-up.

The gold bearing structures consist of sets of parallel narrow (1-2 mm) fractures containing quartz, carbonate, grey sulphide veinlets.

Details of the drill holes and assay results for the fractures sampled are as follows:

Hole: MO-06-01 5639195N 517518E Bearing 120 Dip 45 Length 151.49 m

Principal Intersections:

Sample No.
Intersection (Metres)
Au (g/t)
Au (oz/t)
Zn (%)
143452
23.00 - 23.30 (0.3)
5.31
0.155
 
143455
49.8 - 50.5 (0.7)
4.51
0.132
 
143456
56.60 - 56.90 (0.3)
7.58
0.221
 
143457
65.90 - 66.80 (0.9)
7.52
0.219
 
143458
71.85 - 72.50 (0.65)
2.60
0.076
 
143459
72.50 - 73.30 (0.80)
1.04
0.030
 
143460
74.90 - 75.30 (0.40)
1.77
0.052
 
143461
91.75 - 92.00 (0.25)
45.4
1.324
 
143462
92.50 - 93.30 (0.80)
3.24
0.094
 
143463
95.65 - 95.90 (0.25)
1.72
0.050
 
143465
121.30 - 121.70 (0.4)
3.50
0.102
1.74
143466
124.70 - 125.60 (0.9)
5.36
0.156
1.33
143467
127.00 - 127.50 (0.5)
4.19
0.122
 
143468
133.27 - 134.27 (1.0)
3.39
0.099
 
143472
137.2 - 137.55 (0.35)
2.39
0.070
 

MO-06-02 5639195N 517518E Bearing 120 Dip 60 Length 75.29 m
 
 
 

 

 
Sample No.
Intersection (Metres)
Au (g/t)
Au (oz/t)
143477
56.50 - 57.10 (0.6)
4.96
0.145

MO-06-03 5639197N 517509 E Bearing 120 Dip 45 Length 130.15 m
No significant intercepts

MO-06-04 5639197 517509E Bearing 082 Dip 45 Length 130.15 m

Sample No.
Intersection (Metres)
Au (g/t)
Au (oz/t)
Zn (%)
143480
48.15 - 48.70 (0.55)
2.02
0.059
 
143482
56.77 - 57.5 (0.73)
5.93
0.173
 
143486
60.5 - 61.5 (1.0)
1.92
0.056
 
143487
61.5 - 62.5 (1.0)
9.04
0.264
 
143489
63.5 - 64.5 (1.0)
1.38
0.040
 
143491
66.7 - 67.7 (1.0)
2.99
0.087
 
143492
72.6 - 73.5 (0.9)
1.08
0.031
 
143495
74.8 - 75.8 (1.0)
9.47
0.276
 
143496
81.5 - 82.3 (0.8)
2.62
0.076
 
143499
92.9 - 93.57 (0.67)
9.54
0.278
 
143500
101.1 - 101.8 (0.7)
1.39
0.041
 

Samples were collected under supervision of Chris J. Sampson, P. Eng., a qualified person under NI 43-101. Samples were assayed at Eco-Tech Laboratory Ltd., Kamloops, B.C., a certified assayer by fire assay with A.A. finish.

On Behalf of the Board



“David Wolfin”
David Wolfin
President



The TSX Venture Exchange has not reviewed and does not accept the responsibility for the accuracy or adequacy of this release.