EX-99.1 2 a19-7364_1ex99d1.htm EX-99.1

Exhibit 99.1

 

 

NEXA RESOURCES PROVIDES GREENFIELD PROJECT PIPELINE UPDATE

 

Luxembourg, March 28, 2019 — Nexa Resources S.A. (“Nexa Resources” or “Nexa” or the “Company”) (NYSE and TSX Symbol: “NEXA”) hereby informs its shareholders and the market in general that it has concluded and updated analysis relating to some of its mining projects located in Peru and Brazil, namely, Hilarión, Shalipayco and Caçapava do Sul. The Mineral Resources presented in this news release were estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards on Mineral Resources and Mineral Reserves dated May 10, 2014 (“CIM definitions”), whose definitions are incorporated by reference in National Instrument 43-101 (“NI 43-101”). Such information may not be comparable to similar information prepared in accordance with Industry Guide 7 that is presented in our annual report on Form 20-F.

 

Tito Martins, the Chief Executive Officer of Nexa Resources, commented, “We’re very happy with the results of the updated analysis of these projects. This reinforces our belief that we’re on the right path to generate value for our stakeholders.”

 

Hilarión

 

The Hilarión exploration project is fully owned by Nexa Resources Peru S.A.A. (or “Nexa Peru”), a subsidiary of Nexa Resources, and is located 50 km south of the Antamina mine in the Ancash department (Figure 1) and 230 km from Lima. It is a skarn mineral deposit made of vertical tabular orebodies containing sulfide zinc, lead, silver and copper deposits. The project concept is the development of an underground mine that could either use its own processing plant or use one of the several existing plants in the area, such as the Pachapaqui, Huanzala and Atalaya plants.

 

Nexa Resources is pleased to announce the discovery of a new exploration target 700 meters northwest of the Hilarión Zn-Pb-Ag-(Cu) deposit after a six hole (6,789 meters) drilling program in 2018 on the geologically favorable Hilarión-El Padrino mineralized trend.

 

Exploration work on the Hilarión project has focused on two important sectors: Hilarión (which has been explored since 1980) and El Padrino (which has been explored since 2008). Within the Hilarión-El Padrino mineralized trend are the northern targets of Hilarión North, Eureka II and Mia, defined by geological mapping. The mineralization style is a Zn-Pb-Ag polymetallic skarn deposit, which is mainly located in the Pariatambo Formation within nodular limestones that are cut by a swarm of porphyry dykes, sub-volcanic sills and dioritic-granodioritic stocks aligned along the Yanashallash fault, which is responsible for the contact metamorphism and subsequent metasomatism with Zn-Pb-Ag-(Cu) sulfhide mineralization.

 

In 2018, deep directional drilling was performed with the DEVIDRILL system that allowed drilling to test targets at depth. Nexa personnel supervised this drilling program and samples were sent to ALS Global Lima, Peru an independent laboratory with International Organization for Standardization (“ISO”) 9001, ISO 14001:2004 and ISO 17025:2009 certification. Assays were performed by multi element analysis: ME-MS61, a 48 multi-element suite using four acid digestion

 

Contact: ir@nexaresources.com

 


 

and inductively coupled mass spectrometry (ICP-MS) finish. The locations of the 2018 drill holes are shown on Table 1 and the available mineralized intersection results are shown in Table 2.

 

Table 1. Hilarión North — Location of the 2018 Drilling

 

Hole

 

Easting (m)

 

Northing (m)

 

RL (m)

 

Depth (m)

 

Azimuth

 

Dip

 

PEHILD000001

 

279294.0

 

8895833.0

 

4723.0

 

835.80

 

259.0

 

-40.0

 

PEHILD000002

 

279294.0

 

8895833.0

 

4723.0

 

971.20

 

283.0

 

-45.0

 

PEHILD000003

 

279124.0

 

8896076.0

 

4748.0

 

1201.25 

 

305.0

 

-15.0

 

PEHILD000004

 

279173.0

 

8896048.0

 

4720.0

 

1226.55

 

283.0

 

-20.0

 

PEHILD000005

 

278285.0

 

8896429.0

 

4362.0

 

611.50

 

279.0

 

-30.0

 

PEHILD000006

 

278632.0

 

8896137.0

 

4453.0

 

850.45

 

267.0

 

-36.0

 

 

Coordinates in UTM WGS84 - zone 18S

 

 

Figure 1. Location map of the Hilarión — El Padrino mineralized trend.

 

2


 

Table 2. Hilarión North - Drill Intersection Results — 2018 Drilling

 

Hole

 

From
(m)

 

To
(m)

 

Length(1) (m)

 

Ag
(g/t)

 

Au
(g/t)

 

Cu
(%)

 

Pb
(%)

 

Zn
(%)

 

PEHILD000001

 

258.75

 

264.95

 

6.20

 

27.03

 

0.27

 

0.03

 

0.51

 

3.12

 

PEHILD000001

 

271.30

 

275.15

 

3.85

 

7.57

 

0.01

 

0.10

 

0.18

 

2.72

 

PEHILD000001

 

313.80

 

318.45

 

4.65

 

30.16

 

0.06

 

0.05

 

0.38

 

2.67

 

PEHILD000001

 

326.95

 

330.20

 

3.25

 

49.87

 

0.08

 

0.08

 

0.92

 

1.46

 

PEHILD000002

 

328.30

 

333.55

 

5.25

 

6.62

 

0.00

 

0.04

 

0.08

 

5.62

 

PEHILD000002

 

513.05

 

518.10

 

5.05

 

27.76

 

0.01

 

0.00

 

1.15

 

2.40

 

PEHILD000003

 

105.50

 

115.70

 

10.20

 

33.58

 

0.01

 

0.15

 

0.95

 

2.89

 

PEHILD000003

 

489.55

 

521.80

 

32.25

 

91.22

 

0.04

 

0.17

 

1.34

 

2.42

 

PEHILD000003

 

538.10

 

544.30

 

6.20

 

25.85

 

0.21

 

0.03

 

0.18

 

2.16

 

PEHILD000004

 

493.90

 

497.80

 

3.90

 

36.65

 

0.01

 

0.06

 

0.34

 

2.18

 

PEHILD000004

 

507.00

 

523.90

 

16.90

 

66.76

 

0.03

 

0.18

 

0.31

 

2.89

 

PEHILD000004

 

541.75

 

547.30

 

5.55

 

6.28

 

0.00

 

0.06

 

0.04

 

2.09

 

PEHILD000004

 

554.20

 

560.15

 

5.95

 

5.11

 

0.02

 

0.09

 

0.03

 

5.22

 

PEHILD000004

 

575.00

 

594.90

 

19.90

 

7.21

 

0.01

 

0.05

 

0.02

 

2.75

 

PEHILD000004

 

605.30

 

612.05

 

6.75

 

49.19

 

0.01

 

0.02

 

0.17

 

4.96

 

PEHILD000004

 

627.70

 

631.85

 

4.15

 

43.41

 

0.08

 

0.02

 

0.29

 

2.19

 

PEHILD000005

 

38.75

 

61.30

 

22.55

 

87.00

 

0.04

 

0.09

 

0.17

 

3.63

 

PEHILD000005

 

80.90

 

115.15

 

34.25

 

30.06

 

0.17

 

0.27

 

0.09

 

3.76

 

 


(1) True width is not known at this point.

(2) Only intervals with assays >2% Zn+Pb are reported.

(3) Assay results pending for hole PEHILD000006.

 

Hilarión North Exploration Target Statement

 

Based on 2018 exploration drilling results on the Hilarión North mineralized zone and the favorable geology, Nexa provides the following statement of an exploration target shown in Table 3.

 

Table 3. Hilarión North - Exploration Target Statement

 

 

 

Tonnes
(Mt)

 

Zn
(%)

 

Site/ Deposit

 

Low

 

High

 

Low

 

High

 

Hilarión North

 

24

 

67

 

2.0

 

5.0

 

 

Note: The potential quantity and grade is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration can result in the target being delineated as a Mineral Resource.

 

Exploration target parameters for Hilarión North were based on geological mapping which located outcropping evidence of Zn, Pb, Ag mineralization, 2018 drilling results and proximity and similarity to the Hilarión deposit, as follows: strike length ranging from 500 to 700m, depth continuity ranging between 200 to 400m, and average mineralization width of 10m for an average of eight mineralized zones (Figures 2 and 3).

 

3


 

 

Figure 2. Schematic longitudinal section showing Hilarión North Exploration Target in relation to Hilarión and El Padrino deposits.

 

 

Figure 3. Hilarión North Exploration Target vertical cross section.

 

The Hilarión project Mineral Resource estimate previously reported in the NI 43-101 technical report titled “Technical Report on the Hilarión Project, Ancash Region, Peru” dated August 4, 2017 (the “Hilarión Technical Report”) is summarized in Table 4.

 

4


 

Table 4. Hilarión Project Mineral Resource Estimate as of July 31, 2017

 

 

Notes:

1. CIM definitions were followed for Mineral Resources.

2. Mineral Resources are estimated at an NSR cut off value US$31/t for the Hilarión deposit and an NSR cut off value of US$50/t for the El Padrino deposit.

3. Mineral Resources are estimated using a long-term zinc price of US$1.26 per pound, a lead price of US$1.01 per pound, a copper price of US$21.78 per ounce.

4. A minimum mining width of 2m was used for El Padrino and most of Hilarión.

5. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

6. Numbers may not add due to rounding.

 

The proposed program for the Hilarión project in 2019 includes a follow up drilling program of 8,500 meters in 11 holes in the Hilarión mineralized trend (Hilarión North, Eureka II and Mia) and the development of a preliminary economic assessment (PEA) with the following goals:

 

·                  Identify a suitable location for the infrastructure in the Hilarión sector to support potential development of the known mineral resources in the mountainous Hilarión region.

 

·                  Evaluate location for the process plant and tailings within the 2.5 km between the Hilarión and El Padrino deposits, in the area of El Padrino (Community Aquia) or in the new area of Azulmina (Huallanca Community), east of the Eureka II target for potential development of the known resources of Hilarión and El Padrino.

 

The drilling program was initiated in January 2019.

 

5


 

Shalipayco

 

The Shalipayco project is a joint venture between Nexa Peru (which holds a 75.0% interest) and Pan American Silver Perú S.A.C. (which holds the remaining 25.0%) located in the Central Andes of Peru. It is a potential underground polymetallic project containing zinc, lead and silver deposits. This project consists of mining concessions with evidence of Mississippi Valley-Type (“MVT”) mineralization, which is a deposit type similar to our Morro Agudo mine. The mineralization at Shalipayco is mainly located within the Chambará formation that is part of the Pucará Group, considered an important Peruvian location for MVT mineralization.

 

Nexa Resources is the operator of the joint venture and it is pleased to announce the updated Mineral Resources from the project based on the results of its 2017-2018 drilling campaign.

 

Highlights of our drilling:

 

·                  Drilling has outlined potentially economic mineralization along a strike length of 4 km.

·                  We increased our Inferred Resources from 16.93 Mt to 32.38 Mt at similar grades, which results in an increase of the estimated contained Zn by 59.5% in comparison to the 2017 resource estimate.

·                  We completed new and extensive metallurgical testwork; initial results indicate a Zn concentrate grade of 56% with recoveries between 89% and 95% Zn.

 

From late April 2017 to late January 2018, Nexa completed a total of 37,239 meters of diamond drilling, out of which 35,105 meters were in 122 exploration holes and 2,134 meters were for metallurgical testwork in 12 holes. The Company’s personnel supervised this drilling program and samples were sent to ALS Global Lima, Peru an independent laboratory with certification in ISO 9001, ISO 14001:2004 and ISO 17025:2009. Assays were performed by multi element analysis: ME-MS61, a 48 multi element suite using four acid digestion and inductively coupled mass spectrometry (ICP-MS) finish.

 

The Shalipayco project drilling tested lateral extensions of two out of the four known mineralized horizons: Resurgidora and Intermedio mantos (mantles), in order to upgrade and increase the Mineral Resource estimate previously reported in the Company’s NI 43-101 technical report titled “Technical Report on the Preliminary Economic Assessment of the Shalipayco Project, Junín Region, Peru”, dated July 26, 2017 (the “Shalipayco Technical Report”).

 

6


 

 

Figure 4. Location map of the Shalipayco project.

 

Mineral Resource Statement

 

Data from this drilling phase has contributed to the redefinition of the geological, structural and mineralization model, as well as to a new block model that indicates an increase to the 2017 Mineral Resource estimate. The Mineral Resource estimate CIM definitions is summarized in Table 5.

 

7


 

Table 5. Shalipayco Mineral Resource Statement as of December 31, 2018

 

Classification

 

Tonnes (Mt)

 

Zn (%)

 

Ag (g/t)

 

Pb (%)

 

Zn (Kt)

 

Ag (koz)

 

Pb (Kt)

 

Measured

 

3.78

 

4.18

 

28.9

 

0.46

 

158.0

 

3,512

 

17.4

 

Indicated

 

5.69

 

4.61

 

32.6

 

0.50

 

262.3

 

5,955

 

28.5

 

Measured + Indicated

 

9.47

 

4.44

 

31.1

 

0.48

 

420.3

 

9,467

 

45.8

 

Inferred

 

32.38

 

4.13

 

31.1

 

0.47

 

1,337.3

 

32,345

 

152.2

 

 

Notes:

1. CIM definitions were followed for Mineral Resources.

2. Mineral Resources are reported using a US$45.00 /t Net Smelter Return (NSR) block cut-off value and minimum mining width of 2m.

3. The NSR is calculated based on metal prices of US$3,034.28 per tonne of zinc, US$2,529.54 per tonne of lead and US$21.58 per ounces of silver.

4. The NSR is calculated based on metallurgical recovery of 88.0% for zinc and 77.5% for lead.

5. Numbers may not add due to rounding.

 

Nexa Resources is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate.

 

A comparison of the 2017 model and the current 2018 model is shown on Figure 5.

 

 

Figure 5. Long section of Resurgidora mantle showing a comparison between the 2017 resource model (upper figure) and 2018 updated resource model based on 2017-2018 drilling pierce points (orange dots) (lower figure).

 

Mineralization at Shalipayco is hosted in highly porous, coarse sparitic dolomite occurring in four favorable mineralized horizons located within the Chambará formation (Upper Triassic), known as

 

8


 

Virgencita, Inferior, Intermedio and Resurgidora mantos, and one manto hosted in the Condorsinga formation (Liassic), both belonging to the Pucará Group.  A vertical cross section of the Shalipayco mantos is shown on Figure 6.

 

 

Figure 6. Vertical cross section of the Shalipayco mantos.

 

On a regional scale, mapping confirmed surface evidence of mineralization beyond the current linear northwest-southeast trend towards the northwest and southeast limits of the property along a strike length of 29 km of favorable stratigraphy.  Approximately 11 km of this has potentially economic mineralization confirmed by two scout holes and surface sampling (including 4 km from the known Shalipayco Mineral Resources) and requires further exploration.

 

Caçapava do Sul

 

The Caçapava do Sul project is a joint venture between Mineração Santa Maria Ltda., a wholly owned subsidiary of Nexa Recursos Minerais S.A. (or “Nexa Brazil”), (which holds a 56% interest) and IAMGOLD Corporation (which holds a 44% interest). Nexa Brazil is the operator of the joint venture and is pleased to announce the new Copper Stockwork exploration target (Cu, Pb, Au), initially discovered in September 2017 and confirmed by drilling during 2017 and 2018. Located in the state of Rio Grande do Sul, Brazil (Figure 7), the Caçapava do Sul project consists of the Santa Maria deposit including Area 1, Area 2 and Area 3 mineralized zones (Zn, Pb, Cu, Ag, Au) and the new Copper Stockwork exploration target (Cu, Pb, Au), all as outlined in Figures 1 and 2.

 

9


 

 

Figure 7. Location map of the Caçapava do Sul project.

 

Figure 8. Schematic longitudinal section showing the Copper Stockwork exploration target between Area 1 and Area 2 deposits.

 

During 2017 and 2018, 19 exploratory holes totaling 9,486 meters of diamond drilling were drilled in the Copper Stockwork exploration target (Table 6). Significant drilling results are shown in Table 7. Nexa personnel supervised this drilling program and samples were sent to ALS Global Lima, Peru, an independent laboratory with ISO 9001, ISO 14001:2004 and ISO 17025:2009 certification. Assays were performed by multi element analysis: ME-MS61, a 48 multi element suite using four acid digestion and inductively coupled mass spectrometry (ICP-MS) finish.

 

10


 

Table 6. Copper Stockwork — 2017-2018 Drilling

 

Hole

 

Easting (m)

 

Northing (m)

 

RL (m)

 

Depth (m)

 

Azimuth

 

Dip

 

Year

 

BRSMSMDD0240

 

262682.419

 

6575448.910

 

249.53

 

479.60

 

269.89

 

-53.13

 

2017

 

BRSMSMDD0241

 

262457.506

 

6575455.124

 

224.33

 

385.70

 

267.34

 

-64.51

 

2017

 

BRSMSMDD0242

 

262566.165

 

6575524.241

 

239.53

 

505.50

 

268.66

 

-53.19

 

2017

 

BRSMSMDD0246

 

262406.163

 

6575457.846

 

218.59

 

498.35

 

268.51

 

-63.92

 

2017

 

BRSMSMDD0249

 

262331.262

 

6575471.326

 

207.08

 

408.95

 

265.77

 

-65.34

 

2017

 

BRSMSMDD0251

 

262456.823

 

6575527.207

 

216.48

 

507.10

 

267.20

 

-54.19

 

2017

 

BRSMSMDD0253

 

262678.553

 

6575513.202

 

256.78

 

488.30

 

268.70

 

-48.49

 

2017

 

BRSMSMDD0254

 

262568.484

 

6575474.808

 

238.29

 

500.45

 

269.27

 

-56.72

 

2017

 

BRSMSMDD0255

 

262559.967

 

6575574.157

 

232.45

 

506.45

 

269.40

 

-51.90

 

2017

 

BRSMSMDD0256

 

262625.849

 

6575574.880

 

248.92

 

508.10

 

268.48

 

-53.16

 

2017

 

BRSMSMDD0260

 

262071.740

 

6575586.800

 

192.50

 

567.00

 

091.95

 

-65.70

 

2018

 

BRSMSMDD0261

 

262222.690

 

6575530.020

 

197.53

 

415.60

 

271.40

 

-74.90

 

2018

 

BRSMSMDD0262

 

262626.360

 

6575574.920

 

248.85

 

490.50

 

270.99

 

-69.11

 

2018

 

BRSMD000263

 

262467.580

 

6575660.190

 

215.73

 

451.20

 

268.43

 

-69.85

 

2018

 

BRSMD000264

 

262537.800

 

6575667.340

 

228.33

 

451.10

 

262.26

 

-70.65

 

2018

 

BRSMD000265

 

262469.250

 

6575765.230

 

221.43

 

611.65

 

264.16

 

-75.17

 

2018

 

BRSMD000266

 

262615.200

 

6575659.380

 

248.35

 

513.60

 

266.85

 

-73.00

 

2018

 

BRSMD000267

 

262561.390

 

6575779.510

 

241.12

 

593.20

 

265.05

 

-77.69

 

2018

 

BRSMD000268

 

262705.425

 

6575756.812

 

265.47

 

603.95

 

271.07

 

-74.14

 

2018

 

 

Coordinates in UTM Corrego Alegre Datum - zone 22S

 

11


 

Table 7. Copper Stockwork Intersection Results — 2017- 2018 Drilling.

 

Hole

 

From
(m)

 

To
(m)

 

Length(1) (m)

 

Ag
(g/t)

 

Au
(g/t)

 

Cu
(%)

 

Pb
(%)

 

Zn
(%)

 

Year

 

BRSMSMDD0240

 

355.20

 

364.30

 

9.10

 

8.21

 

0.19

 

0.49

 

2.07

 

0.79

 

2017

 

BRSMSMDD0241

 

279.50

 

332.00

 

52.50

 

5.50

 

0.16

 

0.58

 

0.48

 

0.02

 

2017

 

BRSMSMDD0242

 

315.30

 

339.00

 

23.70

 

5.00

 

0.04

 

0.36

 

0.30

 

0.03

 

2017

 

BRSMSMDD0246

 

240.10

 

335.00

 

94.90

 

2.90

 

0.03

 

0.62

 

0.09

 

0.02

 

2017

 

including

 

308.50

 

329.50

 

21.00

 

9.56

 

0.11

 

2.15

 

0.13

 

0.02

 

2017

 

BRSMSMDD0249

 

326.50

 

355.00

 

28.50

 

3.60

 

0.03

 

0.93

 

0.18

 

0.02

 

2017

 

BRSMSMDD0251

 

389.70

 

455.15

 

65.45

 

1.94

 

0.29

 

0.31

 

0.19

 

0.01

 

2017

 

including

 

389.70

 

404.00

 

14.30

 

2.02

 

0.02

 

0.88

 

0.07

 

0.01

 

2017

 

including

 

441.75

 

448.85

 

7.10

 

5.20

 

2.57

 

0.69

 

0.00

 

0.02

 

2017

 

BRSMSMDD0253

 

351.00

 

360.80

 

9.80

 

2.10

 

0.06

 

0.52

 

0.10

 

0.03

 

2017

 

BRSMSMDD0254

 

311.40

 

318.55

 

7.15

 

8.46

 

0.27

 

0.92

 

0.64

 

0.03

 

2017

 

BRSMSMDD0255

 

352.50

 

447.05

 

94.55

 

7.80

 

0.55

 

0.61

 

1.78

 

0.48

 

2017

 

including

 

374.00

 

392.00

 

18.00

 

15.80

 

2.52

 

0.86

 

2.23

 

0.78

 

2017

 

including

 

424.00

 

441.00

 

17.00

 

14.50

 

0.15

 

1.80

 

4.18

 

1.07

 

2017

 

BRSMSMDD0256

 

339.00

 

380.00

 

41.00

 

2.33

 

0.14

 

0.50

 

0.08

 

0.07

 

2017

 

BRSMSMDD0261

 

339.85

 

350.45

 

10.60

 

10.47

 

0.03

 

0.68

 

0.84

 

0.03

 

2018

 

BRSMSMDD0262

 

363.50

 

384.00

 

20.50

 

2.91

 

0.05

 

0.41

 

0.07

 

0.09

 

2018

 

BRSMD000263

 

242.00

 

382.00

 

140.00

 

1.02

 

0.08

 

0.25

 

0.02

 

0.02

 

2018

 

including

 

323.70

 

348.00

 

24.30

 

1.79

 

0.27

 

0.69

 

0.08

 

0.02

 

2018

 

BRSMD000264

 

287.70

 

404.80

 

117.10

 

1.01

 

0.14

 

0.25

 

0.11

 

0.06

 

2018

 

including

 

329.55

 

342.20

 

12.65

 

1.34

 

0.02

 

0.44

 

0.18

 

0.05

 

2018

 

including

 

394.45

 

404.80

 

10.35

 

3.05

 

1.46

 

1.45

 

0.03

 

0.01

 

2018

 

BRSMD000265

 

434.00

 

436.00

 

2.00

 

1.82

 

0.15

 

0.87

 

0.08

 

0.01

 

2018

 

BRSMD000266

 

310.55

 

433.50

 

122.95

 

1.70

 

0.12

 

0.38

 

0.12

 

0.09

 

2018

 

including

 

390.00

 

423.10

 

33.10

 

4.20

 

0.35

 

0.86

 

0.60

 

0.31

 

2018

 

BRSMD000267

 

498.00

 

501.70

 

3.70

 

12.80

 

0.68

 

1.46

 

0.06

 

0.01

 

2018

 

BRSMD000268

 

525.60

 

531.70

 

6.10

 

3.09

 

1.69

 

0.82

 

0.01

 

0.01

 

2018

 

 


(1) True width is not known at this point.

(2) Intervals with assays not reported here have no consistent samples >0.2% Cu.

 

The positive results from the 2017-2018 drilling program supported the following statement of an exploration target as shown in Table 8.

 

12


 

Table 8. Copper Stockwork Exploration Target Statement

 

 

 

Tonnes
(Mt)

 

Ag
(g/t)

 

Au
(g/t)

 

Cu
(%)

 

Pb
(%)

 

Site/ deposit

 

Low

 

High

 

Low

 

High

 

Low

 

High

 

Low

 

High

 

Low

 

High

 

Copper Stockwork

 

7.5

 

11.5

 

4.00

 

6.00

 

0.15

 

0.35

 

0.40

 

0.60

 

0.50

 

0.70

 

 

Note: The potential quantity and grade is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration can result in the target being delineated as a Mineral Resource.

 

Exploration target parameters for the Copper Stockwork were defined based on drilling results and hydrothermal alteration pattern, as follows: strike length ranging from 600 to 650m, vertical depth between 300 and 350m, average mineralization width from 18 to 22m.

 

The Caçapava do Sul project is located in a mining district discovered in the 19th century and that was actively mined for copper until the 1990s. The Santa Maria deposit was discovered in 1978 and has been actively explored by Nexa since 2008. The Santa Maria deposit is a magmatic-hydrothermal, polymetallic deposit (Zn, Pb, Cu, Ag, Au), consisting of stringer-like textures and associated with argillic alteration and embedded in volcano-sedimentary sequences of the basin. The deposit consists of three mineralized bodies, called Area 1, Area 2 and Area 3, reported in the NI 43-101 technical report titled “Technical report on the Caçapava do Sul Project, State of Rio Grande do Sul, Brazil” dated September 15, 2017 (the “Caçapava do Sul Technical Report”), as well as the newly discovered associated system (Copper Stockwork).

 

Copper mineralization, with associated gold and lead, is present in quartz veins with stockwork pattern and associated dissemination, with hydrothermal alterations predominantly constituted of ilite and strong silicification, in arcosian sediments interspersed with andesitic levels. The mineralized zone is composed of milimetric to centimetric chalcopyrite veinlets (subordinate bornite) as well as zones of hydrothermal breccias with high-grade copper mineralization, associated gold and lead. Mineralization is dominantly flat-lying or has a shallow dip (Figure 9).

 

13


 

Figure 9.Copper Stockwork geological section.

 

The proposed 2019 exploration program for the Caçapava do Sul project consists of:

 

·                  Drilling the extensions of the Copper Stockwork mineralized zone (Cu, Au, Pb), which are currently open to potentially increase the resource base. Drilling will occur in the southwestern and eastern corridors (Figure 10).

 

·                  Deep geophysical investigation using Phoenix System — Deep IP + AMT (Natural-source Audio-frequency Magnetotellurics), to delineate additional magmatic-hydrothermal Cu deposits to be carried out in early 2019.

 

A total of 13,500 meters of diamond drilling is planned to investigate the Copper Stockwork mineralized zone extensions and to follow up geophysical anomalies outlined by the Deep IP +AMT geophysical survey (Figure 10). The survey will be conducted over 32 linear kilometers of favorable geology and airborne geophysical anomalies.

 

14


 

 

Figure 10. Drill Hole location plan map on IP Chargeability background (section 150m). In red color: Area 1 (SW) and Area 2 (NE) Zn-Pb deposits. In blue color: Copper Stockwork mineralized zone.

 

Drilling and Deep IP +AMT geophysics were initiated in February 2019.

 

15


 

Technical Information

 

Jose Antonio Lopes, MausIMM CP (Geo): 224829, a mineral resources manager, a qualified person for purposes of NI 43-101 and a Nexa employee, has verified the data disclosed in this news release including sampling, analytical and test data underlying the information contained herein. Data verification procedures included site visits, review of drill and core collection, logging and sampling practices, and evaluation of quality control sample results and geological interpretations.

 

Information about the sampling methodology, etc. of the projects can be found in the Hilarión Technical Report, the Shalipayco Technical Report and the Caçapava do Sul Technical Report. Each of technical reports are available at www.sedar.com under Nexa Resources’ SEDAR profile.

 

About Nexa

 

Nexa is a large-scale, low-cost integrated zinc producer with over 60 years of experience developing and operating mining and smelting assets in Latin America. The Company currently owns and operates five long-life underground mines - three located in the Central Andes of Peru and two located in the state of Minas Gerais in Brazil - and is among the top five producers of mined zinc globally in 2018, according to Wood Mackenzie. Nexa is also one of the top five metallic zinc producers worldwide in 2018, according to Wood Mackenzie.

 

CAUTIONARY STATEMENT ON FORWARD-LOOKING STATEMENTS

 

This news release contains certain forward-looking information and forward-looking statements as defined in applicable securities laws (collectively referred to in this News Release as “forward-looking statements”). All statements other than statements of historical fact are forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Nexa Resources to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. These forward-looking statements include (but are not limited to) estimates, forecasts, and statements as to management’s expectations with respect to the business and operations of the Company and mining production and its projects.

 

This news release also contains references to estimates of mineral resources and mineral reserves. The estimation of mineral resources is inherently uncertain and involves subjective judgments about many relevant factors. Estimates of mineral reserves provide more certainty but still involve similar subjective judgments. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation (including estimated future production from the Company’s projects, the anticipated tonnages and grades that will be mined and the estimated level of recovery that will be realized), which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that ultimately may prove to be inaccurate. Mineral resource or mineral reserve estimates may have to be re-estimated based on: (i) fluctuations in mineral prices; (ii) results of drilling; (iii) metallurgical testing and other studies; (iv) proposed mining operations, including dilution; (v) the evaluation of mine plans subsequent to the date of any estimates and/or changes in mine plans; (vi) the possible failure to receive required permits, approvals and licenses; and (vii) changes in law or regulation.

 

16


 

Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Statements concerning future production costs or volumes are based on numerous assumptions of management regarding operating matters and on assumptions that demand for products develops as anticipated, that customers and other counterparties perform their contractual obligations, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labor disturbances, interruption in transportation or utilities, adverse weather conditions, and that there are no material unanticipated variations in the cost of energy or supplies.

 

We assume no obligation to update forward-looking statements except as required under securities laws. Further information concerning risks and uncertainties associated with these forward-looking statements and our business can be found in our public disclosures filed under our profile on SEDAR (www.sedar.com) and on EDGAR (www.sec.gov).

 

Contact: Roberta Varella — Head of Investor Relations | ir@nexaresources.com

 

+55 11 3405-5601

 

17