EX-99.33 34 ea164751ex99-33_encore.htm TECHNICAL REPORT DATED JUNE 9, 2021 AND FILED ON JULY 14, 2021

Exhibit 99.33

 

MARQUEZ-JUAN TAFOYA URANIUM PROJECT

43-101 Technical Report
Preliminary Economic Assessment

 

 

 

PREPARED FOR:

encore Energy Corporation

 

AUTHORED BY:

Douglas L. Beahm, P.E., P.G., BRS Inc.

Terence P. McNulty, PE, PHD, McNulty and Associates June 9, 2021

 

 

 

 

 

TABLE OF CONTENTS

 

1.0 Summary 1
2.0 Introduction 10
3.0 Reliance on Other Experts 13
4.0 Property Description 13
5.0 Accessibility, Climate, Local Resources, Infrastructure, and Physiography 19
6.0 History 21
7.0 Geological Setting and Mineralization 24
8.0 Deposit Types 29
9.0 Exploration 30
10.0 Drilling 30
11.0 Sample Preparation, Analyses, and Security 34
12.0 Data Verification 37
13.0 Mineral Processing and Metallurgical Testing 40
14.0 Mineral Resource Estimates 48
15.0 Mineral Reserve Estimates 53
16.0 Mining Methods 53
17.0 Recovery Methods 59
18.0 Project Infrastructure 65
19.0 Market Studies and Contracts 67
20.0 Environmental Studies, Permitting, and Social or Community Impact 68
21.0 Capital and Operating Costs 74
22.0 Economic Analysis 76
23.0 Adjacent Properties 79
24.0 Other Relevant Data and Information 79
25.0 Interpretations and Conclusions 79
26.0 Recommendations 81
27.0 References 84
28.0 Signature Page and Certification of Qualified Person 85

 

i

 

 

Tables:

 

Table 1.1 Indicated Mineral Resource 6
Table 1.2- Summary of Recommendations 8
Table 2.1 Terms and Abbreviations 11
Table 13.1, Master Composite 41
Table 13.2, Zone Composites 42
Table 14.1 Indicated Mineral Resources 50
Table 16.1 Mine CAPEX 55
Table 16.2 Mine Production Profile 56
Table 17.1 Mineral Processing Options 64
Table 19.1 - Uranium Prices 2020 Through 2035 67
Table 21.1 Annual Cash Flow 75
Table 22.1-Life of Mine Cost Summary 76
Table 26.1 - Recommendations 83

 

Figures:

 

Figure 1.1 Location Map 9
Figure 4.1 Ownership Map 18
Figure 6.1 Southeast Deposit Location 23
Figure 7.1, Geology Map 25
Figure 7.2 - Type Log 28
Figure 10.1 -Drill Hole Map 31
Figure 10.2- Cross Section A-A’ 32
Figure 10.2 - Cross Section B-B’ 33
Figure 12.1 -Database Comparison 38
Figure 14.1 - C Sand 51
Figure 14.2 D Sand 52
Figure 16.1 C Sand Mine Production Schedule 57
Figure 16.2 D Sand Mine Production Schedule 58
Figure 17.1 Selective Handling and Sorting 60
Figure 17.2 Heap Leach Flow Sheet 60
Figure 17.3 Agitated Leach Flow Sheet 62
Figure 17.4 Solution Treatment Flow Sheet 63
Figure 18.1 - Infrastructure Map 66

 

Appendix A - Mineral Processing Assumptions and Cost Details

 

ii

 

 

Summary

 

This report titled Marquez-Juan Tafoya Uranium Project, NI 43-101 Technical Report, Preliminary Economic Assessment was prepared in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects (NI 43-101), and in accordance with Canadian Institute of Mining (CIM) Best Practice Guidelines for the Estimation of Mineral Resources and Mineral Reserves (CIM Standards) and has an effective date for mineral resources and pertinent data of June 9, 2021. The effective date of the Preliminary Economic Assessment (PEA) is the same as the overall report, June 9, 2021.

 

The report was prepared for enCore Energy Corporation (TSX-V: EU), (enCore or “the Company”) a minerals development company with uranium properties in Arizona, New Mexico, Utah, Texas, and Wyoming. Two previous reports were issued on portions of the Project. The Marquez portion (Marquez Uranium Property, McKinley and Sandoval Counties, New Mexico: Alief, 2010) and the Juan Tafoya portion (NI 43-101 Technical Report on Mineral Resources, Juan Tafoya Uranium Project, Cibola, McKinley, and Sandoval Counties, New Mexico, USA: Carter, 2014). Although at the time of issuance these reports were completed under NI 43-101 guidance, enCore considers these mineral resource estimates as historical estimates. A qualified person has not done sufficient work for enCore to classify the historical estimates as current mineral resource estimate. The Company does not treat these historical estimates as current mineral resource estimates, and the estimates should not be relied upon. The current mineral resource estimate for the Project is described in Section 14 of this Report.

 

The Marquez-Juan Tafoya Uranium Project (Project) is an advanced-stage exploration property which has been extensively explored in the past by drilling and on a portion of which considerable pre-mining infrastructure was historically constructed including production and ventilation shafts, a mill processing facility, and tailings disposal cells. The surface facilities were dismantled in the early 2000s. No mining or mineral processing has occurred at the site.

 

This report includes disclosure permitted under Section 2.3(3) of NI 43-101 as the PEA. Mineral resources are not mineral reserves and do not have demonstrated economic viability. The PEA is preliminary in nature and there is no certainty that the preliminary economic assessment will be realized. The PEA is described elsewhere in this report and is based on the qualifications and assumptions described herein.

 

1

 

 

1.1Project Overview

 

The Project is located within the Grants Uranium Mineral District of northwest New Mexico, approximately 50 miles west-northwest of Albuquerque, New Mexico (see Figure 1.1). The Project consists of two adjacent properties; Marquez and Juan Tafoya, that were previously developed by separate mining companies, Kerr-McGee Corporation and Bokum Resources, respectively. This is the first time that the two properties are controlled by one company., The Preliminary Economic Assessment (PEA) has been developed based on a combined mineral resource estimate and proposed underground mining and on site mineral processing for the Project.

 

The host for known uranium mineralization within the project is the Westwater Canyon member of the Upper Jurassic Morrison Formation. The Westwater deposits dip gently 1-3° to the west. The mineralization is sandstone-type present as coffinite and uraninite within primary trend deposits, varies from 1,800 to 2,500 feet deep.

 

1.2Project Description and Overview

 

The Marquez-Juan Tafoya uranium project is located at approximately 35°18’ North Latitude by 107°18’ West Longitude. The site is approximately 50 miles west-northwest of Albuquerque, New Mexico (Figure 4-1, Location and Access Map). The project is in an area of mostly un-surveyed lands, in what would be Township 13 North, Ranges 04 and 05 West, 23rd Principal Meridian, New Mexico.

 

EnCore controls private land leases, Marquez and Juan Tafoya, totaling some 18,712 acres (7,572 ha). https://www.enCoreenergycorp.com/projects/new-mexico/juan-tafoya-marquez/

 

1.3Development Status

 

In the 1970s to early 1980s, extensive mineral exploration by drilling defined significant uranium resources on the two properties. Mine and mineral processing infrastructure was constructed by Bokum Resources on the Juan Tafoya portion of the Project, including a 14-foot production shaft (completed to within 200 feet of the mine zone), a 5-foot ventilation shaft, and a partially built mill processing facility and tailings disposal cells. The surface facilities were dismantled and reclaimed in the early 2000s.

 

2

 

 

1.4History

 

1.4.1Marquez History

 

Kerr McGee Corporation entered into a mineral lease agreement with the Williams family for the Marquez Property in the early 1970s. In 1973 exploration drilling began. In 1978, Kerr McGee sold a 50% interest in the project to the Tennessee Valley Authority (TVA). At that time, the joint venture proposed mining the uranium deposit by conventional underground methods, with recovery at Kerr McGee’s Ambrosia Lake mill facility. However, with the decrease in the uranium market beginning in 1980, the property was returned to the mineral lease holder. In 2007, Strathmore Minerals Corporation acquired a mineral lease to the Marquez property. Strathmore was subsequently acquired by Energy Fuels who sold the Marquez property to enCore.

 

1.4.2Juan Tafoya History

 

In 1969, mineral leases were acquired in the Juan Tafoya area by Devilliers Nuclear and began exploratory drilling. In the early 1970s Exxon acquired the rights to 25 small mineral leases, all within the boundary of the JTLC lease, and began exploratory drilling. In 1975, the JTLC lease was acquired from Devilliers by Bokum Resources Corporation, which subsequently acquired the Exxon mineral leases also. In 1976, Bokum entered into a uranium purchase agreement with Long Island Lighting Company, a New York-based utility. However, with the decrease in the uranium market beginning in 1980, the property was returned to the mineral lease holders. In 2006-07, Neutron Energy Inc. acquired the mineral leases. In 2012, Neutron was acquired by Uranium Resources Inc (now Westwater Resources Inc) and in September 2020, enCore Energy announced the purchase of Westwater Resources’ US uranium assets, including the mineral leases to the Juan Tafoya properties. The purchase was completed on December 31, 2020. enCore has yet to explore on the property.

 

1.5Regulatory Status

 

With the exception of an exploratory drilling permit received by Neutron Energy from the State of New Mexico, and currently held by the Company, no other permits have been obtained for the Project. No mining or mineral processing has been completed on the property. A variety of Federal and State permits will be required prior to any mine and/or mineral processing developments. Refer to Section 20.

 

3

 

 

1.6Geology and Mineralization

 

The host for known uranium mineralization at the Project, present as coffinite and uraninite, is sandstone deposits within the Westwater Canyon member of the Upper Jurassic Morrison Formation. The Westwater consists of a fluvial sedimentary sequence deposited during a period of wet subtropical climate as the San Juan Basin subsided and filled with synorogenic deposits during a pre-Laramide orogenic event. The major source of the sandstones was from uplifted highlands to the south and southwest; sediments were laid down by coalescing alluvial fans and associated braided streams. The Westwater deposits dip gently 1-3° to the west. Mineralization at the project varies from 1,800 to 2,500 feet deep.

 

The Westwater sands hosting the uranium mineralization consist of a series of fluvial stacked, quartz-rich arkosic sandstones separated by clay and mudstone beds. The Westwater is 250-325 feet thick at the Project, consisting of four main sand units. The mineralization formed by the down-gradient movement of groundwater solutions flowing through the arkosic-rich sediments and inter-formational and overlying tuffaceous (volcanic) materials. The uranium was precipitated where the action of pyrite-rich sediments and carbonaceous materials (humates) developed a reducing environment (oxidation-reduction contact). The mineralization is contained within mostly primary (trend-type) mineralized bodies previously deposited synorogentically. These trend-type deposits are similar in nature to those discovered and extensively mined in the Ambrosia Lake Uranium District 20 miles to the west. A lesser amount of the mineralization is possibly post-faulting or redistributed mineralization; perhaps amenable to in-situ recovery methods.

 

1.7Mineral Resources

 

Some 926 drill holes totaling approximately 1.9 million feet drilled were completed by past operators. EnCore has not completed any drilling on the project. For this report, 604 drill holes, completed in the area of interest were used. These drill hole locations are shown on Figure 10.1, Drill Hole Map. From the total 604 drill holes, 192 and 337 mineralized incepts were used for the mineral resource estimates, for the “C” and “D” sands, respectively.

 

The principal tool for determining uranium grades encountered by exploration and development drill holes is the gamma-ray log, a geophysical surveying technique that was, and remains the standard in-place assaying method utilized by the global uranium industry. Equivalent uranium grades (% eU3O8), which are radiometric assays, were and are calculated from gamma ray logs using grade determination methodologies that are standard in the uranium mining industry.

 

4

 

 

Each drill hole used in making the mineral resource estimate was correlated and re-interpreted by the author. Conversion of downhole CPS measurements to equivalent uranium content, eU3O8, was verified by the author and is discussed in Section 12.

 

As discussed in Section 11 of this report, a positive disequilibrium factor is stated in historic reports (Alief, 2010 and Carter, 2014) which if applied would increase the estimated average grade and contained pounds. Although some of the chemical data cited in previous reports are available, original laboratory certificates were generally not available. In addition, the core holes were generally completed in areas on strong mineralization and thus may not be representative of the deposit in total. For these reasons, the author elected to assume that the mineralization was in radiometric equilibrium, and no positive factor was applied. A disequilibrium factor (DEF) of 1.0 was utilized for the mineral resource estimate as a conservative measure.

 

Mineral resources were estimated only for those area which contained sufficient thickness, grade and continuity of mineralization to support extraction by underground mining methods. Within these areas drill spacing was on approximate 100 foot centers with some additional closer spaced offset drilling. Mineralization that is well defined by drilling on the C horizon covers an area of approximately 2,500 feet along trend and 200 to 400 feet across trend. The D horizon has an approximate trend length of 4,000 feet and is 200 to 800 feet across trend. Given the dimensions of the mineralized area, the mineralized areas are well defined by multiple data points. Although the drill data has been verified by the author, it is of a historical nature and thus the author recommends that none of the mineralization be considered as measured mineral resource. Based on the continuity of the mineralization and drill spacing relative to the dimensions of mineralized area the author concludes the data support a classification of the mineral resource as indicated.

 

A minimum mining thickness of 6 feet was used. A bulk density factor of 15 ft3/ton was used in the calculations. The mineral resources are reported at a 0.60 GT cutoff (refer to Table 1.1). Mineral resources were calculated using the Grade times Thickness (GT) Contour method in accordance with CIM guidance (CIM, 2013). For the PEA a slightly higher GT cutoff was applied to allow for a profit margin.

 

5

 

 

Table 1.1 Indicated Mineral Resource

 

Indicated Mineral Resource

 

Minimum 0.60 GT  TONS   %eU3O8   Pounds 
ROUNDED TOTAL (x 1,000)   7,100    0.127    18,100 

 

Indicated Mineral Resource

 

Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with CIM standards. At a minimum declaration of mineral reserves would require a Preliminary Feasibility Study (PFS). However, to be considered a mineral resource, reasonable prospects for economic extraction must be demonstrated. Reasonable prospects for economic extraction are demonstrated by the positive outcome of the Preliminary Economic Assessment (PEA) herein.

 

1.8Capital and Operating Costs

 

Mine and mineral processing OPEX and CAPEX are discussed in Sections 17 and 18, respectively. Total CAPEX including pre-production costs, mine and mineral processing equipment and facilities, and replacement capital are estimated at $79.3 million $US. OPEX including mining, mineral processing, royalties, taxes, and reclamation are estimated at $48.15 per pound of uranium recovered. The annual cash flow is discussed in Section 12.

 

The mine production schedule is based on a nominal 1,000 tons mined per day for 15 years with an estimated total approximately 6 million tons at an average grade of 0.172 %eU3O8 containing some 12.2 million pounds of uranium.

 

1.9Economic Analysis

 

This report includes disclosure permitted under Section 2.3(3) of NI 43-101 as the PEA includes a portion of the indicated mineral resources shown in Section 14 of the report. Mineral resources are not mineral reserves and do not have demonstrated economic viability. The PEA is preliminary in nature and there is no certainty that the preliminary economic assessment will be realized. The PEA is described elsewhere in this report and is based on the qualifications and assumptions described herein.

 

An economic analysis for the project is present in Section 22 based on a constant commodity price of $60 per pound as discussed in Section 19. The breakeven commodity price is approximately US$56 per pound. Figures include in Section 22 show the effect of commodity price on IRR and NPV in the range of US$56 to US$70 per pound U3O8. The project as estimated at a commodity price of US$60 per pound U3O8, has a positive return on investment with an IRR of 17% and an NPV at a 7% discount rate of 20,595 million $US.

 

6

 

 

1.10Conclusions

 

The PEA for the Marquez and Juan Tafoya project includes an underground conventional mine operation with on-site mineral processing. The underground mine operations would be concurrent with a mine life of approximately 15 years. This is the first time since the initial discoveries that these two adjacent areas of mineralization have been held by the same party.

 

The project, given the assumptions stated herein, would be profitable with a US$60 per pound selling price. In constant dollars the project is estimated to generate an IRR of 17% before taxes and has an NPV of approximately US$20.5 million at a 7% discount rate. (Refer to Section 22)

 

The technical risks related to the project are considered to be low as the mining and recovery methods are proven. The mining and mineral processing methods proposed have been employed successfully in the vicinity and regionally for deposits of a similar nature and setting.

 

The project was once permitted for similar operations but did not go forward due to falling uranium prices in the 1980’s. The project is located on private land and the mine and mill areas have been previously disturbed. The major permits required include a Source and Byproduct Materials License from the NRC and a mining permit from the state of New Mexico. Based on regional opposition to similar project in the region some level of opposition to the project should be expected. However, overall, the Fraser Institute Annual Survey of Mining Companies, 2020 ranks New Mexico as 10th out of 80 jurisdictions on their Policy Perception Index, which indicates a favorable perception by the mining industry towards New Mexico mining policies.

 

1.11Recommendations

 

The project is sensitive to mining factors including resource recovery, dilution, and grade, and the sizing and sorting of mine materials and mineral processing and recovery. The project is also subject to scrutiny with respect to environmental considerations. Detailed recommendations are provided in Section 26 and are summarized by mineral tenor, mine and mineral resource, mineral processing, environmental and additional studies.

 

7

 

 

Table 1.2 - Summary of Recommendations

 

Mineral Tenor and Leases  $50,000 
      
Mine and Mineral Resources  $1,500,000 
      
Mineral Processing  $500,000 
      
Environmental  $500,000 
      
Southeast Deposit  $50,000 
      
Update Mineral Resources and PEA  $100,000 
      
GRAND TOTAL  $2,700,000 

 

Most of the recommended costs are one time expenditures. Maintaining environmental baselines studies as current and public outreach will have ongoing annual costs.

 

1.12Summary of Risks

 

It is the author’s opinion that the risks associated with this project are similar in nature to other mining projects in general and uranium mining projects specially, i.e., risks common to mining projects include:

 

Future commodity demand and pricing,

 

Environmental and political acceptance of the project,

 

Variance in capital and operating costs,

 

Risks associated with mineral resource estimates, including the risk of errors in assumptions or methodologies,

 

Mine and mineral processing recovery and dilution, and

 

Mineral leases are subject to renewal.

 

Specifically, the Project should anticipate, based on the experience of other proposed mines in the Grants Uranium District, some level of public opposition given its geographical location. However, the project was previously granted both a Source Materials License from the US Nuclear Regulatory Commission (NRC). A new Source Materials License from the NRC for the uranium mill and possibly mined material screening and sorting will be required. New mining and other permits will be required from the State of New Mexico. Significant mine related infrastructure was constructed in the early 1980s. Additionally, the lease holders are active participants and supportive of the project. This sets a positive precedent for uranium mine development in the Marquez-Juan Tafoya area.

 

The author is not aware of any other specific risks or uncertainties that might significantly affect the mineral resource and reserve estimates or the consequent economic analysis. Estimation of costs and uranium price for the purposes of the economic analysis over the life of mine is by its nature forward-looking and subject to various risks and uncertainties. No forward-looking statement can be guaranteed, and actual future results may vary materially.

 

Readers are cautioned that it would be unreasonable to rely on any such forward-looking statements and information as creating any legal rights, and that the statements and information are not guarantees and may involve known and unknown risks and uncertainties, and that actual results are likely to differ (and may differ materially) and objectives and strategies may differ or change from those expressed or implied in the forward-looking statements or information as a result of various factors. Such risks and uncertainties include risks generally encountered in the exploration, development, operation, and closure of mineral properties and processing facilities. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements. Additional risks are itemized in Section 25.

 

8

 

 

Figure 1.1 Location Map

 

 

9

 

 

2.0Introduction

 

2.1Purpose of Report

 

This report was prepared for enCore Energy. The Marquez-Juan Tafoya uranium project in Cibola, McKinley, and Sandoval Counties, New Mexico, in accordance with 43-101 regulations and CIM guidance. This report discloses mineral resource estimates and includes disclosure permitted under Section 2.3(3) of NI 43-101 as the PEA. Mineral resources are not mineral reserves and do not have demonstrated economic viability. The PEA is preliminary in nature and there is no certainty that the preliminary economic assessment will be realized. The PEA is described elsewhere in this report and is based on the qualifications and assumptions described herein.

 

2.2Terms of Reference

 

Units of measurement, unless otherwise indicated, are feet (ft), miles, acres, pounds avoirdupois (lbs), and short tons (2,000 lbs). Uranium oxide is expressed as% U3O8, the standard market unit. Values reported for historical resources and the mineral resources reported here are % eU3O8 (equivalent U3O8 by calibrated geophysical logging unit). Unless otherwise indicated, all references to dollars ($US) refer to the United States currency. Additional units of measurement follow in table 2.1.

 

10

 

 

Table 2.1 Terms and Abbreviations

 

URANIUM SPECIFIC TERMS AND ABBREVIATIONS

 

Grade  Parts Per Million  ppm U3O8  Weight Percent  %U3O8
Radiometric Equivalent Grade     ppm eU3O8     % eU3O8
Thickness  meters  M  Feet  Ft
Grade Thickness Product  grade x meters  GT(m)  grade x feet  GT(Ft)

 

GENERAL TERMS AND ABBREVIATIONS

 

   METRIC  US  Metric: US
   Term  Abbreviation  Term  Abbreviation  Conversion
Area  Square Meters  m2  Square Feet  Ft2  10.76
   Hectare  Ha  Acre  Ac  2.47
Volume  Cubic Meters  m3  Cubic Yards  Cy  1.308
Length  Meter  m  Feet  Ft  3.28
   Meter  m  Yard  Yd  1.09
Distance  Kilometer  km  Mile  mile  0.6214
Weight  Kilogram  kg  Pound  Lb  2.20
   Metric Tonne  Tonne  Short Ton  Ton  1.10

 

2.3Sources of Information and Data

 

Data available for this report includes drill-hole maps, mineralized intercept data, downhole geophysical logs, downhole deviation (drift) surveys, historic reports and resource calculations, and other information from the original files and records of Kerr McGee Corporation (Marquez database) and Bokum Resources (Juan Tafoya database). Original data is in the possession of enCore and was made fully available to the author. The author has verified the drill data and considers it reliable for the purposes of this report.

 

2.4Extent of Author’s Field Involvement

 

Doug Beahm, PE, PG, last visited the site on May 24th and 25th 2012. Terry McNulty did not visit the site but has extensive work experience with conventional mineral processing in the Grants Uranium District.

 

11

 

 

2.5Extent of Author’s Past Education, Qualification, and Experience

 

Doug L. Beahm, P.E., P.G.: The primary author of this report, Mr. Doug Beahm, is both a Professional Geologist and a Professional Engineer, and a Registered Member of the US Society of Mining, Metallurgy, and Exploration Inc. (SME Inc.). Mr. Beahm is a Qualified Person and independent of enCore Energy, using the test set out in Section 1.5 of NI 43-101. Mr. Beahm is experienced with uranium exploration, development, and mining including past employment with Homestake Mining Company, Union Carbide Mining and Metals Division, and AGIP Mining USA. In addition, as a consultant and principal engineer of BRS Inc., Mr. Beahm has provided geological and engineering services related to the development of mining and reclamation plans for a variety of uranium projects. Mr. Beahm’s professional experience dates to 1974. Mr. Beahm has worked previously on the Juan Tafoya project in 2012 as a consultant to a private firm that was reviewing the project for a potential acquisition. In addition, Mr. Beahm has extensive work experience with similar sandstone-hosted uranium deposits. Mr. Beahm is responsible for all sections of the report except as stated in Section 3 and Sections 13 and l7, Mineral Processing and Metallurgical Testing and Recovery Methods, respectively, which was completed by Dr. McNulty.

 

Terrence P. McNulty, P.E., D.Sc.: Dr. McNulty is a Professional Engineer and Registered Member of the US Society of Mining, Metallurgy, and Exploration Inc. (SME Inc.). Dr. McNulty’s responsibilities in the preparation of this report include Section 13, Mineral Processing and Metallurgical Testing and Section 17, Recovery Methods. Dr. McNulty also provide CAPEX and OPEX estimates related to mineral processing. Beginning in the 1960s, Dr. McNulty was involved in laboratory testing and process development for uranium resources being evaluated at Anaconda’s exploration department, as well as providing technical services to the uranium operations. In the late 1970s, he had overall technical responsibilities for expansion Anaconda’s Bluewater uranium acid leaching plant from 3,000 tons per day to 7,000 tons per day and conversion from resin-in-pulp uranium recovery to counter-current distillation and solvent extraction. The Bluewater mill was located north of Grants, New Mexico, in the prolific Ambrosia Lake uranium district, 25 miles west of the Marquez-Juan Tafoya Project. Dr. McNulty is familiar with the extractive metallurgy of sandstone-hosted uranium deposits and is professionally qualified to address the requirements related to Section 17 of this report.

 

12

 

 

3.0Reliance on Other Experts

 

enCore Energy Corp provided, and the Author fully relied upon.

 

The location, extent, and terms relating to Mineral Tenure, Section 4.

 

Status of environmental and operating permits and current bond obligations on the Property, Section 20.

 

Third party data from TradeTech™ for uranium pricing, Section 19.

 

With respect to policy perception, the Author fully relied upon the Fraser Institute “Annual Survey of Mining companies 2020”.

 

4.0Property Description

 

The Marquez-Juan Tafoya uranium project is located at approximately 35°18’ North Latitude by 107°18’ West Longitude. The site is approximately 50 miles west-northwest of Albuquerque, New Mexico (Figure 4-1, Location and Access Map). The project is located in the Grants Uranium District of northwestern New Mexico, in the common corners area of Cibola, McKinley, and Sandoval counties. The project is in an area of mostly un-surveyed lands, in what would be Township 13 North, Ranges 04 and 05 West, 23rd Principal Meridian, New Mexico.

 

EnCore controls private land leases, Marquez and Juan Tafoya, totaling some 18,712 acres (7,572 ha) (“the Property”). https://www.enCoreenergycorp.com/projects/new-mexico/juan-tafoya-marquez/

 

Marquez mineral lease:

 

Approximately 14,501 acres

 

Production Royalty 8 % net proceeds*

 

Annual Payments varies with price currently $50,000 per year.

 

Expiration September 4, 2022

 

Juan Tafoya mineral lease:

 

Approximately 4,211 acres

 

Production Royalty 4% gross

 

If material from other sources is processed from other properties a milling royalty of 2% would apply

 

Annual Payments $315,825.00

 

Expiration October 11, 2021

 

Overriding royalty to Westwater Resources 2.5% net profits royalty

 

*For the PEA, a 4% gross royalty was applied to all production. The Marquez royalty of 8% net proceeds would be less than the 4% gross. Thus, this is a conservative approach.

 

13

 

 

4.1Marquez Ownership and Mineral Tenure

 

The Marquez property is held by a mineral lease covering 14,501 acres; the vast majority of which lies on the western extent of the greater project area, with several small, separate parcels to the east within the boundary of the Juan Tafoya property. The mineral rights are owned separately from the surface rights; the Williams (87.5%) and Koontz (12.5%) families, and the State of New Mexico’s Game and Fish Department, respectively. In 1967, the surface rights were conveyed from the Williams family to the State while the right to develop minerals from the property were retained by the Williams family.

 

4.2Juan Tafoya Ownership and Mineral Tenure

 

The Juan Tafoya property is held by 26 mining leases covering 4,211 acres; 1 lease consists of 4,096 acres (Juan Tafoya Land Company), and the other 25 smaller leases make up 115 acres, all of which are within the boundary of the larger JTLC holdings. The Juan Tafoya leases are on the southeastern extent of the greater project area. The JTLC lease was acquired by Neutron Energy in 2006, and the remaining 25 smaller leases were acquired in 2007. None of the currently defined mineral resources are located on any of the 25 smaller leases.

 

4.3Surface Rights

 

The surface rights to the Marquez property are owned and managed by the State of New Mexico’s Game and Fish Department. The rights were acquired by the state upon transfer from the Williams family in 1967. The Williams retained the mineral rights. The conveyance includes a provision to allow for exploration and development of minerals beneath the land surface.

 

At the Juan Tafoya project the various mineral lease holders also own their surface rights. The lease provides for the use of the land to the extent necessary for mine development and production. Certain payments are necessary depending on if lands are removed from agricultural or grazing use for the extent of the mine and recovery production.

 

The proposed mineral processing facility and tailings disposal cell would be located on the Juan Tafoya lease within the previously licensed footprint. Mining operations will, to the extent practical, selectively handle and sort the mined material returning the waste product to the mine as backfill for mined out areas. This is beneficial for mine safety as roof support in the mine and will also serve to minimize the amount of mine waste brough to the surface.

 

14

 

 

4.4Permitting

 

4.4.1Required Permits for Exploration

 

By way of Neutron Energy’s work on the Juan Tafoya lease, the Company holds a Subpart 4 Exploration Operation Permit (MK023ER-R4) issued by the State of New Mexico’s Energy, Minerals, and Natural Resources Department to conduct exploratory drilling on the Juan Tafoya property. The terms of the permit allow for drilling of 44 holes to depths of up to 2,500 feet. The Company has not yet undertaken any activities under the permit.

 

4.4.2Required Permits for Development

 

A right to mine permit is necessary, obtainable from the State of New Mexico Mining and Minerals Division of the Energy, Minerals and Natural Resources Department. A source materials license for the production and handling of radioactive materials is required from the U.S. Nuclear Regulatory Commission (NRC) if beneficiation, heap leaching, in-situ recovery, or milling occurs on site. This may also include mine material screening and sorting. If the mined material is transported off-site for mineral processing amendments to the existing facility source materials license may be required but a new source materials license would not.

 

Effective March 2016 the Energy, Minerals & Natural Resources Department Mining and Minerals Division issued “Guidance of Meeting Radiation Criteria Levels and Reclamation at New Uranium Mining Operations”, Title 19, Chapter 10, Part 3 and Part 6, New Mexico Administrative Code. These regulations reinforce the US NRC requirements for uranium mill tailings decommissioning and reclamation requirements and add new requirements for reclamation of uranium mine waste. Key requirements of the new regulations include:

 

“The goal of mitigating mine site radiation levels will be to reclaim all new mining disturbance to background radiation levels, while taking into account pre-mining conditions. This will require removing or burying and covering materials that have higher than background levels of radionuclides with a sufficient thickness of clean cover material, such that the radioactivity is suppressed. The type and quality of borrow material chosen for this will be a critical component of successful reclamation. The thickness of the material chosen will also be a critical component. Because of the long half-life of radioactive materials that may be found at the site, reclamation must take into account Best Management Practices to address erosion and stability. Cover material must be of sufficient thickness and texture to remain in place, and not allow for the re-exposure of buried TENORM material.” (NMED 2016)

 

15

 

 

Additional permits would include:

 

Exploration and well drilling (agency jurisdiction dependent on the land status)

 

Discharge and Storm Water Permits (New Mexico Environmental Department, NMED)

 

Archaeological Clearance (State of New Mexico Historical Preservation Office, and other agencies depending on land status)

 

Endangered Species (NMED and other agencies depending on land status)

 

Air Quality Permits (NMED)

 

Mine Dewatering Permit and Water Appropriations (State of New Mexico Engineer’s Office)

 

Other permits relative to land use, solid waste, rights-of-way, etc. depending upon the specific development plans.

 

4.5Environmental Liabilities

 

Although the Marquez-Juan Tafoya project included a partially developed uranium mine and mill facility constructed in the late 1970s and early 1980s, there was never any uranium production from either the mine or mill. As such, there are no known reclamation obligations related to historical activities, and no liabilities that belong to enCore. In that regard, the Company has not assumed any responsibility for reclamation of disturbances other than those generated by enCore.

 

4.6State and Local Taxes

 

In the State of New Mexico, three types of taxes are imposed on the value of produced minerals, including Conservation, Mineral Severance, and Resources Excise taxes. The taxes are as follows:

 

Conservation Tax

 

Uranium production in New Mexico is subject to a Conservation Tax. The taxable value of uranium is 25% of the difference between the taxable value defined under Section 7-25-3 NMSA 1978 and royalties paid or due any Indian tribe, Indian pueblo, or Indian that is a ward of the United States. The tax rate is 0.19% of the taxable value of the product sold.

 

(source: www.tax.newmexico.gov/2020/10/23/conservation-tax/).

 

Mineral Severance Tax

 

Uranium production in New Mexico is subject to a Mineral Severance Tax which is currently taxed at 3.5% of 50% of the taxable value of U308 produced. Currently the effective severance tax rate on uranium is 1.75% (Peach, et al., 2008).

 

16

 

 

Resources Excise Tax

 

The Resources Excise Tax was imposed in 1966 at a rate of 0.75% of the reasonable value of the severed or processed resource. There have been no significant changes since that time (Peach et al., 2008).

 

4.7Encumbrances and Risks

 

To the author’s knowledge there are no other forms of encumbrance to the Project. It is the author’s opinion that the risks associated with this project are similar in nature to other mining projects in general and uranium mining projects specially, i.e., risks common to mining projects include:

 

Future commodity demand and pricing,

 

Environmental and political acceptance of the project,

 

Variance in capital and operating costs, and

 

Risks associated with mineral resource estimates, including the risk of errors in assumptions or methodologies,

 

Mine and mineral processing recovery and dilution, and

 

Mineral leases are subject to renewal.

 

The project was granted both a Source Materials License from the US Nuclear Regulatory Commission and a mining permit from the State of New Mexico circa 1980. Thus, a variety of environmental baseline studies were completed and can be verified by current studies. However, environmental regulations have changed since the permits and licenses were issued in circa 1980 and recent public perception of uranium mining in the region has been negative despite local support. Specifically, the Project should anticipate, based on the experience of other proposed mines in the Grants Uranium District, some level of public opposition given its geographical location.

 

4.8Social and Community Relations

 

Past owners within the last decade completed a variety of environmental studies per the National Environmental Policy Act (NEPA) and engaged the lease holders and local communities and there is local support of the project (Carter, 2014).

 

The Fraser Institute Annual Survey of Mining Companies, 2020 ranks New Mexico as 10th out of 80 jurisdictions on their Policy Perception Index, which indicates a favorable perception by the mining industry towards New Mexico mining policies. On the Fraser survey the states of Idaho, Wyoming, Nevada, Utah, and Arizona rank higher than New Mexico (Fraser, 2020).

 

17

 

 

Figure 4.1 Ownership Map

 

  

18

 

 

5.0Accessibility, Climate, Local Resources, Infrastructure, and Physiography

 

5.1Access

 

The Property can be accessed from Interstate 40 at the town of Laguna. From Interstate 40 take Exit #114, approximately 45 miles west of Albuquerque, and 25 miles east of Grants, and go north 12 miles on State Highway 279 to the village of Seboyeta. In Seboyeta, turn right at the southern edge of town, continue on State Highway 279 east and northerly for 17 miles to the village of Marquez. From there the main area of the Project (common property boundary) is about two miles west of the village.

 

5.2Topography, Elevation, and Vegetation

 

The Project area is typical of the mesa and canyon topography of northwest New Mexico. The west side of the Project is dominated by Cañon de Marquez, one of several northwest-southeast trending canyons that have deeply incised the eastern flank of the Mount Taylor volcanic peak. Elevations range from 6,500 feet in the lowlands near the village of Marquez, to over 8,200 feet to the west atop the mesas.

 

Vegetation is subdivided into three sub-zones, based mostly on elevation: fir-aspen, piñon-juniper trees, and pine-oak-grasslands. Riparian flora of alder and maple populates the sparse stream bottoms. Fauna in the area includes important big game species of mule deer, elk, black bear, wild turkeys, doves/pigeons, and rabbits. Non-game species include rodents, lizards, and birds.

 

5.3Climate

 

The Property climate is semi-arid to arid and receives annual precipitation of 7-12 inches with most precipitation falling in the form of spring rains and late autumnal to early spring snows. The summer months are usually hot, dry, and clear except for infrequent, monsoonal rains. Because of the dry climate, all streams in the area are intermittent to low flow, fed by storm runoff and the occasional groundwater seep. Temperatures range from approximately 50 to 80°F in the summer season, and 10 to 40°F in the winter season.

 

19

 

 

5.4Property Infrastructure

 

Surface facilities constructed by Bokum Resources have been dismantled. Primary infrastructure included access roads, power, and water supply remain as discussed in Section 18. Two shafts (production, ventilation) were sunk by Bokum on the Juan Tafoya lease. Both shafts remain on site, covered by concrete slabs. Bokum also partially constructed a mill processing facility and associated tailings disposal cells. The mill facility and disposal cells were dismantled and reclaimed in the early 2000s. The only other remaining mining related infrastructure onsite are two water tanks, associated with the mill site.

 

5.5Land Use

 

The project is located on Spanish land grants. Historically and currently, the land is used for livestock grazing and limited crop development. Within the project area and vicinity natural resource exploration and development has occurred.

 

5.6Surface Rights and Local Resources

 

Surface rights vary depending on the leased property. The surface of the Marquez Property, controlled by the Williams Mineral Lease, is owned, and controlled by the State of New Mexico’s Department of Fish and Game. At the main Juan Tafoya lease (JTLC), and the other 25 smaller leases, the surfaces are owned and controlled by the individual lease holders.

 

The project area has sufficient surface resources to support underground mining and mill processing facilities, and mine waste and mill tailings disposal cells. There are adequate supplies of water, electricity, and fuel in the area. Two high voltage transmission lines are present 2 to 6 miles south of the Property, and an electric line was constructed to the sites of the former Bokum mill and shaft locations. Three water wells are on the JTLC property, with approximately 1,850 acre-feet of industrial water rights available (Carter, 2014).

 

Although there are no sources of goods and services in the immediate vicinity of the project, there are adequate supplies of equipment, services, and work force at the city of Grants, 30 miles to the southwest, and at Albuquerque, 50 miles southeast of the project.

 

20

 

 

6.0History

 

6.1History of the Marquez Property

 

Kerr McGee Corporation entered into a mineral lease agreement with the Williams family for the Marquez Property in the early 1970s. In 1973 exploration drilling began. In 1978, Kerr McGee sold a 50% interest in the project to the Tennessee Valley Authority (TVA). At that time, the joint venture proposed mining the uranium deposit by conventional underground methods, with recovery at Kerr McGee’s Ambrosia Lake mill facility. However, with the decrease in the uranium market price beginning in 1980, the project was eventually terminated and the property was returned to the mineral lease holder.

 

In 2007, Strathmore Minerals Corporation acquired a mineral lease to the Marquez property. Strathmore was subsequently acquired by Energy Fuels who sold the Marquez property to enCore in January 2016.

 

6.2History of the Juan Tafoya Property

 

In 1969, mineral leases were acquired in the Juan Tafoya area by Devilliers Nuclear who then began exploratory drilling. In the early 1970s Exxon acquired the rights to 25 small mineral leases, all within the boundary of the JTLC lease, and began exploratory drilling. In 1975, the JTLC lease was acquired from Devilliers by Bokum Resources Corporation, which subsequently acquired the Exxon mineral leases also. In 1976, Bokum entered into a uranium purchase agreement with Long Island Lighting Company, a New York-based utility.

 

At the main deposit, a 14-foot diameter shaft was sunk (construction ceased approximately 200 feet above the planned mine level), a 5-foot diameter ventilation shaft was sunk, and a mill processing facility and associated tailings disposal cells were constructed. However, with the decrease in the uranium market, eventually the surface facilities were dismantled without operating and the leases were returned to the mineral owners in the late 1980s.

 

In 2006-07, Neutron Energy acquired the mineral leases. In 2012, Neutron was acquired by Uranium Resources Inc (now Westwater Resources Inc. (Westwater)) and in September 2020, enCore Energy announced the purchase of Westwater’s US uranium assets, including the mineral leases to the Juan Tafoya properties. The purchase was completed on December 31, 2020. enCore has yet to explore on the property.

 

21

 

 

6.3Previous Mineral Resource Estimates

 

Historical mineral resource estimates for the Marquez and Juan Tafoya uranium deposits are available from several sources. These estimates were prepared by Kerr McGee in 1977 and Strathmore in 2010 for the Marquez portion of the project, and Bokum in 1979 and Westwater (Carter 2014) for Juan Tafoya. The 2010 historical mineral resource estimate for Marquez and the 2014 mineral resource estimate for Juan Tafoya are discussed on enCore’s web site.

 

(https://www.enCoreenergycorp.com/projects/juan-tafoya-marquez/).

 

Although at the time of issuance these reports were completed under 43-101 guidance, under “Rules and Policies” of NI 43-101 Standards of Disclosure the mineral resource estimates must be reported as Historical Mineral Resource Estimates. A qualified person has not done sufficient work for enCore to classify the historical estimates as current mineral resource estimates. The Company does not treat these historical estimates as current mineral resource estimates, and the estimates should not be relied upon. The current mineral resource estimate for the Project is described in Section 14 of this Report.

 

Within the Juan Tafoya mineral lease there is an additional area of mineralization defined by past drilling. This area is referred to as the Southeast Deposit (Carter, 2014). This area was not evaluated as part of the PEA as it is approximately 1 mile from the Marquez and Juan Tafoya mineralization and would require separate infrastructure, including a mine shaft, if the mineralization were exploited via conventional underground mining. (Refer to Figure 6.1). Carter, 2014 estimated an inferred mineral resource of 687,500 tons containing 1,900,000 pounds of uranium at an average grade of 0.138 %eU3O8, at a cutoff of 0.08 %eU3O8 for the Southeast Deposit.

 

enCore considers these mineral resource estimates as historical estimates. A qualified person has not done sufficient work for enCore to classify the historical estimates as current mineral resource estimates. The Company does not treat these historical estimate as current mineral resource estimates, and the estimates should not be relied upon.

 

6.4Past Production

 

There has been no mineral production from either the Marquez or Juan Tafoya property.

 

22

 

 

Figure 6.1 Southeast Deposit Location

 

 

From Carter, 2014

 

23

 

 

7.0Geological Setting and Mineralization

 

7.1Regional Geological Setting

 

The Project is located in the Grants Mineral Belt, on the Chaco Slope, which forms the southern flank of the San Juan Basin of northwestern New Mexico. The mineral belt extends for several miles from east of the town of Laguna westerly to the Gallup area, a length of over 100 miles, and is about 25 miles wide. The region includes the Laguna (includes Marquez-Juan Tafoya), Ambrosia Lake, Crownpoint, and Church Rock uranium districts. The Property is located in the eastern part of the mineral belt, on strike with the main mining district of Ambrosia Lake about 25 miles to the west (Figure 7-1).

 

The Late Jurassic Morrison Formation members, including the Westwater Canyon, make up a major alluvial fan/plain system formed of continental, fluviatile deposits by mostly aggrading braided stream channels flowing in an easterly direction from their highland sources south of Gallup. These deposits consist mostly of a sequence of interbedded sandstone, claystone, or mudstone with minor limestone and conglomerate (Livingston, 1980; Turner-Peterson, 1986; Sandford, 1992).

 

Regionally the Morrison Formation consists of three members which, in ascending order, are the Recapture, Westwater, and Brushy Basin (See Figure 7-1). A fourth member, the overlying Jackpile sandstone, is present at the site but does not occur at all areas across the Grants mineral belt. The lower two members start as conglomerates along the southwestern edges of the Grants area, and, gradually, change to sandstones and eventually mudstones in the recognizable areas to the north in the San Juan Basin. The Brushy Basin is largely a lenticular body of bentonitic claystone with minor sandstone and limestone.

 

The Morrison Formation member of economic importance in most of the Grants Mineral Belt, including the Marquez-Juan Tafoya area, is the Westwater Canyon sandstone. The Westwater Canyon is 50 to 300 feet thick in the Grants Mineral Belt. Generally, the larger mineral deposits such as Marquez-Juan Tafoya tend to occur in the thicker sand units.

 

24

 

 

Figure 7.1, Geology Map

 

 

25

 

 

7.2Local Geology and Property Geology

 

7.2.1Structure

 

The geologic structure in the Project area is related to the Acoma Sag and Puerco fault system, both generally located south and southwest of the property (Kelley, 1960). Folding related to the Acoma Sag and movement along the Puerco fault system resulted in generally north-trending joints and fault sets. One such fault dropped a portion of the Marquez deposit 90 feet relative to the remainder of the deposit to the east. Generally, the host formation is flat lying dipping westward at 1-3°.

 

7.2.2Stratigraphy

 

The surficial geology of the Project area is dominated by continental and marine sediments of Upper Cretaceous age, including (in ascending order) the Gallup Sandstone, Dilco Coal member of the Crevasse Canyon Formation, the Dalton Sandstone and Mulatto Tongue members of the Mancos Shale, the Gibson Coal member of the Crevasse Canyon Formation, and the Point Lookout Sandstone (Dillinger, 1990). The floor of the Cañon de Marquez, the primary topographic feature that covers much of the project area, is comprised of the Mancos Shale and Gallup Sandstone. Exposures of the Crevasse Canyon and Point Lookout sandstones are limited to the canyon walls and mesas, where they form steep cliffs and prominent mesas. At depth below the Mancos Shale are the Dakota Sandstone, and the Jackpile, Brushy Basin, Westwater Canyon, and Recapture members of the Morrison Formation (Livingston, 1980; Turner-Peterson, 1986).

 

Figure 7.2 is a typical geophysical log (Hole MAR-382C) for the project showing the local stratigraphic section and host formation. The hole was collared in the Cretaceous Mancos Shale Formation and terminated in the Recapture Member of the Morrison Formation. The host of uranium mineralization locally is Westwater Canyon Member of the Morrison Formation. A brief description of the local stratigraphy follows:

 

Mancos Shale (Cretaceous). Mostly dark gray, fissile shale containing minor thin beds of light brown sandstone.

 

Dakota Sandstone (Cretaceous). Pale brown to light gray, well cemented sandstone in lenticular beds interbedded with minor amounts of dark gray shale; lower part is coarse grained, and commonly has quartz pebble conglomerate at the base. The Dakota sandstone lies in unconformable contact with the underlying Morrison Formation.

 

26

 

 

Morrison Formation (Jurassic)

 

oJackpile Sandstone Member. A fine- to medium-grained, white to light gray, kaolinitic, feldspathic sandstone. Obtains a maximum of 107 feet thick at the Project area.

 

oBrushy Basin Member. Pale, greenish gray claystone to fine-grained sandy claystone. Locally inter-tongues with the underlying Westwater Canyon member. The Brushy Basin is approximately 140 thick at the Project area.

 

oWestwater Canyon Member. Composed of mostly pale yellow to reddish gray, fine to medium-grained cross bedded arkosic-rich sandstones and interbedded shale. A pervasive shale layer (informally termed the K shale) separates the upper sands from the lower sands. The uranium mineralization is confined to the sand layers, which are informally subdivided at the Property into four sandstone units: A, B, C, and D (in descending order). Individual sand units are on the order of tens of feet thick. Overall, the member varies from 239 to 328 feet thick in the Project area.

 

oRecapture Member. A green to greenish gray, and maroon to brown, interbedded mudstone, claystone, siltstone, and sandstone. The Recapture is approximately l00 feet thick in the Project area.

 

27

 

 

Figure 7.2 - Type Log

 

 

 

FIGURE 7.2 TYPE LOG OF DRILL HOLE MAR-382C

 

28

 

 

8.0Deposit Types

 

8.1Mineralization in the Grants Mineral Belt

 

Uranium mineralization in the Grants Mineral Belt of New Mexico is sandstone-hosted as defined in the “World Distribution of Uranium Deposits (UDEPO) with Uranium Deposit Classification”, (IAEA, 2009). Regionally mineralization is termed primary or re-distributed based on the character and morphology of the mineralization. Re-distributed mineralization is typically roll front type. Primary deposits are typically tabular and range in size from small pods a few feet in width and length to bodies several tens of feet thick, several hundred feet wide and several thousand feet long. The deposits tend to occur in clusters and many form distinct trends that are parallel to the sedimentary trend (Fitch, 1980; Turner-Peterson, 1986; Sandford, 1992).

 

Uranium occurs mostly as coffinite and uraninite in tabular primary mineralization, and mostly as uraninite in C-shaped or roll fronts in the redistributed mineralization. Primary mineralization is generally associated with finely disseminated carbon and indistinct organic matter, known as humates. Humates are presumed to have formed from the breakdown and dissolving of vegetal matter and redeposition in the mineralized zones. The redistributed mineralization is typically primary mineralization that has been redissolved and moved farther down dip and redeposited in the form of C-shaped roll fronts. Mineralization occurs in stream channel bottoms and margins in straight channels and feeder channels, meanders, and overflow areas. Pyrite and jordisite (black, soft molybdenum mineral, MoS2) are frequently associated minerals in the arkosic sandstone host rock. The mineralization is found as coating on the sand grains and as filling in the interstices between grains. The interstices are also filled with very-fine kaolin and calcium carbonate. The humates and jordisite, when present, give the mineralized rocks their dark gray to black color.

 

8.2Uranium Mineralization at the Project

 

The mineralized host within the project is primarily hosted in the lower two sand units, Sands C and D, of the Westwater Canyon member of the Jurassic Morrison Formation. Lessor mineralization is present in Sand B but was not well enough defined for inclusion in the current mineral resource estimate. The mineralization occurs mostly as tabular primary deposits (Livingston, 1980) with lesser amounts as roll fronts. Much of the mineralization is associated with disseminated carbon matter (humates), especially the tabular type of mineralization.

 

29

 

 

9.0Exploration

 

enCore Energy has not performed any exploration activities or drilling on the Marquez-Juan Tafoya property; all the data used to define the mineralization is historical in nature (refer Sections 6 and 10).

 

Historically exploration activities included ground and aerial radiometric reconnaissance survey and geological mapping programs. Mineralization at the project is at depth and was discovered by drilling subsequent to the area being defined as prospective by the previous owners.

 

10.0Drilling

 

enCore Energy has not carried out any drilling at the Project. The following discussion describes the details of the pre-1990 drilling programs.

 

10.1Drilling Methods and Data

 

Most of the exploratory and development drilling on the project was conducted by either Kerr McGee or Bokum Resources. When the drilling programs were being conducted the property, ownership was split between these former operators. Records indicate that on the Marquez property Kerr McGee drilled at least 358 holes for 865,940 feet. On the Juan Tafoya property Bokum (with Devilliers and Exxon) drilled at least 568 holes for 1,023,200 feet.

 

For this report, 604 drill holes were completed in the area of interest. These drill hole locations are shown on Figure 10.1, Drill Hole Map. From the total 604 drill holes, 192 and 337 mineralized incepts were used for the mineral resource estimates, for the “C” and “D” sands, respectively.

 

All of the drill holes were vertical and were completed by truck-mounted rotary drill rigs. Upon completion the holes were logged with a geophysical tool that recorded spontaneous potential, resistivity, and natural gamma. The holes were also logged to determine the extent and direction of drift which is the variance for vertical affecting the special location of mineralization relative to the collar location of the drill hole. Mineral resource estimates herein used the spatial location of the mineralized zones at depth based on the downhole drift surveys.

 

Figures 10.2 and 10.3 show representative cross sections of the mineralization along and across the mineralized trend.

 

30

 

 

Figure 10.1 – Drill Hole Map

 

 

 

31

 

 

Figure 10.2 – Cross Section A-A’

 

 

32

 

 

Figure 10.2 – Cross Section B-B’

 

 

33

 

 

11.0Sample Preparation, Analyses, and Security

 

The principal tool for determining uranium grades encountered by exploration and development drill holes is the gamma-ray log, a geophysical surveying technique that was, and remains the standard in-place assaying method utilized by the global uranium industry. Equivalent uranium grades (% eU3O8), which are radiometric assays, were and are calculated from gamma ray logs using grade determination methodologies that are standard in the uranium mining industry. Additional data include limited chemical assays of cored intervals of the uranium mineralization.

 

11.1Radiometric Equivalent Geophysical Log Calibration

 

DOE supports the development, standardization, and maintenance of calibration facilities for environmental radiation sensors. Radiation standards at the facilities are primarily used to calibrate portable surface gamma-ray survey meters and borehole logging instruments used for uranium and other mineral exploration and remedial action measurements. This is an important quality control measure used by the geophysical logging equipment operators. The author has reviewed the geophysical logs and they have annotation of the calibration parameters necessary for the accurate conversion of gamma measurements recorded by the logging units to radiometric equivalent uranium grade. enCore owns all the original drill data for both the Juan Tafoya and Marquez project areas. This information includes geophysical logs, digital readouts of counts per second by ½ foot intervals, lithological logs, and downhole drift surveys as pictured below.

 

34

 

 

 

 

The geophysical logs generally consist of recordings of natural gamma, self-potential, and resistivity. Self-potential and resistivity data are useful in defining bedding boundaries and for correlation of sandstone units and mineralized zones between drill holes.

 

Calibration facilities for natural gamma logging are located at DOE sites at Grand Junction Regional Airport in Grand Junction, Colorado; Grants, New Mexico; Casper, Wyoming; and George West, Texas (https://energy.gov/lm/services/calibration-facilities). These calibration facilities were first established by the US Atomic Energy commission (AEC) in the 1950’s to support the domestic uranium exploration and development programs of that era. The header information for the geophysical logs provides the calibration data and date of calibration.

 

Calibration procedures and standards for the geophysical logging equipment used in the determination of radiometric equivalent uranium grade has been consistent through the various drilling campaigns and has relied on calibration facilities maintain by the US government. It is standard practice for geophysical logging companies to rely on these calibration facilities. These models consist of a barren zone bored in concrete and a mineralized zone constructed of a homogenous concentration of uranium at a known grade followed by and underlying barren zone. There are different grade models to reflect the range on uranium concentrations typically found in the US. In addition, the models can be flooded to determine a water factor and there are models which are cased for the determination of a casing factor. Each of the models are approximately 9 feet deep consisting a 3-foot mineralized zone with 3-foot barren zones above and below. The facilities are secure. Logging unit operators logs the holes, provide the geophysical log data in counts per second (cps) to the facility which in turn processes the data and provides the company with standard calibration values including dead time, K Factor, and water and casing factors (Century, 1975).

 

35

 

 

11.2Drilling Analyses

 

Radiometric equivalent U3O8 content was calculated from gamma logs using industry-standard methods developed by the Atomic Energy Commission (now the DOE: Department of Energy), using either manual or computer methods.

 

The AEC has published information on the calibration standards for geophysical logging and on gamma log interpretation methods (Dodd and Droullard, 1967). The standard manual log interpretation method was the half-amplitude method (Century, 1975). The AEC and its successor agency the Energy Research and Development Administration (ERDA) conducted workshops on gamma-ray logging techniques and interpretation as did private companies including Century Geophysical. The author attended the geophysical log interpretation workshop conducted by Century Geophysical and on November 19, 1976 received certification in geophysical log interpretation from Century after completing their short course. The author has continued to use these techniques where appropriate along with modern scanning and digitizing methods for the preservation and interpretation of geophysical logs.

 

11.3Security

 

The original drill data is currently in the possession of enCore. Drill cutting samples and core samples were generally not preserved. In addition to the physical logs enCore has scanned and digitized logs for most of the data.

 

11.4Radiometric Equilibrium

 

Natural uranium is primarily composed of U238, with U235 comprising only about 0.71% of the total. While both uranium isotopes are subject to radioactive decay and produce a series of daughter products, the gamma logging tool indirectly measures only the concentration of total uranium (expressed as eU3O8) based on the intensity of gamma radiation produced by the decay of daughter products of U235, rather than U235 itself. When all the decay products are maintained in close association with the primary uranium mineralization for the order of about seven hundred thousand years or more, the daughter products will be in equilibrium with the parent U235.Disequilibrium occurs when one or more decay products are dispersed as a result of differences in solubility between uranium and its daughter products. This can be an issue in areas of near-surface recharge of oxidizing, groundwater fluids.

 

Disequilibrium is considered positive when there is a higher proportion of uranium present compared to daughters and negative where daughters are accumulated, and uranium is depleted. The disequilibrium factor (DEF) is determined by comparing the assayed chemical uranium grade to the radiometric equivalent uranium grade. Radiometric equilibrium is represented by a DEF of 1, positive radiometric equilibrium by a factor greater than 1, and negative radiometric equilibrium by a factor of less than 1.

 

Chemical data suggest the Marquez-Juan Tafoya mineralization is enriched in respect to the gamma data. An analysis of disequilibrium for the Juan Tafoya portion of the project was completed by Broad Oak Associates in 2014. The report states that comparison of chemical and radiometric assays show a strong general trend of individual samples, in all grade ranges, to have higher chemical assays than the corresponding radiometric assays (Carter, 2014). Disequilibrium studies completed in 1979 and 1982 which showed DEF factors ranging from 1.23 to 1.28 and

1.17 to 1.31, respectively, on the Marquez portion of the project were cited by Alief, 2010.

 

Although some of the chemical data cited in previous reports were available, original laboratory certificates were generally not available. In addition, the core holes were generally completed in areas on strong mineralization and thus may not be representative of the deposit in total. For these reasons, the author elected not to apply a positive DEF factor and assumed that the mineralization was in radiometric equilibrium. Thus, a DEF of 1.0 was utilized for the mineral resource estimate.

 

36

 

 

12.0Data Verification

 

Most of the exploratory and development drilling on the project was conducted by either Kerr McGee or Bokum Resources. When the drilling programs were being conducted the project there was split ownership of the project between these former operators. Records indicate that on the Marquez property Kerr McGee drilled at least 358 holes for 865,940 feet. On the Juan Tafoya property Bokum (with Devilliers and Exxon) drilled at least 568 holes for 1,023,200 feet.

 

For this report, 604 drill holes were completed in the area of interest. These drill hole locations are shown on Figure 10.1, Drill Hole Map. From the total 604 drill holes, 192 and 337 mineralized incepts were used for the mineral resource estimates, for the “C” and “D” sands, respectively.

 

12.1Verification of Radiometric Drill Data

 

Original geophysical and lithological logs are in possession of enCore. Electronic scans of the drill data for Marquez and original data for Juan Tafoya were provided by enCore. Geophysical logs for every drill hole used in the mineral resource estimate was inspected and interpreted. This included geological correlation and interpretations to separate the mineralized zones by horizon. The C and D horizons contained mineralization of sufficient thickness, grade and continuity for mineral resource estimation. Mineralization in other horizons and within the C and D horizon which was not of sufficient thickness and grade or was isolated from the principal areas of mineralization was excluded from the mineral resource estimate.

 

All drill logs used in the mineral resource estimation contained header information including K Factor, Dead Time, and Water Factor necessary for determination of radiometric equivalent uranium concentration.

 

12.2Verification of Radiometric Drill Data

 

For verification purposes, 46 of the 604 drill holes use in the mineral resource estimate were selected representing the range of mineralization observed. The Author re-calculated the mineralized intercepts using the manual log interpretation methods prescribed by the US AEC and others for each drill holes to verify the original log interpretation. Mineralization in the verification drill holes ranged from a high GT value of 4.27 to a low value of 0.15.

 

Verification by the Author confirmed that the drill hole database reasonably reflects the depth, thickness and radiometric equivalent uranium grade from the original geophysical logs. The only discrepancy noted was the omission of isolated mineralized intercepts of lower grade and thickness which were not included in the database, which the author concurs with.

 

Re-calculation by the Author of 46 drill holes shows the original interpretation of radiometric equivalent uranium grade is approximately 2% less the re-calculated values. Figure 12.1 is a comparison of the drill hole database values to those re-calculated by the Author using the standard half-amplitude log interpolation method.

 

37

 

 

Figure 12.1 - Database Comparison

 

 

 

Note: Average Factor: Current Interpretation 2% Higher than Historic Interpretation.

Range of lndividual Intercept Factors: 0.771 to 1.183
Linear Regression: Slope 0.994, Intercept 0.026

 

12.3Verification of Chemical Data

 

No core samples are available for inspection or assay.

 

38

 

 

12.4Disequilibrium Factor

 

As discussed in Section 11 of this report, a positive disequilibrium factor is stated in historic reports (Alief, 2010 and Carter, 2014) which if applied would increase the estimated average grade and contained pounds. Although some of the chemical data cited in previous reports were available, original laboratory certificates were generally not available. In addition, the core holes were generally completed in areas on strong mineralization and thus may not be representative of the deposit in total. For these reasons, the author elected to assume that the mineralization was in radiometric equilibrium, and no positive factor was applied. A DEF of 1.0 was utilized for the mineral resource estimate as a conservative measure.

 

12.1Density

 

Bulk density data is available for the Project from previous technical reports and studies completed by Kerr McGee and Bokum, resulting in 15 cubic feet per ton (ft3/ton) for the mineralized, host sandstone. This was the typical tonnage factor used by the mining companies across the greater Grants uranium district. The author recommends a density factor of 15 ft3/ton be used for all mineral resource estimations, based on available data and personal mining experience in similar sandstone-hosted deposits.

 

12.2Downhole Deviation

 

All historical drilling on the Project was completed vertically. Downhole drift data were available for all of the drill holes used in the mineral resource estimate. Downhole drift calculations were re-calculated and the spatial location (X, Y, Z) at the base of the mineralized horizons was use in the mineral resource calculations.

 

The dip of the formation is relatively flat, 1-3° to the west. Assuming the combination of formational dip and deviation from vertical in the drill hole was 4 degrees, the ½ foot intervals to which the equivalent grade of mineralization are calculated would have a true thickness of 0.4988 rater than 0.50. this variance is far less than the accuracy to which the geophysical logs can be interpreted and would not affect the mineral resource estimation.

 

39

 

 

13.0Mineral Processing and Metallurgical Testing

 

13.1INTRODUCTION

 

In 1977 and 1978, comprehensive laboratory investigations of a 3-zone composite of the Marquez Canyon resource and a separate sample of core from a nearby resource identified as MAR-241-B- C were conducted by Hazen Research, Inc., Golden, CO (“Hazen”), for Bokum Resources Corporation. All tests were conducted with water from the Bokum shaft. This work was coordinated by A. H. Ross & Associates, Toronto, Ontario (“Ross”). A concurrent evaluation of the process design criteria established by the Hazen program was carried out by Ross, who prepared a flowsheet and an estimate of capital and operating costs that served adequately as the foundation for detailed engineering and plant design. During the 1970s, the combination of Hazen and Ross was considered the gold standard for uranium process development and led to the construction and commercialization of a large number of uranium mills.

 

In 1982, Kerr-McGee Corporation’s Technology Centera conducted a fairly comprehensive laboratory leaching investigation (agitated and in-situ), and a separate analysis by Kerr-McGee Nuclear Corporation focused on the economic potential for in-situ leaching of the Marquez Canyon resource. Both laboratory-scale metallurgical testing programs are discussed in the following sections. Since the Ross evaluation pertained specifically to continuous processing considerations and plant equipment selection, it is discussed in Section 17 of this report.

 

 

a Robertson, W. J., and Shaw, R. C., “Marquez Uranium Ore Characterization-Interim Report”, Kerr-McGee Corporation Technical Center, June 30, 1982.

 

40

 

 

13.2SUMMARY OF PRIOR LABORATORY TESTING

 

The first Hazen laboratory studyb explored the response of the resource to conventional (established industry practice) agitated leaching with sulfuric acid and an oxidant to produce a pregnant leach solution (“PLS”). Leaching was followed by residue washing in countercurrent decantation (“CCD”) thickeners, solvent extraction (“SX”) for purification and concentration of the PLS, and yellow cake precipitation from the SX strip liquor. During leaching, slurry samples were taken at intervals to gauge reaction kinetics. Variables included fineness of grind, acid addition (free acid concentration), oxidant type and addition (emf), and leaching temperature. A 51-pound master composite for the leaching and SX tests was prepared, representing the three mineralized zones in the proportions and grades shown in Table 13.1.

 

Table 13.1, Master Composite

 

ZONE    
Blue   14.2 0.075
237-B-C 1820-1852.5 7.20  
Green 150-B-C 1963-1976.5 6.30     0.12
  239-B-C 2017.5 -2045.5 17.6     0.12
  219-B-C 1956-1968.5 5.00     0.27
  Subtotal/Average   28.90 56.8 0.146
Red 238-B-C 1939-1976 6.89     0.075
  240-B-C 1860-1902.5 7.86     0.082
  Subtotal/Average   14.75 29.0 0.079
  Total/Average   50.85   100.0 0.116

 

 

b Coltrinari, E. L., “Uranium Recovery from Marquez Canyon Ore by Acid Leach and Solvent Extraction”, HRI Project No. 4287, August 31, 1977.

 

41

 

 

 

Separate composites of each ore zone were also prepared, as summarized in Table 13.2, to evaluate the metallurgical variability of the three zones. Note that the weights and assays in Table 13.2 differ slightly from those in Table 13.1, possibly reflecting some variability between split core fragments from the same footage interval.

 

Table 13.2, Zone Composites

 

ZONE    
Blue   0.073
237-B-C   1820-1852.5 100.0
Green 150-B-C   1963-1976.5 21.5  
  239-B-C   2017.5-2045.5 61.4  
  219-B-C   1956-1968.5 17.1  
        100.0 0.138
Red 238-B-C   1939-1976 46.3  
  240-B-C   1860-1902 53.7  
  Total/Average 100.0 0.075

 

The first (1977) Hazen laboratory program concluded that the master composite and individual zone composites responded well to agitated 2-stage leaching with sulfuric acid at an elevated temperature and with either sodium chlorate or manganese dioxide as the oxidant. This work established near-optimum conditions, within the limitations of extrapolating laboratory data to commercial plant performance. For instance, the temperatures tested were 50°C and 80°C. Recommendations included a minus 28-mesh grind, 80 grams per liter of H2SO4, 10 lb/ton NaClO3, 50°C, and 12 hours retention time. These conditions yielded 98.0-98.2 percent uranium extraction with 87-114 lb/ton acid consumption for the master composite, but tests on individual zone composites resulted in respective uranium extractions and acid consumptions as follows: Blue, 88% and 65 lb/ton; Red, 98% and 92 lb/ton; and Green, 98% and 111 lb/ton. Residues from the composites assayed 0.0020-0.0022 % U3O8. (Note that uranium recovery is somewhat lower than uranium extraction, as will be discussed in Section 13.3.8.)

 

Purification and concentration of the PLS was accomplished by SX. The loaded organic phase was then stripped with an acidic solution of sodium chloride and ammonium chloride. This solution was treated with ammonium hydroxide at pH 7.4-7.6 and 60-63°C to precipitate yellow cake, an ammonium diuranate-uranium hydrate compound. The precipitate was thickened, and ammonium sulfate was added to the thickened slurry to enable removal of sodium (as NaCl) by washing and re-thickening prior to de-watering and drying. The yellow cake met commercial specifications required at the time by Allied Chemical and Kerr-McGee for conversion to uranium hexafluoride, UF6.

 

However, a stabilized third-phase emulsion, or scum (currently called “crud”), consisting of a phosphomolybdate-amine species, formed during stripping of uranium from the loaded Alamine 336 extractant with the acidic chloride solution. This indicated the potential for operating problems in a commercial SX circuit and prompted Ross to recommend additional testing.

 

Accordingly, Hazen conducted a second studyc in 1978 using a small continuous SX “mini-plant” to simulate conditions expected in the planned commercial facility. The objectives were (1) to establish a procedure for controlling formation and accumulation of the stable emulsion, and (2) to confirm that a high-purity yellow cake could be produced. The only element that approached a specification limit at the time was molybdenum at 0.079% Mo and 0.087% Mo versus limits of 0.100% Mo for both Kerr-McGee and Allied Chemical. The author understands that the specifications imposed by current converters of yellow cake, Cameco and ConverDyn, are essentially the same or only slightly more stringent as those for Kerr-McGee and Allied.

 

 

c Coltrinari, E. L., “Uranium Recovery from Marquez Canyon Ore by Acid Leach and Solvent Extraction”, HRI Project No. 4468, October 6, 1978.

 

42

 

 

The uranium and accessory minerals were not thoroughly characterized by Hazen, but a limited amount of work was reported as follows by the Kerr-McGee Technical Centerd:

 

“Mineralogically, the composite consisted primarily of rounded quartz, rounded and altered feldspar grains, and clay. Many of the quartz and feldspar grains are cemented in agglomerates with the clay. Calcite is a minor constituent along with small amounts of zircon, pyrite, coal, a diopside-type mineral, and agglomerates of an asphaltic-appearing constituent containing quartz and feldspar grains.

 

An autoradiograph of the asphaltic conglomerates showed them to be radioactive but no X-ray diffraction pattern other than quartz was obtained. However, the material could contain coffinite which is often amorphous and gives no pattern.

 

A second coal-like sample gave a uraninite pattern, and a similar sample separated by heavy liquids assayed 0.8% U3O8.

 

The natural grain size is mostly 48-mesh with some 28-mesh.”

 

It is important to note that the study by Robertson and Shaw for Kerr-McGee applied some sophisticated analytical techniques to the hydrocarbon constituent observed by Hazen and revealed a possible cause of the refractory response of the uranium in the Marquez samples to standard agitated acid leaching conditions. The preliminary conclusion was that the organic carbon responsible for the problem is “younger”, i.e., higher in volatile content, than the organic material that usually accompanies tractable uranium mineralization. Actually, there may be several issues at play, since the uranium in the leach residues could have been coffinite, U(SiO4)1-x(OH)4x, which is sometimes refractory in its own right.

 

 

d Robertson, W. J., and Shaw, R. C., “Marquez Uranium Ore Characterization, Interim Report”, Kerr-McGee Corporation Technical Center

 

43

 

 

13.3PROCESSING OPTIONS and RECOVERY ESTIMATES

 

13.3.1Underground Crushing, Screening, and Sorting

 

The resource will be saturated with hot water at approximately 100°F (38°C) and proposed upgrading of the mineralized rock by radiometric sorting will require 2-stage crushing to a nominal fragment top-size of 2 to 2½ inches (50-64 mm). This will create a significant quantity of fine particles (“slimes”) that probably will be higher in uranium grade than the resource average. Recovery of this uranium and management of the solid residue will require pumping a slurry to the surface, leaching with sulfuric acid, and treatment of the resulting pregnant solution. Operationally, it would make sense to add the dust collection scrubber discharge slurry to the shaft sump along with the slimes stream. We have assumed that the combined uranium-bearing slurry will be collected in the sump, that a low-head sump pump will feed high-pressure slurry pumps, and that the slurry will be delivered to a thickener on the surface.

 

Regardless of the leaching option eventually selected for the project, we have assumed that the thickened slurry from the shaft sump will be leached with sulfuric acid and sodium chlorate at about pH 1.5. This could be done by adding the slurry to heap feed as it traverses a conveyor, or by combining the slurry with rod mill discharge for subsequent agitated leaching.

 

Since acid leaching of the uranium minerals will be enhanced by elevated solution temperature, the hot mine water will be a valuable asset, reducing significantly the amount of solution heating that would otherwise be required to achieve the optimum leaching temperature of 50°C (122°F).

 

We have no information on uranium grade as a function of rock fragment size at coarser sizes, e.g., above 2 inches mean diameter, but it is generally true that screening alone will result in a significant grade difference, with the coarser fragments having a lower uranium assay. Lacking this information specific to the Marquez Canyon resource, we have relied on our experience with other projects, suggesting that a significant fraction of the mined weight can be removed and left underground as backfill. We will use these assumptions to provide an understanding of cost and revenue effects, pending results of screening tests if a decision is made to explore this option. Our primary objective in taking this approach is to minimize the tonnage of ore that must be hoisted and treated. This in turn will minimize sulfuric acid usage, gypsum formation, tailings generation and disposal, and the volumetric requirements for evaporation and disposal of a process bleed stream.

 

44

 

 

The first commercial installation of radiometric sorting was at Cotter Corporation’s underground Schwartzwalder Mine in Coal Creek Canyon west of Golden, CO, around 1970. Many installations followed globally, including conveyor belt, loader bucket, and overhead truck scanners. However, separation efficiency can only be confirmed by testing. The most reliable tests require large (20-50 ton) bulk samples at a supplier’s facility, but laboratory screening and assaying can provide useful guidance.

 

The first commercial installation of radiometric sorting was at Cotter Corporation’s underground Schwartzwalder Mine in Coal Creek Canyon west of Golden, CO, around 1970. Many installations followed globally, including conveyor belt, loader bucket, and overhead truck scanners. However, separation efficiency can only be confirmed by testing. The most reliable tests require large (20-50 ton) bulk samples at a supplier’s facility, but laboratory screening and assaying can provide useful guidance.

 

Depending on the nature of the screening and sorting method(s) employed on this project, NRC may require the process to be included within the source materials licensing for the mill.

 

Based on recent experience on a North African project, we are assuming that the feed would be screened in the size range minus 2½-inch plus I-inch and that there would be a 30 percent weight rejection with a loss of 5 percent of the uranium, for a net mill feed grade increase from 0.120% U3O8 to about 0.16% U3O8. Screening alone would lead to unwanted rejection of coarse high-grade fragments, whereas radiometric sorting is more selective and will accommodate a potential coarse high-grade size fraction. Because sorting is inefficient on sizes smaller than I-inch, it may be preferable to crush to a larger (>2½-inch) top-size, while combining the sorter concentrate with screen undersize. The installed cost and higher operating costs of sorting could then be partially offset by elimination of a secondary crusher.

 

13.3.2Treatment of Ore Slimes from Underground Mine Water

 

As mentioned above in Sub-Section 13.3.1, slimes liberated during crushing and screening of the mineralized rock will provisionally be combined with the dilute (approximately 5 percent solids by weight) slurry from the underground dust collection venturi scrubber and pumped to the surface. A small conventional thickener will densify the slimes to about 35-50 percent solids, and the slimes will be pumped to heap or conventional agitated leaching. The relatively clear thickener overflow will be added to the process water storage tank.

 

13.3.3Heap Leaching with Sulfuric Acid

 

The metallurgical feasibility of heap leaching is traditionally assessed by conducting tests in a vertical column, usually made of a transparent plastic. A crushed sample is contacted by a downward flow of leaching solution applied at a low flowrate, typically 0.005 US gallons per minute per square foot of cross-sectional area (0.203 liters/minute/square meter) of the column. This is the usual application rate for a commercial heap, so scale-up is simplified. However, the Hazen and Kerr-McGee laboratory programs were conducted before heap leaching had become popular, so we have no relevant information.

 

Nonetheless, heap leaching of low-grade uranium ores was done commercially during the 1960’s and 1970’s and it has become such a common practice in treating oxidized ores of gold and copper that we can make some realistic assumptions.

 

45

 

 

13.3.4Agitated Acid Leaching and Tailings Impoundment

 

At the time of the Hazen laboratory programs, nearly all uranium ores across the globe were being treated by agitated leaching, either with sulfuric acid or with alkaline carbonate solutions, in the case of ores with high calcite content that caused excessive acid consumption. The Hazen laboratory programs assessed sample response to standard agitated acid leaching practice and the Ross engineering evaluation confirmed suitability of that technology. This form of leaching generally has higher capital and operating costs than heap leaching, but will inevitably provide higher uranium extraction and recovery due to a number of factors that include (1) finer particle size distribution, allowing quick and complete access of solution to the uranium mineral, (2) the ability to operate at elevated temperature, ensuring faster reaction kinetics and maximum terminal extraction, and (3) avoidance of the various solution contact obstacles caused by heap construction and solution distribution.

 

However, there are downsides to agitated leaching in addition to higher costs: (1) operation with relatively high free acid concentration may cause increased mobilization of undesirable impurities; (2) the higher free acid concentration increases the eventual cost of tailings neutralization; and (3) the fine leached residue must be placed in a lined impoundment with monitoring wells and a requirement for perpetual management.

 

In response to the client’s request and supplied with very solid laboratory data from Hazen, Ross designed a conventional 2,000 short ton per day (tpd) mill with a safety-factored design capacity of 2,192 tpd. The mill and its infrastructure were built during 1978 and 1979, were never operated, and were dismantled around 1992. In order to reduce sulfuric acid consumption, and consistent with the Hazen work, leaching was to be done in two stages at 50°C (122°F) and 55 percent solids with an interstage thickener and 12 hours total residence time in the leach tanks. We have deviated from this design by recommending a single-stage leach with the same temperature and slurry density, but with 20 hours residence time. This should yield the same uranium extraction with only slightly higher acid consumption, but with a significant reduction in capital expense due to elimination of an interstage thickener, pumps, piping, and building area.

 

13.3.5Alkaline In-Situ Leaching from the Surface

 

Kerr-McGee Nucleare evaluated alkaline in-situ leaching, concluding that uranium extractions would be variable, but generally low at around 30 percent. Since the early-1980s, we as an industry have learned a lot about in-situ uranium extraction and it is likely that extractions could be improved markedly.

 

However, Kerr-McGee also learned that the barren strata above and below the uranium-mineralized zones have higher permeabilities than the uranium zones themselves from testing of ore from the Marquez project. If so, this would encourage leakage and loss of leach liquors and unreliable hydraulic control. The current state of the art in the in-situ uranium recovery industry in the U.S. has identified controls to mitigate these issues, and the oil & gas industry has also developed a variety of flow control additives that potentially could reduce solution leakage, but such remedies would have to be investigated.

 

 

F. Buntz, B. J., and Freeman, M. D., “In-Situ Leaching Feasibility Study - Evaluation of the Marquez Deposit, McKinley County, New Mexico”, Mining & Milling Division, Kerr McGee Nuclear Corp., June 28, 1982.

 

46

 

 

13.3.6Alkaline In-Situ Leaching from an Underground Access Level

 

Kerr-McGee also concluded that in-situ injection and extraction wells with depths below collar of nearly 2,000 feet would be prohibitively expensive to drill, case, and operate. However, the existence of a shaft completed to within about 200 feet of the resource suggests the possibility of developing an access level just above mineralization in the upper confining barren formation. Hypothetically, this would allow inexpensive shallow wells and potentially simple and reliable operation and hydraulic control. Any further consideration of this option is outside the scope of a PEA but may deserve future attention.

 

13.3.7Pregnant Solution Treatment and Bleed Solution Disposal

 

Pregnant solution treatment and bleed solution disposal is common to all options. The Ross design and the constructed mill separated PLS from leached residue in a countercurrent decantation circuit consisting of six conventional thickeners. The PLS was clarified in a seventh thickener and the clarified solution was pumped through two multi-media “sand” filters for final removal of entrained solids. The solution was upgraded and purified with solvent extraction in four stages each of extraction and stripping. The recommended tertiary amine (Alamine 336) was to be diluted with kerosene (Napoleum 470-B) and isodecanol as a modifier. The purified strip liquor was to be sparged in two stages with anhydrous ammonia to precipitate ammonium diuranate (“ADU”) yellow cake, which would be thickened, centrifuged, and dried in a multiple-hearth furnace.

 

Leachable molybdenum dictated a sodium chloride (salt) strip of the loaded organic, followed by regeneration with sodium carbonate.

 

13.3.8Estimated Uranium Recoveries

 

Since there have been no laboratory simulations of heap leaching by the conventional vertical column method, we have no information about the response of the resource to acid leaching, the potential for swelling or compaction, net acid consumption, extraction of uranium, and solution grades. Therefore, we have made some assumptions based on industry experience and professional judgment. This has resulted in an estimate of 83 percent extraction of uranium into the pregnant leach solution. Typical solution treatment losses are about 3 percent, giving a recovery estimate of 80 percent.

 

Fortunately, the 1977-78 Hazen agitated tests on ground samples and the 1978 Ross estimate of solution losses are very reliable, enabling us to reduce the 98 percent uranium extractions to 95 percent uranium recovery to yellow cake.

 

13.4RISKS, RECOVERY UNCERTAINTIES, and DISCUSSION

 

There is a finite risk that samples tested do not faithfully represent what will be mined over the project’s life. There is a possibility that molybdenum could exceed yellow cake specifications, above which a penalty could be applied by the converter. We believe that the 1978 Hazen investigation provided clear guidance toward minimizing this risk, but careful attention will be required during plant operation. Advances in instrumentation and process control during the intervening 40 years will ease this task. Our assumptions about radiometric sorter efficiency may not be realistic and should be confirmed.

 

13.5RECOMMENDATIONS

 

If time and budgets permit and if core rejects exist in an unaltered condition, it would be advisable to initiate a laboratory confirmation of the Hazen Research results for grinding, leaching, solvent extraction, yellow cake precipitation, and yellow cake impurity levels. Heap and in-situ leaching are potentially viable alternatives, so evaluation of those techniques would probably be very worthwhile. Radiometric sorting could offer a significant cost advantage but sorting efficiency should be validated with at least a laboratory-scale program that explores the variability of uranium grade with drill core fragment size. It is also possible that a vendor of sorting equipment would conduct an inexpensive design test on a bulk sample of the resource.

 

47

 

 

14.0Mineral Resource Estimates

 

14.1Mineral Resource Estimation

 

This technical report provides estimates of mineral resources at the Marquez-Juan Tafoya project. Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with CIM standards. At a minimum declaration of mineral reserves would require a Preliminary Feasibility Study (PFS). However, to be considered a mineral resource, reasonable prospects for economic extraction must be demonstrated. For the purpose of this report, reasonable prospects for economic extraction are demonstrated by the positive outcome of the Preliminary Economic Assessment (PEA) herein.

 

14.1.1Definitions

 

A mineral resource is defined as a concentration of an occurrence of natural, solid, inorganic, or fossilized organic material in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics, and continuity of a mineral resource are known, estimated, or interpreted from specific geologic evidence and knowledge (CIM, 2014). Mineral resource estimates are classified as Measured, Indicated, or Inferred based on the level of understanding and definition of the mineral resource.

 

The mineral resources reported herein have demonstrated reasonable prospect for eventual economic extraction as demonstrated by the PEA. The capital and operating costs and other economic considerations are discussed in subsequent sections of this report.

 

Mineral resources were estimated only for those area which contained sufficient thickness, grade and continuity of mineralization to support extraction by underground mining methods. Within these areas drill spacing was on approximate 100 foot centers with additional closer spaced offset drilling. Mineralization that is well defined by drilling on the C horizon covers and area of approximately 2,500 feet along trend and 200 to 400 feet across trend. The D horizon has an approximate trend length of 4,000 feet and is 200 to 800 feet across trend. Given the dimensions of the mineralized area, the mineralized areas are defined by multiple data points.

 

Mineral resource estimates by Kerr McGee and others assigned measured mineral resources to a 50 foot radius from the drill hole and indicated mineral resources from 50 to 200 ft form the drill hole. Hasan, 2010 assigned measured resources to a 100 foot square polygon and indicated mineral resources up 200 feet from the drill hole.

 

Although the drill data has been verified by the author, it is of a historical nature and the author recommends that none of the mineralization be consider as measured mineral resource. Based on the continuity of the mineralization and drill spacing relative to the dimensions of mineralized area the author concludes the data support a classification of the mineral resource as indicated.

 

48

 

 

14.1.2Methodology

 

Mineral resource calculations are based on radiometric equivalent uranium grades calculated by downhole gamma-ray probes. Drill data was available by½ foot intervals. The procedure followed to define mineralized zones within each drill holes for resource estimation purposes included.

 

Drill logs were interpreted and correlated by horizon. Mineral resource estimation was only completed in the C and D horizons. These estimates were done separately.

 

A minimum mining thickness of 6 feet was applied to all mineralized zones.

 

oMineralized zones less than 6 feet were diluted to 6 feet at the grade present in the drill hole.

 

oMineralized zones greater than 6 feet were not diluted.

 

The Grade Thickness product (GT) was calculated for each mineralized zone after dilution to the 6 foot minimum thickness.

 

The GT intercept data were mapped in space accounting for downhole drift to total depth.

 

A GT Surface model was developed inclusive of each sand horizon GT intercept and contours modeled over the range of 0.10 to 5.0 GT

 

The 0.1GT contour areas of influence for each datum point above cutoff grade was applied on an observed Northwest to Southeast anisotropy.

 

Areas of influence were 200 feet along a longitudinal axis observed to be oriented at an azimuth of 300 degrees and 150 ft of influence was applied along the latitudinal axis.

 

The Volume of the GT model was then used to estimate pounds of uranium.

 

The Grade Thickness product (GT) was calculated for each mineralized zone after dilution to the 6 foot minimum thickness.

 

The GT data were contoured over the range of 0.10 to 5.0 GT to estimate pounds of uranium.

 

49

 

 

Thickness (T) was contoured for the same area to estimate tonnage of mineralized material.

 

Average grade was calculated from GT divided by T.

 

A minimum mining thickness of 6 feet used. A bulk density factor of 15 ft3/ton was used in the calculations. The mineral resources were reported at a 0.60 GT cutoff. Mineral resources were calculated using the Grade times Thickness (GT) Contour method in accordance with CIM guidance (CIM, 2013).

 

14.2Key Assumptions and Parameters

 

14.2.1Cutoff Criteria and Reasonable Prospects for Economic Extraction

 

The PEA estimates the cost of mining and mineral processing to be $92 per ton. A sales price of $60 per pound has been used as the base case as discussed in Section 19. For these parameters, the breakeven grade would be approximately 0.078 %eU3O8 or a GT, at a 6 foot thickness of approximately 0.50. Mineral resources are reported at a slightly higher GT cutoff of 0.60 to meet reasonable prospects for economic extraction. In addition, areas where the mineralization appeared to be isolated and/or drilling was limited which were estimated to contain less than 20,000 lbs eU3O8 were excluded from the reported estimated mineral resource due to economic considerations.

 

The PEA was based on a cutoff of 0.80 to allow for a reasonable profit margin.

 

14.2.2Bulk Density

 

As previously discussed, a bulk density of 15 cubic feet per ton was used in the estimation of mineral resources.

 

14.2.3Radiometric Equilibrium

 

As previously discussed, a DEF of 1 was used in the estimation of mineral resources.

 

14.3Mineral Resource Summary

 

Table 14.1 Indicated Mineral Resources

 

Indicated Mineral Resources
Minimum 0.60 GT  TONS   %eU3O8   Pounds 
C Sand   1,426,355    0.156    4,455,706 
D Sand   5,685,244    0.120    13,678,258 
TOTAL   7,111,599    0.127    18,133,964 
ROUNDED TOTAL (x 1,000)   7,100    0.127    18,100 

 

50

 

 

Figure 14.1 – C Sand

 

 

51

 

 

Figure 14.2 D Sand

 

 

52

 

 

15.0Mineral Reserve Estimates

 

Mineral reserves are not reported herein as a PEA is not sufficient to support the declaration of mineral reserves.

 

16.0Mining Methods

 

16.1Summary

 

For the purposes of this PEA mining via conventional underground room and pillar mining with vertical shaft hoist was selected. The shaft would be located at the previous site location requiring rehabilitation of the shaft and installation of a new hoist.

 

Figures 16.1 and 16.2 depict the annual mine production work areas for the C and D sands, respectively. Mining in the C sand would extend for 10 years while the D sand would extend over 15 years.

 

16.2Mining Method

 

Mineralization within the C and D sand horizons is reasonably flat lying and tabular. The deposit is crossed by one identified post-mineralization, high angle normal fault with approximately 90 feet displacement with will require and internal raise to access mineralization on both sides of the fault. There is a risk that ground water flow may be higher along and near the fault and that additional roof support may be necessary.

 

Mining will be by room and pillar. General methods and assumptions include:

 

Development drifts will utilize dual openings. 10 by 15-foot openings will be used for haulage, and 8 by 10-foot openings will be used for transportation and ventilation.

 

Mining panels will utilize multiple entries depending on the width of the zone. Entries will be approximately 12 feet wide, minimum of 6 feet high and averaging 7 feet high.

 

Crosscuts will be placed on 100-foot centers.

 

Mining will be completed by advance and retreat methods.

 

Advance mining is accomplished by driving approximately 12 by 7-foot drifts within zones meeting cutoff grade. Multiple drifts will be driven parallel to one another with crosscuts on 100-foot centers. The parallel drifts will be 27 feet apart on centerline.

 

53

 

 

This will leave a pillar with a dimension of approximately 15 feet wide and 90 feet long. On retreat mining, these pillars are removed if they meet cutoff criteria.

 

As discussed in Section 19, mined material will be sized and sorted underground with the waste return to mined out rooms as backfill. This will provide additional roof support and will minimize the quantity of mine waste brought to the surface which would need to be disposed of.

 

Ventilation will include a minimum of two ventilation shaft which will also function as emergency escapeways.

 

Mine ventilation which meets standards for removal of diesel emissions will also provide adequate ventilation for radon gas given the anticipated mining grades.

 

Blasting of the rock, both for development and mining, will be done by drilling 8 to 12- foot blast holes using jumbo drilling rigs and filling the blast holes with ANFO (Ammonium Nitrate and Fuel Oil).

 

16.3Mine Equipment

 

Multiple references were available for estimation of mine OPEX and CAPEX. The most relevant included data the late-2020 edition of Mining Cost Service and an internal report completed by former owner, Neutron Energy, in 2011.

 

With respect to CAPEX, the 2011 Neutron Energy CAPEX for mine equipment escalated to 2021 was 13.2 million $US. Using Mine Cost Service, CAPEX was estimated at $13.4 million $US. The slightly higher Mine Cos Service estimate was used in the PEA. Mine CAPEX costs are summarized in Table 16.1.

 

With respect to OPEX Costmine (published in 2009 and escalated to 2021$) estimates an OPEX for a 1,200 ton per day (TPD) hoist room and pillar underground mine at $42.53 per ton. The Neutron Energy estimate (2011 escalated to 2021$) estimated OPEX costs of $50.49 per ton. The higher of the two estimates of $50.49 per ton was used in the PEA.

 

54

 

 

Table 16.1 Mine CAPEX

 

Underground Mine       
Equipment  Description  CAPEX 
Single Boom Jumbo  21‘x18‘coverage  $1,158,400 
Bolter  20’ to 23’ reach  $766,000 
Medium Loader 2.5 Yd  81 HP  $708,300 
UG Haul Truck  20t  $1,343,000 
PowderTruck  600 pound ANFO  $505,000 
Scissor Truck  12 feet lift  $350,100 
Lube Truck  675 gall  $184,000 
shotcrete machine  25 yds per hr  $429,000 
shotcrete hauler  10yd transmixer  $390,000 
Grader  12ft  $318,700 
Pickups  1 ton reg cab  $273,000 
Main Vent Fans  120 inch 500 kcfm, 800hp  $308,400 
Smaller Main Fans  96 inch 300 kcfm, SOOhp  $399,800 
Aux fans  30 hp 47 kcfm  $198,400 
Juan Tafoya Hoist  150T/HR 80” DRUM ST SKIP  $1,535,600 
Shaft Pump  380 kw {twice size of Shafter)  $655,000 
Stationery Pumps w fish tan  0  $295,000 
Small Face Pump  3 HP max flow 460 max head 70’  $60,000 
Large Face Pump  75 HP max flow 1140 max head 180’  $100,500 
Surface loader  5yd3  $365,300 
Surface Grader  14ft  $431,000 
Road Hauler  14 yd3 tractor and trailer  $382,000 
Water Truck- smalI  5000 GALLON 175 hp  $279,000 
Skid Steer Loader  3250 lb lift capacity  $83,900 
Compressor Small  2500 cfm 600 hp  $198,600 
Backup Generator Large  2250 kw  $454,900 
Lamp Charger  40LAMP  $48,000 
Lamp  led - Li Iodide  $49,200 
Self Rescuer  Standard  $57,000 
Explosive Magazines Large  24 t trailer mount  $39,000 
Explosive Magazines Small  8 t skid mount  $34,000 
Workshop Tools  0  $115,000 
Air Doors  12x12  $30,375 
Service Trucks  82hp, 5 Ton, no cranes or attachme  $381,500 
Portable Transformers  0  $425,000 
Refuge Chamber        
TOTAL MINE CAPEX     $13,351,975 
Rounded {x 1,000) US$     $13,400 

 

55

 

 

16.4Life of Mine Plan

 

The life on mine production schedule is based on an average hoisting capacity of 1,000 TPD for 330 day (to account for maintenance and downtime). Initial mining will occur within both the C and D sands. Table 16.2 summarizes and Figures 16.1 and 16.2 display the mine production schedule. Years 1 through 5 are broken out as to specific mining areas. More general areas for mining are shown for Years 5-10 and 10-15. The C mining is anticipated over a 10 year period while the D sand extends to 15 years.

 

Table 16.2 Mine Production Profile

 

Production   Totals     Year 1     Year 2     Year 3     Year 4     Year 5     Years 6-10     Years 11-15  
Mine Rate 1000 tpd 330 m tons/year
C Sand (A area)                                                
Total Tons (Ratio 1.3:1)     1,222       137       144       169       131       114       527          
Tons of Waste     282       32       33       39       30       26       122          
Tons of Resource (x1,000)     940       105       111       130       101       88       405          
Selective handling to separate waste reduce tons 30%     658       74       78       91       71       62       284          
Pounds U3O8 Contained (x1,000)     3,445       418       364       595       379       434       1,255          
Selective handling to separate waste - loss 5% lbs     3,273       397       346       565       360       412       1,192          
Grade% U3O8     0.249       0.270       0.223       0.311       0.255       0.335       0.210          
D Sand (C, F, and G1 areas)                                                                
Total Tons     4,811       239       270       205       189       287       1,378       2,243  
Tons of Waste     1,110       55       62       47       44       66       318       518  
Tons of Resource     3,701       184       208       158       145       221       1,060       1,725  
Selective Handling to remove waste reduce tons 30%     2,591       129       146       111       102       155       742       1,208  
Pounds U3O8 Contained (x1,000)     9,380       538       591       438       456       602       2,665       4,090  
Selective Handling to remove waste - loose 5% lbs     ,.8,911       511       561       416       433       572       2,532       3,886  
Grade% U3O8     0.172       0.198       0.193       0.188       0.213       0.185       0.171       0.161  
Total Tons     6,033       376       415       374       320       402       1,905       2,243  
Tons of Waste     1,392       87       96       86       74       93       440       518  
Tons of Resource     3,249       202       223       202       172       216       1,026       1,208  
Pounds U3O8 Contained     12,184       908       907       981       793       984       3,724       3,886  
Grade% U3O8     0.188       0.224       0.203       0.243       0.230       0.228       0.182       0.161  
Recovered Pounds 95% Recovery     11,575       863       862       932       754       935       3,538       3,691  

 

56

 

 

Figure 16.1 C Sand Mine Production Schedule

 

 

57

 

 

Figure 16.2 D Sand Mine Production Schedule

 

 

58

 

 

17.0Recovery Methods

 

17.1RECOVERY METHODS and PROCESSING FLOWSHEETS

 

17.1.1Plant Design by A. H. Ross and Associates (1977)

 

Pursuant to the client’s request, Ross designed a conventional 2,000 ton per day plant with a semi autogenous grinding (“SAG”) mill that eliminated the need for a primary crusher. The SAG mill discharge was delivered to a rod mill for production of a nominally minus 28-mesh feed to a 2- stage agitated sulfuric acid leaching circuit. The 2-stage leaching configuration was common at the time with the objective of maximizing uranium extraction while reducing acid consumption. Planned leaching conditions included a total retention time of 12 hours at 50°C with about 80 grams/liter free acid and 10 pounds/ton of sodium chlorate, NaCl04, as the oxidant for tetravalent uranium. We have considered other processing options, as discussed in Section 13, and presented in greater detail below.

 

17.1.2Underground Selective Handling, Screening and Sorting

 

As illustrated in Figure 17.1, ore is trammed from the stopes to a transfer conveyor that discharges into a primary jaw crusher surge bin, thence through the crusher onto a double-deck vibrating screen. Screen undersize at about minus I-inch is conveyed directly to the skip and screen oversize in the approximate range minus 2½-inch plus I-inch is delivered to a radiometric ore sorter with selectable discrimination sensitivity. The reason for removing the fine fraction is that sorting efficiency is greatly reduced for fragments with mean diameters less than about 1 inch (25 mm). The less radioactive fraction is rejected and returned to the stopes as backfill, while the more radioactive fraction is conveyed to the skip. The combined screen undersize and sorter concentrate are hoisted to the surface for processing.

 

Radiometric sorting has been used in the uranium industry since the early-l 970s, when Cotter Corp. installed it at the Schwartzwalder Mine near Golden, Colorado. It is likely that Cotter’s objectives included (1) reducing the cost of truck haulage of the ore from Golden to Canon City, a distance of several hundred miles, and (2) increasing the grade of the feed to an old mill with limited capacity. For the Marquez Project, we are recommending sorting for different reasons: (1) the sorter reject, comprising coarse rock fragments, would be ideal backfill for mined-out stopes, (2) electrical energy consumption for hoisting would be reduced; and (3) the total volumes of impounded tailings solids and evaporation pond influent would be reduced.

 

Although there will be exhaust fans for evacuation of radon-contaminated air from the underground workings, we have also provided for wet venturi scrubbers to capture dust generated during crushing and screening. The slurry from the venturi scrubbers, combined with muddy water released from crushing wet ore will be carried through a drainage ditch to a partitioned shaft sump, keeping the slurry separate from nearly clear water released from drifts and stopes. A separate pumping system will deliver the slurry to a thickener on the surface and the thickener underflow will be processed.

 

59

 

 

Figure 17.1 Selective Handling and Sorting

 

 

 

17.1.3Heap Leaching with Dilute Sulfuric Acid

 

The ore may be processed either by heap leaching of the sorter concentrate or by agitated (“tank”) leaching following size reduction of the concentrate by rod milling. The choice between the two methods of leaching may ultimately be determined by a more detailed evaluation. Heap leaching, which has been applied extensively in the gold industry, and adopted at a few uranium operations during the 1960s and 1970s, may have lower capital costs if the original tailings impounded area is useable. However, we lack data from traditional column simulation of heap leaching, so are provisionally recommending agitated leaching, which was tested thoroughly by Hazen with very high uranium extractions.

 

The cost estimation section and the Appendix contain information on heap pad design, and our design strategy is one which has evolved in the gold industry. Basically, a suitable area, preferably rectangular with a slight natural gradient of a few percent, is graded and compacted before being surrounded by a berm and covered by a heavy-duty high-density polyethylene (“HDPE”) sheet with welded seams. This primary liner is then covered with 12 to 18 inches of gravel in which a network of perforated solution collection piping has been installed. The gravel is overlain with a second HDPE liner sheet that is covered by typically 12 inches of fine soil to protect the upper liner from sharp rock fragments and vehicular traffic.

 

If heap leaching is eventually selected, sorter concentrate will be delivered by conveyor to a radial stacker, which is a moveable inclined conveyor that can pivot at the lower end, enabling creation of a uniform pile of ore about 25-30 feet in height. PLS would be pumped to a solution treatment plant for clarification, solvent extraction, and precipitation of yellowcake, labeled “YC” in Figure 17.2.

 

Figure 17.2 Heap Leach Flow Sheet

 

 

 

60

 

 

17.1.4Agitated Leaching with Dilute Sulfuric Acid

 

This is the processing route for which we have the most information, including the 1977-78 laboratory reports by Hazen and the 1977 report by A. H. Rossf that provided the design criteria for the 2,000 tpd plant that was built for Bokum Resources. We have estimated CAPEX and OPEX for a very similar process but reduced in scale to 1,000 tpd of ore. However, there are important differences between the original concept and the current recommendation.

 

For reasons, as mentioned in 17.1.2, that mainly relate to reduced hoisting expense and minimized waste management requirements, we are recommending underground crushing and screening and radiometric ore sorting. This eliminates the semi-autogenous grinding (“SAG”) mill but retains a rod mill for final grinding to grain liberation particle size. The risk of sending oversize slow leaching particles to the leaching circuit is eliminated by adding a DSM-type sieve bend on the rod mill discharge. Whereas Ross chose two-stage leaching with an interstage thickener and 12 hours retention time, we recommend single-stage leaching for 20 hours. This is expected to maximize leach extraction by increasing leach tank dimensions while eliminating a thickener and a significant amount of plumbing and pumping. See Figure 17.3.

 

 

f Ross, A.H., and Associates, “A Metallurgical Evaluation and Criteria for the Marquez Uranium Mill Design”, October 1977.

 

61

 

 

Figure 17.3 Agitated Leach Flow Sheet

 

 

 

17.1.5Underground In-Situ Leaching with Alkaline Solution

 

Underground In-Situ Leaching with Alkaline Solution

 

A limited amount of testing and evaluation of in-situ leaching was done by two Kerr-McGee groups, as summarized in Section 13, and the conclusions were generally negative. Some of the obvious drawbacks included (1) variable, but generally poor, response to an alkaline carbonate lixiviant; (2) the confining strata above and below the mineralized formation were more porous and permeable than the mineralized sandstone; (3) permeabilities were generally very low in the mineralized sandstone; and (4) the depth from surface to mineralization, 1,800-2,000 feet, was considered extreme for an in-situ application and the predicted well costs and pumping energy requirements were very high.

 

These are all valid concerns and we have decided that it makes sense to accept Kerr-McGee’s conclusions. However, we offer two observations: (1) a lot has been learned about in-situ leaching since the early-1980s, especially with regard to solution management (permeability blocking polymers, etc.) and hydraulic control, and (2) since the existing shaft extends to a depth only about 100-200 feet above mineralization, there could be an opportunity to develop an access level at that depth and to drill very shallow injection and extraction wells. Pregnant leach solutions could then be collected on that level and pumped to the surface for treatment.

 

17.1.6Solution Treatment and Bleed Solution Disposal

 

Common to all leaching options, the recommended plant for treating PLS is conventional and essentially identical to the original flowsheet, except for reduced treatment capacity and the minor changes noted in 17.1.4. Precipitation with ammonia yields ammonium diuranate (“ADU”), which is then thickened. Ammonium sulfate is added to the first yellow cake thickener underflow to remove sodium and the slurry is repulped and thickened in a second thickener. The final underflow is further de-watered in a centrifuge prior to drying. In order to minimize worker exposure in the yellow cake section, we are recommending a rotary vacuum dryer as a modem replacement for the classic multiple hearth roaster specified by Ross.

 

The dried yellow cake is packaged in standard reinforced steel drums with locking clamps and seals and is stored on a dock prior to shipment by truck directly to buyers or to a uranium hexafluoride conversion plant. See Figure 17.4.

 

62

 

 

Figure 17.4 Solution Treatment Flow Sheet

 

 

 

17.2ESTIMATED CAPITAL and OPERATING COSTS

 

Our primary database for equipment costs is the late-2020 edition of Mining Cost Service and equipment purchase prices were escalated to June 2021 using the U. S. Consumer Price Index, which has been nearly unchanged during the last year. Some equipment items are not included in that publication, so we have escalated those values from our most recent vendor quotations. In some cases, the equipment capacity based on a mass balance for Marquez Canyon did not match available data, so prices were interpolated at a 0.6 exponential, (price 2/price 1)°-6.

 

Rather than estimating the complete spectrum of costs for the two alternatives, heap and agitated (tank) leaching, we have made separate estimates of costs for (1) underground crushing and sorting, (2) heap leaching, (3) agitated leaching, and (4) solution treatment, since (1) and (4) are common to both leaching methods. If in-situ leaching is evaluated in the future, it will be acceptable to estimate the costs of that technique, then simply to add item (4) costs.

 

63

 

 

A distinct advantage of the Marquez Canyon resource that was not recognized during the late- 1970s, but mentioned by Kerr-McGee, is that geothermal influence from proximity to Mt. Taylor has resulted in an underground water temperature of about 100°F. Uranium minerals invariably dissolve more rapidly at elevated temperatures and the Hazen laboratory tests confirmed this behavior, concluding that a leaching temperature of 50°C (122°F) was near optimum. The result from a cost standpoint is that using water from underground as process water will reduce significantly the capital and operating costs for a water heating system. This advantage applies both to heap and agitated leaching, although the exposed nature of heap leaching leads to fairly rapid cooling with reduced thermal effect on kinetics.

 

In the Appendix is a 3-sheet Excel database containing (1) a simplified mass balance used to estimate post-sorting ore tonnage, (2) an itemized estimate of equipment sizes, purchased prices, and constructed plant costs, and (3) estimated costs of operating and maintaining the surface assets. The estimated cost of constructing a tailings disposal impoundment for the agitated leaching option is provisional and assumes that the preparation done by Bokum Resources, i.e., site clearing, grading, and berm construction, is still serviceable. In comparing these estimates with those for other projects, it is important to bear in mind that this is a medium-size project in terms of pounds, but a relatively small one in terms of ore treatment rate, so maximum economy of scale has not quite been achieved.

 

Table 17.1 Mineral Processing Options

 

PROCESSING OPTION  UJOs
Recovery,
%
   CAPEX,
US$
xl,000
   OPEX,
US$x
1,000/YR
 
Heap Leaching   80    28,770    9,140 
Agitated Leaching   95    29,960    12,270 

 

For the purposes of this PEA the Agitated Leaching option was evaluated.

 

64

 

 

18.0Project Infrastructure

 

All necessary utilities and general infrastructure for the planned project are either currently available on site or can readily be established. Existing infrastructure is depicted on Figure 18.1.

 

In the early 1980’s the project was being developed by Bokum Resources as a conventional underground mine and mill operation when falling uranium prices halted development. The underground mine shaft and head frame were constructed but have been removed. The bottom of the shaft was completed to within 200 feet of the first mineralized horizon. The processing facility was constructed but not operated and has been dismantled. Foundations and access roads for both the shaft and processing facility remain on site.

 

The project is located on private lands dating to an original Spanish land grant. These lands are adequate for all planned mining and mineral processing operations including the disposal of mineral processing wastes (tailings).

 

Project infrastructure is present at the site but may need to be updated including:

 

Access to the project area, as well as the site of the Marquez deposit shaft and former mill site is pre-existing with a well-constructed gravel road capable of supporting heavy truck traffic connecting the project site with a paved State highway. A haulage road between the shaft site and the former mill was constructed by the former operator of the project.

 

Water wells with adequate supply for planned operations are present at the project.

 

A high-voltage electrical transmission line extends into the property from a transformer substation located approximately 2 miles (3.2 kilometers) south of the project. This electrical line was constructed to provide power to the mine and mill facilities that were partially developed on the property and is adequate for planned operations.

 

65

 

 

Figure 18.1 – Infrastructure Map

 

 

66

 

 

19.0Market Studies and Contracts

 

Uranium does not trade on the open market and many of the private sales contracts are not publicly disclosed. Monthly long-term industry average uranium prices based on the month-end prices are published by Ux Consulting, LLC, and Trade Tech, LLC. CIM Guidance of Commodity Pricing (November 28, 2015) reviews methods for determining an appropriate long-term commodity price assumption for use in cut-off calculations and to support assessment of “reasonable prospects of eventual economic extraction.” Industry accepted practice is to use “Consensus Prices” obtained by collating publicly available commodity price forecasts from credible sources.

 

The following provides a summary of TradeTech™ 4th quarter 2020 forecasts for 2020 (TradeTech™ 2020). TradeTech™ uranium price forecasts are based on Forward Availability Models (FAM). The FAM 1 model assume a good level of uranium production growth resulting is higher supply and more conservative pricing. In contrast FAM 2 assumes continued restricted project development resulting in lower supply and higher pricing. FAM 2 price forecasts are the most reasonable for purposes of this report, as they more closely reflect past and current market conditions. TradeTech™ provides both spot and long term contract or term pricing. For the purposes, of this report term pricing is assumed as larger projects are typically supported by long term contracts.

 

Table 19.1- Uranium Prices 2020 Through 2035

 

   2021   2022   2023   2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034   2035 
FAM2term* (nom)  $46   $48   $52   $53   $55   $58   $62   $67   $70   $76   $79   $82   $85   $88   $91 
FAM 1 TERM (NOM)  $44   $45   $45   $46   $48   $51   $55   $58   $59   $59   $62   $64   $67   $70   $71 

 

*TradeTech™ FAM 2: Uranium Market Price Forecasts (Nominal US$/lb U3Os) used for PEA.

 

The average price (FAM 2 NOM) over the period of2021 through 2035 is US$67/lb. Discounting the projected price @ 2% per year, to account for inflation, yields a discounted average price of US$58/lb over the same period. For the economic analysis, Internal Rate of Return (IRR) and Net Present Value (NPV) were estimated at 2020 constant dollars assuming an average uranium price ofUS$60/lb. This analysis was compared to a future dollar case where the project production was assumed to begin in 2025 with CAPEX and OPEX escalated @ 2% per year from 2021 through 2035 with uranium price as projected in Table 19.1. In both cases the IRR was the similar. The future dollar case yielded a higher NPV. Thus, the Author recommends the more conservative constant dollar case with a price of US$60/lb for the economic analysis, Section 22 of this report.

 

67

 

 

20.0Environmental Studies, Permitting, and Social or Community Impact

 

20.1BASELINE STUDIES

 

enCore has not conducted or prepared any environmental baseline studies that would support a mine permit application for the combined projects. Neutron Energy, Inc. conducted preliminary baseline environmental studies to support the permitting and licensing of the Juan Tafoya Mine and the proposed uranium mill on the former Bokum Mill Site. This work continued from 2007 through 2010 before it was placed on hold in response to declining uranium prices. Likewise, in the 1980’s, Kerr-McGee conducted baseline environmental studies. Prior to further permitting, enCore may have to perform new baseline environmental studies due to the age of the previous work by Neutron Energy Inc and Kerr-McGee.

 

20.2SITE HYDROLOGY

 

In 2009, Neutron Energy Inc. prepared a report on the regional and local hydrology for the Juan Tafoya Mine. That report was preliminary, but it provides an adequate description of the hydrologic settings associated with the Juan Tafoya-Marquez Project. The hydrologic setting at the Site consists of ephemeral stream channels, shallow alluvial aquifers, and deeper regional aquifers. These hydrologic features of the Site are described in more detail in the following subsections.

 

20.2.1Surface Water

 

The Cafi6n de Marquez, a tributary of the Rio Grande, is the major surface water feature at the Site. The headwaters of Cafi6n de Marquez are located on the Mesa Chivato at an elevation of approximately 7,500 feet. Cafi6n de Marquez is said to be perennial near its headwaters due to a small spring, Ojo de Marquez, that discharges through the highly permeable volcanic cap rock on Mesa Chivato approximately 3,500 feet west of the JTLC boundary (Bokum Resources, 1978; TVA, 1983) (Figure ). Depending upon the season, some or all of the streamflow is diverted into a small reservoir and irrigation ditch (acequia) that is used by members of the JTLC. East of the village of Marquez, Cafi6n de Marquez is ephemeral. There has been no gauging of spring or stream flow in Cafi6n de Marquez that would provide historical information on seasonal spring flow fluctuations (TVA, 1983).

 

68

 

 

Other tributaries at the Site including Cafi6n de Santa Rosa and Cafi6n Seco are ephemeral and are highly dependent on seasonal precipitation and snowmelt (Figure 7).

 

20.2.2Groundwater

 

Groundwater is regionally present in two types of aquifers: (1) unconfined alluvial aquifers thatare limited in extent and fluctuate in direct relationship to seasonal precipitation (short-term fluctuations) and climatic change (long-term fluctuations), and (2) deeper confined aquifers that vary greatly in water quantity and quality. Figure 7 illustrates locations of existing wells in and around the Site found through records searches and field reconnaissance. The water quality and quantity in the aquifers in the vicinity of the Site is described in the following subsections.

 

20.2.2.1Alluvial Aquifers

 

Unconsolidated alluvial sediments that accumulate in the major drainage channels are locally and intermittently saturated. Alluvial deposits are composed of permeable sands and gravel that allow for infiltration following storm events. Because of their dependence on infrequent recharge, these aquifers are not dependable water sources, though several tribes in the area (Laguna and Acoma Pueblo) depend on these shallow aquifers for their drinking water. Generally, the water quality in the alluvial aquifers at the Site is of poor quality and the water is suitable only for small domestic or stock wells (TVA, 1983).

 

20.2.2.2Gallup Sandstone

 

The Gallup Sandstone is the first major aquifer unit encountered at wells in the Site vicinity and is the drinking water source for the JTLC. Reported transmissivity values in the Gallup Sandstone range from 57 to 300 square feet per day (ft2/day) (NRC, 1980a). Measured sustainable discharge from 49 water wells in the San Juan Basin that were completed in the Gallup Sandstone ranges from less than 1 to 645 gallons per minute (gpm) with the median discharge being 42 gpm. The water is generally of good quality, containing total dissolved solids (TDS) concentrations of less than 2,000 milligrams per liter throughout the aquifer; it is a major source of potable or treatable water for the City of Gallup, Chaco Culture National Historical Park, and many small public distribution systems in the southern part of the San Juan Basin (Kernodle, 1996). Near the Site, wells completed in the Gallup Sandstone provide drinking and stock water to the village of Marquez. The Gallup Sandstone is expected to be about 100 feet bgs at the mill site and is not present beneath the tailings site.

 

69

 

 

20.2.2.3Tres Hermanos Sandstone

 

The Tres Hermanos Sandstone is the only unit in the Mancos Shale Formation that can yield potable water. The yield from these beds, which are discontinuous in the area, is typically low, from 5 to 20 gpm (Dinwiddie, 1964). The Tres Hermanos is expected to be about 700 feet bgs beneath the mill site, and about 350 to 530 feet bgs beneath the tailings site. Because it is low yielding and deep in the area of the Site, and because the research completed for this report did not reveal any water supplies wells completed in this unit, the Tres Hermanos Sandstone is not considered a viable aquifer of concern for the purposes of this analysis and will not be discussed further.

 

20.2.2.4Dakota Formation

 

The Dakota Formation is approximately 500 to 1,000 feet bgs at the Site. Transmissivity values of 44 and 85 ft2/day were reported for aquifer tests conducted northeast of Crownpoint, New Mexico (Dames and Moore, 1977, cited by Kernodle, 1996). An aquifer test conducted east of Grants, New Mexico indicated transmissivity of 2,000 ft2/day (Risser and Lyford, 1983, cited by Kernodle, 1996). The quality of the water in the sandstone aquifers of the Dakota Formation generally is not as good as that of water in the underlying Westwater Canyon Member of the Morrison Formation (Kernodle, 1996); however, in the southern part of the San Juan Basin, the Dakota Formation is hydraulically connected with the underlying Morrison Formation (Cooley and Weist, 1979; Stone et al., 1983; Craigg et al., 1989). The reported or measured discharge from 30 water wells completed in the Dakota ranges from 1 to 75 gpm with a median of 12 gpm (Kernodle, 1996). Although the Dakota Formation is a regionally-important aquifer, low local yields and poor water quality resulting from naturally-occurring sulfide and uranium minerals make the water from this aquifer unfit for consumption in some areas of New Mexico.

 

20.2.2.5Westwater Canyon Sandstone

 

The Westwater Canyon Sandstone is both a principal uranium ore-bearing zone in the Grants Mineral Belt and a source of potable water in the southern San Juan Basin. It is separated from the Dakota Formation aquifer by the Brushy Basin Member of the Morrison Formation, which consists of approximately 160 feet of shale and limestone. The Westwater Canyon Sandstone varies in thickness from 100 feet on the north, east, and south sides of the San Juan Basin to about 300 feet in the west-central part of the basin (Craig et al., 1955, cited by Kernodle, 1996).

 

A groundwater flow model of the Westwater Canyon Formation northeast of Gallup, New Mexico indicated the aquifer has a transmissivity of 300 ft2/day (Hearne, 1977, cited by Kernodle, 1996). The median discharge reported from 83 water wells completed in the Morrison Formation across the San Juan Basin is 30 gpm with a range from 1 to 2,250 gpm. Generally, yields are high and transmissivity values range from 2 to 490 ft2/day (TVA, 1983). However, the Morrison Formation has been greatly influenced by aquifer dewatering associated with previous uranium mining in the areas west of Mt. Taylor. Like the Dakota Formation, the Westwater Canyon Sandstone is a regionally-important aquifer, but locally poor water quality resulting from naturally-occurring sulfide and uranium minerals make the water from this aquifer unfit for consumption in some areas. It is expected to be approximately 2,000 feet bgs at the Site.

 

20.2.2.6San Andres Limestone and the Glorieta Sandstone

 

The Pemian-age San Andres Limestone consists of limestone with minor dolomite, shale, siltstone, and gypsum. The top of the formation was exposed and eroded during Triassic time (McLemore, 1998; Summers and Kottlowski, 1969). The Permian-age Glorieta Sandstone is described near Bluewater Lake in the Zuni Mountains. It is typically cross bedded, indicating deposition as eolian dunes and in local stream channels along the shore of the Permian sea that extended across New Mexico (McLemore, 1998.). The Glorieta was deposited along the coast or in shallow water as the seas began to cover the region (USGS, 2005). Both formations provide water supplies in certain areas of the State; however, based on the research completed for this report, there are no water supply wells in these formations in the area of the Site most likely because these formations are over 4,000 to 6,000 feet bgs in the study area. Therefore, these aquifers will not be considered further in this report.

 

70

 

 

20.3PROJECT PERMITTING

 

20.3.1PERMITTING REQUIREMENTS - STATE

 

Mine permitting authority in New Mexico resides primarily with the Mining and Minerals Division MMD) of the New Mexico Energy, Minerals, and Natural Resources Department. The permitting process entails preparation of three major documents: a Sampling and Analysis Plan, a Baseline Data Report, and a Mining, Operations and Reclamation Plan. In October

 

The New Mexico Environment Department (NMED) regulates mining operations through the issuance of a Discharge Permit and establishment of standards for discharges or potential releases from mining operations. The Discharge Permit requires characterization of all materials or structures (e.g., waste rock piles) that could be exposed to environmental dispersal agents, and designs for all systems that will be used to prevent or control potential releases to the environment (e.g., liner systems for ponds).

 

Mine dewatering is regulated by the New Mexico Office of the State Engineer (NMOSE) through approval of a Mine Dewatering Permit. Under the Mine Dewatering Act, the applicant is required to provide a Plan of Replacement for wells or other water sources that could be impaired by the proposed dewatering activities over the Projected life of the mine. Water pumped from the mine is considered “produced” water and conveys no water right but can be used for beneficial purposes.

 

20.3.2PERMITTING REQUIREMENTS- FEDERAL

 

All of the surface ownership for the Juan Tafoya-Marquez Project is former Spanish Land Grant that is owned in fee by others that enCore leases. There is no Federal Land Management Agency such the Department of Interior or Department of Agriculture.

 

Federal approvals needed are a discharge permit (NPDES) for the discharges related to dewatering and approval of radon releases from the mine under the National Emission Standards for Hazardous Air Pollutants (NESHAPs) regulations, both issued by the U.S. EPA.

 

If enCore intends to use radiometric ore sorting or construct a surface uranium recovery facility such as a uranium mill or a heap leach, along with the related tailings management facility, a Source Material License will be required to be issued by the U.S. Nuclear Regulatory Commission. In this case, upon decommissioning of the uranium recovery facility and closure of the tailings management facility, the site will be transferred to the U.S. Department of Energy, Office of Legacy Management. This will be completed in a manner similar to the nearby L-Bar Mill Tailings site.

 

Table 20-1 lists the major permits needed to construct a new underground uranium mine in the State of New Mexico. Because it is anticipated that there would be no processing or concentrating of natural ore at the mine site, no U.S. Nuclear Regulatory Commission (NRC) approvals are needed.

 

71

 

 

TABLE 20.3 - 1 MAJOR AND MINOR mAN TAFOYA-MARQUEZ PROJECT PERMITS

 

AGENCY PERMIT OR APPROVAL
FEDERAL  
U.S. Army Corps of Engineers Nationwide 44 Permit (Section 404 compliance)
U.S. Environmental Protection Agency

Spill Prevention Control and Countermeasures Plan (SPCC)

 

Notification of Hazardous Waste Activity

 

Storm Water Pollution Prevention Plan (SWPPP) Subpart A of the Radionuclide National Emission Standards for Hazardous Air Pollutants (NESHAPs) National Pollutant Discharge Elimination System (NPDES) permit

U.S. Fish and Wildlife Service Threatened and Endangered Species (Section 7 Consultation)
Federal Communications Commission Radio authorizations
U.S. Department of Transportation Requirements for transport and handling of radioactive material including ore
Treasury Department (Bureau of Alcohol, Tobacco, Firearms and Explosives) Explosives use permits
Mine Safety and Health Administration

Mine Identification Number Legal Identity Report Ground Control Plan

Miner Training Plan Worker exposure standards

STATE  
New Mexico Energy, Minerals and Natural Resources, Department, Mining and Minerals Division New Mine Permit
New Mexico Environment Department - Groundwater Bureau Discharge Permit

New Mexico Environment Department

 

Drinking Water Bureau

Public water supply system

 

New Mexico Environment Department -Waste Management Bureau Solid Waste System Permit
New Mexico Environment Department Petroleum Storage Tank Bureau Registration of diesel and petroleum tanks
New Mexico Office of the State Engineer Permit to Appropriate Waters
New Mexico Game & Fish Department Wildlife consultation
State Historic Preservation Office Section 106 (NHPA) consultation
New Mexico Department of Transportation Road Access ROW and Pipeline Construction
McKinley and Sandoval Counties Building Department Building Permits Septic System Approval

 

72

 

 

 

20.3.3CURRENT PERMIT STATUS

 

The Company only has one permit in effect at this time. In 2015, the New Mexico Energy, Minerals and Natural Resources Department renewed Exploration Permit; Marquez Canyon Exploration Project, Permit No. MK023ER-R6.

 

20.4SOCIAL OR COMMUNITY REQUIREMENTS

 

Any permitting activities for the Project will require a two part review process. Upon completion of the technical review by the regulatory agency on specific approval actions, the agency’s decision will be made available to the public for review and comment prior to issuance of any major approvals. When the Company begins to advance the permitting process, it will work closely with the regulatory agencies, government officials, and the local community to assure transparency as the Project is advanced.

 

20.5ARCHAEOLOGICAL AND TRADITIONAL CULTURAL PROPERTY

 

Consideration of archaeological and cultural resources is an important part of the USFS and State of New Mexico permitting processes. The company will need to conduct cultural resource surveys of the Juan Tafoya-Marquez Project area. Prior to the field survey, a literature search will be conducted of the National Register of Historic Places (NRHP), the State Register of Cultural Properties, and the Archaeological Records Management Section of the State Historic Preservation Division (HPD). Following the literature search, detailed field surveys will be completed to identify cultural resources within the Project area boundary and proposed access corridors, so that appropriate mitigation measures could be implemented in advance of any construction and operations. Archaeological sites will be inventoried and mapped as required by the State of New Mexico SHPO regulations. Detailed inventory reports prepared by LMASI and submitted to the USFS and SHPO for review. If necessary, facility layouts were adjusted to avoid eligible archaeological sites wherever feasible to do so.

 

73

 

 

20.6MINE CLOSURE REQUIREMENTS

 

20.6.1Reclamation

 

Reclamation and closure of the entire mine and surface facilities will be conducted in accordance with the methods and commitments made in the Mining, Operations and Reclamation Plan (MORP).

 

Reclamation and closure will be based on the following general objectives:

 

Reclamation goals and objectives will be considered during design and planning of construction and operations;

 

Concurrent (progressive) reclamation will be implemented where possible.

 

Upon cessation of operations, the areas will be decommissioned and rehabilitated to allow for future land use as guided by the federal, state and local agencies; and

 

Reclamation and closure will ensure that long-term physical and chemical stability is provided.

 

The initial reclamation and closure plan prepared for the mine and surface facilities will be living documents that will be updated throughout the Project’s life to reflect changing conditions and the input of the applicable federal and state regulatory agencies. The primary reclamation activities will involve backfilling mine workings, removal of surface facilities and infrastructure, re contouring and scarifying disturbed areas, applying stockpiled organics, and re-vegetation in accordance with seed mixtures and methods that are required for the MORP.

 

20.6.2Reclamation and Closure

 

A detailed closure plan will be developed for the Project. The closure plan will be developed using the guidelines noted above. enCore will be required to post a reclamation performance bond with the State of New Mexico prior to approval of the Permit to Mine. The New Mexico Mining and Minerals Division (MMD) regulations allow for phased bonding, and enCore intends to prepare those cost estimates in phases of site development.

 

21.0Capital and Operating Costs

 

Project cost estimates are based on a conventional room and pillar underground mine operation with on-site processing via a conventional acid mill. All costs are estimated in Constant 2021 U.S. Dollars. Mining and mineral recovery methods and annual schedules are described in Sections 17 and 18, respectively. The currently planned mine life is 15 years. The estimated annual cash flow follows.

 

OPEX and CAPEX costs reflect a full and complete operating cost going forward including all pre-production costs, permitting costs, mine and mineral processing costs through the production of yellowcake, and compete reclamation and closure costs for of the mine and mill. CAPEX does not include sunk costs or acquisition costs.

 

74

 

 

Table 21.1 Annual Cash Flow

 

 

75

 

 

22.0Economic Analysis

 

This report includes disclosure permitted under Section 2.3(3) of NI 43-101 as the PEA includes a portion of the indicated mineral resources shown in Section 14 of the report. Mineral resources that are not mineral reserves and do not have demonstrated economic viability. The PEA is preliminary in nature and there is no certainty that the preliminary economic assessment will be realized. The PEA is described elsewhere in this report and is based on the qualifications and assumptions described herein.

 

22.1Life of Mine Cost Summary

 

The cost model, Table 21.3, is in constant US dollars (2021) and was based on a constant commodity price of US$60 per pound of uranium oxide. Life of mine costs are summarized in Table 22.1.

 

Table 22.1 - Life of Mine Cost Summary

 

 

Cost Center  Total Cost
US$ (x1,000)*
   Cost per
Pound
Recovered
US$
 
OPEX Mine  $308,000   $26.62 
OPEX Mill  $184,000   $15.90 
Decommissioning and Reclamation  $13,000   $1.11 
Taxes and Royalties  $53,000   $4.55 
TOTAL CAPITAL (Life-Of-Mine)  $558,000   $15.90 

 

*rounded

 

22.2Pre-Tax Rate of Return and NPV

 

The Project has a positive rate ofretum as follows.

 

IRR PRE INCOME TAX   17%
NPV5%  $28,293 
NPV7%  $20,595 
NPV 10%  $11,856 

 

76

 

 

22.3After Tax Considerations

 

Tax considerations, with respect to US income tax, are based on a stand-alone operation and include a depletion tax credit equivalent to 22% of 50% of the expenses for uranium and a US corporate federal income tax rate of 21%. Table 22.3 summarizes the estimated after-tax IRR and NPV for a range of discount rates in US$ x 1,000.

 

IRR POST INCOME TAX   16%
NPV5%  $25,900 
NPV7%  $18,473 
NPV 10%  $10,082 
NPV 15%  $1,077 

 

22.4Sensitivity

 

Project economic sensitivities were evaluated with respect to commodity price, resource recovery, mined grade, CAPEX, and OPEX. Overall, the project the project is most sensitive to mined grade, resource recovery, and commodity price. The project is less sensitive to variations in OPEX and is the least sensitive to variations in CAPEX, as follows.

 

10% Change  IRR   NPV 7%* 
Price   13%  $30,000 
Recovery   15%  $35,000 
Grade   16%  $37,000 
CAPEX   5%  $6,400 
OPEX   10%  $26,000 

 

*rounded

 

The subsequent table and figures display the projects sensitivity to these criteria for IRR and NPV 7% for commodity price. The breakeven commodity price is approximately US$56 per pound U3O8.

 

Commodity Price per
Pound U3Os
   IRR{%)   NPV@ 7%
Discount Rate
UD$ x 1,000
 
$56    5    nil 
$60    17   $20,914 
$65    30   $50,970 
$70    39   $71,199 

 

77

 

 

 

 

 

 

22.5Payback Period

 

Referring to the cash flow (Table 21.3) the payback period is approximately 5 years.

 

22.6Consideration of Inferred Mineral Resources

 

The base case economic analysis considered only the Indicated mineral resources for the project. For the PEA, a GT cutoff of0.80 was applied and areas of isolated mineralization, less than 20,000 pounds of uranium, were excluded.

 

78

 

 

23.0Adjacent Properties

 

The Project is within the Grant Uranium Belt and as such there are numerous areas of historic mining and milling operations, as well as numerous advanced stage projects controlled by others. The are no current mineral processing facilities in the Grants Uranium Belt. The nearest processing facility is approximately 300 miles to the northwest, the White Mesa mill, owned by Energy Fuels.

 

24.0Other Relevant Data and Information

 

24.1Groundwater Levels and Quality

 

Historic groundwater quality data in the vicinity of the mine shaft show Radium-226 levels below drinking water standards (lntera, 2008). This and other historic water quality parameters indicate the mine waters could be discharged and/or would be suitable for use as mill process water.

 

The water level associated with the Westwater Canyon Member (host sandstone) is approximately 6130 feet above mean sea level as compared to the shaft collar elevation of approximately 6980 feet above mean sea level or a depth of approximately 850 feet below the ground surface (Intera, 2009). Specific information relative to mine inflow and dewatering requirements were not available.

 

For the PEA it was assumed that water from mine dewatering would be used for mineral processing. If the volume of water produced form mine dewatering was not sufficient enCore has sufficient water rights from other sources for mineral processing.

 

There is a risk that the mine dewatering volume could exceed mineral processing requirements and/or the water quality would not meet discharge standards. In that event some form of water treatment may be required.

 

25.0Interpretations and Conclusions

 

The PEA for the Marquez and Juan Tafoya project includes an underground conventional mine operation with on-site mineral processing. The underground mine operations would be concurrent with a mine life of approximately 15 years. This is the first time since the initial discoveries that these two adjacent areas of mineralization have been held by the same party.

 

The project, given the assumptions stated herein, would be profitable with a US$60 per pound selling price. In constant dollars the project is estimated to generate an IRR of 17% before taxes and has an NPV of approximately US$20.5 million at a 7% discount rate. (Refer to Section 22)

 

79

 

 

The technical risks related to the project are considered to be low as the mining and recovery methods are proven. The mining and mineral processing methods proposed have been employed successfully in the vicinity and regionally for deposits of a similar nature and geologic setting.

 

The project was once permitted for similar operations but did not go forward due falling uranium prices in the l 980’s. The project is located on private land and the mine and mill areas have been previously disturbed. The major permits required include a Source and Byproduct Materials License from the NRC and a mining permit from the state of New Mexico. Based on regional opposition to similar project in the region some level of opposition to the project should be expected. However, overall, the Fraser Institute Annual Survey of Mining Companies, 2020 ranks New Mexico as 10th out of 80 jurisdictions on their Policy Perception Index, which indicates a favorable perception by the mining industry towards New Mexico mining policies.

 

The author is not aware of any other specific risks or uncertainties that might significantly affect the mineral resource and reserve estimates or the consequent economic analysis. Estimation of costs and uranium price for the purposes of the economic analysis over the life of mine is by its nature forward-looking and subject to various risks and uncertainties. No forward-looking statement can be guaranteed, and actual future results may vary materially.

 

Readers are cautioned that it would be unreasonable to rely on any such forward-looking statements and information as creating any legal rights, and that the statements and information are not guarantees and may involve known and unknown risks and uncertainties, and that actual results are likely to differ (and may differ materially) and objectives and strategies may differ or change from those expressed or implied in the forward-looking statements or information as a result of various factors. Such risks and uncertainties include risks generally encountered in the exploration, development, operation, and closure of mineral properties and processing facilities. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation:

 

risks associated with mineral resource estimates, including the risk of errors m assumptions or methodologies;

 

risks associated with estimating mineral extraction and recovery, forecasting future price levels necessary to support mineral extraction and recovery and the Company’s ability to increase mineral extraction and recovery in response to any increases in commodity prices or other market conditions;

 

uncertainties and liabilities inherent to conventional mineral extraction and recovery;

 

geological, technical and processing problems, including unanticipated metallurgical difficulties, less than expected recoveries, ground control problems, process upsets, and equipment malfunctions;

 

risks associated with labor costs, labor disturbances, and unavailability of skilled labor;

 

risks associated with the availability and/or fluctuations in the costs of raw materials and consumables used in the production processes;

 

risks associated with environmental compliance and permitting, including those created by changes in environmental legislation and regulation, and delays in obtaining permits and licenses that could impact expected mineral extraction and recovery levels and costs;

 

actions taken by regulatory authorities with respect to mineral extraction and recovery activities;

 

risks associated with dependence on third parties in the provision of transportation and other critical services; and

 

risks associated with the assumptions and general level of accuracy of a PEA.

 

80

 

 

26.0Recommendations

 

The project is sensitive to mining factors including resource recovery, dilution, and grade, and the sizing and sorting of mine materials and mineral processing and recovery. The project is also subject to scrutiny with respect to environmental considerations. Recommendations are summarized by mineral tenor, mine and mineral resource, mineral processing, and environmental including but are not limited to:

 

Mineral tenor and rights should be confirmed, and leases updated.

 

Mine and mineral resources

 

oThe condition of the existing mine and vent shaft should be determined. This could include accessing the shafts, examining the interior of the shafts via downhole camera, lidar (above the water table) and/or sonar (below the water table)

 

oHydrological studies are recommended using existing wells to determine potentiometric water levels, hydraulic properties of the Westwater Canyon Member, and predict groundwater inflow during mining operations.

   

oGroundwater quality studies using existing wells to determine water quality parameters and assess suitability for use in mineral processing and/or treatment and discharge.

   

oCoring to define disequilibrium conditions and to collect a representative bulk sample of the mineralized material for geotechnical and metallurgical studies.

   

oGeotechnical studies would include material classification, compressive strength and related parameters.

 

Mineral processing

 

oRepresentative bulk samples from coring should be tested for:

 

the variability of uranium grade by size fraction.

   

suitability of the material for radiometric sorting.

   

parameters related to grinding, leaching characteristic via acid and alkaline lixiviants, process recovery, solvent extraction, yellow cake precipitation, and yellow cake impurity levels.

 

oSuitability of the material for heap and/or in-situ recovery should be evaluated.

 

81

 

 

Environmental

 

oAn environmental audit should be completed.

   

oStatus of all previously conducted environmental baseline studies should be determined and follow up studies and/or sampling should be conducted to maintain the studies in accordance with current regulations and practices.

   

oThe fatal flaw analysis for mill and tailings site in 2008 should be reviewed and updated as appropriate.

   

oPublic outreach within the local communities should be revived.

 

Southeast Deposit

 

oReview past drilling and other geologic information relative to the Southeast Deposit.

   

oAs appropriate and an investigative program should be recommended to evaluate the mineral resources and potential economic recovery methods for mineralization in this area.

 

Update Mineral Resource Estimates and PEA

 

Cost estimates are summarized in Table 26.1. Most of the costs are one time expenditures. Maintaining environmental baselines studies as current and public outreach will have ongoing annual costs.

 

82

 

 

Table 26.1 - Recommendations

 

Mineral Tenor and Leases  $50,000 
      
Mine and Mineral Resources     
Shaft Condition  $50,000 
Hydrological Study  $250,000 
Groundwater Quality  $50,000 
Coring  $1,000,000 
Sample Analysis  $50,000 
Geotechnical Testing  $100,000 
Subtotal Mine and Mineral Resources  $1,500,000 
      
Mineral Processing     
Sizing and Sorting  $150,000 
Metallurgical Testing  $250,000 
Heap and ISR evaluation  $100,000 
Subtotal Mineral Processing  $500,000 
      
Environmental     
Audit  $50,000 
Status and Update Baseline Studies  $250,000 
Fatal Flaw Analysis  $50,000 
Public Outreach  $150,000 
Subtotal Environmental  $500,000 
      
Southeast Deposit  $50,000 
      
Update Mineral Resources and PEA  $100,000 
      
GRAND TOTAL  $2,700,000 

 

83

 

 

27.0References

 

Alief, H.M., 2010, Marquez Uranium Property, McKinley and Sandoval Counties, New Mexico, National Instrument 43-101 Mineral Resource Report, prepared for Strathmore Minerals Corporation, 35p.

 

Carter, G.S., 2014, NI 43-101 Technical Report on Mineral Resources: Juan Tafoya Uranium Project, Cibola, McKinley, and Sandoval Counties, New Mexico USA, prepared for Uranium Resources Inc., 75p.

 

Dodd, P.H., and Droullard, R.F., 1967, Borehole logging methods for exploration and evaluation of uranium deposits, U.S. Atomic Energy Commission.

 

Fitch, D.C., 1980, Exploration for Uranium Deposits, Grants Mineral Belt, in Geology and Mineral Technology of the Grants Uranium Region, 1979, Rautman, C.A., ed., New Mexico Bureau of Mines and Mineral Resources, p. 40-51.

 

Fraser Institute “Annual Survey of Mining companies 2020”.

 

Kelley, V.C., 1963, Tectonic Setting, in Geology and Technology of the Grants Uranium Region, Kelley, V.C., ed., New Mexico Bureau of Mines and Mineral Resources, p. 19-20.

 

Livingston, Jr., B.A., 1980, Geology and Development of Marquez, New Mexico, Uranium Deposit, in Geology and Mineral Technology of the Grants Uranium Region, 1979, Rautman, C.A., ed., New Mexico Bureau of Mines and Mineral Resources, p. 253-161.

 

Peach, J., and Popp, A.V., 2008, The Economic Impact of Proposed Uranium Mining and Milling Operations in the State of New Mexico: prepared by the Office of Policy Analysis, Arrowhead Center, New Mexico State University, lOlp.

 

Sandford, R.F., 1992, A New Model for Tabular-Type Uranium Deposits: Economic Geology, Volume 87, p. 2041-2055.

 

Turner-Peterson, C.E., 1986, Fluvial Sedimentology of a Major Uranium-Bearing Sandstone - A Study of the Westwater Canyon Member of the Morrison Formation, San Juan Basin, New Mexico, in A Basin Analysis Case Study: The Morrison Formation, Grants Uranium Region, New Mexico, AAPG Studies in Geology #22, Turner-Peterson, et al., eds., American Association of Petroleum Geologists, p. 47-75.

 

Turner-Peterson, C.E., and Fishman, N.S., 1986, Geologic Synthesis and Genetic Models for Uranium Mineralization in the Morrison Formation, Grants Uranium Region, New Mexico, in A Basin Analysis Case Study: The Morrison Formation, Grants Uranium Region, New Mexico, AAPG Studies in Geology #22, Turner-Peterson, et al., eds., American Association of Petroleum Geologists, p. 357-388.

 

Tradetech, 2020, Uranium Market Study Issue 4.

 

84

 

 

28.0Signature Page and Certification of Qualified Person

 

I, Douglas L. Beahm, P.E., P.G., do hereby certify that:

 

1.I am the Principal Engineer and President of BRS, Inc., 1130 Major Avenue, Riverton, Wyoming 82501.

 

2.I am the author of the report “Marquez-Juan Tafoya Uranium Project, 43-101 Technical Report, Preliminary Economic Assessment” dated June 9, 2021.

 

3.I graduated with a Bachelor of Science degree in Geological Engineering from the Colorado School of Mines in 1974. I am a licensed Professional Engineer in Wyoming, Colorado, Utah, and Oregon; a licensed Professional Geologist in Wyoming; a Registered Member of the SME.

 

4.I have worked as an engineer and a geologist since 1974. My work experience includes uranium exploration, mine production, and mine/mill decommissioning and reclamation. Specifically, I have worked with numerous uranium projects hosted in sandstone environments in Wyoming.

 

5.I was last present at the site on May 25, 2012.

   

6.I am responsible for all sections of the report with the exception of Sections 13 and 17 where I relied upon Terence McNulty, co-author, and those portions of Sections 4, 19, and 20, where I relied on enCore as stated in Section 3.

   

7.I am independent of the issuer in accordance with the application of Section 1.5 of NI 43-101. I have no financial interest in the property and am fully independent of enCore Energy. I hold no stock, options or have any other form of financial connection to enCore. enCore is but one of many clients for whom I consult.

   

8.I do have prior working experience on the property as stated in the report.

   

9.I have read the definition of“qualified person” set out in National Instrument 43-101 and certify that by reason of my education, professional registration, and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

   

10.I have read NI 43-101 and Form 43-l0lFl, and the Technical Report has been prepared in compliance with same.

   

11.As of the date of this report, to the best of my knowledge, information and belief, the parts of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

 

June 9, 2021  
“original signed and sealed”  
Isl Douglas L. Beahm  
   
Douglas L. Beahm, SME Registered Member  

 

85

 

 

CERTIFICATE of QUALIFIED PERSON TERENCE P. (“Terry”) McNULTY

 

I, Terence P. McNulty, D. Sc., P. E., do hereby certify that:

 

1.I am the owner and President ofT. P.McNulty and Associates, Inc., located at4321 N. Camino de Carrillo, Tucson, AZ 85750-6375. My email address is tpmaconl@aol.com.

 

2.I am co-author of the report entitled “Marquez - Juan Tafoya Uranium Project NI 43-101 Technical Report- Preliminary Economic Assessment”, and dated June 9, 2021.

 

3.I earned a Bachelor of Science degree in Chemical Engineering from Stanford University in 1961, a Master of Science degree in Metallurgical Engineering from Montana School of Mines in 1963, and a Doctor of Science degree from Colorado School of Mines in 1966. I am a Registered Professional Engineer in the State of Colorado (License # 24789) and a Registered Member (#2152450RM) of the Society of Mining, Metallurgy, & Exploration, Inc.

 

4.I have worked as a metallurgical engineer for 58 years, including periods of employment between degrees. For the purpose of this Report, my relevant experience includes the following:

 

a.I was Manager of Corporate R&D and Technical Services for The Anaconda Company and ARCO/Anaconda Minerals during the 1970s and was responsible for direction of many laboratory investigations for the Uranium Division;

 

b.I had overall technical responsibility for expansion of the Bluewater, NM, uranium mill from 3,000 to 7,000 tons of ore daily and had the same responsibilities for the in-situ uranium production facility at Rhode Ranch, TX;

 

c.Since 2008, I have participated in 35 uranium studies and have contributed to NI 43- 101 compliant reports for most of them.

 

5.I have not been on the site recently.

 

6.I am responsible for all of Sections 13 and 17 of this report and related Appendices.

 

7.Applying all relevant tests in NI 43-101, I am independent of the issuer.

 

8.I do not have prior work experience on the subject property.

 

9.I have read the defmition of “Qualified Person” set out in National Instrument 43-101 and certify that, by reason of my education, professional registration, and relevant work experience, I fulfill the requirements of Qualified Person for the purposes of NI 43-101.

 

10.I have read NI 43-101 and Form 43-l0lFI and the Technical Report has been prepared in compliance with those requirements.

 

11.As of the date of this Report, I am unaware of any material fact or material change with respect to the subject matter of the Technical Report that would affect the conclusions provided herein.

 

12.I consent to the filing of the Technical Report with any stock exchange and any regulatory authority.

 

June 9, 2021

Signed and Sealed

 

“Terence P. McNulty”

 

Terence P. McNulty

 

T. P. McNULTY AND ASSOCIATES, INC.

 

86

 

 

Appendix A

 

 

 

 

 

87

 

  

APPENDIX 17- I

ENCORE ENERGY CORP.

MARQUEZ CANYON/JUAN TAFOYA PROJECT

SIMPLIFIED MASS BALANCE for UNDERGROUND SORTING with HEAP or AGITATED LEACHING on the SURFACE

Terry McNulty - May 2021

 

The following assumes 30% weight loss and 5% U3O8 loss during screening and sorting

 

Preliminary design assumes primary and secondary crushing undrrground to a nominally minus½2-inch product, which would be a suitable feedsize for underground radiometric sorting. The upgraded ore would then be hoisted and collected in a stockpile from which ore would be drawn through a slot onto a belt feeder. The ore would pass over a conveyor and belt scale (“weightometer”), thence to a rod mill in closed circuit ith a sieve-bend screen, yielding a nominally minus 28-mesh (0.589 mm) product. Previous designs have included a semi-autogenous (“SAG”) mill, but underground crushing, screening, and sorting have eliminated this requirement.

 

High water flows underground with entrained uranium-bearing solids may necessitate a sump pump and booster pump to elevate the slurry to a surface thickener and then to the agitated acid leach circuit for dissolving uranium from the collected sludge, including slurry from the dust scrubber. The thickener underflow mass flow and solution flowrate would be measured and sampled for correct metallurgical accounting. Alternatively, the slurry would be acidified and added to heap leach feed, enabling agglomeration of fines.

 

One-stage 6-tank agitated leaching in hot aqueous sulfuric acid with sodium chlorate as an oxidant for tetravalent uranium would be followed by counter-current decantation (“CCD”) washing of dissolved uranium away from the leached residue in a string of six high-rate thickeners.. The clarified pregnant leach solution (“PLS”) would then be purified and upgraded in uranium concentration through a standard solvent extraction circuit using a tertiary amine diluted with kerosene and isodecanol. Four extraction mixer/settlers are in closed circuit with four strip mixer/settlers and a single-stage organic scrub mixer/settler using soda ash solution to regenerate the organic. The uranium-enriched strip liquor is then steam-heated and enters three agitated tanks in series where it is sparged with anhydrous ammonia to precipitate ammonium diuranate yellowcake (“ADU”). The ADU slurry is thickened, centrifuged, and dried in a vacuum rotary dryer, followed by loading into standard drums for shipment. Wet venturi scrubbers are located throughout the plant to capture fugitive dust, and the dust slurries are returned to points in the process that most closely match uranium concentration. For example, dust slurry from the grinding area will be added to the rod mill discharge and periodically hand-sampled to ensure accurate metallurgical accounting.

  

      DILUTED MINE-RUN ORE SCREENED or SORTED   Calculated 
OPTION  DESCRIPTION  Wet TPD   % Water   Dry TPD   TPD H2O   % U3O8   Lb. U3O8   HEADS 
ALL  Primary jaw crusher to 6-inch   1,429    10    1286    143    0.120    3,087      
   Conveyor   1,429    10    1286    143    0.120    3,087      
   2-deck vibrating screen   1,429    10    1286    143    0.120    3,087      
   Secondary crusher to 2½Ͳinch   715    10    643    71    0.120    1,543      
   Screen o’size return conveyors   715    10    643    71    0.120    1,543      
   Sorter feed conveyor   1,429    10    1286    143    0.120    3,087      
   Radiometric sorter   1,429    10    1286    143    0.120    3,087      
   Reject conveyor to backfill   409    10    368    41    0.042    154      
   Upgraded ore conveyor   1,000    9    905    95    0.159    2,901      
   Skip loading pocket   1,000    9    905    95    0.159    2,871      
   Minewater and ore slimes slurry   20    75    5    15    0.309    31    0.160 
   Surface stockpile with draw slot   1000    9    910    90    0.160    2,871      
   Apron feeder   1000    9    910    90    0.160    2,871      
   Conveyor to Heap or Mill   1000    9    910    90    0.160    2,901      
   Weightometer   1000    9    910    90    0.160    2,901      
   Process water tank (from mine)   2731    100    0    2731    0    0      
   Process water pump   2731    100    0    2731    0    0      
   Minewater slurry thickener   20    60    8    12    0.309    31      
                                       
HEAP  Portable radial stacker   1,000    9    905    95    0.160    2,901      
LEACH  (Feed conveyor included above)                                   
                                       
TANK  Solution head tank   0    100    0    810    0    0      
LEACH  Mill feed conveyor   1,000    9    905    95    0.160    2,901      
   Weightometer   1,000    9    905    95    0.160    2,901      
   Rod-media grinding mill discharge   1,267    30    1267    1293    0.160    2,901      
   Screen feed pump   1,811    50    905    905    0.160    2,901      
   DSM-type sieve bend   500    50    250    250    0.160    2,901      
   Agitated leaching tanks (1 stage only)   1,811    45    941    869    0.160    31      
   Leach discharge thickener, incl.4% gypsum   1,883    50    941    869    0.002    31      
   CCD feed pump   1,883    50    941    869    0.002    2,901      
   CCD thickeners   1,883    50    941    869    0.002    31      
   CCD underflow pump   1,883    50    941    869    0.002    31      
   Tailings booster pump   1,883    50    941    869    0.002    31      
                                       
ALL  Clarifier feed pump   869    99    9    860    0.002    0      
OPTIONS  Clarifier underflow to leach   50    70    9    860    0.002    0      
   Sand filter feed pump   1    99    0    860    0.002    0      

 

88

 

  

APPENDIX17-II

ENCORE ENERGY CORP.

MARQUEZ CANYON/JUAN TAFOYA PROJECT

EQUIPMENT LISTS and COST ESTIMATES

Terry McNulty - May 2021

 

Actual average ore feedrate = 910-1,000 Dry Short Tons per Day (DSTPD), but design is for 1,100 DSTPD to allow for expansion or exessive downtime that would require operating at higher throughput.

 

Note: Some items, especially tanks, may have diffreent prices for the same sizes, reflecting different materials or protective coatings.

 

Equipment selections are important. For instance, these leach residues are good candidates for high-rate thickeners. The purchase price is higher and more flocculant is usualoly needed, but the tanks are typically one-third the diameter of conventional thickeners, enabling savings in building footprine, lengths of piping and elecytrical runs, and HVAC expense.

 

   LEACH                    
   FEED              UNIT   TOTAL 
ITEM  DSTPD   SIZE  kW   Number   PRICE   PRICE 
COMMON TO ALL OPTIONS:  1,000                    
Crusher feed bin        20-ton w/16” x 16” grizzly   0    1    57,000    57,000 
Apron feeder, manganese alloy       36” x 8’   5    1    102,000    102,000 
Primary jaw crusher, 2-toggle       15” x 24”   30    1    178,000    178,000 
Conveyor to screen, inclined       36” x 100’   40    1    80,000    80,000 
Vibrating screen, 2-deck, inclined       4‘W x 10‘L   4    1    41,000    41,000 
Secondary (cone) crusher       30-inch standard   100    1    327,000    327,000 
Chutes, lpcally fabricated, rubber lined steel       As needed to fit equipment   0    5    25,000    125,000 
Sorter feed conveyor       24” x 100’, inclined   7    1    68,000    68,000 
Radiometric sorter       24” wide with air blast rejector   20    1    570,000    570,000 
Reject conveyor to backfill surge pile       24” x 100’   20    1    68,000    68,000 
Weightometer, 0.5% accuracy w/panel       36”   0.5    2    10,600    21,200 
Upgraded ore conveyor       24” x 100’, essentially level   20    1    68,000    68,000 
Skip loading pocket (included by BRS)           0    0         - 
Motor control center       300 kva   0    1    88,000    88,000 
Lighting (included by BRS)           0    0         - 
Dust scrubber, wet venturi       18,000 cfm   80    1    125,000    125,000 
Minewater sump pump       30 gpm, 50’ TDH   4    1    12,100    12,100 
Minewater booster pump to surface       50 gpm, 2,500’ TDH   20    4    19,000    76,000 
Scrubber slurry pump       20 gpm, 25’ TDH   4    1    7,500    7,500 
Pipeline to plant area       3’ ABS, 13,000’@ $4.00 laid   0    13,000    4    52,000 
Thickener for minewater slurry       30’ D, epoxy-painted steel   2    1    198,000    198,000 
Agitated leach tank for minewater slurry       4-hour 8‘D x 10’ RLS, 50% solids   0    1    32,000    32,000 
Leach tank agitator       36‘D, RLS   15    1    22,000    22,000 
Minewater leach residue thickener       30‘D, conventional, RLS   3    1    225,000    225,000 
Surface surge bin for skip       50-ton, locally fabricated steel   0    1    50,000    50,000 
Belt feeder to stockpile conveyor       24” x 8’   5    1    21,000    21,000 
Conveyor to stockpile       24” x 100’, inclined   7    1    68,000    68,000 
Surface stackpile pad w/feeder slot       100’ x 100’ x 8-inch concrete   0    1    100,000    100,000 
Belt feeder       24” x 20’   5    1    45,000    45,000 
Weightometer, 0.5% accuracy w/panel       36”   0.5    1    10,600    10,600 
Front-end wheel loader       4.5 cy, Cat 966 equiv.   0    1    360,000    360,000 
TOTAL           392              3,197,400 

  

89

 

 

A. HEAP LEACHING OPTION for 9.6 Million Tons @ 3 tons/square foot:   -   NET if TAILINGS AREA LINED 
Pad with dual-HDPE liners:              -        
Preparation       3.2 MM Sq. Feet        3,200,000    0.05    160,000       - 
Fabric       3.32 MM Sq. Feet        3,320,000    0.15    498,000       - 
Bedding material       69,000 Cu. Yards        69,000    7.34    506,460       - 
Drain material       137,000 Cu. Yards        137,000    6.77    927,490       - 
Liner, 80-mil HDPE       6.64 MM Sq. Feet        6,640,000    0.72    4,780,800       2,390,400 
Geo-net       3.32 MM Sq. Feet        3,320,000    0.35    1,162,000       581,000 
ABS pipe       10-inch        1,200    6.89    8,268       8,268 
ABS pipe       8-inch        7,800    4.79    37,362       37,362 
ABS pipe       6-inch        10,100    2.52    25,452       25,452 
PVC pipe       2-inch        9,200    0.90    8,280       8,280 
Sub-total                          8,114,112       3,050,762 
Mobilization & de-mobilization                          243,423       121,712 
QA/QC on plastic welds                          324,564       162,282 
Solution collection ditches                          811,411       811,411 
Runoff diversion channels                          40,571       40,571 
Sub-total                          1,419,970       1,135,976 
Solution ponds                          476,704       238,352 
Pumping & piping                          190,682       190,682 
Sub-total                          667,386       429,034 
Motor control center       300 kva                  88,000       88,000 
Safety showers                3    1,250    3,750       3,750 
Eye wash fountains                3    475    1,425       1,425 
Makeup water & monitor wells                          255,037       255,037 
Sub-total                          348,212       348,212 
Sub-total                          10,549,679       4,963,983 
Construction materials                          2,109,936       992,797 
Construction labor                          3,164,904       1,489,195 
Contractor's fee                          3,164,904       1,489,195 
Sub-total                          8,439,743       3,971,186 
Sub-totals                          18,641,211       8,935,169 
                                     
Leach pad loading @ nominally minus 2-inch                                    
Stockpile conveyor to stacker       24-inch x 200 feet   24    1    102,000    102,000       102,000 
Portable radial stacker       24-inch x 80 feet   7.5    1    93,000    93,000       93,000 
Sub-total           31.5              195,000       195,000 
TOTAL                          18,836,211   NET   9,130,169 
                                     
B. GRINDING & AGITATED LEACHING:  kW                        
Process water storage tank       100,000 gal., 36'D x 14'H   0    1    111,000    111,000         
Concentrated sulfuric acid storage tank       12'D x 20'H, polyethylene   0    2    16,000    32,000         
Sulfuric acid feed pump       5 gpm   0.75    6    7,000    42,000         
Sodium chlorate bulk storage bin       2,000 cu. ft., (1 week), poly.   0    1    20,000    20,000         
Sodium chlorate feeder (dry solids)       6” x 36” vibrating, reagent-type   0.75    1    3,500    3,500         
Sodium chlorate mix tank       1,500 gal., polyethylene   0    1    1,500    1,500         
Mix tank circulating pump       10 gpm, 50' TDH, plastic   1    2    3,000    6,000         
Sodium chlorate solution feeder (valve)           0    2    2,000    4,000         
Instrument air compressor       21 cfm   5    1    6,500    6,500         
Surge bin, 20-ton       Locally fabricated, steel   0    1    25,000    25,000         
Belt feeder       24”W x 4''L   2    1    12,000    12,000         
Rod mill feed conveyor       30”W x 20'L   8    1    31,000    31,000         
Weightometer, 0.5% accuracy, w/panel       36”   9    1    10,600    10,600         
Dust scrubber, wet venturi       18,000 cfm   80    1    125,000    125,000         
Overhead travelling bridge crane       5-ton, 32' span   2    1    49,000    49,000         
Sump for rod mill, screen, and scrubber       Locally fabricated, steel   0    1    7,500    7,500         
Grinding area sump pump       30 gpm, 50' TDH   5    1    12,100    12,100         
Rod mill discharge pump       600 gpm, 40' TDH   40    1    19,000    19,000         
Sieve bend classifier       4'W x 5' L   0    1    49,000    49,000         
Rod mill       7'D x 12'L   188    1    315,000    315,000         
Boiler for superheating solutions       5 MMBtu/hour natural gas   0    1    78,000    78,000         
Slurry storage tank       20'D x 24'H, epoxy-painted steel   0    1    120,000    120,000         
Slurry tank agitator       54”D, ship-type, RLS   15    1    55,000    55,000         
Automatic sampler       Variable,cycle, slotted cutter head   0.3    1    13,000    13,000         
Leach feed slurry pump       400 gpm, 40' TDH   8    2    13,500    27,000         
Leach tank, 1-stage, 20 hours, 50°C       20'D x 24'H, baffled, RLS   0    6    195,000    1,170,000         
Leach tank agitator, Mixco A-310       42” D   93    6    185,000    1,110,000         
Leach tank scrubber, wet venturi       18,000 cfm   80    1    125,000    125,000         
Flocculant mix tank       500 gal., polyethylene   0    1    900    900         
Flocculant mix tank agitator       Portable   1.5    1    1,800    1,800         
Flocculant feeder       6” x 36”, vibrating, reagent-type   0.3    1    3,500    3,500         
Leaching area sump       Cast in concrete floor   0    1    0    -         
Leaching area sump pump       30 gpm, 50' TDH   5    1    12,100    12,100         
CCD feed pump       600 gpm, 40' TDH   40    2    19,000    38,000         
CCD thickener tank, High-rate       25'D x 10' H w/mixer box   0    6    255,000    1,530,000         
CCD thickener mechanism       Automatic lift, torque controlled   7    6    85,000    510,000         
CCD underflow pump       200 gpm, 25' TDH   4    6    15,000    90,000         
CCD overflow pump       500 gpm, 25' TDH, SS 316   6    6    32,000    192,000         
Tailings pump       200 gpm, 40' TDH   12    2    13,000    26,000         
Tailings impoundment       Existing area will need upgrading   0    1    950,000    950,000         
Tailings water reclaim barge & pump       500 gpm, 100' TDH, RLS   7.5    1    19,000    19,000         
Eye wash fountains           0    3    475    1,425         
Motor control centers       1,000 kva   15    1    160,000    160,000         
Building, prefabricated       100'W x 125' x 35'H, insulated   100    1    2,200,000    2,200,000         
Sub-total           1,316              9,314,425         
Construction materials                          4,657,213         
Installation labor                          3,725,770         
Contractor's fee                          2,328,606         
Sub-total                          20,026,014         
                                     
C. PREGNANT LEACH SOLUTION and MINEWATER TREATMENT:                   
Combined solution clarifier       Conventional thickener, 50' D   2    1    310,000    310,000         
Clarifier mechanism, light duty       Slime solids only   2    1    65,000    65,000         
Clarifier underflow pump       50 gpm, 40' TDH, SS 316   4    1    12,000    12,000         
Mixed media “sand” filter       24” D, swimming pool-type, FRP   0    3    4,500    13,500         
Sand filter feed pump       600 gpm, 25 psi, swimming pool   2    2    7,000    14,000         
Clarified PLS storage tank       20'D x 24'H, epoxy-painted steel   0    1    120,000    120,000         
Isodecanol storage tank       500 gal., polyethylene   0    1    900    900         
Amine extractant storage tank       500 gal., polyethylene   0    1    900    900         
Kerosene diluent storage tank       5,000 gal. fuel tank, mild steel   0    1    13,000    13,000         
Kerosene pump       20 gpm, 10' TDH   1.5    1    900    900         
SX feed pump       500 gpm, 25'TDH, SS 316   7    1    27,000    27,000         
Extraction mixer/settler       815 sq. ft., FRP   7    4    38,000    152,000         
Raffinate storage tank w/skimmer       55,000 gal., 20'D x 24' RLS   0    1    135,000    135,000         
Raffinate pump       500 gpm, 25' TDH, SS 316   7    1    27,000    27,000         
Crud tank w/skimmer       15,000 gal., polyethylene   0    1    16,000    16,000         
Filter press feed pump       10 gpm, 100' TDH, SS 316   3    1    9,000    9,000         
Crud filter press       10-leaf, 20 sq. ft., FRP, manual   0    1    18,000    18,000         
Strip mixer/settler       160 sq. ft., FRP   3    4    19,000    76,000         
Salt (NaCl) mix tank       5,000 gal., polyethylene   0    1    6,500    6,500         
Salt mix tank agitator       Portable   1.5    1    1,800    1,800         
Organic scrub mixer/settler       160 sq. ft., FRP   3    1    19,000    19,000         
Clean organic storage tank       15,000 gal., polyethylene   0    1    16,000    16,000         
Fire suppression system       N2-loaded sprinklers   0    1    55,000    55,000         
Eye wash station           0    3    475    1,425         
Ammonia storage tank       Provided by farm supplier   0    1    0    -         
Precipitation tank       500 gal., polyethylene   0    3    900    2,700         
Precipitation tank agitator       Portable   1.5    3    1,800    5,400         
Yellowcake thickener       10'D, conventional, FRP   1.5    2    65,000    130,000         
Thickener mechanism           1.5    2    17,000    34,000         
Yellowcake thickener overflow tank       2,500 gal, polyethylene   0    1    3,500    3,500         
Ammonium sulfate storage tank       2,500 gal, polyethylene   0    1    3,500    3,500         
Polishing filter (for entrained YC fines)       24” D, swimming pool-type, FRP   0    1    4,500    4,500         
Filter feed pump       20 gpm, 25 psi, swimming pool   1.5    1    2,000    2,000         
Clarified barren strip tank       1,500 gal, polyethylene   0    1    1,500    1,500         
Sodium removal tank       200 gal, polyethylene   0    2    500    1,000         
Sodium removal tank agitator       Portable   1.5    2    1,800    3,600         
Clarified YC solution bleed tank to tailings       500 gal., polyetylene   0    1    900    900         
Centrifuge for thickened yellowcake slurry       150 lb/hr H2O removal   3    1    14,000    14,000         
Vacuum rotary dryer, Stokes type, SS 316       1.4 cu. m.   2    1    288,000    288,000         
Vacuum pump       150 scfm   5.5    1    21,000    21,000         
Dust scrubbrer, wet venturi       2,800 cfm   7    1    19,400    19,400         
Drum filling & weighing machine       5 drums/ 24 hours   1    1    29,000    29,000         
Yellowcake drum inventory       Reinforced, 800 lb, security lid   0    10    110    1,100         
Drum loading dock           0    1    18,000    18,000         
Bleed solution evaporation cell       1 acre x 3' deep, double-lined   0    1    0    175,000         
Office (double-wide mobile)       50-foot length, HVAC   15    1    40,000    40,000         
Sample prep building       50-foot length, HVAC   15    1    40,000    40,000         
Sample prep equipment       Crusher, pulverizer, hoods, etc.   15    1    75,000    75,000         
Assay lab (double-wide mobile)       50-foot length, HVAC   15    1    43,000    43,000         
Analytical equipment and supplies       Hoods, benches, AA, fluorometer   0    1    435,000    435,000         
Motor control centers       500 kva   10    2    90,000    180,000         
Standby generator       Diesel, 400 kW   0    1    59,000    59,000         
Security shack, mobile       8' x 20', insulated   7    1    13,000    13,000         
SX building       50'W x 80'L x 15'H, insulated   20    1    410,000    410,000         
Reagent first fills       30-day supply   0    1    227,000    227,000         
Perimeter fence       4,000 linear feet @ 6 feet high   0    4,000    12    48,000         
Perimeter and yard lighting           50    1    15,000    15,000         
First-aid supplies           0    1    1,000    1,000         
Sub-total           216              3,454,025         
Construction materials                          1,554,311         
Contractor's fee                          1,727,013         
TOTAL                          6,735,349         
                           -         
HEAP LEACHING TOTAL CAPITAL =    28,768,959                      -         
AGITATED LEACHING TOTAL CAPITAL =   29,958,763                      -         

 

90

 

  

APPENDIX 17-III

ENCORE ENERGY CORP.

MARQUEZ CANYON/JUAN TAFOYA PROJECT

ESTIMATED OPERATING & MAINTENANCE/REPAIR COSTS for STAFFING and MATERIALS & REAGENTS

Terry McNulty - May 2021

 

A. PERSONNEL:

  

      LEACHING OPTIONS     
     

HEAP LEACHING

  

AGITATED LEACHING

   SOLUTION TREATMENT 
CLASSIFICATION  Number  ANNUAL   BURDEN   TOTAL   ANNUAL   BURDEN   TOTAL   ANNUAL   BURDEN   TOTAL 
Salaried:                                       
Processing Manager  1   145,000    0.38    200,100    145,000    0.38    200,100              0 
Metallurgist  1   135,000    0.38    186,300    135,000    0.38    186,300              0 
Operations Supervisor  1   110,000    0.38    151,800    110,000    0.38    151,800              0 
Mainenance Supervisor  1   105,000    0.38    144,900    105,000    0.38    144,900              0 
Radiation Safety Officer  1   105,000    0.38    144,900    105,000    0.38    144,900              0 
Personnel & Safety Manager  1   100,000    0.38    138,000    100,000    0.38    138,000              0 
Chief Chemist  1   95,000    0.38    131,100    95,000    0.38    131,100              0 
Purchasing Agent/Warehouse  1   85,000    0.38    117,300    85,000    0.38    117,300              0 
Shift Foreman  4   85,000    0.38    117,300    85,000    0.38    469,200              0 
Accounting Clerk 1   50,000    0.38    69,000    50,000    0.38    69,000              0 
TOTALS  13             1,400,700              1,752,600              0 
                                                 
Hourly:                                                
Heap or Plant Operator  4   68,000    0.38    93,840    68,000    0.38    375,360    0         0 
Grinding & Leaching Operator  4   0    0.38    0    68,000    0.38    375,360    0         0 
CCD & SX Operator  4   0    0.38    0    0    0.38    -    68,000    0.38    375,360 
Yellowcake Operator  4   0    0.38    0    0    0.38    -    68,000    0.38    375,360 
Laboratory Technician  4   0    0.38    0    68,000    0.38    375,360    0         0 
Intrumentation & Process Control  1   0    0.38    0    68,000    0.38    93,840    0         0 
Mechanic/Welder  3   68,000    0.38    93,840    68,000    0.38    281,520    0         0 
Electrician  3   65,000    0.38    89,700    65,000    0.38    269,100    0         0 
Helper/Laborer  6   48,000    0.38    66,240    48,000    0.38    397,440    0         0 
TOTALS  33             343,620              2,167,980              750720 

  

B. CONSUMABLES:  Price/unit   USAGE   Annual $   USAGE   Annual $   USAGE   Annual $ 
Electricity, PSCNM, $/kWh   0.030    3,104,640    93,139    10,422,720    312,682    214    50,846 
Natural gas, NMGas, $/MMBtu   2.20    0    0    23,760    52,272    0      
Diesel fuel, $/gal   2.75    18,000    49,500    6,000    16,500    0      
Sulfuric acid, $/ton   150    11,550    1,732,500    14,850    2,227,500    0      
Sodium chlorate, $/ton   250    1,650    412,500    3,300    825,000    0      
Flocculant for CCD, $/lb   3.00    0         50,000    150,000    0      
Kerosene, $/gal   3.50    0         0    -    59,400    207,900 
Isodecanol SX modifier, $/lb   1.35    0         0    -    6,900    9,315 
Alamine 336 SX extractant, $/lb   7.50    0         0    -    3,900    29,250 
Sodium chloride, $/ton   40    0         0    -    3,300    132,000 
Anhydrous ammonia, $/ton   280    0         0    -    99    27,720 
Ammonium sulfate, $/ton   175    0         0    -    150    26,250 
Lubricants, $/gal   16    660    10,560    330    5,280    85    1,360 
Maintenance & repair supplies/day   1,000    330    330,000    330,000    330,000    0    - 
Laboratory supplies/day   1,000    330    330,000    330,000    0    0    - 
              2,958,199         3,919,234         484,641 

 

TOTAL ANNUAL OPEX:      Recovery   Lbs.U3O8   $/Pound 
Heap Leaching   9,135,281    0.80    844,800    10.81 
Agitated Leaching   12,272,575    0.95    1,003,200    12.23 

 

TOTAL CAPEX:      Life Lbs.       Total $/lb 
Heap Leaching/SX   28,768,959    12,672,000    2.27    13.08 
Agitasted Leaching/SX*   29,958,763    15,048,000    1.99    14.22 
* Includes reagent "first fill" at   227,287                

 

If existing tailings area useable for a pad, heap capital reduces to $19,063,619.

  

91

 

 

APPENDIXl7-II

ENCORE ENERGY CORP.

MARQUEZ CANYON/JUAN TAFOYA PROJECT

EQUIPMENT LISTS and COST ESTIMATES

Terry McNulty - May 2021

 

Actual average ore feed rate 910-1.000 Dry Short Tons per Day (DSTPD). but design is for I. I 00 DSTPD to allow for expansion or excssivc downtime that would require operating at higher throughput.

 

Note: Some items, especially tan.ks, may have diffrecnt prices for the same sizes, reflecting different materials or protective coatings.

 

Equipment selections arc importanl. For instance, these leach residues arc good candidates for high-rate thickeners.

 

The purchase price is higher and more flocculant is usualoly needed, but the tanks arc typically one-third the diameter of conventional thickeners. enabling savings in building footprinc, lengths of piping and clccytrical runs, and HVAC expense.

 

   FEED              UNIT   TOTAL 
ITEM  DSTPD   SIZE  [ILLEGIBLE]   Number   PRICE   PRICE 
COMMON TO ALL OPTIONS:  1,000                    
Crusher feed bin      20-ton w/16” x 16” grizzly   0         57.000    57,000 
Apron feeder, manganese alloy      36” X 8’             102,000    102,000 
Primary jaw crusher, 2-loggle      (5” X 24”   30         178,000    178,000 
Conveyor to screen, inclined      36” X 100’   40         80,000    80,000 
Vibrating screen, 2-deck, inclined      4‘W x I0‘L   4         41,000    41,000 
Secondary (cone) crusher      30-inch standard   100         327,000    327,000 
Chutes, lpcally fabricated, rubber lined steel      As needed to fit equipment   0         25,000    125,000 
Sorter feed conveyor      24” x 100’, inclined             68,000    68,000 
Radiometric sorter      24” wide with air blast rejector   20         570,000    570,000 
Reject conveyor to backfill surge pile      24“xl00’   20         68,000    68,000 
Weightometer, 0.5% accuracy w/pancl      36”   0.5         10,600    21,200 
Upgraded ore conveyor      24” x 100’, essentially level   20    I    68,000    68,000 
Skip loading pocket (included by BRS)          0    0           
Motor control center      300 kva   0    I    88,000    88,000 
Lighting (included by BRS)          0    0           
Dust scrubber, wet venturi      18,000 cfm   80         125,000    125,000 
Minewater sump pump      30 gpm. 50” TOH   4         12.100    12,100 
Minewater booster pump to surface      50 gpm. 2.500’ TOH   20    4    19,000    76,000 
Scrubber slurry pump      20 gpm, 25’ TOH   4    I    7,500    7,500 
Pipeline to plant area      3’ ABS, 13,000’@ $4.00 laid   0    13,000    4    52,000 
Thickener for minewater slurry      30’ D, epoxy-painted steel   2    I    198,000    198,000 
Agitated leach tank for mincwater slurry      4-hour 8’0 x IO’ RLS, 50% solids   0         32,000    32,000 
Leach tank agitator      36’0, RLS   15         22,000    22,000 
Mincwater leach residue thickener      30’0, conventional, RLS             225,000    225,000 
Surface surge bin for skip      50-ton, locally fabricated steel   0         50,000    50,000 
Belt feeder to stockpile conveyor      24” X 8’             21,000    21,000 
Conveyor to stockpile      24” x 100’, inclined             68,000    68.000 
Surface stackpile pad w/fceder slot      I 00’ x I 00’ x 8-inch concrete   0         100,000    100,000 
Belt feeder      24” X 20’             45,000    45.000 
Weightometer, 0.5% accuracy w/panel      36”   0.5         10,600    10,600 
Front-end wheel loader      14.5 cy, Cat 966 equiv.             360,000    360,000 
TOTAL                         3,197,400 

 

92

 

 

A. HEAP LEACHING OPTION for 9.6 Million Tons  tons/square foot:              ifTAILINGS
AREA LINED
Pad with dual-HOPE liners:                      
Preparation  3.2 MM Sq. Feet       3,200,000    0.05    160,000       11 
Fabric  3.32 MM Sq. Feet      3,320,000    0.15    498,000         
Bedding material  69,000 Cu. Yards      69,000    7.34    506,460         
Drain material  137.000 Cu. Yards      137,000    6.77    927,490         
Liner, 80-mil HOPE  6.64 MM Sq. Feet       6,640,000    0.72    4,780,800       2.390,400 
Geo-net  3.32 MM Sq. Feet       3,320,000    0.35    1,162,000       581,000 
ABS pipe  10-inch         1,200    6.89    8,268       8,268 
ABS pipe  8-inch         7,800    4.79    37,362       37,362 
ABS pipe  6-inch         10,100    2.52    25,452       25,452 
PVC pipe  2-inch         9,200    0.90    8,280         
Sub-total                8,114,112       3,050,762 
Mobilization & de-mobilization                243,423       121,712 
QA/QC on plastic welds                324,564       162,282 
Solution collection ditches                811,411       811,411 
Runoff diversion channels                40,571         
Sub-total                1,419,970       I,135,976   
Solution ponds                476,704       238,352 
Pumping & piping                190,682         
Sub-total                667,386       429,034 
Motor control center  300 kva                  88,000       88,000 
Safety showers           1,250    3,750       3,750 
Eye wash fountains           475    1,425       1,425 
Makeup water & monitor wells                255,037       255,037 
Sub-total                348,212         
Sub-total                10,549,679       4,963,983 
Construction materials                2,I 09,936         992,797 
Construction labor                3,164,904       1,489,195 
Contractor’s fee                3,164,904       1,489,195 
Sub-total                8,439,743       3,971,186 
Sub-totals                18,641,211       8,935,169 
                           
Leach pad loading@ nominally minus 2-inch                          
Stockpile conveyor to stacker  24-inch x 200 feet           102,000    102,000       102,000 
Portable radial stacker  24-inch x 80 feet            93,000    93,000         
Sub-total                195,000         
TOTAL                18,836,211   NET   9,130,169 
                           
B. GRINDING & AGITATED LEACHING:                          
Process water storage tank  I 00,000 gal., 36’0 x I 4‘H    I    111,000    111,000         
Concentrated sulfuric acid storage tank  12’0 x 20‘H, polyethylene    2    16,000    32,000         
Sulfuric acid feed pump  5 gpm   6    7,000    42,000         

 

93

 

 

Sodium chlorale bulk storage bin  2,000 cu. fl., (I week), poly.   0       20,000    20,000 
Sodium chlorate feeder (dry solids)  6” x 36” vibrating, reagent-type   0.75       3,500    3,500 
Sodium chlorate mix tank  1,500 gal., polyethylene   0   I   1,500    1,500 
Mix lank circulating pump  IO gpm, 50’ TOH, plastic   I   2   3,000    6,000 
Sodium chlorate solution feeder (valve)      0       2,000    4,000 
l.nstrument air compressor  21 cfm           6,500    6,500 
Surge bin, 20-ton  Locally fabricated, steel   0       25,000    25,000 
Belt feeder  24“W x 4“L           12,000    12.000 
Rod mill feed conveyor  30“W x 20‘L           31,000    31,000 
Wcightomctcr, 0.5% accuracy, w/pancl  36”   9       10,600    10,600 
Dust scrubber, wet venturi  18,000 cfm   80       125,000    125,000 
Overhead travelling bridge crane  5-ton, 32’ span   2       49,000    49,000 
Sump for rod mill, screen, and scrubber  Locally fabricated, steel   0       7,500    7,500 
Grinding area sump pump  30 gpm, 50’ TDH           12,100    12,100 
Rod mill discharge pump  600 gpm, 40’ TDH   40       19,000    19,000 
Sieve bend classifier  4‘W x 5’ L   0       49,000    49,000 
Rod mill  7‘D x 12‘L   188       315,000    315,000 
Boiler for supcrheating solutions  5 MM Btu/hour natural gas   0       78,000    78,000 
Slurry storage tank  20’0 x 24‘H, epoxy-painted steel   0       120,000    120,000 
Slurry tank agitator  54“D, ship-type, RLS   15       55,000    55,000 
Automatic sampler  Variable,cycle, slotted cutter head   0.3   I   13,000    13,000 
Leach feed slurry pump  400 gpm, 40’ TOH       2   13,500    27,000 
Leach tank, I -stage, 20 hours, 50°C  20‘D x 24‘H, barned, RLS   0   6   195,000    I, 170,000 
Leach tank agitator, Mixco A-310  42” D   93   6   185,000    1,110,000 
Leach tank scrubber, wet venturi  18,000 cfm   80       125,000    125,000 
Flocculant mix tank  500 gal., polyethylene   0       900    900 
Flocculant mix tank agitator  Portable   1.5       1,800    1,800 
Flocculant feeder  6” x 36”, vibrating, reagent-type   0.3       3,500    3,500 
Leaching area sump  Cast in concrete Door   0       0      
Leaching area sump pump  30 gpm, 50’ TDH       I   12,100    12.100 
CCD feed pump  600 gpm, 40’ TDH   40   2   19,000    38,000 
CCO thickener tank, High-rate  25’0 x IO’ H w/mixer box   0   6   255,000    1,530,000 
CCO thickener mechanism  Automatic lift, torque controlled       6   85,000    510,000 
CCO underflow pump  200 gpm, 25’ TDH   4   6   15,000    90,000 
CCO overflow pump  500 gpm, 25’ TDH, SS 3 I 6   6   6   32,000    192,000 
Tailings pump  200 gpm, 40’ TOH   12   2   13,000    26.000 
Tailings impoundmcnt  Existing area will need upgrading   0   I   950,000    950,000 
Tailings water reclaim barge & pump  500 gpm, I 00’ TDH, RLS   7.5       19,000    19,000 
Eye wash fountains      0   3   475    1,425 
Motor control centers  1,000 kva   15       160,000    160,000 
Building, prefabricated  IOO’W x 125’ x 35‘H, insulated   .1illl      2,200,000    2,200,000 
Sub-total      1,316            9,314,425 
Construction materials                   4,657,213 
Installation labor                   3,725,770 
Contractor’s fee                   2,328,606 
Sub-total                   20,026,014 

 

94

 

 

C. PREGNANT LEACH SOLUTION and MINEWATER TREATMENT:

 

Combined solution clarifier  Conventional thickener, 50’ D   2       310,000    310,000 
Clarifier mechanism, light duty  Slime solids only   2       65,000    65,000 
Clarifier undernow pump  50 gpm, 40’ TDH, SS 316   4       12,000    12,000 
Mixed media “sand” filter  24” D, swimming pool-lype, FRP   0       4,500    13,500 
Sand filter feed pump  600 gpm, 25 psi, swimming pool   2   2   7,000    14,000 
Clarified PLS storage tank  20‘D x 24‘H, epoxy-painted steel   0       120,000    120,000 
lsodccanol swrage tank  500 gal., polyethylene   0       900    900 
Amine extractant storage tank  500 gal., polyethylene   0       900    900 
Kerosene diluent storage tank  5,000 gal. fuel tank, mild steel   0       13,000    13,000 
Kerosene pump  20 gpm, IO’ TDH   1.5       900    900 
SX feed pump  500 gpm, 25‘TDH, SS 3 I 6       I   27,000    27,000 
Extraction mixer/scltlcr  815sq. ft.,FRP   7   4   38,000    152,000 
Raffinate storage tank w/skimmer  55,000 gal., 20‘D x 24’ RLS   0       I 35,000    135,000 
Raffinate pump  500 gpm, 25’ TDH, SS 316           27,000    27,000 
Crud tank w/skimmer  15,000 gal., polyethylene   0       16,000    16,000 
Filler press feed pump  IO gpm, 100’ TDH, SS 316   3       9,000    9,000 
Crud filtcr press  I 0-leaf, 20 sq. ft., FRP, manual   0       18,000    18,000 
Strip mixer/settler  160 sq. ft., FRP   3   4   19,000    76,000 
Salt (NaCl) mix tank  5,000 gal., polyethylene   0       6,500    6,500 
Salt mix tank agitator  Portable   1.5       1,800    1,800 
Organic scrub mixer/settler  160 sq. ft., FRP           19,000    19,000 
Clean organic storage tank  15,000 gal., polyethylene   0       16,000    16,000 
Fire suppression system  N2-loaded sprinklers   0       55,000    55,000 
Eye wash station      0       475    1,425 
Ammonia storage tank  Provided by farm supplier   0       0      
Precipitation tank  500 gal., polyethylene   0       900    2,700 
Precipitation tank agitator  Portable   1.5       1,800    5,400 
Yellowcake thickener  I O’D, conventional, FRP   1.5   2   65,000    130,000 
Thickener mechanism      1.5       17,000    34,000 
Yellowcake thickener overflow tank  2,500 gal, polyethylene   0       3,500    3,500 
Ammonium sulfate storage tank  2,500 gal, polyethylene   0       3,500    3,500 
Polishing filler (for entrained YC fines)  24” D, swimming pool-type, FRP   0       4,500    4,500 
Filter feed pump  20 gpm, 25 psi, swimming pool   1.5       2,000    2,000 
Clarified barren strip tank  1,500 gal, polyethylene   0       1,500    1,500 
Sodium removal tank  200 gal, polyethylene   0       500    1,000 
Sodium removal tank agitator  Portable   1.5       1,800    3,600 
Clarified YC solution bleed tank to tailings  500 gal., polyetylene   0       900    900 
Centrifuge for thickened yellowcake slurry  150 lb/hr H2O removal           14,000    14,000 
Vacuum rotary dryer, Stokes type, SS 316  1.4 cu. m.   2       288,000    288,000 
Vacuum pump  150 sefm   5.5       21,000    21,000 
Dust scrubbrer, wet venturi  2,800 efm           19,400    19,400 
Drum filling & weighing machine  5 drums/ 24 hours   I       29,000    29,000 
Yellowcake drum inventory  Reinforced, 800 lb, security lid   0   10   110    1,100 
Drum loading dock      0       18,000    18,000 
Bleed solution evaporation cell  I acre x 3’ deep, double-lined   0       0    175,000 

 

95

 

 

Omce (double-wide mobile)       50-foot length, HVAC    15       40,000    40,000 
Sample prep building       50-foot length, HVAC   15       40,000    40,000 
Sample prep equipment       Crusher, pulverizer, hoods, etc.   15       75,000    75,000 
Assay lab (double-wide mobile)       50-foot length, HVAC    15       43,000    43,000 
Analytical equipment and supplies       Hoods, benches, AA, fluoromctcr   0       435,000    435,000 
Motor control centers       500 kva   IO   2   90,000    180,000 
Standby generator       Diesel, 400 kW   0       59,000    59,000 
Security shack, mobile       8’ x 20’, insulated           13,000    13,000 
SX building        50‘W x S0‘L x I 5‘H, insulated   20       410,000    410,000 
Reagent first fills       30-day supply    0       227,000    227,000 
Perimeter fence       4,000 linear feet @ 6 feet high   0   4,000   12    48,000 
Perimeter and yard lighting           50   I   15,000    15,000 
First-aid supplies           0       1,000    1,000 
Sub-total I           216            3,454,025 
Construction materials                        1,554,311 
Contractor’s fee                         1,727,013 
TOTAL I                         6,735,349 
                           
HEAP LEACHING TOTAL CAPITAL=    28,768,959                      
AGITATED LEACHING TOTAL CAPITAL   29,958,763                      

 

96

 

 

A PPENDlX 17-[JI

ENCORE ENERGY CORP.

MARQUEZ CANYON/JUAN TAFOYA PROJECT

ESTIMATED OPERATING & MAINTENANCE/REPAIR COSTS for STAFFING and MATERIALS & REAGENTS

TcrryMcNulty- May2021

 

A. PERSONNEL:

 

       LEACHING OPTIONS     
       HEAP
LEACHING
   AGITATED
LEACHlNG
   SOLUTIG:11
TREATMENT
 
Salaried:  Number       BURDEN   TOTAL           TOTAL           TOTAL 
Processing Manager        145,000    0.38    200,100    145.000    0.38    200,100                
Metallurgist        135,000    0.38    186,300    135,000    0.38    186,300                
Operations Supervisor        110,000    0.38    151,800    110,000    0.38    151,800                
MainenanccSupcrvisor        105.000    0.38    144,900    105,000    0.38    144,900                
Radiation Safety omccr        105,000    0.38    144,900    105,000    0.38    144,900                
Personnel & Safety Manager        100,000    0.38    138,000    100,000    0.38    138.000                
Chief Chemist        95,000    0.38    131,100    95,000    0.38    131,100                
Purchasing Agent/Warehouse        85,000    0.38    117,300    85,000    0.38    117,300                
Shill Foreman        85,000    0.38    117,300    85,000    0.38    469,200                
Accounting Clerk        50,000    0.38    §2.l!Q!!    50,000    0.38                     
TOTALS   13              1,400,700              1,752,600                
Hourly:                                                  
Heap or Plant Operator        68,000    0.38    93,840    68,000    0.38    375,360                
Grinding & Leaching Operator        0    0.38    0    68J)(Xl   0.38    375,360                
CCD & SX Operator             0.38              0.38         68,000    0.38    375,360 
Yellowcake Operator             0.38              0.38         68,000    0.38    375,360 
Laboratory Technician             0.38         68,000    0.38    375,360              0 
I ntn1mcntation & Process Control        0    0.38    0    68,000    0.38    93,840                
Mechanic/Welder        68,000    0.38    93,8-W    68,000    0.38    281,520                
Electrician        65,000    0.38    89,700    65,000    0.38    269,100                
Helper/Laborer        48,000    0.38         48,000    0.38    397,440                
TOTALS   33              343,620              2,167,980              750720 

 

B. CONSUMABLES:  Price/unit   USAGF.       USAGF.       USAGF.   Annual S 
Electricity, PSCNM, $/kWh   O.oJO    3,104,640    93,139    10,422,720    312,682    214    50,846 
Namral gas, NMGas, $/MMBru   2.20    0    0    23,760    52.272    0      
Diesclfucl.S/ga!   2.75    18,000    49.500    6,000    !6,500           
Sulfuric acid, $/ton   150    11,550    1,732,500    14,850    2,227,500           
Sodiumchloratc,S/ton   250    1.650    -112.500    3,300    825,000           
Flocculant for CCD. S/lb   JOO    0         50,000    150,000           
Kcrosene.S/gal   3.50                        59.400    207,900 
lsodccanol SX modifier, $/lb   1.35                        6,900    9,315 
A/amine 336 SX cxtractant, $/lb   7.50                        3,900    29,250 
Sodium chloride, $/ton   40                        J,300    132,000 
Anhydrous ammonia. $/ton   280                        99    27,720 
Ammonium sulfate, $/ton   175                        150    26,250 
Lubricants. $/gal   16    660    10,560    330    5,280    85    1,360 
Maintenance&rcpairsupplics/day   1,000    330    330,000    330,000    330.000    0      
Laboratory supplies/day   1,000    330    330,000    330,000                
              2,958,199         3,919,234         484,641 

 

TOTAL ANNUAL OPEX:          Lhs,U.10k   $/Pound 
HcapLcaching   9,135,281    0.80    844,800    10.81 
Agitated Leaching   12,272,575    1.00    0.95 3.200    12.23 

 

TOTAL CAPEX:     

 

Life Lhs.

         
Heap Lcaehing/SX   28,768,959    12,672,000    2.27    13.08 
Agitastcd LcachinglSX●   29,958,763    15,048,000    1.99    14.22 
● includes reagent “first fill”at   227,287                

 

If existing tailings area useablc fora pad,

h<‘apcapital rrduccstoS\9,063,619.

 

 

97