XML 37 R28.htm IDEA: XBRL DOCUMENT v3.25.3
Short-Term Borrowings (Tables)
6 Months Ended
Jun. 30, 2025
Short-Term Borrowings [Abstract]  
Schedule of Short-term borrowings from banks Short-term borrowings from banks
   As of
December 31,
   As of
June 30,
 
   2024   2025 
   RMB   RMB 
       (Unaudited) 
Short-term borrowings        
Industrial Bank Co., Ltd. Xiamen Branch (a)   10,000    10,000 
Agricultural Bank of China, Xiamen Software Park Sub-branch (b)   10,000    10,000 
China Construction Bank Corporation Limited Shanghai Jiading Sub-Branch (c)   2,109    2,108 
Subtotal – Bank Loans   22,109    22,108 
           
Short-term borrowings from several third-party investors (the “Investors”)   9,595    4,983 
           
Total   31,704    27,091 
  (a)

On June 21, 2024, the Group entered into two one-year loan agreements with Industrial Bank Co., Ltd Xiamen Branch for RMB3,000 each, bearing interest at the one-year LPR of 3.45% with an upward floating spread of 0.4%.

 

On September 14, 2024, the Group entered into a one-year loan agreement with the same bank for RMB4,000, bearing interest at the one-year LPR of 3.35% with an upward floating spread of 0.25%. These loans were fully repaid in June 2025.

 

On June 17, 2025, the Group entered into three new one-year loan agreements with the same bank, including one loan of RMB4,000 and two loans of RMB3,000 each, all bearing interest at the one-year LPR of 3.0%. The Company’s chairman, Mr. Zhang Andong, and his spouse, Ms. Zhang Hongling, provided personal guarantees for these borrowings.

 

All the above loans remained outstanding as of June 30, 2025, and are scheduled to be repaid upon maturity.

 

  (b) On August 30, 2023, the Group entered into a facility agreement with Agricultural Bank of China, Xiamen Software Branch, for a total amount of RMB10,000, with a validity period of ten years from August 30, 2023 to August 29, 2033. Under the facility, the term of each individual borrowing shall not exceed one year. The effective LPR interest rate was 3.45% and floating downward by 0.05%. The Group drew borrowings of RMB1,750, RMB3,200, and RMB5,050, respectively, from September 2nd to 4th, 2024. The spouse of the Company’s chairman, Ms. Zhang Hongling, provided personal guarantees for these borrowings. All such loans remained outstanding as of June 30, 2025 and are expected to be repaid upon maturity.

 

  (c) On March 5, 2024, the Group entered into a one-year loan agreement with China Construction Bank Corporation Limited Shanghai Jiading Sub-Branch of RMB2,109 with an LPR interest rate of 3.45% and floating upward by 0.5%. The Group repaid RMB1 in March 2025. As of June 30, 2025, the outstanding balance was RMB2,108. The Group has arranged with the bank to facilitate the payment of the outstanding balance in November 2025.