XML 88 R140.htm IDEA: XBRL DOCUMENT v2.4.0.8
Real Estate and Accumulated Depreciation (Detail) (USD $)
In Thousands, unless otherwise specified
12 Months Ended
Dec. 31, 2013
Dec. 31, 2012
Dec. 31, 2011
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost $ 2,385,742    
Buildings & Improvements, Initial Cost 6,474,093    
Improvements, Initial Cost 6,293    
Land, Total Cost 2,444,001    
Buildings & Improvements, Total Cost 7,784,060    
Total Cost 10,228,061    
Accumulated Depreciation 1,826,979    
Total Cost, Net of Accumulated Depreciation 8,401,082    
Encumbrances 1,709,351    
The changes in Total Real Estate Assets, excluding real estate held for sale, for the three years ended December 31, 2013 are as follows:      
Balance, beginning of year 8,639,111 8,266,839 8,411,239
Acquisitions and transfers from joint ventures 1,776,474 594,633 260,161
Developments, improvements and expansions 196,127 105,132 104,245
Changes in land under development and construction in progress (1,884) 3,188 (15,153)
Real estate held for sale (16,450) 0 (3,267)
Adjustment of property carrying values (72,597) (135,813) (125,844)
Sales, transfers to joint ventures and retirements (309,170) (194,868) (364,542)
Balance, end of year 10,211,611 8,639,111 8,266,839
The changes in Accumulated Depreciation and Amortization, excluding real estate held for sale, for the three years ended December 31, 2013 are as follows:      
Balance, beginning of year 1,670,717 1,550,066 1,452,112
Depreciation for year 267,096 233,619 230,332
Real estate held for sale (3,780) 0 (977)
Sales and retirements (110,834) (112,968) (131,401)
Balance, end of year 1,823,199 1,670,717 1,550,066
Bayamon, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 132,074    
Buildings & Improvements, Initial Cost 152,441    
Improvements, Initial Cost 0    
Land, Total Cost 132,759    
Buildings & Improvements, Total Cost 176,723    
Total Cost 309,482    
Accumulated Depreciation 45,468    
Total Cost, Net of Accumulated Depreciation 264,014    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Carolina, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 28,522    
Buildings & Improvements, Initial Cost 76,947    
Improvements, Initial Cost 0    
Land, Total Cost 28,601    
Buildings & Improvements, Total Cost 81,889    
Total Cost 110,490    
Accumulated Depreciation 23,128    
Total Cost, Net of Accumulated Depreciation 87,362    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Humacao, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 16,386    
Buildings & Improvements, Initial Cost 74,059    
Improvements, Initial Cost 0    
Land, Total Cost 16,386    
Buildings & Improvements, Total Cost 82,824    
Total Cost 99,210    
Accumulated Depreciation 24,948    
Total Cost, Net of Accumulated Depreciation 74,262    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Isabela, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,175    
Buildings & Improvements, Initial Cost 41,094    
Improvements, Initial Cost 0    
Land, Total Cost 8,236    
Buildings & Improvements, Total Cost 42,814    
Total Cost 51,050    
Accumulated Depreciation 12,309    
Total Cost, Net of Accumulated Depreciation 38,741    
Encumbrances 22,400    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
San German, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,215    
Buildings & Improvements, Initial Cost 24    
Improvements, Initial Cost 0    
Land, Total Cost 3,215    
Buildings & Improvements, Total Cost 41    
Total Cost 3,256    
Accumulated Depreciation 31    
Total Cost, Net of Accumulated Depreciation 3,225    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Cayey, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 18,226    
Buildings & Improvements, Initial Cost 25,101    
Improvements, Initial Cost 0    
Land, Total Cost 18,538    
Buildings & Improvements, Total Cost 26,978    
Total Cost 45,516    
Accumulated Depreciation 7,674    
Total Cost, Net of Accumulated Depreciation 37,842    
Encumbrances 21,209    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Bayamon, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 91,645    
Buildings & Improvements, Initial Cost 98,007    
Improvements, Initial Cost 0    
Land, Total Cost 92,027    
Buildings & Improvements, Total Cost 109,104    
Total Cost 201,131    
Accumulated Depreciation 30,465    
Total Cost, Net of Accumulated Depreciation 170,666    
Encumbrances 125,700    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Rio Piedras, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,338    
Buildings & Improvements, Initial Cost 23,285    
Improvements, Initial Cost 0    
Land, Total Cost 10,338    
Buildings & Improvements, Total Cost 29,778    
Total Cost 40,116    
Accumulated Depreciation 8,248    
Total Cost, Net of Accumulated Depreciation 31,868    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Bayamon, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,294    
Buildings & Improvements, Initial Cost 11,987    
Improvements, Initial Cost 0    
Land, Total Cost 4,584    
Buildings & Improvements, Total Cost 23,890    
Total Cost 28,474    
Accumulated Depreciation 4,940    
Total Cost, Net of Accumulated Depreciation 23,534    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Arecibo, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,965    
Buildings & Improvements, Initial Cost 29,898    
Improvements, Initial Cost 0    
Land, Total Cost 8,094    
Buildings & Improvements, Total Cost 32,451    
Total Cost 40,545    
Accumulated Depreciation 9,285    
Total Cost, Net of Accumulated Depreciation 31,260    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Hatillo, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 101,219    
Buildings & Improvements, Initial Cost 105,465    
Improvements, Initial Cost 0    
Land, Total Cost 101,219    
Buildings & Improvements, Total Cost 130,042    
Total Cost 231,261    
Accumulated Depreciation 35,861    
Total Cost, Net of Accumulated Depreciation 195,400    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Vega Baja, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,076    
Buildings & Improvements, Initial Cost 18,684    
Improvements, Initial Cost 0    
Land, Total Cost 7,076    
Buildings & Improvements, Total Cost 18,928    
Total Cost 26,004    
Accumulated Depreciation 5,479    
Total Cost, Net of Accumulated Depreciation 20,525    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Guayama, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,960    
Buildings & Improvements, Initial Cost 18,721    
Improvements, Initial Cost 0    
Land, Total Cost 1,960    
Buildings & Improvements, Total Cost 19,642    
Total Cost 21,602    
Accumulated Depreciation 5,546    
Total Cost, Net of Accumulated Depreciation 16,056    
Encumbrances 11,918    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Fajardo, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,376    
Buildings & Improvements, Initial Cost 41,199    
Improvements, Initial Cost 0    
Land, Total Cost 4,376    
Buildings & Improvements, Total Cost 47,198    
Total Cost 51,574    
Accumulated Depreciation 12,056    
Total Cost, Net of Accumulated Depreciation 39,518    
Encumbrances 25,500    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
San German, PR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,470    
Buildings & Improvements, Initial Cost 20,751    
Improvements, Initial Cost 0    
Land, Total Cost 6,470    
Buildings & Improvements, Total Cost 21,409    
Total Cost 27,879    
Accumulated Depreciation 6,238    
Total Cost, Net of Accumulated Depreciation 21,641    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (A)    
Brandon, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 4,111    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 6,351    
Total Cost 6,351    
Accumulated Depreciation 5,268    
Total Cost, Net of Accumulated Depreciation 1,083    
Encumbrances 0    
Depreciable Lives (Years) 30 years    
Date of Construction (C) Acquisition (A) 1972 (C)    
Stow, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 993    
Buildings & Improvements, Initial Cost 9,028    
Improvements, Initial Cost 0    
Land, Total Cost 993    
Buildings & Improvements, Total Cost 36,730    
Total Cost 37,723    
Accumulated Depreciation 15,823    
Total Cost, Net of Accumulated Depreciation 21,900    
Encumbrances 0    
Depreciable Lives (Years) 30 years    
Date of Construction (C) Acquisition (A) 1969 (C)    
Westlake, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 424    
Buildings & Improvements, Initial Cost 3,803    
Improvements, Initial Cost 201    
Land, Total Cost 424    
Buildings & Improvements, Total Cost 10,501    
Total Cost 10,925    
Accumulated Depreciation 6,855    
Total Cost, Net of Accumulated Depreciation 4,070    
Encumbrances 0    
Depreciable Lives (Years) 30 years    
Date of Construction (C) Acquisition (A) 1974 (C)    
Palm Harbor, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,137    
Buildings & Improvements, Initial Cost 4,089    
Improvements, Initial Cost 0    
Land, Total Cost 1,137    
Buildings & Improvements, Total Cost 4,937    
Total Cost 6,074    
Accumulated Depreciation 2,647    
Total Cost, Net of Accumulated Depreciation 3,427    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1995 (A)    
Homestead, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 23,390    
Buildings & Improvements, Initial Cost 59,639    
Improvements, Initial Cost 0    
Land, Total Cost 24,103    
Buildings & Improvements, Total Cost 62,099    
Total Cost 86,202    
Accumulated Depreciation 7,716    
Total Cost, Net of Accumulated Depreciation 78,486    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2008 (C)    
Tarpon Springs, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 146    
Buildings & Improvements, Initial Cost 7,382    
Improvements, Initial Cost 81    
Land, Total Cost 146    
Buildings & Improvements, Total Cost 9,788    
Total Cost 9,934    
Accumulated Depreciation 7,009    
Total Cost, Net of Accumulated Depreciation 2,925    
Encumbrances 0    
Depreciable Lives (Years) 30 years    
Date of Construction (C) Acquisition (A) 1974 (C)    
McHenry, IL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,294    
Buildings & Improvements, Initial Cost 5,251    
Improvements, Initial Cost 0    
Land, Total Cost 13,771    
Buildings & Improvements, Total Cost 59,409    
Total Cost 73,180    
Accumulated Depreciation 10,944    
Total Cost, Net of Accumulated Depreciation 62,236    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2006 (C)    
Miami, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 11,626    
Buildings & Improvements, Initial Cost 30,457    
Improvements, Initial Cost 0    
Land, Total Cost 26,743    
Buildings & Improvements, Total Cost 113,896    
Total Cost 140,639    
Accumulated Depreciation 21,435    
Total Cost, Net of Accumulated Depreciation 119,204    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2006 (C)    
San Antonio, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,990    
Buildings & Improvements, Initial Cost 28,404    
Improvements, Initial Cost 0    
Land, Total Cost 3,990    
Buildings & Improvements, Total Cost 36,741    
Total Cost 40,731    
Accumulated Depreciation 6,841    
Total Cost, Net of Accumulated Depreciation 33,890    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (C)    
Starkville, MS [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 703    
Buildings & Improvements, Initial Cost 6,921    
Improvements, Initial Cost 0    
Land, Total Cost 703    
Buildings & Improvements, Total Cost 7,130    
Total Cost 7,833    
Accumulated Depreciation 3,858    
Total Cost, Net of Accumulated Depreciation 3,975    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1994 (A)    
Gulfport, MS [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 36,370    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 51,901    
Total Cost 51,901    
Accumulated Depreciation 19,322    
Total Cost, Net of Accumulated Depreciation 32,579    
Encumbrances 23,479    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Tupelo, MS [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,213    
Buildings & Improvements, Initial Cost 14,979    
Improvements, Initial Cost 0    
Land, Total Cost 2,213    
Buildings & Improvements, Total Cost 18,884    
Total Cost 21,097    
Accumulated Depreciation 10,578    
Total Cost, Net of Accumulated Depreciation 10,519    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1994 (A)    
Long Beach, CA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 111,512    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 145,131    
Total Cost 145,131    
Accumulated Depreciation 44,934    
Total Cost, Net of Accumulated Depreciation 100,197    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2005 (C)    
Brunswick, ME [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,796    
Buildings & Improvements, Initial Cost 15,459    
Improvements, Initial Cost 0    
Land, Total Cost 3,796    
Buildings & Improvements, Total Cost 20,842    
Total Cost 24,638    
Accumulated Depreciation 10,552    
Total Cost, Net of Accumulated Depreciation 14,086    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1997 (A)    
Oceanside, CA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 10,643    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 14,387    
Total Cost 14,387    
Accumulated Depreciation 5,925    
Total Cost, Net of Accumulated Depreciation 8,462    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2000 (C)    
Reno, NV [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,132    
Buildings & Improvements, Initial Cost 4,696    
Improvements, Initial Cost 0    
Land, Total Cost 1,132    
Buildings & Improvements, Total Cost 4,722    
Total Cost 5,854    
Accumulated Depreciation 1,358    
Total Cost, Net of Accumulated Depreciation 4,496    
Encumbrances 2,595    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2000 (C)    
Everett, MA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,311    
Buildings & Improvements, Initial Cost 44,647    
Improvements, Initial Cost 0    
Land, Total Cost 9,462    
Buildings & Improvements, Total Cost 51,541    
Total Cost 61,003    
Accumulated Depreciation 20,200    
Total Cost, Net of Accumulated Depreciation 40,803    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2001 (C)    
Pasadena, CA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 46,957    
Buildings & Improvements, Initial Cost 101,475    
Improvements, Initial Cost 2,053    
Land, Total Cost 46,957    
Buildings & Improvements, Total Cost 105,967    
Total Cost 152,924    
Accumulated Depreciation 39,837    
Total Cost, Net of Accumulated Depreciation 113,087    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Salisbury, MD [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,070    
Buildings & Improvements, Initial Cost 12,495    
Improvements, Initial Cost 277    
Land, Total Cost 2,071    
Buildings & Improvements, Total Cost 15,488    
Total Cost 17,559    
Accumulated Depreciation 5,405    
Total Cost, Net of Accumulated Depreciation 12,154    
Encumbrances 8,332    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1999 (C)    
Apex, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,576    
Buildings & Improvements, Initial Cost 43,619    
Improvements, Initial Cost 0    
Land, Total Cost 10,521    
Buildings & Improvements, Total Cost 55,713    
Total Cost 66,234    
Accumulated Depreciation 12,316    
Total Cost, Net of Accumulated Depreciation 53,918    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2006 (C)    
Erie, PA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,373    
Buildings & Improvements, Initial Cost 19,201    
Improvements, Initial Cost 0    
Land, Total Cost 6,373    
Buildings & Improvements, Total Cost 52,661    
Total Cost 59,034    
Accumulated Depreciation 25,612    
Total Cost, Net of Accumulated Depreciation 33,422    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1995 (C)    
San Francisco, CA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,464    
Buildings & Improvements, Initial Cost 25,730    
Improvements, Initial Cost 0    
Land, Total Cost 10,464    
Buildings & Improvements, Total Cost 26,229    
Total Cost 36,693    
Accumulated Depreciation 7,724    
Total Cost, Net of Accumulated Depreciation 28,969    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2002 (A)    
Chillicothe, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 43    
Buildings & Improvements, Initial Cost 2,549    
Improvements, Initial Cost 2    
Land, Total Cost 1,170    
Buildings & Improvements, Total Cost 4,405    
Total Cost 5,575    
Accumulated Depreciation 2,539    
Total Cost, Net of Accumulated Depreciation 3,036    
Encumbrances 4,097    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1974 (C)    
Phoenix, AZ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 18,701    
Buildings & Improvements, Initial Cost 18,811    
Improvements, Initial Cost 118    
Land, Total Cost 18,701    
Buildings & Improvements, Total Cost 20,027    
Total Cost 38,728    
Accumulated Depreciation 4,916    
Total Cost, Net of Accumulated Depreciation 33,812    
Encumbrances 16,803    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1999 (A)    
Macedonia, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 11,582    
Buildings & Improvements, Initial Cost 34,323    
Improvements, Initial Cost 0    
Land, Total Cost 11,582    
Buildings & Improvements, Total Cost 34,811    
Total Cost 46,393    
Accumulated Depreciation 6,241    
Total Cost, Net of Accumulated Depreciation 40,152    
Encumbrances 19,834    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2011 (A)    
Huber Hts, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 757    
Buildings & Improvements, Initial Cost 14,469    
Improvements, Initial Cost 0    
Land, Total Cost 757    
Buildings & Improvements, Total Cost 25,404    
Total Cost 26,161    
Accumulated Depreciation 13,804    
Total Cost, Net of Accumulated Depreciation 12,357    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1993 (A)    
Boardman, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,152    
Buildings & Improvements, Initial Cost 27,983    
Improvements, Initial Cost 0    
Land, Total Cost 8,152    
Buildings & Improvements, Total Cost 30,383    
Total Cost 38,535    
Accumulated Depreciation 14,834    
Total Cost, Net of Accumulated Depreciation 23,701    
Encumbrances 24,907    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1997 (C)    
Solon, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,220    
Buildings & Improvements, Initial Cost 7,454    
Improvements, Initial Cost 0    
Land, Total Cost 6,220    
Buildings & Improvements, Total Cost 24,870    
Total Cost 31,090    
Accumulated Depreciation 10,434    
Total Cost, Net of Accumulated Depreciation 20,656    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1998 (C)    
Bedford, IN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 706    
Buildings & Improvements, Initial Cost 8,425    
Improvements, Initial Cost 6    
Land, Total Cost 1,067    
Buildings & Improvements, Total Cost 11,508    
Total Cost 12,575    
Accumulated Depreciation 6,616    
Total Cost, Net of Accumulated Depreciation 5,959    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,993 (A)    
Sunset Hills, MO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 12,791    
Buildings & Improvements, Initial Cost 38,404    
Improvements, Initial Cost 0    
Land, Total Cost 13,403    
Buildings & Improvements, Total Cost 51,322    
Total Cost 64,725    
Accumulated Depreciation 24,181    
Total Cost, Net of Accumulated Depreciation 40,544    
Encumbrances 26,701    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Brentwood, MO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,018    
Buildings & Improvements, Initial Cost 32,053    
Improvements, Initial Cost 0    
Land, Total Cost 10,018    
Buildings & Improvements, Total Cost 34,419    
Total Cost 44,437    
Accumulated Depreciation 15,380    
Total Cost, Net of Accumulated Depreciation 29,057    
Encumbrances 31,612    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Cedar Rapids, IA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,219    
Buildings & Improvements, Initial Cost 12,697    
Improvements, Initial Cost 0    
Land, Total Cost 4,219    
Buildings & Improvements, Total Cost 14,067    
Total Cost 18,286    
Accumulated Depreciation 7,053    
Total Cost, Net of Accumulated Depreciation 11,233    
Encumbrances 5,825    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Des Peres, MO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,775    
Buildings & Improvements, Initial Cost 8,370    
Improvements, Initial Cost 0    
Land, Total Cost 4,275    
Buildings & Improvements, Total Cost 9,492    
Total Cost 13,767    
Accumulated Depreciation 4,623    
Total Cost, Net of Accumulated Depreciation 9,144    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1998 (A)    
Springfield, MO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 2,048    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 2,655    
Total Cost 2,655    
Accumulated Depreciation 1,194    
Total Cost, Net of Accumulated Depreciation 1,461    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
St. Louis [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,159    
Buildings & Improvements, Initial Cost 3,818    
Improvements, Initial Cost 0    
Land, Total Cost 6,051    
Buildings & Improvements, Total Cost 7,508    
Total Cost 13,559    
Accumulated Depreciation 2,168    
Total Cost, Net of Accumulated Depreciation 11,391    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Aurora, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 832    
Buildings & Improvements, Initial Cost 7,560    
Improvements, Initial Cost 0    
Land, Total Cost 1,592    
Buildings & Improvements, Total Cost 14,136    
Total Cost 15,728    
Accumulated Depreciation 6,805    
Total Cost, Net of Accumulated Depreciation 8,923    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,995 (C)    
Nampa, ID [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,395    
Buildings & Improvements, Initial Cost 8,563    
Improvements, Initial Cost 0    
Land, Total Cost 9,609    
Buildings & Improvements, Total Cost 92,404    
Total Cost 102,013    
Accumulated Depreciation 12,146    
Total Cost, Net of Accumulated Depreciation 89,867    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,007 (A)    
Fenton, MO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 414    
Buildings & Improvements, Initial Cost 4,244    
Improvements, Initial Cost 476    
Land, Total Cost 430    
Buildings & Improvements, Total Cost 7,643    
Total Cost 8,073    
Accumulated Depreciation 5,965    
Total Cost, Net of Accumulated Depreciation 2,108    
Encumbrances 0    
Depreciable Lives (Years) 30 years    
Date of Construction (C) Acquisition (A) 1,983 (A)    
Simpsonville, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 417    
Buildings & Improvements, Initial Cost 6,563    
Improvements, Initial Cost 0    
Land, Total Cost 417    
Buildings & Improvements, Total Cost 6,800    
Total Cost 7,217    
Accumulated Depreciation 4,321    
Total Cost, Net of Accumulated Depreciation 2,896    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,994 (A)    
Camden, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 627    
Buildings & Improvements, Initial Cost 7,519    
Improvements, Initial Cost 7    
Land, Total Cost 1,021    
Buildings & Improvements, Total Cost 11,690    
Total Cost 12,711    
Accumulated Depreciation 7,234    
Total Cost, Net of Accumulated Depreciation 5,477    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,993 (A)    
N. Charleston, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 911    
Buildings & Improvements, Initial Cost 11,346    
Improvements, Initial Cost 1    
Land, Total Cost 1,081    
Buildings & Improvements, Total Cost 16,914    
Total Cost 17,995    
Accumulated Depreciation 10,809    
Total Cost, Net of Accumulated Depreciation 7,186    
Encumbrances 10,451    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,993 (A)    
Mt. Pleasant, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,430    
Buildings & Improvements, Initial Cost 10,470    
Improvements, Initial Cost 0    
Land, Total Cost 2,430    
Buildings & Improvements, Total Cost 21,205    
Total Cost 23,635    
Accumulated Depreciation 10,558    
Total Cost, Net of Accumulated Depreciation 13,077    
Encumbrances 11,441    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,995 (A)    
Sault St. Marie, MI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,826    
Buildings & Improvements, Initial Cost 13,710    
Improvements, Initial Cost 0    
Land, Total Cost 1,826    
Buildings & Improvements, Total Cost 20,610    
Total Cost 22,436    
Accumulated Depreciation 9,792    
Total Cost, Net of Accumulated Depreciation 12,644    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,994 (A)    
Grand Rapids, MI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,380    
Buildings & Improvements, Initial Cost 17,323    
Improvements, Initial Cost 0    
Land, Total Cost 3,380    
Buildings & Improvements, Total Cost 24,897    
Total Cost 28,277    
Accumulated Depreciation 11,273    
Total Cost, Net of Accumulated Depreciation 17,004    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,995 (A)    
Howell, MI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 332    
Buildings & Improvements, Initial Cost 11,938    
Improvements, Initial Cost 1    
Land, Total Cost 332    
Buildings & Improvements, Total Cost 13,933    
Total Cost 14,265    
Accumulated Depreciation 8,810    
Total Cost, Net of Accumulated Depreciation 5,455    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,993 (A)    
Mt. Pleasant, MI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 767    
Buildings & Improvements, Initial Cost 7,769    
Improvements, Initial Cost 20    
Land, Total Cost 1,112    
Buildings & Improvements, Total Cost 21,279    
Total Cost 22,391    
Accumulated Depreciation 10,121    
Total Cost, Net of Accumulated Depreciation 12,270    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,993 (A)    
Meridian, ID [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 24,591    
Buildings & Improvements, Initial Cost 31,779    
Improvements, Initial Cost 0    
Land, Total Cost 24,841    
Buildings & Improvements, Total Cost 61,903    
Total Cost 86,744    
Accumulated Depreciation 20,976    
Total Cost, Net of Accumulated Depreciation 65,768    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,001 (C)    
Midvale, UT [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 25,662    
Buildings & Improvements, Initial Cost 56,759    
Improvements, Initial Cost 0    
Land, Total Cost 28,395    
Buildings & Improvements, Total Cost 93,895    
Total Cost 122,290    
Accumulated Depreciation 34,375    
Total Cost, Net of Accumulated Depreciation 87,915    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Taylorsville, UT [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 24,327    
Buildings & Improvements, Initial Cost 53,686    
Improvements, Initial Cost 0    
Land, Total Cost 31,368    
Buildings & Improvements, Total Cost 77,697    
Total Cost 109,065    
Accumulated Depreciation 35,361    
Total Cost, Net of Accumulated Depreciation 73,704    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Orem, UT [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,428    
Buildings & Improvements, Initial Cost 12,259    
Improvements, Initial Cost 0    
Land, Total Cost 5,428    
Buildings & Improvements, Total Cost 17,317    
Total Cost 22,745    
Accumulated Depreciation 7,085    
Total Cost, Net of Accumulated Depreciation 15,660    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Riverdale, UT [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 24,755    
Buildings & Improvements, Initial Cost 45,635    
Improvements, Initial Cost 0    
Land, Total Cost 24,755    
Buildings & Improvements, Total Cost 59,314    
Total Cost 84,069    
Accumulated Depreciation 24,182    
Total Cost, Net of Accumulated Depreciation 59,887    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (C)    
Birmingham, AL [member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,573    
Buildings & Improvements, Initial Cost 26,002    
Improvements, Initial Cost 0    
Land, Total Cost 11,434    
Buildings & Improvements, Total Cost 49,515    
Total Cost 60,949    
Accumulated Depreciation 24,724    
Total Cost, Net of Accumulated Depreciation 36,225    
Encumbrances 23,524    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,994 (A)    
Valencia, CA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 15,784    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 18,015    
Total Cost 18,015    
Accumulated Depreciation 4,263    
Total Cost, Net of Accumulated Depreciation 13,752    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,006 (A)    
Mooresville, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 14,369    
Buildings & Improvements, Initial Cost 43,688    
Improvements, Initial Cost 0    
Land, Total Cost 14,369    
Buildings & Improvements, Total Cost 46,676    
Total Cost 61,045    
Accumulated Depreciation 13,930    
Total Cost, Net of Accumulated Depreciation 47,115    
Encumbrances 17,345    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,004 (A)    
Wilmington, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,287    
Buildings & Improvements, Initial Cost 16,852    
Improvements, Initial Cost 1,183    
Land, Total Cost 4,287    
Buildings & Improvements, Total Cost 34,907    
Total Cost 39,194    
Accumulated Depreciation 21,353    
Total Cost, Net of Accumulated Depreciation 17,841    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,989 (C)    
Spring Hill, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,084    
Buildings & Improvements, Initial Cost 4,816    
Improvements, Initial Cost 266    
Land, Total Cost 2,096    
Buildings & Improvements, Total Cost 11,838    
Total Cost 13,934    
Accumulated Depreciation 7,171    
Total Cost, Net of Accumulated Depreciation 6,763    
Encumbrances 2,985    
Depreciable Lives (Years) 30 years    
Date of Construction (C) Acquisition (A) 1,988 (C)    
Centennial, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,833    
Buildings & Improvements, Initial Cost 35,550    
Improvements, Initial Cost 0    
Land, Total Cost 8,082    
Buildings & Improvements, Total Cost 62,797    
Total Cost 70,879    
Accumulated Depreciation 27,858    
Total Cost, Net of Accumulated Depreciation 43,021    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1997 (C)    
New Bern, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 441    
Buildings & Improvements, Initial Cost 6,575    
Improvements, Initial Cost 0    
Land, Total Cost 441    
Buildings & Improvements, Total Cost 7,107    
Total Cost 7,548    
Accumulated Depreciation 3,969    
Total Cost, Net of Accumulated Depreciation 3,579    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,989 (C)    
Princeton, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 13,448    
Buildings & Improvements, Initial Cost 74,249    
Improvements, Initial Cost 0    
Land, Total Cost 14,464    
Buildings & Improvements, Total Cost 97,982    
Total Cost 112,446    
Accumulated Depreciation 40,289    
Total Cost, Net of Accumulated Depreciation 72,157    
Encumbrances 57,000    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,997 (A)    
Phoenix [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 15,352    
Buildings & Improvements, Initial Cost 22,813    
Improvements, Initial Cost 1,601    
Land, Total Cost 15,352    
Buildings & Improvements, Total Cost 27,005    
Total Cost 42,357    
Accumulated Depreciation 12,805    
Total Cost, Net of Accumulated Depreciation 29,552    
Encumbrances 30,000    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,003 (A)    
Russellville, AR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 606    
Buildings & Improvements, Initial Cost 13,391    
Improvements, Initial Cost 0    
Land, Total Cost 606    
Buildings & Improvements, Total Cost 17,814    
Total Cost 18,420    
Accumulated Depreciation 9,312    
Total Cost, Net of Accumulated Depreciation 9,108    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,994 (A)    
N. Little Rock, AR [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 907    
Buildings & Improvements, Initial Cost 17,160    
Improvements, Initial Cost 0    
Land, Total Cost 907    
Buildings & Improvements, Total Cost 21,448    
Total Cost 22,355    
Accumulated Depreciation 10,448    
Total Cost, Net of Accumulated Depreciation 11,907    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,994 (A)    
Littleton, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 12,249    
Buildings & Improvements, Initial Cost 50,709    
Improvements, Initial Cost 0    
Land, Total Cost 12,621    
Buildings & Improvements, Total Cost 69,633    
Total Cost 82,254    
Accumulated Depreciation 21,172    
Total Cost, Net of Accumulated Depreciation 61,082    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,002 (C)    
San Antonio, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,475    
Buildings & Improvements, Initial Cost 37,327    
Improvements, Initial Cost 0    
Land, Total Cost 4,873    
Buildings & Improvements, Total Cost 47,510    
Total Cost 52,383    
Accumulated Depreciation 15,148    
Total Cost, Net of Accumulated Depreciation 37,235    
Encumbrances 24,800    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,002 (C)    
Denver, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,141    
Buildings & Improvements, Initial Cost 3,593    
Improvements, Initial Cost 0    
Land, Total Cost 1,141    
Buildings & Improvements, Total Cost 5,666    
Total Cost 6,807    
Accumulated Depreciation 1,127    
Total Cost, Net of Accumulated Depreciation 5,680    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,001 (A)    
Dublin, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,609    
Buildings & Improvements, Initial Cost 11,546    
Improvements, Initial Cost 0    
Land, Total Cost 3,609    
Buildings & Improvements, Total Cost 15,036    
Total Cost 18,645    
Accumulated Depreciation 6,526    
Total Cost, Net of Accumulated Depreciation 12,119    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Columbus, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 11,087    
Buildings & Improvements, Initial Cost 44,494    
Improvements, Initial Cost 0    
Land, Total Cost 12,243    
Buildings & Improvements, Total Cost 59,258    
Total Cost 71,501    
Accumulated Depreciation 25,689    
Total Cost, Net of Accumulated Depreciation 45,812    
Encumbrances 50,200    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 1,998 (A)    
Freehold, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,460    
Buildings & Improvements, Initial Cost 2,475    
Improvements, Initial Cost 0    
Land, Total Cost 3,166    
Buildings & Improvements, Total Cost 3,319    
Total Cost 6,485    
Accumulated Depreciation 528    
Total Cost, Net of Accumulated Depreciation 5,957    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2,005 (C)    
Jackson, MS [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,190    
Buildings & Improvements, Initial Cost 6,783    
Improvements, Initial Cost 0    
Land, Total Cost 4,190    
Buildings & Improvements, Total Cost 7,519    
Total Cost 11,709    
Accumulated Depreciation 2,582    
Total Cost, Net of Accumulated Depreciation 9,127    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Ocala, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,916    
Buildings & Improvements, Initial Cost 3,893    
Improvements, Initial Cost 0    
Land, Total Cost 1,916    
Buildings & Improvements, Total Cost 6,160    
Total Cost 8,076    
Accumulated Depreciation 1,943    
Total Cost, Net of Accumulated Depreciation 6,133    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Tallahassee, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,881    
Buildings & Improvements, Initial Cost 2,956    
Improvements, Initial Cost 0    
Land, Total Cost 1,881    
Buildings & Improvements, Total Cost 7,461    
Total Cost 9,342    
Accumulated Depreciation 2,354    
Total Cost, Net of Accumulated Depreciation 6,988    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Cumming, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 14,249    
Buildings & Improvements, Initial Cost 23,653    
Improvements, Initial Cost 0    
Land, Total Cost 14,249    
Buildings & Improvements, Total Cost 24,734    
Total Cost 38,983    
Accumulated Depreciation 8,984    
Total Cost, Net of Accumulated Depreciation 29,999    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Douglasville, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,540    
Buildings & Improvements, Initial Cost 9,625    
Improvements, Initial Cost 0    
Land, Total Cost 3,540    
Buildings & Improvements, Total Cost 9,877    
Total Cost 13,417    
Accumulated Depreciation 3,598    
Total Cost, Net of Accumulated Depreciation 9,819    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Columbus, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,220    
Buildings & Improvements, Initial Cost 8,159    
Improvements, Initial Cost 0    
Land, Total Cost 4,220    
Buildings & Improvements, Total Cost 10,326    
Total Cost 14,546    
Accumulated Depreciation 3,695    
Total Cost, Net of Accumulated Depreciation 10,851    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Newnan, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,858    
Buildings & Improvements, Initial Cost 15,248    
Improvements, Initial Cost 0    
Land, Total Cost 2,858    
Buildings & Improvements, Total Cost 15,779    
Total Cost 18,637    
Accumulated Depreciation 4,221    
Total Cost, Net of Accumulated Depreciation 14,416    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Warner Robins, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,729    
Buildings & Improvements, Initial Cost 7,459    
Improvements, Initial Cost 0    
Land, Total Cost 5,729    
Buildings & Improvements, Total Cost 7,933    
Total Cost 13,662    
Accumulated Depreciation 2,939    
Total Cost, Net of Accumulated Depreciation 10,723    
Encumbrances 6,491    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Woodstock, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,486    
Buildings & Improvements, Initial Cost 2,573    
Improvements, Initial Cost 0    
Land, Total Cost 1,486    
Buildings & Improvements, Total Cost 2,689    
Total Cost 4,175    
Accumulated Depreciation 1,912    
Total Cost, Net of Accumulated Depreciation 2,263    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Fayetteville, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,524    
Buildings & Improvements, Initial Cost 10,627    
Improvements, Initial Cost 0    
Land, Total Cost 8,524    
Buildings & Improvements, Total Cost 14,720    
Total Cost 23,244    
Accumulated Depreciation 4,858    
Total Cost, Net of Accumulated Depreciation 18,386    
Encumbrances 9,483    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Charleston, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,479    
Buildings & Improvements, Initial Cost 9,850    
Improvements, Initial Cost 0    
Land, Total Cost 3,479    
Buildings & Improvements, Total Cost 19,087    
Total Cost 22,566    
Accumulated Depreciation 8,309    
Total Cost, Net of Accumulated Depreciation 14,257    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Denver, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 20,733    
Buildings & Improvements, Initial Cost 22,818    
Improvements, Initial Cost 0    
Land, Total Cost 20,804    
Buildings & Improvements, Total Cost 25,094    
Total Cost 45,898    
Accumulated Depreciation 9,033    
Total Cost, Net of Accumulated Depreciation 36,865    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Chattanooga, TN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,845    
Buildings & Improvements, Initial Cost 13,214    
Improvements, Initial Cost 0    
Land, Total Cost 1,845    
Buildings & Improvements, Total Cost 17,575    
Total Cost 19,420    
Accumulated Depreciation 6,454    
Total Cost, Net of Accumulated Depreciation 12,966    
Encumbrances 9,336    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Hendersonville, TN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,249    
Buildings & Improvements, Initial Cost 9,068    
Improvements, Initial Cost 0    
Land, Total Cost 3,249    
Buildings & Improvements, Total Cost 9,123    
Total Cost 12,372    
Accumulated Depreciation 3,266    
Total Cost, Net of Accumulated Depreciation 9,106    
Encumbrances 4,782    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Johnson City, TN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 521    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 2,067    
Total Cost 2,067    
Accumulated Depreciation 480    
Total Cost, Net of Accumulated Depreciation 1,587    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Chester, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,780    
Buildings & Improvements, Initial Cost 4,752    
Improvements, Initial Cost 0    
Land, Total Cost 10,780    
Buildings & Improvements, Total Cost 7,221    
Total Cost 18,001    
Accumulated Depreciation 3,116    
Total Cost, Net of Accumulated Depreciation 14,885    
Encumbrances 7,135    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Milwaukee, WI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,527    
Buildings & Improvements, Initial Cost 3,600    
Improvements, Initial Cost 0    
Land, Total Cost 4,527    
Buildings & Improvements, Total Cost 4,888    
Total Cost 9,415    
Accumulated Depreciation 1,710    
Total Cost, Net of Accumulated Depreciation 7,705    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Suwanee, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 13,479    
Buildings & Improvements, Initial Cost 23,923    
Improvements, Initial Cost 0    
Land, Total Cost 13,335    
Buildings & Improvements, Total Cost 30,661    
Total Cost 43,996    
Accumulated Depreciation 10,851    
Total Cost, Net of Accumulated Depreciation 33,145    
Encumbrances 24,907    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
West Allis, WI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,371    
Buildings & Improvements, Initial Cost 10,982    
Improvements, Initial Cost 0    
Land, Total Cost 2,371    
Buildings & Improvements, Total Cost 12,265    
Total Cost 14,636    
Accumulated Depreciation 4,125    
Total Cost, Net of Accumulated Depreciation 10,511    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Orland Park, IL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,430    
Buildings & Improvements, Initial Cost 13,081    
Improvements, Initial Cost 0    
Land, Total Cost 10,430    
Buildings & Improvements, Total Cost 14,039    
Total Cost 24,469    
Accumulated Depreciation 4,165    
Total Cost, Net of Accumulated Depreciation 20,304    
Encumbrances 6,399    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Louisville, KY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,180    
Buildings & Improvements, Initial Cost 747    
Improvements, Initial Cost 0    
Land, Total Cost 4,288    
Buildings & Improvements, Total Cost 2,029    
Total Cost 6,317    
Accumulated Depreciation 689    
Total Cost, Net of Accumulated Depreciation 5,628    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
N. Charleston, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,146    
Buildings & Improvements, Initial Cost 5,990    
Improvements, Initial Cost 0    
Land, Total Cost 5,146    
Buildings & Improvements, Total Cost 10,641    
Total Cost 15,787    
Accumulated Depreciation 3,297    
Total Cost, Net of Accumulated Depreciation 12,490    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
West Long Branch, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 14,131    
Buildings & Improvements, Initial Cost 51,982    
Improvements, Initial Cost 0    
Land, Total Cost 14,131    
Buildings & Improvements, Total Cost 57,832    
Total Cost 71,963    
Accumulated Depreciation 17,124    
Total Cost, Net of Accumulated Depreciation 54,839    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Mays Landing, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 49,033    
Buildings & Improvements, Initial Cost 107,230    
Improvements, Initial Cost 0    
Land, Total Cost 49,033    
Buildings & Improvements, Total Cost 114,711    
Total Cost 163,744    
Accumulated Depreciation 36,302    
Total Cost, Net of Accumulated Depreciation 127,442    
Encumbrances 62,176    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Toledo, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,316    
Buildings & Improvements, Initial Cost 3,961    
Improvements, Initial Cost 0    
Land, Total Cost 928    
Buildings & Improvements, Total Cost 3,142    
Total Cost 4,070    
Accumulated Depreciation 1,237    
Total Cost, Net of Accumulated Depreciation 2,833    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Mays Landing, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 36,224    
Buildings & Improvements, Initial Cost 56,949    
Improvements, Initial Cost 0    
Land, Total Cost 36,224    
Buildings & Improvements, Total Cost 62,196    
Total Cost 98,420    
Accumulated Depreciation 19,660    
Total Cost, Net of Accumulated Depreciation 78,760    
Encumbrances 3,296    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Ashtabula, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,444    
Buildings & Improvements, Initial Cost 9,912    
Improvements, Initial Cost 0    
Land, Total Cost 119    
Buildings & Improvements, Total Cost 3,620    
Total Cost 3,739    
Accumulated Depreciation 3,018    
Total Cost, Net of Accumulated Depreciation 721    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Horseheads, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 659    
Buildings & Improvements, Initial Cost 2,426    
Improvements, Initial Cost 0    
Land, Total Cost 4,777    
Buildings & Improvements, Total Cost 33,556    
Total Cost 38,333    
Accumulated Depreciation 4,738    
Total Cost, Net of Accumulated Depreciation 33,595    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2008 (C)    
West Seneca, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,929    
Buildings & Improvements, Initial Cost 12,926    
Improvements, Initial Cost 0    
Land, Total Cost 2,929    
Buildings & Improvements, Total Cost 13,193    
Total Cost 16,122    
Accumulated Depreciation 4,098    
Total Cost, Net of Accumulated Depreciation 12,024    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Amherst, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 28,331    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 25,779    
Total Cost 25,779    
Accumulated Depreciation 10,722    
Total Cost, Net of Accumulated Depreciation 15,057    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Ithaca, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,198    
Buildings & Improvements, Initial Cost 42,969    
Improvements, Initial Cost 0    
Land, Total Cost 9,198    
Buildings & Improvements, Total Cost 44,363    
Total Cost 53,561    
Accumulated Depreciation 13,553    
Total Cost, Net of Accumulated Depreciation 40,008    
Encumbrances 8,424    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Hamburg, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,565    
Buildings & Improvements, Initial Cost 9,238    
Improvements, Initial Cost 0    
Land, Total Cost 2,565    
Buildings & Improvements, Total Cost 9,367    
Total Cost 11,932    
Accumulated Depreciation 2,887    
Total Cost, Net of Accumulated Depreciation 9,045    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Hamburg, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,598    
Buildings & Improvements, Initial Cost 31,853    
Improvements, Initial Cost 0    
Land, Total Cost 6,598    
Buildings & Improvements, Total Cost 33,684    
Total Cost 40,282    
Accumulated Depreciation 10,641    
Total Cost, Net of Accumulated Depreciation 29,641    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Tonawanda, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,061    
Buildings & Improvements, Initial Cost 6,887    
Improvements, Initial Cost 0    
Land, Total Cost 1,591    
Buildings & Improvements, Total Cost 5,899    
Total Cost 7,490    
Accumulated Depreciation 2,706    
Total Cost, Net of Accumulated Depreciation 4,784    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Hamburg, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,152    
Buildings & Improvements, Initial Cost 22,075    
Improvements, Initial Cost 0    
Land, Total Cost 4,152    
Buildings & Improvements, Total Cost 22,738    
Total Cost 26,890    
Accumulated Depreciation 7,090    
Total Cost, Net of Accumulated Depreciation 19,800    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Olean, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,834    
Buildings & Improvements, Initial Cost 29,813    
Improvements, Initial Cost 0    
Land, Total Cost 8,844    
Buildings & Improvements, Total Cost 31,677    
Total Cost 40,521    
Accumulated Depreciation 10,121    
Total Cost, Net of Accumulated Depreciation 30,400    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Big Flats, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 22,229    
Buildings & Improvements, Initial Cost 52,579    
Improvements, Initial Cost 0    
Land, Total Cost 22,279    
Buildings & Improvements, Total Cost 58,398    
Total Cost 80,677    
Accumulated Depreciation 19,989    
Total Cost, Net of Accumulated Depreciation 60,688    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Williamsville, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,021    
Buildings & Improvements, Initial Cost 6,768    
Improvements, Initial Cost 0    
Land, Total Cost 5,021    
Buildings & Improvements, Total Cost 8,852    
Total Cost 13,873    
Accumulated Depreciation 3,373    
Total Cost, Net of Accumulated Depreciation 10,500    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Buffalo, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,010    
Buildings & Improvements, Initial Cost 19,044    
Improvements, Initial Cost 0    
Land, Total Cost 4,468    
Buildings & Improvements, Total Cost 16,158    
Total Cost 20,626    
Accumulated Depreciation 5,968    
Total Cost, Net of Accumulated Depreciation 14,658    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Lockport, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,253    
Buildings & Improvements, Initial Cost 23,829    
Improvements, Initial Cost 0    
Land, Total Cost 9,253    
Buildings & Improvements, Total Cost 24,287    
Total Cost 33,540    
Accumulated Depreciation 7,548    
Total Cost, Net of Accumulated Depreciation 25,992    
Encumbrances 3,591    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Buffalo, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,568    
Buildings & Improvements, Initial Cost 29,001    
Improvements, Initial Cost 0    
Land, Total Cost 3,620    
Buildings & Improvements, Total Cost 30,232    
Total Cost 33,852    
Accumulated Depreciation 9,193    
Total Cost, Net of Accumulated Depreciation 24,659    
Encumbrances 9,760    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Cheektowaga, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 15,471    
Buildings & Improvements, Initial Cost 25,600    
Improvements, Initial Cost 0    
Land, Total Cost 15,471    
Buildings & Improvements, Total Cost 27,267    
Total Cost 42,738    
Accumulated Depreciation 9,233    
Total Cost, Net of Accumulated Depreciation 33,505    
Encumbrances 2,062    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
New Hartford, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,279    
Buildings & Improvements, Initial Cost 13,685    
Improvements, Initial Cost 0    
Land, Total Cost 1,279    
Buildings & Improvements, Total Cost 13,790    
Total Cost 15,069    
Accumulated Depreciation 4,308    
Total Cost, Net of Accumulated Depreciation 10,761    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Gates, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,369    
Buildings & Improvements, Initial Cost 40,672    
Improvements, Initial Cost 0    
Land, Total Cost 9,369    
Buildings & Improvements, Total Cost 42,207    
Total Cost 51,576    
Accumulated Depreciation 13,501    
Total Cost, Net of Accumulated Depreciation 38,075    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Rome, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,565    
Buildings & Improvements, Initial Cost 5,078    
Improvements, Initial Cost 0    
Land, Total Cost 4,565    
Buildings & Improvements, Total Cost 9,412    
Total Cost 13,977    
Accumulated Depreciation 2,722    
Total Cost, Net of Accumulated Depreciation 11,255    
Encumbrances 1,303    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Dewitt, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 881    
Buildings & Improvements, Initial Cost 5,686    
Improvements, Initial Cost 0    
Land, Total Cost 561    
Buildings & Improvements, Total Cost 4,199    
Total Cost 4,760    
Accumulated Depreciation 1,693    
Total Cost, Net of Accumulated Depreciation 3,067    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Niskayuna, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 20,297    
Buildings & Improvements, Initial Cost 51,155    
Improvements, Initial Cost 0    
Land, Total Cost 20,297    
Buildings & Improvements, Total Cost 52,733    
Total Cost 73,030    
Accumulated Depreciation 16,750    
Total Cost, Net of Accumulated Depreciation 56,280    
Encumbrances 11,884    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Victor, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,374    
Buildings & Improvements, Initial Cost 6,433    
Improvements, Initial Cost 0    
Land, Total Cost 1,427    
Buildings & Improvements, Total Cost 5,239    
Total Cost 6,666    
Accumulated Depreciation 2,157    
Total Cost, Net of Accumulated Depreciation 4,509    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2004 (A)    
Allentown, PA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,558    
Buildings & Improvements, Initial Cost 20,060    
Improvements, Initial Cost 0    
Land, Total Cost 5,558    
Buildings & Improvements, Total Cost 23,125    
Total Cost 28,683    
Accumulated Depreciation 7,719    
Total Cost, Net of Accumulated Depreciation 20,964    
Encumbrances 11,168    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
St. John, MO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,613    
Buildings & Improvements, Initial Cost 7,040    
Improvements, Initial Cost 0    
Land, Total Cost 2,827    
Buildings & Improvements, Total Cost 8,149    
Total Cost 10,976    
Accumulated Depreciation 2,839    
Total Cost, Net of Accumulated Depreciation 8,137    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Ft. Collins, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,129    
Buildings & Improvements, Initial Cost 2,054    
Improvements, Initial Cost 0    
Land, Total Cost 1,129    
Buildings & Improvements, Total Cost 4,581    
Total Cost 5,710    
Accumulated Depreciation 1,531    
Total Cost, Net of Accumulated Depreciation 4,179    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Lakeland, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,445    
Buildings & Improvements, Initial Cost 0    
Improvements, Initial Cost 0    
Land, Total Cost 1,445    
Buildings & Improvements, Total Cost 5,877    
Total Cost 7,322    
Accumulated Depreciation 1,393    
Total Cost, Net of Accumulated Depreciation 5,929    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Hamilton, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,039    
Buildings & Improvements, Initial Cost 49,896    
Improvements, Initial Cost 0    
Land, Total Cost 11,774    
Buildings & Improvements, Total Cost 85,704    
Total Cost 97,478    
Accumulated Depreciation 26,011    
Total Cost, Net of Accumulated Depreciation 71,467    
Encumbrances 39,594    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
Lansing, MI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,598    
Buildings & Improvements, Initial Cost 6,999    
Improvements, Initial Cost 0    
Land, Total Cost 2,094    
Buildings & Improvements, Total Cost 14,827    
Total Cost 16,921    
Accumulated Depreciation 3,836    
Total Cost, Net of Accumulated Depreciation 13,085    
Encumbrances 6,364    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2003 (A)    
San Antonio, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,613    
Buildings & Improvements, Initial Cost 10,791    
Improvements, Initial Cost 0    
Land, Total Cost 6,168    
Buildings & Improvements, Total Cost 71,565    
Total Cost 77,733    
Accumulated Depreciation 11,641    
Total Cost, Net of Accumulated Depreciation 66,092    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (C)    
San Antonio, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,381    
Buildings & Improvements, Initial Cost 6,487    
Improvements, Initial Cost 0    
Land, Total Cost 2,381    
Buildings & Improvements, Total Cost 22,157    
Total Cost 24,538    
Accumulated Depreciation 4,755    
Total Cost, Net of Accumulated Depreciation 19,783    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Kyle, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,548    
Buildings & Improvements, Initial Cost 7,349    
Improvements, Initial Cost 0    
Land, Total Cost 6,236    
Buildings & Improvements, Total Cost 20,961    
Total Cost 27,197    
Accumulated Depreciation 1,730    
Total Cost, Net of Accumulated Depreciation 25,467    
Encumbrances 19,006    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2009 (C)    
Brandon, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,775    
Buildings & Improvements, Initial Cost 13,117    
Improvements, Initial Cost 0    
Land, Total Cost 4,775    
Buildings & Improvements, Total Cost 14,324    
Total Cost 19,099    
Accumulated Depreciation 1,858    
Total Cost, Net of Accumulated Depreciation 17,241    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2009 (A)    
Atlanta, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 14,078    
Buildings & Improvements, Initial Cost 41,050    
Improvements, Initial Cost 0    
Land, Total Cost 14,078    
Buildings & Improvements, Total Cost 42,094    
Total Cost 56,172    
Accumulated Depreciation 5,445    
Total Cost, Net of Accumulated Depreciation 50,727    
Encumbrances 43,300    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2009 (A)    
Marietta, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,425    
Buildings & Improvements, Initial Cost 27,737    
Improvements, Initial Cost 0    
Land, Total Cost 8,425    
Buildings & Improvements, Total Cost 27,756    
Total Cost 36,181    
Accumulated Depreciation 3,781    
Total Cost, Net of Accumulated Depreciation 32,400    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2009 (A)    
Maple Grove, MN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,917    
Buildings & Improvements, Initial Cost 23,954    
Improvements, Initial Cost 0    
Land, Total Cost 8,917    
Buildings & Improvements, Total Cost 24,336    
Total Cost 33,253    
Accumulated Depreciation 2,238    
Total Cost, Net of Accumulated Depreciation 31,015    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2011 (A)    
Charlotte, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 27,707    
Buildings & Improvements, Initial Cost 45,021    
Improvements, Initial Cost 0    
Land, Total Cost 27,707    
Buildings & Improvements, Total Cost 46,986    
Total Cost 74,693    
Accumulated Depreciation 3,620    
Total Cost, Net of Accumulated Depreciation 71,073    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2011 (A)    
Charlotte Three [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,733    
Buildings & Improvements, Initial Cost 5,424    
Improvements, Initial Cost 0    
Land, Total Cost 4,733    
Buildings & Improvements, Total Cost 5,515    
Total Cost 10,248    
Accumulated Depreciation 419    
Total Cost, Net of Accumulated Depreciation 9,829    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2011 (A)    
Colorado Springs, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,890    
Buildings & Improvements, Initial Cost 25,531    
Improvements, Initial Cost 0    
Land, Total Cost 4,890    
Buildings & Improvements, Total Cost 25,946    
Total Cost 30,836    
Accumulated Depreciation 1,795    
Total Cost, Net of Accumulated Depreciation 29,041    
Encumbrances 8,880    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2011 (A)    
Columbus, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 18,716    
Buildings & Improvements, Initial Cost 25,531    
Improvements, Initial Cost 0    
Land, Total Cost 18,716    
Buildings & Improvements, Total Cost 65,096    
Total Cost 83,812    
Accumulated Depreciation 4,773    
Total Cost, Net of Accumulated Depreciation 79,039    
Encumbrances 44,225    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2011 (A)    
Portland Oregon [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 20,208    
Buildings & Improvements, Initial Cost 50,738    
Improvements, Initial Cost 0    
Land, Total Cost 20,208    
Buildings & Improvements, Total Cost 51,165    
Total Cost 71,373    
Accumulated Depreciation 3,142    
Total Cost, Net of Accumulated Depreciation 68,231    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Phoenix [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 15,090    
Buildings & Improvements, Initial Cost 36,880    
Improvements, Initial Cost 0    
Land, Total Cost 15,090    
Buildings & Improvements, Total Cost 38,400    
Total Cost 53,490    
Accumulated Depreciation 2,633    
Total Cost, Net of Accumulated Depreciation 50,857    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Charlotte One [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,600    
Buildings & Improvements, Initial Cost 30,392    
Improvements, Initial Cost 0    
Land, Total Cost 3,600    
Buildings & Improvements, Total Cost 30,392    
Total Cost 33,992    
Accumulated Depreciation 578    
Total Cost, Net of Accumulated Depreciation 33,414    
Encumbrances 15,725    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (C)    
Tucson [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 19,298    
Buildings & Improvements, Initial Cost 94,117    
Improvements, Initial Cost 0    
Land, Total Cost 19,298    
Buildings & Improvements, Total Cost 95,826    
Total Cost 115,124    
Accumulated Depreciation 4,843    
Total Cost, Net of Accumulated Depreciation 110,281    
Encumbrances 23,632    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Phoenix One [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 34,201    
Buildings & Improvements, Initial Cost 88,475    
Improvements, Initial Cost 0    
Land, Total Cost 34,201    
Buildings & Improvements, Total Cost 94,937    
Total Cost 129,138    
Accumulated Depreciation 4,687    
Total Cost, Net of Accumulated Depreciation 124,451    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Independence [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,011    
Buildings & Improvements, Initial Cost 45,752    
Improvements, Initial Cost 0    
Land, Total Cost 5,011    
Buildings & Improvements, Total Cost 45,990    
Total Cost 51,001    
Accumulated Depreciation 2,043    
Total Cost, Net of Accumulated Depreciation 48,958    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Arnold, MO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 892    
Buildings & Improvements, Initial Cost 5,283    
Improvements, Initial Cost 0    
Land, Total Cost 892    
Buildings & Improvements, Total Cost 5,376    
Total Cost 6,268    
Accumulated Depreciation 222    
Total Cost, Net of Accumulated Depreciation 6,046    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Charlotte, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 11,224    
Buildings & Improvements, Initial Cost 82,124    
Improvements, Initial Cost 0    
Land, Total Cost 11,224    
Buildings & Improvements, Total Cost 84,737    
Total Cost 95,961    
Accumulated Depreciation 3,151    
Total Cost, Net of Accumulated Depreciation 92,810    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Raleigh, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,317    
Buildings & Improvements, Initial Cost 35,411    
Improvements, Initial Cost 0    
Land, Total Cost 3,317    
Buildings & Improvements, Total Cost 35,671    
Total Cost 38,988    
Accumulated Depreciation 1,330    
Total Cost, Net of Accumulated Depreciation 37,658    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Oakland [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,361    
Buildings & Improvements, Initial Cost 33,538    
Improvements, Initial Cost 0    
Land, Total Cost 4,361    
Buildings & Improvements, Total Cost 33,538    
Total Cost 37,899    
Accumulated Depreciation 912    
Total Cost, Net of Accumulated Depreciation 36,987    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Highland Village, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,545    
Buildings & Improvements, Initial Cost 28,365    
Improvements, Initial Cost 0    
Land, Total Cost 5,545    
Buildings & Improvements, Total Cost 28,601    
Total Cost 34,146    
Accumulated Depreciation 774    
Total Cost, Net of Accumulated Depreciation 33,372    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Tampa, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,124    
Buildings & Improvements, Initial Cost 20,082    
Improvements, Initial Cost 0    
Land, Total Cost 4,124    
Buildings & Improvements, Total Cost 20,098    
Total Cost 24,222    
Accumulated Depreciation 487    
Total Cost, Net of Accumulated Depreciation 23,735    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Douglasville, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,812    
Buildings & Improvements, Initial Cost 24,645    
Improvements, Initial Cost 0    
Land, Total Cost 6,812    
Buildings & Improvements, Total Cost 24,914    
Total Cost 31,726    
Accumulated Depreciation 598    
Total Cost, Net of Accumulated Depreciation 31,128    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Midlothian, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,507    
Buildings & Improvements, Initial Cost 9,229    
Improvements, Initial Cost 0    
Land, Total Cost 3,507    
Buildings & Improvements, Total Cost 9,229    
Total Cost 12,736    
Accumulated Depreciation 227    
Total Cost, Net of Accumulated Depreciation 12,509    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Midlothian, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,754    
Buildings & Improvements, Initial Cost 20,273    
Improvements, Initial Cost 0    
Land, Total Cost 4,754    
Buildings & Improvements, Total Cost 20,508    
Total Cost 25,262    
Accumulated Depreciation 527    
Total Cost, Net of Accumulated Depreciation 24,735    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Newport News, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 963    
Buildings & Improvements, Initial Cost 7,120    
Improvements, Initial Cost 0    
Land, Total Cost 963    
Buildings & Improvements, Total Cost 7,120    
Total Cost 8,083    
Accumulated Depreciation 187    
Total Cost, Net of Accumulated Depreciation 7,896    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Cumming, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,851    
Buildings & Improvements, Initial Cost 49,659    
Improvements, Initial Cost 0    
Land, Total Cost 6,851    
Buildings & Improvements, Total Cost 49,666    
Total Cost 56,517    
Accumulated Depreciation 802    
Total Cost, Net of Accumulated Depreciation 55,715    
Encumbrances 34,083    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Winter Garden, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 38,945    
Buildings & Improvements, Initial Cost 130,382    
Improvements, Initial Cost 0    
Land, Total Cost 38,945    
Buildings & Improvements, Total Cost 130,413    
Total Cost 169,358    
Accumulated Depreciation 2,008    
Total Cost, Net of Accumulated Depreciation 167,350    
Encumbrances 105,044    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Grandville, MI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,483    
Buildings & Improvements, Initial Cost 18,933    
Improvements, Initial Cost 0    
Land, Total Cost 6,483    
Buildings & Improvements, Total Cost 18,937    
Total Cost 25,420    
Accumulated Depreciation 373    
Total Cost, Net of Accumulated Depreciation 25,047    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Aurora, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,816    
Buildings & Improvements, Initial Cost 20,798    
Improvements, Initial Cost 0    
Land, Total Cost 4,816    
Buildings & Improvements, Total Cost 20,829    
Total Cost 25,645    
Accumulated Depreciation 175    
Total Cost, Net of Accumulated Depreciation 25,470    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Irving, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 17,701    
Buildings & Improvements, Initial Cost 10,571    
Improvements, Initial Cost 0    
Land, Total Cost 17,701    
Buildings & Improvements, Total Cost 10,702    
Total Cost 28,403    
Accumulated Depreciation 116    
Total Cost, Net of Accumulated Depreciation 28,287    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Brentwood, TN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,101    
Buildings & Improvements, Initial Cost 25,956    
Improvements, Initial Cost 0    
Land, Total Cost 6,101    
Buildings & Improvements, Total Cost 26,113    
Total Cost 32,214    
Accumulated Depreciation 240    
Total Cost, Net of Accumulated Depreciation 31,974    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Clarence, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,232    
Buildings & Improvements, Initial Cost 4,705    
Improvements, Initial Cost 0    
Land, Total Cost 2,232    
Buildings & Improvements, Total Cost 4,705    
Total Cost 6,937    
Accumulated Depreciation 86    
Total Cost, Net of Accumulated Depreciation 6,851    
Encumbrances 0    
Depreciable Lives (Years) 20 years    
Date of Construction (C) Acquisition (A) 2013 (A)    
Monaca, PA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,317    
Buildings & Improvements, Initial Cost 27,501    
Improvements, Initial Cost 0    
Land, Total Cost 4,317    
Buildings & Improvements, Total Cost 27,512    
Total Cost 31,829    
Accumulated Depreciation 261    
Total Cost, Net of Accumulated Depreciation 31,568    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
St. Paul, MN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,150    
Buildings & Improvements, Initial Cost 21,558    
Improvements, Initial Cost 0    
Land, Total Cost 7,150    
Buildings & Improvements, Total Cost 22,259    
Total Cost 29,409    
Accumulated Depreciation 299    
Total Cost, Net of Accumulated Depreciation 29,110    
Encumbrances 0    
Depreciable Lives (Years) 20 years    
Date of Construction (C) Acquisition (A) 2013 (A)    
Columbia, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,950    
Buildings & Improvements, Initial Cost 29,065    
Improvements, Initial Cost 0    
Land, Total Cost 2,950    
Buildings & Improvements, Total Cost 29,165    
Total Cost 32,115    
Accumulated Depreciation 263    
Total Cost, Net of Accumulated Depreciation 31,852    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Merriam, KS [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,153    
Buildings & Improvements, Initial Cost 41,811    
Improvements, Initial Cost 0    
Land, Total Cost 7,153    
Buildings & Improvements, Total Cost 41,859    
Total Cost 49,012    
Accumulated Depreciation 383    
Total Cost, Net of Accumulated Depreciation 48,629    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Apopka, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,721    
Buildings & Improvements, Initial Cost 5,302    
Improvements, Initial Cost 0    
Land, Total Cost 2,721    
Buildings & Improvements, Total Cost 5,313    
Total Cost 8,034    
Accumulated Depreciation 85    
Total Cost, Net of Accumulated Depreciation 7,949    
Encumbrances 0    
Depreciable Lives (Years) 20 years    
Date of Construction (C) Acquisition (A) 2013 (A)    
Plant City, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,304    
Buildings & Improvements, Initial Cost 24,875    
Improvements, Initial Cost 0    
Land, Total Cost 4,304    
Buildings & Improvements, Total Cost 25,197    
Total Cost 29,501    
Accumulated Depreciation 217    
Total Cost, Net of Accumulated Depreciation 29,284    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Canton, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,889    
Buildings & Improvements, Initial Cost 46,335    
Improvements, Initial Cost 0    
Land, Total Cost 9,889    
Buildings & Improvements, Total Cost 46,872    
Total Cost 56,761    
Accumulated Depreciation 432    
Total Cost, Net of Accumulated Depreciation 56,329    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
North Olmsted, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 24,352    
Buildings & Improvements, Initial Cost 61,449    
Improvements, Initial Cost 0    
Land, Total Cost 24,352    
Buildings & Improvements, Total Cost 61,477    
Total Cost 85,829    
Accumulated Depreciation 851    
Total Cost, Net of Accumulated Depreciation 84,978    
Encumbrances 0    
Depreciable Lives (Years) 20 years    
Date of Construction (C) Acquisition (A) 2013 (A)    
Parker, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,089    
Buildings & Improvements, Initial Cost 35,697    
Improvements, Initial Cost 0    
Land, Total Cost 9,089    
Buildings & Improvements, Total Cost 35,704    
Total Cost 44,793    
Accumulated Depreciation 317    
Total Cost, Net of Accumulated Depreciation 44,476    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Birmingham, AL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,974    
Buildings & Improvements, Initial Cost 13,884    
Improvements, Initial Cost 0    
Land, Total Cost 1,974    
Buildings & Improvements, Total Cost 14,056    
Total Cost 16,030    
Accumulated Depreciation 122    
Total Cost, Net of Accumulated Depreciation 15,908    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Schaumburg, IL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 27,466    
Buildings & Improvements, Initial Cost 84,679    
Improvements, Initial Cost 0    
Land, Total Cost 27,466    
Buildings & Improvements, Total Cost 84,748    
Total Cost 112,214    
Accumulated Depreciation 782    
Total Cost, Net of Accumulated Depreciation 111,432    
Encumbrances 66,282    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Naples, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,172    
Buildings & Improvements, Initial Cost 39,342    
Improvements, Initial Cost 0    
Land, Total Cost 10,172    
Buildings & Improvements, Total Cost 39,366    
Total Cost 49,538    
Accumulated Depreciation 362    
Total Cost, Net of Accumulated Depreciation 49,176    
Encumbrances 25,987    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Fairfax, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 15,681    
Buildings & Improvements, Initial Cost 68,536    
Improvements, Initial Cost 0    
Land, Total Cost 15,681    
Buildings & Improvements, Total Cost 68,671    
Total Cost 84,352    
Accumulated Depreciation 581    
Total Cost, Net of Accumulated Depreciation 83,771    
Encumbrances 39,419    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Framingham, MA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 75,675    
Buildings & Improvements, Initial Cost 185,094    
Improvements, Initial Cost 0    
Land, Total Cost 75,675    
Buildings & Improvements, Total Cost 185,236    
Total Cost 260,911    
Accumulated Depreciation 1,650    
Total Cost, Net of Accumulated Depreciation 259,261    
Encumbrances 129,158    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Lithonia, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,477    
Buildings & Improvements, Initial Cost 3,476    
Improvements, Initial Cost 0    
Land, Total Cost 2,477    
Buildings & Improvements, Total Cost 3,511    
Total Cost 5,988    
Accumulated Depreciation 28    
Total Cost, Net of Accumulated Depreciation 5,960    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Lithonia, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,546    
Buildings & Improvements, Initial Cost 5,951    
Improvements, Initial Cost 0    
Land, Total Cost 4,546    
Buildings & Improvements, Total Cost 5,951    
Total Cost 10,497    
Accumulated Depreciation 61    
Total Cost, Net of Accumulated Depreciation 10,436    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Frisco, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,793    
Buildings & Improvements, Initial Cost 4,708    
Improvements, Initial Cost 0    
Land, Total Cost 4,793    
Buildings & Improvements, Total Cost 4,710    
Total Cost 9,503    
Accumulated Depreciation 37    
Total Cost, Net of Accumulated Depreciation 9,466    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
McKinney, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,813    
Buildings & Improvements, Initial Cost 10,034    
Improvements, Initial Cost 0    
Land, Total Cost 4,813    
Buildings & Improvements, Total Cost 10,038    
Total Cost 14,851    
Accumulated Depreciation 94    
Total Cost, Net of Accumulated Depreciation 14,757    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Mesquite, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,051    
Buildings & Improvements, Initial Cost 25,531    
Improvements, Initial Cost 0    
Land, Total Cost 7,051    
Buildings & Improvements, Total Cost 25,531    
Total Cost 32,582    
Accumulated Depreciation 232    
Total Cost, Net of Accumulated Depreciation 32,350    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Overland Park, KS [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,776    
Buildings & Improvements, Initial Cost 3,652    
Improvements, Initial Cost 0    
Land, Total Cost 4,776    
Buildings & Improvements, Total Cost 3,659    
Total Cost 8,435    
Accumulated Depreciation 31    
Total Cost, Net of Accumulated Depreciation 8,404    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Plainville, CT [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 17,528    
Buildings & Improvements, Initial Cost 59,777    
Improvements, Initial Cost 0    
Land, Total Cost 17,528    
Buildings & Improvements, Total Cost 60,087    
Total Cost 77,615    
Accumulated Depreciation 546    
Total Cost, Net of Accumulated Depreciation 77,069    
Encumbrances 48,233    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Coon Rapids, MN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 25,692    
Buildings & Improvements, Initial Cost 106,300    
Improvements, Initial Cost 0    
Land, Total Cost 25,692    
Buildings & Improvements, Total Cost 106,623    
Total Cost 132,315    
Accumulated Depreciation 1,477    
Total Cost, Net of Accumulated Depreciation 130,838    
Encumbrances 59,624    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Brandon, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,938    
Buildings & Improvements, Initial Cost 13,685    
Improvements, Initial Cost 0    
Land, Total Cost 2,938    
Buildings & Improvements, Total Cost 13,741    
Total Cost 16,679    
Accumulated Depreciation 130    
Total Cost, Net of Accumulated Depreciation 16,549    
Encumbrances 9,532    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2013 (A)    
Brookfield, WI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,791    
Buildings & Improvements, Initial Cost 16,023    
Improvements, Initial Cost 0    
Land, Total Cost 4,791    
Buildings & Improvements, Total Cost 16,064    
Total Cost 20,855    
Accumulated Depreciation 967    
Total Cost, Net of Accumulated Depreciation 19,888    
Encumbrances 5,958    
Depreciable Lives (Years) 20 years    
Date of Construction (C) Acquisition (A) 2013 (A)    
Brown Deer, WI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,465    
Buildings & Improvements, Initial Cost 32,652    
Improvements, Initial Cost 0    
Land, Total Cost 8,465    
Buildings & Improvements, Total Cost 33,509    
Total Cost 41,974    
Accumulated Depreciation 460    
Total Cost, Net of Accumulated Depreciation 41,514    
Encumbrances 12,297    
Depreciable Lives (Years) 20 years    
Date of Construction (C) Acquisition (A) 2013 (A)    
Tinley Park, IL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,120    
Buildings & Improvements, Initial Cost 37,496    
Improvements, Initial Cost 0    
Land, Total Cost 9,120    
Buildings & Improvements, Total Cost 47,474    
Total Cost 56,594    
Accumulated Depreciation 2,688    
Total Cost, Net of Accumulated Depreciation 53,906    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2012 (A)    
Macon, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,940    
Buildings & Improvements, Initial Cost 5,192    
Improvements, Initial Cost 0    
Land, Total Cost 2,940    
Buildings & Improvements, Total Cost 6,214    
Total Cost 9,154    
Accumulated Depreciation 1,248    
Total Cost, Net of Accumulated Depreciation 7,906    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Snellville, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,185    
Buildings & Improvements, Initial Cost 51,815    
Improvements, Initial Cost 0    
Land, Total Cost 10,342    
Buildings & Improvements, Total Cost 54,934    
Total Cost 65,276    
Accumulated Depreciation 12,210    
Total Cost, Net of Accumulated Depreciation 53,066    
Encumbrances 21,200    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Union, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,650    
Buildings & Improvements, Initial Cost 15,689    
Improvements, Initial Cost 0    
Land, Total Cost 7,650    
Buildings & Improvements, Total Cost 22,897    
Total Cost 30,547    
Accumulated Depreciation 4,461    
Total Cost, Net of Accumulated Depreciation 26,086    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Boiling Springs, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,015    
Buildings & Improvements, Initial Cost 4,486    
Improvements, Initial Cost 0    
Land, Total Cost 1,015    
Buildings & Improvements, Total Cost 4,492    
Total Cost 5,507    
Accumulated Depreciation 1,426    
Total Cost, Net of Accumulated Depreciation 4,081    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Taylors, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,732    
Buildings & Improvements, Initial Cost 4,506    
Improvements, Initial Cost 0    
Land, Total Cost 1,732    
Buildings & Improvements, Total Cost 4,516    
Total Cost 6,248    
Accumulated Depreciation 1,013    
Total Cost, Net of Accumulated Depreciation 5,235    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Dothan, AL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,358    
Buildings & Improvements, Initial Cost 26,903    
Improvements, Initial Cost 0    
Land, Total Cost 2,770    
Buildings & Improvements, Total Cost 24,532    
Total Cost 27,302    
Accumulated Depreciation 6,340    
Total Cost, Net of Accumulated Depreciation 20,962    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Bradenton, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,766    
Buildings & Improvements, Initial Cost 31,203    
Improvements, Initial Cost 0    
Land, Total Cost 10,916    
Buildings & Improvements, Total Cost 39,465    
Total Cost 50,381    
Accumulated Depreciation 14,167    
Total Cost, Net of Accumulated Depreciation 36,214    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Clearwater, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,579    
Buildings & Improvements, Initial Cost 15,855    
Improvements, Initial Cost 0    
Land, Total Cost 5,579    
Buildings & Improvements, Total Cost 17,554    
Total Cost 23,133    
Accumulated Depreciation 4,117    
Total Cost, Net of Accumulated Depreciation 19,016    
Encumbrances 6,814    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Tampa, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,699    
Buildings & Improvements, Initial Cost 3,338    
Improvements, Initial Cost 0    
Land, Total Cost 1,699    
Buildings & Improvements, Total Cost 3,394    
Total Cost 5,093    
Accumulated Depreciation 750    
Total Cost, Net of Accumulated Depreciation 4,343    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Tequesta, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,108    
Buildings & Improvements, Initial Cost 7,400    
Improvements, Initial Cost 0    
Land, Total Cost 2,108    
Buildings & Improvements, Total Cost 7,129    
Total Cost 9,237    
Accumulated Depreciation 1,639    
Total Cost, Net of Accumulated Depreciation 7,598    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Roswell, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,566    
Buildings & Improvements, Initial Cost 15,005    
Improvements, Initial Cost 0    
Land, Total Cost 7,416    
Buildings & Improvements, Total Cost 24,767    
Total Cost 32,183    
Accumulated Depreciation 7,181    
Total Cost, Net of Accumulated Depreciation 25,002    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Hagerstown, MD [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,440    
Buildings & Improvements, Initial Cost 9,697    
Improvements, Initial Cost 0    
Land, Total Cost 2,440    
Buildings & Improvements, Total Cost 11,949    
Total Cost 14,389    
Accumulated Depreciation 2,826    
Total Cost, Net of Accumulated Depreciation 11,563    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Greensboro, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,012    
Buildings & Improvements, Initial Cost 11,162    
Improvements, Initial Cost 0    
Land, Total Cost 2,849    
Buildings & Improvements, Total Cost 7,713    
Total Cost 10,562    
Accumulated Depreciation 2,536    
Total Cost, Net of Accumulated Depreciation 8,026    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Greensboro, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,153    
Buildings & Improvements, Initial Cost 9,455    
Improvements, Initial Cost 0    
Land, Total Cost 3,153    
Buildings & Improvements, Total Cost 9,689    
Total Cost 12,842    
Accumulated Depreciation 2,155    
Total Cost, Net of Accumulated Depreciation 10,687    
Encumbrances 4,580    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
East Hanover, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,847    
Buildings & Improvements, Initial Cost 23,798    
Improvements, Initial Cost 0    
Land, Total Cost 3,847    
Buildings & Improvements, Total Cost 24,240    
Total Cost 28,087    
Accumulated Depreciation 5,291    
Total Cost, Net of Accumulated Depreciation 22,796    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Camp Hill, PA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,631    
Buildings & Improvements, Initial Cost 8,402    
Improvements, Initial Cost 0    
Land, Total Cost 589    
Buildings & Improvements, Total Cost 4,201    
Total Cost 4,790    
Accumulated Depreciation 1,883    
Total Cost, Net of Accumulated Depreciation 2,907    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Middletown, RI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,804    
Buildings & Improvements, Initial Cost 16,805    
Improvements, Initial Cost 0    
Land, Total Cost 3,842    
Buildings & Improvements, Total Cost 18,023    
Total Cost 21,865    
Accumulated Depreciation 3,792    
Total Cost, Net of Accumulated Depreciation 18,073    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Lexington, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,795    
Buildings & Improvements, Initial Cost 9,933    
Improvements, Initial Cost 0    
Land, Total Cost 1,795    
Buildings & Improvements, Total Cost 10,005    
Total Cost 11,800    
Accumulated Depreciation 2,218    
Total Cost, Net of Accumulated Depreciation 9,582    
Encumbrances 4,120    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Newport News, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 10,064    
Buildings & Improvements, Initial Cost 21,272    
Improvements, Initial Cost 0    
Land, Total Cost 4,026    
Buildings & Improvements, Total Cost 11,155    
Total Cost 15,181    
Accumulated Depreciation 4,392    
Total Cost, Net of Accumulated Depreciation 10,789    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Richmond, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 11,879    
Buildings & Improvements, Initial Cost 34,736    
Improvements, Initial Cost 0    
Land, Total Cost 11,879    
Buildings & Improvements, Total Cost 35,681    
Total Cost 47,560    
Accumulated Depreciation 8,022    
Total Cost, Net of Accumulated Depreciation 39,538    
Encumbrances 11,969    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Springfield, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 12,627    
Buildings & Improvements, Initial Cost 30,572    
Improvements, Initial Cost 0    
Land, Total Cost 12,627    
Buildings & Improvements, Total Cost 31,546    
Total Cost 44,173    
Accumulated Depreciation 7,027    
Total Cost, Net of Accumulated Depreciation 37,146    
Encumbrances 10,588    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Springfield, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,389    
Buildings & Improvements, Initial Cost 9,466    
Improvements, Initial Cost 0    
Land, Total Cost 4,389    
Buildings & Improvements, Total Cost 10,167    
Total Cost 14,556    
Accumulated Depreciation 2,484    
Total Cost, Net of Accumulated Depreciation 12,072    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Sterling, VA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,426    
Buildings & Improvements, Initial Cost 18,651    
Improvements, Initial Cost 0    
Land, Total Cost 8,426    
Buildings & Improvements, Total Cost 18,692    
Total Cost 27,118    
Accumulated Depreciation 4,142    
Total Cost, Net of Accumulated Depreciation 22,976    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Windsor Court, CT [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 6,090    
Buildings & Improvements, Initial Cost 11,745    
Improvements, Initial Cost 0    
Land, Total Cost 6,090    
Buildings & Improvements, Total Cost 11,758    
Total Cost 17,848    
Accumulated Depreciation 2,613    
Total Cost, Net of Accumulated Depreciation 15,235    
Encumbrances 6,951    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Valrico, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,282    
Buildings & Improvements, Initial Cost 12,190    
Improvements, Initial Cost 0    
Land, Total Cost 3,282    
Buildings & Improvements, Total Cost 18,438    
Total Cost 21,720    
Accumulated Depreciation 3,047    
Total Cost, Net of Accumulated Depreciation 18,673    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Atlanta, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 11,120    
Buildings & Improvements, Initial Cost 31,341    
Improvements, Initial Cost 0    
Land, Total Cost 11,120    
Buildings & Improvements, Total Cost 34,629    
Total Cost 45,749    
Accumulated Depreciation 7,366    
Total Cost, Net of Accumulated Depreciation 38,383    
Encumbrances 11,555    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Norcross, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 3,007    
Buildings & Improvements, Initial Cost 8,489    
Improvements, Initial Cost 0    
Land, Total Cost 3,007    
Buildings & Improvements, Total Cost 8,635    
Total Cost 11,642    
Accumulated Depreciation 1,897    
Total Cost, Net of Accumulated Depreciation 9,745    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Bowie, MD [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,739    
Buildings & Improvements, Initial Cost 14,301    
Improvements, Initial Cost 0    
Land, Total Cost 5,744    
Buildings & Improvements, Total Cost 14,404    
Total Cost 20,148    
Accumulated Depreciation 3,246    
Total Cost, Net of Accumulated Depreciation 16,902    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Charlotte [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,842    
Buildings & Improvements, Initial Cost 9,807    
Improvements, Initial Cost 0    
Land, Total Cost 2,842    
Buildings & Improvements, Total Cost 10,008    
Total Cost 12,850    
Accumulated Depreciation 2,240    
Total Cost, Net of Accumulated Depreciation 10,610    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Cornelius, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,382    
Buildings & Improvements, Initial Cost 15,184    
Improvements, Initial Cost 0    
Land, Total Cost 4,382    
Buildings & Improvements, Total Cost 20,355    
Total Cost 24,737    
Accumulated Depreciation 4,931    
Total Cost, Net of Accumulated Depreciation 19,806    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Raleigh, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,728    
Buildings & Improvements, Initial Cost 10,665    
Improvements, Initial Cost 0    
Land, Total Cost 2,728    
Buildings & Improvements, Total Cost 10,819    
Total Cost 13,547    
Accumulated Depreciation 2,411    
Total Cost, Net of Accumulated Depreciation 11,136    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Morgantown, WV [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,645    
Buildings & Improvements, Initial Cost 10,341    
Improvements, Initial Cost 0    
Land, Total Cost 4,645    
Buildings & Improvements, Total Cost 10,513    
Total Cost 15,158    
Accumulated Depreciation 2,512    
Total Cost, Net of Accumulated Depreciation 12,646    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Edgewater, NJ [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,714    
Buildings & Improvements, Initial Cost 30,473    
Improvements, Initial Cost 0    
Land, Total Cost 7,714    
Buildings & Improvements, Total Cost 30,992    
Total Cost 38,706    
Accumulated Depreciation 6,799    
Total Cost, Net of Accumulated Depreciation 31,907    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Highland Ranch, CO [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,380    
Buildings & Improvements, Initial Cost 4,682    
Improvements, Initial Cost 0    
Land, Total Cost 1,078    
Buildings & Improvements, Total Cost 4,481    
Total Cost 5,559    
Accumulated Depreciation 1,056    
Total Cost, Net of Accumulated Depreciation 4,503    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Dania Beach, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 9,593    
Buildings & Improvements, Initial Cost 17,686    
Improvements, Initial Cost 0    
Land, Total Cost 9,593    
Buildings & Improvements, Total Cost 17,691    
Total Cost 27,284    
Accumulated Depreciation 4,001    
Total Cost, Net of Accumulated Depreciation 23,283    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Plantation, FL [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 21,729    
Buildings & Improvements, Initial Cost 37,331    
Improvements, Initial Cost 0    
Land, Total Cost 22,112    
Buildings & Improvements, Total Cost 94,158    
Total Cost 116,270    
Accumulated Depreciation 20,138    
Total Cost, Net of Accumulated Depreciation 96,132    
Encumbrances 45,800    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Rome, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,523    
Buildings & Improvements, Initial Cost 4,007    
Improvements, Initial Cost 0    
Land, Total Cost 24    
Buildings & Improvements, Total Cost 2,081    
Total Cost 2,105    
Accumulated Depreciation 999    
Total Cost, Net of Accumulated Depreciation 1,106    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Sylvania, GA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 431    
Buildings & Improvements, Initial Cost 3,774    
Improvements, Initial Cost 0    
Land, Total Cost 431    
Buildings & Improvements, Total Cost 3,774    
Total Cost 4,205    
Accumulated Depreciation 875    
Total Cost, Net of Accumulated Depreciation 3,330    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Worcester, MA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,395    
Buildings & Improvements, Initial Cost 10,938    
Improvements, Initial Cost 0    
Land, Total Cost 1,230    
Buildings & Improvements, Total Cost 4,126    
Total Cost 5,356    
Accumulated Depreciation 2,193    
Total Cost, Net of Accumulated Depreciation 3,163    
Encumbrances 5,157    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Westland, MI [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,400    
Buildings & Improvements, Initial Cost 2,531    
Improvements, Initial Cost 0    
Land, Total Cost 1,303    
Buildings & Improvements, Total Cost 2,393    
Total Cost 3,696    
Accumulated Depreciation 573    
Total Cost, Net of Accumulated Depreciation 3,123    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Winston-Salem, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 7,156    
Buildings & Improvements, Initial Cost 15,010    
Improvements, Initial Cost 0    
Land, Total Cost 7,156    
Buildings & Improvements, Total Cost 15,010    
Total Cost 22,166    
Accumulated Depreciation 3,462    
Total Cost, Net of Accumulated Depreciation 18,704    
Encumbrances 4,566    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Dunkirk, NY [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 1,487    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 1,414    
Total Cost 1,414    
Accumulated Depreciation 337    
Total Cost, Net of Accumulated Depreciation 1,077    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Alliance, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 812    
Buildings & Improvements, Initial Cost 16,244    
Improvements, Initial Cost 0    
Land, Total Cost 812    
Buildings & Improvements, Total Cost 16,244    
Total Cost 17,056    
Accumulated Depreciation 3,728    
Total Cost, Net of Accumulated Depreciation 13,328    
Encumbrances 6,859    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Cincinnati, OH [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,805    
Buildings & Improvements, Initial Cost 5,028    
Improvements, Initial Cost 0    
Land, Total Cost 2,805    
Buildings & Improvements, Total Cost 5,028    
Total Cost 7,833    
Accumulated Depreciation 1,129    
Total Cost, Net of Accumulated Depreciation 6,704    
Encumbrances 2,486    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Erie, PA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 0    
Buildings & Improvements, Initial Cost 1,486    
Improvements, Initial Cost 0    
Land, Total Cost 0    
Buildings & Improvements, Total Cost 1,433    
Total Cost 1,433    
Accumulated Depreciation 334    
Total Cost, Net of Accumulated Depreciation 1,099    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Greenville, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 1,452    
Buildings & Improvements, Initial Cost 1,891    
Improvements, Initial Cost 0    
Land, Total Cost 419    
Buildings & Improvements, Total Cost 877    
Total Cost 1,296    
Accumulated Depreciation 413    
Total Cost, Net of Accumulated Depreciation 883    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Greenville, SC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 5,659    
Buildings & Improvements, Initial Cost 14,411    
Improvements, Initial Cost 0    
Land, Total Cost 5,659    
Buildings & Improvements, Total Cost 14,411    
Total Cost 20,070    
Accumulated Depreciation 3,335    
Total Cost, Net of Accumulated Depreciation 16,735    
Encumbrances 4,534    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Houston, TX [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 4,380    
Buildings & Improvements, Initial Cost 8,729    
Improvements, Initial Cost 0    
Land, Total Cost 4,380    
Buildings & Improvements, Total Cost 8,775    
Total Cost 13,155    
Accumulated Depreciation 2,059    
Total Cost, Net of Accumulated Depreciation 11,096    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Olympia, WA [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,946    
Buildings & Improvements, Initial Cost 3,050    
Improvements, Initial Cost 0    
Land, Total Cost 2,061    
Buildings & Improvements, Total Cost 2,884    
Total Cost 4,945    
Accumulated Depreciation 665    
Total Cost, Net of Accumulated Depreciation 4,280    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Evansville, IN [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 8,964    
Buildings & Improvements, Initial Cost 18,764    
Improvements, Initial Cost 0    
Land, Total Cost 8,964    
Buildings & Improvements, Total Cost 18,807    
Total Cost 27,771    
Accumulated Depreciation 4,320    
Total Cost, Net of Accumulated Depreciation 23,451    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Apex, NC [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 2,362    
Buildings & Improvements, Initial Cost 4,452    
Improvements, Initial Cost 0    
Land, Total Cost 2,362    
Buildings & Improvements, Total Cost 4,452    
Total Cost 6,814    
Accumulated Depreciation 641    
Total Cost, Net of Accumulated Depreciation 6,173    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Date of Construction (C) Acquisition (A) 2007 (A)    
Portfolio Balance (DDR) -unencumbered [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 178,644    
Buildings & Improvements, Initial Cost 189,116    
Improvements, Initial Cost 0    
Land, Total Cost 178,644    
Buildings & Improvements, Total Cost 189,116    
Total Cost 367,760    
Accumulated Depreciation 332    
Total Cost, Net of Accumulated Depreciation 367,428    
Encumbrances 0    
Depreciable Lives (Years) 31 years 6 months    
Portfolio Balance (DDR) -encumbered [Member]
     
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]      
Land, Initial Cost 61,866    
Buildings & Improvements, Initial Cost 188,988    
Improvements, Initial Cost 0    
Land, Total Cost 61,866    
Buildings & Improvements, Total Cost 188,988    
Total Cost 250,854    
Accumulated Depreciation 72,270    
Total Cost, Net of Accumulated Depreciation 178,584    
Encumbrances $ 44,974    
Depreciable Lives (Years) 31 years 6 months