EX-99.1 2 d160497dex991.htm EX-99.1 EX-99.1

Exhibit 99.1

 

LOGO

 

SANDRIDGE ENERGY

INVESTOR PRESENTATION

September 2016

Sandridge the power of us


LOGO

 

CAUTIONARY STATEMENTS

Forward Looking Statement

This presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. These statements express a belief, expectation or intention and are generally accompanied by words that convey projected future events or outcomes. The forward-looking statements include statements about the company’s corporate strategies, future operations, development plans and appraisal programs, our drilling inventory and locations, estimated production, rates of return, reserves, projections and estimates of net income and EBITDA, projected capital expenditures, projected operating, general and administrative and other costs, anticipated efficiency and cost reduction initiative outcomes, the acquisition of seismic data, infrastructure utilization and investment, liquidity, capital structure, hedging position and strategies, and price realizations and differentials. We have based these forward-looking statements on our current expectations and assumptions and analyses made by us in light of our experience and our perception of historical trends, current conditions and expected future developments, as well as other factors we believe are appropriate under the circumstances. However, whether actual results and developments will conform with our expectations and predictions is subject to a number of risks and uncertainties, including the volatility of oil and natural gas prices, our success in discovering, estimating, and developing oil and natural gas reserves, the availability and terms of capital, our timely execution of hedge transactions, credit conditions of global capital markets, changes in economic conditions, regulatory changes and other factors, many of which are beyond our control. We refer you to the discussion of risk factors in Part I, Item 1A – “Risk Factors” of our Annual Report on Form 10-K for the year ended December 31, 2015 and in comparable “Risk Factors” sections of our Quarterly Reports on Form 10-Q filed after the date of this presentation. All of the forward-looking statements made in this presentation are qualified by these cautionary statements. The actual results or developments anticipated may not be realized or, even if substantially realized, they may not have the expected consequences to or effects on our company or our business or operations. Such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. We undertake no obligation to update or revise any forward-looking statements.

The SEC permits oil and natural gas companies, in their filings with the SEC, to disclose only proved, probable and possible reserves, as each is defined by the SEC. At times we use the terms “EUR” (estimated ultimate recovery) and “recoverable reserves” that the SEC’s guidelines prohibit us from including in filings with the SEC. These estimates are by their nature more speculative than estimates of proved, probable or possible reserves and, accordingly, are subject to substantially greater risk of being actually realized by the company. For a discussion of the company’s proved reserves, as calculated under current SEC rules, we refer you to the company’s amended Annual Report on Form 10-K referenced above, which is available on our website at www.sandridgeenergy.com and at the SEC’s website at www.sec.gov.

www.SandRidgeEnergy.com 1


LOGO

 

SANDRIDGE ENERGY

With a strong balance sheet, we have competitive project IRRs from the high-graded harvest of our Mid-Continent position, plus we’re adding portfolio diversification and long term growth from our North Park Niobrara project…with capacity to do more.

balance sheet—~$525 MM of Liquidity – protect the Balance sheet –Long Runway

MID-continent – high-graded harvest – competitive project IRRs –Adjacent Zone Appraisal

Niobrara oil – dominant North park position – log term oil growth – expands drilling inventory

Potential – Additional Zones – Extended & Multilaterals – New Ares –Ploneering Technologies www.SandRidgeEnergy.com 2


LOGO

 

SANDRIDGE ENERGY OVERVIEW

De-levered Oil Producer Focused on Value Creation

KEY INFORMATION

PRIMARY ASSETS

462K

Mid-Continent Net Acres Focus Area ~300 2P2

Locations

129K

North Park Basin Net Acres Niobrara Oil ~1,300 2P2

Locations

PRODUCTION & RESERVES

54.7 MBoepd3 Q2’16 Production

(28% oil)

281 MMBoe1 Proved Reserves

(25% oil)

(1) SandRidge reserves and PV-10 pro forma for WTO divestiture and net of noncontrolling interests as of 12.31.15, based on SEC pricing at that time ($46.79 / $2.59) (2) 2P locations: Undeveloped Proved and Probable (3) Excludes production related to noncontrolling interests

www.SandRidgeEnergy.com 3


LOGO

 

MID-CONTINENT EXPERTISE EXPANDING INTO THE NIOBRARA

$225MM—$255MM Capital Budget in 2016 in Two Major Project Areas

MID-CONTINENT: HIGH-GRADED HARVEST

One rig active most of 2016

High-graded harvest of Mid-Continent position to manage decline rates

~$2MM per lateral costs

Appraise adjacent plays

Generate flow stability competitive while advancing returns innovations at the strip and cash

NIOBRARA: INITIATE OIL PROGRAM

One rig active through August 2016

Initiate Niobrara oil development program

Line of sight to sub-$4MM per lateral costs

+ Room to improve costs and optimize completions

Deploy extended laterals and assess multilateral potential and additional Niobrara benches

Our combined programs diversify and reduce risk by drilling a higher percentage of proved locations plus sharing expertise and best practices between the two areas. Continue improving both capital and expense efficiency.

www.SandRidgeEnergy.com 4


LOGO

 

THE REORGANIZED SANDRIDGE ENERGY (NYSE:SD)

Emerging with Strong Pro Forma Balance Sheet, Minimal Leverage and ~$525MM of Liquidity

COMMON 19.4 MM new common shares to be issued at emergence 15.0 MM issuable upon conversion of mandatory convert EQUITY 4.9 MM warrants at $41.34 strike price

2.1 MM warrants at $42.03 strike price

MANDATORILY $282MM face value

CONVERTIBLE Unsecured and mandatorily convertible into 15.0 MM shares DEBT No interest1 $425MM Undrawn2

REVOLVING No financial covenants or borrowing base redeterminations for two years Liquidity CREDIT FACILITY LIBOR (100 bps floor) + 475 bps rate 525MM $100MM CASH Pro forma for emergence payments, expect to emerge with

~$100MM in unrestricted cash

$

(1)

 

Make whole applicable if note accelerated following an event of default

(2)

 

Pro forma for debt pay down following emergence and excludes approximately $10.2MM of LOCs

Note: In addition to the items above there will be a $35MM note secured by the Company’s downtown office building

www.SandRidgeEnergy.com 5


LOGO

 

OPERATIONAL HIGHLIGHTS AND FULL YEAR CAPEX PLAN

Q2’16 production 5.0 mmBoe 28% oil

Nibrara (90% oil)

1st well: 30-day IP1 of 550 Boepd (89% oil) four additional wells: 30-day IP avg of 460 Boepd (91% oil) three additional wells in various stages of evaluation

Well costs

$1.9MM per lateral 1H’16 D&C in Miss $1.7MM per lateral D&C on first Miss dual extended lateral Line of sight to sub-$4.0MM per lateral D&C in Niobrara

Mid-continent 1st dual extended laterla2: 30-day IP of 1,099 Boepd (60% oil) chester extended lateral: 30-day ip of 560 boepd (62% oil)

2016 plan $225MM-$255MM CAPEX 37 lateral spud -26 in mid-continent 11 in Niobrara

100% muli and extended laterals in mississippian

(1) Calculated as the highest consecutive 30-Day average production rate during the early life of a well (2) A “lateral” is defined as a single one-mile section lateral

www.SandRidgeEnergy.com 6


LOGO

 

MID-CONTINENT OVERVIEW

Diverse Asset with Focus Expanding Beyond Mississippian Interval in Oklahoma

Stacked reservoirs combined with large acreage base

Appraising adjacent plays and additional zones

Miss Lime has been primary target

? +/- 300’ thick carbonate at ~6,000’ TVD

Focus area concentrated within 462K net acres in OK

Over 1,600 horizontal wells drilled in OK & KS since 2010

Salt water disposal infrastructure

? 1,095 miles of pipeline, connected to 136 active disposal wells, injecting ~670 MBwpd

Electrical infrastructure

? 1,250 miles of power lines, six substations and two micro grids

Field office is located in Alva, OK

KS OK R WOODS WOODWARD ALFALFA MAJOR GARFIELD GRANT KAY NOBLE

www.SandRidgeEnergy.com 7


LOGO

 

DURABLE IMPROVEMENT IN MISSISSIPPIAN ECONOMICS

Multi and Extended Laterals are a Breakthrough

D&C CAPEX, $MM PER LATERAL

Lower costs per lateral

-37% vs 2014

D&C CAPEX, SMM PER LATERAL

Lower costs per lateral

$3.0 $2.0 $1.0 0

100% 80% 60% 40% 20% 0%

2014 2015 2016E

$3.0 $2.2 $1.9

-37% vs 2014

D&C Capex per Lateral

% Multi or Extended Laterals

www.SandRidgeEnergy.com 8


LOGO

 

CONSISTENT RESULTS FROM MISSISSIPPIAN DRILLING

Similar Recoveries for Much Lower Costs per Lateral

90-DAY CUMULATIVE MBOE PER LATERAL AND D&C CAPEX, $MM PER LATERAL

Lower costs for similar production

35.0 30.0 25.0 20.0 15.0 10.0 5.0 0

MBoe

25.8

29.6

25.7

25.0

Group 1

Group 2

Group 3

Group 4

NOV ‘14-JAN ‘15

JAN ‘15-AP ‘15

APR 15-MAY ‘15

JUN ‘15-AUG ‘16

$3.5 $3.0 $2.5 $2.0 $1.5 $1.0 $0.5 $0.0

Lower costs for similar production

Results shown by groups of 50 wells

www.SandRidgeEnergy.com 9


LOGO

 

MULTILATERAL AND EXTENDED LATERAL TOOLKIT

Multiple Laterals from a Single Vertical Wellbore

MORE EFFICIENT THAN SINGLE LATERALS

Less capital per lateral: shared facilities, pads, infrastructure

Lower LOE: shared artificial lift and fixed costs

Increases full cycle value

RECENT ADVANCES

First dual extended lateral completed in Q1’16, the Dettle 2408 1-29 20H

Extended laterals expected to commercialize Chester oil development

Technology transfer to Niobrara play in Colorado

www.SandRidgeEnergy.com 10


LOGO

 

MULTI AND EXTENDED LATERAL DRILLING ENHANCES VALUE CREATION

Lower CAPEX, Lower LOE and Higher NPV

Three years of accumulated learnings have established a competitive advantage

KEY DRIVERS OF MORE VALUE PER LATERAL

CAPEX: Lower D&C per lateral

LOE: Shared tanks, pads, etc.

Ability to tailor completions to acreage situation and development history

Confidence in approach in new areas

(1)

 

Includes : Midstream and Electrical ($55K), SWD ($120K), and Workovers ($320K) (2) 9.19.16 Strip Pricing

www.SandRidgeEnergy.com 11


LOGO

 

MID-CONTINENT: ACHIEVEMENTS AND PRIORITIES

ACHIEVEMENTS

Multi and extended lateral development yields best 2016 well returns in Mississippian Lime, driven by a significant improvement in drilled and completed lateral cost per foot

Multi and extended lateral development provide strong results

– Dettle (Dual-XL) produced a 30-Day IP of 1,099 Boepd (60% oil) for $1.7MM per lateral

– Chester drilling with most recent 7 laterals averaging a 30-Day IP of 487 Boepd (60% oil), expanding drilling inventory on existing leasehold footprint

– Q2’16 Chester extended lateral, the Earl 2414 1-11H14H, produced a 30-Day IP of 560 Boepd (62 % oil) at $2.16MM per lateral

Continued focus on operating cost improvement through contract renegotiations and operating efficiencies

Effectively managing SWD limitations from regulatory agencies, with minimal production deferment

PRIORITIES

Test and delineate adjacent emerging plays

Continue to drive down individual well costs through innovative operating practices including multilateral, extended lateral and dual extended lateral utilization

Reduce production downtime

Expand alternate zone water injection plan; successful Penn Sands pilot injection test initiated in Q3’16

www.SandRidgeEnergy.com 12


LOGO

 

NORTH PARK NIOBRARA ASSET OVERVIEW

Dominant Acreage Position with Highest Niobrara Oil Rates

Targeting sub-$4MM per lateral for ~250 MBo recovery

Stacked pay potential with over 1,300 locations

Ten wells drilled in 2016; five wells with over 90 days of production; three wells in early evaluation phase and two currently being completed

Successfully drilled first extended lateral (two mile lateral)

28 MMBoe of proved reserves1 (81% oil); 108 PUDs

September 2016 production: ~1,600 Net Bopd from 23 horizontal wells; 42 drilling permits approved

Large contiguous acreage position; federal units largely eliminate near term HBP drilling requirements

SUMMARY OF ACREAGE HELD NET ACRES

HBP 22K Held by Federal Unit (HBU) 53K

Total Acreage Currently Held 75K (58%)

Additional HBU by YE’17 33K

Total Expected Acreage Held by YE’17 108K (84%)

(1)

 

SandRidge reserves as of 12.31.15, based on SEC pricing at that time ($46.79 / $2.59)

81% OIL IN NORTH PARK VS ~35% FOR DJ BASIN

1,300 LOCATIONS

129K NET ACRES IN JACKSON COUNTY 75K NET ACRES (OR 58%) HBP OR BY

FEDERAL UNIT

SandRidge Acreage

www.SandRidgeEnergy.com 13


LOGO

 

INITIALLY TARGETING LOWER NIOBRARA

Similar Geologic Characteristics to the DJ Basin Niobrara but Higher Oil Cut

NORTH PARK

DJ BASIN BASIN

Oil EUR % 81% 35%—40%

Depth 5,500 – 9,000 ft. 6,000 – 8,000 ft.

Reservoir Storage Capacity Gross Thickness 450 – 480 ft. 150 – 300 ft.

Porosity 6 – 9% 6 – 10%

OOIP per Section 63.8 MMBo 41.3 MMBo Thermal Maturity (Ro) 0.75 – 1.0% 0.5 – 1.4+%

Reservoir Production Potential Reservoir Pressure > 0.55 psi/ft 0.41—0.60 psi/ft Gas-oil Ratio (GOR) 600 – 700 scf/stb Up to 10,000+ scf/stb

Total Organic Content 3% 3%

www.SandRidgeEnergy.com 14


LOGO

 

SANDRIDGE RESULTS SUPPORT MODELED EXPECTATIONS

467 Boepd Average 30-day IP of Last Ten Wells Drilled by Previous Operators

478 BOEPD AVERAGE 30-DAY IP BROUGHT ONLINE 2H’16; IN VARIOUS ON FIRST FIVE SANDRIDGE WELLS STAGES OF EVALUATION

DESIGNED TO TEST AND EVALUATE

Spacing

Artificial lift methods

Stimulation concepts, including pumping slickwater fracs

www.SandRidgeEnergy.com 15


LOGO

 

ACHIEVABLE UPSIDE IN NORTH PARK BASIN, COLORADO

Lower Costs, Optimized Completions, Extended Laterals, Stacked Pay and Location Count

UPSIDE INCLUDES

Expanding structural and geologic reservoir characterization model beyond existing 54 square miles of 3D seismic by acquiring additional 65 square miles of 3D seismic starting in 2017

Proving up additional benches (first SandRidge well, the Gregory 1-9H, producing from Upper and Lower Niobrara)

Drilling extended laterals (one planned in 2H’16)

Optimizing completions to enhance production rate and ultimate recovery, while reducing costs

Reducing drilling and completion costs through applied learnings and observing DJ Basin operators

HBP AND FEDERAL UNITS HOLD 58% OF ACREAGE

www.SandRidgeEnergy.com 16


LOGO

 

NIOBRARA ASSET MIDSTREAM STATUS

WTI Oil Differential Reduced from $11+/Bbl to $3.15/Bbl

CURRENT OIL AND GAS DISPOSITION

Building out field gathering infrastructure; centralized tank battery concept used for processing, storage and export

Oil trucked to market (centralized oil loading bay could handle 40 MBopd)

Gas combusted under appropriate permits

MIDSTREAM STRATEGY

Reduce air emissions by removing liquids from gas stream with Methane Recovery Units (MRUs)

Gas reinjection being considered to reduce combustion volumes

Oil and gas pipelines under evaluation

Currently proceeding with engineering, permitting and right-of-way acquisition for oil and natural gas pipelines

NORTH PARK BASIN POTENTIAL PIPELINE ROUTES

www.SandRidgeEnergy.com 17


LOGO

 

NORTH PARK BASIN: ACHIEVEMENTS AND PRIORITIES

ACHIEVEMENTS

First production achieved on the Gregory 1-9H with a 30-Day IP of 550 Boepd (89% oil)

– Tracer testing on the Gregory 1-9H confirmed oil production from Upper and Lower Niobrara

An average 30-Day IP of 478 Boepd (91% oil) from first five wells

Drilled the field’s first two mile lateral

Reduced spud to rig release time from 31 days to ~11 days

Reduced WTI oil differential from $11+/Bbl to $3.15/Bbl

Completed construction of the field’s first central tank battery

Zero recordable safety incidents since taking over operations in December 2015

PRIORITIES

Lower D&C Cost: Line of sight to sub-$4MM per lateral

Expand extended lateral program

Determine additional bench potential

Delineate additional proved reserves and increase recoverable reserves

Form two additional Federal Units in 2017 (~33K net acres Held by Unit)

Additional 3D seismic surveys to enhance delineation area by 65 square miles

Consolidate acreage in primary development area

www.SandRidgeEnergy.com 18


LOGO

 

INVESTMENT THESIS POST RESTRUCTURING

HARVEST & APPRAISE

MISSISSIPPIAN EXPERTISE PLUS ADJACENT PLAYS

High-graded harvest of our ~462K acre Oklahoma focus area

– ~1,300 producing horizontal wells, 3D seismic and improved reservoir characterization

– One rig active most of 2016

– Production decline moderating

– Infrastructure in place

Industry leading well costs and innovative multilateral development Mid-Continent position supports other zones and opportunities Appraising adjacent plays and additional zones Industry activity moving north and west towards our position

DIVERSIFY

GROW OIL AND VALUE VIA NIOBRARA

Growth in oil reserves and value per barrel via North Park Niobrara development

– Drilling and completing with encouraging results

– 1,300 locations and significant PUD potential

Expand extended lateral program

Upside through more Niobrara benches, completion and spacing optimization and lower well costs

DE-LEVERED

STRONG FINANCIAL POSITION

Net unlevered balance sheet1 and strong liquidity provides financial flexibility at emergence

~$525MM Liquidity

– ~$100MM of unrestricted cash at emergence

– Undrawn $425MM revolver2

No financial covenants or borrowing base redeterminations for two years

(1)

 

Excluding mandatorily convertible note

(2)

 

Pro forma for debt pay down following emergence and excludes approximately $10.2MM of LOCs

www. SandRidgeEnergy.com 19


LOGO

 

APPENDIX

Sandridge the power us


LOGO

 

2016 OPERATIONAL GUIDANCE

TOTAL COMPANY PRODUCTION

Oil (MMBbls) 5.3—5.5 Natural Gas Liquids (MMBbls) 4.1—4.3

Total Liquids (MMBbls) 9.4—9.8

Natural Gas (Bcf) 56.7—56.8 Total (MMBoe) 18.9—19.3

PRICING REALIZATIONS

Oil (differential below WTI) $3.75 NGLs (realized % of WTI) 27% Gas (differential below Henry Hub) $0.50

COSTS PER BOE

LOE $9.00—$9.20 DD&A – oil & gas 5.10—5.50 DD&A – other 1.40—1.45 Total DD&A $6.50—$6.95 G&A – cash1 $4.25—$4.50

% OF NET REVENUE

Severance Taxes 2.00%—2.25%

Corporate Tax Rate 0% Deferral Rate 0%

(1) Adjusted G&A—Cash is a non-GAAP financial measure as it excludes from G&A non-cash compensation, severance, bad debt allowance, shareholder litigation costs, restructuring costs, and other non-recurring items. Incentive compensation plan normalized to be consistent with prior year compensation plans. The most directly comparable GAAP measure for Adjusted G&A—cash is General and Administrative Expense. Information to reconcile this non-GAAP financial measure to the most directly comparable GAAP financial measure is not available at this time, as management is unable to forecast the excluded items for future periods.

www.SandRidgeEnergy.com 21


LOGO

 

2016 CAPITAL EXPENDITURES GUIDANCE

CAPEX GUIDANCE $MM

D&C $125—$140 Other E&P $95—$110

Total Exploration and Production $220—$250

General Corporate $5

Total Capital Expenditures $225—$255

LATERAL SPUDS GROSS NET

Mid-Continent 26 21 North Park 11 11

Total Laterals 37 32

CAPEX GUIDANCE DETAIL $MM

Mid-Continent D&C $45—$50 North Park D&C 55—60 Other—D&C1 25—30

Total Drilling & Completing $125—$140

OTHER E&P

Land, G&G and Seismic $10—$15 Infrastructure2 25—30 Workovers 35—40 Capitalized G&A and Interest 25

Total Other E&P $95—$110

NON E&P

General Corporate $5

Total Capital Expenditures (excl. A&D and P&A) $225—$255

(1)

 

2015 Carryover, JV Penalty, Rig Penalty, Non-Op, SWD (2) Facilities—Electrical, SWD, Gathering, Pipelines

www.SandRidgeEnergy.com 22


LOGO

 

2015 YEAR END RESERVES

RESERVES PV-10

OIL NGLS GAS EQUIVALENT

% $MM %

(MMBBLS) (MMBBLS) (BCF) (MMBOE)

Reservoir Category

PDP – Producing 41 47 763 215 77% $ 993 92% PNP – Non Producing — 4 1—3—PBP – Behind Pipe — 2 1—(3)—PUD – Undeveloped 29 10 149 64 23% 83 8%

Total 71 57 918 281 $ 1,077

Development Status

Total Developed 41 47 769 217 77% $ 994 92% Total Undeveloped 29 10 149 64 23% 83 8%

Total 71 57 918 281 $ 1,077

Note: SandRidge reserves and PV-10 pro forma for WTO divestiture and net of noncontrolling interests as of 12.31.15, based on SEC pricing at that time ($46.79 / $2.59) Note: Numbers may not add due to rounding

www.SandRidgeEnergy.com 23


LOGO

 

ACREAGE SUMMARY

Significant HBP Acreage, with Expiring Acreage Mostly in Kansas

ACREAGE SUMMARY

(IN THOUSANDS)

HBP NON-HBP TOTAL 2016 2017 2018 2019 2020 TOTAL

373.3 172.0

OK 68% 32%

164.9 407.1

KS 29% 71%

71.8 57.7

CO 55% 45%

16.1 7.8

TX 67% 33%

626 645

TOTAL

49% 51%

545 Expiring Acreage 100% Extendable Acreage 572 Expiring Acreage 100% Extendable Acreage 129 Expiring Acreage 100% Extendable Acreage

23 Expiring Acreage 100% Extendable Acreage

1,271 Expiring Acreage

100% Extendable Acreage

27.8 106.1 34.1 3.7—172

7.1 23.6 10.1 0.1—41 257.4 145.8 3.7 0.2—407 129.3 77.7 1.5 0.1—209

2.8 45.5 6.6 1.9 0.6 57

1.4 2.0 0.3 0.7 0.6 5

- 0.1—7.3—7

- 0 ——0

288 297 44 13 1 644

138 103 12 1 1 254

Note: Data as of 6.30.16

www.SandRidgeEnergy.com 24