4.1
Electricity-
The metered cost of all
electricity consumed by the Tenant at the tariff to the
Tenant
plus a charge for reading the meter.
If not metered, consumption will
be calculated
according
to the area of the
premises in relation
to the gross
lettable area ("gla”)
of the building. In addition to the aforementioned the
tenant will be liable to pay pro rata share in proportion
to the gross lettable
area of the building of the electricity
consumed
within the common area
or
areas of the building, including the electricity
consumed
by the air
conditioning
system servicing
the common areas.
4.2
The
metered
cost
of
all
water
consumed
by
the
Tenant.
If
not
metered,
consumption will
be
calculated
according to
the area
of the
premises
in
relation to the gross lettable area ("gla”) of the building.
4.3
Sewerage
&
Refuse:
A
prorata share of the municipal charges for refuse
removal,
sewerage and other sanitation related charges; provided that
if the volume of
refuse generated by the tenant is higher,
per square meter of space occupied,
than the average, the calculation will be weighted to take
account thereof;
Installation
The
Landlord
shall
contribute
a
maximum
amount
of
R
9 000
000,00
(nine
million
rand)(ex
VAT)
towards
the
Tenants
cost
for
the
remodeling
of
the
Tenants
rented
space,
which
amount
shall
be
payable
against
approved
construction
invoices
(payment
terms).
Please
note thal
specifically
no amounts
will be paid
towards
any furniture or moveable assets.
The
Tenant
shall
be
given
3
months
usage
of
the
new
Signage
Boards
at
no
additional
cost.
Should
the
tenant
decide
to
extend
this period
the
tenant
will
deal
directly
with
Epic
Outdoor
and will be expected
to cover the monthly costs of placement.
7.
Walkway upgrade
The Landlord is committed to the upgrading of the walkways
between floors three -
six. Please
further note
that no Furniture
will be provided
by the Landlord.
Apart from the amendments contained herein, the
terms and conditions of the Main Lease
shall apply
to this
Addendum.