XML 66 R55.htm IDEA: XBRL DOCUMENT v3.25.3
Note 16 - Segment Reporting (Details Textual)
9 Months Ended
Sep. 30, 2025
Boe
Number of Reportable Segments Not Disclosed [Flag] true
Heavy Fabrications [Member]  
Number of Facilities 2
Number of Tower Sections in Production Capacity of Turbines Total 1,650
Heavy Fabrications [Member] | Maximum [Member]  
Annual Tower Production Capacity 550
Power Generating Capacity of Turbines (Barrel of Oil Equivalent) 1.7
Industrial Solutions [Member]  
Number of Tower Sections in Production Capacity of Turbines Total 660
Industrial Solutions [Member] | Maximum [Member]  
Annual Tower Production Capacity 220
Power Generating Capacity of Turbines (Barrel of Oil Equivalent) 800