XML 37 R18.htm IDEA: XBRL DOCUMENT v3.23.3
Commitments and Contingencies
9 Months Ended
Sep. 30, 2023
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies

9. Commitments and Contingencies

 

Legal Claims

 

The Company may be subject to legal claims and actions from time to time as part of its business activities. As of September 30, 2023 and December 31, 2022, the Company was not subject to any pending or threatened legal claims or actions.

 

Principal Commitments

 

Clinical Trial Agreements

 

At September 30, 2023, the Company’s remaining contractual commitments pursuant to clinical trial agreements and clinical trial monitoring agreements not yet incurred, as described below, aggregated $6,262,000, which, based on current estimates, are currently scheduled to be incurred through approximately December 31, 2027. The Company’s ability to conduct and fund these contractual commitments is subject to the timely availability of sufficient capital to fund such expenditures, as well as any changes in the allocation or reallocation of such funds to the Company’s current or future clinical trial programs. The Company expects that the full amount of these expenditures will be incurred only if such clinical trial programs are conducted as originally designed and their respective enrollments and duration are not modified or reduced. Clinical trial programs, such as the types that the Company is engaged in, can be highly variable and can frequently involve a series of changes and modifications over time as clinical data are obtained and analyzed, and are frequently modified, suspended or terminated before the clinical trial endpoint is reached. Accordingly, such contractual commitments as discussed herein should be considered as estimates only based on current clinical assumptions and conditions, and are typically subject to significant modifications and revisions over time.

 

The following is a summary of the contractual clinical trials discussed below as of September 30, 2023:

 

Description

of

Clinical Trial

 

Type of

Clinical Trial

 

 

Institution

 

 

Estimated

Start Date

 

 

 

Estimated End Date

 

 

Number of Patients

in Trial

 

 

 

Study Objective

 

 

 

Clinical Update

 

 

 

NCT No.

                         
LB-100 combined with carboplatin, etoposide and atezolizumab in small cell lung cancer  Phase 1b  City of Hope and Sarah Cannon  March 2021  March 2026  14 to 36  Determine RP2D  Three patients entered  NCT04560972
                         
LB-100 combined with doxorubicin in sarcoma  Phase 1b  GEIS  June 2023  June 2024  9 to 18  Determine MTD and RP2D  One patient entered  NCT05809830
                         
Doxorubicin with or without LB-100 in sarcoma  Randomized Phase 2  GEIS  July 2024  June 2026  150  Determine efficacy: PFS  Clinical trial not yet begun (subject to completion of Phase 1b GEIS clinical trial)  NCT05809830
                         
LB-100 combined with dostarlimab in ovarian clear cell carcinoma  Phase 1b/2  MD Anderson  March 2024  December 2025  21  Determine the survival of patients with ovarian clear cell carcinoma  No patients entered at September 30, 2023  NCT06065462

 

Moffitt. Effective August 20, 2018, the Company entered into a five-year Clinical Trial Research Agreement with the Moffitt Cancer Center and Research Institute Hospital Inc., Tampa, Florida (“Moffitt”). Pursuant to the Clinical Trial Research Agreement, Moffitt agreed to conduct and manage a Phase 1b/2 clinical trial to evaluate the toxicity and therapeutic benefit of the Company’s lead anti-cancer clinical compound LB-100 to be administered intravenously in patients with low or intermediate-1 risk myelodysplastic syndrome (MDS).

 

 

In November 2018, the Company received approval from the U.S. Food and Drug Administration for its Investigational New Drug Application to conduct a Phase 1b/2 clinical trial to evaluate the toxicity and therapeutic benefit of LB-100 in patients with low and intermediate-1 risk MDS who have failed or are intolerant of standard treatment. Patients with MDS, although usually older, are generally well except for severe anemia requiring frequent blood transfusions. This Phase 1b/2 clinical trial utilized LB-100 as a single agent in the treatment of patients with low and intermediate-1 risk MDS, including patients with del(5q) myelodysplastic syndrome (del5qMDS) failing first line therapy.

 

During the three months ended June 30, 2023, the Phase 1b/2 clinical trial at Moffitt evaluating LB-100 in patients with MDS was closed by the principal investigator. In this clinical trial, single agent LB-100 was used on a new schedule of days 1, 3, and 5 every 3 weeks. The Company is not employing this schedule in its other clinical trials. Although the Maximally Tolerated Dose (“MTD”) was not achieved, there was no dose-limiting toxicity on this schedule at doses that were greater than the MTD in the Phase 1 clinical trial of LB-100 on the Monday, Tuesday, Wednesday schedule.

 

During the three months ended September 30, 2023 and 2022, the Company incurred costs of $0 and $9,218, respectively, pursuant to this agreement, which have been included in research and development costs in the Company’s consolidated statements of operations. During the nine months ended September 30, 2023 and 2022, the Company incurred costs of $0 and $18,623, respectively, pursuant to this agreement, which have been included in research and development costs in the Company’s consolidated statements of operations. As of September 30, 2023, total costs of $131,074 have been incurred pursuant to this agreement.

 

The Company has decided not to pursue further studies in MDS, as other opportunities have become available (see “Patent and License Agreements - Moffitt” below).

 

GEIS. Effective July 31, 2019, the Company entered into a Collaboration Agreement for an Investigator-Initiated Clinical Trial with the Spanish Sarcoma Group (Grupo Español de Investigación en Sarcomas or “GEIS”), Madrid, Spain, to carry out a study entitled “Randomized phase I/II trial of LB-100 plus doxorubicin vs. doxorubicin alone in first line of advanced soft tissue sarcoma”. The purpose of this clinical trial is to obtain information with respect to the efficacy and safety of LB-100 combined with doxorubicin in soft tissue sarcomas. Doxorubicin is the global standard for initial treatment of advanced soft tissue sarcomas (“ASTS”). Doxorubicin alone has been the mainstay of first line treatment of ASTS for over 40 years, with little therapeutic gain from adding cytotoxic compounds to or substituting other cytotoxic compounds for doxorubicin. In animal models, LB-100 consistently enhances the anti-tumor activity of doxorubicin without apparent increases in toxicity.

 

GEIS has a network of referral centers in Spain and across Europe that have an impressive track record of efficiently conducting innovative studies in ASTS. The Company agreed to provide GEIS with a supply of LB-100 to be utilized in the conduct of this clinical trial, as well as to provide funding for the clinical trial. The goal is to enter approximately 150 to 170 patients in this clinical trial over a period of two years. As advanced sarcoma is a very aggressive disease, the design of the study assumes a median progression free survival (“PFS”, no evidence of disease progression or death from any cause) of 4.5 months in the doxorubicin arm and an alternative median PFS of 7.5 months in the doxorubicin plus LB-100 arm to demonstrate a statistically significant decrease in relative risk of progression or death by adding LB-100. There is a planned interim analysis of the primary endpoint when approximately 50% of the 102 events required for final analysis is reached.

 

The Company had previously expected that this clinical trial would commence during the quarter ended June 30, 2020. However, during July 2020, the Spanish regulatory authority advised the Company that although it had approved the scientific and ethical basis of the protocol, it required that the Company manufacture new inventory of LB-100 under current Spanish pharmaceutical manufacturing standards. These standards were adopted subsequent to the production of the Company’s existing LB-100 inventory.

 

 

In order to manufacture a new inventory supply of LB-100 for the GEIS clinical trial, the Company engaged a number of vendors to carry out the multiple tasks needed to make and gain approval of a new clinical product for investigational study in Spain. These tasks included the synthesis under good manufacturing practices (GMP) of the active pharmacologic ingredient (API), with documentation of each of the steps involved by an independent auditor. The API was then transferred to a vendor that prepares the clinical drug product, also under GMP conditions documented by an independent auditor. The clinical drug product was then sent to a vendor to test for purity and sterility, provide appropriate labels, store the drug, and distribute the drug to the clinical centers for use in the clinical trials. A formal application documenting all steps taken to prepare the clinical drug product for clinical use was submitted to the appropriate regulatory authorities for review and approval before being used in a clinical trial.

 

As of September 30, 2023, this program to provide new inventory of the clinical drug product for the Spanish Sarcoma Group study, and potentially for subsequent multiple trials within the European Union, had cost approximately $1,144,000. Although the production of new inventory has been completed, nominal trailing costs subsequent to September 30, 2023 may be incurred.

 

On October 13, 2022, the Company announced that the Spanish Agency for Medicines and Health Products (Agencia Española de Medicamentos y Productos Sanitarios or “AEMPS”) had authorized a Phase 1b/randomized Phase 2 study of LB-100, the Company’s lead clinical compound, plus doxorubicin, versus doxorubicin alone, the global standard for initial treatment of advanced soft tissue sarcomas (ASTS). Consequently, this clinical trial commenced during the quarter ended June 30, 2023 and is expected to be completed and a report prepared by December 31, 2026. In April 2023, GEIS completed its first site initiation visit in preparation for the clinical trial at Fundación Jiménez Díaz University Hospital (Madrid). Up to 170 patents will be entered into the clinical trial. The Phase 1b section of the protocol is expected to be completed by June 30, 2024, at which time the Company expects to have data on both response and toxicity from this portion of the clinical trial, and subject to clinical results, anticipates that it will be able to proceed to a related Phase 2 study.

 

The interim analysis of this clinical trial will be done before full accrual of patients is completed to determine whether the study has the possibility of showing superiority of the combination of LB-100 plus doxorubicin compared to doxorubicin alone. A positive study would have the potential to change the standard therapy for this disease after four decades of failure to improve the marginal benefit of doxorubicin alone.

 

The Company’s agreement with GEIS provides for various payments based on achieving specific milestones over the term of the agreement. During the three months ended September 30, 2023 and 2022, the Company did not incur any costs pursuant to this agreement. During the nine months ended September 30, 2023 and 2022, the Company incurred costs of $268,829 and $0, respectively, pursuant to this agreement. Such costs, when incurred, are included in research and development costs in the Company’s consolidated statements of operations. Through September 30, 2023, the Company has paid GEIS an aggregate of $684,652 for work done under this agreement through the fourth milestone.

 

The Company’s aggregate commitment pursuant to this agreement, less amounts previously paid to date, totaled approximately $3,423,000 as of September 30, 2023, which is expected to be incurred through December 31, 2027. As the work is being conducted in Europe and is paid for in Euros, final costs are subject to foreign currency fluctuations between the United States Dollar and the Euro. Such fluctuations are recorded in the consolidated statements of operations as foreign currency gain or loss, as appropriate.

 

City of Hope. Effective January 18, 2021, the Company executed a Clinical Research Support Agreement with the City of Hope National Medical Center, an NCI-designated comprehensive cancer center, and City of Hope Medical Foundation (collectively, “City of Hope”), to carry out a Phase 1b clinical trial of LB-100, the Company’s first-in-class protein phosphatase inhibitor, combined with an FDA-approved standard regimen for treatment of untreated extensive-stage disease small cell lung cancer (“ED-SCLC”). LB-100 will be given in combination with carboplatin, etoposide and atezolizumab, an FDA-approved but marginally effective regimen, to previously untreated ED-SCLC patients. The dose of LB-100 will be escalated with the standard fixed doses of the 3-drug regimen to reach a recommended Phase 2 dose (“RP2D”). Patient entry will be expanded so that a total of 12 patients will be evaluable at the RP2D to confirm the safety of the LB-100 combination and to look for potential therapeutic activity as assessed by objective response rate, duration of overall response, progression-free-survival and overall survival.

 

 

The clinical trial was initiated on March 9, 2021, with patient accrual expected to take approximately two years to complete. However, as patient accrual was slower than expected, the Company has been seeking to add additional sites to increase the rate of patient accrual. Effective March 6, 2023, the Sarah Cannon Research Institute (“SCRI”), Nashville, Tennessee, joined the City of Hope’s ongoing Phase 1b clinical trial. The Company is continuing its efforts to add additional sites. The addition of SCRI is expected to expedite and expand the accrual of patients to this clinical trial, thus reducing the time required to demonstrate the feasibility, tolerability and efficacy of adding LB-100 to the current standard treatment regimen. With the addition of SCRI, the Company currently expects that this clinical trial will be completed by March 31, 2026.

 

In early July 2023, the Company was notified that one of three centers accruing patients to its Phase 1b clinical trial in small cell lung cancer had a shortage of carboplatin and as a result the clinical trial was placed on a temporary enrollment hold. This matter was resolved and the temporary enrollment hold was lifted in late July 2023.

 

During the three months ended September 30, 2023 and 2022, the Company did not incur any costs pursuant to this agreement. During the nine months ended September 30, 2023 and 2022, the Company incurred costs of $69,001 and $0, respectively, pursuant to this agreement, which are included in research and development costs in the Company’s consolidated statements of operations. As of September 30, 2023, total costs of $447,512 have been incurred pursuant to this agreement.

 

The Company’s aggregate commitment pursuant to this agreement, less amounts previously paid to date, totaled approximately $2,433,000 as of September 30, 2023, which is expected to be incurred through March 31, 2026. If a significant number of patients fail during the dose-escalation process, an increase of up to 12 patients would likely be necessary, at an estimated additional cost of approximately $800,000.

 

The Company currently expects that enrollment in this clinical trial will range from approximately 18 to 30 enrollees, with 24 enrollees as the most likely number. Should fewer than 42 enrollees be required, the Company has agreed to compensate City of Hope on a per enrollee basis. If a significant improvement in outcome is seen with the addition of LB-100, this would be an important advance in the treatment of a very aggressive disease.

 

Theradex. On June 22, 2023, the Company finalized a work order agreement with Theradex Systems, Inc. (“Theradex”), an international contract research organization (“CRO”), to conduct a Phase I/II randomized trial of LB-100 plus doxorubicin vs. doxorubicin alone in first line of advanced soft tissue sarcomas. The study is expected to be completed by June 30, 2026.

 

Costs under this work order agreement are estimated to be approximately $153,000, with such payments expected to be allocated approximately 72% to Theradex for services and approximately 28% for payments for pass-through software costs. During the three months and nine months ended September 30, 2023, the Company incurred costs of $$3,750 and 10,000, respectively, pursuant to this work order. As of September 30, 2023, total costs of $10,000 have been incurred pursuant to this work order agreement.

 

The Company’s aggregate commitment pursuant to this clinical trial monitoring agreement, less amounts previously paid to date, totaled approximately $144,000 as of September 30, 2023, which is expected to be incurred through June 30, 2026.

 

National Cancer Institute Pharmacologic Clinical Trial. In May 2019, the National Cancer Institute (“NCI”) initiated a glioblastoma (“GBM”) pharmacologic clinical trial. This study was being conducted and funded by the NCI under a Cooperative Research and Development Agreement, with the Company responsible for providing the LB-100 clinical compound.

 

Primary malignant brain tumors (gliomas) are very challenging to treat. Radiation combined with the chemotherapeutic drug temozolomide has been the mainstay of therapy of the most aggressive gliomas (glioblastoma multiforme or GBM) for decades, with some further benefit gained by the addition of one or more anti-cancer drugs, but without major advances in overall survival for the majority of patients. In animal models of GBM, the Company’s novel protein phosphatase inhibitor, LB-100, has been found to enhance the effectiveness of radiation, temozolomide chemotherapy treatments and immunotherapy, raising the possibility that LB-100 may improve outcomes of standard GBM treatment in the clinic. Although LB-100 has proven safe in patients at doses associated with apparent anti-tumor activity against several human cancers arising outside the brain, the ability of LB-100 to penetrate tumor tissue arising in the brain has not been determined. Many drugs potentially useful for GBM treatment do not enter the brain in amounts necessary for anti-cancer action.

 

 

The NCI study was designed to determine the extent to which LB-100 enters recurrent malignant gliomas. Patients having surgery to remove one or more tumors received one dose of LB-100 prior to surgery and had blood and tumor tissue analyzed to determine the amount of LB-100 present and to determine whether the cells in the tumors showed the biochemical changes expected to be present if LB-100 reached its molecular target. As a result of the innovative design of the NCI study, it was believed that data from a few patients would be sufficient to provide a sound rationale for conducting a larger clinical trial to determine the effectiveness of adding LB-100 to the standard treatment regimen for GBMs. Five patients were entered into this study and analysis of the blood and tissue has been conducted. If there is clinical evidence in at least two of the patients of penetration of LB 100 into tumor tissue, the study will be deemed as successful. Results of this study are currently being reviewed by the NCI and a report is pending.

 

MD Anderson Cancer Center Trial. On September 20, 2023, the Company announced a Phase 1b/2 collaborative clinical trial to assess whether adding LB-100 to the programmed death receptor-1 (“PD-1”)-blocking monoclonal antibody of GSK plc (“GSK”), dostarlimab, may enhance the effectiveness of immunotherapy in the treatment of ovarian clear cell carcinoma (“OCCC”). The clinical trial is sponsored by The University of Texas MD Anderson Cancer Center (“MD Anderson”) and will be conducted at MD Anderson, and will also be open at Northwestern University’s Robert H. Lurie Comprehensive Cancer Center. The Company will provide LB-100 and GSK will provide dostarlimab and financial support for the clinical trial.

 

Clinical Trial Monitoring Agreements

 

Moffitt. On September 12, 2018, the Company finalized a work order agreement with Theradex (“CRO”), to monitor the Phase 1b/2 clinical trial being managed and conducted by Moffitt. The clinical trial began in April 2019 and the first patient was entered into the clinical trial in July 2019.

 

The costs of the Phase 1b/2 clinical trial being paid to or through Theradex have been recorded and charged to operations based on periodic documentation provided by the CRO. During the three months ended September 30, 2023 and 2022, the Company incurred costs of $566 and $11,953, respectively, pursuant to this work order. During the nine months ended September 30, 2023 and 2022, the Company incurred costs of $20,850 and $19,792, respectively, pursuant to this work order. As of September 30, 2023, total costs of $148,138 have been incurred pursuant to this work order agreement.

 

As a result of the closure of the Company’s Clinical Trial Research Agreement with Moffitt during the three months ended June 30, 2023 (see “Clinical Trial Agreements – Moffitt” above), this work order agreement with Theradex to monitor the Clinical Trial Research Agreement with Moffitt was similarly suspended, although nominal oversight trailing costs subsequent to September 30, 2023 are expected to be incurred relating to the closure of the Moffitt study.

 

City of Hope. On February 5, 2021, the Company signed a new work order agreement with Theradex to monitor the City of Hope investigator-initiated clinical trial in small cell lung cancer in accordance with FDA requirements for oversight by the sponsoring party. Costs under this work order agreement are estimated to be approximately $335,000. During the three months ended September 30, 2023 and 2022, the Company incurred costs of $4,500 and $7,731, respectively, pursuant to this work order. During the nine months ended September 30, 2023 and 2022, the Company incurred costs of $15,740 and $23,466, respectively, pursuant to this work order. As of September 30, 2023, total costs of $74,181 have been incurred pursuant to this work order agreement.

 

The Company’s aggregate commitment pursuant to this clinical trial monitoring agreement, less amounts previously paid to date, totaled approximately $262,000 as of September 30, 2023, which is expected to be incurred through March 31, 2026.

 

 

Patent and License Agreements

 

Moffitt. Effective August 20, 2018, the Company entered into an Exclusive License Agreement with Moffitt. Pursuant to the License Agreement, Moffitt granted the Company an exclusive license under certain patents owned by Moffitt (the “Licensed Patents”) relating to the treatment of MDS and a non-exclusive license under inventions, concepts, processes, information, data, know-how, research results, clinical data, and the like (other than the Licensed Patents) necessary or useful for the practice of any claim under the Licensed Patents or the use, development, manufacture or sale of any product for the treatment of MDS which would otherwise infringe a valid claim under the Licensed Patents. The Company was obligated to pay Moffitt a non-refundable license issue fee of $25,000 after the first patient was entered into a Phase 1b/2 clinical trial to be managed and conducted by Moffitt. The clinical trial began at a single site in April 2019 and the first patient was entered into the clinical trial in July 2019. The Company was also obligated to pay Moffitt an annual license maintenance fee of $25,000 commencing on the first anniversary of the Effective Date and every anniversary thereafter until the Company commences payment of minimum royalty payments. The Company had also agreed to pay non-refundable milestone payments to Moffitt, which could not be credited against earned royalties payable by the Company, based on reaching various clinical and commercial milestones aggregating $1,897,000, subject to reduction by 40% under certain circumstances relating to the status of Valid Claims, as such term is defined in the License Agreement.

 

On October 4, 2023, the Company received a counter-signed termination letter dated September 29, 2023 with respect to the Exclusive License Agreement dated August 20, 2018 between the Company and Moffitt, effective September 30, 2023. The Company and Moffitt agreed that no termination fee shall be due or payable by the Company, and Moffitt acknowledged that no payments are owed by the Company under the Agreement.

 

During the three months and nine months ended September 30, 2023, the Company recorded credits to operations of $21,507 and $9,109, respectively, representing the reversal of obligations previously recorded with respect to the Exclusive License Agreement. During the three months and nine months ended September 30, 2022, the Company recorded charges to operations of $6,301 and $18,699, respectively, in connection with its obligations under the Exclusive License Agreement.

 

Employment Agreements with Officers

 

During July and August 2020, the Company entered into one-year employment agreements with each of its executive officers at that time, consisting of Dr. John S. Kovach, Eric J. Forman, Dr. James S. Miser, and Robert N. Weingarten, which provided for aggregate annual cash compensation of $640,000, payable monthly (see Note 6). These employment agreements were automatically renewable for additional one-year periods unless terminated by either party upon 60 days written notice prior to the end of the applicable one-year period, or by death, or by termination for cause. These employment agreements were automatically renewed for additional one-year periods in July and August 2021, 2022 and 2023.

 

On April 9, 2021, the Board of Directors increased the annual cash compensation of Eric J. Forman, Dr. James S. Miser, and Robert N. Weingarten under the employment agreements, such that the aggregate annual compensation for all officers increased to $775,000, effective May 1, 2021.

 

Effective November 6, 2022, Mr. Forman was promoted to Vice President and Chief Operating Officer, with an annual salary of $200,000. In addition, Mr. Forman is being provided an office allowance of approximately $1,500 per month through December 31, 2023.

 

On September 26, 2023, the Company entered into an employment agreement with Bastiaan van der Baan to act as the Company’s President and Chief Executive Officer and as Vice Chairman of the Board of Directors with an annual salary of $150,000. The term of the employment agreement is for three years and is automatically renewable for additional one-year periods unless terminated by either party, subject to early termination as described in the employment agreement. Under the employment agreement, Mr. van der Baan’s annual may be increased from time to time at the sole discretion of the Board of Directors. In addition, Mr. van der Baan will be eligible to receive an annual bonus as determined in the sole discretion of the Board of Directors. Mr. Van der Baan was appointed as Chairman of the Board of Directors upon the death of Dr. Kovach on October 5, 2023.

 

The aggregate annual cash compensation for all officers increased to $950,000, effective September 26, 2023, which has continued through September 30, 2023. As a result of Dr. Kovach’s death on October 5, 2023, aggregate annual compensation of all officers will decrease to $700,000 from that date forward.

 

 

Other Significant Agreements and Contracts

 

NDA Consulting Corp. On December 24, 2013, the Company entered into an agreement with NDA Consulting Corp. for consultation and advice in the field of oncology research and drug development. As part of the agreement, NDA also agreed to cause its president, Dr. Daniel D. Von Hoff, M.D., to become a member of the Company’s Scientific Advisory Committee. The term of the agreement was for one year and provided for a quarterly cash fee of $4,000. The agreement has been automatically renewed for additional one-year terms on its anniversary date since 2014. Consulting and advisory fees charged to operations pursuant to this agreement were $4,000 and $4,000 for the three months ended September 30, 2023 and 2022, respectively, and $12,000 and $12,000 for the nine months ended September 30, 2023 and 2022, which were included in research and development costs in the consolidated statements of operations.

 

BioPharmaWorks. Effective September 14, 2015, the Company entered into a Collaboration Agreement with BioPharmaWorks, pursuant to which the Company engaged BioPharmaWorks to perform certain services for the Company. Those services included, among other things, assisting the Company to commercialize its products and strengthen its patent portfolio; identifying large pharmaceutical companies with a potential interest in the Company’s product pipeline; assisting in preparing technical presentations concerning the Company’s products; consultation in drug discovery and development; and identifying providers and overseeing tasks relating to clinical development of new compounds.

 

BioPharmaWorks was founded in 2015 by former Pfizer scientists with extensive multi-disciplinary research and development and drug development experience. The Collaboration Agreement was for an initial term of two years and automatically renews for subsequent annual periods unless terminated by a party not less than 60 days prior to the expiration of the applicable period. In connection with the Collaboration Agreement, the Company agreed to pay BioPharmaWorks a monthly fee of $10,000, subject to the right of the Company to pay a negotiated hourly rate in lieu of the monthly payment and agreed to issue to BioPharmaWorks certain equity-based compensation (see Note 7). The Company recorded charges to operations pursuant to this Collaboration Agreement of $30,000 and $30,000 for the three months ended September 30, 2023 and 2022, respectively, and $90,000 and $90,000 for the nine months ended September 30, 2023 and 2022, respectively, which were included in research and development costs in the consolidated statements of operations.

 

Netherlands Cancer Institute. On October 8, 2021, the Company entered into a Development Collaboration Agreement with the Netherlands Cancer Institute, Amsterdam (“NKI”) (see Note 6), one of the world’s leading comprehensive cancer centers, and Oncode Institute, Utrecht, a major independent cancer research center, for a term of three years. The Development Collaboration Agreement was subsequently modified by Amendment No. 1 thereto. The Development Collaboration Agreement is intended to identify the most promising drugs to be combined with LB-100, and potentially LB-100 analogues, to be used to treat a range of cancers, as well as to identify the specific molecular mechanisms underlying the identified combinations. The Company agreed to fund the study, at an approximate cost of 391,000 Euros and provide a sufficient supply of LB-100 to conduct the study.

 

On October 3, 2023, the Company entered into Amendment No. 2 to the Development Collaboration Agreement with NKI, which provides for additional research activities, extends the termination date of the Development Collaboration Agreement by two years to October 8, 2026, and adds 250,000 Euros (approximately $263,000 at October 3, 2023) to the operating budget being funded by the Company.

 

During the three months ended September 30, 2023 and 2022, the Company incurred charges in the amount of $51,568 and $46,068, respectively, with respect to this agreement, which amounts are included in research and development costs in the Company’s consolidated statements of operations. During the nine months ended September 30, 2023 and 2022, the Company incurred charges in the amount of $156,949 and $149,184, respectively, with respect to this agreement, which amounts are included in research and development costs in the Company’s consolidated statements of operations. As of September 30, 2023, total costs of $416,356 have been incurred pursuant to this agreement. The Company’s aggregate commitment pursuant to this agreement, as amended, less amounts previously paid to date, totaled approximately $316,000 as of September 30, 2023, which is expected to be incurred through October 8, 2026. As the work is being conducted in Europe and is paid for in Euros, final costs are subject to foreign currency fluctuations between the United States Dollar and the Euro.

 

 

MRI Global. The Company has contracted with MRI Global for stability analysis, storage and distribution of LB-100 for clinical trials in the United States. On June 10, 2022, the contract was amended to reflect a new total contract price of $273,980 for services to be rendered through April 30, 2023. Effective April 17, 2023, the contract was further amended to reflect a new total contract price of $326,274 for services to be rendered through April 30, 2024. During the three months ended September 30, 2023 and 2022, the Company incurred costs of $19,845 and $5,549, respectively, pursuant to this contract. During the nine months ended September 30, 2023 and 2022, the Company incurred costs of $27,028 and $25,902, respectively, pursuant to this work order. As of September 30, 2023, total costs of $241,841 have been incurred pursuant to this contract.

 

The Company’s aggregate commitment pursuant to this contract, less amounts previously paid to date, totaled approximately $84,000 as of September 30, 2023.

 

External Risks

 

Covid-19 Virus. The global outbreak of the novel coronavirus (Covid-19) in early 2020 led to disruptions in general economic activities throughout the world as businesses and governments implemented broad actions to mitigate this public health crisis. The extent to which the coronavirus pandemic may reappear and impact the Company’s clinical trial programs and capital raising efforts in the future is uncertain and cannot be predicted.

 

Inflation Risk. The Company does not believe that inflation has had a material effect on its operations to date, other than its impact on the general economy. However, there is a risk that the Company’s operating costs could become subject to inflationary and interest rate pressures in the future, which would have the effect of increasing the Company’s operating costs (including, specifically, clinical trial costs), and which would put additional stress on the Company’s working capital resources.

 

Supply Chain Issues. The Company does not currently expect that supply chain issues will have a significant impact on its business activities, including its ongoing clinical trials.

 

Potential Recession. There are various indications that the United States economy may be entering a recessionary period. Although unclear at this time, an economic recession would likely impact the general business environment and the capital markets, which could, in turn, affect the Company.

 

The Company is continuing to monitor these matters and will adjust its current business and financing plans as more information and guidance become available.