China Recycling Energy Corporation (the “Company” or “CREG”) was incorporated on May 8, 1980, under the laws of the State of Colorado. On September 6, 2001, the Company re-domiciled its state of incorporation to Nevada. The Company, through its subsidiaries, Shanghai TCH Energy Technology Co., Ltd (“Shanghai TCH”) and Huahong New Energy Technology Co, Ltd, provides energy saving solution and services, including selling and leasing energy saving systems and equipment to our customers. On March 8, 2007, the Company changed its name to “China Recycling Energy Corporation” from “China Digital Wireless, Inc.”
 
On February 1, 2007, the Company’s subsidiary, Shanghai TCH, conditionally entered into two top gas recovery turbine systems (the “TRT”) projects, each evidenced by a joint-operation agreement, with Xi’an Yingfeng Science and Technology Co., Ltd. (the “Yingfeng”). TRT is an electricity generating system that utilizes the exhaust pressure and heat produced in the blast furnace of a steel mill to generate electricity.
 
Under the Joint-Operation Agreement, Shanghai TCH and Yingfeng jointly pursued a top gas recovery turbine project (the "TRT Project") which was to design, construct, install and operate a TRT Project for Zhangzhi Iron and Steel Holdings Ltd. (the"Zhangzhi"). This TRT Project was initiated by a contract to design and construct the TRT System (the “Project Contract”) which Yingfeng and Zhangzhi entered in 2006. This project was completed and put into operation in February 2007.
 
Under another Joint-Operation Agreement, Shanghai TCH and Yingfeng jointly pursued another TRT project to design, construct, install and operate a TRT Project for Xingtai Iron and Steel Company, Ltd. (the “Xingtai”). This project was completed and put into operation in August 2007.
 
On October 31, 2007, Shanghai TCH entered an asset-transfer agreement with Yingfeng. The terms and conditions of this agreement required the transfer of all electricity-generating related assets owned by Yingfeng to Shanghai TCH. As a result, the contractual relationships between Shanghai TCH and Yingfeng under the TRT Project Joint-Operation Agreement on April 8, 2007 were terminated.
 
In November 2007, Shanghai TCH signed a cooperative agreement with Shengwei Group to build two sets of 12MW pure low temperature cement waste heat powered generator systems (“CHPG”) for Shengwei’s two 2,500-tons-per-day cement manufacturing lines in Jin Yang and for a 5,000-tons-per-day cement manufacturing line in Tong Chuan. At the end of 2008, construction of the CHPG in Tong Chuan was completed for $6,191,000 (RMB 43,000,000) and put into operation. On June 29, 2009, construction of the CHPG in Jin Yang was completed for $7,318,000 (RMB 50,000,000) and put into operation.
 
On April 14, 2009, the Company incorporated a joint venture (the “JV”) with Erdos Metallurgy Co., Ltd. (the “Erdos”) to recycle waste heat from Erdos’ metal refining plants to generate power and steam, which will then be sold back to Erdos. The name of the JV is Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd (the “Erdos TCH”) with a term of 20 years. Total investment for the project is estimated at approximately $78 million (RMB 500 million) with an initial investment of $17.55 million (RMB 120,000,000). As of December 31, 2011, Erdos contributed 7% of the total investment of the project, and Xi’an TCH contributed 93%. According to Xi’an TCH and Erdos’ agreement on profit distribution, Xi’an TCH and Erdos will receive 80% and 20% of the profit from the JV, respectively, until Xi’an TCH receives the complete return of its investment. Xi’an TCH and Erdos will then receive 60% and 40% of the profit from the JV, respectively. The profits to be distributed will be computed based on Chinese generally accepted accounting principles. The main difference between US GAAP (Generally Accepted Accounting Principles) and Chinese GAAP with regards to Erdos is that Erdos is treated as a sales-type lease under US GAAP and as an operating lease under Chinese GAAP. When the term of the JV expires, Xi’an TCH will transfer its equity in the JV to Erdos at no additional cost.
 
On April 18, 2009, Erdos TCH signed a Cooperation Agreement with Erdos to recycle heat from groups of furnaces of Erdos Metallurgy’s metal refining plants to generate power and steam, which will then be sold back to Erdos Metallurgy. According to the contract, Erdos TCH will install a group of power generation projects with a total of 70MW power capacity, which may expand up to 120MW, and 30-ton steam per hour, with an estimated total investment of over $79 million (RMB 500 million). The construction of the projects was split into three phases, two power generation systems in Phase I with a total of 18MW power capacity, three power generation systems in Phase II with a total of 27MW power capacity and one power generation system in Phase III with 25MW power capacity.
 
At the end of 2009, Erdos TCH completed the first 9MW power station of Phase I of the project and put it into operation. Phase I includes two 9MW units for a combined 18MW power capacity. In March of 2010, the Company completed the second 9MW capacity power station and put it into operation. Pursuant to the Co-operation Agreement and the supplement agreements signed between Erdos and Erdos TCH, Erdos shall purchase all the electricity and steam to be generated from the JV’s power generation projects.
 
On December 10, 2010, Erdos TCH entered into a supplementary agreement with Xi’an Huaxin Energy Tech Co., Ltd (the contractor for construction) to change the Erdos Phase II project of four 9MW waste heat generation systems to three 9MW systems, and to move the fourth 9MW waste heat generation system into Phase III of the project; as a result of entering into this supplementary agreement, the construction costs decreased from $37.4 million (RMB248 million) to $28.1 million (RMB186 million) for the Phase II. In the first quarter of 2011, the Company completed all three 9MW power stations of Phase II and put them into operation.
 
On September 30, 2009, Xi’an TCH delivered three 6MW capacity Waste Gas Power Generation (“WGPG”) power generating systems to Shenmu County Jiujiang Trading Co., Ltd. (“Shenmu”) pursuant to a Cooperative Contract on Coke-oven Gas Power Generation Project (including its Supplementary Agreement) the “Cooperative Agreement”) and a Gas Supply Contract for Coke-oven Gas Power Generation Project. The terms of these contracts are for 10 years, and they state that Xi’an TCH will recycle coke furnace gas from the coke-oven plant of Shenmu to generate power, which will be supplied back to Shenmu.
 
On December 31, 2011, Xi’an TCH entered into a Repurchase Agreement for the Coke-Oven Gas Power Generation Project (the “Repurchase Agreement”) with Shenmu. Under the Repurchase Agreement, Shenmu will purchase the set of 18MW capacity power generating systems (the “Systems”) from Xi’an TCH and pay outstanding energy saving service fees of $3.08 million (RMB 19.44 million) to Xi’an TCH within 3 working days from the date of the Repurchase Agreement. Xi’an TCH will transfer the Systems to Shenmu for $18.75 million (RMB 120 million) (the “Repurchase Price”). Shenmu shall pay the first 30% of the Repurchase Price within 5 working days of the Repurchase Agreement date, the second 30% of Repurchase Price within 90 days of the Repurchase Agreement date and the remaining 40% of the Repurchase Price within 180 days of the date of Repurchase Agreement date. The ownership of the Systems will be transferred to Shenmu when the entire Repurchase Price has been paid. The Cooperative Contract will be terminated upon Shenmu’s payment of the entire Repurchase Price. In January 2012, the Company received $3.08 million (RMB 19.44 million) outstanding energy saving service fees and $5.71 million (RMB 36 million) of the first 30% of repurchase price from Shenmu.
 
On January 20, 2010, Xi’an TCH entered into a Technical Reconstruction Letter of Intent with Xueyi Dong (“Dong”) a natural person with Chinese citizenship for Xi’an TCH reconstructing and transforming a Thermal Power Generation Systems owned by Dong into a 12MW Biomass Power Generation System (the “Biomass Systems” or “BMPG”) for $2.2 million (RMB 15 million), which was paid by Xi’an TCH to Dong. After the transformation of the system, Xi’an TCH entered into a Biomass Power Generation Asset Transfer Agreement with Dong on June 29, 2010. Under the Transfer Agreement, Dong transferred the Biomass Systems to Xi’an TCH, and Xi’an TCH will pay Dong $14,705,900 (RMB 100,000,000) for the systems, including RMB 20,000,000 in cash and RMB 80,000,000 in shares of the Company’s common stock. The exchange rate between U.S. Dollar and Chinese RMB in connection with the stock issuance was 1:6.8. As of December 31, 2011, the Company had paid the cash portion in full and issued 2,941,176 shares of common stock, which represented payment in full of the RMB 80,000,000, in connection with this transaction. In connection with this transaction, the Company, for the year ended December 31, 2011, recorded a gain due to change in fair value of liability on settlement of debt in the amount of $5.44 million.
 
On June 29, 2010, Xi’an TCH entered into a Biomass Power Generation Project Lease Agreement with PuCheng XinHengYuan Biomass Power Generation Co., Ltd., (“XHY”). Under this lease agreement, Xi’an TCH leased this same set of 12MW biomass power generation systems to XHY at a minimum of $279,400 (RMB 1,900,000) per month for 15 years.
 
On September 30, 2010, Xi’an TCH delivered to Zhongbao Binhai Nickel Co., Ltd. (“Zhongbao”) a 7MW capacity Waste Heat Power Generation (“WHPG”) system, an integral part of the facilities designed to produce 80,000 tons of nickel-alloy per year according to the recovery and power generation of waste heat agreement with Zhongbao, a nickel-alloy manufacturing joint venture between Zhonggang and Shanghai Baoshan Steel Group established in June 2009. Total investment in this project was approximately $7.8 million (RMB 55 million). The waste heat agreement with Zhongbao has a term of nine years and provides that Xi’an TCH will recycle waste heat from the nickel-alloy rotary kilns of Zhongbao to generate power and steam, which will be supplied back to Zhongbao. In addition, Xi’an TCH is responsible for applying for the Clean Development Mechanism (“CDM”) under the Kyoto Protocol. Net proceeds from any CDM credit will be distributed between Zhongbao and Xi’an TCH at 60% and 40%, respectively. Xi’an TCH had not commenced the CDM application process as of December 31, 2011.
 
 
On March 15, 2011, the Company incorporated a new wholly owned subsidiary Pingshan County Shengda Energy Technology Co., Ltd (“Shengda”). Xi’an TCH contributed cash of $4,559,271 (RMB 30,000,000) into Shengda as initial capital. Shengda was set up in order to undertake waste energy recycling projects from a steel and chemical company in Pingshan county in accordance with and pursuant to a Recycling Economy Projects Cooperative Framework Agreement entered into by the parties. The final terms for the projects have not been reached and entered, and Shengda is not currently operational.
 
On May 25, 2011, Xi’an TCH entered into a Letter of Intent with ShenQiu YuNeng Thermal Power Co., Ltd. (the “ShenQiu”) for Xi’an TCH to reconstruct and transform a Thermal Power Generation System owned by ShenQiu into a 75T/H Biomass Power Generation System for approximately $3.5 million (RMB 22.5 million). The project commenced in June 2011, and was completed in the third quarter of 2011. On September 28, 2011, Xi’an TCH entered into a Biomass Power Generation Asset Transfer Agreement with Shenqiu (the “Seller”). The Transfer Agreement provided for the sale to Xi’an TCH of a set of 12,000 KW biomass power generation systems from the Seller after Xi’an TCH completes the conversion of the system for biomass power generation purpose. As consideration for the biomass power generation system, Xi’an TCH will pay to the Seller $10,937,500 (RMB 70,000,000) in cash in three installments in 6 months upon the transfer of ownership of the system. As of December 31, 2011, $7,812,500 (RMB 50,000,000) was paid by Xi’an TCH to the Seller. On September 28, 2011, Xi’an TCH also entered into a Biomass Power Generation Project Lease Agreement with the Seller. Under the Lease Agreement, Xi’an TCH will lease this set of 12,000 KW biomass power generation systems to the Seller at approximately $281,250 (RMB 1,800,000) per month for a term of 11 years. Seller provided one month leasing fee as security deposit to Xi’an TCH as well as personal guarantees from its legal representative. The ownership of this system will be transferred to Shenqiu with no cost at the end of the lease term.