Loan Payable
6 Months Ended 12 Months Ended
Jun. 30, 2021
Dec. 31, 2020
Debt Disclosure [Abstract]    
LOAN PAYABLE

8. LOAN PAYABLE

 

Entrusted Loan Payable (HYREF Loan)

 

The HYREF Fund was established in July 2013 with a total fund size of RMB 460 million ($77 million) invested in Xi’an Zhonghong for Zhonghong’s three new CDQ WHPG projects. The HYREF Fund invested RMB 3 million ($0.5 million) as an equity investment and RMB 457 million ($74.5 million) as a debt investment in Xi’an Zhonghong; in return for such investments, the HYREF Fund was to receive interest from Zhonghong for the HYREF Fund’s debt investment. The loan was collateralized by the accounts receivable and the fixed assets of Shenqiu Phase I and II power generation systems; the accounts receivable and fixed assets of Zhonghong’s three CDQ WHPG systems; and a 27 million RMB ($4.39 million) capital contribution made by Xi’an TCH in Zhonghong. Repayment of the loan (principal and interest) was also jointly and severally guaranteed by Xi’an TCH and the Chairman and CEO of the Company. In the fourth quarter of 2015, three power stations of Erdos TCH were pledged to Industrial Bank as an additional guarantee for the loan to Zhonghong’s three CDQ WHPG systems. In 2016, two additional power stations of Erdos TCH and Pucheng Phase I and II systems were pledged to Industrial Bank as an additional guarantee along with Xi’an TCH’s equity in Zhonghong. 

 

The term of this loan was for 60 months from July 31, 2013 to July 30, 2018, with an interest rate of 12.5%. On August 6, 2016, Zhonghong was required to repay principal of RMB 280 million ($42.22 million), of which the Company paid RMB 50 million ($7.54 million); while on August 6, 2017, Zhonghong was initially supposed to repay principal of RMB 100 million ($16.27 million) and on July 30, 2018, Zhonghong was initially supposed to repay the remainder of RMB 77 million ($12.52 million). During the term, Zhonghong was to maintain a minimal funding level and capital level in its designated account with the Supervising Bank to make sure it has sufficient funds to make principal payments when they are due. Notwithstanding the requirements, the HYREF Fund and Supervising Bank verbally notified Zhonghong from the beginning that it was unlikely that they would enforce these requirements for the purpose of the efficient utilization of working capital. The Company had paid RMB 50 million ($7.54 million) of the RMB 280 million ($42.22 million), and on August 5, 2016, the Company entered into a supplemental agreement with the lender to extend the due date of the remaining RMB 230 million ($34.68 million) of the original RMB 280 million ($45.54 million) to August 6, 2017. During the year ended December 31, 2017, the Company negotiated with the lender again to further extend the remaining loan balance of RMB 230 million ($34.68 million), RMB 100 million ($16.27 million), and RMB 77 million ($12.52 million) (which included investment from Xi’an TCH of RMB 75 million and was netted off with the entrusted loan payable of the HYREF Fund in the balance sheet). The lender had tentatively agreed to extend the remaining loan balance until August 2019 with an adjusted annual interest rate of 9%, subject to the final approval from its headquarters. The headquarters did not approve the extension proposal with an adjusted annual interest rate of 9%; however, on December 29, 2018, the Company worked out with the lender an alternative repayment proposal as described below. As of December 31, 2018, the entrusted loan payable had an outstanding balance of $59.29 million, of which, $10.92 million was from the investment of Xi’an TCH; accordingly, the Company netted the loan payable of $10.92 million with the long-term investment to the HYREF Fund made by Xi’an TCH. As of June 30, 2021, the interest payable for this loan was $0 and the outstanding balance for this loan (non-current) was $0.31 million. As of December 31, 2020, the interest payable for this loan was $10.14 million and the outstanding balance for this loan was $22.20 million including a non-current portion of $0.30 million. 

 

Repayment of HYREF loan

 

1. Transfer of Chengli project as partial repayment

 

On December 29, 2018, Xi’an Zhonghong, Xi’an TCH, HYREF, Guohua Ku, and Chonggong Bai entered into a CDQ WHPG Station Fixed Assets Transfer Agreement, pursuant to which Xi’an Zhonghong transferred Chengli CDQ WHPG station as the repayment for the loan of RMB 188,639,400 ($27.54 million) to HYREF, the transfer of which was completed on January 22, 2019.

 

Xi’an TCH is a secondary limited partner of HYREF. The fair value of the CDQ WHPG station applied in the transfer was determined by the parties based upon the appraisal report issued by Zhonglian Assets Appraisal Group (Shaanxi) Co., Ltd. as of August 15, 2018. However, per the discussion below, Xi’an Zhonghong, Xi’an TCH, Guohua Ku and Chonggong Bai (the “Buyers”) entered into a Buy Back Agreement, also agreed to buy back the Station when conditions under the Buy Back Agreement are met. Due to the Buy Back agreement, the loan was not deemed repaid, and therefore the Company recognized Chengli project as assets subject to buyback and kept the loan payable remained recognized under ASC 405-20-40-1 as of December 31, 2020. The Buy Back agreement was terminated in April 2021 (see 2 below for detail).

 

2. Buy Back Agreement

 

On December 29, 2018, Xi’an TCH, Xi’an Zhonghong, HYREF, Guohua Ku, Chonggong Bai and Xi’an Hanneng Enterprises Management Consulting Co. Ltd. (“Xi’an Hanneng”) entered into a Buy Back Agreement. 

 

Pursuant to the Buy Back Agreement, the Buyers jointly and severally agreed to buy back all outstanding capital equity of Xi’an Hanneng which was transferred to HYREF by Chonggong Bai (see 3 below), and a CDQ WHPG station in Boxing County which was transferred to HYREF by Xi’an Zhonghong. The buy-back price for the Xi’an Hanneng’s equity was based on the higher of (i) the market price of the equity shares at the time of buy-back; or (ii) the original transfer price of the equity shares plus bank interest. The buy-back price for the Station was based on the higher of (i) the fair value of the Station on the date transferred; or (ii) the loan balance at the date of the transfer plus interest accrued through that date. HYREF could request that the Buyers buy back the equity shares of Xi’an Hanneng and/or the CDQ WHPG station if one of the following conditions is met: (i) HYREF holds the equity shares of Xi’an Hanneng until December 31, 2021; (ii) Xi’an Huaxin New Energy Co., Ltd., is delisted from The National Equities Exchange And Quotations Co., Ltd., a Chinese over-the-counter trading system (the “NEEQ”); (iii) Xi’an Huaxin New Energy, or any of the Buyers or its affiliates has a credit problem, including not being able to issue an auditor report or standard auditor report or any control person or executive of the Buyers is involved in crimes and is under prosecution or has other material credit problems, to HYREF’s reasonable belief; (iv) if Xi’an Zhonghong fails to timely make repayment on principal or interest of the loan agreement, its supplemental agreement or extension agreement; (v) the Buyers or any party to the Debt Repayment Agreement materially breaches the Debt Repayment Agreement or its related transaction documents, including but not limited to the Share Transfer Agreement, the Pledged Assets Transfer Agreement, the Entrusted Loan Agreement and their guarantee agreements and supplemental agreements. Due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report, on December 19, 2019, Xi’an TCH, Xi’an Zhonghong, Guohua Ku and Chonggong Bai jointly and severally agreed to buy back all outstanding capital equity of Xi’an Hanneng which was transferred to HYREF by Chonggong Bai earlier. The total buy back price was RMB 261,727,506 ($37.52 million) including accrued interest of RMB 14,661,506 ($2.10 million), and was paid in full by Xi’an TCH on December 20, 2019.

 

On April 9, 2021, Xi’an TCH, Xi’an Zhonghong, Guohua Ku, Chonggong Bai and HYREF entered a Termination of Fulfillment Agreement (termination agreement). Under the termination agreement, the original buyback agreement entered on December 19, 2019 was terminated upon signing of the termination agreement. HYREF will not execute the buy-back option and will not ask for any additional payment from the buyers other than keeping the CDQ WHPG station. The Company recorded a gain of approximately $3.1 million from transferring the CDP WHPG station to HYREF as partial repayment of the entrusted loan resulting from the termination of the buy-back agreement.

 

3.Transfer of Xuzhou Huayu Project and Shenqiu Phase I & II project to Mr. Bai for partial repayment of HYREF loan

 

On January 4, 2019, Xi’an Zhonghong, Xi’an TCH, and Mr. Chonggong Bai entered into a Projects Transfer Agreement, pursuant to which Xi’an Zhonghong transferred a CDQ WHPG station (under construction) located in Xuzhou City for Xuzhou Huayu Coking Co., Ltd. (“Xuzhou Huayu Project”) to Mr. Bai for RMB 120,000,000 ($17.52 million) and Xi’an TCH transferred two Biomass Power Generation Projects in Shenqiu (“Shenqiu Phase I and II Projects”) to Mr. Bai for RMB 127,066,000 ($18.55 million). Mr. Bai agreed to transfer all the equity shares of his wholly owned company, Xi’an Hanneng, to HYREF as repayment for the RMB 247,066,000 ($36.07 million) loan made by Xi’an Zhonghong to HYREF as consideration for the transfer of the Xuzhou Huayu Project and Shenqiu Phase I and II Projects. 

 

On February 15, 2019, Xi’an Zhonghong completed the transfer of the Xuzhou Huayu Project and Xi’an TCH completed the transfer of Shenqiu Phase I and II Projects to Mr. Bai, and on January 10, 2019, Mr. Bai transferred all the equity shares of his wholly owned company, Xi’an Hanneng, to HYREF as repayment of Xi’an Zhonghong’s loan to HYREF as consideration for the transfer of the Xuzhou Huayu Project and Shenqiu Phase I and II Projects. 

 

Xi’an Hanneng is a holding company and was supposed to own 47,150,000 shares of Xi’an Huaxin New Energy Co., Ltd. (“Huaxin”), so that HYREF will indirectly receive and own such shares of Xi’an Huaxin as the repayment for the loan of Zhonghong. Xi’an Hanneng already owned 29,948,000 shares of Huaxin; however, Xi’an Hanneng was not able to obtain the remaining 17,202,000 shares due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report.

 

On December 19, 2019, Xi’an TCH, Xi’an Zhonghong, Guohua Ku and Chonggong Bai jointly and severally agreed to buy back all outstanding capital equity of Xi’an Hanneng which was transferred to HYREF by Chonggong Bai earlier. The total buy back price was RMB 261,727,506 ($37.52 million) including accrued interest of RMB 14,661,506 ($2.10 million), and was paid in full by Xi’an TCH on December 20, 2019. On December 20, 2019, Mr. Bai, Xi’an TCH and Xi’an Zhonghong agreed to have Mr. Bai repay the Company in cash for the transfer price of Xuzhou Huayu and Shenqiu in five installment payments. The 1st payment of RMB 50 million ($7.17 million) is due on January 5, 2020, the 2nd payment of RMB 50 million ($7.17 million) was due on February 5, 2020, the 3rd payment of RMB 50 million ($7.17 million) was due on April 5, 2020, the 4th payment of RMB 50 million ($7.17 million) is due on June 30, 2020, and the final payment of RMB 47,066,000 ($6.75 million) is due on September 30, 2020. As of June 30, 2021, the Company has received the full payment of RMB 247 million ($36.28 million) from Mr. Bai.

 

On April 9, 2021, Xi’an TCH, Xi’an Zhonghong, Guohua Ku, Chonggong Bai and HYREF entered a Termination of Fulfillment Agreement (termination agreement). Under the termination agreement, the original buyback agreement entered on December 19, 2019 was terminated upon signing of the termination agreement. HYREF will not execute the buy-back option and will not ask for any additional payment from the buyers other than keeping the CDQ WHPG station. The Company recorded a gain of approximately $3.1 million from transferring the CDP WHPG station to HYREF as partial repayment of the entrusted loan resulting from the termination of the buy-back agreement.

 

4. The lender agreed to extend the repayment of RMB 77.00 million ($11.04 million) to July 8, 2023; of which, RMB 75.00 million ($10.81 million) was Xi’an TCH’s investment into the HYREF fund as a secondary limited partner, and the Company netted off the investment of RMB 75 million ($10.81 million) by Xi’an TCH with the entrusted loan payable of the HYREF Fund.

9. LOANS PAYABLE

 

Entrusted Loan Payable (HYREF Loan)

 

The HYREF Fund was established in July 2013 with a total fund size of RMB 460 million ($77 million) invested in Xi’an Zhonghong for Zhonghong’s three new CDQ WHPG projects. The HYREF Fund invested RMB 3 million ($0.5 million) as an equity investment and RMB 457 million ($74.5 million) as a debt investment in Xi’an Zhonghong; in return for such investments, the HYREF Fund was to receive interest from Zhonghong for the HYREF Fund’s debt investment. The loan was collateralized by the accounts receivable and the fixed assets of Shenqiu Phase I and II power generation systems; the accounts receivable and fixed assets of Zhonghong’s three CDQ WHPG systems; and a 27 million RMB ($4.39 million) capital contribution made by Xi’an TCH in Zhonghong. Repayment of the loan (principal and interest) was also jointly and severally guaranteed by Xi’an TCH and the Chairman and CEO of the Company. In the fourth quarter of 2015, three power stations of Erdos TCH were pledged to Industrial Bank as an additional guarantee for the loan to Zhonghong’s three CDQ WHPG systems. In 2016, two additional power stations of Erdos TCH and Pucheng Phase I and II systems were pledged to Industrial Bank as an additional guarantee along with Xi’an TCH’s equity in Zhonghong. 

 

The term of this loan was for 60 months from July 31, 2013 to July 30, 2018, with an interest rate of 12.5%. On August 6, 2016, Zhonghong was required to repay principal of RMB 280 million ($42.22 million), of which the Company paid RMB 50 million ($7.54 million); while on August 6, 2017, Zhonghong was initially supposed to repay principal of RMB 100 million ($16.27 million) and on July 30, 2018, Zhonghong was initially supposed to repay the remainder of RMB 77 million ($12.52 million). During the term, Zhonghong was to maintain a minimal funding level and capital level in its designated account with the Supervising Bank to make sure it has sufficient funds to make principal payments when they are due. Notwithstanding the requirements, the HYREF Fund and Supervising Bank verbally notified Zhonghong from the beginning that it was unlikely that they would enforce these requirements for the purpose of the efficient utilization of working capital. The Company had paid RMB 50 million ($7.54 million) of the RMB 280 million ($42.22 million), and on August 5, 2016, the Company entered into a supplemental agreement with the lender to extend the due date of the remaining RMB 230 million ($34.68 million) of the original RMB 280 million ($45.54 million) to August 6, 2017. During the year ended December 31, 2017, the Company negotiated with the lender again to further extend the remaining loan balance of RMB 230 million ($34.68 million), RMB 100 million ($16.27 million), and RMB 77 million ($12.52 million) (which included investment from Xi’an TCH of RMB 75 million and was netted off with the entrusted loan payable of the HYREF Fund in the balance sheet). The lender had tentatively agreed to extend the remaining loan balance until August 2019 with an adjusted annual interest rate of 9%, subject to the final approval from its headquarters. The headquarters did not approve the extension proposal with an adjusted annual interest rate of 9%; however, on December 29, 2018, the Company worked out with the lender an alternative repayment proposal as described below. As of December 31, 2018, the entrusted loan payable had an outstanding balance of $59.29 million, of which, $10.92 million was from the investment of Xi’an TCH; accordingly, the Company netted the loan payable of $10.92 million with the long-term investment to the HYREF Fund made by Xi’an TCH. As of December 31, 2019, the interest payable for this loan was $8.20 million and the outstanding balance for this loan was $20.77 million including a non-current portion of $0.29 million. As of December 31, 2020, the interest payable for this loan was $10.14 million and the outstanding balance for this loan was $22.20 million including a non-current portion of $0.30 million. The Company recorded interest expense of $1.30 million and $1.72 million for the years ended December 31, 2020 and 2019.

 

Repayment of HYREF loan

 

1. Transfer of Chengli project as partial repayment

 

On December 29, 2018, Xi’an Zhonghong, Xi’an TCH, HYREF, Guohua Ku, and Chonggong Bai entered into a CDQ WHPG Station Fixed Assets Transfer Agreement, pursuant to which Xi’an Zhonghong transferred Chengli CDQ WHPG station as the repayment for the loan of RMB 188,639,400 ($27.54 million) to HYREF, the transfer of which was completed on January 22, 2019.

 

Xi’an TCH is a secondary limited partner of HYREF. The fair value of the CDQ WHPG station applied in the transfer was determined by the parties based upon the appraisal report issued by Zhonglian Assets Appraisal Group (Shaanxi) Co., Ltd. as of August 15, 2018. However, per the discussion below, Xi’an Zhonghong, Xi’an TCH, Guohua Ku and Chonggong Bai (the “Buyers”) entered into a Buy Back Agreement, also agreed to buy back the Station when conditions under the Buy Back Agreement are met. Due to the Buy Back agreement, the loan was not deemed repaid, the Company kept the Chengli project in its books as assets subject to buyback and kept the loan payable in its book under ASC 405-20-40-1 as of December 31, 2020 and 2019.

 

2. Buy Back Agreement

 

On December 29, 2018, Xi’an TCH, Xi’an Zhonghong, HYREF, Guohua Ku, Chonggong Bai and Xi’an Hanneng Enterprises Management Consulting Co. Ltd. (“Xi’an Hanneng”) entered into a Buy Back Agreement. 

 

Pursuant to the Buy Back Agreement, the Buyers jointly and severally agreed to buy back all outstanding capital equity of Xi’an Hanneng which was transferred to HYREF by Chonggong Bai (see 5 below), and a CDQ WHPG station in Boxing County which was transferred to HYREF by Xi’an Zhonghong. The buy-back price for the Xi’an Hanneng’s equity was based on the higher of (i) the market price of the equity shares at the time of buy-back; or (ii) the original transfer price of the equity shares plus bank interest. The buy-back price for the Station was based on the higher of (i) the fair value of the Station on the date transferred; or (ii) the loan balance at the date of the transfer plus interest accrued through that date. HYREF could request that the Buyers buy back the equity shares of Xi’an Hanneng and/or the CDQ WHPG station if one of the following conditions is met: (i) HYREF holds the equity shares of Xi’an Hanneng until December 31, 2021; (ii) Xi’an Huaxin New Energy Co., Ltd., is delisted from The National Equities Exchange And Quotations Co., Ltd., a Chinese over-the-counter trading system (the “NEEQ”); (iii) Xi’an Huaxin New Energy, or any of the Buyers or its affiliates has a credit problem, including not being able to issue an auditor report or standard auditor report or any control person or executive of the Buyers is involved in crimes and is under prosecution or has other material credit problems, to HYREF’s reasonable belief; (iv) if Xi’an Zhonghong fails to timely make repayment on principal or interest of the loan agreement, its supplemental agreement or extension agreement; (v) the Buyers or any party to the Debt Repayment Agreement materially breaches the Debt Repayment Agreement or its related transaction documents, including but not limited to the Share Transfer Agreement, the Pledged Assets Transfer Agreement, the Entrusted Loan Agreement and their guarantee agreements and supplemental agreements. Due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report, on December 19, 2019, Xi’an TCH, Xi’an Zhonghong, Guohua Ku and Chonggong Bai jointly and severally agreed to buy back all outstanding capital equity of Xi’an Hanneng which was transferred to HYREF by Chonggong Bai earlier. The total buy back price was RMB 261,727,506 ($37.52 million) including accrued interest of RMB 14,661,506 ($2.10 million), and was paid in full by Xi’an TCH on December 20, 2019.

 

The Company might be contingently liable for the difference between the fair value of the transferred asset and the loan and related interest if the fair value of the transferred asset at the time of the exercise of the buyback option is higher than the loan and related accrued interest. Based on an appraisal, as of December 31, 2020, the asset was valued at $27.97 million while the loan and related interest was $32.35 million.

 

On April 9, 2021, the buyers and HYREF entered a Termination of Fulfillment Agreement (termination agreement). Under the termination agreement, the original buyback agreement was terminated upon signing of the termination agreement. HYREF will not execute the buy-back option and will not ask for any additional payment from the buyers other than keeping the CDQ WHPG station (also see Note 19).

 

Due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report, on December 19, 2019, Xi’an TCH, Xi’an Zhonghong, Guohua Ku and Chonggong Bai jointly and severally agreed to buy back all outstanding capital equity of Xi’an Hanneng which was transferred to HYREF by Chonggong Bai earlier. The total buy back price was RMB 261,727,506 ($37.52 million) including accrued interest of RMB 14,661,506 ($2.10 million), and was paid in full by Xi’an TCH.

 

3. Xi’an TCH transferred 40% ownership in the Fund Management Company to Hongyuan Huifu for partial payment of financial advisory fee

 

On December 29, 2018, Xi’an TCH entered into a Share Transfer Agreement with Hongyuan Huifu Venture Capital Co. Ltd (“Hongyuan Huifu”), pursuant to which Xi’an TCH transferred its 40% ownership in Hongyuan Recycling Energy Investment Management Beijing Co., Ltd. (the “Fund Management Company”) to Hongyuan Huifu for consideration of RMB 3,453,867 ($504,000) (the “Fund Management Company Transfer Price”). On January 22, 2019, Xi’an TCH completed the 40% ownership transfer transaction. The Company had $46,461 loss from the sale of a 40% equity interest in Fund Management Company during the year ended December 31, 2019. 

 

On December 29, 2018, Xi’an TCH, Hongyuan Huifu and Fund Management Company entered into a supplemental agreement to the Share Transfer Agreement. Xi’an TCH owes the Fund Management Company RMB 18,306,667 ($2,672,000) in financial advisory fees, and the parties agreed that the Fund Management Company Transfer Price could be used to offset the outstanding financial advisory fees. Upon the completion of this transaction, the Fund Management Company owed RMB 3,453,867 ($502,400) to Hongyuan Huifu, and Xi’an TCH owed RMB 14,852,800 ($2,168,000) to the Fund Management Company. As of December 31, 2020, Xi’an TCH paid in full of $2,168,000 to the Fund Management Company. 

 

4. HYREF Fund transferred 10% ownership in Xi’an Zhonghong to Shanghai TCH (Long-Term Payable)

 

On December 29, 2018, Shanghai TCH entered into a Share Transfer Agreement with HYREF, pursuant to which HYREF agreed to transfer its 10% ownership in Xi’an Zhonghong to Shanghai TCH for RMB 3 million ($460,000), and was recorded as long-term payable in the Company’s balance sheet. On January 22, 2019, Hongyuan Huifu completed the transfer of its 10% ownership in Xi’an Zhonghong to Shanghai TCH, Xi’an Zhonghong then became a 100% subsidiary of the Company. The Company did not record any gain or loss for this purchase as the controlling interest did not change.

 

5. Transfer of Xuzhou Huayu Project and Shenqiu Phase I & II project to Mr. Bai for partial repayment of HYREF loan

 

On January 4, 2019, Xi’an Zhonghong, Xi’an TCH, and Mr. Chonggong Bai entered into a Projects Transfer Agreement, pursuant to which Xi’an Zhonghong transferred a CDQ WHPG station (under construction) located in Xuzhou City for Xuzhou Huayu Coking Co., Ltd. (“Xuzhou Huayu Project”) to Mr. Bai for RMB 120,000,000 ($17.52 million) and Xi’an TCH transferred two Biomass Power Generation Projects in Shenqiu (“Shenqiu Phase I and II Projects”) to Mr. Bai for RMB 127,066,000 ($18.55 million). Mr. Bai agreed to transfer all the equity shares of his wholly owned company, Xi’an Hanneng, to HYREF as repayment for the RMB 247,066,000 ($36.07 million) loan made by Xi’an Zhonghong to HYREF as consideration for the transfer of the Xuzhou Huayu Project and Shenqiu Phase I and II Projects. 

 

On February 15, 2019, Xi’an Zhonghong completed the transfer of the Xuzhou Huayu Project and Xi’an TCH completed the transfer of Shenqiu Phase I and II Projects to Mr. Bai, and on January 10, 2019, Mr. Bai transferred all the equity shares of his wholly owned company, Xi’an Hanneng, to HYREF as repayment of Xi’an Zhonghong’s loan to HYREF as consideration for the transfer of the Xuzhou Huayu Project and Shenqiu Phase I and II Projects. 

 

Xi’an Hanneng is a holding company and was supposed to own 47,150,000 shares of Xi’an Huaxin New Energy Co., Ltd. (“Huaxin”), so that HYREF will indirectly receive and own such shares of Xi’an Huaxin as the repayment for the loan of Zhonghong. Xi’an Hanneng already owned 29,948,000 shares of Huaxin; however, Xi’an Hanneng was not able to obtain the remaining 17,202,000 shares due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report.

 

On December 19, 2019, Xi’an TCH, Xi’an Zhonghong, Guohua Ku and Chonggong Bai jointly and severally agreed to buy back all outstanding capital equity of Xi’an Hanneng which was transferred to HYREF by Chonggong Bai earlier. The total buy back price was RMB 261,727,506 ($37.52 million) including accrued interest of RMB 14,661,506 ($2.10 million), and was paid in full by Xi’an TCH on December 20, 2019. On December 20, 2019, Mr. Bai, Xi’an TCH and Xi’an Zhonghong agreed to have Mr. Bai repay the Company in cash for the transfer price of Xuzhou Huayu and Shenqiu in five installment payments. The 1st payment of RMB 50 million ($7.17 million) is due on January 5, 2020, the 2nd payment of RMB 50 million ($7.17 million) was due on February 5, 2020, the 3rd payment of RMB 50 million ($7.17 million) was due on April 5, 2020, the 4th payment of RMB 50 million ($7.17 million) is due on June 30, 2020, and the final payment of RMB 47,066,000 ($6.75 million) is due on September 30, 2020. As of December 31, 2020, the Company has received the full payment of RMB 247 million ($36.28 million) from Mr. Bai.

 

6. The lender agreed to extend the repayment of RMB 77.00 million ($11.04 million) to July 8, 2023; of which, RMB 75.00 million ($10.81 million) was Xi’an TCH’s investment into the HYREF fund as a secondary limited partner, and the Company netted off the investment of RMB 75 million ($10.81 million) by Xi’an TCH with the entrusted loan payable of the HYREF Fund.

 

A reconciliation of repayment of HYREF loan (entrusted loan) by three Projects at December 31, 2020 was as follows:

 

Transfer price for Chengli Project  $28,910,696   Entrusted loan payable at December 31, 2020, net with Xi’an TCH investment in entrusted loan (current and noncurrent)  $22,203,262 
Transfer price for Xuzhou Huayu Project   18,391,086   Interest payable on entrusted loan at December 31, 2020   10,144,228 
Transfer price for Shenqiu Phase I and II Projects   19,474,015   Add back: Xi’an TCH investment in entrusted loan   11,494,429 
        Less: interest accrued from September 20, 2018 to December 31, 2020 (cut-off date for interest calculation for repayment was September 20, 2018)   (3,130,276)
        Less: portion of loan with repayment due date extended to year 2023   (11,800,947)
              
        Add back: interest & penalty repaid by Xi’an TCH   9,186,358 
        Add back: loan principle repaid by Xi’an TCH   28,678,743 
   $66,775,797      $66,775,797