Commitments and Contingencies
12 Months Ended
Dec. 31, 2024
Commitments and Contingencies  
Commitments and Contingencies

20.

Commitments and Contingencies

 

Legal Proceedings


The Company is subject to certain claims and lawsuits arising in the normal course of business. The Company assesses liabilities and contingencies in connection with outstanding legal proceedings utilizing the latest information available. Where it is probable that the Company will incur a loss and the amount of the loss can be reasonably estimated, the Company records a liability in our consolidated financial statements. These legal accruals may be increased or decreased to reflect any relevant developments on a quarterly basis. Where a loss is not probable or the amount of the loss is not estimable, the Company does not record an accrual, consistent with applicable accounting guidance. Based on information currently available, advice of counsel, and available insurance coverage, the Company believes that the established accruals are adequate and the liabilities arising from the legal proceedings will not have a material adverse effect on the consolidated financial condition. However, that in light of the inherent uncertainty in legal proceedings there can be no assurance that the ultimate resolution of a matter will not exceed established accruals. As a result, the outcome of a particular matter or a combination of matters may be material to the results of operations for a particular period, depending upon the size of the loss or the income for that particular period.

 

1.) Pizzarotti Litigation - On or about August 10, 2018 Pizzarotti, LLC filed a complaint against the Company and Mahesh Shetty, the Company’s former President and CFO, and others, seeking unspecified damages for an alleged breach of contract by the Company and another entity named Phipps & Co. (“Phipps”). The lawsuit was filed as Pizzarotti, LLC. v. Phipps & Co., et al., Index No. 653996/2018 and commenced in the Supreme Court of the State of New York for the County of New York. On or about April 1, 2019, Phipps filed cross-claims against the Company and Mr. Shetty asserting claims for indemnification, contribution, fraud, negligence, negligent misrepresentation, and breach of contract. SG Blocks has likewise cross claimed against Phipps for indemnification and contribution, claiming that any damages to the Plaintiff were the result of the acts or omissions of Phipps and its principals.


Pizzarotti’s suit arose from a contract dated April 3, 2018 that it executed with Phipps whereby Pizzarotti, a construction manager, engaged Phipps to perform stone procuring and tile work at a construction project located at 161 Maiden Lane, New York 10038. Pizzarotti’s claims against the Company arise from a purported assignment agreement dated August 10, 2018, whereby Pizzarotti claims that the Company agreed to assume certain obligations of Phipps under a certain trade contract between Pizzarotti and Phipps & Co. Phipps’ claims against the Company arise from a purported Assignment Agreement, dated as of May 30, 2018, between Pizzarotti, Phipps and the Company (the “Assignment Agreement”), pursuant to which, it is alleged, that the Company agreed to provide a letter of credit in connection with the sub-contracted work to be provided by Phipps to Pizzarotti.


The Company believes that the Assignment Agreement was void for lack of consideration and moved to dismiss the case on those and other grounds. On June 17, 2020, the New York Supreme Court entered an order dismissing certain claims against the Company brought by cross claimant Phipps. Specifically, the court dismissed Phipps’ claims for indemnification, contribution, fraud, negligence and negligent misrepresentation. The court did not dismiss Phipps’ claim for breach of the Assignment Agreement. The issue of the validity of the Assignment Agreement, and the Company’s defenses to the claims brought by the plaintiff Pizzarotti and cross claimant Phipps, are being litigated. The Company maintains that the Assignment Agreement, to the extent valid and enforceable, was properly terminated and/or there are no damages, and, consequently, that the claims brought against the Company are without merit. The Company intends to continue to vigorously defend the litigation. The parties have engaged in written discovery but no depositions have been conducted as of yet. By motion dated February 24, 2021, Pizzarotti moved to stay the entire action pending the outcome of a separate litigation captioned Pizzarotti, LLC v. FPG Maiden Lane, LLC et. al., Index No. 651697/2019, involving some of the same parties (but excluding the Company). Phipps cross moved to consolidate the two actions. The Company opposed both motions. On April 26, 2021, the court denied both motions and directed the parties to meet and confer concerning the scheduling of depositions. On May 10, 2021, the parties jointly filed with the court a proposed order providing the completion of depositions of all parties and nonparties by September 30, 2021. On April 4, 2024, the court entered an order setting forth the following dates for the completion of the parties depositions: (1) deposition of plaintiff shall occur by May 31, 2024, (2) deposition of Phipps shall occur by June 30, 2024, (3) deposition of the Company shall occur by July 20, 2024, (4) deposition of Mr. Shetty shall occur by August 9, 2024, (5) deposition of FPG Maiden Lane, & J. Landau shall occur by August 30, 2024, and (6) depositions of non-parties shall occur by September 30, 2024. The Company believes all depositions did not currently take place . As of December 31, 2024, the Company cannot estimate any potential loss.

 

(2) CPF GP 2019-1, LLC Litigation – In September 2023, a suit was filed in the form of a declaratory judgment to say CPF GP did not owe certain monies to the Company. The Company filed counterclaims for the amounts owed. The case settled in February 2024 in exchange for mutual dismissals and monthly payments of the balance due, which is $745,000 in total to the Company from CPF GP.  To date, the Company has not received additional monthly payments and has not recorded this gain.


(3) Farnam Litigation – In October 2023, Farnam Street Financial, Inc. (“Farnam”) filed suit against the Company in the United States District Court for the District of Minnesota (Case No. 23-CV-3212) alleging breaches by the Company under a certain lease agreement between Farnam and the Company dated as of October 13, 221. Farnam sought monies owed under such lease agreement. On August 1, 2024, the Company, SG Echo and SG Environmental Solutions Corp. (“SG Environmental”), a wholly owned subsidiary of the Company, entered into a settlement agreement (the “Settlement”) with Farnam to resolve the pending litigation. Simultaneously with the execution of the Settlement, (i) the Company, SG Environmental and Farnam entered into an assignment and assumption agreement, pursuant to which SG Environmental was substituted for the Company as the lessee under the lease agreement, and (ii) SG Environmental and Farnam executed a new Lease Schedule No. 001R (“Schedule 1R”), which replaced the prior schedule in its entirety. The terms of the Settlement included the following: (i) SG Environmental will be the signatory under the “Lessee” under the lease; (ii) the initial term (the “Initial Term”) of Schedule 1R is 18 months; (iii) the “Commencement Date” of Schedule 1R is August 1, 2024; (iv) the original cost of the equipment subject to Schedule 1R is $1,556,163.00; (v) so long as there has been no default under the lease and Schedule 1R, SG Environmental shall have the option to purchase the equipment at the end of the Initial Term for thirty-five percent (35%) of the original cost of the equipment, or $544,657.05, plus applicable taxes; (vi) the “Monthly Lease Charge” under Schedule 1R is $65,880.95, plus applicable taxes; and (vii) SG Environmental shall provide a new security deposit under Schedule 1R in the amount of $167,056.00, which shall be paid on or before August 1, 2024. Simultaneously with the execution of the Settlement, the Company and SG Echo executed a guaranty, whereby each of the Company and SG Echo jointly and severally guarantee SG Environmental’s full and prompt payment and performance under the lease and Schedule 1R. Per the Settlement, Farnam shall retain as income all prior payments from the Company (or any Company affiliate) under the lease, the prior schedule, or any other agreement with the Company or its affiliates, including all monthly lease charges, interim rent, taxes, interest, fees, late charges, and any security deposits, including the deposit under the prior schedule. Under the terms of the Settlement, Farnam and the Company each agree to waive and release any and all claims against the other, except with respect to each party’s performance under the Settlement and each party’s future obligations under the lease, Schedule 1R and guaranty agreements. The case remains ongoing as disputes have arisen post-Settlement between the Company and Farnam. As of December 31, 2024, the Company cannot estimate any potential loss, besides the original amounts of approximately $1.5 million which are included in accounts payable and accrued expenses.


(4) American Express Litigation – In December 2023, American Express Travel Related Services Company, Inc. (“AMEX”) filed suit against the Company in the Supreme Court of the State of New York, County of New York (Case No. 162231/2023) alleging breaches of a commercial credit card agreement between AMEX and the Company, dated as of November 8, 2022. AMEX sought monies owed under the commercial credit card agreement, with a balance of $232,218.94 as of the commencement of the action. In August 2024, AMEX filed a Motion for Default Judgment, which was granted by the court on or about September 19, 2024, for the amount of damages requested in AMEX’s motion. As of December 31, 2024, the estimated potential loss to the Company is approximately $232,000 which is included in accounts payable and accrued expenses.

 

(5) Choctaw Litigation – In March 2024, the Choctaw Nation of Oklahoma (“Choctaw Nation”) filed suit against SG Echo, LLC (“SG Echo”) and the Company in the District Court of Bryan County, State of Oklahoma (Case No. CJ-2024-41) alleging: (a) breaches by SG Echo under a certain commercial lease agreement between SG Echo and the Choctaw Nation related to commercial property located at 2917 Big Lots Road, Durant, Oklahoma 74701; and (b) declaratory and injunctive relief relating to certain cranes, declaring the Choctaw Nation to be the owner of the cranes and not SG Echo. The Company disputes the Choctaw Nation’s allegations. As of December 31, 2024, the case remains pending. As of December 31, 2024, the Company cannot estimate any potential loss. As of December 31, 2024, the estimated potential loss to the Company is approximately $138,000 which is included in accounts payable and accrued expenses.

(6) Durant Industrial Authority Litigation – In November 2024, The Durant Industrial Authority (“DIA”) filed suit against the Company, SG Echo, LLC, among others, alleging breaches by the Company and SG Echo under a certain forgivable promissory note executed between SG Echo as the borrower and the DIA as the lender in the principal sum of $750,000 (the “Forgivable Note”). The indebtedness under the Forgivable Note would be forgiven in three separate phases based upon the schedule set forth in the Forgivable Note. The DIA’s allegations include, among others, that due to SG Echo’s alleged breaches, the Forgivable Note is no longer forgivable and has been accelerated and is due in full. The Company and SG Echo dispute the DIA’s allegations. As of December 31, 2024, the case remains pending. As of December 31, 2024, the Company cannot estimate any additional potential loss, however as of December 31, 2024 the $750,000 is included in short-term notes payable.

 

(7) Rulien Litigation – In March, 2024, Rulien Advisors, LLC (“Rulien”) filed suit against the Company in the Supreme Court of the State of New York Commercial Division, Kings County (Case No. 506426/2024) alleging breaches of a consulting agreement entered into by the Company and Rulien, dated as of December 17, 2018 (the “Consulting Agreement”), whereby the Company engaged Rulien to act as a non-exclusive independent sales representative to promote the sale of, and to solicit orders for, products and services offered for sale by the Company. Rulien alleges that it has earned commissions for (a) the alleged sale of property located at 1900 American Drive, Lago Vista, Texas, and (b) the Company’s spin-off of the Company’s wholly-owned subsidiary, Safe and Green Development Corporation, into a separate publicly traded company listed on the Nasdaq stock exchange. The Company disputes Rulien’s claims. The case remains pending. As of December 31, 2024, the Company cannot estimate any potential loss.

 

(8) Caliber Litigation – In June 2024, Caliber Corporate Advisers, LLC (“Caliber”) filed suit against the Company in the Supreme Court of the State of New York, County of New York (Case No. 652893/2024) alleging breaches of a Consulting Services Agreement between Caliber and the Company (the “Services Agreement”), alleging a balance owed of $46,350. The Company disputes Calibers claims, and claims that Caliber failed to provide meaningful services as set forth in the Services Agreement. As of December 31, 2024, the case remains pending. As of December 31, 2024, the Company cannot estimate any potential loss.

 

(9) MDisrupt Litigation – In August 2024, MDisrupt, Inc. (“MDisrupt”) filed suit against Safe and Green Medical Corporation (“SG Medco”) and the Company in the 353rd District Court of Travis County, Texas (Case No. D-1-GN-24-003213) alleging breaches of a consulting services agreement between Medco and MDisrupt entered into on or about September 20, 2023 (the “Services Agreement”), alleging a balanced owed of $183,901. Medco and the Company dispute MDisrupt’s allegations. Further, the Company was not party to the Services Agreement. As of December 31, 2024, the case remains pending. As of December 31, 2024, the Company cannot estimate any potential loss and does not believe any loss is probable.  As of December 31, 2024, the estimated potential loss to the Company is $183,901 which is included in accounts payable and accrued expenses.

 

Vendor Litigation


1.) SG Blocks, Inc. v HOLA Community Partners, et. al.


On April 13, 2020, Plaintiff SG Blocks, Inc. (“SG Blocks” or the “Company”) filed a Complaint against HOLA Community Partners (“HCP”), Heart of Los Angeles Youth, Inc. (“HOLA”) (HCP and HOLA are collectively referred to as the “HOLA Defendants”), and the City of Los Angeles (“City”) in the United States District Court for the Central District of California, Case No. 2:20-cv-03432-ODW (“HOLA Action”). The Company asserted seven claims against HOLA Defendants arising out of and related to the HOLA Project, to wit, for: (1) breach of contract; (2) conversion; (3) default and judicial foreclosure under the Agreement as a security agreement; (4) misappropriation of trade secrets under California Civil Code section 3426; (5) misappropriation of trade secrets under 18 U.S.C. § 1836; and (6) intentional interference with contractual relations. On April 20, 2020, HOLA filed a separate action against the Company in the Los Angeles Superior Court arising out of the HOLA Project, asserting claims of (1) negligence; (2) strict products liability; (3) strict products liability, (4) breach of contract; (5) breach of express warranty; (6) violation of Business and Professions Code § 7031(b); and (7) violation of California’s unfair competition law, Business and Professions Code section 17200 (“UCL”) (“HOLA State Court Action”). The HOLA State Court Action was removed to the Central District of California and consolidated with the HOLA Action.

On January 22, 2021, the Company filed a Third-Party Complaint in the HOLA Action against Third-Party Defendants Teton Buildings, LLC, Avesi Construction, LLC, and American Home Building and Masonry Corp (“AHB”) for indemnity and contribution with respect to HOLA’s claims. The Company has also notified its general liability carrier Sompo International regarding coverage concerning HOLA’s claims On February 25, 2021, the Court entered an order dismissing the Company’s claims for (1) breach of contract; (2) conversion; (3) default and judicial foreclosure under the Agreement as a security agreement; (4) misappropriation of trade secrets under California Civil Code section 3426; (5) misappropriation of trade secrets under 18 U.S.C. § 1836; but denied dismissal of the Company’s claims for intentional interference with contractual relations. The Court also denied the Company’s motion to dismiss HOLA’s claims.


On March 12, 2021, the HOLA Defendants filed an answer to the Company’s complaint against it denying liability and asserting affirmative defenses. On March 12, 2021, the Company filed an answer to the HOLA Defendants’ First Amended Consolidated Complaint against it, denying liability and asserting affirmative defenses. 


On April 26, 2021, the Company and the HOLA Defendants filed a Joint Stipulation to Dismiss HOLA Community Partners’ Sixth Claim for Relief (violation of California Business and Professions Code §7031(b)), with prejudice, pursuant to Fed. R. Civ. P. 41(a)(1)(A)(ii).


On July 23, 2021, the Company filed a First Amended Third-Party Complaint adding the following additional third party defendants seeking, inter alia, contractual indemnity, equitable indemnity; and contribution: American Home Building and Masonry Corp. (“American Home”), Anderson Air Conditioning, L.P. (“Anderson”). Broadway Glass and Mirror, Inc. (“Broadway”), Marne Construction, Inc. (“Marne”), The McIntyre Company (“McIntyre”), Dowell & Bradley Construction, Inc. dba J R Construction (“JR Construction”) Junior Steel Co. (“Junior Steel”) Saddleback Roofing, Inc. (“Saddleback”) Schindler Elevator Corporation (“Schindler”) U.S. Smoke & Fire Corp. (“U.S. Smoke”) and FirstForm, Inc. (“FirstForm”) (collectively the “Additional Third Party Defendants”).


On September 2, 2021, Schindler Elevator Corp. filed its answer to the First Amended Third-Party Complaint. On September 3, 2021, Junior Steel Co. filed its answer to the First Amended Third-Party Complaint. On September 7, 2021, Anderson Air Conditioning, L.P. filed its answer to the First Amended Third-Party Complaint. On October 6, 2021, the McIntyre Group filed its answer to the First Amended Third-Party Complaint.

 

On February 7, 2022, the Company filed a request for entry of a Clerk’s default against the following defendants: American Home Building and Masonry Corp., Avesi Construction, Marne Construction, Inc., FirstForm, Inc., Dowell & Bradley Construction, Inc, Saddleback Roofing, Inc., and US Smoke and Fire Corp. On February 9, 2022, the court entered a clerk’s default pursuant to Federal Rule 55 against the following defendants: American Home Building and Masonry Corp. Avesi Construction, Dowel & Bradley Construction, Inc., Saddleback Roofing Inc. and US smoke and Fire Corp. The parties that have answered and appeared in the case are currently engaged in discovery.


The dispute between SG Blocks, Inc., HOLA Community Partners, and others in the above-described lawsuit settled, and a formal settlement agreement was executed in December 2022. In accordance with the settlement agreement, all funds to be paid were, in fact, paid. On February 27, 2023, the settling parties filed a Joint Stipulation to Dismiss All Causes of Action Against All Parties Except Avesi Construction, LLC (“Aveshi”), and Saddleback Roofing, Inc. (“Saddleback”). The claims against the settling parties, pursuant to the settlement, were to be dismissed and have since been dismissed. SG Blocks, Inc. had taken defaults against Aveshi and Saddleback, and is continuing to pursue default judgments against same.


On February 17, 2025, the Company executed a Settlement Agreement and Release with Saddleback, to release all claims between the parties. As part of the settlement, Saddleback agreed to pay a settlement payment of $400,000. All of the settlement proceeds were refunded to the Company’s Insurer Sompo, based on monies already paid out by Sompo in the underlying matter. As the matter is now settled, the parties will shortly move the court to dismiss the Saddleback matter.


2.) SG Blocks, Inc. v. EDI International, PC


On June 21, 2019, SG Blocks, Inc. filed a lawsuit against EDI International, PC (“EDI”), a New Jersey corporation, in connection with the parties’ consulting agreement, dated June 29, 2016, pursuant to which EDI, was to provide, for a fee, certain architectural and design services for the original project between the Company and HOLA (“Project”). The lawsuit is styled SG Blocks, Inc. v. EDI et al., and was filed in California Superior Court, for the County of Los Angeles, case no. 19STCV21725. SG Blocks, Inc. claims that EDI, tortiously interfered with SG Blocks, Inc’s economic relationship with HCP and HOLA. The complaint seeks in excess of $1,275,754 in damages. EDI, filed a cross-complaint for alleged unpaid fees and tortious interference with EDI contractual relationship with HCP and HOLA. EDI cross-complaint seeks in excess of $30,428.71 in damages. On July 8, 2020, SG Blocks, Inc. added PVE LLC as a defendant in the lawsuit, claiming PVE LLC is liable to the same extent as EDI. In May 2021, the parties settled EDI affirmative claims, and its cross-complaint was dismissed with prejudice on August 23, 2021. On SG Blocks, Inc.’s remaining claims, trial is set for October 2024. On or about November 15, 2024, the Company received a jury verdict in its favor in the amount of $1.274 million against EDI styled as SG Blocks, Inc. v EDI et al, case no. 19STCV21725, which has been secured to a judgment. The case is currently proceeding through post-judgment motions and filings. There remains uncertainty whether the Company will be able to collect on the judgment.


3.) Teton Buildings, LLC


(i) On January 1, 2019, SG Blocks commenced an action against Teton Buildings, LLC (“Teton”) in Harris County, Texas (“Teton Texas Action”) to recover approximately $2,100,000 arising from defendant’s breach of the operative contract related to Heart of Los Angeles construction project in Los Angeles (the “HOLA Project”) entered into on or about June 2, 2017. The Petition brought claims of breach of contract, negligence, and breach of express warranty. In or about February 2022 SG Blocks dismissed without prejudice the Teton Texas Action.


(ii) On or about September 12, 2018, the Company entered into a Firm Price Quote and Purchase (the “GVL Contract”) with Teton to govern the manufacture and provision of 23 shipping containers and modular units (the “Teton GVL Modules”) for the Four Oaks Gather GVL project in South Carolina (the “GVL Project.”). The Company maintains that Teton breached the GVL Contract by (i) failing to timely deliver the Teton GVL Modules, (ii) delivering Teton GVL Modules that were defective in their design and manufacture, (iii) otherwise failed to meet South Carolina Building Code regulations and (iv) breached applicable warranties. As a result of the breach and defects in performance, design and manufacture by Teton, Company asserts that it has sustained $761,401.66 in actual and consequential damages, excluding attorney’s fees. On October 16, 2019, Teton filed for Chapter 11 in the United States Bankruptcy Court for Southern District of Texas, Houston Division styled In re: Teton Buildings, LLC and bearing the case number 19-35811. On February 11, 2020, the Company filed a proof of claim again Teton in the amount of $2,861,401.66 arising from the HOLA Project and the GVL Contract.


 

On or about March 16, 2020, the Bankruptcy Court converted Teton’s Chapter 11 reorganization case to a Chapter 7 liquidation case. On July 18, 2019, Ronald Sommers, the Chapter 7 Trustee, filed a Report of No Distribution stating that there is no property available for distribution to creditors. On August 20, 2019, the Bankruptcy Court closed the Teton bankruptcy case. As such, there is no prospect of any recovery against Teton.


On January 22, 2021, the Company filed a third-party complaint against Teton in the United States District Court for the Central District of California, Case No. 2:20−cv−03432 in the HOLA Action (described above), seeking to determine Teton’s liability in its capacity as a bankruptcy debtor in order to collect any damages payable from Teton’s liability insurance carrier or carriers. On July 23, 2021, the Company filed a First Amended Third-Party Complaint against Teton and other named third party defendants (see #2 below). Teton has been served with the First Amended Third-Party Complaint and on or about February 11, 2022, Teton filed an answer and affirmative defenses.


On or about December 31, 2022, the parties who appeared in the HOLA Action, including Teton by and through its insurance carrier, executed a Settlement Agreement and Release. On February 28, 2023 the court “so ordered” the parties’ stipulation dismissing all causes of action against the parties to the Settlement Agreement and Release.

 

Other Litigation


1.) John Williams Shaw and Leo Patrick Shaw


On March 15, 2023, a complaint was filed against John Williams Shaw and Leo Patrick Shaw (the “Defendants”) in the United States District Court of the Southern District of New York seeking damaged to recover short swing profits from the Defendants pursuant to Section 16(b) of the Exchange Act. On September 26, 2023, the matter was settled and on, October 3, 2023, a Stipulation and Order of Dismissal with Prejudice was filed and so-ordered by the assigned judge. The Company is currently unable to predict the outcome or possible recovery, if any, associated with the resolution of this litigation, and, accordingly, the Company has made no provision related to this matter in the consolidated financial statements.

 

Commitments

 

In April 2020, the Company entered into an amendment to its employment agreement, dated January 1, 2017, with Paul Gavin (the "Amendment"), to extend the term of employment to December 31, 2021, provide for an annual base salary of $400,000 provide for a performance bonus structure for a bonus of up to 50% of base salary upon the Company’s achievement of $2,000,000 EBITDA and additional performance bonus payments for the achievement of EBITDA in excess of $2,000,000 based on a percentage of the incremental increase in EBITDA (ranging from 10% of the incremental increase in EBITDA if the Company achieves over $2,000,000 and up to $7,000,000 in EBITDA, 8% of the incremental increase in EBITDA if the Company achieves over $7,000,000 and up to $12,000,000 in EBITDA and 3% of the incremental increase in EBITDA over $12,000,000), provide for a profits-based additional bonus of up to $250,000 in certain limited circumstances, and provide for one (1) year severance, plus a pro-rated amount of any unpaid bonus earned by him during the year as verified by the Company’s principal financial officer, if Mr. Galvin is terminated without cause. At the Company’s option, up to fifty (50%) percent of the EBITDA performance bonuses may be paid in restricted stock units if then available for grant under the Company’s Incentive Plan


On July 5, 2022, the Company entered into an amendment to its employment agreement, dated January 1, 2017, as amended, with Paul Galvin, to provide for the payment of an annual base salary of $500,000 and on September 19, 2023 the agreement was amended to increase the annual base salary to $750,000. On October 22, 2024, the Board of Directors (the “Board”) of the Company determined not to renew the Employment agreement between the Company and Paul Galvin, the Company’s Chief Executive Officer and, in connection with such determination, delivered a written notice of termination to Mr. Galvin on October 24, 2024 in accordance with the terms of the Employment Agreement. Mr. Galvin’s employment with the Company as its Chief Executive Officer will terminate effective as of the close of business on December 31, 2024 (the “Effective Date”).

On May 1, 2023, the Company appointed Patricia Kaelin as the Company’s Chief Financial Officer and entered into an employment agreement with Patricia Kaelin (the “Kaelin Employment Agreement”) to employ Ms. Kaelin in such capacity for an initial term of two (2) years, which provides for an annual base salary of $250,000, a discretionary bonus of up to 20% of her base salary upon achievement of objectives as may be determined by the Company’s board of directors and severance in the event of a termination without cause on or after September 30, 2023 in amount equal to equal to one year’s annual base salary and benefits. The Kaelin Employment Agreement also provides for the grant to Ms. Kaelin of a restricted stock grant under the Company’s Stock Incentive Plan, as amended and as available for grant, of 60,000 shares of the Company’s common stock (3,000 as adjusted for the May Stock Split), vesting quarterly on a pro-rata basis over the next eighteen (18) months of continuous service. Ms. Kaelin is subject to a one-year post-termination non-compete and non-solicit of employees and clients. She is also bound by confidentiality provisions. During July 2023, Ms. Kaelin’s annual base salary was adjusted to $300,000, retroactive to May 1, 20