Legal Proceedings
9 Months Ended
Jun. 30, 2011
Legal Proceedings [Abstract]  
Legal Proceedings

General

From time to time, TVA is a party to or otherwise involved in lawsuits, claims, proceedings, investigations, and other legal matters (“Legal Proceedings”) that have arisen in the ordinary course of conducting TVA’s activities, as a result of a catastrophic event or otherwise.  TVA had accrued approximately $385 million of potential losses with respect to Legal Proceedings as of June 30, 2011.   Of this amount, $350 million is included in Other long-term liabilities and $35 million is included in Accounts payable and accrued liabilities.  No assurance can be given that TVA will not be subject to significant additional claims and liabilities.  If actual liabilities significantly exceed the estimates made, TVA’s results of operations, liquidity, and financial condition could be materially adversely affected.

EPA Settlement

On April 14, 2011, TVA entered into two agreements that generally absolve TVA from any liability under the New Source Review (“NSR”) requirements of the Clean Air Act (“CAA”) for maintenance, repair, and component replacement projects at TVA’s coal-fired units.  The first agreement is a Federal Facilities Compliance Agreement with EPA.  The second agreement is a consent decree with Alabama, Kentucky, North Carolina, Tennessee, and three environmental advocacy groups: the Sierra Club, National Parks Conservation Association, and Our Children’s Earth Foundation (the “Consent Decree”).  The two agreements (collectively, “the Environmental Agreements”) are substantially the same and are parts of a collective undertaking and are described below.

Under the agreements:

·  
Most existing and possible claims against TVA based on alleged NSR and associated violations are waived and cannot be brought against TVA.  Some possible claims for sulfuric acid mist and greenhouse gases (“GHG”) can still be brought against TVA.  Additionally, the agreements do not address compliance with new laws and regulations or the cost associated with such compliance.

·  
EPA generally will not enforce NSR requirements for new plant maintenance, repair, and component replacement projects against TVA until 2019.  Possible claims for NSR violations involving increases in GHG and sulfuric acid mist from projects can still be pursued in the future.  Claims for increases in particulates also can be pursued except at TVA’s Allen Fossil Plant, Bull Run Fossil Plant (“Bull Run”), Kingston, and Gallatin Fossil Plant and Unit 5 at TVA’s Colbert Fossil Plant.
 
·  
TVA commits to retiring on a phased schedule two units at the John Sevier Fossil Plant (“John Sevier”), the six small units at the Widows Creek Fossil Plant (“Widows Creek”), and 10 units at the Johnsonville Fossil Plant (“Johnsonville”).  This is a total of approximately 2,700 MW (nameplate capacity) or 2,200 MW (summer net dependable capability).  The majority of these retirement costs have been previously included in the ARO liability.  Further, the depreciation expense related to these facilities was changed beginning in April 2011 in order to depreciate the assets over their remaining useful lives.

·  
Of the remaining 5,600 MW (nameplate capacity) or 4,500 MW (summer net dependable capability) coal-fired fleet capacity that is not already fully equipped with advanced sulfur dioxide (“SO2”) or nitrogen oxides (“NOx”) controls, TVA must decide whether to control, convert, or retire 4,300 MW (nameplate capacity) or 3,500 MW (summer net dependable capability) on a unit by unit schedule which can extend until 2019.

·  
Annual, declining emission caps are set for SO2 and NOx.

·  
TVA, with EPA approval, will invest $290 million in energy efficiency projects, demand response projects, renewable energy projects, and other TVA projects by June 2016.  This amount is included on the June 30, 2011 Balance Sheet as a regulatory asset.

·  
TVA will provide Alabama, Kentucky, North Carolina, and Tennessee a total of $60 million in annual installments beginning in 2011 through 2016 to fund environmental projects, giving a preference for projects in the TVA watershed or service area.  This amount is included on the June 30, 2011 Balance Sheet as a regulatory asset.

·  
The civil penalties of $10 million were expensed during the period ended June 30, 2011, and subsequently paid in July 2011.  The civil penalty was divided among EPA, Alabama, Kentucky, and Tennessee.

The $290 million and the $60 million detailed above are included in Other long-term liabilities on the June 30, 2011 Balance Sheet.  In conjunction with the approval of the agreements, the TVA Board determined that it was appropriate to record the amounts detailed above as regulatory assets. Therefore, the amounts will be recovered in future periods.

The agreement with EPA was noticed in the Federal Register, and the public comment period expired with no changes made to the agreement.  That agreement became effective on June 13, 2011.  The United States District Court for the Eastern District of Tennessee (“Eastern District of Tennessee”) entered the Consent Decree on June 30, 2011.  In connection with the agreement and the entry of the Consent Decree, the following legal and administrative clean air proceedings discussed below are expected to be terminated or narrowed in scope:
 
·  
The Proceeding Involving the John Sevier CAA Permit, and
·  
The Proceeding Involving the Shawnee Fossil Plant (“Shawnee”) CAA Permit.

Additionally, the following legal and administrative clean air proceedings have already been terminated in connection with the agreement and the Consent Decree:

·  
The Case Involving Alleged Violations of New Source Review Regulations at Bull Run,
·  
The Case Brought by North Carolina Alleging Public Nuisance, and
·  
The Proceeding Involving the Paradise Fossil Plant (“Paradise”) CAA Permit.

Demand and sales projections for the TVA system are expected to require that TVA replace the retired capacity over time.  The cost of this is uncertain and depends on demand and the energy resources chosen for this replacement capacity.  TVA anticipates meeting this need with a mix of generating assets and investments in energy efficiency and demand reduction programs so as to minimize the total costs of replacing the generation lost as a result of retiring these units.

Litigation

Legal Proceedings Related to the Kingston Ash Spill.  Sixty-one lawsuits based on the Kingston ash spill have been filed in the Eastern District of Tennessee.  Eight of those actions have been voluntarily dismissed.  The lawsuits, filed by residents, businesses, and property owners in the Kingston area, allege various causes of action in tort – including nuisance, strict liability, personal injury, and property damage – as well as inverse condemnation, and generally seek unspecified compensatory and punitive damages, court orders to clean up the plaintiffs’ properties and surrounding properties, and other relief.  The lawsuits seeking class certification have been voluntarily consolidated so there is now only one complaint, Chesney, seeking class certification.  The court has denied the request for class certification.  TVA is the sole defendant in all actions, since the two non-TVA defendants in Chesney have been dismissed from the lawsuit.  On March 26, 2010, the court issued a decision finding (1) the discretionary function doctrine is applicable to TVA’s ash pond design decisions and its spill response activities, (2) plaintiffs cannot recover punitive damages against TVA, and (3) plaintiffs have no right to a jury trial against TVA.  The court denied TVA’s motions with regard to plaintiffs’ tort claims concerning TVA's maintenance and upkeep of the ash pond, along with the inverse condemnation claims raised by certain plaintiffs.  The court has scheduled the seven earliest-filed cases for trial beginning on September 13, 2011, and the remaining cases for trial beginning November 1, 2011.

On March 22, 2011, the court issued decisions on two motions filed by TVA.  With respect to the TVA motions, the court held that (1) a plaintiff could not bring a claim for TVA’s allegedly having caused a nuisance with regard to property if the plaintiff did not have a valid property interest in that property and (2) a plaintiff who filed for bankruptcy after bringing suit against TVA but did not include the suit in the bankruptcy proceeding was barred from pursuing the suit against TVA.

On March 24, 2011, the court issued a decision which granted TVA’s motion for summary judgment on any claim related to activities the court had previously ruled as being protected by the discretionary function doctrine (ash pond design and spill response activities).  The court denied TVA’s motion with regard to any alleged failures to adequately inform or train personnel in applicable policies or procedures or negligent maintenance.  The court also held that while TVA’s design and construction decisions concerning the ash pond were protected by the discretionary function doctrine, the court would not grant summary judgment on claims related to alleged negligence in carrying out such design and construction decisions. 

On April 19, 2011, plaintiffs in one of the lawsuits requested permission from the court to file an amended complaint which asserts only claims based on alleged property damage, including nuisance and trespass.  The court allowed the amended complaint and the case with regard to these plaintiffs will proceed on the property damage claims and not on any personal injury or related claims, including requests for medical monitoring.

On August 2, 2011, the court granted summary judgment in favor of TVA on plaintiffs’ personal injury, emotional distress, and inverse condemnation claims.  The court denied summary judgment on the trespass, nuisance, and property injury claims, and the litigation now will proceed to the scheduled bench trial on those claims.
 
TVA has received several notices of intent to sue under various environmental statutes from both individuals and environmental groups.  In addition, TVA has received substantial other claims from individuals and companies allegedly affected by the ash spill and may receive additional claims.

Civil Penalty and Natural Resource Damages for the Kingston Ash Spill.  On June 14, 2010, TDEC issued a civil penalty order of approximately $12 million to TVA for the Kingston ash spill, citing violations of the Tennessee Solid Waste Disposal Act and the Tennessee Water Quality Control Act.  Of the $12 million, TVA has already satisfied $6 million of the obligation and may also be credited up to $2 million for performing environmental projects approved by TDEC.  The remaining obligation will be paid in installments through July 2012.  On January 24, 2011, TVA entered into a memorandum of agreement with the TDEC and the Fish and Wildlife Service establishing a process and a method for resolving the natural resource damage claim associated with the Kingston ash spill.  As part of this memorandum of agreement, TVA agreed to pay $250 thousand each year for three years as a down payment on the amount of natural resource damages ultimately established.   TVA is also required to reimburse TDEC and the Fish and Wildlife Service for their costs.

Case Brought by North Carolina Alleging Public Nuisance.  On January 30, 2006, North Carolina filed suit against TVA in the United States District Court for the Western District of North Carolina, alleging that TVA’s operation of its coal-fired power plants in Tennessee, Alabama, and Kentucky constitutes a public nuisance.  On January 13, 2009, the court held that emissions from Bull Run, Kingston, and John Sevier, located in Tennessee, and Widows Creek, located in Alabama, constitute a public nuisance. 

The court issued an order that required TVA to operate existing flue gas scrubbers and selective catalytic reduction systems (“SCRs”) at the units that have them, add scrubbers and SCRs by certain dates at the units that do not have them, and meet specified emission rates and annual tonnage caps for NOx and SO2 after the applicable operation dates for the scrubbers.

TVA appealed the decision to the United States Court of Appeals for the Fourth Circuit (“Fourth Circuit”), which on July 26, 2010, reversed the holding of the district court and directed the district court to dismiss the action against TVA.  In its decision, the Fourth Circuit held that (1) state laws, including nuisance laws, could not be used to bypass the regulatory structure established by Congress and EPA for controlling emissions; (2) the district court improperly applied North Carolina law to power plants located in Alabama and Tennessee; and (3) the plant operations in Alabama and Tennessee could not be considered nuisances because both states had specifically approved these operations.  North Carolina requested an en banc rehearing, but the Fourth Circuit denied this request on September 21, 2010.  The district court dismissed the case with prejudice on October 1, 2010.  North Carolina filed a petition for review of the Fourth Circuit’s decision with the U.S. Supreme Court on February 2, 2011.  On July 22, 2011, the U.S. Supreme Court granted the parties joint motion to withdraw the petition for review, ending this case.  See EPA Settlement.
 
Case Involving Alleged Violations of the New Source Review Regulations at Bull Run.  The National Parks Conservation Association and the Sierra Club filed suit against TVA on February 13, 2001, in the Eastern District of Tennessee, alleging that TVA did not comply with the NSR requirements of the Clean Air Act when TVA repaired Bull Run.  On March 31, 2010, the court ruled in TVA’s favor, holding that two maintenance projects at Bull Run fell under the exception for “routine maintenance repair and replacement” and therefore did not require NSR permits.  The plaintiffs appealed this decision to the United States Court of Appeals for the Sixth Circuit (“Sixth Circuit”). On July 6, 2011, the Sixth Circuit granted the parties’ joint motion to dismiss this case.  See EPA Settlement.

Case Involving Tennessee Valley Authority Retirement System.  On March 5, 2010, eight current and former participants in and beneficiaries of the Tennessee Valley Authority Retirement System (“TVARS”) filed suit in the United States District Court for the Middle District of Tennessee against the six then-current members of the TVARS Board.  The lawsuit challenged the TVARS Board’s decision to suspend the TVA contribution requirements for 2010 through 2013, and to amend the TVARS Rules and Regulations to (1) reduce the calculation for cost of living adjustment (“COLA”) benefits for CY 2010 through CY 2013, (2) reduce the interest crediting rate for the fixed fund accounts, and (3) increase the eligibility age to receive COLAs from age 55 to 60.  The plaintiffs allege that these actions violated the TVARS Board members’ fiduciary duties to the plaintiffs (and the purported class) and the plaintiffs’ contractual rights, among other claims.  The plaintiffs sought, among other things, unspecified damages, an order directing the TVARS Board to rescind the amendments, and the appointment of a seventh TVARS Board member.  Five of the six individual defendants filed motions to dismiss the lawsuit, while the remaining defendant filed an answer to the complaint.  On July 28, 2010, TVA moved to intervene in the suit in the event it was not dismissed.  On September 7, 2010, the district court dismissed the breach of fiduciary duty claim against the directors without prejudice, allowing the plaintiffs to file an amended complaint within 14 days against TVARS and TVA but not the individual directors.  The plaintiffs previously had voluntarily withdrawn their constitutional claims, so the court also dismissed those claims without prejudice.  The court dismissed with prejudice the plaintiffs’ claims for breach of contract, violation of the Internal Revenue Code, and appointment of a seventh TVARS Board member. 

On September 21, 2010, the plaintiffs filed an amended complaint against TVARS and TVA.  The plaintiffs allege, among other things, violations of their constitutional rights (due process, equal protection, and property rights), violations of the Administrative Procedure Act, and breach of statutory duties owed to the plaintiffs.   They seek a declaratory judgment and appropriate relief for the alleged statutory and constitutional violations and breaches of duty.  TVA filed its answer to the amended complaint on December 27, 2010.  A briefing schedule has been issued and final dispositive motions are due in 2012.

Case Arising out of Hurricane Katrina.  In April 2006, TVA was added as a defendant to a class action lawsuit brought in the United States District Court for the Southern District of Mississippi by 14 Mississippi residents allegedly injured by Hurricane Katrina.  The plaintiffs sued seven large oil companies and an oil company trade association, three large chemical companies and a chemical trade association, and 31 large companies involved in the mining and/or burning of coal, alleging that the defendants’ greenhouse gas emissions contributed to global warming and were a proximate and direct cause of Hurricane Katrina’s increased destructive force.  Action by the United States Supreme Court on January 10, 2011, ended this case in a manner favorable to TVA.

On May 27, 2011, under a Mississippi state statute that permits the re-filing of lawsuits that were dismissed on procedural grounds, the plaintiffs filed another lawsuit against the same and additional defendants, again alleging that the defendants’ greenhouse gas emissions contributed to global warming and were a proximate and direct cause of Hurricane Katrina' s increased destructive force.

Global Warming Cases, Southern District of New York.  On July 21, 2004, two lawsuits were filed in the United States District Court for the Southern District of New York against TVA and other companies that generate power from fossil-fuel electric generating facilities alleging that global warming is a public nuisance and that carbon dioxide (“CO2”) emissions from fossil-fuel electric generating facilities should be ordered abated because they contribute to causing the nuisance.  The first case was filed by various states (California, Connecticut, Iowa, New Jersey, New York, Rhode Island, Vermont, and Wisconsin) and the City of New York against TVA and other power suppliers.  The second case, which also alleges private nuisance, was filed against the same defendants by Open Space Institute, Inc., Open Space Conservancy, Inc., and the Audubon Society of New Hampshire.  The plaintiffs seek a court order requiring each defendant to cap its CO2 emissions and then reduce these emissions by an unspecified percentage each year for at least a decade.  In September 2005, the district court dismissed both lawsuits because they raised political questions that should not be decided by the courts.  The plaintiffs appealed to the United States Court of Appeals for the Second Circuit (“Second Circuit”).  On September 21, 2009, the Second Circuit reversed the district court’s decision and remanded the cases to the district court for further proceedings.  On November 5, 2009, TVA and the other defendants filed a petition seeking a rehearing by the entire Second Circuit, which petition was denied on March 5, 2010.  On December 6, 2010, the U.S. Supreme Court granted a petition requesting that the Supreme Court review the Second Circuit’s decision.  The U.S. Solicitor General filed a brief on behalf of TVA on January 31, 2011.  Oral arguments were held on April 19, 2011.  On June 16, 2011, the Supreme Court issued a decision reversing the Second Circuit’s ruling, and holding that any federal common law cause of action was displaced by the CAA and its implementing regulations.  The Supreme Court did not address the plaintiffs’ state law claims, but instead remanded the case to the Second Circuit for consideration of these claims.

Case Regarding Bellefonte Nuclear Plant Units 1 and 2.  On March 9, 2009, in response to a request by TVA, the Nuclear Regulatory Commission (“NRC”) issued an order reinstating the construction permits for Bellefonte Units 1 and 2 and returning the Bellefonte construction permits to a terminated status.  (They are currently in deferred status.)  On March 30, 2009, Blue Ridge Environmental Defense League (“BREDL”) filed a petition in the United States Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) challenging NRC’s authority to reinstate the construction permits and alleging that NRC failed to follow the requirements of the National Environmental Policy Act (“NEPA”).  TVA was permitted to intervene in this proceeding.  On June 11, 2009, the D.C. Circuit issued an order holding the case in abeyance pending further order of the court.  On March 8, 2010, BREDL filed a second petition in the D.C. Circuit, again challenging NRC’s compliance with NEPA and NRC’s authority to reinstate the construction permits.  TVA was granted intervenor status in this case as well, and requested that the court dismiss this second petition.  On July 26, 2010, the D.C. Circuit consolidated the two BREDL petitions and continued the stay of the case pending the conclusion of an administrative proceeding concerning the same issues.  The administrative proceeding, in which BREDL challenged the reinstatement of the construction permits before an NRC Atomic Safety and Licensing Board (“ASLB”), was completed on September 29, 2010, with the dismissal of all contentions.  Upon completion of the administrative proceeding, the D.C. Circuit on November 5, 2010, issued an order returning the two cases to the court’s active docket.  Final briefs have been submitted, and oral arguments have been scheduled to take place on October 20, 2011.

Administrative Proceedings Regarding Bellefonte Units 3 and 4.  TVA submitted its Combined Construction and Operating License Application for two Advanced Passive 1000 reactors at Bellefonte Units 3 and 4 to NRC in October 2007.  On June 6, 2008, Bellefonte Efficiency and Sustainability Team (“BEST”), BREDL, and Southern Alliance for Clean Energy (“SACE”) submitted to NRC a joint petition for intervention and a request for a hearing.  The petition raised 20 potential contentions with respect to TVA’s Combined Construction and Operating License Application.  The ASLB denied standing to BEST and admitted four of the 20 contentions submitted by BREDL and SACE.  NRC later reversed the ASLB’s decision to admit two of the four contentions, leaving only two contentions (which involve questions about the estimated costs of the new nuclear plant and the impact of the facility’s operations, in particular the plant intake, on aquatic ecology) to be litigated in a future hearing.  No hearing will take place until NRC issues a final Environmental Impact Statement and final Safety Evaluation Report for the units.  On September 29, 2010, TVA notified NRC that the recently completed Final Supplemental Environmental Impact Statement had determined that completion of the partially constructed Bellefonte Unit 1 is the preferred alternative for near-term additional generating capacity at the Bellefonte site.  Consequently, with the exception of the ongoing review of hydrology-related portions of the application, TVA requested that NRC defer review of the Bellefonte Units 3 and 4 Combined Construction and Operating License Application pending a final decision of the TVA Board regarding new generation capacity at the Bellefonte site.  On April 21, 2011, the ASLB requested that TVA provide the ASLB with a status report that describes in as much detail as practicable TVA’s plans for reaching a decision regarding how TVA expects to proceed with the licensing of Bellefonte.  TVA provided a status report to the ASLB on May 6, 2011, indicating that while TVA intends to continue the ongoing licensing efforts for Bellefonte, a decision by the TVA Board had been delayed pending consideration of the impacts of the events at the Fukushima Daiichi facility in Japan.  TVA committed to inform the ASLB of any subsequent decision in this regard as soon as practicable.

Administrative Proceedings Regarding Watts Bar Nuclear Plant Unit 2.  On July 13, 2009, SACE, the Tennessee Environmental Council, the Sierra Club, We the People, and BREDL filed a request for a hearing and petition to intervene in the NRC administrative process reviewing TVA’s application for an operating license for Watts Bar Nuclear Plant (“Watts Bar”) Unit 2.  The petitioners raised seven contentions related to TVA’s environmental review of the project and NRC’s basis for confidence in the availability of safe storage options for spent nuclear fuel.  On November 19, 2009, the ASLB granted SACE’s request for hearing, admitted two of SACE’s seven contentions for hearing, and denied the request for hearing submitted on behalf of the other four petitioners.  On March 26, 2010, NRC affirmed the ASLB’s decision denying the other petitioners the opportunity to participate.  After providing additional information to NRC on April 9, 2010, which addressed one of the two admitted contentions, TVA submitted a motion asking the ASLB to dismiss the contention as moot.  The motion was unopposed by SACE and on June 2, 2010, the ASLB granted TVA’s motion to dismiss the contention.  SACE also asked the ASLB to waive NRC’s longstanding regulations establishing that, for the purposes of the NEPA, the need for power and alternative energy source issues will not be considered in operating license proceedings.  On June 29, 2010, the ASLB denied this request and declined to refer the waiver petition to NRC for consideration.  SACE subsequently filed a petition for interlocutory review of this decision with NRC, which NRC denied on November 30, 2010.  Regarding the sole remaining contention which raises concerns about the aquatic impacts of two-unit operation, several additional reports have been provided to NRC providing up to date information to address this contention.  These reports include a mussel survey and entrainment report, both issued on March 24, 2011, and an impingement report issued on March 29, 2011.  A supplement to the impingement report was submitted on April 28, 2011.  A hearing on the remaining contention is expected to take place in the latter part of 2012.
 
John Sevier Fossil Plant Clean Air Act Permit.  On September 20, 2010, the Environmental Integrity Project, the Southern Environmental Law Center, and the Tennessee Environmental Council filed a petition with EPA, requesting that the EPA Administrator object to the CAA permit issued to TVA for operation of John Sevier.  Among other things, the petitioners allege that repair, maintenance, or replacement activities undertaken at John Sevier Unit 3 in 1986 triggered the Prevention of Significant Deterioration (“PSD”) requirements for SO2 and NOx.  The CAA permit, issued by the TDEC, remains in effect pending the disposition of EPA’s petition.  See EPA Settlement.

Paradise Fossil Plant Clean Air Act Permit.  On December 21, 2007, the Sierra Club, the Center for Biological Diversity, Kentucky Heartwood, Preston Forsythe, and Hilary Lambert filed a petition with EPA raising objections to the conditions of TVA’s current CAA permit at Paradise.  Among other things, the petitioners allege that activities at Paradise triggered the NSR requirements for NOx and that the monitoring of opacity at Units 1 and 2 of the plant is deficient.  In an order issued in July 2009, EPA agreed that the permit failed to include a proper PSD analysis for NOx emission increases as a result of physical changes made to the plant’s three main boilers in the 1984-1986 period, that the permit failed to require adequate monitoring systems for opacity and NOx, and that the monitoring of soot emissions from the coal washing and handling plant was inadequate.  TVA’s permit at Paradise is issued by the Kentucky Division for Air Quality (“KDAQ”).  In November 2009, KDAQ determined that the actions at Paradise had not triggered NSR requirements and reissued the operating permit without including NSR compliance milestones.  On January 9, 2010, the Sierra Club petitioned EPA to object to the operating permit, alleging that KDAQ had failed to properly take into account the PSD requirements for the physical changes made in 1986.  On May 21, 2010, the Sierra Club filed a lawsuit seeking to compel EPA to act on the petition.  To resolve this lawsuit, EPA entered into a consent decree with the Sierra Club under which EPA agreed to respond to the petition.  On May 2, 2011, EPA denied the petition, citing the Environmental Agreements.  See EPA Settlement.

Shawnee Fossil Plant Clean Air Act Permit.  On December 16, 2010, the Environmental Integrity Project and the Southern Alliance for Clean Energy filed a petition with EPA requesting that the EPA Administrator object to the proposed CAA renewal permit issued to TVA for operations at Shawnee.  Among other things, the petitioners allege that repair, maintenance, or replacement undertaken at Shawnee Units 1 and 4 in the 1989-90 period triggered the PSD requirements for SO2 and NOx.  The current permit remains in effect pending KDAQ’s finalization of the renewal permit.  See EPA Settlement.

Notice of Violation at Widows Creek Unit 7.  On July 16, 2007, TVA received a Notice of Violation (“NOV”) from EPA alleging, among other violations, that TVA failed to properly maintain ductwork at Widows Creek Unit 7.  TVA repaired the ductwork in 2005.  On March 5, 2008, TVA and Alabama entered into an agreed order in which TVA agreed to pay the state $100 thousand.  On March 15, 2011, TVA and EPA entered into an agreed order which resolves this matter, and under which TVA paid $450 thousand and retired 1,000 SO2 and NOx allowances.

Kingston NPDES Permit Appeal.  The Sierra Club filed a challenge to the National Pollutant Discharge Elimination System (“NPDES”) permit issued by Tennessee for the scrubber-gypsum pond discharge at Kingston in November 2009 before the Tennessee Water Quality Control Board (“TWQCB”).  This is the second such challenge nationally.  In addition to its allegation that Tennessee violated the Clean Water Act by failing to set specific limits on certain toxic discharges, the Sierra Club alleges that no discharges from the pond infrastructure should be allowed because zero-discharge scrubbers exist.  TDEC is the defendant in the challenge, and TVA has intervened in support of TDEC’s decision to issue the permit.  The matter was set for a hearing before the TWQCB in February 2011 but has since been stayed by agreement of the parties.  The other similar challenge involves an Allegheny Power NPDES permit for its scrubber discharge at a Pennsylvania plant.

Bull Run NDPES Permit Appeal. The SACE and the Tennessee Clean Water Network (“TCWN”) filed a challenge to the NPDES permit for Bull Run on November 1, 2010.  TDEC is the defendant in the challenge and TVA’s petition to intervene to support TDEC’s decision to issue the permit was granted on January 12, 2011.  The matter is expected to go to a hearing before the TWQCB in the spring of 2012.

Johnsonville Fossil Plant NDPES Permit Appeal.  SACE and TCWN filed a challenge to the NPDES permit for Johnsonville on or about March 10, 2011.  TDEC is the defendant in the challenge.  TVA has filed a motion to intervene in this administrative challenge.

John Sevier Fossil Plant NDPES Permit Appeal.  SACE and TCWN filed a challenge to the NPDES permit for John Sevier on or about May 31, 2011.  TDEC is the defendant in the challenge.  TVA has filed a motion to intervene in this administrative challenge.

Information Request from EPA.  On April 25, 2008, TVA received a request from EPA under Section 114 of the CAA requesting extensive information about maintenance, repair, and replacement projects at and the operations of 14 of TVA’s coal-fired units.  These 14 units are located in Alabama, Kentucky, and Tennessee.  The Environmental Agreements have resolved most issues related to this information request, excluding claims related to sulfuric acid mist.  See EPA Settlement.
 
Petitions Resulting from Japanese Nuclear Events

As a result of the events precipitated by the March 11, 2011 earthquake and tsunami at the Japanese nuclear power stations, petitions have been filed with NRC which could impact TVA’s nuclear program.  These petitions include:

·  
Petition Seeking Enforcement Action Against Licensees of NRC

Saprodani Associates filed a petition on March 12, 2011, under the 10 CFR 2.206 process requesting that NRC take enforcement action, issue a Notice of Violation, and immediately shutdown all U.S. reactors known to be near an earthquake fault line.  On June 29, 2011, NRC rejected the petition but committed to continue analyzing the events at Fukushima Daiichi and to take any actions deemed appropriate following its analysis.

·  
Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions Pending Investigation of Lessons Learned From Fukushima Daiichi Nuclear Power Station Accident

Separate but essentially identical petitions have been filed by almost 50 petitioners in 24 ongoing NRC licensing proceedings, including Watts Bar Unit 2 (filed April 14, 2011 by SACE) and Bellefonte Units 3 and 4 (filed April 18, 2011 by BREDL).  Filed under NRC’s general authority to regulate the U.S. nuclear industry, the petitions seek to suspend all licensing decisions and other major licensing activities pending completion of NRC’s Fukushima Task Force investigation and subsequent issuance of any proposed regulatory decisions and/or environmental analyses.

·  
Petition to Suspend AP1000 Design Certification Rulemaking Pending Evaluation of Fukushima Accident Implications on Design and Operational Procedures and Request for Expedited Consideration

A petition was filed by 13 petitioners on April 6, 2011, requesting that NRC suspend the AP1000® design certification rulemaking while NRC investigates the Fukushima accident and determines appropriate lessons learned to be incorporated into the design and operational procedures.  The AP1000® is a pressurized water nuclear reactor designed by the Westinghouse Electric Company, LLC, and is the nuclear reactor technology TVA has referenced in its Bellefonte Units 3 and 4 combined license application.  Granting of this petition could potentially impact the licensing proceeding for these units.

·  
Petition to Immediately Suspend the Operating Licenses of GE BWR Mark I Units Pending Full NRC Review With Independent Expert and Public Participation From Affected Emergency Planning Zone Communities

Beyond Nuclear filed a petition on April 13, 2011, requesting that NRC take emergency enforcement action against all nuclear reactor licensees that operate units that use the General Electric Mark I BWR design.  TVA uses this design at Browns Ferry Units 1, 2, and 3.  The petition requests NRC to take an enforcement action and requests NRC to take several actions, including the suspension of the operating licenses at the affected nuclear units, including Browns Ferry Units 1, 2, and 3, until several milestones have been met.