Asset Retirement Obligations Asset Retirement Obligations (Policies)
12 Months Ended
Sep. 30, 2018
Asset Retirement Obligation Disclosure [Abstract]  
Asset Retirement Obligations, Policy

Decommissioning Costs

TVA recognizes legal obligations associated with the future retirement of certain tangible long-lived assets.  These obligations relate to fossil fuel-fired generating plants, nuclear generating plants, hydroelectric generating plants/dams, transmission structures, and other property-related assets.  These other property-related assets include, but are not limited to, easements and coal rights.  Activities involved with retiring these assets could include decontamination and demolition of structures, removal and disposal of wastes, and site restoration.  Revisions to the estimates of asset retirement obligations ("AROs") are made whenever factors indicate that the timing or amounts of estimated cash flows have changed materially.  Any accretion or depreciation expense related to these liabilities and assets is charged to a regulatory asset.  See Note 7Nuclear Decommissioning Costs and Non-Nuclear Decommissioning Costs and Note 12.

To estimate its decommissioning obligation related to its nuclear generating stations, TVA uses a probability-weighted, discounted cash flow model which, on a unit-by-unit basis, considers multiple outcome scenarios that include significant estimations and assumptions. Those assumptions include (1) estimates of the cost of decommissioning, (2) the method of decommissioning and the timing of the related cash flows, (3) the license period of the nuclear plant, considering the probability of license extensions, (4) cost escalation factors, and (5) the credit adjusted risk free rate to measure the obligation at the present value of the future estimated costs. TVA has ascribed probabilities to two different decommissioning methods related to its nuclear decommissioning obligation estimate: the DECON method and the SAFSTOR method. The DECON method requires radioactive contamination to be removed from a site and safely disposed of or decontaminated to a level that permits the site to be released for unrestricted use shortly after it ceases operation. The SAFSTOR method allows nuclear facilities to be placed and maintained in a condition that allows the facilities to be safely stored and subsequently decontaminated to levels that permit release for unrestricted use.