Nye Veier AS has selected the Belgian contractor BESIX and Italian contractor
Rizzani in a joint venture to the concretization phase for the regulation,
design and construction of the new E6 Moelv-Roterud in the county Innlandet,
Norway. Multiconsult is set to deliver design and engineering services to the
new E6 road and the bridge crossing lake Mjøsa. AF Gruppen is sub-contractors
and Selberg Architects is the bridge architect.
The Moelv - Roterud section is about eleven kilometres and consists of a new
four-lane bridge crossing lake Mjøsa and over nine kilometres of road.
The proposed bridge concept consists of a superstructure where a significant
part of the construction made out of wood and will be a considerably lighter
construction than ordinary concrete structure. This is an innovative design and
concept, combining wood and concrete, never been built before. This is resulting
in a significantly lower greenhouse gas release compared to an ordinary concrete
structure. The contract has a budget NOK 2.55 billion.
The contract for the interaction phase is expected to be signed by the end of
August 2020, and the contract for the design and build phase is expected to be
signed at the end of 2021.
For further information, please contact:
Investor relations:
Pål-Sverre Jørgensen, Group Treasurer & Investor Relations Officer
Phone: +47 416 11 161
E-mail: ir@multiconsult.no
Media:
Gaute Christensen, VP Communications
Phone: +47 911 70 188
E-mail: gaute.christensen@multiconsult.no