Invitation to presentation of Scatec Solar ASA's second quarter results 2018




Oslo, July 6, 2018: Scatec Solar ASA will release its second quarter results on
Friday, July 20, 2018 at 07:00 (CET).

A presentation of the results will be held on the same day at 08:00. The
location of the presentation is Høyres Hus (6(th) floor), Stortingsgata
20, 0161 Oslo. The presentation and Q&A session can be followed through a live
webcast from our website on:
http://webtv.hegnar.no/presentation.php?webcastId=92016596

For more information, please contact:

Mikkel Tørud, CFO,           tel: +47 976 99 144
mikkel.torud@scatecsolar.com


About Scatec Solar
Scatec Solar is an integrated independent solar power producer, delivering
affordable, rapidly deployable and sustainable clean energy worldwide. A long-
term player, Scatec Solar develops, builds, owns, operates and maintains solar
power plants and has an installation track record of 1,000 MW. The company is
producing electricity from 322 MW of solar power plants in the Czech Republic,
South Africa, Rwanda, Honduras and Jordan and has 1,092 MW under construction.

With an established global presence and a significant project pipeline, the
company is targeting a capacity of 3.5 GW in operation and under construction by
end of 2021. Scatec Solar is headquartered in Oslo, Norway and listed on the
Oslo Stock Exchange under the ticker symbol 'SSO'. To learn more, visit
www.scatecsolar.com