CORRESP 1 filename1.htm sj2910correspeni

Eni S.p.A.
Sede legale in Roma
Piazzale Enrico Mattei 1, 00144 Roma
Tel. centralino: +39 06598.21
www.eni.com

Capitale sociale euro 4.005.358.876.00 I.v.
Registro Imprese di Roma
Codice fiscale 00484960588
Part. IVA 00905811006
R.E.A. Roma n. 756453

Sedi secondarie:
Via Emilia, 1 e Piazza Ezio Vanoni, 1
20097 San Donato Milanese (MI)

 
   

October 29, 2010

Alessandro Bernini

 

CHIEF FINANCIAL OFFICER

 
Direct Telephone

(+39)-02-52041730

 
Fax

(+39)-02-52041765

 

Prot. 46/10/CFO

United States Securities and Exchange Commission
100 F Street N.E., Stop 7010
Washington, D.C. 20549

Attention: Mr. H. Roger Schwall
  Assistant Director
  Division of Corporation Finance
     
  Re: Eni S.p.A.
    Form 20-F for Fiscal Year Ended December 31, 2009
    Filed April 26, 2010
    File No. 001-14090

Dear Mr. Schwall:
The information set forth below is submitted in response to your comments on the above referenced filings, as set forth in your letter dated September 28, 2010. The numbered paragraphs and headings correspond to the numbered paragraphs and headings of your letter.

 

Form 20-F for the Fiscal Year Ended December 31, 2009

Information on the Company, page 20

Exploration & Production, page 25

Disclosure of Reserves, page 25

- 1 -


  

1. We note the discussion on page 22 of your filing indicating that you entered into a contract in January 2010 to develop the Zubair oil field in Iraq. Based on disclosure on page 28 of your filing, we understand that you have reported reserves in connection with this project as of December 31, 2009. Please furnish to us a detailed explanation of the contractual arrangements that support your claim to proved reserves. Address the capital contractual arrangements that support your claim to proved reserves. Address the capital you will have at risk, the contractual oil price(s) and the cost recovery and profit apportionment of derived revenue. Please tell us if you will be allowed to apply production/revenues from other areas to your Zubair field cost recovery and profit balances. Also, explain how you considered the timing of the agreement in evaluating whether to report reserves in connection with this project as of December 31, 2009.

Response to Comment 1

We confirm that, starting from 2009, proved reserves associated with the development of the Zubair oil field are reported. Under the relevant Technical Service Contract, Eni and its partners are required to increase the production of the field from the current level of approximately 0.2 million barrel of oil per day to 1.2 million over a period of six years and maintain such level for a period of seven years thereafter. Capital expenditure and operating expenditure will be recovered out of part of the increased production. Recoverability is due to start in the fourth quarter of 2010 because actual production has already exceeded the contractual baseline by more than 10%. Profit oil, in the form of a remuneration fee of up to 2 $/bl applied on the increased production will be received after all costs have been recovered. Eni’s share of the maximum capital at risk – i.e. the maximum capital exposure taking into account ongoing cost recovery – is estimated to be 1 billion dollars according to management’s financial projections. The field "rehabilitation plan" contemplates an initial increase in production and is expected to allow deeper knowledge of the reservoir. A final "redevelopment plan" will be formulated, subject to approval by the Iraqi authorities, to achieve the aforesaid production target. The contract does not include a fixed level of oil price for the purpose of calculating cost oil and profit oil entitlements. Those entitlements will reflect prevailing export market conditions – accordingly, higher oil prices will reduce Eni’s cost and profit oil entitlement, and lower oil prices will increase such entitlement. No production or revenues from other fields can be claimed against Zubair recoverable cost or profit oil. The oil entitlement mechanism and the associated risk profile of the Contract as described above is similar to those applicable in Production Sharing Contracts, supporting our claim to proved reserves.

With regard to the timing of the agreement and the reporting of the proved reserves, we respectfully submit to the Staff that at the balance sheet date we had more than reasonable expectations that the legal right to produce the booked reserves would exist. Our conclusion was based on the fact that the terms of the agreement had been substantially agreed upon between the Consortium and the relevant Iraqi authorities in December 2009, and that the Iraqi Government informed the Consortium on December 31, 2009 that the authorization process had been finalized with the approval of the Iraqi Council of Ministers. Our expectations were confirmed 22 days later when the signing ceremony occurred.

Furthermore, we note that the volume of booked reserves represents less than 1% of our total proved reserves at December 31, 2009, and that they did not impact our net profit and cash flow statements for the year then ended.

 

Proved Undeveloped Reserves, page 29

2. We note your discussion of reserves that remain proved undeveloped for five or more years. Describe for us the specific field or projects involved. For each field or project, explain, in greater detail, the reason why the reserves remain undeveloped. Also, tell us the volume of reserves at issue, by field or project and in total. For further guidance, refer to Compliance and Disclosure Interpretation 131.03, which can be found at:

http://www.sec.gov/divisions/corpfin/guidance/oilandgas-interp.htm

- 2 -


  

Response to Comment 2

Reserves proved and undeveloped for five or more years amounted to 0.8 BBOE as of December 31, 2009, of which 0.6 BBOE referred to the Kashagan project in Kazakhstan where development activities are progressing and production start-up is targeted by the end of 2012. For more details regarding this project please refer to part 1 item 4 page 45 where it is fully disclosed how the project is progressing and a description of events that have historically led to a delay in development at that field. See also our discussion under the Risk Factors section about risks associated with oil&gas development projects on page 8.

The remaining amount of proved reserves that have remained undeveloped for five or more years are primarily related to gas fields located in Libya, amounting to 0.18 BBOE, where development completion and production start up is dependent upon a long-term gas supply agreement. Fulfillment of the contractual delivery quantities shall require phased production start up from the above fields, which are expected to be put in production over the next several years.

The residual amount of proved undeveloped reserves for five or more years is referred to several minor projects that are in the development phase.

 

Consolidated Financial Statements, page F-1

Summary of significant accounting policies, page F-13

3. We note your disclosure in which you state you accrue for losses related to construction contracts once you "become aware of such losses." Please confirm your accounting policy is consistent with the guidance in paragraph 36 of IAS 11 which requires you to recognize expected losses when they become probable.

Response to Comment 3

We confirm that our accounting policy is consistent with the guidance in paragraph 36 of IAS 11; therefore losses related to construction contracts are recognized immediately as an expense when it is probable that total contract costs will exceed total contract revenues. However, in light of the Staff’s comment, in our future filings we plan to clarify the point. An example of proposed disclosure follows (changes highlighted in bold):

"Current assets

Contract work in progress is measured using the cost-to-cost method whereby contract revenue is recognized based on the stage of completion as determined by the cost incurred. Advances are deducted from inventories within the limits of contractual considerations; any excess of such advances over the value of the inventories is recorded as a liability. Losses related to construction contracts are accrued for once the company becomes aware of such losses recognized immediately as an expense when it is probable that total contract costs will exceed total contract revenues. Contract work in progress not yet invoiced, whose payment will be made in a foreign currency, is translated to euro using the current exchange rates at year end and the effect of rate changes is reflected in the profit and loss account.
…"

 

Notes to Consolidated Financial Statements, page F-28

Non-current assets, page F-33

Note 8 – Property plant and equipment, page F-33

4. We note that you disclose, here and under Note 10 – Intangible assets, a post-tax discount rate used to determine value in use for purposes of evaluating impairment. Given the guidance provided in IAS 36, paragraph 55 that the discount rate shall be a pre-tax rate please explain to us the specific reasons you believe use of a post-tax discount rate is appropriate, and in compliance with the accounting guidance provided in IAS 36.

- 3 -


  

Response to Comment 4

Although IAS 36, paragraph 55, specifically requires the use of a pre-tax discount rate to determine value-in-use for purposes of evaluating the impairment of assets, paragraph 57 recognizes that asset-specific discount rates may not be directly available from the market. Our experience shows that pre-tax discount rates are not directly available from the market for our asset portfolio and, as a result, we utilize an impairment model in which value-in-use is determined by applying a post-tax discount rate to post-tax cash flows. Discounting post-tax cash flows at a post-tax discount rate yields the same result as discounting pre-tax cash flows at a pre-tax discount rate, as long as the pre-tax discount rate is the post-tax rate adjusted to reflect the specific amount and timing of the future tax cash flows.

The impairment model we utilize takes into consideration the specific amount and timing of future tax cash flows; consequently, the model results in an impairment assessment that is substantially equal to an assessment based on a pre-tax discount rate and pre-tax cash flow, as we have disclosed in Notes 8 and 10.

 

Note 11 – Investments, page F-41

5. We note on page F-44 you present summarized financial data about the investments you account for under the equity method. Please clarify the accounting standards for which the financial information has been prepared and whether the presentation is of only your percentage interest in the investments.

Response to Comment 5

As disclosed on page F-44, "Other information about investments" is presented "net to Eni" and therefore they reflect Eni’s interest in the investments.
The above mentioned summarized financial data are prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board (IASB).

In response to the Staff’s comment, in our future filings we plan to clarify the point. An example of proposed disclosure follows (changes highlighted in bold):

"Other information about investments
The following table summarizes key financial data of unconsolidated entities controlled by Eni, joint ventures and associates, prepared in accordance with the accounting policies adopted in the preparation of Eni’s consolidated financial statements and reflecting net to Eni’s interest in such entities, as disclosed in their latest available financial statements: of unconsolidated entities controlled by Eni, joint ventures and associates:

 

Supplemental Oil and Gas Information, page F-114

6. We note that you have disclosed results of operations from oil and gas producing activities, as required by ASC paragraph 932-235-50-23, for your consolidated subsidiaries, your joint ventures and affiliates, and on combined basis. ASC paragraph 932-235-50-28 indicates that presentation on a combined basis is allowable only for the amounts disclosed under ASC paragraph 932-235-50-23; other amounts shall not be combined. Revise your presentation to remove combined totals mot allowed by ASC paragraph 932-235-50-28.

Response to Comment 6

We acknowledge the Staff comment and we will remove the combined amounts in accordance with ASC paragraph 932-235-50-28 in our future filings.

- 4 -


  

7. We note that you have identified third party engineering firms as having audited a portion of your reserve estimates that you have disclosed and note that you have attached the reports from these engineers as an exhibit to your filing. However, these reports to do not comply in entirety with Item 1202(a)(8) of Regulation S-K. We expect that you will need to discuss the following points with your third party engineering firms, and obtain and file reports that comply with the aforementioned guidance.

Please quantify by geographic location the actual average oil, NGL and natural gas prices used in computing reserves as this is a key assumption.

Within both of the reports the third party engineering firms state that the reserves were estimated using generally accepted geological and petroleum engineering and evaluation principles and methods. While we understand that there are fundamentals of physics, mathematics and economics that are applied in the estimation of reserves, we are not aware of an official industry compilation of such generally accepted petroleum engineering and evaluation principles. With a view toward possible disclosure, please explain to us the basis for concluding that such principles have been sufficiently established so as to judge that the reserve information has been prepared in conformity with such principles.

Within Ryder Scott Company’s report they state that the report "was prepared for the exclusive use and sole benefit of Eni S.p.A. and may not be put to other uses without our prior written consent for such use." Please obtain and file revised version of this report which retains no language that could suggest either a limited audience or a limit on potential investor reliance.

Please include a statement indicating that the assumption, data, methods and procedures used are appropriate for the purpose served by the respective report.

With respect to the DeGolyer and MacNaughton report, please disclose the date on which the report was completed.

With respect to the Ryder Scott Company report, please include as statement that they used all methods and procedures it considered necessary under the circumstances to prepare the report.

Response to Comment 7

We have obtained new reports from the third party engineering firms and we believe that those new reports fully comply with Item 1202(a)(8) of Regulation S-K.
However, we believe that information on prices that the Staff has required in the first bullet point (actual average oil, NGL and natural gas prices by geographic location), cannot be provided without disclosing commercially sensitive data, since the third party engineering firms evaluated only part of the reserves located in a given geographic area, and therefore in some areas the average price approximates the actual applicable contractual price, which is confidential information. Accordingly, the revised reports, which are enclosed as an attachment to this response letter, incorporate all the Staff’s comments with the exception of information on prices.

We plan to file such revised reports under cover of a Form 6-K.

***

- 5 -


  

In some of our responses, we have agreed to change or supplement the disclosures in our future filings. We are doing that in the spirit of cooperation with the Staff and not because we believe our prior filing is deficient or inaccurate. Accordingly, any changes implemented in future filings should not be taken as an admission that prior disclosures were in any way deficient. In light of the nature of the changes in disclosure, we believe that it will not be necessary to file an amendment to the 2009 Form 20-F.

We are available to discuss the foregoing with you at your convenience.

If you have any questions relating to this letter, please feel free to call the undersigned at +39-02-520-41730.

Eni acknowledges that it is responsible for the adequacy and accuracy of the disclosure in its Form 20-F, that Staff comments or changes to disclosure in response to Staff comments do not foreclose the Commission from taking any action with respect to its Form 20-F, and that Eni may not assert Staff comments as a defense in any proceeding initiated by the Commission or any person under the federal securities laws of the United States.

  Very truly yours,
   
  /s/ ALESSANDRO BERNINI
  Alessandro Bernini
  Title: Chief Financial Officer

 

 

 

 

 

- 6 -


  Attachment

Reports of independent engineering firms

 

DEGOLYER AND MACNAUGHTON
5001 Spring Valley Road
Suite 800 East
Dallas, Texas 75244

February 26, 2010

Eni S.p.A.
E&P Division
Ms. Manuela Feudaroli
Vice President, Reserves
Via Emilia 1
20097 San Donato Milanese
Milano, Italy

Dear Ms. Feudaroli:

Pursuant to your request, we have conducted an independent evaluation, on the date of this letter report, to serve as a reserves audit of the net proved crude oil, natural gas liquids (NGL), and natural gas reserves, as of December 31, 2009, of certain properties in Europe, North Africa, and West Africa owned by Eni S.p.A. (Eni). Eni has represented that these properties account for 21 percent, on a net equivalent barrel basis, of Eni’s net proved reserves as of December 31, 2009, and that Eni’s net proved reserves estimates have been prepared in accordance with the reserves definitions of Rules 4–10(a) (1)–(32) of Regulation S–X of the Securities and Exchange Commission (SEC) of the United States. We have reviewed information provided to us by Eni that it represents to be Eni’s estimates of the net reserves, as of December 31, 2009, for the same properties as those which we have independently evaluated.

Reserves included herein are expressed as net reserves as represented by Eni. Gross reserves are defined as the total estimated petroleum to be produced from these properties after December 31, 2009. Net reserves are defined as that portion of the gross reserves attributable to the interests owned by Eni after deducting interests owned by others.

Estimates of oil, NGL, and natural gas should be regarded only as estimates that may change as further production history and additional information become available. Not only are such reserves estimates based on that information which is

- 7 -


  

2

DEGOLYER AND MACNAUGHTON

currently available, but such estimates are also subject to the uncertainties inherent in the application of judgmental factors in interpreting such information.

Data used in this audit were obtained from reviews with Eni personnel, Eni files, from records on file with the appropriate regulatory agencies, and from public sources. In the preparation of this report we have relied, without independent verification, upon such information furnished by Eni with respect to property interests, production from such properties, current costs of operation and development, current prices for production, agreements relating to current and future operations and sale of production, and various other information and data that were accepted as represented. A field examination of the properties was not considered necessary for the purposes of this report.

Methodology and Procedures

Our estimates of reserves were prepared by the use of standard geological and engineering methods generally accepted by the petroleum industry as presented in the publication of the Society of Petroleum Engineers entitled "Standards Pertaining to the Estimating and Auditing of Oil and Gas Reserves Information (Revision as of February 19, 2007)." The method or combination of methods used in the analysis of each reservoir was tempered by experience with similar reservoirs, stage of development, quality and completeness of basic data, and production history.

When applicable, the volumetric method was used to estimate the original oil in place (OOIP) and the original gas in place (OGIP). Structure and isopach maps were constructed to estimate reservoir volume. Electrical logs, radioactivity logs, core analyses, and other available data were used to prepare these maps as well as to estimate representative values for porosity and water saturation. When adequate data were available and when circumstances justified, material balance and other engineering methods were used to estimate OOIP or OGIP.

Estimates of ultimate recovery were obtained after applying recovery factors to OOIP or OGIP. These recovery factors were based on consideration of the type of energy inherent in the reservoirs, analyses of the petroleum, the structural positions of the properties, and the production histories. When applicable, material balance and other engineering methods were used to estimate recovery factors. An analysis

- 8 -


  

3

DEGOLYER AND MACNAUGHTON

of reservoir performance, including production rate, reservoir pressure, and gas-oil ratio behavior, was used in the estimation of reserves.

For depletion-type reservoirs or those whose performance disclosed a reliable decline in producing-rate trends or other diagnostic characteristics, reserves were estimated by the application of appropriate decline curves or other performance relationships. In the analyses of production-decline curves, reserves were estimated only to the limits of economic production or to the limit of production licenses as appropriate.

Definition of Reserves

Petroleum reserves included in this report are classified as proved. Reserves classifications used for our estimates of proved reserves are in accordance with the reserves definitions of Rules 4–10(a) (1)–(32) of Regulation S–X of the SEC. Eni has represented that its estimates of proved reserves are in accordance with the reserves definitions of Rules 4–10(a) (1)–(32) of Regulation S–X of the SEC. Reserves are judged to be economically producible in future years from known reservoirs under existing economic and operating conditions and assuming continuation of current regulatory practices using conventional production methods and equipment. In the analyses of production-decline curves, reserves were estimated only to the limit of economic rates of production under existing economic and operating conditions using prices and costs consistent with the effective date of this report, including consideration of changes in existing prices provided only by contractual arrangements but not including escalations based upon future conditions. The petroleum reserves are classified as follows:

Proved oil and gas reserves – Proved oil and gas reserves are those quantities of oil and gas, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible—from a given date forward, from known reservoirs, and under existing economic conditions, operating methods, and government regulations—prior to the time at which contracts providing the right to operate expire, unless evidence indicates that renewal is reasonably certain, regardless of whether deterministic or probabilistic methods are used for the estimation. The project to extract the hydrocarbons must have commenced or the

- 9 -


  

4

DEGOLYER AND MACNAUGHTON

operator must be reasonably certain that it will commence the project within a reasonable time.

(i) The area of the reservoir considered as proved includes:
(A) The area identified by drilling and limited by fluid contacts, if any, and (B) Adjacent undrilled portions of the reservoir that can, with reasonable certainty, be judged to be continuous with it and to contain economically producible oil or gas on the basis of available geoscience and engineering data.

(ii) In the absence of data on fluid contacts, proved quantities in a reservoir are limited by the lowest known hydrocarbons (LKH) as seen in a well penetration unless geoscience, engineering, or performance data and reliable technology establishes a lower contact with reasonable certainty.

(iii) Where direct observation from well penetrations has defined a highest known oil (HKO) elevation and the potential exists for an associated gas cap, proved oil reserves may be assigned in the structurally higher portions of the reservoir only if geoscience, engineering, or performance data and reliable technology establish the higher contact with reasonable certainty.

(iv) Reserves which can be produced economically through application of improved recovery techniques (including, but not limited to, fluid injection) are included in the proved classification when:
(A) Successful testing by a pilot project in an area of the reservoir with properties no more favorable than in the reservoir as a whole, the operation of an installed program in the reservoir or an analogous reservoir, or other evidence using reliable technology establishes the reasonable certainty of the engineering analysis on which the project or program was based; and (B) The project has been approved for development by all necessary parties and entities, including governmental entities.

- 10 -


  

5

DEGOLYER AND MACNAUGHTON

(v) Existing economic conditions include prices and costs at which economic producibility from a reservoir is to be determined. The price shall be the average price during the 12-month period prior to the ending date of the period covered by the report, determined as an unweighted arithmetic average of the first-day-of-the-month price for each month within such period, unless prices are defined by contractual arrangements, excluding escalations based upon future conditions.

Developed oil and gas reserves – Developed oil and gas reserves are reserves of any category that can be expected to be recovered:

(i) Through existing wells with existing equipment and operating methods or in which the cost of the required equipment is relatively minor compared to the cost of a new well; and

(ii) Through installed extraction equipment and infrastructure operational at the time of the reserves estimate if the extraction is by means not involving a well.

Undeveloped oil and gas reserves – Undeveloped oil and gas reserves are reserves of any category that are expected to be recovered from new wells on undrilled acreage, or from existing wells where a relatively major expenditure is required for recompletion.

(i) Reserves on undrilled acreage shall be limited to those directly offsetting development spacing areas that are reasonably certain of production when drilled, unless evidence using reliable technology exists that establishes reasonable certainty of economic producibility at greater distances.

(ii) Undrilled locations can be classified as having undeveloped reserves only if a development plan has been adopted indicating that they are scheduled to be drilled within five years, unless the specific circumstances justify a longer time.

(iii) Under no circumstances shall estimates for undeveloped reserves be attributable to any acreage for which an application of fluid injection or other improved recovery

- 11 -


  

6

DEGOLYER AND MACNAUGHTON

technique is contemplated, unless such techniques have been proved effective by actual projects in the same reservoir or an analogous reservoir, as defined in [section 210.4–10 (a) Definitions], or by other evidence using reliable technology establishing reasonable certainty.

Primary Economic Assumptions

The following economic assumptions were used for estimating existing and future prices and costs:

Oil and NGL Prices

Eni has represented that the oil and NGL prices were based on a 12-month average price (reference price), calculated as the unweighted arithmetic average of the first-day-of-the-month price for each month within the 12-month period prior to the end of the reporting period, unless prices are defined by contractual arrangements. A dated Brent oil price of U.S.$59.91 per barrel was the resulting reference price. Eni supplied appropriate differentials by field to the relevant reference prices and the prices were held constant thereafter.

Natural Gas Prices

Eni has represented that the natural gas prices were based on a reference price, calculated as the unweighted arithmetic average of the first-day-of-the-month price for each month within the 12-month period prior to the end of the reporting period, unless prices are defined by contractual arrangements. A significant quantity of the gas sold by Eni is subject to contract prices, and the range of such prices is varied. Where appropriate, Eni supplied appropriate differentials by field to the relevant reference prices and the prices were held constant thereafter.

- 12 -


  

7

DEGOLYER AND MACNAUGHTON

Operating Expenses and Capital Costs

Operating expenses and capital costs, based on information provided by Eni, were used in estimating future costs required to operate the properties. In certain cases, future costs, either higher or lower than existing costs, may have been used because of anticipated changes in operating conditions. These costs were not escalated for inflation.

While the oil and gas industry may be subject to regulatory changes from time to time that could affect an industry participant’s ability to recover its oil and gas reserves, we are not aware of any such governmental actions which would restrict the recovery of the December 31, 2009, estimated oil and gas volumes. The reserves estimated in this report can be produced under current regulatory guidelines.

Eni has represented that its estimated net proved reserves attributable to the reviewed properties in Europe, North Africa, and West Africa are based on the definitions of proved reserves of the SEC. Eni represents that its estimates of the net proved reserves attributable to these properties, which represent 21 percent of Eni’s reserves on a net equivalent basis, are as follows, expressed in millions of barrels (MMbbl), billions of cubic feet (Bcf), and millions of barrels of oil equivalent (MMboe):

   

Estimated by Eni
Net Proved Reserves as of
December 31, 2009

   
   

Oil and
NGL
(MMbbl)

 

Natural
Gas
(Bcf)

 

Oil
Equivalent
(MMboe)

   
 
 
Properties reviewed by DeGolyer and MacNaughton            
Total Proved  

952

 

2,470

 

1,383

             
Note: Gas is converted to oil equivalent using a factor of 5,742 cubic feet of gas per 1 barrel of oil equivalent.

In comparing the detailed net proved reserves estimates prepared by us and by Eni, we have found differences, both positive and negative. It is our opinion that the net proved reserves estimates prepared by Eni on the properties reviewed by us and referred to above, when compared on the basis of net equivalent barrels, in aggregate, do not differ materially from those prepared by us, with tolerance of 5 percent or less.

- 13 -


  

8

DEGOLYER AND MACNAUGHTON

DeGolyer and MacNaughton is an independent petroleum engineering consulting firm that has been providing petroleum consulting services throughout the world for over 70 years. DeGolyer and MacNaughton does not have any financial interest, including stock ownership, in Eni. Our fees were not contingent on the results of our evaluation. This letter report has been prepared at the request of Eni. DeGolyer and MacNaughton has used all assumptions, data, procedures, and methods that it considers necessary and appropriate to prepare this report.

 

  Submitted,
   
  /s/ DEGOLYER AND MACNAUGHTON
   
  DeGOLYER and MacNAUGHTON
  Texas Registered Engineering Firm F-716

 

 

 

 

  /s/ LLOYD W. CADE, P.E.
   
  Lloyd W. Cade, P.E.

[SEAL]

Senior Vice President
  DeGolyer and MacNaughton

 

- 14 -


  

DEGOLYER AND MACNAUGHTON

 

CERTIFICATE of QUALIFICATION

I, Lloyd W. Cade Petroleum Engineer with DeGolyer and MacNaughton, 5001 Spring Valley Road, Suite 800 East, Dallas, Texas, 75244 U.S.A., hereby certify:

1. That I am a Senior Vice President with DeGolyer and MacNaughton, which company did prepare the letter report addressed to Eni dated February 26, 2010, and that I, as Senior Vice President, was responsible for the preparation of this report.

2. That I attended Kansas State University, and that I graduated with a Bachelor of Science degree in Mechanical Engineering in the year 1982; that I am a Registered Professional Engineer in the State of Texas; that I am a member of the International Society of Petroleum Engineers; and that I have approximately twenty-seven (27) years of experience in oil and gas reservoir studies and reserves evaluations.

SIGNED: February 26, 2010

 

 

 

  /s/ LLOYD W. CADE, P.E.
   
  Lloyd W. Cade, P.E.

[SEAL]

Senior Vice President
  DeGolyer and MacNaughton

- 15 -


  

 

 

Eni S.p.A.

 

 

 

 

Estimated

Future Reserves and Income

Attributable to Certain

Leasehold and Royalty Interests

 

 

 

SEC Parameters

 

 

 

As of

December 31, 2009

- 16 -


  

 

 

 

February 23, 2010

 

Eni S.p.A.
E&P Division
Ms. Manuela Feudaroli
Vice President Reserves
Via Emilia 1
20097 San Donato Milanese
Milano, Italy

Dear Ms. Feudaroli:

At the request of Eni S.p.A. (Eni), Ryder Scott Company (Ryder Scott) has conducted a reserves audit of the estimates of the proved reserves as prepared by Eni’s engineering and geological staff based on the definitions and disclosure guidelines of the United States Securities and Exchange Commission (SEC) contained in Title 17, Code of Federal Regulations, Modernization of Oil and Gas Reporting, Final Rule released January 14, 2009 in the Federal Register (SEC regulations). Our third party reserves audit, completed on January 25, 2010 and presented herein, was prepared for public disclosure by Eni in filings made with the SEC in accordance with the disclosure requirements set forth in the SEC regulations. Eni has indicated that the proved net reserves attributable to the properties that we reviewed account for 6.5 percent of their total proved net remaining hydrocarbon reserves. The subject properties are located in the following geographic locations:

  • North Africa

  • North America

  • South America and Caribbean

As prescribed by the Society of Petroleum Engineers in Paragraph 2.2(f) of the Standards Pertaining to the Estimating and Auditing of Oil and Gas Reserves Information (SPE auditing standards), a reserves audit is defined as "the process of reviewing certain of the pertinent facts interpreted and assumptions made that have resulted in an estimate of reserves prepared by others and the rendering of an opinion about (1) the appropriateness of the methodologies employed; (2) the adequacy and quality of the data relied upon; (3) the depth and thoroughness of the reserves estimation process; (4) the classification of reserves appropriate to the relevant definitions used; and (5) the reasonableness of the estimated reserve quantities."

Based on our review, including the data, technical processes and interpretations presented by Eni, it is our opinion that the overall procedures and methodologies utilized by Eni in preparing their estimates of the proved reserves as of December 31, 2009 comply with the current SEC regulations and that the overall proved reserves for the reviewed properties as estimated by Eni are, in the aggregate, reasonable within 5 percent of Ryder Scott’s estimates which is less than the established audit tolerance guidelines of 10 percent as set forth in the SPE auditing standards.

The conclusions discussed in this report, as of December 31, 2009, are related to hydrocarbon prices. The hydrocarbon prices used in the preparation of this report are based on the average prices during the 12-month period prior to the ending date of the period covered in this report, determined as the unweighted arithmetic averages of the prices in effect on the first-day-of-the-month for each month

- 17 -


  

Eni S.p.A.
February 23, 2010
Page 2

within such period, unless prices were defined by contractual arrangements, as required by the SEC regulations. Actual future prices may vary significantly from the prices required by SEC regulations; therefore, volumes of reserves actually recovered may differ significantly from the estimated quantities audited by Ryder Scott.

Reserves Included in This Report

The proved reserves included herein conform to the definition as set forth in the Securities and Exchange Commission’s Regulations Part 210.4-10(a). An abridged version of the SEC reserves definitions from 210.4-10(a) entitled "Petroleum Reserves Definitions" is included as an attachment to this report. The various proved reserve status categories are defined under the attachment entitled "Petroleum Reserves Definitions" in this report.

No attempt was made to quantify or otherwise account for any accumulated gas production imbalances that may exist. The audited proved gas volumes included gas consumed in operations as reserves. Non-hydrocarbon or inert gas volumes have been excluded from the reserves reported herein.

Reserves are those estimated remaining quantities of petroleum that are anticipated to be economically producible, as of a given date, from known accumulations under defined conditions. All reserve estimates involve an assessment of the uncertainty relating the likelihood that the actual remaining quantities recovered will be greater or less than the estimated quantities determined as of the date the estimate is made. The uncertainty depends chiefly on the amount of reliable geologic and engineering data available at the time of the estimate and the interpretation of these data. The relative degree of uncertainty may be conveyed by placing reserves into one of two principal classifications, either proved or unproved. Unproved reserves are less certain to be recovered than proved reserves, and may be further sub-classified as probable and possible reserves to denote progressively increasing uncertainty in their recoverability. At Eni’s request, this report addresses only the proved reserves attributable to the properties evaluated herein.

Proved oil and gas reserves are those quantities of oil and gas which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible from a given date forward. The proved reserves included herein were estimated using deterministic methods. If deterministic methods are used, the SEC has defined reasonable certainty for proved reserves as a "high degree of confidence that the quantities will be recovered."

Proved reserve estimates will generally be revised only as additional geologic or engineering data become available or as economic conditions change. For proved reserves, the SEC states that "as changes due to increased availability of geoscience (geological, geophysical, and geochemical), engineering, and economic data are made to the estimated ultimate recovery (EUR) with time, reasonably certain EUR is much more likely to increase or remain constant than to decrease." Moreover, estimates of proved reserves may be revised as a result of future operations, effects of regulation by governmental agencies or geopolitical or economic risks. Therefore, the proved reserves included in this report are estimates only and should not be construed as being exact quantities, and if recovered, the revenues therefrom, and the actual costs related thereto, could be more or less than the estimated amounts.

The proved reserves reported herein are limited to the period prior to expiration of current contracts providing the legal rights to produce, or a revenue interest in such production, unless evidence indicates that contract renewal is reasonably certain. Furthermore, properties in the different countries may be subjected to significantly varying contractual fiscal terms that affect the net revenue to Eni for the production of these volumes. The prices and economic return received for these net

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 18 -


  

Eni S.p.A.
February 23, 2010
Page 3

volumes can vary significantly based on the terms of these contracts. Therefore, when applicable, Ryder Scott reviewed the fiscal terms of such contracts and discussed with Eni the net economic benefit attributed to such operations for the determination of the net hydrocarbon volumes and income thereof. Ryder Scott has not conducted an exhaustive audit or verification of such contractual information. Neither our review of such contractual information nor our acceptance of Eni’s representations regarding such contractual information should be construed as a legal opinion on this matter.

Ryder Scott did not evaluate the country and geopolitical risks in the countries where Eni operates or has interests. Eni’s operations may be subject to various levels of governmental controls and regulations. These controls and regulations may include, but may not be limited to, matters relating to land tenure and leasing, the legal rights to produce hydrocarbons including the granting, extension or termination of production sharing contracts, the fiscal terms of various production sharing contracts, drilling and production practices, environmental protection, marketing and pricing policies, royalties, various taxes and levies including income tax, and foreign trade and investment and are subject to change from time to time. Such changes in governmental regulations and policies may cause volumes of proved reserves actually recovered and amounts of proved income actually received to differ significantly from the estimated quantities.

The estimates of proved reserves audited herein were based upon a detailed study of the properties in which Eni owns an interest; however, we have not made any field examination of the properties. No consideration was given in this report to potential environmental liabilities that may exist nor were any costs included for potential liabilities to restore and clean up damages, if any, caused by past operating practices.

Audit Data, Methodology, Procedure and Assumptions

The estimation of reserves involves two distinct determinations. The first determination results in the estimation of the quantities of recoverable oil and gas and the second determination results in the estimation of the uncertainty associated with those estimated quantities in accordance with the definitions set forth by the Securities and Exchange Commission’s Regulations Part 210.4-10(a). The process of estimating the quantities of recoverable oil and gas reserves relies on the use of certain generally accepted analytical procedures. These analytical procedures fall into three broad categories or methods: (1) performance-based methods; (2) volumetric-based methods; and (3) analogy. These methods may be used singularly or in combination by the reserve evaluator in the process of estimating the quantities of reserves. Reserve evaluators must select the method or combination of methods which in their professional judgment is most appropriate given the nature and amount of reliable geoscience and engineering data available at the time of the estimate, the established or anticipated performance characteristics of the reservoir being evaluated and the stage of development or producing maturity of the property.

In many cases, the analysis of the available geoscience and engineering data and the subsequent interpretation of this data may indicate a range of possible outcomes in an estimate, irrespective of the method selected by the evaluator. When a range in the quantity of reserves is identified, the evaluator must determine the uncertainty associated with the incremental quantities of the reserves. If the reserve quantities are estimated using the deterministic incremental approach, the uncertainty for each discrete incremental quantity of the reserves is addressed by the reserve category assigned by the evaluator. Therefore, it is the categorization of reserve quantities as proved, probable and/or possible that addresses the inherent uncertainty in the estimated quantities reported. For proved reserves, uncertainty is defined by the SEC as reasonable certainty wherein the "quantities actually recovered are much more likely than not to be achieved." The SEC states that "probable reserves are those additional reserves that are less certain to be recovered than proved reserves but

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 19 -


  

Eni S.p.A.
February 23, 2010
Page 4

which, together with proved reserves, are as likely as not to be recovered." The SEC states that "possible reserves are those additional reserves that are less certain to be recovered than probable reserves and the total quantities ultimately recovered from a project have a low probability of exceeding proved plus probable plus possible reserves." All quantities of reserves within the same reserve category must meet the SEC definitions as noted above.

Estimates of reserves quantities and their associated reserve categories may be revised in the future as additional geoscience or engineering data become available. Furthermore, estimates of reserves quantities and their associated reserve categories may also be revised due to other factors such as changes in economic conditions, results of future operations, effects of regulation by governmental agencies or geopolitical or economic risks as previously noted herein.

The proved reserves for the properties included herein were estimated by performance methods, analogy methods, the volumetric method, or a combination of performance and volumetric methods. These performance methods include, but may not be limited to, decline curve analysis and analogy which utilized extrapolations of historical production and pressure data available through December, 2009 in those cases where such data were considered to be definitive. The data utilized in this analysis were supplied to Ryder Scott by Eni and were considered sufficient for the purpose thereof. The volumetric method was used where there were inadequate historical performance data to establish a definitive trend and where the use of production performance data as a basis for the reserve estimates was considered to be inappropriate. The volumetric analysis utilized pertinent well and seismic data supplied to Ryder Scott by Eni that were available through December, 2009. The data utilized from the well and seismic data incorporated into our volumetric analysis were considered sufficient for the purpose thereof.

To estimate economically recoverable proved oil and gas reserves and related future net cash flows, we consider many factors and assumptions including, but not limited to, the use of reservoir parameters derived from geological, geophysical and engineering data that cannot be measured directly, economic criteria based on current costs and SEC pricing requirements, and forecasts of future production rates. Under the SEC regulations 210.4-10(a)(22)(v) and (26), proved reserves must be anticipated to be economically producible from a given date forward based on existing economic conditions including the prices and costs at which economic producibility from a reservoir is to be determined. While it may reasonably be anticipated that the future prices received for the sale of production and the operating costs and other costs relating to such production may increase or decrease from those under existing economic conditions, such changes were, in accordance with rules adopted by the SEC, omitted from consideration in making this evaluation.

Eni has informed us that they have furnished us all of the material accounts, records, geological and engineering data, and reports and other data required for this investigation. In preparing our forecast of future proved production and income, we have relied upon data furnished by Eni with respect to property interests owned, production and well tests from examined wells, normal direct costs of operating the wells or leases, other costs such as transportation and/or processing fees, ad valorem and production taxes, recompletion and development costs, abandonment costs after salvage, product prices based on the SEC regulations, adjustments or differentials to product prices, geological structural and isochore maps, well logs, core analyses, and pressure measurements. Ryder Scott reviewed such factual data for its reasonableness; however, we have not conducted an independent verification of the data furnished by Eni. We consider the factual data used in this report appropriate and sufficient for the purpose of our investigations.

In summary, we consider the assumptions, data, methods and analytical procedures used in this report appropriate for the purpose hereof, and we have used all such methods and procedures that we consider necessary and appropriate to conduct the audit of reserves of the properties described

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 20 -


  

Eni S.p.A.
February 23, 2010
Page 5

herein. The proved reserves discussed herein were determined in conformance with the United States Securities and Exchange Commission (SEC) Modernization of Oil and Gas Reporting; Final Rule, including all references to Regulation S-X and Regulation S-K, referred to herein collectively as the "SEC Regulations." In our opinion, the proved reserves reviewed in this report comply with the definitions, guidelines and disclosure requirements as required by the SEC regulations.

Future Production Rates

For wells currently on production, our forecasts of future production rates are based on historical performance data. If no production decline trend has been established, future production rates were held constant, or adjusted for the effects of curtailment where appropriate, until a decline in ability to produce was anticipated. An estimated rate of decline was then applied to depletion of the reserves. If a decline trend has been established, this trend was used as the basis for estimating future production rates.

Test data and other related information were used to estimate the anticipated initial production rates for those wells or locations that are not currently producing. For reserves not yet on production, sales were estimated to commence at an anticipated date furnished by Eni. Wells or locations that are not currently producing may start producing earlier or later than anticipated in our estimates due to unforeseen factors causing a change in the timing to initiate production. Such factors may include delays due to weather, the availability of rigs, the sequence of drilling, completing and/or recompleting wells and/or constraints set by regulatory bodies.

The future production rates from wells currently on production or wells or locations that are not currently producing may be more or less than estimated because of changes including, but not limited to, reservoir performance, operating conditions related to surface facilities, compression and artificial lift, pipeline capacity and/or operating conditions, producing market demand and/or allowables or other constraints set by regulatory bodies.

Hydrocarbon Prices

The hydrocarbon prices used herein are based on SEC price parameters using the average prices during the 12-month period prior to the ending date of the period covered in this report, determined as the unweighted arithmetic averages of the prices in effect on the first-day-of-the-month for each month within such period, unless prices were defined by contractual arrangements. For hydrocarbon products sold under contract, the contract prices, including fixed and determinable escalations, exclusive of inflation adjustments, were used until expiration of the contract. Upon contract expiration, the prices were adjusted to the 12-month unweighted arithmetic average as previously described.

Eni furnished us with the above mentioned average prices in effect on December 31, 2009. These initial SEC hydrocarbon prices were determined using the 12-month average first-day-of-the-month benchmark prices appropriate to the geographic area where the hydrocarbons are sold. In certain geographic areas, the price reference and benchmark prices may be defined by contractual arrangements. The average Dated Brent of $59.908/Bbl and WTI of $61.138 average oil prices were used by Eni. Eni also indicated that they provided us with the gas prices outside the United States of America based on their gas sales agreements. Gas prices in the United States of America were referenced back to the Henry Hub unweighted average of $3.871/MMBTU.

The product prices that were actually used to determine the future gross revenue for each property reflect adjustments to the benchmark prices for gravity, quality, local conditions and/or distance from market, referred to herein as "differentials." The differentials used in the preparation of

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 21 -


  

Eni S.p.A.
February 23, 2010
Page 6

this report were furnished to us by Eni. The differentials furnished to us were accepted as factual data and reviewed by us for their reasonableness; however, we have not conducted an independent verification of the data used by Eni to determine these differentials.

Costs

Operating costs used in our evaluation were based on the operating expense reports of Eni and include only those costs directly applicable to the evaluated assets. The operating costs include a portion of general and administrative costs allocated directly to the leases and wells. The operating costs furnished to us were accepted as factual data and reviewed by us for their reasonableness; however, we have not conducted an independent verification of the operating cost data used by Eni. No deduction was made for loan repayments, interest expenses, or exploration and development prepayments that were not charged directly to the assets.

Development costs were furnished to us by Eni and are based on authorizations for expenditure for the proposed work or actual costs for similar projects. The development costs furnished to us were accepted as factual data and reviewed by us for their reasonableness; however, we have not conducted an independent verification of these costs. The estimated net cost of abandonment after salvage was included for properties where abandonment costs net of salvage were significant. The estimates of the net abandonment costs furnished by Eni were accepted without independent verification.

The proved developed and undeveloped reserves in this report have been incorporated herein in accordance with Eni’s plans to develop these reserves as of December 31, 2009. The implementation of Eni’s development plans as presented to us and incorporated herein is subject to the approval process adopted by Eni’s management. As the result of our inquires during the course of preparing this report, Eni has informed us that the development activities included herein have been subjected to and received the internal approvals required by Eni’s management at the appropriate local, regional and/or corporate level. In addition to the internal approvals as noted, certain development activities may still be subject to specific partner AFE processes, Joint Operating Agreement (JOA) requirements or other administrative approvals external to Eni. Additionally, Eni has informed us that they are not aware of any legal, regulatory, political or economic obstacles that would significantly alter their plans.

Current costs used by Eni were held constant throughout the life of the properties.

Standards of Independence and Professional Qualification

Ryder Scott is an independent petroleum engineering consulting firm that has been providing petroleum consulting services throughout the world for over seventy years. Ryder Scott is employee-owned and maintains offices in Houston, Texas; Denver, Colorado; and Calgary, Alberta, Canada. We have over eighty engineers and geoscientists on our permanent staff. By virtue of the size of our firm and the large number of clients for which we provide services, no single client or job represents a material portion of our annual revenue. We do not serve as officers or directors of any publicly-traded oil and gas company and are separate and independent from the operating and investment decision-making process of our clients. This allows us to bring the highest level of independence and objectivity to each engagement for our services.

Ryder Scott actively participates in industry-related professional societies and organizes an annual public forum focused on the subject of reserves evaluations and SEC regulations. Many of our staff have authored or co-authored technical papers on the subject of reserves related topics. We

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 22 -


  

Eni S.p.A.
February 23, 2010
Page 7

encourage our staff to maintain and enhance their professional skills by actively participating in ongoing continuing education.

Prior to becoming an officer of the Company, Ryder Scott requires that staff engineers and geoscientists have received professional accreditation in the form of a registered or certified professional engineer’s license or a registered or certified professional geoscientist’s license, or the equivalent thereof, from an appropriate governmental authority or a recognized self-regulating professional organization.

We are independent petroleum engineers with respect to Eni. Neither we nor any of our employees have any interest in the subject properties and neither the employment to do this work nor the compensation is contingent on our estimates of reserves for the properties which were reviewed.

The results of this study, presented herein, are based on technical analysis conducted by teams of geoscientists and engineers from Ryder Scott. The professional qualifications of the undersigned, the technical person primarily responsible for overseeing, reviewing and approving the evaluation of the reserves information discussed in this report, are included as an attachment to this letter.

Terms of Usage

The results of our third party study, presented in report form herein, were prepared in accordance with the disclosure requirements set forth in the SEC regulations and intended for public disclosure as an exhibit in filings made with the SEC by Eni.

We have provided Eni with a digital version of the original signed copy of this report letter. In the event there are any differences between the digital version included in filings made by Eni and the original signed report letter, the original signed report letter shall control and supersede the digital version.

The data and work papers used in the preparation of this report are available for examination by authorized parties in our offices. Please contact us if we can be of further service.

 

  Very truly yours,
HGA/sm

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 23 -


  

 

 

Professional Qualifications
Herman G. Acuña

The conclusions presented in the report issued on February 23, 2010 for Eni S.p.A are the result of technical analysis conducted by teams of geoscientists and engineers from Ryder Scott Company, L.P. Herman G. Acuña was the primary technical person responsible for overseeing the independent estimation of the reserves, future production and income to render the audit conclusions of that report.

Mr. Acuña, an employee of Ryder Scott Company L.P. (Ryder Scott) since 1997, is a Managing Senior International Vice President and serves as an Engineering Group Coordinator responsible for coordinating and supervising staff and consulting engineers of the company in ongoing reservoir evaluation studies worldwide. Before joining Ryder Scott, Mr. Acuña served in a number of engineering positions with Exxon. For more information regarding Mr. Acuña’s geographic and job specific experience, please refer to the Ryder Scott Company website at
www.ryderscott.com/Experience/Employees.

Mr. Acuña earned a Bachelor (Cum Laude) and a Masters (Magna Cum Laude) of Science degree in Petroleum Engineering from The University of Tulsa in 1987 and 1989 respectively. He is a registered Professional Engineer in the State of Texas, a member of the Association of International Petroleum Negotiators (AIPN) and the Society of Petroleum Engineers (SPE).

In addition to gaining experience and competency through prior work experience, the Texas Board of Professional Engineers requires a minimum of fifteen hours of continuing education annually, including at least one hour in the area of professional ethics, which Mr. Acuña fulfills. As part of his 2009 continuing education hours, Mr. Acuña attended over 34 hours of formalized training and conferences including 10 hours dedicated to the subject of the definitions and disclosure guidelines contained in the United States Securities and Exchange Commission Title 17, Code of Federal Regulations, Modernization of Oil and Gas Reporting, Final Rule released January 14, 2009 in the Federal Register. In 2009, Mr. Acuña taught various company reserves evaluation schools in Argentina, Bolivia, China, Spain, U.S.A and Venezuela. Mr. Acuña has participated in various capacities in reserves conferences such as being a panelist a the 2008 Trinidad and Tobago’s Petroleum Conference, delivering the reserves evaluation seminar during IAPG convention in Mendoza, Argentina in 2006 and chairing the first Reserves Evaluation Conference in the Middle East in Dubai, U.A.E in 2006.

Based on his educational background, professional training and 20 years of practical experience in petroleum engineering and the estimation and evaluation of petroleum reserves, Mr. Acuña has attained the professional qualifications as a Reserves Estimator and Reserves Auditor set forth in Article III of the "Standards Pertaining to the Estimating and Auditing of Oil and Gas Reserves Information" promulgated by the Society of Petroleum Engineers as of February 19, 2007.

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 24 -


  

 

PETROLEUM RESERVES DEFINITIONS

As Adapted From:
RULE 4-10(a) of REGULATION S-X PART 210
UNITED STATES SECURITIES AND EXCHANGE COMMISSION (SEC)

 

 

PREAMBLE

On January 14, 2009, the United States Securities and Exchange Commission (SEC) published the "Modernization of Oil and Gas Reporting; Final Rule" in the Federal Register of National Archives and Records Administration (NARA). The "Modernization of Oil and Gas Reporting; Final Rule" includes revisions and additions to the definition section in Rule 4-10 of Regulation S-X, revisions and additions to the oil and gas reporting requirements in Regulation S-K, and amends and codifies Industry Guide 2 in Regulation S-K. The "Modernization of Oil and Gas Reporting; Final Rule", including all references to Regulation S-X and Regulation S-K, shall be referred to herein collectively as the "SEC Regulations". The SEC Regulations take effect for all filings made with the United States Securities and Exchange Commission as of December 31, 2009, or after January 1, 2010. Reference should be made to the full text under Title 17, Code of Federal Regulations, Regulation S-X Part 210, Rule 4-10(a) for the complete definitions, as the following definitions, descriptions and explanations rely wholly or in part on excerpts from the original document (direct passages excerpted from the aforementioned SEC document are denoted in italics herein).

Reserves are those estimated remaining quantities of petroleum which are anticipated to be economically producible, as of a given date, from known accumulations under defined conditions. All reserve estimates involve some degree of uncertainty. The uncertainty depends chiefly on the amount of reliable geologic and engineering data available at the time of the estimate and the interpretation of these data. The relative degree of uncertainty may be conveyed by placing reserves into one of two principal classifications, either proved or unproved. Unproved reserves are less certain to be recovered than proved reserves and may be further sub-classified as probable and possible reserves to denote progressively increasing uncertainty in their recoverability. Under the SEC Regulations as of December 31, 2009, or after January 1, 2010, a company may optionally disclose estimated quantities of probable or possible oil and gas reserves in documents publicly filed with the Commission. The SEC Regulations continue to prohibit disclosure of estimates of oil and gas resources other than reserves and any estimated values of such resources in any document publicly filed with the Commission unless such information is required to be disclosed in the document by foreign or state law as noted in §229.1202 Instruction to Item 1202.

Reserves estimates will generally be revised as additional geologic or engineering data become available or as economic conditions change.

Reserves may be attributed to either natural energy or improved recovery methods. Improved recovery methods include all methods for supplementing natural energy or altering natural forces in the reservoir to increase ultimate recovery. Examples of such methods are pressure maintenance, natural gas cycling, waterflooding, thermal methods, chemical flooding, and the use of miscible and immiscible displacement fluids. Other improved recovery methods may be developed in the future as petroleum technology continues to evolve.

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 25 -


  

PETROLEUM RESERVES DEFINITIONS
Page 2

Reserves may be attributed to either conventional or unconventional petroleum accumulations. Petroleum accumulations are considered as either conventional or unconventional based on the nature of their in-place characteristics, extraction method applied, or degree of processing prior to sale. Examples of unconventional petroleum accumulations include coalbed or coalseam methane (CBM/CSM), basin-centered gas, shale gas, gas hydrates, natural bitumen and oil shale deposits. These unconventional accumulations may require specialized extraction technology and/or significant processing prior to sale.

Reserves do not include quantities of petroleum being held in inventory.

Because of the differences in uncertainty, caution should be exercised when aggregating quantities of petroleum from different reserves categories.

RESERVES (SEC DEFINITIONS)

Securities and Exchange Commission Regulation S-X §210.4-10(a)(26) defines reserves as follows:

Reserves. Reserves are estimated remaining quantities of oil and gas and related substances anticipated to be economically producible, as of a given date, by application of development projects to known accumulations. In addition, there must exist, or there must be a reasonable expectation that there will exist, the legal right to produce or a revenue interest in the production, installed means of delivering oil and gas or related substances to market, and all permits and financing required to implement the project.

Note to paragraph (a)(26): Reserves should not be assigned to adjacent reservoirs isolated by major, potentially sealing, faults until those reservoirs are penetrated and evaluated as economically producible. Reserves should not be assigned to areas that are clearly separated from a known accumulation by a non-productive reservoir (i.e., absence of reservoir, structurally low reservoir, or negative test results). Such areas may contain prospective resources (i.e., potentially recoverable resources from undiscovered accumulations).

PROVED RESERVES (SEC DEFINITIONS)

Securities and Exchange Commission Regulation S-X §210.4-10(a)(22) defines proved oil and gas reserves as follows:

Proved oil and gas reserves. Proved oil and gas reserves are those quantities of oil and gas, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible—from a given date forward, from known reservoirs, and under existing economic conditions, operating methods, and government regulations—prior to the time at which contracts providing the right to operate expire, unless evidence indicates that renewal is reasonably certain, regardless of whether deterministic or probabilistic methods are used for the estimation. The project to extract the hydrocarbons must have commenced or the operator must be reasonably certain that it will commence the project within a reasonable time.

(i) The area of the reservoir considered as proved includes:

(A) The area identified by drilling and limited by fluid contacts, if any, and

 

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 26 -


  

PETROLEUM RESERVES DEFINITIONS
Page 3

(B) Adjacent undrilled portions of the reservoir that can, with reasonable certainty, be judged to be continuous with it and to contain economically producible oil or gas on the basis of available geoscience and engineering data.

(ii) In the absence of data on fluid contacts, proved quantities in a reservoir are limited by the lowest known hydrocarbons (LKH) as seen in a well penetration unless geoscience, engineering, or performance data and reliable technology establishes a lower contact with reasonable certainty.

PROVED RESERVES (SEC DEFINITIONS) CONTINUED

(iii) Where direct observation from well penetrations has defined a highest known oil (HKO) elevation and the potential exists for an associated gas cap, proved oil reserves may be assigned in the structurally higher portions of the reservoir only if geoscience, engineering, or performance data and reliable technology establish the higher contact with reasonable certainty.

(iv) Reserves which can be produced economically through application of improved recovery techniques (including, but not limited to, fluid injection) are included in the proved classification when:

(A) Successful testing by a pilot project in an area of the reservoir with properties no more favorable than in the reservoir as a whole, the operation of an installed program in the reservoir or an analogous reservoir, or other evidence using reliable technology establishes the reasonable certainty of the engineering analysis on which the project or program was based; and

(B) The project has been approved for development by all necessary parties and entities, including governmental entities.

(v) Existing economic conditions include prices and costs at which economic producibility from a reservoir is to be determined. The price shall be the average price during the 12-month period prior to the ending date of the period covered by the report, determined as an unweighted arithmetic average of the first-day-of-the-month price for each month within such period, unless prices are defined by contractual arrangements, excluding escalations based upon future conditions.

 

 

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 27 -


  

 

RESERVES STATUS DEFINITIONS AND GUIDELINES

As Adapted From:
RULE 4-10(a) of REGULATION S-X PART 210
UNITED STATES SECURITIES AND EXCHANGE COMMISSION (SEC)

and

PETROLEUM RESOURCES MANAGEMENT SYSTEM (SPE-PRMS)
Sponsored and Approved by:
SOCIETY OF PETROLEUM ENGINEERS (SPE),
WORLD PETROLEUM COUNCIL (WPC)
AMERICAN ASSOCIATION OF PETROLEUM GEOLOGISTS (AAPG)
SOCIETY OF PETROLEUM EVALUATION ENGINEERS (SPEE)

 

Reserves status categories define the development and producing status of wells and reservoirs. Reference should be made to Title 17, Code of Federal Regulations, Regulation S-X Part 210, Rule 4-10(a) and the SPE-PRMS as the following reserves status definitions are based on excerpts from the original documents (direct passages excerpted from the aforementioned SEC and SPE-PRMS documents are denoted in italics herein).

DEVELOPED RESERVES (SEC DEFINITIONS)

Securities and Exchange Commission Regulation S-X §210.4-10(a)(6) defines developed oil and gas reserves as follows:

Developed oil and gas reserves are reserves of any category that can be expected to be recovered:

(i) Through existing wells with existing equipment and operating methods or in which the cost of the required equipment is relatively minor compared to the cost of a new well; and

(ii) Through installed extraction equipment and infrastructure operational at the time of the reserves estimate if the extraction is by means not involving a well.

Developed Producing (SPE-PRMS Definitions)

While not a requirement for disclosure under the SEC regulations, developed oil and gas reserves may be further sub-classified according to the guidance contained in the SPE-PRMS as Producing or Non-Producing.

Developed Producing Reserves
Developed Producing Reserves are expected to be recovered from completion intervals that are open and producing at the time of the estimate.

Improved recovery reserves are considered producing only after the improved recovery project is in operation.

 

 

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 28 -


  

RESERVES STATUS DEFINITIONS AND GUIDELINES
Page 2

 

Developed Non-Producing
Developed Non-Producing Reserves include shut-in and behind-pipe reserves.

Shut-In
Shut-in Reserves are expected to be recovered from:

(1) completion intervals which are open at the time of the estimate but which have not yet started producing;
(2) wells which were shut-in for market conditions or pipeline connections; or
(3) wells not capable of production for mechanical reasons.

Behind-Pipe
Behind-pipe Reserves are expected to be recovered from zones in existing wells which will require additional completion work or future re-completion prior to start of production.

In all cases, production can be initiated or restored with relatively low expenditure compared to the cost of drilling a new well.

 

UNDEVELOPED RESERVES (SEC DEFINITIONS)

Securities and Exchange Commission Regulation S-X §210.4-10(a)(31) defines undeveloped oil and gas reserves as follows:

Undeveloped oil and gas reserves are reserves of any category that are expected to be recovered from new wells on undrilled acreage, or from existing wells where a relatively major expenditure is required for recompletion.

(i) Reserves on undrilled acreage shall be limited to those directly offsetting development spacing areas that are reasonably certain of production when drilled, unless evidence using reliable technology exists that establishes reasonable certainty of economic producibility at greater distances.

(ii) Undrilled locations can be classified as having undeveloped reserves only if a development plan has been adopted indicating that they are scheduled to be drilled within five years, unless the specific circumstances, justify a longer time.

(iii) Under no circumstances shall estimates for undeveloped reserves be attributable to any acreage for which an application of fluid injection or other improved recovery technique is contemplated, unless such techniques have been proved effective by actual projects in the same reservoir or an analogous reservoir, as defined in paragraph (a)(2) of this section, or by other evidence using reliable technology establishing reasonable certainty.

 

RYDER SCOTT COMPANY      PETROLEUM CONSULTANTS

- 29 -