[CONSOLIDATION_METHOD_TITLE] [CONSOLIDATION_METHOD]
Related Companies
[]
Related Funds
[]
English
oda_MaterialEventDisclosureGeneralAbstract|
Material Event Disclosure General
oda_UpdateAnnouncementFlag|
Update Notification Flag
Evet (Yes)
oda_CorrectionAnnouncementFlag|
Correction Notification Flag
Hayır (No)
oda_DateOfThePreviousNotificationAboutTheSameSubject|
Date Of The Previous Notification About The Same Subject
01.09.2022
oda_DelayedAnnouncementFlag|
Postponed Notification Flag
Hayır (No)
oda_AnnouncementContentSection|
Announcement Content
oda_ExplanationSection|
Explanations
oda_ExplanationTextBlock|
As part of the capacity expansion works of Taşpınar Wind Power Plant, which has been operating in Korubaşı Municipality, Nilüfer District, Bursa Province since October 2020, 2 Nordex N149 turbines were successfully commissioned on 29.12.2023 with the acceptance by the Ministry. As a result of the acceptance, the number of turbines in Taşpınar WPP has increased to 16 and our power plant has increased its electrical power by 13 MW.

With the 9.4 MWm Taşpınar Hybrid SPP, which was approved by the Ministry on 07.12.2023, the total current installed capacity of our power plant is 88.3951 MWm / 73 MWe.