[CONSOLIDATION_METHOD_TITLE] [CONSOLIDATION_METHOD]
Related Companies
[]
Related Funds
[]
English
oda_MaterialEventDisclosureGeneralAbstract|
Material Event Disclosure General
oda_UpdateAnnouncementFlag|
Update Notification Flag
Evet (Yes)
oda_CorrectionAnnouncementFlag|
Correction Notification Flag
Hayır (No)
oda_DateOfThePreviousNotificationAboutTheSameSubject|
Date Of The Previous Notification About The Same Subject
21.12.2021
oda_DelayedAnnouncementFlag|
Postponed Notification Flag
Hayır (No)
oda_AnnouncementContentSection|
Announcement Content
oda_ExplanationSection|
Explanations
oda_ExplanationTextBlock|

Pursuant to our material event disclosure dated 21.12.2021, EMRA has approved the application of Zorlu Doğal Elektrik Üretimi AŞ, an indirect wholly-owned subsidiary of Zorlu Enerji, to amend the generation license of its Kızıldere 2 GPP for increasing the power plant's installed capacity from 80 MWm / 80 MWe to 91.995 MWm / 80.00 MWe for the purpose of establishing a solar power plant to be integrated to the existing GPP, as a result of which, the facility will operate as a hybrid renewable power plant and generate electricity from both geothermal and solar energy (Main Source: Geothermal + Secondary Source: Solar) and the license has been amended accordingly.


This statement was translated into English for informational purposes. In case of a discrepancy between the Turkish and the English versions of this disclosure statement, the Turkish version shall prevail.