National Storage Mechanism | Additional information
RNS Number : 7773Z
Sound Energy PLC
18 September 2025
 

 

 

The information contained within this announcement is deemed by the Company to constitute inside information pursuant to Article 7 of EU Regulation 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 as amended.  Upon the publication of this announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain.

 

 

18 September 2025


SOUND ENERGY PLC

("Sound Energy", "Sound" or the "Company" and together with subsidiaries the ''Group'')

 

HALF YEARLY REPORT FOR THE SIX MONTHS ENDED 30 JUNE 2025

Sound Energy, the transition energy company, announces its unaudited half-year report for the six months ended 30 June 2025.

 

HIGHLIGHTS

Development of the Moroccan Tendrara Production Concession   

·      Phase 1 Micro LNG (''mLNG'') project (''Phase 1''):

Change of main contract of the mLNG project from vendor financing contract to a traditional Engineering, Procurement and Construction (EPC) contract

Post-period end the Operator, Mana Energy, on behalf of the consortium has finalised a $25 million debt facility from a local bank to fund the above-mentioned change in contract. Sound's share of the facility is $5 million

First gas expected by year-end 2025

 

·      Phase 2 Gas (pipeline) development (''Phase 2'')

The Operator has commissioned an update of the Front-End Engineering & Design (FEED) study and selection of EPC contractor

Energy Transition Business Development

·      Formation of HyMaroc Ltd, a Company established to explore for Natural Hydrogen and Helium in Morocco

·      A binding agreement to create a joint venture Company to produce and sell renewable energy via access to the medium voltage grid in Morocco

 

Exploration

·      Exploration licences are all in the process of extension and renewal

 

 

Graham Lyon, Executive Chairman said:

''The Company is now on the cusp of first revenue generation with Tendrara gas production and a funded second phase project development awaiting FID. It has two funded exploration wells to be drilled and has begun diversification with two exciting new ventures. I would like to thank the Ministries in Morocco and National Office of Hydrocarbons and Mines (ONHYM) our state partner, for their continued co-operation and increased support. I appreciate the proactive approach of Mana Energy to enhance the value at Tendrara. Finally, a thank you to our staff who have continued to drive the Company forward and expand our portfolio opportunity set, and to all our shareholders for their continuing support of the Company and its objectives.''

For further information please visit  https://www.soundenergyplc.com/

 

follow on X @soundenergyplc and LinkedIn

or contact:

 

 

Flagstaff Strategic and Investor Communications

Tim Thompson, Mark Edwards, Alison Allfrey 

 

 

Tel: 44 (0)20 129 1474

[email protected]

Sound Energy

Graham Lyon, Executive Chairman

 

 

[email protected]

  

Zeus- Nominated Advisor and Broker

James Joyce, Gabriella Zwarts (Investment Banking)

Simon Johnson (Corporate Broking)   


Tel:44 (0)20 3829 5000  

 

 

 

STATEMENT FROM THE EXECUTIVE CHAIRMAN

Transformation

The first half of 2025 saw Sound in its new role as minority co-venturer with Mana Energy and the National Office of Hydrocarbons and Mines (ONHYM) in the development of the Tendrara concession. In June, two new initiatives to diversify the Sound portfolio in Morocco were announced, both with experienced partners. Firstly, the formation of HyMaroc Ltd, www.HyMaroc.com , a company established to explore for Natural Hydrogen and Helium in Morocco and secondly a binding agreement to create a joint venture to produce and sell renewable energy via access to the medium voltage grid in Morocco. Leveraging our local knowledge and stakeholder relationships, Sound is now in a diversified position to perform a key role in Morocco's energy growth and transition plans.

Phase 1 Tendrara Micro LNG Project (mLNG) 

The Micro-LNG project continues to move from design, engineering and construction to installation and commissioning with first gas production now scheduled for Q4 2025. Mana Energy as Operator has enhanced the former Sound Energy local team with additional specific project delivery resources. The main contract with Italfluid GeoEnergy S.r.l (Italfluid) has been changed from a vendor financing contract to a traditional Engineering, Procurement and Construction (EPC) contract with commensurate reduction in daily operating costs. This has only been possible with the support of Mana Energy's financial capacity. Attijariwafa Bank has provided a $25 million debt facility to Mana Energy on behalf of the consortium to fund this contract conversion. Sound's share of this facility is $5 million.  Sound continues to support the Operator with certain services; however, it is recognised that Mana Energy is using its considerable Project delivery capacity to achieve first gas by year-end 2025.

ESG

Following the transfer of operatorship to Mana Energy, Sound Energy's Environmental, Social and Governance (ESG) commitments and activities associated with the Tendrara operations have been handed over to Mana Energy. Mana Energy continues to operate in an environmentally responsible manner and to support the local community. Governance continues to be a focus for the organisation, overseen by the Board of Directors. ESG related processes and commitments are core to Sound Energy's values and will be included in all new business opportunities. ESG remains at our core despite non-operator emissions attributable to Sound being de-minimis.

It is to our great sadness that our Health, Safety, Security and Environmental (HSSE) Manager, Sean Gallagher, passed away unexpectedly in July 2025 following a routine hospital operation. Sean was a much respected, liked and admired member of the Sound executive team at the Tendrara development with a wealth of experience in HSSE matters and extensive practical handling of risk management with 23 years' experience in the oil and gas industry. He will be sorely missed by all his colleagues.

Phase 2 Tendrara Processing and Pipeline Project 

The pipeline project has not progressed as promptly as Sound would have liked this year, however updating of the Front-End Engineering & Design (FEED) study and selection of EPC contractor, which remains the key outstanding CP for the debt closure, is now in the hands of the Mana Energy procurement team who have commissioned this work. Results of the FEED update is due this year such that Final Investment Decision (FID) can be taken thereafter.

Exploration

The Company and ONHYM have previously proposed extensions to the Anoual licence to the relevant Ministries and we continue to await approval. Similarly, Sound is in continued exclusive discussions with ONHYM for the Grand Tendrara licence through Operator Mana Energy and directly for Sidi Moktar Onshore licence. Sound Energy's costs are to be carried by Managem SA for the SBK-1 structure well and M5 exploration wells as per terms of the farm-out transaction. We continue to push for optimal licence terms and instigation of exploration drilling.

Corporate 

During the period Sound continued to optimise its costs. Zeus was appointed as NOMAD alongside its role as Corporate broker. Sound's former CFO resigned to pursue other opportunities, and the company hired Andy Matharu, a very experienced corporate financier with strong background in Petroleum Engineering to succeed as CFO. Andy joined the Company full time as of 1st September 2025, corporate balance sheet restructuring being his current primary focus. The company continues to engage with stakeholders and has held several live Q&A sessions.  The AGM was held on 17th June with all resolutions supported by shareholders.

Board

Mohammed Seghiri resigned as COO from the Company and the Board to join Managem SA, providing continuation of operations in Morocco. We thank Mohammed for his 8 years of service to Sound Energy.

 

Graham Lyon

Chairman (Executive)

 

OPERATIONS REVIEW

Tendrara Development

Sound Energy is pursuing the Field Development Plan underpinning the Tendrara Concession centred around the TE-5 Horst gas discovery. The development is progressing in two phases. Phase 1, the mLNG production scheme provides gas to industrial consumers. The planned Phase 2 pipeline development provides gas to power the state energy power stations. Phase 2 is centred around the installation of a 120km gas export pipeline to help fully unlock the gas potential of this region and lower the cost of development for future discoveries. Both phases address different markets in Morocco - the industrial energy user and the state power producer, both of which have strong and growing demand, with Tendrara gas playing an important role in supporting Morocco's strategy to lower carbon emissions. As Morocco continues to grow both industrially and domestically and as other fuel sources become scarcer in-country, there is opportunity to supply more of the energy mix. Morocco's imports of natural gas from Spain through the GME pipeline rose again in 2024.  In 2023 Morocco imported 9,4721 GWh (approximately 0.965 BCM, 30.5 Bcf) of natural gas from Spain and in 2024 imports increased to 9,7031 GWh (approximately 0.886 BCM, 31.3 Bcf).  In the first five months of 2025, imports have risen by 7% compared to the same period in 20241.

Progress of the Phase 1 Development Project mLNG

This first phase focuses on the existing TE-6 and TE-7 wells of the TE-5 Horst. First gas will be achieved by tying the currently suspended TE-6 and TE-7 gas wells with flowlines connected to the inlet of a skid mounted, combined gas processing and mLNG plant. Production from both wells will meet the 10 mmcf/d sales gas volume.

In 2021, the Company entered into a lease contract with Italfluid for the design, construction, commissioning, operation, and maintenance of the mLNG facilities under a 10-year lease arrangement. The mLNG facilities, which will also treat, and process raw gas produced from the wells prior to liquefaction, is the principal part of the surface facilities required to be built and operated as part of this first phase of development. Also in 2021, the Company entered into a Sale and Purchase Agreement with Afriquia Gaz to offtake the LNG produced.  The LNG will be delivered to on-site storage from the outlet of the mLNG facilities whereupon Afriquia Gaz will lift and take title for LNG for transportation, distribution and sale to the Moroccan industrial market.

Groundworks for the construction of the mLNG facility commenced March 2022 following completion of surveying and remediation works to the access road for the facility.  The raised foundation platform for the LNG storage tank, and pads for the skid mounted units, including the compressor package, were completed in 2023 along with the necessary piping and cabling for the firefighting system which have been installed along with fencing and lighting towers.  During 2024, installation of the necessary insulation and construction of the outer and inner tank shells of the tank commenced and were completed in 2025.  Facilities engineering and manufacturing continued to progress with major vendors under the Italfluid contract.  In 2023 the Company selected Gas to Liquid Equipment (GLE) to provide engineering and procurement services for the flowline system and associated well head facility equipment for the gas gathering system to transport the gas from the well heads to the mLNG plant.  During the first half of 2025 the necessary equipment packages for the gas gathering system were delivered to site and the groundworks completed.   

In 2024, works to convert TE-6 and TE-7 wells from appraisal gas wells into long term gas producers were successfully completed, replacing the carbon steel production tubing with corrosion resistant steel. The wells were opened up in 2025, tested successfully flowing gas with no water.

During 2024, the equipment packages for the gas plant were completed and tested in the workshops, brought from workshops located around the world and delivered to site via the main ports in Morocco. 

In March 2025, the Company announced that the mLNG project main contractor, Italfluid, and the operator of the Tendrara Production Concession had agreed to amend their contractual arrangement by terminating the vendor financed lease agreement entered into in 2020 and entering into an EPC contract. The parties are currently in advanced discussions to agree an operations and maintenance contract. Throughout 2025 the equipment packages are being assembled on site in preparation for plant commissioning and activation in the remaining quarter of the year.

 

1 https://www.cores.es/sites/default/files/archivos/estadisticas/gas-exports.xlsx All gas data from Corporación de Reservas Estratégicas de Productos Petrolíferos under the aegis of the Spanish Ministry for the Ecological Transition and the Demographic Challenge

 

 

Progress of the Phase 2 Development Project

Based upon current development capital estimates, the funding arising from Managem SA combined with the previously announced project debt financing from Attijariwafa Bank will provide Sound Energy with funds required to achieve first gas under its Phase 2 Tendrara Production Concession development plan. 

 

Eastern Morocco

GRAND TENDRARA

- 8 years from October 20182

27.5% interest Non-operated 

Exploration permit

14,411 km2 acreage

ANOUAL

  - 11 years from September 20172

27.5% interest Non-operated 

Exploration permit

8,873 km2


Eastern Morocco Licences

TENDRARA CONCESSION

- 25 years from September 2018

20% interest Non-operated 

Production permit

133.5 km2 acreage

 

Exploration

Our Eastern Morocco Licences comprising the Concession together with the Anoual and Grand Tendrara exploration permits are positioned in a region containing a potential extension of the established petroleum plays of the Algerian Triassic Province and Saharan Hercynian Platform. The presence of the key geological elements of the Algerian Trias Argilo-Gréseux Inférieur or (TAGI) gas play are already proven within the licence areas with the underlying Palaeozoic, representing a significant upside opportunity to be explored.

These licences cover a surface area of over 23,000 square kilometres, but so far only thirteen wells have been drilled, of which six are either located within or local to the Concession. Exploration drilling beyond the region of the Concession has been limited and the Group maintains a portfolio of features identified from previous operators' studies, plus new targets identified by Sound Energy from the recent geophysical data acquisition, subsequent processing and ongoing interpretation studies. These features are internally classified as either prospects, leads or concepts based upon their level of technical maturity and represent potential future exploration drilling targets.

Whilst the Company has strategically prioritised its gas monetisation strategy through the phased development of the TE-5 Horst (Tendrara Production Concession), the Company has also re-evaluated its extensive exploration portfolio within the Grand Tendrara and Anoual exploration permits surrounding the Concession. By integrating the acquired data and learnings from previous drilling campaigns with acquired and reprocessed seismic datasets, the Company has high graded several potential near term subsalt drilling opportunities within the TAGI gas reservoir, the proven reservoir of the TE-5 Horst gas accumulation.

In June 2024, the Company concluded a competitive farm-out process in the under-explored but highly prospective Tendrara Basin in Eastern Morocco. This opportunity provides access to high impact, short term exploration opportunities, in a stable country with very attractive fiscal terms.  By entering into a binding SPA with Managem, the Company has secured the funding of drilling two exploration wells, one on Grand Tendrara and one at Anoual, which each have the potential to be commercialised through the planned infrastructure on Phase 2.  The SPA was completed in December 2024.

 At Grand Tendrara an exploration well is planned on the structure previously drilled by the SBK-1 well in 2000, with an estimated unrisked exploration potential of 140 Bcf gross Pmean Gas Initially in Place (GIIP).  SBK-1 flowed gas to surface during testing in 2000 at a peak rate of 4.41 mmscf/d post acidification but was not tested with mechanical stimulation.  Mechanical stimulation has proven to be a key technology to commercially unlock the potential of the TAGI gas reservoir in the TE-5 Horst gas accumulation and accordingly the Company believes this offers potential to unlock commerciality elsewhere in the basin.

At Anoual a well is planned to be drilled on the M5 prospect located on the Anoual permits, with an estimated unrisked exploration potential of 943 Bcf gross Pmean GIIP. The timing of drilling of both wells are to be agreed with Managem and the Company is providing technical support to the operator on an on-going basis under a Technical Services Agreement.

2 agreed with ONHYM and subject to Ministry of Energy Transition and Sustainable Development approval

 

Southern Morocco

Southern Morocco Licence

SIDI MOKTAR ONSHORE

- 10 years from April 2018

75% interest Operated

Exploration permit

4,712 km2

 

Southern Morocco Exploration

The Sidi Moktar licence is located in the Essaouira Basin, in Southern Morocco. The licence covers a combined area of 4,712 km2. The Group views the Sidi Moktar licences as an exciting opportunity to explore high impact prospectivity within the sub-salt Triassic and Palaeozoic plays in the underexplored Essaouira Basin in the West of Morocco.

The Sidi Moktar permit hosts a variety of proven plays. The licence hosts 44 vintage wells drilled between the 1950s and the present day. Previous exploration has been predominantly focused on the shallower post-salt plays. The licence is adjacent to the ONHYM operated Meskala gas and condensate field. The main reservoirs in the field are Triassic aged sands, directly analogous to the deeper exploration plays in the Sidi Moktar licence. The Meskala field and its associated gas processing facility are linked via a pipeline to a state-owned phosphate plant, which produces fertiliser both for domestic and export markets. This pipeline passes across the Sidi Moktar licence. The discovery of the Meskala field proved the existence of a deeper petroleum system in the basin. Specifically, Meskala provides evidence that Triassic clastic reservoirs are effective, proves the existence of the overlying salt seal and gives support for evidence of charge from deep Palaeozoic source rocks. Based on work undertaken by Sound Energy, the main focus of future exploration activity in the licence is expected to be within this deeper play fairway. The Company believes that the deeper, sub-salt Triassic and Palaeozoic plays may contain significant prospective resources, in excess of any discovered volumes in the shallower stratigraphy.

The Company's evaluation of the exploration potential of Sidi Moktar, following an independent technical review, includes a mapped portfolio of sub-salt, Triassic and Palaeozoic leads in a variety of hydrocarbon trap types. Sound Energy is developing a work programme to mature the licence with specific focus on the deeper, sub-salt plays.  The Company believes additional seismic acquisition and processing is required to mature these leads into drillable exploration prospects.

Preparations for this seismic acquisition campaign have commenced with the completion and approval of an Environmental Impact Assessment (EIA) in late 2019.

The Company continues to seek to progress a farm out process for this permit, offering an opportunity to a technically competent partner to acquire a material position in this large tract of prospective acreage. In parallel, the Company continues to engage in dialogue with a number of seismic acquisition and processing contractors for potential services to undertake the survey.

 

Condensed Interim Consolidated Income Statement


Notes

Six months ended

30 June 2025

Unaudited £'000s

Six months ended

 30 June 2024

Unaudited

£'000s

Year ended

     31 Dec 2024

Audited

£'000s

Other income


8

-

-

Impairment loss on development assets and exploration costs

4

-

(122,951)

(122,042)

Gross profit/(loss)


8

(122,951)

(122,042)

Administrative expenses


(1,437)

(1,398)

(4,586)

Group operating loss from continuing operations


(1,429)

(124,349)

(126,628)

Finance revenue


33

9

12

Foreign exchange (loss)/gain


(3,866)

155

2,294

Finance expense


(262)

(903)

(2,302)

Loss for period before taxation from continuing operations


(5,524)

(125,088)

(126,624)

Tax expense


(2)

-

-

Loss for period after taxation from continuing operations


(5,526)

(125,088)

(126,624)

 

Discontinued operations

Loss for the period after tax from discontinued operations

10

-

(23,141)

(24,196)

Total loss for the period


(5,526)

(148,229)

(150,820)

 





Other comprehensive income





Items that may subsequently be reclassified
to profit and loss account:





Foreign currency translation income


51

810

9

Total comprehensive loss for
the period attributable to equity holders
of the parent


(5,475)

(147,419)

(150,811)








Pence

Pence

Pence

Basic and diluted (loss)/profit per share for the period from continuing and discontinued operations attributable to equity holders of the parent

3

(0.27)

(7.50)

(7.48)

Basic and diluted (loss)/profit per share for the period from continuing operations attributable to equity holders of the parent

3

(0.27)

(6.33)

(6.28)

 

 

Condensed Interim Consolidated Balance Sheet


Notes

30 June
2025

Unaudited

£'000s

 30 June

2024

Unaudited

£'000s

 31 Dec

2024

Audited

 £'000s

Non-current assets





Property, plant and equipment

4

12,222

10,135

10,489

Intangible assets

5

13,135

13,846

14,097

Prepayments

6

-

1,367

1,522

Deferred consideration

7

20,082

-

21,045



45,439

25,348

47,153

Current assets





Inventories


390

191

69

Other receivables


2,855

53

3,247

Prepayments


50

43

25

Cash and short term deposits

8

2,831

235

7,895



6,126

522

11,236

Assets of disposal group held for sale

10

-

35,531

-

Total assets


51,565

61,401

58,389

Current liabilities





Trade and other payables


2,137

833

3,665

Lease liabilities


68

31

-



2,205

864

3,665

Liabilities of disposal group held for sale

10

-

5,443

-

Non-current liabilities





Lease liabilities


90

-

-

Loans and borrowings

9

37,647

35,534

37,707



37,737

35,534

37,707

Total liabilities


39,942

41,841

41,372

Net assets


11,623

19,560

17,017

Capital and reserves





Share capital and share premium


41,073

40,050

41,073

Shares to be issued


374

374

374

Warrant reserve


2,071

2,071

2,071

Convertible bond reserve


28

28

28

Foreign currency reserve


1,659

2,704

1,608

Accumulated deficit


(33,582)

(25,667)

(28,137)

Total equity


11,623

19,560

17,017

 


Condensed Interim Consolidated Statement of Changes in Equity

 


Share

capital

£'000s

Share

premium

£'000s

 

Shares to be issued

£'000s

Accumulated

Deficit

£'000s

Warrant

reserve

£'000s

Convertible bond

reserve

£'000s

Foreign currency

reserves

£'000s

Total

equity

£'000s

At 1 January 2025

20,806

20,267

374

(28,137)

2,071

28

1,608

17,017

Total loss for the period

-

-

-

(5,526)

-

-

-

(5,526)

Other comprehensive income

-

-

-

-

-

-

51

51

Total comprehensive loss for the period

-

-

 

-

(5,526)

-

-

51

(5,475)

Share based payments

-

-

-

81

-

-

-

81

At 30 June 2025 (unaudited)

20,806

20,267

374

(33,582)

2,071

28

1,659

11,623

 


Share

capital

£'000s

Share

premium

£'000s

 

Shares to be issued

£'000s

Accumulated

Deficit

£'000s

Warrant

reserve

£'000s

Convertible bond

reserve

£'000s

Foreign currency

reserves

£'000s

Total

equity

£'000s

 

At 1 January 2024

19,631

20,267

374

122,443

2,071

28

1,894

166,708

 

Total loss for the period

-

-

-

(148,229)

-

-

-

(148,229)

 

Other comprehensive loss

-

-

-

-

-

-

810

810

 

Total comprehensive loss for the period

-

-


-

(148,229)

-

-

810

(147,419)

 

Issue of share capital on conversion of bond

300

(148)

-

-

-

-

-

152

 

Share based payments

-

-

-

119

-

-

-

119

 

At 30 June 2024 (unaudited)

19,931

20,119

374

(25,667)

2,071

28

2,704

19,560

 










 










 

 

 

 

 

Share capital

£'000s

 

Share premium

£'000s

 

Shares to be

issued

£'000s

 

Accumulated

Surplus/

(deficit)

£'000s

 

Warrant reserve

£'000s

Convertible

Bond reserve

£'000s

Foreign currency reserves

£'000s

 

Total equity

£'000s

At 1 January 2024


19,631

20,267

374

122,443

2,071

28

1,894

166,708

Total loss for the year


-

-

-

(150,820)

-

-

-

(150,820)

Other comprehensive

gain


 

-

 

-

 

-

 

-

 

-

 

-

 

9

 

9

Total comprehensive loss


 

-

 

-

 

-

 

(150,820)

 

-

 

-

 

9

 

(150,811)

Issue of share capital on conversion of bond

 

 

 

1,175

 

-

 

-

 

(554)

 

-

 

-

 

-

 

621

Transfer to profit and loss account on bond conversion to shares


 

 

-

 

 

-

 

 

-

 

 

554

 

 

-

 

 

-

 

 

-

 

 

554

Reclassification to profit and loss account on disposal of subsidiary


 

 

-

 

 

-

 

 

-

 

 

-

 

 

-

 

 

-

 

 

(295)

 

 

(295)

Share-based payments


-

-

-

240

-

-

-

240

At 31 December 2024


20,806

20,267

374

(28,137)

2,071

28

1,608

17,017

 

Condensed Interim Consolidated Statement of Cash Flows


Notes

Six months

ended

30 June

 2025 Unaudited £'000s

Six months

ended

30 June

2024 Unaudited £'000s

Year

ended

31 Dec

2024

Audited

£'000s

Cash flow from operating activities





Cash flow from operations


(2,815)

(191)

(2,352)

Interest received


33

20

23

Tax paid


(2)

-

-

Net cash flow from operating activities


(2,784)

(171)

(2,329)

Cash flow from investing activities





Disposal of subsidiary


-

-

9,236

Capital expenditure


(992)

(1,616)

(4,640)

Exploration expenditure


(242)

(371)

(651)

Prepayment for Phase 1, mLNG Project


-

-

(143)

Net cash flow from investing activities


(1,234)

(1,987)

3,802

Cash flow from financing activities


 



Net proceeds from borrowings


-

2,046

5,822

Interest payments


(666)

(354)

(1,168)

Loan repayments


-

-

(1,350)

Lease payments


(6)

(93)

(124)

Net cash flow from financing activities


(672)

1,599

3,180

Net (decrease)/increase in cash and cash equivalents


(4,690)

(559)

4,653

Net foreign exchange difference


(374)

(345)

226

Cash and cash equivalents at the beginning of the period


7,895

3,016

3,016

Cash and cash equivalents at the end of the period

8

2,831

2,112

7,895


Notes to Statement of Cash Flows

 


Six months

ended

30 June

 2025 Unaudited £'000s

Six months

ended

30 June

2024 Unaudited £'000s

Year

ended

31 Dec

2024

Audited

£'000s

Cash flow from operations reconciliation





Loss before tax from continuing operations


(5,526)

(125,088)

(126,624)

Loss before tax from discontinued operations


-

(23,141)

(24,196)

Total (loss)/profit for the period before tax


(5,526)

(148,229)

(150,820)

Finance revenue


(33)

(20)

(23)

Increase in inventories


(321)

(717)

(260)

Decrease in short term receivables and prepayments


367

794

803

(Decrease)/increase in accruals and short term payables


(1,529)

585

1,113

Impairment loss on development assets, intangible assets and exploration costs


-

146,425

122,042

Loss on disposal of subsidiary


-

-

23,438

Foreign currency translation loss reclassified from other comprehensive income


-

-

295

Depreciation and amortisation


18

104

128

Share based payments charge


81

119

794

Finance costs and exchange adjustments


4,128

748

138

Cash flow from operations


(2,815)

(191)

(2,352)

There were no non-cash transactions during the period.


Notes to the Condensed Interim Consolidated Financial Statements

1. Basis of preparation

The condensed interim consolidated financial statements do not represent statutory accounts within the meaning of section 435 of the Companies Act 2006. The financial information for the year ended 31 December 2024 is based on the statutory accounts for the year ended 31 December 2024. Those accounts, upon which the auditors issued an unqualified opinion, have been delivered to the Registrar of Companies and did not contain statements under section 498(2) or (3) of the Companies Act 2006.

The condensed interim financial information is unaudited and has been prepared on the basis of the accounting policies set out in the Group's 2024 statutory accounts and in accordance with IAS 34 Interim Financial Reporting as adopted by the United Kingdom.

The seasonality or cyclicality of operations does not impact on the interim financial statements.

Going concern

As at 31 August 2025, the Group's unaudited cash balance was approximately £2.1 million. The Directors have reviewed the Company's cash flow forecasts for the next 12-month period to September 2026. 

The need for additional financing indicates the existence of a material uncertainty, which may cast significant doubt about the Group and Company's ability to continue as a going concern. These condensed interim consolidated financial statements do not include adjustments that would be required if the Company was unable to continue as a going concern. Mana Energy, the Operator of the Tendrara Production Concession (Concession) expect to achieve first gas before the end of 2025. During August 2025, Mana Energy entered into a facility agreement (subject to some conditions precedent), with a local Moroccan bank to fund Phase 1 of the Concession. The facility is intended to finance capital expenditure, for all the partners, attributable to the engineering, procurement and construction contract with the mLNG project main contractor, Italfuid, during 2025. The Company, through its wholly owned subsidiary, Sound Energy Meridja Limited which has a 20% interest in the Concession, is in discussion with Mana Energy to conclude the terms under which the Company will access up to $5.0 million of the facility to fund its share of the capital expenditure. The Company continues to exercise rigorous cost control to conserve cash resources, and the Directors believe that there are several corporate funding options available to the Company, including various debt, equity and equity-linked funding options. The Directors therefore have a reasonable expectation that the Company and the Group will be able to secure the funding required to continue in operational existence for the foreseeable future and have made a judgement that the Group will continue to realise its assets and discharge its liabilities in the normal course of business. Accordingly, the Directors have adopted the going concern basis in preparing the condensed interim consolidated financial statements.


2. Segment information

The Group categorises its operations into three business segments based on Corporate, Exploration and Appraisal and Development and Production. The Group's Exploration and Appraisal activities are carried out in Morocco. The Group's reportable segments are based on internal reports about the components of the Group which are regularly reviewed by the Board of Directors, being the Chief Operating Decision Maker, for strategic decision making and resources allocation to the segment and to assess its performance. The segment results for the period ended 30 June 2025 are as follows:


Segment results for the period ended 30 June 2025


Corporate £'000s

Development & Production £'000s

Exploration & Appraisal £'000s

Total

 £'000s

Other income

-

-

8

8

Impairment loss on development assets and exploration costs

-

-

-

-

Administration expenses

(1,437)

-

-

(1,437)

Operating loss segment result

(1,437)

-

8

(1,429)

Interest revenue

33

-

-

33

Finance costs and exchange adjustments

(4,128)

-

-

(4,128)

Loss for the period before taxation from continuing operations

(5,532)

-

8

(5,524)

 

The segments assets and liabilities at 30 June 2025 are as follows:


Corporate £'000s

Development & Production £'000s

Exploration & Appraisal £'000s

Total

£'000s

Non-current assets

208

32,141

13,090

45,439

Current assets

2,893

3,001

232

6,126

Liabilities attributable to continuing operations

(23,898)

(15,922)

(122)

(39,942)

 

The geographical split of non-current assets at 30 June 2025 is as follows:


UK

£'000s

Morocco

£'000s

Development and production assets

-

12,059

Deferred consideration

-

20,082

Right of use assets

156

-

Fixtures, fittings and office equipment

2

5

Software

37

8

Exploration and evaluation assets

-

13,090

Total

195

45,244

 

Segment results for the period ended 30 June 2024


Corporate £'000s

Development & Production £'000s

Exploration & Appraisal £'000s

Total

 £'000s

Other income

-

-

-

-

Impairment loss on development assets and exploration costs

-

(122,951)

-

(122,951)

Administration expenses

(1,398)

-

-

(1,398)

Operating profit segment result

(1,398)

(122,951)

-

(124,349)

Interest revenue

9

-

-

9

Finance costs and exchange adjustments

(748)

-

-

(748)

Profit for the period before taxation from continuing operations

(2,137)

(122,951)

-

(125,088)

 

The segments assets and liabilities at 30 June 2024 were as follows:


Corporate £'000s

Development & Production £'000s

Exploration & Appraisal £'000s

Total

£'000s

Non-current assets

88

11,483

13,777

25,348

Current assets

288

191

43

522

Liabilities attributable to continuing operations

(23,583)

(12,613)

(202)

(36,398)

The geographical split of non-current assets at 30 June 2024 was as follows:


UK

£'000s

Morocco

£'000s

Development and production assets

-

10,116

Right of use assets

15

-

Fixtures, fittings and office equipment

3

1

Software

60

9

Prepayment

-

1,367

Exploration and evaluation assets

-

13,777

Total

78

25,270

 

Segment results for the year ended 31 December 2024


 

 

Corporate

£'000s

Development

and production

£'000s

Exploration

and appraisal

£'000s

 

 

Total

£'000s

Other income

-

-

-

-

Impairment of development assets and exploration costs

-

(122,042)

-

(122,042)

Administration expenses

(4,586)

-

-

(4,586)

Operating (loss)/profit segment result

(4,586)

(122,042)

-

(126,628)

Interest receivable

12

-

-

12

Finance expense and exchange adjustments

(8)

-

-

(8)

Loss for the before taxation from continuing operations

 

(4,582)

 

(122,042)

 

-

 

(126,624)

 

 

The segments assets and liabilities at 31 December 2024 were as follows:

 


 

 

Corporate

£'000s

Development

and production

£'000s

Exploration

and appraisal

£'000s

 

 

Total

£'000s

Non-current assets

61

28,707

18,385

47,153

Current assets

9,513

1,649

74

11,236

Liabilities attributable to continuing operations

(25,818)

(15,433)

(121)

(41,372)

 

 The geographical split of non-current assets at 31 December 2024 was as follows:


UK

£'000s

Morocco

£'000s

Development and production assets

-

10,485

Fixtures, fittings and office equipment

3

1

Deferred consideration

-

21,045

Software

49

8

Prepayments

-

1,522

Exploration and evaluation assets

-

14,040

Total

52

47,101

 

3. Profit/(loss) per share

The calculation of basic profit/(loss) per Ordinary Share is based on the profit/(loss) after tax and on the weighted average number of Ordinary Shares in issue during the period. The calculation of diluted profit/(loss) per share is based on the profit/(loss) after tax on the weighted average number of ordinary shares in issue plus weighted average number of shares that would be issued if dilutive options and warrants were converted into shares. Basic and diluted profit/(loss) per share is calculated as follows:



30 June

2025

£'000

30 June

2024

£'000

31 December

2024

£'000

Loss after tax from continuing operations

(5,526)

(125,088)

(126,624)

Loss after tax from discontinued operations

-

(23,141)

(24,196)

Total loss after tax from continuing operations

(5,526)

(148,229)

(150,820)

 


million

million

million

Weighted average shares in issue

2,081

1,977

2,017

Dilutive potential ordinary shares

-

-

-

Diluted weighted average number of shares

2,081

1,977

2,017

 


Pence

Pence

Pence

Basic and diluted loss per share from continuing operations

(0.27)

(6.33)

(6.28)

Basic and diluted loss/(profit) per share from discontinued operations

-

(1.17)

(1.20)

Basic and diluted loss per share from continuing operations and discontinued operations

(0.27)

(7.50)

(7.48)

 

 

4. Property, plant and equipment

 


 30 June

 2025

£'000s

 30 June

2024

£'000s

 31 December

2024

 £'000s

 

Cost




 

At start of period

 135,274

158,791

158,791

 

Additions

1,185

2,628

5,260

 

Transfer from prepayments

1,391

-

-

 

Exchange adjustments

(11,526)

1,050

2,023

Derecognition on expiry of lease

-

-

(331)

 

Disposal

-

(192)

(30,469)

 

Transfer to assets of disposal group held for sale

-

(28,482)

-

 

At end of period

126,324

133,795

 135,274

 





 

Impairment and depreciation




 

At start of period

124,785

864

864

 

Charge for period

6

128,260

129,948

 

Exchange adjustments

(10,689)

32

2,393

 

Derecognition on expiry of lease

-

-

(331)

 

Disposal

-

(182)

(8,089)

 

Transfer to assets of disposal group held for sale

-

(5,314)

-

 

At end of period

114,102

123,660

124,785

 

Net book amount

12,222

10,135

 10,489


The Company undertook an assessment of external and internal indicators of impairment as at 30 June 2025 and concluded that there was no indication that the carrying amount of the Company's share of the Tendrara Production Concession was impaired.

 

5. Intangibles


 30 June

 2025

Unaudited £'000s

 30 June

2024

Unaudited

£'000s

 31 December

2024

 Audited

£'000s

Cost




At start of period

14,222

45,964

45,964

Additions

243

427

749

Exchange adjustments

(1,193)

498

334

Disposal

-

-

(32,825)

Transfer to assets of disposal group held for sale

-

(32,721)

-

At end of period

13,272

14,168

14,222

Impairment and Depreciation




At start of period

125

10,962

10,962

Charge for period

12

17,902

16,526

Exchange adjustments

-

269

207

Disposal

-

-

(27,570)

Transfer to assets of disposal group held for sale

-

(28,811)

-

At end of period

137

322

125

Net book amount

13,135

13,846

14,097

 

6. Prepayments

During Q1 2025 Micro-LNG Project main contractor, Italfluid, and the operator of the Tendrara Production Concession agreed to amend their contractual arrangement by terminating the vendor financed lease agreement entered into in 2020 and entering into an engineering, procurement and construction (EPC) contract. As a result, amounts previously reported as non-current prepayment were reclassified to property, plant and equipment.                                    

 

 

7. Deferred consideration


 

30 June

 2025

Unaudited

£'000s

 

30 June

2024

Unaudited

£'000s

 

 31 December

2024

Audited

£'000s





At Start of period

21,045

-

-

Additions

-

-

20,696

Unwinding of discount/change in discount rate

893

-

-

Exchange adjustments

(1,856)

-

349

At end of period

20,082

-

21,045


Deferred consideration relates to future funding to be received by the group from Managem SA, (the purchaser) of the Company's former subsidiary disposed in December 2024. The Company's share of its future expenditure on the Tendrara Production Concession Phase 2 development (Phase 2 development) will be funded by the purchaser up to $24.5 million, the purchaser will also fund the drilling of one exploration well on each of the Anoual and Grand Tendrara licences for up to $2.6 million and $3.6 million, respectively, and pay to the group $1.5 million upon achieving first gas on the Phase 2 development. The Company calculated the deferred consideration after taking account of the expected timing of receipt of the various elements of the deferred consideration based on current estimates of the timing of the operations and applied a discount rate of 10.24% (2024: 10.55%).

 

8. Cash and cash equivalents

For the purposes of the condensed interim consolidated statement of cash flows, cash and cash equivalents comprise the following as at 30 June 2025.


 

30 June

 2025

Unaudited

£'000s

 

30 June

2024

Unaudited

£'000s

 

 31 December

2024

Audited

£'000s





Cash and short term deposits

2,831

235

7,895

Cash and short term deposits attributable to discontinued operations

-

1,877

-


2,831

2,112

7,895

 


9. Loans and borrowings


 

30 June

 2025

Unaudited

£'000s

 

30 June

2024

Unaudited

£'000s

 

 31 December

2024

Audited

£'000s

Non-current liability




Secured bonds

23,184

21,964

21,950

Loan note- Afriquia

14,108

12,613

15,433

Convertible bonds

355

957

324


37,647

35,534

37,707


The Company has €25.32 million secured bonds (the "Secured Bonds"). The Secured Bonds mature on 21 December 2027. The Secured Bonds bear 2% cash interest paid per annum until maturity and 3% interest per annum to be paid at redemption. In 2021, the Company issued to the Bondholders 99,999,936 warrants to subscribe for new ordinary shares in the Company at an exercise price of 2.75 pence per share. The warrants expire on 21 December 2027. The Bonds are secured on the issued share capital of Sound Energy Morocco South Limited. After taking account of the terms of the Bonds, the effective interest is approximately 6.5%.                                                                                       

The Company has a $18.0 million 6% secured loan note facility with Afriquia Gaz maturing in December 2033 (the ''Loan''). The drawn down principal bears 6% interest per annum payable quarterly, but was deferred and capitalised semi-annually, until the second anniversary of the issue of Notice to Proceed. Repayment of interest that is not deferred commenced in Q2 2024. The principal and deferred interest will be repayable annually in equal instalments commencing December 2028. The Loan is secured on the issued share capital of Sound Energy Meridja Limited. The weighted effective interest on the drawdowns made is approximately 6.2%.

The Company has outstanding interest of £0.6 million accrued on previously issued convertible bonds that were converted to equity and £0.25 million being the principal amount that was then outstanding repaid in December 2024.  The carrying amount of the deferred interest is stated at fair value and is measured using the discounted cashflow method. A discount rate of 17.4% was used to discount the outstanding deferred interest over the term of the liability.

           

10. Discontinued operations

On 14 June 2024, the Company announced that it had entered into a binding sale and purchase agreement with Managem SA for the disposal of SEME that owns:

·      55% interest in the Tendrara Production Concession, including the liability for payments arising from the Schlumberger net profit interest (NPI) agreement (pursuant to the acquisition of Schlumberger Silk Route Services Limited in 2021);

·      47.5% interest in the Grand Tendrara licence; and

·      47.5% interest in the Anoual licence.

 

The consideration for the sale (which completed in December 2024) comprised:

·      Back costs (expenditure on the licences) from 1 January 2022 to completion date;

·      Tendrara Production Concession Phase 2 carry of up $24.5 million;

·      Anoual licence carry on one well, $2.6 million;

·      Grand Tendrara licence carry on one well, $3.6 million;

·      On achieving Phase 2 first gas, $1.5 million.

 

The results of discontinued operations for the period are presented below.

 


 

Six months

ended

30 June 2025

Unaudited

£'000s

Six months

ended

30 June

2024

Unaudited

£'000s

 

 

Year ended

31 December

2024

Audited

£'000s

Other income

-

-

-

Impairment of tangible and intangible assets

-

(23,107)

-

Gross loss

-

(23,107)

-

Administrative costs

-

(140)

(563)

Operating loss from discontinued operations

-

(23,247)

(563)

Finance revenue

-

11

11

Foreign exchange loss

-

(71)

(76)

Finance costs recovery/(expense)

-

166

165

Foreign currency translation loss reclassified from other comprehensive income

-

-

(295)

Loss on disposal of subsidiary

-

-

(23,438)

Loss for the period before taxation from discontinued operations

-

(23,141)

(24,196)

Tax expense

-

-

-

Loss for the period after taxation from discontinued operations

-

(23,141)

(24,196)

 


The major classes of assets and liabilities of the discontinued operations classified as held for sale as at 30 June 2024 are as follows:


 

30 June 2024

Unaudited

£'000s



Assets




Property, plant and equipment

23,168



Intangible assets

3,910



Prepayments

4,278



Inventories

1,441



Other receivables

857



Cash and short term deposits

1,877



Assets of disposal group held for sale

35,531



Liabilities




Trade and other payables

4,002



Tax liabilities

1,441



Liabilities of disposal group held for sale

5,443



Net assets

30,088



 

The net cash flows of the discontinued operations were as follows:

 


 

Six months

ended

30 June 2025

Unaudited

£'000s

Six months

ended

30 June

2023

Unaudited

£'000s

 

 

Year ended

31 December

2024

Audited

£'000s

Net cash flow from operating activities

-

1,581

(816)

Net cash flow from investing activities

-

(1,361)

9,236

Net cash flow from financing activities

-

-

-

Net cash inflow/(outflow)

-

220

8,420

 


11. Post balance sheet events

In August 2025, the joint operations Operator of the Concession, Mana Energy, on behalf of the consortium finalised a $25 million debt facility from a local bank to partially fund mLNG project capital expenditure. The Company, through its wholly owned subsidiary, Sound Energy Meridja Limited which has a 20% interest in the Concession, is in discussion with Mana Energy to conclude the terms under which the Company will access up to $5.0 million of the facility.

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
IR PKOBKOBKDFCD