[CONSOLIDATION_METHOD_TITLE] [CONSOLIDATION_METHOD]
Related Companies
[]
Related Funds
[]
English
oda_MaterialEventDisclosureGeneralAbstract|
Material Event Disclosure General
oda_UpdateAnnouncementFlag|
Update Notification Flag
Hayır (No)
oda_CorrectionAnnouncementFlag|
Correction Notification Flag
Hayır (No)
oda_DateOfThePreviousNotificationAboutTheSameSubject|
Date Of The Previous Notification About The Same Subject
-
oda_DelayedAnnouncementFlag|
Postponed Notification Flag
Hayır (No)
oda_AnnouncementContentSection|
Announcement Content
oda_ExplanationSection|
Explanations
oda_ExplanationTextBlock|

Within the scope of Regulation on Electricity Storage Facilities in the electricity market dated on 19.11.2022, Naturel Batarya Sistemleri ve Enerji Yatırımları A.Ş. which is a 100% subsidiary of Naturel Yenilenebilir Enerji Ticaret A.Ş. has applied to  EMRA (Energy Market Regulatory Authority) for 2 seperate Battery Operated Solar Power Plant to establish a Solar Power Generation Plant with a total power of 150 MWm / 100 MWe and to establish battery electric storage facility with a capacity of 100 MWh integrated into these power plants dated on 02.12.2022(today)

The total capacity of Naturel Yenilenebilir Enerji and its subsidiaries is targeted to reach a total installed capacity of 1.352,53 MWp and 720 MWh electricity storage capacity with the already in operation SPPs and along with the pre-license applications to the relevant institutions.

It is respectfully announced to the public and our investors.

This statement has been translated into English for informational purposes. In case of a discrepancy between the Turkish and the English versions of this disclosure statement, the Turkish version shall prevail.